You are on page 1of 3

Privileged and Confidential

EIA for Residential cum Passive Recreational Development within REC Zone and R(C)
Zone at Various Lots in DD 104, Yuen Long, N.T.

Appendix 3-1A
Construction Programme of the Adjacent Planned
Development Projects

Appendix 3-1A-1 Indicative Project Construction Programme for Planned Kam Pok Road Site
2014

Dump Trucks Travelling on Haul Road


during site formation

Construction of Underground Services


and Utilities

Road works

Foundation

Superstructure

M9

2015
M10

M11

M12

M1

Concurrent Construction Activities


by Work Group

Duration of Concurrent Works

Remark:

Site formation works of Proposed development.


The above Construction Programme for Site Formation is prepared with the following assumption:
Working hours = 08:00 to 18:00
Working days = 25 days per month

M2

M3

M4

M5

M6

M7

2016
M8

M9

M10

M11

M12

M1

M2

M3

M4

M5

A+F

B+D

B+C

C+E
3.5 months

M8

1.5 month

Site Formation, Filling and Excavation

M7

2.5 months

M6

7.5 months

Construction Activity

M6

M7

M8

M9

M10

M11

M12

Appendix 3-1A-2 Indicative Construction Programme for Planned RD Site


2016
Construction Activity

M5

M6

N7

N8

N9

2017
M10

M11

M12

M1

M2

M3

M4

M5

M6

2018
N7

N8

N9

M10 M11 M12

M1

M2

M3

M4

Site Formation:
Site clearance and
preparation
A

Site Formation, Filling and


Excavation

Dump Trucks Travelling on


Haul Road during Site
Formation

Sub-structure (Pile Cap)


F
Construction of Underground Services and Utilities

Construction of Underground
Services and Utilities

Road orks
Roadworks
C

Road works

Foundation
D

Foundation

Superstructure
E

Superstructure

Concurrent Construction
Activities by Work Group
Duration of Concurrent
Works (no. of months)
Remark:

Site formation works of Proposed development.


The above Construction Programme for Site Formation is prepared with the following assumption:
Working hours = 08:00 to 18:00 hours
Working days = 25 days per months