Professional Documents
Culture Documents
TRA Civl Wash Room Jabo
TRA Civl Wash Room Jabo
HSE
RISK
EVALUATION
(Refer to
BREAK DOWN
HAZARDS IDENTIFY HAZARDS EFECT
evaluation
TASK IN TO STEPS
form)
HE
CONTROL
MEASURE
DATE: 12-09-2004
ACTION TO BE TAKEN
RESIDUAL RISK
DESCRIBE ACTION
MAN POWER.
HE
Manual Excavation
up to 2 feet.
Hit / Collapsing of
Trench,
undergrounding pipe
lines
People injury
PTW, Inspection of
site, GCM,
barrication,
Site supervisor/Safety
watch/ Skilled Labor.
Masonry work
People injury.
Site supervisor/Safety
watch, skilled Mason
and labor.
VL
GENERAL COMMENTS
Prepared by: Abdul Wahab
NAME OF TEAM LEADER-------------------------------------- P#
SIGNATURE---------------------------------------------------------
SIGNATURE --------------------------------------------------------
LEGENDS
HE= HAZARDS EFFECT
P = PROBABILITY
R = RISK ACTOR