OBJECTIVE:
The objective of this method statement is to carry out the acrylic emulsion painting work by
meeting the technical specification and complying with Standards.
SCOPE:
The scope of this method statement includes acrylic emulsion painting works at ITC
Infotech – Green Center project while executing, it in accordance with technical
specifications.
REFERENCE:
Manufacturer Specification
BOQ- Ref No – 5.02
Approved Finishes Schedule
Sandpaper
Scrapper /Putty Blade
Appropriate Roller Sponge
Flat Brushes
Wall Sander
MATERIAL USED:
Approved Putti
Approved Primer
Approved Acrylic Emulsion Paint
SAFETY PRECAUTION:
PROCEDURE:
General:
Acrylic paint:
RESPONSIBILITIES.
QA/QC In charge: He shall be responsible for ensuring the quality of work &
materials as per the Specifications and standards.
HSE Manager/Engineer: He shall be responsible for assisting to
engineer/supervisor to ensure the safety of workers during the progress of work.
Safety inductions of each staff and workers shall be done and daily PPE check to be
done and toolbox talk shall be carried out before the start of work. General
safety awareness as well as safety precautions and guidelines for activity to be
carried out in that day shall be discussed.
Stores officer: He shall be responsible for storing of all materials. Also responsible
for maintaining the record of incoming and outgoing and up to date stock details of
materials.