Professional Documents
Culture Documents
OPERATION DEPARTMENT
SOOT BLOWERS AVAILABILITY/OPERATION DETAILS
Sl
No
1
2
3
4
5
6
7
Description
Wall Blowers: Available (No.)
Frequency of Operation of W.B
No. of blowers operated daily
(W.B)
LRSB: Available (No.)
Frequency of Operation of LRSB
No. of blowers operated /date
(LRSB)
APH Soot Blowers: Available (No.)
Total
(Nos.
Installed)
64
Once in each
shift
UNIT-1
UNIT-2
64+64+64
56
daily as per
scheduled
16+18+12
(46 nos)
4
Testing/ Inspection
NonAvailabil
ity, if
any
Frequen
cy of
checkin
g
Checked
Daily
pressure
DC Seal Oil Pumps
2
and discharge
pressure
Date/ Pr
Date
Disch Pr
Ksc
Checked
Twice in
a week
DC Scanner Fan
During
unit SD
Daily
DG Sets
Daily
Dewatering pumps
Daily
Daily
Cable Rooms
Inspection
Daily
Date
Disch Pr
Ksc
Checked
Date
Checked
Date
Checked
Date
Last
Checked
Date
Pressure
At boiler top
in ksc
Last
Checked
Date
U-1
U-2
Sl
No
9
10
Testing/ Inspection
Diesel Fire Fighting
Pumps (FH &
Sprinkler)
Diesel engine driven
booster Pump
(Electrical & Diesel)
NonAvailabil
ity, if
any
Frequen
cy of
checkin
g
Daily
Daily
Date/ Pr
Last
Checked
Date
Last
Checked
Date
U-1
U-2
UNIT-1
UNIT-2
U 1
U-2
REMARKS
Area/syst
em
Hydrant
Spray
Hydrant
Spray
Transform
Tota
l No
3
er
Other
Areas
U-1
Available No
U-2
Remarks
1
1
2
U-1
U-2