Inspection Checklist for RC Concreting Works (Pre)


No.

Item to be Inspect?
SAFETY

Status
OK() NOT
OK(X)

Remarks

MHSB HSSI

Support System are rigidly constructed and safe

Work platform are properly constructed and safe

Traffic Control
PREPARATION

Ground compaction/hardcore/ sand blinding

Lean concrete
FROMWORK

Dimension levels, verticality, alignment

Adequately supported or propped and rigid

Joints Tight

Surface of forms acceptable/workmanship


REINFORCEMENT

10 Correct bar & link grade, size, number & spacing


11 Correct lap of anchorage length/lapping
12 Adequate chairs, spacers, etc.
13 Cover as required
14 No mud, oil , loose rust, etc.
M/E OPENING AND PIPE SLEEVES
15 Opening Size/ Position
16 Trimming Bar( Fire Protection, communication,
cold water supply, air-conditioned service,etc.)
17 Proper installation of concealed electrical piping

Inspection Result & Status