Project Summary
Organization Details
Company Name
Website address
Gate No.1,
Saki Vihar Road,
Powai, Mumbai,
Maharashtra 400072
http://www.larsentoubro.com/
Supervisor Details
Supervisor Name
Vijaykumar Yadav
Designation
Vijaykumar.yadav@larsentoubro.com
Email address
022-67053360
Project Details
Project Title
Project Duration
22 weeks
1. Objective of work:
a.
b.
c.
d.
e.
f.
2. Motivation
a. Improvements achieved by the fabrication process
b. Design modifications and replacing the older method by the new designed fixture
The desire to achieve the results successfully & also to carry out work, initiate and execute by
Larsen & Toubro Heavy Engineering.
3. Tools required
a. Modification in tungsten electrode as per specific requirement
b. Titanium welding specification
c. Arc Voltage Controller (AVC) machine.