Professional Documents
Culture Documents
Of This Work Taken Into Consideration
Of This Work Taken Into Consideration
Section 7: _____
Date: ________
CHECK OFF the following sheets and assignments among your papers for this project, as you
complete them. ADD YOUR OWN SHEETS AS YOU DO THE TASKS. KEEP ALL PAPERS.
ALL MATERIALS SHOULD BE PREPARED BY THURSDAY, MAY 20, 2010, AND HANDED
IN FOR FINAL CHECKING ON THAT DATE. YOUR FINAL GRADE ON THE PROJECT WILL
BE GIVEN WITH ALL OF THIS WORK TAKEN INTO CONSIDERATION.
____ B. Inquiry Skills Sheet: Making Models and Skills Test A: Basic Process Skills (one
sheet)
____ C. Project Worksheet 2: Making your model more earthquake-resistant [“The Wall”]
(group activity)
____ D. Project Worksheet 1: Drawing your model to scale (with 2 views of your structure
drawn to scale on graph paper)
____ G. Your log of the Sharing Session (photocopied sheet), Log sheet on testing your
model (two times) and Notes on any changes/improvements made to your model
NOTE: ORAL PRESENTATIONS WILL BE MADE AFTER THIS CHECKLIST IS HANDED IN.
YOU WILL HAVE THE GUIDELINES FOR THE ORAL PRESENTATION WITH THIS PACKET
IN ORDER TO PREPARE FOR THE DAY YOU PRESENT TO THE CLASS.