Professional Documents
Culture Documents
4 ACP
Gregory Donnard
Thursday 9th Feb 2012
Agenda
Introduction
Automated Network Planning
ACP Overview
Optimization Constraints
Optimization Goals
Mentum Planet 5.4 New Features
Questions & Answers
Automated Network
Planning
Automated
Cell Planning
Automated
Site Selection
Automated
Site
Placement
Single Site
Optimization
Automatic
display/update of layers
Signal Strength
C/(N+I)
Single Site Optimization Tool
ACP Overview
Openness
Available APIs for automation
Optimization Constraints
Optimization Goals
Support for dynamic loads
10
12
Optimization
Constraints
Optimization Constraints
Parameters
Power
Antenna type
Antenna azimuth
Antenna tilt
3-ways antennas
(e-tilt, e-azimuth
and e-bandwidth)
Range
Cost per change
Tabular Editor can be
used for global editing
14
Optimization Constraints
Antenna Synchronization
Three dual-beam
antennas to be used by
six sectors
Dual-beam antennas
physically linked to
each other
Important to consider
such synchronization in
Radio Planning and
Automatic Cell Planning
tool
15
Dual-Beam Antenna
6-Sector Configuration
Optimization Goals
Optimization Goals
Optimization goal
definition
Coverage
Quality
Capacity
Combined goals
Multi-technololgy
goals
Bundled into
optimization profiles
in the Project Explorer
18
Optimization Goals
Optimization Goals
Optimization Goals
Cdma2000 - 1xRTT / EVDO
Pilot Ec
Pilot Ec/Io
First - Nth Signal Strength
Reverse Signal Strength
Capacity
Pilot Ec coverage limit
LTE FDD/TDD
RSRP
RSRQ
Reference Signal CINR
Downlink Data CINR
Spectral Efficiency
Capacity
Uplink Signal Strength
TDMA/FDMA
CPICH Ec
CPICH Ec/Io
Uplink Coverage
CPICH Ec coverage limit
HS-DSCH Ec/Nt
Capacity
1st - Nth CPICH Ec
Signal
Strength
C/(N+I)
Optimization Goals
19
Signal
Strength
C/(N+I)
Optimization Profiles
Multi-technology
optimization profiles
E.g. RSRP and Pilot Ec/Io
Ability to define
combined goals
E.g. RSRP and DL CINR
20
Spectral Efficiency
Unique to Mentum
Planet ACP
Optimization of the
Data rate distribution
Optimization of the
overall system capacity
More optimal than
using a single C/(N+I)
threshold
21
Capacity
Does not optimize
capacity
Goal to have sector
loads as close as
possible to user-defined
target load
Sectors with low or high
loads => high cost
Sectors with target
load => low cost
22
Capacity Cost
24
Speed improvements
Graph and report enhancements
Support for antenna synchronization
Support for antenna system constraints
Ability to Apply original configuration (as of mP
5.3.2)
Support for Global Loads (as of mP 5.3.2)
XOR logical operator