Closing report
Content
1.0
Introduction................................................................................................. 3
1.1
Background of the Study .................................................................................... 3
1.1.1
History of QCC Curly team ........................................................................ 3
1.1.2
Review of the QCC Curly Studies .............................................................. 4
1.2
QCC Curly Team 2010 ....................................................................................... 5
1.2.1
Background of QCC Curly Team (2010).................................................... 5
1.2.2
Objective and Target................................................................................... 8
1.2.3
QCC Curly Team Organization Chart ........................................................ 8
2.0
2.1
Effectiveness for previous QCC Curly Study..................................................... 9
2.2
Root cause analysis ........................................................................................... 13
2.3
Proposal of improvement.................................................................................. 15
2.3.1
Create "On Hold" tag for curly wire ......................................................... 15
2.3.2
Create and conduct Survey ....................................................................... 15
2.3.3
Review & check RWD SOP & WI versus current practical at RWD
section 16
2.3.4
Pulley out of alignment checking at all RWD machine............................ 16
2.3.5
Tension arm vibration checking and verification ..................................... 16
2.3.6
Monitor wire break in RWD section......................................................... 16
2.3.7
Conduct Awareness training to RWD operator ........................................ 16
3.0
3.1
Gantt chart for QCC curly team........................................................................ 17
3.2
Implementation ................................................................................................. 18
3.2.1
Questionnaire and Survey for training...................................................... 18
3.2.2
Evaluation of machine variation on end tension verification ................... 21
4.0
4.1
Result ................................................................................................................ 25
4.1.1
Effectiveness of Awareness Training. ...................................................... 25
4.1.2
The Effectiveness of Machine Tension Modification............................... 25
4.2
Conclusion ........................................................................................................ 29
5.0
Appendix .................................................................................................... 33
1.0 Introduction
1.1 Background of the Study
1.1.1 History of QCC Curly team
Since 2000 years, the first QCC Curly team was established to eliminate curly
issue which is lead by KS Ong, activities still been carried on to monitor the reoccurrence
of the abnormality. From the pass studies, QCC Curly team have clarified the few types
of the Curly that observe as shown in Appendix 1, type A is known as spiral curl, type B
as wavy curl and type C as entangled curl. Quote by previous QCC Curly report, QCC
Curly team had identified different major root-cause that will cause 3 different type of
curly and all the criteria mainly occurred at the final stage of production process, thus all
the action is mainly focus in the last stage of the process -Rewinding section .Table 1
have shown the different curly types causes,
Type
A
B
C
Cause
Wire entwine at tension arm
Wire entangle at tension weight
Action
Fix high friction rubber at
tension arm
Methodology
Semi MistakeProofing
Semi MistakeProofing
Semi MistakeProofing
MistakeProofing
MistakeProofing
Training
Training
Training
1) Training group:
The main role for the Training group is to create and suitable syllabus of training material
which related to the potential curly issue and method to reduce curly. A questionnaire in
Appendix 3 been distribute to Rewinding Operator to examine the knowledge about
curly. Base on the questionnaire and study from QCC Curly team, the new procedure and
awareness been create, QCC Curly training group will prepare the training schedule to
conduct the training and educated existing operator or new operator, and all the training
material and procedure can refer to Appendix 4.
2) Improvement Group :
Refer to the Appendix 5, many simulation study have been done by QCC Curly team
simulate the actual problem which will cause the curly occur in production. Main role of
QCC Curly Improvement group is conducting test and evaluated the abnormality of the
Curly. The QCC Curly Improvement group has classified 3 different of curly and base on
different type of curly and machine modification had been done to reduce the curly risk
occur on the machine. Action been verified, and majority of the action have success and
curly issue have reduce a lot since 2001 years after the QCC Curly established.
3) Audit Group
After the new procedure for curly had been established, QCC Curly Audit group
functional to ensure operation is standardized in production. To ensure the stability of the
long run process, QCC Curly has to judge and consults productions run smoothly refer to
Appendix 6. Monitoring process will continuous until target achieves which is curly is
fully eliminated.
From the previous study, QCC curly team has reduce the reject frequencies from
1.6 times claim monthly to 0.14 time claim monthly, and the improving percentage of
reducing customer complaint is high, which is 91% improvement.
Before Improvement
After Improvement
Cases
3
2
1
0
Apr May June Jul
Month
Defect
2003
2004
2005
2006
2007
2008
2009
Sticky
Curly
Loose
Spool Glue
Entanglement
Wrong label
EFO Opened
Foreign Material
21
17
Total
24
EF O Ope ne d
21
S pl c a s e dirty
Wire lo o p de fo rm pro ble m
18
Wro ng c a rto n bo x la be l c o lo r
15
Wro ng la be l
Wro ng s pl c o lo r
12
Enta ngle m e nt
Wro ng ta pe c o lo r
S po o l Glue
Lo o s e
C urly
2003
2004
2005
2006
2007
2008
2009
S tic ky
Ye ar
The Graph 2 show that, in 2009 curly is the major contribute to the customer
claim, which there are 3 different customer had claimed the same defect , RIST, UTAC
DG (ASAT DG) and Panasonic Singapore.
No
RMA
Description
R912-008
R911-003
R907-008
1.2.3
Advisor
SC Puah
Leader
CH Wong
Secretary
Salmiah
QA
Norita
Process
Engineering
Faridah
Production
Suzila
Production
Azri
The new QCC Curly team is supervised by SC Puah, senior QA Manager, and lead by
CH Wong from QA/QC with multi-disciplinary from different department, Secretary
Miss Salmiah from QA, members, Faridah from Process Engineering, Suzila and Azri
which is from Production. Please refer Appendix 7
There are no more pulley shaft grinded to avoid the wire hang at pulley shaft, the
latest pulleys been modified without grinded and replace with cap cover, to cover the
shaft from the pulley (figure 2).
10
Figure 4: Hold the wire source, before cut the wire (to prevent wire spring back)
For current practice, operator ought to be hold Annealing spool end wire source
after end tape pasted on spool flange prior to cut the wire source for rewinding process
completion. The tension apply on the wire will cause the start tape source spring back if
cut without hold. A new entanglement checking method been implement in Rewinding
section, operator need will need to hold wire horizontally and observe the annealing spool
mother lot no entangling.
11
For each wire setup up, rewinding operator required to do curl check to ensure
wire in the curl acceptance criteria.
12
13
To avoid wire curly flow to customer side, we had implemented curl check follow
the 3 criteria, entanglement check to detect the curly while setting the wire. Our QCCCurly team members observed the rewinding operator, and make sure that they
implement curl check and entangle check when doing wire setup. Our rewinding operator
been brief to few action example like pull or twist the wire during set up and to hold the
wire during end taping process after finish rewinding, all the action been observed too by
QCC- Curly members when the time doing the verification study.
The competency of man kind is one of the potential causes too, while different
man kind will have different characteristic. We have come out a few assumptions that
human mistake that can cause curl defect in the process like they not follow procedure
which documented, not check curl on Mother Lot, ignorance of vibration sensor and so
on. And maybe some of them is new still not use to be the process, and not aware for the
defect.
14
From the figure 7, we have concluded 3 possible major causes that would be
contribute the curly to the product:1) Tension not consistent
2) Tension arm vibration
3) Mother lot entanglement
15
From the survey form, we will know how much operator know much about curly issue.
(Refer to Appendix 8)
2.3.3
17
3.2 Implementation
3.2.1 Questionnaire and Survey for training
To establish a suitable training material, QCC-Curly team have create questionnaire
form to survey the current practice inside the production and to know the competency of
RWD operator to do checking for curly wire, 8 question been create and overall answer
are correct.
18
19
1) Apakah itu curly dan lukiskan jenis curly yang anda tahu
100%
Betul semua
20
21
(Refer Appendix 10). By using the winding condition of 158 with the tension setting
2.2g, set count 630, a verification been done for all the machine.
End Tension Last Layer-Machine Indication
6
Tension (g)
5
4
Line A
Line B
Line C
2
1
0
1
9 10 11 12 13 14 15 16 17 18 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
M achine
Tension (g)
5
4
Line A
Line B
Line C
2
1
0
1
9 10 11 12 13 14 15 16 17 18 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Machine
Tension (g)
5
4
Line A
Line B
Line C
2
1
0
1
9 10 11 12 13 14 15 16 17 18 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
M achine
22
Tension (g)
5
4
Line A
Line B
Line C
2
1
0
1
9 10 11 12 13 14 15 16 17 18 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
M achine
Machine Quantity
5 mc
29 mc
6 mc
23
Type
PC98
PC98
PC98
PC98
PC98
PC98
PC98
PC98
PC98
PC98
PCAT
PC98
PC98
PC98
PC98
PC98
PC98
PC98
PC98
PC98
PC98
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
PCAT
Machine
item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
April
wk4
Modification schedule
May
wk1
wk2
wk3
Remarks
wk4
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
completed
Plan
Completed
24
25
26
Graph 13: End tension last layer Gauge for 1.9g ~ 3.4g
27
Graph 17: End Tension Last Layer Gauge for >= 3.5g,
28
4.2 Conclusion
Since Jan 09, Curly defect is one of the famous defects that are happen internally
and externally. Before QCC-Curly setup, there are 6 issue related to curly defect in
production, 5 customer complaint. All are detected in rewinding process checking or
claim from customer. After QCC-curly team setup in 2010 February, curly defect have
reduce to 0 compare to 2009. QCC-curly team has monitored the curly defect and
continues improve the process which will cause the defect of curly.
# SPA
0
Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep- Oct09
09
09
09
09
09
09
09
09
09
09
09
10
10
10
10
10
10
10
10
10
10
29
# issue SPA
2009
2010
0
DWG
ANL
RWD
QAO
2010
# SPA
4
3
2
1
0
# SPA
# ANL spool
0
2009
2010
30
Reject
0
2009
2010
Customer
Defects Description
Itemcode
Received
Complaint Date
RF00275JPN
23/07/09
R4K0246JAG
10/11/09
RGS0485BR1
23/12/09
RGS0485BR1
22-01-10
RGS0485BR1
01-02-10
Customer Complaint
R907-008
Panasonic
(S)
R911-003
Asat DG
R912-008
RIST
R1001-002 &
ROHM
APOLO
R1002-001
ROHM
APOLO
31
3
2009
2010
2
0
Customer Complaint
Claim
Total
0
Jan09
Feb09
Mar09
Apr09
May09
Jun09
Jul09
Aug- Sep09
09
Oct09
Nov09
Dec09
Jan10
Feb10
Mar10
Apr10
May10
Jun10
Jul10
Aug- Sep10
10
Oct10
Month
32
5.0 Appendix
Appendix 1
Type A
Type B
Type C
33
Appendix 2
POTENTIAL FAILURE MODE AND EFFECT ANALYSIS ( PROCESS FMEA )
Item : Cover at Tension Arm
Process
Function
Setting wire
Potential
Failure
Mis-setting
Mishandling
Loose Wire
Potential Effect
of Failure
Hang at weight
Sev
Occ
Det
RPN
Recommended Action
Action Taken
Occ Det
RPN
1
1
5
Re-set wire
160
Re-set wire
Sev
5
Hang at shaft
Re-set wire
128
Re-set wire
24
Re-set wire
192
Re-set wire
192
40
Re-set wire
96
Hang at stopper
Re-set wire
16
Re-set wire
Finger
QAO to decide
168
Consult QAO
168
Do in fast pace
Scrap
144
144
Scrap
126
Follow procedure
126
Drop
Rough handling
Scrap
24
Training
24
Tension variation
TBA
Adjustment
48
Adjustment
48
Place properly
200
200
2
1
Change spring/holder
Apply PM
6
7
96
63
8
9
2
1
4
5
64
45
1461
1085
Process
Potential
Function
Failure
Tension BoardTension Arm
Adjustment Vibrate
Potential Effect
of Failure
Loose wire
Sev
10
Occ
5
Current Control
Process
Redo TBA
Det
RPN
Recommended Action
200
Redo TBA
Sev
7
Action Taken
Occ Det
RPN
4
4
112
Sticky wire
10
250
Redo TBA
Curly wire
10
Redo TBA
80
Redo TBA
10
80
Redo TBA
128
Redo TBA
96
Entanglement to ANL
spool
Redo TBA
128
Redo TBA
128
786
140
556
Process
Function
Setting wire
Sev
6
Occ
5
Current Process
Control
Scrap wire
Det
RPN
120
Scrap Wire
180
Scrap Wire
180
Recommended Action
Install rubber, wire break when
touch rubber
Install rubber, wire break when
touch rubber
Install rubber, wire break when
touch rubber
480
Sev
6
Action Taken
Occ Det
RPN
4
2
48
72
72
192
Process
Potential
Potential Effect
Function
Failure
of Failure
Setting Wire Out of pulley at Scratch
tension arm
Sev
Occ
Det
RPN
Recommended Action
Action Taken
Occ Det RPN
3
3
81
3
3
81
5
3
4
4
180
108
Sev
9
9
Curly wire
10
Out of pulley
Touch air knife
5
5
4
4
200
200
10
10
3
3
3
3
90
90
Wire break
10
Material issue
Tension too high
Anl temp too high
4
3
3
3
3
3
120
90
90
Issue MDF
Reduce tension, adjustmt
Reduce temp
10
10
10
4
3
3
3
3
3
120
90
90
10
Sensor malfunction
Check according to PM
120
Freq PM
10
90
1108
732
34
Appendix 3
Questionaire For QCC Curly Refresher Training
1)
2)
Wire selepas Annealing perlu dilebihkan untuk mengelakkan punca wire daripada
hilang dan termasuk ke lapisan bawah.
A) Betul
B) Salah
3)
4)
Tujuan wire tidak boleh diletakkan tape selepas job end Annealing adalah untuk
mengelakkan operator memotong wire tanpa menanggalkan tape wire terlebih
dahulu yang akan mengakibatkan berlakunya spring back effect dan
entanglement.
A) Betul
B) Salah
5)
6)
35
7)
Berikan susunan langkah yang patut diambil sekiranya anda terjumpa vibration
yang kuat pada tansion arm di m/c Rewinding semasa proses sedang dijalankan.
I)
Hold & Stamp
II)
100% curl check
III)
Inform Leader or Supervisor
IV)
Stop the machine
V)
Inform QCC Curly Team or Engineering
A) I, II, III, IV, V
B) IV, I, III, II, V
C) II, III, IV, I, V
8)
Wire yang perlu diperiksa di QCIP tidak patut digulung semula secara
backward.
A) Betul
B) Salah
9)
10)
Type C
Di bawah adalah perbezaan antara curly wire bagi Type B dan Type C, kecuali :
A) Wire Type B tidak ada kink tetapi wire Type C ada kink.
B) Jarak gelombang curl bagi wire Type B adalah sekata tetapi Type C tidak
sekata.
C) Kalau terjumpa Type B pada satu spool, seluruh lot wire perlu direject tetapi
tak perlu reject seluruh lot wire kalau terjumpa satu spool Type C.
36
Appendix 4
1.0
BACKGROUND
Recently, we are facing curly wire problem which is expectedly occurred at Rewinding
Section and this case should be seriously being taken so that excellent quality is
maintained and upgraded from time to time. Despite that we are having good QA team,
however, Production Section is the most worried of this curly wire because we are very
emphasizing quality as our main target besides volume and other achievements.
For that matter, Production is proposing to hire more staff for Rewinding Section so that
smooth running of the production line together with Quality Awareness could be
enhanced and maintained.
Figure 1 in Appendix shows Gun Chart for the Curly Wire Countermeasure.
2.0
PURPOSE
This proposal is mainly to practice curly wire checking of product wire at Rewinding
Section so that it could be detected at early phase. In addition, it is also to achieve fullyutilization of Rewinding m/c as a whole.
3.0
METHODOLOGY
3.1
Curly wire checking at Rewinding would involve operators whom run the machine. As for
now, rewinding has 17 machines which comprises of 3 lines for each m/c and these lines
are labeled as Line A, Line B and Line C. As of our current practice, we have 13
operators as a whole and division for each shift is as follows:
(07:00 - 13:15)
(13:00 - 23:15)
(23:00 - 07:00)
37
1st Shift -
2nd Shift -
3rd Shift -
Operators who run the m/c have to undergo curly wire checking, therefore, we have to
minimize the number of m/c they are operating. We are proposing each operators to run
3 m/c. So, for this proposal, Rewinding requires: 6 operators for each shift.
Thus, the proposed job division for each shift is (Operators' location layout is shown
in Appendix Figure 2) :
1 operator (SO)
Since moving and weighing spool & case is one of crucial job,
and Rewinding has manpower shortage, this job is proposed to be
accomplished by OT person.
Two methods are proposed which are shown in Diagram 1 and Diagram 2. Method 1
needs Process Engineering to change the set condition so that wire lead would be 20 for
curl check.
38
Diagram 1 below shows the flow chart Method 1 for Running Wire at Rewinding:
OPERATOR RUN
WIRE
WIRE
STOP
RUN NEW
WIRE
CHECK
WIRE'SCURL
NOT
OK
OK
JOB
END
INFORM
LEADER
QAO TO
CONFIRM
SCRAP IF
REJECT
PROCEED IF
ACCEPTED
39
Diagram 2 below shows the flow chart Method 2 for Running Wire at Rewinding:
OPERATOR RUN
WIRE
RUN NEW
WIRE
CHECK
WIRE'SCURL
NOT
OK
OK
JOB
END
INFORM
LEADER
QAO TO
CONFIRM
SCRAP IF
REJECT
PROCEED IF
ACCEPTED
40
3.1
Jig Fabrication
Each m/c is provided with one jig. The function of this jig is for the operator to put the
product spool on it before undergo curly checking. The rough sketch of this jig is shown
in Figure 3 in Appendix A. Production would discuss with Engineering in fabricating of
this jig which material suitable is from PVC-Transparent. This jig could accommodate 3
product spool.
Basically, the operator would run the m/c as usual. When the m/c stop, the operator had
to put aside the completed product wire on the jig located nearby. As discussed earlier,
there are 2 methods which being shown in flow chart.
The jig has come into two sizes; one for AL4-spool and another one is for AL2_spool as
shown in the Appendix A. In total, the jig required by Rewinding is 15 for AL4-spool and
10 for AL2-spool.
4.0
Operators who run the m/c have to undergo curly wire checking, therefore, we have to
minimize the number of m/c they are operating, so that:
Thorough inspection could be done. With this, operators are more concentrated to
check the wire curl. If only one operator does curly wire checking, we have to provide
one station for the checking. The completed products are sent to this station before
checking.
1) This may need more space.
2) Double-work. The operator has to remove the wire from the case to do the
checking. This may lead to mishandling.
3) We may encounter accumulated wire at checking station due to manpower
shortage. Thus, job end volume would decrease.
Maximize m/c utility. With minimizing the number of m/c for operator, m/c utilization
could be increased.
Increase volume achievement. Thus, when the m/c utilization increases, and more
manpower, volume achievement would be more efficient and excellent.
Mishandling could be avoided. As we discussed earlier, mishandling would be
eliminated.
Jig is designed so that it would be efficient as product's placement. It is made from PVC
which is suitable in a clean air environment. It has no hazardous effect or harmful to the
operator. The jig is of low material cost and simple machining is done in-house.
Method 2 is advisable as compared to Method 1 because the latter may cause loose
wire. However, both methods need careful handling.
41
5.0
The progress would be monitored monthly and compared them between before and after
accomplishment of this method. Targeted period for full-observation is about 6 months.
Of course, from time to time, the procedure would be updated for betterment of both
Quality and Quantity of our products.
C:\Documents and
Settings\chwong\Desktop\Curly study\QCC Curly study 1999\Module training.ppt
Appendix 5
C:\Documents and
C:\Documents and
Settings\chwong\Desktop\Curly
Settings\chwong\Desktop\Curly
study\QCC Curly studystudy\QCC
1999\CurlyCurly
wire study
QCC team
1999\QCC
Improvement
Curly Wire
andProposal
corrective
2000.ppt
action.ppt
42
Appendix 6
MALAYSIAN ELECTRONICS MATERIALS SDN. BHD.
: Curly
ISSUE DATE
ISSUE PERSON
TO SECTION
DISCREPANCY :
__________________________________________________________________________________
_________
____________________________________________________________________________________
_______
________________________________________________________________________________________________________
________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
Replied by:
________________________________
Date
Approved by:
________________________
Date
Approved by:
________________________
Date
43
Appendix 7
C:\Documents and
Settings\chwong\Desktop\QCC Qurly team\hook simulation test (Curly defeat)\Study effectiveness procedure.ppt
Appendix 8
Soalan:
1) Semasa RWD process setiap spool manakah mesti buat curl check?
a. Mother lot spool setiap set up process
2) Apakah tindakan yang perlu anda lakukan sekiranya wire break berlaku ketika
RWD machine tengah beroperasi?
3) Mengapa anda perlukan untuk tidak melepaskan wire secara mengejut selepas
End Tape?
4) Mengapakah setiap End Wire pada ANL mother lot perlu diikat pada hook?
5) Apakah itu curly dan lukiskan jenis curly yang anda tahu?
8) Kesan kesan terhadap MEM sekiranya wire yang kita hantar ke customer
mempunyai defect wire curly
44
Appendix 9
C:\Documents and
Settings\chwong\Desktop\QCC Qurly team\SOP & WI vursus current practise.pdf
Appendix 10
Machine
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Setting Condition
winding cond ; 158
Tension setting : 2.2
set count : 630
item : RN30243JFL
Parameter
End tension last layer gauge
End stop tension machine
Line A
Line B
Line C
Line A
Line B
Line C
4.6
4.5
3.4
3.8
3.6
3.3
3.5
2.5
1.5
3.4
2.3
1.1
3.5
3.5
3.6
3
3.1
3.3
3.7
3.6
3.5
3.6
3.4
3.1
3.7
3.7
3.6
3.1
3.4
3.3
3
3.5
3.8
2.8
2.9
3.2
3.3
3.7
3.6
3.2
3.1
3.2
4.5
4.2
3.9
4.2
4
3.5
4.3
3.5
4
4
3
3.4
3.9
4.2
4.1
3.5
3.3
3
4.5
4.4
2.5
3.9
4.2
2
5
3.4
3.5
4.5
2.9
2.8
3.6
2
4
3.3
1.4
3.5
3.3
3.7
3.7
3
3.6
3.6
3.3
2.6
1.8
3.2
2.2
1.7
2.7
3
3.9
2.7
2.8
3.5
3.9
2.8
3.8
3.7
2.7
3.4
3.4
3.5
3.1
3.3
3.4
3.2
3.4
3.7
2.2
3.1
3.5
2
3.5
3.7
4
3.3
3.4
3.5
5
4.6
2.2
4.4
4.4
2
4.5
4.2
2.5
4
4
2
3.7
3.8
2.2
3.8
4.1
2
4
4
3.2
3.9
4
2
4.3
3.8
2.3
4
3.8
1.9
4.5
4.7
2.3
4.1
4.3
2
4.5
4.4
2.6
4.1
3.8
2
4.7
4.4
2.6
4
3.9
2
4.9
4.6
3.5
4
4
1.6
4
4.1
2.9
3.5
4.1
2
5
5
2.7
4.2
4
1.9
4.3
4.2
2.3
3.9
3.9
2
4.7
4.7
2.7
4.2
4.2
1.9
4.5
3.8
4.2
4.1
4.1
2.2
4.3
4.2
2.4
3.9
3.9
2
4.5
4.8
2.4
4.5
4.8
2
4.8
4.5
4
4.3
4.1
2.1
4.1
4.1
2.3
3.9
4.2
2
4.5
3.5
4.4
3.8
3.6
2.1
4.5
5
2.9
4.3
5
2
Appendix 11
C:\Documents and
Settings\chwong\Desktop\QCC Qurly team\training material for operator.ppt
45