SUBJECT:SECL: SAND BLASTING AND PAINTING FOT STAIR AND HAND RAIL (OUTSIDE THE TANK)
DATE OF MEETING: 30 /12 /2017 JOB NO:
LOCATION: Fire water tank B REPORTED BY:
ATTENDENCE FROM SECL ATTENDENCE FROM SUBCONTRACTOR
Org. Job Title Name Signature Org. Job Title Name Signature
SECL
SECL
SECL
SECL
The Head of the team responsible for construction work or the work supervisor is required to attend S-PCM or
the meeting needs to be held at site.
ITEM No DESCRIPTION OF DISCUSSION
1. Activity: SAND BLASTING AND PAINTING FOT STAIR AND HAND RAIL (OUTSIDE THE TANK)
DETAIL DRAWING: