Project Name: New Shooting Ranges and Training Complex Lehsaynia~ Qatar
Contractor: Takyeef Electro Mechanical W.L.L
Mobile: +974 77473594
Tel: +974 4451 4400 Ext 304
Fax: 497444451 4411
Email: caren.delos@takyeer.com
Attn: MS. Caren Delos Reyes
‘Submittal and Procurement Engineer - MEP
Subject LPG tank size calculation as per gas consumption and minimum
wogod refilling time.
LPG Consumption details for kitchen in dining hall building received from kitchenco
S.N Description No. of Total Gas Consumption
equipment BTUHr.
Gas equipment connection details
1 received from (kitchenco) & 672,082
LPG Unit conversion
BTU/AR. KG/HR. Litters/hr. |
672,082 14.29 24.98
Gas Consumption Total
Gas consumption per hour. — 14.29Kg/hr.
‘Suppose gas operating hours per day (all equipment full on hrs.
load)
Total Consumption per days - 71.45 Kaldays. |
Total Consumption per 10 days — 714.5 K/10days. |
Tank Size Calculation as per gas demand:
Grand Total Effective load $ (Kg/day.) =71.45
Days of storage required 10 (As per Wogod Requirement).
Allow for Maximum filling of tank = 85% of total volume.
tig)
Minimum gas level at which the tanks required to re fill = 25% of total volume. Eau
Specific gravity of LPG = 0.5724
bg
es
Qatar Gas GroupWL.L.
7 4580855 | (+974) 44580694
5 44604709 TAQa?LPG tank water capacity (T) (litter) required
= Days of storage required (10 days as per woqod) x daily consumption (Kaytiay).
(Allow for Maximum filing of tank - Minimum gas level at which the tank required tore fl) X Specific gravity of LG
10x 71.45
(0.85-0.25)X 0.5724
T= 714.5 0.3444
Ts 2080.42 L Tank water capacity
Calculated required tank capacity is 2080.42 L which is not a standard size so our proposal
for 2,250 L water capacity vertical underground type tank which is available with woqod.
Note: The LPG tank size mention in drawing is 2 Nos. of 1.3 M? isis not standard size and also not available wth woqod.