CONTINENTAL ENGINEERING CORPORATION

JMRC-1B PROJECT JP/EW/1B/C1


64th WEEKLY SHE WALK REPORT
LOCATION:- Badi Chauper
DATE: 13/05/2016
MEMBERS PRESENT: Mr.Ajay Narwal, Mr. Sugato Sinha Ray, Mr.Pramod Kumar Meena , Mr.Shashank
Shekhar , Mr.Rama Raju, Mr. Tapus Roy, Mr.S.K.Dewedi , Mr Rajaneesh Kumar, Mr. M.P.Singh , Mr. M.Vijayan
Kumar, Mr. K.S.Shukla (D.Thakkar),
SL
NO

OBSERVATION

01

It is found that People


Roaming on the site
without PPEs.

02

It is found that
Motorcycles are
parked near the
Assembly point.

PHOTOGRAPHS

LOCATION
Tripolia

Tripolia

CONTROL MEASURE

ACTION BY

TARGET
DATE

Everyone should wear


proper PPEs While
Entering into the site.

Mr. Kanda
Swamy/ Mr.
Tapas Roy

Immediate

Mr. Duryodhan
Nayak /Mr.
Tapas Roy

Immediate

All the vehicles


should park at the
parking area only.

REMAR

Toe guard is not


provided along with
the Hard
Barricading.

In Tripolia
Side

04

Opening at the
entrance is not
secured.

Chouper

05

Emergency number
is not Mentioned on
ID Card.

03

Badi
Chauper

Provide Toe Guard.

Mr. Tapas Roy


17/05/2016

Gate should be
provide with
securities at every
entrance /exist area

Emergency contact
number should
mention on all
Identity cards.

Mr. D.M. Sahoo/


Mr. Tapas Roy

17/05/2016

Mr. D.M. Sahoo

16/05/2016

06

It is found that only


one pot is placed in
Ramgunj site area
& it is open to the
sun.

Ramgunj

Increase the No. of


drinking water pots &
place them in a
designated area and
Display drinking
water board along
with the pot.
All the Drinking water
pots should clean
regularly & maintain
the record.

Mr.D.M.Sahoo/
Mr. Tapas Roy

16/05/2016

07

Barricading was not


fixed near the soil
excavated area.

Ramgunj

Provide Barricading

Mr. Tapas
Roy
/Mr.Shashak
Shekhar

Immediate

08

Naked joints &


Multiple
connections are
found in Ramgunj
side area.

Ramgunj

All the electrical joints


are to be connected
through connecters
only & detach all the
multiple connections.

Mr. M.P.Singh

Immediate

09

Gas cylinders were


simply placed
without any
Provision.

Ramgunj

Place the cylinders


either in storage area
or in Gas cylinder
trolley.

Mr.Tapas Roy

Immediate

10

Drainage water was


stagnated in site

Ramgunj

Make Provision to the


drain free to flow.

Mr.D.M.Sahoo/
Mr.Tapas Roy

16/05/2016

11

Alignment of the
barricading board is
not done properly,
Nails are not
inserted
accordingly.

Ramgunj

Do the Alignment
required & insert the
nails accordingly.

Mr. Tapas
Roy
/Mr.Shashak
Shekhar

Immediate

12

It is found that
Reinforcement rods
are using in the
place of lock pins.

Ramgunj

Prepared by

Reviewed by

S.K. Dewedi
Sr.

Machineries are to be
inspected & such
flaws are to be
rectified before put in
use.

Mr. L.K.Singh

Immediate

Approved by

G.S.S. Rama Raju

Executive Environment

Christopher Mark Cooper


Chief SHE Manager

Project Leade