Work Done Report 27th March to 31st March

1. CA Venktesh: Went and discussed about the training and as they


already told they were quite busy with the audit till this week, so
basically

they

will

do

it

on

2nd

April.

2. CA Tahir: Went to talk about the partnership for generating lead along.
3. CA khurram: Went and talked to him about the issues they were facing
at the client place.
4. GSIC: Went to Al Ain to have a partner meeting with his resource as well
as

with

the

owner

about

the

market

approach.

Demo- Given to Shabab Store, Gas Distribution, Arbeel Auto parts.


Sales Discussion- Was given to Al Farhan grocery, Silver burgers
cafeteria, Foyez grocery.
5. Peniel: Had meeting with them to enquire about the leads and closing
of

the

leads

this

week.

Installed MU at Al Ajil for them. With basic training.


6. CorePlus: Meeting with Haji Engineering for new TE9 prospect.
7. Loditech: Meeting with Spire Power for TE9 Prospect. Multi licensing

requirement is there for the client with some customization.