You are on page 1of 6

APPENDIX A: DATA FOR RUNOFFS COEFFICIENTS

APPENDIX B: DATA FOR MAXIMUM RAINFALL RATE

APPENDIX C: DESIGN FLOW COMPUTATION FOR WATER DISTRIBUTION


SYSTEM)

(POPULATION FOR 50-YEAR DESIGN PERIOD)


The first step in designing a water system is to determine the design population of the LA Townhomes.
Since it is a subdivision, the designers computed the population using the number of households. Using the
table below, the average household size was projected.

Year
2002
2003
2004
2005
2006
2007
2008
2009
2010

Population
288
293
298
303
308
313
318
323
328

Population Projection

1.) Arithmetic Method:


P
K=
K

2.) Geometric Method:


K=

ln P
K

328323
= 20102009

ln(328323)
20102009

=5

= 1.609437912

P = Po + KT
lnPt = lnPo + KT
= 328 + (5)(50)
= 578

lnPt = ln328 + (1.609437912)(50)


Pt = 707.03
Therefore Projected Population after
50 yrs. =

578+707 . 03
2

= 643

Design Flow Determination

Projected population = 643 person


Using Level 3: Individual House connection for day demand per household = 100 lcpd
Total Average Daily Demand
ADD = 100(643)
ADD = 64300 L/day
ADD = 0.7442 L/sec
Maximum Daily Demand
MDD = 1.3(ADD)
MDD = 1.3(0.7442)
MDD = 0.96746 L/sec
Peak Hour Demand
PHD = 2.5(ADD)
PHD = 2.5 (0.7442)
PHD= 1.8605 L/sec
For Non-Revenue water (use 15% of ADD)
= 0.15 (ADD)
= 0.15 (0.7442)
= 0.11163
Therefore the design flow is 1.07909 L/sec

APPENDIX D: COST ESTIMATES FOR WATER DISTRIBUTION SYSTEM

Water line estimate (HdPE)


Unit
Sub total
Item Description
Quantity Unit
Cost
Cost
100 mm Diameter (3m)
111 Pcs
1080
119880
50 mm Diameter (3m)
384 Pcs
810.48
311224.32
Tee (50 x 50 x 50 mm)
12 Pcs
469.48
5633.76
Reducer (50 x 100mm)
96 Pcs
279.62
26843.52
Elbow 45 (100 mm)
3 Pcs
226.16
678.48
Elbow 90 (50 mm)
28 Pcs
371.8
10410.4
Gate Valve (100 mm)
48 Pcs
492.36
23633.28
Grand Total Cost
498303.76

Water line estimate (PVC)


Item Description
100 mm Diameter (3m)
63 mm Diameter (3m)
Tee (63 x 63 x 63 mm)
Reducer (63 x 100mm)
Elbow 45 (100 mm)
Elbow 90 (63 mm)

Quantity
111
384
12
96
3
28

Unit
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs

Gate Valve (100 mm)


48 Pcs
Grand Total Cost

Unit Cost
1045
595
315
194
146.34
246
213.166
7

Sub total
Cost
115995
228480
3780
18624
439.02
6888
10232
384438.02

APPENDIX E: COST ESTIMATES FOR STORM DRAINAGE SYSTEM