AC PANEL
TEST REPORT
Format
A4
Rev. A
Date
15.09.2015
Lang.
En
Date
15.09.2015
Project No.
ISSUE DATE
15/09/2015
ENG. N
MV & LV SWICTHGEAR
TEST REPORT
CLIENT N
REV.
SH/OF
2/4
0
SUMMARY:
1.
2.
Project No.
ISSUE DATE
15/09/2015
ENG. N
MV & LV SWICTHGEAR
TEST REPORT
SH/OF
3/4
CLIENT N
REV.
Project No:
Area/Unit:
Project Title:
System/Sub System:
Equipment Desc..:
Type:
Serial Number:
Manufacturer:
Rated Voltage:
Length of Busbar:
Temperature:
Humidty:
INSULATION RESISTANCE
U-N
Before HIPOT After HIPOT
V-N
Before HIPOT
After HIPOT
W-N
Before HIPOT
After HIPOT
PHASE U
Leakage
Test Voltage
Current
PHASE V
Leakage
Test Voltage
Current
PHASE W
Leakage
Test Voltage
Current
15 sec..
30 sec..
60 sec..
120 sec..
BUSBAR CONTACT RESISTANCE TEST
Applied Current:
L1
Measured Contact Resistance:
L2
L3
Project No.
ISSUE DATE
15/09/2015
ENG. N
MV & LV SWICTHGEAR
TEST REPORT
SH/OF
4/4
CLIENT N
REV.
REMARKS
TEST EQUIPMENT
MANUFACTURER
TYPE
SERIAL NUMBER
CALIBRATION DATE
Circuit designation
From
To
Busbar conductivity,
L1
L2
L3
Result