0% found this document useful (0 votes)
229 views1 page

Process Plan for DEVDATT Industries

This one-page process plan document outlines the inspection procedures for a manufacturing part. It includes sections for inspecting incoming raw materials according to test certificates, in-process inspections every two hours using various measuring instruments, and final inspections of 5 parts before dispatch. The plan provides details on inspection parameters, dimensions, tolerances, measuring tools, and the quality records generated for traceability.

Uploaded by

Teti Azril
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
229 views1 page

Process Plan for DEVDATT Industries

This one-page process plan document outlines the inspection procedures for a manufacturing part. It includes sections for inspecting incoming raw materials according to test certificates, in-process inspections every two hours using various measuring instruments, and final inspections of 5 parts before dispatch. The plan provides details on inspection parameters, dimensions, tolerances, measuring tools, and the quality records generated for traceability.

Uploaded by

Teti Azril
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DEVDATT INDUSTRIES

TITLE : PROCESS PLAN


DOC. NO. : QF/42
CL. NO. : 7.1
Process Plan No:
Part Name:
Part No.:
Drawing No:
Raw Material Chemical Composition

PG. NO. : 01 of 01

Raw Material Physical Composition


Inspection method As per Test Certificate

Sr.
No.

Parameters

Inward Inspection
Dimension
Tolerance

Measuring Instrument

Inspection
Frequency

Quality Record: As per Receipt Inspection Report (05 nos. only)

Op.
No.

Operation
Name

Parameters

In process Inspection
Dimension
Tolerance

Measuring
Instrument

Inspection
Frequency

Quality Record : As per Daily Production & Inspection Report (In every 2 hours)

Sr.
No.

Parameters

Final Inspection
Dimension
Tolerance

Measuring Instrument

Quality Record : As per Pre Dispatch Inspection Report (05 nos. only)
REV. NO.
DATE
PREPARED BY
REV NO:00

Inspection
Frequency

APPROVED BY
REL DATE:01/04/2010

DEVDATT INDUSTRIES 
 TITLE : PROCESS PLAN 
DOC. NO. : QF/42 
CL. NO. : 7.1 
PG. NO. : 01 of 01 
Process Plan No: 
Part Name:

You might also like