Professional Documents
Culture Documents
SYSTEM
24 December 2013
PMI Revision 00
Presentation outline
Introduction to HPBypass
Components of HPBypass System
System Details
24 December 2013
PMI Revision 00
Introduction
To improve flexible operation
Dumping of excess steam to
PMI Revision 00
24 December 2013
PMI Revision 00
24 December 2013
PMI Revision 00
24 December 2013
PMI Revision 00
24 December 2013
PMI Revision 00
24 December 2013
PMI Revision 00
24 December 2013
PMI Revision 00
Interlocks
Opening Generator circuit breaker open.
Turbine trip out.
Manual command for fast opening.
Protection Condenser vacuum too low.
Temp. to high at down stream of H.P. Bypass.
24 December 2013
PMI Revision 00
10
PMI Revision 00
11
Hp bypass control
Hydraulically operated
Steam pressure control
Down steam temperature control
Spray water pressure control.
On -off control
24 December 2013
PMI Revision 00
12
C&I componenets
24 December 2013
PMI Revision 00
13
24 December 2013
PMI Revision 00
14
Interlocks of hp bypass
24 December 2013
PMI Revision 00
15
Stage-2 systems
Hp bypass system
02 nos of control valves
02 nos of temperature control valves
01 no. of spray water isolation valve
Trip closes on
-down steam temperature very high
-vacuum is low
24 December 2013
PMI Revision 00
16
24 December 2013
PMI Revision 00
17
24 December 2013
PMI Revision 00
18
24 December 2013
PMI Revision 00
19
24 December 2013
PMI Revision 00
20
THANK YOU
24 December 2013
PMI Revision 00
21