You are on page 1of 1

Welding Consumables Receiving Inspection Record

Inspection Report No.

P.O No. / Requisition No.

Job No.

Inspection Date

Inspection Location

Page

S/R

Description

Size (mm)

QTY.

ASME Specification

Brand Name

Lot No.

Test Report/ Certificate


Status (2)

Inspected by:
Sign.:
Date:

Report No.

Approved by:
Sign.:
Date:

Notes
1) The status (Accept or Reject) is based on the Designated AWS Specification
2) Accept (When reviewed and accepted), Hold (When NCR is issued) or Reject (When test report is rejected).
3)Visual Inspection shall include the condition and marking of both packing and consumables
4) State either accept or reject

INPEC Q. C. Manual

Exhibit No. (34)

Rev.: 0

Date: 20/ 01 / 2014

Result (1)

REMARKS

You might also like