Electrical Works(Cable Pulling,Termination,Jointing

and Conduit)
Inspection Checklist
Project Name

KHABAT THERMAL POWER


PLANT UNITS 1&2

Owner Name

Ministry of Electricity (MOE) of Kurdistan


Regional Government

Contractor

POSCO ENGINEERING &


CONSTRUCTION CO., LTD.

Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING INC.

Area / Unit

SEE ATTACHED
DRAWING/CABLE LIST

Item Name / Item No


/ Description

ITP No

KP-00+++-CQ712-G0012

ITP Item

Report No

Date

Drawing No

Rev.

Approximate Date/Time of Related Activity:


No.

ITEM DESCRIPTION

Subcontractor

Cable conduits are routed properly in the way that there is no clashing with steel
reinforcement in concrete or other building services above surface.

Cable conduits are fixed on steel reinforcement or any type of structure at particular
appropriate intervals.

Bending radiuses are appropriate for later cable pulling works.

Metal boxes whether in the concrete or on surface are properly fixed.

Embedded or surface type metal boxes ,for lighting switch,power socket,etc., are
mounted according to the dimensions given in the related drawings.

Placement of conduit and box works are satisfactory.

Remarks / Comments

Subcontractor

GAMA

3rd Party / AI

POSCO

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No: KP-00+++-CQ712-G0012-F01, Rev.1

GAMA