JOB SAFETY ANALYSIS

Project Title: Project #:

Affiliate: TASK: Concreting Basic Job Steps Potential Hazards

Personnel Protective Equipment Required Date: Recommendations

y Lack of communication y Non compliance of client requirement, F & S Regulations and HSE MS Procedures y y y y Equipment y y y y y y y y y y y

Obtain Approval and daily permit from the concerned authority in full aspects. Hold pre-job safety meeting. Refer recommended International/ National / Client standard and Procedures. Obtain work permit from the concerned authority in all aspects. Submit the MSDS and obtain approval from the concerned authority. Inspect and obtain inspection tag for the concrete Mixer truck and Concrete pump. Set concrete pump in firm surface on outrigger pad. Extend outrigger fully with 1% tolerance. Control and minimize the personnel entry in to the pouring area. Use burn protective plastic over all suite, Gum Boot, Mono Goggle. Ensure the availability and effectiveness emergency eye wash and shower. Use extension chute and sufficient length discharge hose. Isolate services as needed through authorized permit. Make clean and tidy the surface area. Make Safety grooving on rebar mat or temporary safety platform. Minimize the personnel in the slippery surface area. Use anti skit footwear.

1. Preparation

Splash and Burn 2. Concrete Pouring

Slippery Surface

Page 1 of 2

JOB SAFETY ANALYSIS


Project Title: Project #:

Affiliate: TASK: Concreting Basic Job Steps Potential Hazards

Personnel Protective Equipment Required Date: Recommendations

High Pressure

y y y y y

Use whip arrestor in the each hose coupling. Inspect and ensure the all coupling and connection free from trip. Hold firmly and involve more than a person. Hose handlers must be take frequent break. Wear appropriate PPE including Double ear protection and proper Gloves. Take frequent break, those all are exposed to vibration continuously.

Vibration y y Blocking Emergency Equipment 3. Post activity and Housekeeping. Unattended trenches Trenches left open for extended period Name Prepared BY Reviewed By Approved By y y y y y

De-route emergency ways, If the concrete pump position effect the existing emergency route. Barricade the trenches Use warning signs & lights Close the trench, backfill and compact the area. Close the permit after making the site clean & tidy. Designation Signature Date

Page 2 of 2