Quantity of Cement Required for Cementing:

Hole Size

Hole Depth
(Meter)

Casing Size

Casing Landing
Depth
(Meter)

17
Or
0.4445 m

0-100

13 3/8
Or
0.339725 m

0-100

12
Or
0.31115 m

8
Or
0.2159 m

100-900

9 5/8
Or
0.244475 m

0-900

900-2000

5
Or
0.1397 m

0-2000

As per the given Data we have to calculate


Volume of the cement slurry.
Quantity of Cement Required.
Amount of water Required.

Volume of the cement Slurry is defined as

( Dh 2D c 2) H
4

Dh = Hole Diameter
Dc = Casing Diameter
H = Depth

Surface Casing:
Hole Diameter 17 = 0.4445 m
Casing Diameter 13 3/8 = 0.339725 m
So

( Dh 2D c 2) H
The volume of cement slurry, V
4

( 0.444520.3397252 ) 100
4
m

6.4534

Quantity of Cement Required = 6.4534/0.82


3
= 7.87 m
Quantity of Water Required = 7.87/2
= 3.935

m3

Intermediate Casing:
Hole Diameter 12.25 = 0.31115 m
Casing Diameter 9 5/8 = 0.244475 m
So
The volume of cement slurry, V

( Dh 2D c 2) H
4

( 0.3111520.2444752 ) 900
4

3
26.1865 m

Quantity of Cement Required = 26.1865/0.82


3
= 31.93 m

Quantity of Water Required = 31.93/2


3
= 15.96 m

Production Casing:

Hole Diameter 8 = 0.2159 m


Casing Diameter 5 = 0.1397 m
So
The volume of cement slurry, V

( Dh 2D c 2) H
4

( 0.215920.1397 2) 2000
4

3
42.56 m

Quantity of Cement Required = 42.56/0.82


3
= 51.90 m
Quantity of Water Required = 51.90/2
3
= 25.95 m
So finally we conclude that
The total requirement of Cement:
= 91.70 + (20 % of 91.70 as margin)
3
= 110.04 m

i.e.

110.04 X 1900 = 209076 Kg


4182 bags

The total Quantity of Water required:


= 45.86 + (20 % of 45.86 as margin)

3
= 55.032 m

i.e. 55.032 X 1000 = 55032 liter


14538 gal
******************************************************************
1 meter cube = 1900 kg of API class G cement
1 meter cube = 1000 liter of water
1 US GAL = 3.78541 liter
1 bag = 50 kg