Professional Documents
Culture Documents
It is fast and
easy to assemble and reduces wasting timber on construction sites. Its lengths are 130 cm and
260cm; the basic height of 115cm can be extended with 60 cm extension guards. The safety mesh
uses the same time and material saving anchoring equipment as the stop-end equipment.
144
MEVA FormSet
Stop-Ends, Anchoring, Safety
Anchoring
and Safety
The planing cap leaves behind a smooth surface when anchoring single-side formwork.
If an anchor sleeve is also used, the tie rod
is not lost but can be regained and re-used.
Using planing caps and anchor sleeves saves
time, work and money.
1 The jacket tube protects the anchor.
2 The planing cap is placed onto the end of the
anchor thread before the pour.
3 During the concrete pour, the planing cap simulates a flush surface and leaves an even surface
without protruding tie rods that hinder work.
4 After the pour, the planing cap is removed
and the tie rod attached with a union nut to
the anchor.
5 Anchoring for the support frame is ready.
The plastic anchor sleeve:
No rust. Easy to place, easy to use.
The anchor sleeve makes attaching the stop-end
rail or bracket safe and faste. It is rust-free and
made of high-density plastic. The first 2 cm are
unthreaded, so the tie rod can be aligned easily. A
nail holder helps to attach it to the facing. It also
automatically removes the nail when pulled out.
145