Professional Documents
Culture Documents
Draft (Ref - Standard Minimal New Supplier Assesment)
Draft (Ref - Standard Minimal New Supplier Assesment)
Vendor Auditor
Responsible contact
Total score % 75.41
person
Existing Feedback action
certifications plan until
Employees Feedback to
Evaluation Grading
> 85% A Required Action Plan for NCR & Observations
76% ~ 84% B Required Action Plan for NCR & Observations
51% ~ 75% C To re-audit External Provider within 12 months period
< 50% D External Provider required to submit improvement plan and re-audit to be done within 6 months
Comments / Summary :
The result of the audit evaluation show a classification on level C. We trust that Abrasive Engineering Sdn Bhd able to produce our Bolzen and
Haken. Abrasive would be able to improve if the documented processes are pragmatically being implemented (and the written processes are
being lived). Upon receipt of the action plan we are able to judge this accordingly.
The correction action was discussed on the day of the audit and will subsequently be made available as a file. The audited organisation has been
instructed to define sustainable measures for the rectification of the detected weak points, to implement such measures promptly in the operational
practice and to communicate this to the auditor by the defined deadline.
We wish to point out that the processes could only be tested on a random basis in this audit. Additional weak points and/ or potential for
improvement could still exist. It is the duty of the audited divisions to extend the testing and necessary action to similar relevant topics.
In-progress
Yes
Attach certificate
No
Implementation
Findings Corrective action Owner
until
A-3 System established but not fully implemented.
There are no drawing and others documents
distribution to related person or production
personel.
Vendor Auditor
Responsible contact
Total score % 75.41
person
Existing Feedback action
certifications plan until
Employees Feedback to
Evaluation Grading
> 85% A Required Action Plan for NCR & Observations
76% ~ 84% B Required Action Plan for NCR & Observations
51% ~ 75% C To re-audit External Provider within 12 months period
< 50% D External Provider required to submit improvement plan and re-audit to be done within 6 months
Comments / Summary :
In-progress
Yes
Attach certificate
No
Implementation
Findings Corrective action Owner
until
A-3 System established but not fully implemented.
There are no drawing and others documents
distribution to related person or production
personel.
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
1 Is Quality Manual establish and clearly 2 Have procedure. Refer to Non-conformity and
defined? Attach either one procedure, Corrective Action Procedure, Doc. No. : QSP
Customer Complaint, etc. 102
2 Does Quality Policy and Quality Objectives 2 Refer to Quality Policy, Doc. No. :
establish? Please attach.
3 How does documents being control and 1 System established but not fully implemented.
distribute? Internal and external documents? There are no drawing and others documents
(e.g. internal form / control plan / work distribution to related person or production
instruction / customer drawings etc..) Attach personnel.
the Distribution List
4 Do you maintain the latest version of 1 System established but not fully implemented.
A: Quality Management System
documents (drawings / control plan / process Drawing no proper format and numbering. No
flow)? Have the Master List up-to-date? Master List for drawing control. Master List
Please attach. only implement on QM and procedure.
5 Is there any retention time for the control 2 Related records and retention period and
6.3
documents? What is the retention period? Any indicate on Control of Quality Record
guidelines for dispose the records? Show the procedure, Doc. No. : QSP 5
guidelines / procedure.
6 How was the Quality Objectives monitoring? 0 There are no any supporting documents (data
Any document / analysis to support those and graph, etc.) to monitor the Quality
Quality Objectives? KPI? Please attach. Objectives.
7 How long will the internal meeting / production 2 Meeting hold when needed. The person who
meeting be held? Show the Meeting Minutes hold the meeting will doing summary and
record. email to their staff.
8 Are the Document Distribution List contents 0 There are no standard format or form of
information of document title, document Document Distribution List. To create a
number, revision, received by, returned by? Document Distribution List and use it. For
Attach the Document Distribution List. document control purpose.
1 Tunjukan catatan rapat Tinjauan Manajemen 2 Have. Refer to Management Review Minutes
terbaru. Apakah hasil audit, of Meeting attached. Which conducted on
keluhan/tanggapan pelanggan, sasaran mutu, 26th July 2023
status tindakan perbaikan dan pencegahan,
tindak lanjut dari Tinjauan Manajemen
sebelumnya, rekomendasi untuk perbaikan
berkelanjutan telah ditinjau dalam Rapat
Tinjauan Manajemen.
B. Management Responsibility
2 How often, by whom and according to which 2 Internal Audit conduct once a year. (name
specifications are internal audits carried out? auditor). Audit carried out according to
ISO9001 standard and related documents.
Page 9 of 24
B. Management Responsibili
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
3 Is there any internal audit being conducted? 2 Yes. Refer to Audit Summary Report. Dated :
Attach the audit report. 26/07/2022
5 How does the customer satisfaction being 2 Refer to Customer Satisfaction Survey
monitored? Attach the satisfaction reply your attached. Which survey by (PT.. dated :
from customer. 22/11/2023
B. Management Responsibility
6 Do you implement corrective actions for the 2 Refer to Non-conformance Report (Internal
matter directed by the audit? Evidence? Audit), dated : 26/07/2022
7 Attach the Quality Risk Assessment Register. 2 Refer to Risk & Opportunities attached. Doc.
No. : ..
8 How do you promote continual improvement? 1 System established but not fully implemented.
Example : Quality Objectives. No evidence and documents proof that have
any continuous improvement for company and
workers.
1 Is the supplier reliability measured and 2 Refer to Vendor Evaluation, company : ....,
evaluated? Audit conducted? Evidence? dated : 17-Nov-2022
2 Does the training include contract or agency 2 Yes. Training by internal trainer. Refer to
personnel? Evidence? attachment.
C. Resource Management & Training
4 Does the organization have maintain 2 Yes. Refer to Training Plan attached. Year :
appropriate records of education, training and 2022 ~ 2023
skills? Training plan for the employees?
Attach training plan.
5 Are employees regularly informed and trained 2 Have. Train by Work Instruction. Doc. No. :
about environmental protection and on job …..
training? Show the Training record and
Training material / handbook.
Page 10 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
1 Does the organization have detailed capacity 2 According to customer requirement. Based on
planning? (e.g. product planning schedule). customer schedule.
D. Product realization plan
Evidence?
2 When changing process, any documented 2 Yes. Refer to Work Instruction. Doc. No. :
record for the changes? Example : Control BF/TI/1702Rev0. There are no any changes
Plan / Work Instruction? Please show. at the moment.
3 Is the process parameter set according to the 2 Yes. Refer to Work Instruction. Doc. No. : …
process specification? Show the WI / control
plan or related documents.
6.0
D. Product realization plan
4 How do you handling NC / rejected parts? 0 No related documents support. Etc : Rework
Show the related documents. or Sorting record
5 Is there any contingency plan available in the 0 No contingency plan and others related
event of an emergency such as utility documents support. Etc : Incident and Injuries
interruptions, labour shortage, key equipment Occur, Fire Incident.
failure and field return? Attach the
contingency plan.
1 How do you handling customer complaint / 1 System established but not fully implemented.
feedback? Any CAR raise and evidence that No supporting documents to proof. Have
had monitoring and closed? complaint but no fill-up the form no records.
E. Customer Complaint Handling
2 Are all customer complaint recorded? Show 1 No customer complaint and no evidence.
the related documents.
5.0
3 How do you communicate the changes of the 1 Verbally inform only. No evidence show.
order to customers and relevant dept?
1 Is there any recording system establish for 2 Yes. By using Stock Re-position Form.
raw material receiving? Incoming
checksheet? Any evidence?
2 What if nonconforming material is found, how 1 System established but not implemented.
is it managed? Only blank form attached.
F. Raw Material Receiving & Storage.
7.1
Page 11 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
F. Raw Material Receiving & Storage.
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
4 How well is the raw material segregation and 0 There are no system to FIFO control.
identified by part no and FIFO control.
Evidence?
7.1
5 Is there any procedure establish for raw 2 Refer to Control of Material procedure, Doc.
material issuing to production? Show related No. : ….... and using Goods Release Note to
documents. control.
6 Photo the Incoming area, In-process area, 1 Incoming area was messy. Needs to re-
and Finished goods area. arrange properly. Outgoing area was clean
and clear.
7 Do you carry out stock take? Attach the latest 2 Have. Clearly show items, material size, book
stock take. balance qty, actual on hand qty and variance.
1 Is there any incoming inspection for the raw 2 Yes. By using Stock Re-position Form.
material received (Check sheet and
Inspection Standard), to ensure the correct
material received?
Is the inspection being carried out
according to procedure required?
2 Is the 1st piece, middle piece and last piece, 0 No system implemented. No IPQC checking
inspection being practiced during production? during in-process.
Show the inspection checksheet.
3 Is there any part confirmation after machine 0 Have checking but no records.
set-up and approval before mass-production?
Show the evidence or any records.
4 Are the equipment used for measurement 0 Current product mostly check by using visual.
calibrated? No equipments are using.
G. Quality control (In-coming, In-Process & Final Inspection)
5 How do you control if any jig, mould, or 0 Current product mostly check by using visual.
template used for different product model? No equipments are using.
6 Is there any sampling plan used and being 2 Yes. Refer to attachment.
followed? Attach it.
4.5
Page 12 of 24
G. Quality control (In-coming, In-
4.5
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
8 Are all non-conforming products segregated 2 Yes. ID have attach at the lot
and physically identified to prevent their
unintended use ?
9 Are the QC inspectors well trained to do 1 Have training but no proper record.
inspection? Evidence?
10 How do you manage the nonconforming 1 If scrap, just return to customer. No proper
products, are they clearly identified, record.
segregated, disposed, and recorded? Show
the disposed or scrap record.
1 Is the checking equipment / jig proper 0 Caliper,Hight gauge never calibrate. Mostly
controlled? ID / label / rack? Attach jigging checking by visual only.
area.
2 Are all the equipment used for inspection 0 No equipment master list no calibration and
H. Calibration
1 Is there any lot traceability system 2 Yes. Trace by using D/O number.
established? Does the traceability originate
with raw material? Does the lot control reflects
the last process? Show evidence.
3 Are the tests documented and the 0 Have testing but no record.
5.0
corresponding records archived?
4 How was it ensures that all employees are 2 Packing standard follow Incoming Delivery
familiar with the packaging specifications? WI Order packing details.
or versions in different languages? Show it.
Page 13 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
1 Is there any system to determine the 1 System established but no records proof.
disposition of rejected material? Does this
include rework process?
J. Control of Non-conforming Product
3 Does the organisation ensure that product 2 Identified by using Work Order. Work Order
7.5
which does not conform to requirements is will place above the parts until delivery stage.
identified and controlled to prevent its
unintended use or delivery?
4 Is there any system established to evaluate 1 System established but no records proof.
returned parts from customer?
1 Is there any Process Flow Chart or Control 2 Have. Documents for eyes only no attached.
Plan for each individual item?
2 Is each process clearly identified and followed 2 Have. Documents for eyes only no attached.
according to the Process Flow Chart or
Control Plan?
3 Is the Process Flow Chart or Control Plan 2 Have. Approved Sales Manager and above.
checked and approved by authorized
persons?
4 Are the machine parameter setting available 2 Yes. Change and setting by Leader.
for each parts? Who is authorized to change
the parameter settings?
5 Are defined and separated containers 2 Yes. Rework parts - Yellow. OK parts - Green.
available for goods, rework and NG parts? Rejected parts - Red bin.
Page 14 of 24
K. Manufacturing Monitoring & Measurements & Maintenanc
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
8 Show the list of Machinery. (e.g. machine 1 Have machinery but no Machinery List. No
number, machine description, machine model, documents no records.
machine maker, year of purchase)
9 Is there any Work Instruction / S.O.P for 2 Have. Refer to Work Instruction.
manufacturing process, machine set-up &
shut down ?
6.5
10 Who is authorized to stop the production? Is it 2 Production and Manager authorize to stop the
stated in the Job Manual / Job Description? production. Stated at Job Description.
12 Is the tool life being monitored? Show the 0 No tool life monitoring action. No supporting
Tool life Record. document show.
13 Is there any long term capability being 0 No CP/CPK records and parts investigate
calculated? (i.e. SPC ) action.
14 Any compliance of environmental requirement 0 No. Only have ISO9001. current status
such as ISO14001? Attach the certificate. ISO9001:2008. the next audit on Dec'17.
K. Manufacturing Monitoring & Measurements & Maintenance
16 Is there any safety concerned within the 2 All the operator have wearing safety shoe.
organization? Such as Safety Rules,
applicable of PPE, safe handling of chemical
17 Any compliance obligations applicable? Such 0 Not applicable. No product related with
as RoHs compliance, Environmental quality chemical.
act or relevant obligations
1 Is there any system established for 'Stock 1 No minimum stock level control for material.
Level Control'? High risk production will stop if material finish
and no replace new order.
Page 15 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
2 Does packaging and material handling protect 2 Yes. By using pallet stretch film and wrapping.
parts from damage and contamination?
3 Is there any Out-going inspection data 2 Yes. Refer to Outgoing Self Inspection Sheet.
attached to the delivery of finished goods?
How is the controlling method?
L. Finished Goods Storage Control
6 Does the storage layout provides clear 2 Yes. Incoming area very messy.
identification and segregation to prevent
mixture or wrong part being issue?
7 Is there any identification label used for each 2 Yes. Clearly show item description, qty,
material of shipment such as date of packing details, lot no., machine type and
Manufacture, Part No, Part Name, Quantity, media.
Lot card number and QC approval?
8 Can this label be used to trace the finished 2 Yes. Trace by using D/O number and lot card
goods back to its initial process? number.
Page 16 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
1 Is Quality Manual establish and clearly 2 Have procedure. Refer to Non-conformity and
defined? Attach either one procedure, Corrective Action Procedure, Doc. No. : QSP
Customer Complaint, etc./Apakah Manual 102
Mutu ditetapkan dan didefinisikan dengan
jelas? Lampirkan salah satu prosedur,
Pengaduan Pelanggan, dll.
2 Does Quality Policy and Quality Objectives 2 Refer to Quality Policy, Doc. No. : QM A52
establish? Please attach./Apakah Kebijakan and Quality Objectives, Doc. No. : QM A62
Mutu dan Sasaran Mutu ditetapkan? Harap
lampirkan.
3 How does documents being control and 1 System established but not fully implemented.
distribute? Internal and external documents? There are no drawing and others documents
(e.g. internal form / control plan / work distribution to related person or production
instruction / customer drawings etc..) Attach personnel.
the Distribution List/Bagaimana dokumen
dikendalikan dan didistribusikan? Dokumen
internal dan eksternal? (misalnya formulir
4 Do you maintain
internal the latest
/ control plan version
/ instruksi of / gambar
kerja 1 System established but not fully implemented.
A: Quality Management System
documents (drawings
pelanggan dll.) / control
Lampirkan plan
Daftar / process
Distribusi.. Drawing no proper format and numbering. No
flow)? Have the Master List up-to-date? Master List for drawing control. Master List
Please attach. only implement on QM and procedure.
5 Is there any retention time for the control 2 Related records and retention period and
6.3
documents? What is the retention period? Any indicate on Control of Quality Record
guidelines for dispose the records? Show the procedure, Doc. No. : QSP 5
guidelines / procedure./Apakah ada waktu
retensi untuk dokumen kontrol? Apa itu
periode retensi? Adakah pedoman untuk
membuang catatan? Tunjukkan
6 How was the Quality Objectives monitoring?
pedoman/prosedur. 0 There are no any supporting documents (data
Any document / analysis to support those and graph, etc.) to monitor the Quality
Quality Objectives? KPI? Please attach. Objectives.
7 How long will the internal meeting / production 2 Meeting hold when needed. The person who
meeting be held? Show the Meeting Minutes hold the meeting will doing summary and
record./Berapa lama rapat internal / rapat email to their staff.
produksi diadakan? Menampilkan rekaman
Risalah Rapat.
8 Are the Document Distribution List contents 0 There are no standard format or form of
information of document title, document Document Distribution List. To create a
number, revision, received by, returned by? Document Distribution List and use it. For
Attach the Document Distribution List./Apakah document control purpose.
dalam Daftar Distribusi Dokumen informasi isi
judul dokumen, nomor dokumen, revisi,
diterima oleh, dikembalikan oleh? Lampirkan
1 Show
Daftar the latest Management
Distribusi Dokumen. Review meeting 2 Have. Refer to Management Review Minutes
record. Does audit result, customer of Meeting attached. Which conducted on
complaint / feedback, quality objectives, 23th Dec 2016.
status of corrective and preventive action,
follow-up actions from previous Management
Review, recommendations for continual
improvement had reviewed during the
Management Review Meeting./Menampilkan
B. Management Responsibility
Page 17 of 24
B. Management Responsibili
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
3 Is there any internal audit being conducted? 2 Yes. Refer to Audit Summary Report. Dated :
Attach the audit report./Apakah ada audit 8/12/16
internal yang dilakukan? Lampirkan laporan
audit.
6 Do you implement corrective actions for the 2 Refer to Non-conformance Report (Internal
matter directed by the audit? Audit), dated : 8/12/16
Evidence?/Apakah Anda menerapkan
tindakan korektif untuk hal yang diarahkan
oleh audit? Bukti?
7 Attach the Quality Risk Assessment 2 Refer to Risk & Opportunities attached. Doc.
Register./Lampirkan Daftar Penilaian Risiko No. : QM A61
Kualitas.
8 How do you promote continual improvement? 1 System established but not fully implemented.
Example : Quality Objectives./Bagaimana No evidence and documents proof that have
Anda mempromosikan perbaikan any continuous improvement for company and
berkelanjutan? Contoh : Sasaran Mutu. workers.
1 Is the supplier reliability measured and 2 Refer to Vendor Evaluation, company : SIAM
evaluated? Audit conducted? IKK CO., LTD., dated : 17-Nov-16
Evidence?/Apakah keandalan pemasok
diukur dan dievaluasi? Audit dilakukan?
Bukti?
2 Does the training include contract or agency 2 Yes. Training by internal trainer. Refer to
personnel? Evidence?/Apakah pelatihan attachment.
mencakup personel kontrak atau agen?
C. Resource Management & Training
Bukti?
5 Are employees regularly informed and trained 2 Have. Train by Work Instruction. Doc. No. :
about environmental protection and on job BF/TI/1702Rev0
training? Show the Training record and
Training material / handbook.
Page 18 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
1 Does the organization have detailed capacity 2 According to customer requirement. Based on
planning? (e.g. product planning schedule). customer schedule.
D. Product realization plan
Evidence?
2 When changing process, any documented 2 Yes. Refer to Work Instruction. Doc. No. :
record for the changes? Example : Control BF/TI/1702Rev0. There are no any changes
Plan / Work Instruction? Please show. at the moment.
3 Is the process parameter set according to the 2 Yes. Refer to Work Instruction. Doc. No. :
process specification? Show the WI / control BF/TI/1702Rev0.
plan or related documents.
6.0
D. Product realization plan
4 How do you handling NC / rejected parts? 0 No related documents support. Etc : Rework
Show the related documents. or Sorting record
5 Is there any contingency plan available in the 0 No contingency plan and others related
event of an emergency such as utility documents support. Etc : Incident and Injuries
interruptions, labour shortage, key equipment Occur, Fire Incident.
failure and field return? Attach the
contingency plan.
1 How do you handling customer complaint / 1 System established but not fully implemented.
feedback? Any CAR raise and evidence that No supporting documents to proof. Have
had monitoring and closed? complaint but no fill-up the form no records.
E. Customer Complaint Handling
2 Are all customer complaint recorded? Show 1 No customer complaint and no evidence.
the related documents.
5.0
3 How do you communicate the changes of the 1 Verbally inform only. No evidence show.
order to customers and relevant dept?
1 Is there any recording system establish for 2 Yes. By using Stock Re-position Form.
raw material receiving? Incoming
checksheet? Any evidence?
2 What if nonconforming material is found, how 1 System established but not implemented.
is it managed? Only blank form attached.
F. Raw Material Receiving & Storage.
7.1
Page 19 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
F. Raw Material Receiving & Storage.
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
4 How well is the raw material segregation and 0 There are no system to FIFO control.
identified by part no and FIFO control.
Evidence?
7.1
5 Is there any procedure establish for raw 2 Refer to Control of Material procedure, Doc.
material issuing to production? Show related No. : QSP 10. and using Goods Release Note
documents. to control.
6 Photo the Incoming area, In-process area, 1 Incoming area was messy. Needs to re-
and Finished goods area. arrange properly. Outgoing area was clean
and clear.
7 Do you carry out stock take? Attach the latest 2 Have. Clearly show items, material size, book
stock take. balance qty, actual on hand qty and variance.
1 Is there any incoming inspection for the raw 2 Yes. By using Stock Re-position Form.
material received (Check sheet and
Inspection Standard), to ensure the correct
material received?
Is the inspection being carried out
according to procedure required?
2 Is the 1st piece, middle piece and last piece, 0 No system implemented. No IPQC checking
inspection being practiced during production? during in-process.
Show the inspection checksheet.
3 Is there any part confirmation after machine 0 Have checking but no records.
set-up and approval before mass-production?
Show the evidence or any records.
4 Are the equipment used for measurement 0 Current product mostly check by using visual.
calibrated? No equipments are using.
G. Quality control (In-coming, In-Process & Final Inspection)
5 How do you control if any jig, mould, or 0 Current product mostly check by using visual.
template used for different product model? No equipments are using.
6 Is there any sampling plan used and being 2 Yes. Refer to attachment.
followed? Attach it.
4.5
Page 20 of 24
G. Quality control (In-coming, In-
4.5
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
8 Are all non-conforming products segregated 2 Yes. ID have attach at the lot
and physically identified to prevent their
unintended use ?
9 Are the QC inspectors well trained to do 1 Have training but no proper record.
inspection? Evidence?
10 How do you manage the nonconforming 1 If scrap, just return to customer. No proper
products, are they clearly identified, record.
segregated, disposed, and recorded? Show
the disposed or scrap record.
1 Is the checking equipment / jig proper 0 Caliper, roughness tester never calibrate.
controlled? ID / label / rack? Attach jigging Mostly checking by visual only.
area.
2 Apakah semua peralatan yang digunakan 0 No equipment master list no calibration and
H. Calibration
1 Is there any lot traceability system 2 Yes. Trace by using D/O number.
established? Does the traceability originate
with raw material? Does the lot control reflects
the last process? Show evidence.
3 Are the tests documented and the 0 Have testing but no record.
5.0
corresponding records archived?
4 How was it ensures that all employees are 2 Packing standard follow Incoming Delivery
familiar with the packaging specifications? WI Order packing details.
or versions in different languages? Show it.
Page 21 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
1 Is there any system to determine the 1 System established but no records proof.
disposition of rejected material? Does this
include rework process?
J. Control of Non-conforming Product
3 Does the organisation ensure that product 2 Identified by using Work Order. Work Order
7.5
which does not conform to requirements is will place above the parts until delivery stage.
identified and controlled to prevent its
unintended use or delivery?
4 Is there any system established to evaluate 1 System established but no records proof.
returned parts from customer?
1 Is there any Process Flow Chart or Control 2 Have. Documents for eyes only no attached.
Plan for each individual item?
2 Is each process clearly identified and followed 2 Have. Documents for eyes only no attached.
according to the Process Flow Chart or
Control Plan?
3 Is the Process Flow Chart or Control Plan 2 Have. Approved Sales Manager and above.
checked and approved by authorized
persons?
4 Are the machine parameter setting available 2 Yes. Change and setting by Leader.
for each parts? Who is authorized to change
the parameter settings?
5 Are defined and separated containers 2 Yes. Rework parts - Yellow. OK parts - Green.
available for goods, rework and NG parts? Rejected parts - Red bin.
Page 22 of 24
K. Manufacturing Monitoring & Measurements & Maintenanc
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
8 Show the list of Machinery. (e.g. machine 1 Have machinery but no Machinery List. No
number, machine description, machine model, documents no records.
machine maker, year of purchase)
9 Is there any Work Instruction / S.O.P for 2 Have. Refer to Work Instruction.
manufacturing process, machine set-up &
shut down ?
6.5
10 Who is authorized to stop the production? Is it 2 Production and Manager authorize to stop the
stated in the Job Manual / Job Description? production. Stated at Job Description.
12 Is the tool life being monitored? Show the 0 No tool life monitoring action. No supporting
Tool life Record. document show.
13 Is there any long term capability being 0 No CP/CPK records and parts investigate
calculated? (i.e. SPC ) action.
14 Any compliance of environmental requirement 0 No. Only have ISO9001. current status
such as ISO14001? Attach the certificate. ISO9001:2008. the next audit on Dec'17.
K. Manufacturing Monitoring & Measurements & Maintenance
16 Is there any safety concerned within the 2 All the operator have wearing safety shoe.
organization? Such as Safety Rules,
applicable of PPE, safe handling of chemical
17 Any compliance obligations applicable? Such 0 Not applicable. No product related with
as RoHs compliance, Environmental quality chemical.
act or relevant obligations
1 Is there any system established for 'Stock 1 No minimum stock level control for material.
Level Control'? High risk production will stop if material finish
and no replace new order.
Page 23 of 24
BILLION FORTUNE SDN BHD (287931-K) Lamp
AUDIT CHECKSHEET
Judgement Weighted
Title No Process / procedure Findings
0 1 2 score
2 Does packaging and material handling protect 2 Yes. By using pallet stretch film and wrapping.
parts from damage and contamination?
3 Is there any Out-going inspection data 2 Yes. Refer to Outgoing Self Inspection Sheet.
attached to the delivery of finished goods?
How is the controlling method?
L. Finished Goods Storage Control
6 Does the storage layout provides clear 2 Yes. Incoming area very messy.
identification and segregation to prevent
mixture or wrong part being issue?
7 Is there any identification label used for each 2 Yes. Clearly show item description, qty,
material of shipment such as date of packing details, lot no., machine type and
Manufacture, Part No, Part Name, Quantity, media.
Lot card number and QC approval?
8 Can this label be used to trace the finished 2 Yes. Trace by using D/O number and lot card
goods back to its initial process? number.
Page 24 of 24