You are on page 1of 3

DocuSign Envelope ID: E3585CD8-2B3B-45CF-914F-AC121277C907

Form No: AI3EGDT1034-08


METHANEX EGYPT Rev No: 3
Management of Change Issue Date: 8-Sep-20

Title: Pre-Start-up Safety Review Checklist.


PCR No. D20001500 Page: 1 of 3

Project No: EG2TEEN-EWP-00329 Date: 14/01/2022


Project Description: Replace 2" injection sulphuric acid branch for 16”-RW-001-P101-P

Pre-Start-up Protocol: Level 1 Level 2

Pre-Start Up Review Team


Name Signature
Responsible Engineer Mohamed Mostafa
Execution Leader Ahmed Fathy
Operations Representative Abdou Safa
Responsible Care Representative Sherif Sabry
Maintenance Representative Ahmed Fathy
Process Representative N/A
Q.C. Representative Mohamed Kamal

Priority A Punch Items: No


Priority B Punch Items: Yes

System Ready for Start-up:


Responsible Engineer

Code: AI3EGDT1034-08 Issue date: 8-Sep-20 Page 1 of 3


Approved: Revision No. [03]
Uncontrolled when printed
DocuSign Envelope ID: E3585CD8-2B3B-45CF-914F-AC121277C907

Form No: AI3EGDT1034-08


METHANEX EGYPT Rev No: 3
Management of Change Issue Date: 8-Sep-20

Title: Pre-Start-up Safety Review Checklist.


PCR No. D20001500 Page: 2 of 3

LEVEL 1 PROTOCOL
Project No: EG2TEEN-EWP-00329 Date: 12/01/2022
Project Description: Replace 2" injection sulphuric acid branch for 16”-RW-001-P101-P

Item No. Description Satisfactory Unsatisfactory


1 Flanges/Bolts/Gaskets/ Y
2 Supports Y
3 Accessibility Y
4 Grounding N/A
5 Direction of Valves Y
6 Painting Y
7 Heat Tracing/Insulation N/A
8 Tagging or Identification Y
9 Control Loop Checked as per specifications (e.g. complex loops, C&E,…) N/A
10 SCR is implemented N/A
11 Instrument Ranges N/A
12 PHA Comments/ Actions Complete N/A
13 Safety Valves N/A
14 Fire Protection N/A
15 Safety Equipment N/A
16 P& ID red line N/A
17 Mechanical Completion (NDE, Pressure Testing) N/A
18 Process Safety Information (Operating Procedures, Datasheets) are updated N/A
19 Electrical Classification N/A
20 Valve’s car seals (open / close) are installed N/A
21 Others.
Code: AI3EGDT1034-08 Issue date: 8-Sep-20 Page 2 of 3
Approved: Revision No. [03]
Uncontrolled when printed
DocuSign Envelope ID: E3585CD8-2B3B-45CF-914F-AC121277C907

Form No: AI3EGDT1034-08


METHANEX EGYPT Rev No: 3
Management of Change Issue Date: 8-Sep-20

Title: Pre-Start-up Safety Review Checklist.


PCR No. D20001500 Page: 3 of 3

Pre-Commissioning and Field Verification Form.


Priority Priority Work
Number. Comments/ Risk Ranking Results Responsibility Completed
A B Order
Maintenance
1. Routing the line is according to Iso Y

Maintenance
2. Housekeeping has done at working place Y

3. Equipment handed over to operation Operation Y

4. Touch up Painting for line Maintenance Y

5.

6.

7.

8.
9.
10.
11.
12.

Code: AI3EGDT1034-08 Issue date: 8-Sep-20 Page 3 of 3


Approved: Revision No. [03]