No. Process Not conformances. Corrective action Target date Resp. Remarks
number
System correction
1. Radioactive material verified at gate . Two different formats
1
are found. STR/MAT/02 DT. 05.03.2020. No. revision number .
System correction
2 2. Old format 08 09.2017 -. No format number - store
10 Scrap charging Need to address in the system and in Work
3. For Nickel plates there is no evidence for verification of ROH instruction for approval of RM
3 Things gone wrong
and reports.
Different SMS process technology sheet is evidenced and process Things gone wrong .
6 is carried out as per the modified one . This modified one is Need detail of what are
Melting in differs for all the SMS processes and not as per Need to address in the new Technology sheet
20 all the corrective action
Electrical furnace SWIL/TS/SMS/GEN/100 dt. 22.11.2017. with all correction
introduced against new
process
Tramp elements addition are not as per the technical sheet and
certain addition like spar, calcium lime and call dolerite are not
7 address in the technical sheet.
9 30 Rearcing in LRF Chemical composition adjustment is not as per the tech sheet to Need to address in the new Technology sheet Things gone wrong
modified as per the new tech sheet. with all correction
10 40A VOD This process is not addressed in the technical sheet Introduce in Tech sheet
11 40 VD In VD old document are used and two different documents are Need system correction .
available like PRD/05 AND PRD /06
Electrode carried out as per SOP and recorded. Format number actual and
16 70 Need system correction .
conditioning control plan to be verified.
ESR log sheet , and process sheet and PLC control data are
17 80
verified.
Process
No. Process Not conformances. Corrective action Target date Resp. Remarks
number
This process is marked as semi critical characteristics Either introduce statistical data monitoring for
3 Nirova 30-15 heat treatment requirement are not addressed in the work process or product parameters or remove
Heating of semis for hot instruction F/RM/PRD/06 the semi cc
130A
rolling
4 Temperature as per control plan is 1130 - 1150 deg C , where as the Need correction in CP and WI
process temperature is 1120 Dec. Actual is 1115 deg C.
5 Format F/RM/PRD /06 and the register format number is different. Need system correction
Cogging of Billets )100
140
mm RCS) Things gone wrong.
ingot size is referred in control plan as 140 mm where as actual size is 70
6 Need system correction
mm
conditioning of Rolled
9 110B compliance observed . But no recording of results evidenced Need system correction
billets
160
DP test carried out . WI to be corrected.
NDT Inspection of Billets Regarding UT test in work instruction WI/QA/NDT/14 , In material details
11 - UT machine internal for testing , Nirova grade is not addressed
crack.
Nil
12 170 Lime coating No issue.
Final rolling to round Zyglo carried out as per control plan and recorded in record Need system correction in CP , Tech sheet and
15 180
bars of planned size SWIL/F/RM/ZT08/00 but the same is not addressed in control plan WI.
Transfer of bars to HT
17 100C Heat wise and grade wise identified.
shop
Control plan specify both air cool and quench. But any one process to be
followed. Need correction in control plan.
18 Need correction in CP and WI and system. Things gone wrong
Solution treatment annealing is 930- 1030 deg C . Actual is 960 -1120 deg
C . Difference observed.
19 To be corrected in system and CP, WI Things gone wrong
Solution annealing of
200
bars (optional )
Solution annealing process is marked as semi critical characteristics , but
there is no statistical requirement are specified for monitoring and
recording of either process or product parameters. Either introduce statistical data monitoring for
20 process or product parameters or remove
the semi cc
Process
No. number Process Not conformances. Corrective action Target date Resp. Remarks
Feed rate different scale followed. Eg. 3-7 m/min where as the
control instrument is different. Need system correction and shall be
7 compliance with work instruction
240 A
work rest blade thickness 1-3 - how it is selected The procedure to be addressed in the work
8 instruction
Feed rate shown in control instrument is 45 sec where as in Need system correction and shall be
9 control plan/sop specifies met/min. compliance with work instruction
Rough Grinding
Rough Grinding sop does not address the work rest plate height as per control Work instruction to be modified to address
plan. the work rest plate details. Measuring gauge
will be introduced
12 Work rest blade height is not measured and no gauge available.
Daily verification of concentration of coolant is not evidenced. concentration verification shall be introduced
as a part of first off inspection and recorded.
Control plan and work instruction will address
14 the same .
Feed rate different scale followed. Eg. 3-7 m/min where as the Need system correction and shall be
18 control instrument is different.
compliance with work instruction
work rest blade thickness 1-3 - how it is selected how. The procedure to be addressed in the work
19 instruction
Feed rate shown in control instrument is 45 sec where as in Need system correction and shall be
20
control plan/sop specifies met/min. compliance with work instruction
Need system correction
21 SOP 02 does not address the recording details .
work instruction will be modified to address
all the DOE approved parameters with details.
specified only the limited parameters . Where as all the modified Work instruction to be corrected.
22 parameters through DOE including maintanence parameters are
not addressed in the SOP.
sop does not address the work rest plate height as per control Work instruction to be modified to address
240 B Pre final grinding plan. the work rest plate details. Measuring gauge
Work rest blade height is not measured and no gauge available. will be introduced
23
240 B Pre final grinding
Daily verification of concentration of coolant is not evidenced. concentration verification shall be introduced
as a part of first off inspection and recorded.
Control plan and work instruction will address
25 the same .
Feed rate different scale followed. Eg. 3-7 m/min where as the
control instrument is different. Need system correction and shall be
29
compliance with work instruction
work rest blade thickness 1-3 - how it is selected how. The procedure to be addressed in the work
30 instruction
Feed rate shown in control instrument is 45 sec where as in Need system correction and shall be
31 control plan/sop specifies met/min. compliance with work instruction
sop does not address the work rest plate height as per control Work instruction to be modified to address
plan. the work rest plate details. Measuring gauge
34 Work rest blade height is not measured and no gauge available. will be introduced
Rejection material storage is next not accepted material in ZYGLO Rejection /Rework storage area will be re
46
. NEED immediate locate change for further mix up. located with control .
Visual Aid of Mix up test by X Mat SWIL/VA/VS/INS/07/02 is not Visual Aid chart will be displayed at the work Rajneesh/
55 provided at the work station. station Tiwari
R.P. Application & Reference std given as ASTM 388 . SOP to address the master Verification of master sample in UT will be
58 Ultrasonic Testing. sample details with setting parameters. addressed in the SOP and shall be recorded.
Quarantine area and identification and tracebility is not Quarantine area will be identified and the
59 290 respective material will be marked for
evidenced. identification and traceability.
SOP to address all the initial setting parameters with material SOP will address all the setting parameters in
60 grade . the UT machine
Rajneesh/
No check list available as per work instruction WI/VS/QA/13, Colour code check list as per the work Tiwari
61 instruction will be provided at the work
Bundling and packing. station and shall be verified
Material found non conformances are stored in a Rework area Identification and verification check list will be Rajneesh/
63 29.02.2020 Tiwari
and material kept without identification. introduced.
Rajneesh/
Verification of identification and tracebility Tiwari
some bundles are found with identification and tracebility
64 material 21-4N will be included as the part of bundling and 29.02.2020
packing list
Rajneesh/
Tiwari
Work instruction will be provided at the
Transfer to finish good For operation 310 i.e. Transfer to finish good area and dispatch , respective work stations.
67 100 E area and dispatch for which no work instruction is available at the work station. The same will be verified as the part of Daily 29.02.2020
Routine Management during the approval.
Process Audit observation for Processes Mix up test, Colour coding. SWIL Plant 2 - 07.02.2020
No. Process Process Not conformances. Corrective action Target date Resp.
number
Skill matrix will be displayed in the respective
station with operators details and required
1 280 Mix-up Test Operator qualification and skill report report and actual not skill with actual skill 29.02.2020 Manwesh
evidenced at the work station.
Visual Aid of Mix up test by X Mat SWIL/VA/VS/INS/07/02 is not Visual Aid chart will be displayed at the work Rajneesh/ Tiwari
3
provided at the work station. station
Rajneesh/ Tiwari
Colour code check list as per the work
4 290 Colour coding No check list available as per work instruction WI/VS/QA/13, instruction will be provided at the work
Bundling and packing.
station and shall be verified
Material found non conformances are stored in a Rework area Identification and verification check list will be Rajneesh/ Tiwari
6 29.02.2020
and material kept without identification. introduced.
Rajneesh/ Tiwari
Verification of identification and tracebility
Bundling and some bundles are found with identification and tracebility
7 300 will be included as the part of bundling and 29.02.2020
packing material 21-4N
packing list
Rajneesh/ Tiwari
Transfer to Work instruction will be provided at the
finish good For operation 310 i.e. Transfer to finish good area and dispatch , respective work stations.
10 310 29.02.2020
area and for which no work instruction is available at the work station. The same will be verified as the part of Daily
dispatch Routine Management during the approval.