You are on page 1of 3

SPECIMAN CALCULATION

Constant head method


Considering 3rd set table 01
Collection volume

240ml

Time taken

11.0s

Flow rate

240/11

21.82ml/s

H1

76.1cm

H2

51.7cm

24.4cm

H1-H2

Falling head method


Considering 3rd set table 02
Height of the water column

60 cm

Pressure head (H)

144cm

Ln(H)

4.96

Time taken

86s

Constant head
35.00
30.00
25.00
20.00
q/(mm/s)

Constant head
15.00
10.00
5.00
0.00
20

21

22

23

24

25

26

h1-h2/(cm)

CALCUTATION
From Constant head method
Tan

35/(26.5-20)

Tan = m

5.38

kA/L

5.38

5.38*14.07/4542

0.0167s-1

27

28

29

30

Falling head
5.3
5.2
5.1
5
4.9
Axis Title

4.8

Falling head

4.7
4.6
4.5
4.4
4.3
-30 -10 10 30 50 70 90 110 130 150 170 190 210 230 250
Axis Title

Falling head method


Tan

(4.8-4.3)/(200-90)

0.055

kA/aL

0.055*12.2*197.3/8011.85

0.016s-1

You might also like