OPERATION DEPARTMENT
SOOT BLOWERS AVAILABILITY/OPERATION DETAILS
Sl
No
1
2
3
4
5
6
7
Total
(Nos.
Installed)
Description
Wall Blowers: Available
(No.)
Frequency of Operation of
W.B
No. of blowers operated
daily (W.B)
LRSB: Available (No.)
Frequency of Operation of
LRSB
No. of blowers
operated /date (LRSB)
APH Soot Blowers:
Available (No.)
UNIT-3
UNIT-4
UNIT-5
UNIT-6
88
44 in each
shift
44+44+44
34
twice in
week
12+12 or
15+15
4
Testing/
Inspection
NonAvail
abilit
y, if
any
Frequ
ency
of
checki
ng
Turbine DC Lube
1
Checked
Date
Daily
Twice
in a
week
DC Scanner Fan
weekl
y
Daily
DG Sets
Daily
Dewatering
pumps
Daily
water pr at
furthest &
highest point
Cable Rooms
Inspection
Date/ pr
Daily
Daily
Disch Pr
Ksc
Checked
Date
Disch Pr
Ksc
Checked
Date
Checked
Date
Checked
Date
Last
Checked
Date
Pressure
At boiler
top in
ksc
Last
Checked
U-3
U-4
U-5
U-6
Sl
No
10
Testing/
Inspection
Diesel Fire
Fighting Pumps
(FH & Sprinkler)
Diesel engine
driven booster
Pump (Electrical
& Diesel)
NonAvail
abilit
y, if
any
Frequ
ency
of
checki
ng
Daily
Daily
Date/ pr
Date
Last
Checked
Date
Last
Checked
Date
U-3
U-4
U-5
U-6
Description
CO2 Cylinders ( Stock/Rack)
(Cyl.)
H 2 Cylinders ( Stock/Rack)
(Cyl.)
Hydrogen Driers Availability
(%)
Design
Value
UNIT-3
UNIT-4
UNIT-5
UNIT-6
U-3
U-4
U-5
U-6
REMARKS
DESCRIPTION
Availability of Motor
driven fire Booster pump
Availability of Diesel
driven fire Booster pump
High Velocity Water
Spray (Sprinkler system)
Fire
booster
pump
Fire
booster
pump
Transform
er
Other
Areas
U-3
U-4
U-5
U-6
Remark
s
1
1
8
8
U-3
U-4
U-5
U-6