Control Plan
• To learn how to link each step in the Control Plan to the FMEA
Control Plan, Summary
• Sequence Of Events
• Assembly Drawing
• CTQ List
• Process Map
Control Plan
Characteristics Methods
Process Description
M/c,
Corrective Action
Reaction Plan &
Primary Alternate
Process No.
Device,
Product / Measurement Measurement Sample Control Method
Jig, Class
Tools, No Process - Control Control
Product Process
Fixture . Specifications Preventio
/ Tolerance Detectio
for Mfg. MMR L.C. MMR L.C. Size Freq n (Error
n control
Proofing)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
A B C D
Operation Characteristic Methods Reaction Plan
Advanced Product Quality Manual (APQP) Reference Manual, QS-9000
Control Plan
1. Part/Process No. 1 2 3
Identify the process/operation that best describes the activity being addressed
(e.g. work elements)
Identify the processing equipment required. (e.g.. machine, device, jig power
tools, assist arms, conveyors, etc.)
Control Plan
Characteristics
B Characteristics 4 5 6 7
4. Number
Identifies the cross reference number from the applicable documentation.
5. Product Characteristics
Distinguishing features and/or attributes
6. Process Characteristics
Characteristics of the process
Characteristics:
Identify Product and Process characteristics for each Control Plan step
Product Characteristic Process Characteristic
C Method
control (Error
8 9 10 11 12 13 14 15 16
List sample size and frequency to perform evaluation. (eg. size: 4pieces /
frequency: fifth time per shift)
Control Plan
Methods
Primary Alternate
Product / Process - Measurement Measurement Sample Control Method
C Method Specifications /
Tolerance
Control
MMR MMR
Control
L.C. Size Freq
Detection Prevention
control (Error
8 9 10 11 12 13 14 15 16
Examples:
- Check sheets (weld, quality, tool, material, etc) – Variation control charts
– Error/mistake proofing
- Preventative tooling – SPC charts
Control Plan, Reaction Plan
Reaction Plan
D Reaction Plan
& Corrective
Action
17
17. Reaction plan
• Specifies who to inform to make a decision or what to do when a process goes out of
control
-Call supervisor
-Calibrate equipment
Control Plan, Examples
Prototype Pre-Launch Production Key Contac t Person : Dilip Parida Original Dat e: 01.04.2017
Part Desc ription: Moulding (Prod) Plant Approval Sign: Rev. No. / Date: 01 /15.10.2018
C o r r e c ti v e A c t i o n
R e - w o r k / r e c h e c k R&e a c ti o n P l a n &
Part No. / Drg. No.: Generic Core T eam : DP,SP,MS,SD,MKM,PP Cust omer : All
Process N o.
D e s c r i p ti o n
C la s s
Produc t / Measurement Measurement Sample Cont rol Met hod
Jig,
No Proc ess - Control Control
T ools, Produc t Proc ess
. Spec ific ations
e f o r e t a k i n g p r o d u c ti o n
Fixt ure Prevention
m o u l d i n g b o x c o n d i t io n
/ Toleranc e Detec t ion
for Mfg. MMR L.C. MMR L.C. Size Freq (Error
I n s p e c t io n a s p e r s a m p le s iz e &E n s u r e th e p a tt e r n &
c ont rol Proofing)
Daily
before
Free from
1 Patt ern Visual --- --- Onc e taking to
damages et c . productio
correct
n
Patt ern Patt ern should Each
2 Visual --- --- 100%
M o u ld in g B o x , A ir G u n ,
m o u ld in g p r o c e s s c o n t r o l& m o n it o r in g
box
Moulding Each
3 breakage ,prop Visual --- --- 100%
M o u l d M a k in g
P R O D /W I/05
box setup
b
matchplate
Pressure 1Kg/c m
4 Air pressure 6- 8.5 Kg/c m2 --- ---
Gauge 2
60
Each
re p o r t - P R D /F /0 4
C he ck & R e -se t
5 Jolting time 5- 8 Sec . Cloc k 1 Sec --- --- Onc e setup
Sqeezing
6 3- 4 Sec . Cloc k 1 Sec --- ---
time
Mould No breakage
7 Visual --- --- 100% C ont…
c ondit ion /damages
Hardness Hardness
8 70-85 1 --- --- 5%
Vert ic al t est er
Hardness Hardness
9 80-95 1 --- --- 5% Per
Horizontal t est er Batch
Mould 2
10 c oat ing(Opti 13-14 Sec B4 Cup 1 --- --- Onc e
onal) per
01/15.10.2018 Air pressure range inc reased from- 6.0- 6.5 to 6.0- 8.5)
00/ 01.04.2017 New Release
Rev. No. / Dat e Change Det ails summary
Prepared By Approved By
Control Plan, Next steps
FMEA and Control Plans are mandatory for PPAP submission level 3.
Quality Focus Day Workshop
List of acronyms:
+91- 9616498682