PLANT DETAILS
2.0
OBJECTIVE
3.0
PROPOSAL
4.0
SERVICES REQUIRED
5.0
SAFETY PERECAUTIONS
6.0
EMERGENCY PROCEDURE
7.0
8.0
METHOD
9.0
COMPLETION CRITERIA
10.0
APPENDICES
a) LOG SHEET
b) CHECKING AND COMMISSIONING OF VFD.
Sheet 2 of 15
PLANT DETAILS:
The plant details of the Draft System is as follows.
1.1
1.2
No of Fan
: 2
Type
: NDZV 47
Make
: BHEL
Flow
: 558.2 cu.m/Sec
Pressure
: 485 mmwc
Temperature
: 1530C
Drive
: Motor
Speed
: 580 RPM
Motor Rating
: 3650
Control
: 2
Type
Signatures
NTPC
BHEL
Sheet 3 of 15
: BHEL
Flow
: 246 cu.m/Sec
Pressure
: 351 mmwc
Temperature
: 500C
Drive
: Motor
Speed
: 980 RPM
Motor Rating
: 1175 KW
Control
The boiler is also equipped with primary air fan, which form a
part of the coal preparation and firing system.
1.3
: 2
Type
: Axial AP 2-20/12
Axial Reaction, Double
stage with silencer
Make
: BHEL
Flow
: 170.5 cu.m/Sec
Pressure
: 1183 mmwc
Signatures
NTPC
BHEL
Sheet 4 of 15
: 500C
Drive
: Motor
Speed
: 1480 RPM
Motor Rating
: 2450 KW.
Control
1.4
All the fan are mounted on concrete deck with suction and
discharge duct. Connected to the Fan flanges. FD Fans and PA
fans are provided with Silencer at the suction duct. Regulation of
Fan from no load to full load is performed by changing the pitch
angle of blade profile on all blades simultaneously during
operation. This is achieved through a sophisticated servo
mechanism (Hydraulic Servo Motor) externally actuated by a
power cylinder or Servomotor and forced lub-oil system.
1.5
1.6
1.7
In ID Fan, the bearings are white metal sleeve type with forced oil
lubrication. Fixed bearing near drive end is designed to absorb
the Axial forces. Thermometers are provided in the bearing
housing for temperature monitoring.
Signatures
NTPC
BHEL
Sheet 5 of 15
1.9
1.10
2.0
OBJECTIVE:
To commission the fans (ID Fan, FD Fan and PA fan) and make it
available for commissioning and operation of the Unit.
3.0
PROPOSAL
It is proposed to commission the fans as per the following
proposals.
3.1
3.2
3.3
4.0
SERVICES REQUIRED
4.1
4.2
Signatures
NTPC
BHEL
Sheet 6 of 15
4.4
4.5
4.6
5.0
SAFETY PRECAUTIONS:
5.1
5.2
5.3
5.4
5.5
5.6
Oil collecting trays and sand buckets are made available at test
area.
Signatures
NTPC
BHEL
Sheet 7 of 15
EMERGENCY PRECAUTIONS:
6.1
6.2
6.3
The test team should be aware of the steps to be taken to trip the
running equipment in case any emergency / abnormal
observations are notified to them.
Signatures
NTPC
BHEL
Sheet 8 of 15
7.1
7.2
Fan casing, Suction / Discharge ducts are cleared off men &
temporary materials.
7.3
All permanent supports and guides of fan & duct are erected.
7.4
7.5
7.6
Signatures
NTPC
BHEL
Sheet 9 of 15
7.8
7.9
7.10
7.11
Signatures
NTPC
BHEL
Sheet 10 of 15
METHOD
8.1
8.2
8.3
8.4
Start the motor once again and put under 8 Hrs trial run (FD and
PA motors). In the case of VFD synchronous Machine, put the
machine under 4 Hrs trial through channel I and under 4 Hrs trial
through channel II.
8.5
8.6
After satisfactory completion of drive trial run, drive and the fan
are coupled.
8.7
Signatures
NTPC
BHEL
Sheet 11 of 15
8.9
8.10
Signatures
NTPC
BHEL
Sheet 12 of 15
COMPLETION CRITERIA
Commissioning of Fan (ID Fan, FD fan and PA Fan) completed
with satisfactory completion of
a) Oil flushing of Lub-Oil system
b) Trial run of motors for 8 Hrs
c) Trial run of Fan for 8 Hrs.
(8 Hrs trial each for motor and Fan of FD and PA system and 8
Hrs trial for motor and Fan of ID system with channels I ans II
each inservice for 4 Hrs duration)
10.0
APPENDICES:
a) Log Sheets.
b) Checking and Commissioning of VFD
Signatures
NTPC
BHEL
SHEET 13 OF 15
10.0
LOG SHEET
DATE :
Project :
Unit
:
Activity :
LUB-OIL SYSTEM
SL
No
TIME
Discharge
Pressure
Filter
DP
Control
Lub-Oil
oil
Pressure
pressure
BEARING TEMPERATURE
Oil
Temp
after
cooler
Tank
Oil
Level
Motor
DE
NDE
Fan
DE
NDE
Draft
(Suction/
Discharge)
Signatures
NTPC
BHEL
Remarks