You are on page 1of 2734

GOVERNMENT OF KHYBER PAKHTUNKHWA

CSR CELL FINANCE DEPARTMENT


MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-01-a

Item Name :

50 Meter

Carriage of 100 cft / 5 tonne of all materials by truck or other


means : 1st 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #1

1.000

70.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

85.40

Cost Per 50 m: 85.40

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

70.00

70.00

15.40

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-01-b

Item Name :

50 Meter

Carriage of 100 cft / 5 tonne of all materials by truck or other


means : 2nd 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #2

1.000

15.00

EQUIPMENT

75.00

15.00

22

3.30

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

18.30

Cost Per 50 m: 18.30

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

15.00

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-01-c

Item Name :

50 Meter

Carriage of 100 cft / 5 tonne of all materials by truck or other


means : 3rd to 5th 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #3

1.000

10.00

EQUIPMENT

75.00

10.00

22

2.20

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

12.20

Cost Per 50 m: 12.20

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

10.00

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-01-d

Item Name :

250 Meter

Carriage of 100 cft / 5 tonne of all materials by truck or other


means : 250 to 1000 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #4

1.000

50.00

EQUIPMENT

75.00

22

Rs/250m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/250m

Composite Rates Per

250 Meter

Rs.

61.00

Cost Per 250 m: 61.00

Labour Rates Per

250 Meter

Rs.

0.00

Cost Per 250 m: 0.00

50.00

50.00

11.00

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-01-e

Item Name :

km

Carriage of 100 cft / 5 tonne of all materials by truck or other


means : 1st kilometer

Detail

Qty

Unit

Rate (Rs)

Rs/Km

150.00

Amount

EQUIPMENT
1.000

Carriage Charges #5

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Rs/Km

150.00

75.00

150.00

22

33.00

Composite Rates Per

km

Rs.

183.00

Cost Per km: 183.00

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-01-f

Item Name :

km

Carriage of 100 cft / 5 tonne of all materials by truck or other


means : 2nd - 5th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.000

Carriage Charges #6

Rs/Km

60.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

60.00

75.00

60.00

22

Composite Rates Per

km

Rs.

73.20

Cost Per km: 73.20

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

13.20

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-01-g

Item Name :

km

Carriage of 100 cft / 5 tonne of all materials by truck or other


means : 6th to 10th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.000

Carriage Charges #7

Rs/Km

50.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

50.00

75.00

50.00

22

Composite Rates Per

km

Rs.

61.00

Cost Per km: 61.00

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

11.00

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-01-h

Item Name :

km

Carriage of 100 cft / 5 tonne of all materials by truck or other


means : 11th & subsequent kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.000

Carriage Charges #8

Rs/Km

30.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

30.00

75.00

30.00

22

6.60

Composite Rates Per

km

Rs.

36.60

Cost Per km: 36.60

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-02-a

Item Name :

50 Meter

Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :


1st 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #1

0.630

70.00

EQUIPMENT

75.00

44.10

22

9.70

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

53.80

Cost Per 50 m: 53.80

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

44.10

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-02-b

Item Name :

50 Meter

Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :


2nd 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #2

0.630

15.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

11.53

Cost Per 50 m: 11.53

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

9.45

9.45

2.08

10

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-02-c

Item Name :

50 Meter

Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :


3rd to 5th 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #3

0.630

10.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

7.69

Cost Per 50 m: 7.69

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

6.30

6.30

1.39

11

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-02-d

Item Name :

50 Meter

Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :


250 - 1000 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #4

0.630

50.00

EQUIPMENT

75.00

31.50

22

6.93

Rs/250m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/250m

Composite Rates Per

50 Meter

Rs.

38.43

Cost Per 250 m: 38.43

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 250 m: 0.00

31.50

12

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-02-e

Item Name :

km

Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :


1st kilometer

Detail

Qty

Unit

Rate (Rs)

Rs/Km

150.00

Amount

EQUIPMENT
0.630

Carriage Charges #5

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Rs/Km

94.50

75.00

94.50

22

Composite Rates Per

km

Rs.

115.29

Cost Per km: 115.29

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

20.79

13

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-02-f

Item Name :

km

Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :


2nd - 5th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.630

Carriage Charges #6

Rs/Km

60.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

37.80

75.00

37.80

22

8.32

Composite Rates Per

km

Rs.

46.12

Cost Per km: 46.12

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

14

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-02-g

Item Name :

km

Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :


6th - 10th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.630

Carriage Charges #7

Rs/Km

50.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

31.50

75.00

31.50

22

6.93

Composite Rates Per

km

Rs.

38.43

Cost Per km: 38.43

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

15

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-02-h

Item Name :

km

Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :


11th & subsequent kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.630

Carriage Charges #8

Rs/Km

30.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

18.90

75.00

18.90

22

4.16

Composite Rates Per

km

Rs.

23.06

Cost Per km: 23.06

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

16

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-03-a

Item Name :

Tonne/50 Met

Carriage of cement(bag), bitumen/lubricants (drum) by truck or


other means : 1st 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #1

0.200

70.00

EQUIPMENT

75.00

14.00

22

3.08

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

14.00

Composite Rates Per

Tonne/50 M Rs.

17.08

Cost Per tonne/50m: 17.08

Labour Rates Per

Tonne/50 M Rs.

0.00

Cost Per tonne/50m: 0.00

17

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-03-b

Item Name :

Tonne/50 Met

Carriage of cement (bag) bitumen/lubricant (drum) by truck or other


means : 2nd 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #2

0.200

15.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

Tonne/50 M Rs.

3.66

Cost Per tonne/50m: 3.66

Labour Rates Per

Tonne/50 M Rs.

0.00

Cost Per tonne/50m: 0.00

3.00

3.00

0.66

18

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-03-c

Item Name :

Tonne/50 Met

Carriage of cement (bag), bitumen/lubricant (drum) by truck or


other means : 3rd to 5th 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #3

0.200

10.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

Tonne/50 M Rs.

2.44

Cost Per tonne/50m: 2.44

Labour Rates Per

Tonne/50 M Rs.

0.00

Cost Per tonne/50m: 0.00

2.00

2.00

0.44

19

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-03-d

Item Name :

Tonne/250 Me

Carriage of cement(bag), bitumen/lubricant (drum) by truck or other


means : 250 to 1000 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #4

0.200

50.00

EQUIPMENT

75.00

10.00

22

2.20

Rs/250m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/250m

Composite Rates Per

Tonne/250

Rs.

12.20

Cost Per t/250m: 12.20

Labour Rates Per

Tonne/250

Rs.

0.00

Cost Per t/250m: 0.00

10.00

20

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-03-e

Item Name :

Tonne/1 Km

Carriage of cement(bags), bitumen/lubricant (drum) by truck or


other means : 1st kilometer

Detail

Qty

Unit

Rate (Rs)

Rs/Km

150.00

Amount

EQUIPMENT
Carriage Charges #5

0.200

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Rs/Km

30.00

75.00

30.00

22

6.60

Composite Rates Per

Tonne/1 K

Rs.

36.60

Cost Per tonne/km: 36.60

Labour Rates Per

Tonne/1 K

Rs.

0.00

Cost Per tonne/km: 0.00

21

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-03-f

Item Name :

Tonne/1 Km

Carriage of cement(bag), bitumen/lubricant (drum) by truck or other


means : 2nd - 5th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #6

0.200

Rs/Km

60.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

12.00

75.00

12.00

22

2.64

Composite Rates Per

Tonne/1 K

Rs.

14.64

Cost Per tonne/km: 14.64

Labour Rates Per

Tonne/1 K

Rs.

0.00

Cost Per tonne/km: 0.00

22

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-03-g

Item Name :

Tonne/1 Km

Carriage of cement(bag), bitumen/lubricant (drum) by truck or other


means : 6th - 10th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #7

0.200

Rs/Km

50.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

10.00

75.00

10.00

22

2.20

Composite Rates Per

Tonne/1 K

Rs.

12.20

Cost Per tonne/km: 12.20

Labour Rates Per

Tonne/1 K

Rs.

0.00

Cost Per tonne/km: 0.00

23

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-03-h

Item Name :

Tonne/1 Km

Carriage of cement(bag), bitumen/lubricant (drum) by truck or other


means : 11th & subsequent km

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #8

0.200

Rs/Km

30.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

6.00

75.00

6.00

22

Composite Rates Per

Tonne/1 K

Rs.

7.32

Cost Per tonne/km: 7.32

Labour Rates Per

Tonne/1 K

Rs.

0.00

Cost Per tonne/km: 0.00

1.32

24

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-04-a

Item Name :

50 Meter

Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :


1st 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #1

0.600

70.00

EQUIPMENT

75.00

42.00

22

9.24

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

51.24

Cost Per 50 m: 51.24

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

42.00

25

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-04-b

Item Name :

50 Meter

Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :


2nd 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #2

0.600

15.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

10.98

Cost Per 50 m: 10.98

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

9.00

9.00

1.98

26

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-04-c

Item Name :

50 Meter

Carriage of 100cft of sarkanda, pichi, frash etc by road or boat :


3rd to 5th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #3

0.600

10.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

7.32

Cost Per 50 m: 7.32

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

6.00

6.00

1.32

27

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-04-d

Item Name :

250 Meter

Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :


250 to 1000 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #4

0.600

50.00

EQUIPMENT

75.00

30.00

22

6.60

Rs/250m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/250m

Composite Rates Per

250 Meter

Rs.

36.60

Cost Per 250 m: 36.60

Labour Rates Per

250 Meter

Rs.

0.00

Cost Per 250 m: 0.00

30.00

28

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-04-e

Item Name :

km

Carriage of 100cft of sarkanda, pichi, frash etc by road or boat :


1st kilometer

Detail

Qty

Unit

Rate (Rs)

Rs/Km

150.00

Amount

EQUIPMENT
0.600

Carriage Charges #5

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Rs/Km

90.00

75.00

90.00

22

Composite Rates Per

km

Rs.

109.80

Cost Per km: 109.80

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

19.80

29

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-04-f

Item Name :

km

Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :


2nd - 5th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.600

Carriage Charges #6

Rs/Km

60.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

36.00

75.00

36.00

22

7.92

Composite Rates Per

km

Rs.

43.92

Cost Per km: 43.92

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

30

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-04-g

Item Name :

km

Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :


6th - 10th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.600

Carriage Charges #7

Rs/Km

50.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

30.00

75.00

30.00

22

6.60

Composite Rates Per

km

Rs.

36.60

Cost Per km: 36.60

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

31

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-04-h

Item Name :

km

Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :


11th & subsequent kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.600

Carriage Charges #8

Rs/Km

30.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

18.00

75.00

18.00

22

3.96

Composite Rates Per

km

Rs.

21.96

Cost Per km: 21.96

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

32

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-05-a

Item Name :

50 Meter

Carriage of small consignments upto 250kg 1st 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #1

0.050

70.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

4.27

Cost Per 50 m: 4.27

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

3.50

3.50

0.77

33

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-05-b

Item Name :

50 Meter

Carriage of small consigmnments upto 250 kg 2nd 50 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #2

0.050

15.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

0.92

Cost Per 50 m: 0.92

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

0.75

0.75

0.17

34

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-05-c

Item Name :

50 Meter

Carriage of small consignments upto 250 kg 3rd to 5th 50 meters

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #3

0.050

10.00

EQUIPMENT

75.00

22

Rs/50m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/50m

Composite Rates Per

50 Meter

Rs.

0.61

Cost Per 50 m: 0.61

Labour Rates Per

50 Meter

Rs.

0.00

Cost Per 50 m: 0.00

0.50

0.50

0.11

35

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-05-d

Item Name :

250 Meter

Carriage of small consignments upto 250 kg 250 - 1000 meter

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #4

0.050

50.00

EQUIPMENT

75.00

22

Rs/250m

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/250m

Composite Rates Per

250 Meter

Rs.

3.05

Cost Per 250 m: 3.05

Labour Rates Per

250 Meter

Rs.

0.00

Cost Per 250 m: 0.00

2.50

2.50

0.55

36

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-05-e

Item Name :

km

Carriage of small consignments upto 250 kg 1st kilometer

Detail

Qty

Unit

Rate (Rs)

Rs/Km

150.00

Amount

EQUIPMENT
0.050

Carriage Charges #5

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Rs/Km

7.50

75.00

7.50

22

Composite Rates Per

km

Rs.

9.15

Cost Per km: 9.15

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

1.65

37

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-05-f

Item Name :

km

Carriage of small consignments upto 250 kg 2nd to 5th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.050

Carriage Charges #6

Rs/Km

60.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

3.00

75.00

3.00

22

Composite Rates Per

km

Rs.

3.66

Cost Per km: 3.66

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

0.66

38

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-05-g

Item Name :

km

Carriage of small consignments upto 250 kg 6th to 10th kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.050

Carriage Charges #7

Rs/Km

50.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

2.50

75.00

2.50

22

Composite Rates Per

km

Rs.

3.05

Cost Per km: 3.05

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

0.55

39

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-05-h

Item Name :

km

Carriage of small consignments upto 250 kg 11th & subsequent


kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.050

Carriage Charges #8

Rs/Km

30.00

TOTAL

EQUIPMENT

Cont. Profit + Over Heads (Material+Labour+Equipment)

Rs/Km

1.50

75.00

1.50

22

Composite Rates Per

km

Rs.

1.83

Cost Per km: 1.83

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

0.33

40

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-06-a

km

Carriage of consignments (odd job) Coolie load

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.100

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

50.00

1.50

78.00

51.50

22

Composite Rates Per

km

Rs.

62.50

Cost Per km: 62.50

Labour Rates Per

km

Rs.

62.50

Cost Per km: 62.50

11.00

41

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-06-b

km

Carriage of consignments (odd job) Donkey load

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.075

Donkey

400.00

Day

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Day

30.00

75.00

30.00

22

6.60

Composite Rates Per

km

Rs.

36.60

Cost Per km: 36.60

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

42

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-06-c

km

Carriage of consignments (odd job) Cart Load

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.038

Bullock Cart

700.00

Day

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Day

26.25

75.00

26.25

22

5.78

Composite Rates Per

km

Rs.

32.03

Cost Per km: 32.03

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

43

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-06-d

km

Carriage of consignments (odd job) Camel load

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.075

Camel

800.00

Day

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Day

60.00

75.00

60.00

22

Composite Rates Per

km

Rs.

73.20

Cost Per km: 73.20

Labour Rates Per

km

Rs.

0.00

Cost Per km: 0.00

13.20

44

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-07-a

Day

Hire Charges of Truck

Detail

Qty

Unit

Rate (Rs)

Hour

1,000.00

Amount

EQUIPMENT
7.729

Truck (10ton)

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

7,729.47

75.00

7,729.47

22

1,700.48

Composite Rates Per

Day

Rs.

9,429.95

Cost Per Day: 9,429.95

Labour Rates Per

Day

Rs.

0.00

Cost Per Day: 0.00

45

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

01-07-b

Item Name :

Day

Hire charges of Tractor with trolley

Detail

Qty

Unit

Rate (Rs)

Hour

1,000.00

Amount

EQUIPMENT
7.730

Tractor With Trolly

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

7,730.00

75.00

7,730.00

22

1,700.60

Composite Rates Per

Day

Rs.

9,430.60

Cost Per Day: 9,430.60

Labour Rates Per

Day

Rs.

0.00

Cost Per Day: 0.00

46

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-07-c

Day

Hire charges of Tractor without trolley

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
7.246

Tractor Without Trolly 80 HP

700.00

Day

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Day

5,072.20

75.00

5,072.20

22

1,115.88

Composite Rates Per

Day

Rs.

6,188.08

Cost Per Day: 6,188.08

Labour Rates Per

Day

Rs.

0.00

Cost Per Day: 0.00

47

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-08-a

Each

Hand shunting loaded railway wagons Upto 500 meter

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
1.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

750.00

22.50

78.00

772.50

22

Composite Rates Per

Each

Rs.

937.50

Cost Per Each: 937.50

Labour Rates Per

Each

Rs.

937.50

Cost Per Each: 937.50

165.00

48

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-08-b

Each

Hand shunting loaded railway wagons Upto 1 kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
2.250

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,125.00

33.75

78.00

1,158.75

22

247.50

Composite Rates Per

Each

Rs.

1,406.25

Cost Per Each: 1,406.25

Labour Rates Per

Each

Rs.

1,406.25

Cost Per Each: 1,406.25

49

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-08-c

Each

Hand shunting loaded railway wagons Upto 2 kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
2.750

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,375.00

41.25

78.00

1,416.25

22

302.50

Composite Rates Per

Each

Rs.

1,718.75

Cost Per Each: 1,718.75

Labour Rates Per

Each

Rs.

1,718.75

Cost Per Each: 1,718.75

50

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-08-d

Each

Hand shunting loaded railway wagons 3rd & subsequent kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
1.250

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

Composite Rates Per

Each

Rs.

781.25

Cost Per Each: 781.25

Labour Rates Per

Each

Rs.

781.25

Cost Per Each: 781.25

137.50

51

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-09-a

Each

Hand shunting empty railway wagons Upto 500 meter

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.750

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

375.00

11.25

78.00

386.25

22

82.50

Composite Rates Per

Each

Rs.

468.75

Cost Per Each: 468.75

Labour Rates Per

Each

Rs.

468.75

Cost Per Each: 468.75

52

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-09-b

Each

Hand shunting empty railway wagons Upto 1 kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
1.125

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

562.50

16.88

78.00

579.38

22

Composite Rates Per

Each

Rs.

703.13

Cost Per Each: 703.13

Labour Rates Per

Each

Rs.

703.13

Cost Per Each: 703.13

123.75

53

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-09-c

Each

Hand shunting empty railway wagons Upto 2 kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
1.375

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

687.50

20.63

78.00

708.13

22

Composite Rates Per

Each

Rs.

859.38

Cost Per Each: 859.38

Labour Rates Per

Each

Rs.

859.38

Cost Per Each: 859.38

151.25

54

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 01 , CARRIAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

01-09-d

Each

Hand shunting empty railway wagons 3rd & subsequent kilometer

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.625

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

312.50

9.38

78.00

321.88

22

68.75

Composite Rates Per

Each

Rs.

390.63

Cost Per Each: 390.63

Labour Rates Per

Each

Rs.

390.63

Cost Per Each: 390.63

55

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-01

(British) :

100 cft

Load into or unload from railway wagons within 50m shingle, sand,
ballast, tiles, etc, laid & stacked

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

100 cft

Rs.

625.00

Per CUM : Rs 220.72

Labour Rates Per

100 cft

Rs.

625.00

Per CUM : Rs 220.72

110.00

56

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-02-a

(British) :

1000 No.

Load into or unload from railway wagons within 50m laid & stacked :
Bricks 10" size

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

137.50

Composite Rates Per

1000 No.

Rs.

781.25

Cost Per 1000 No.: 781.25

Labour Rates Per

1000 No.

Rs.

781.25

Cost Per 1000 No.: 781.25

57

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-02-b

(British) :

1000 No.

Load into or unload from railway wagons within 50m laid & stacked :
Bricks 9" or smaller size

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

110.00

Composite Rates Per

1000 No.

Rs.

625.00

Cost Per 1000 No.: 625.00

Labour Rates Per

1000 No.

Rs.

625.00

Cost Per 1000 No.: 625.00

58

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-03

(British) :

100 No.

Load into or unload from railway wagons, cement in bags and


stacking within 50m.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

137.50

Composite Rates Per

100 No.

Rs.

781.25

Cost Per 100 No.: 781.25

Labour Rates Per

100 No.

Rs.

781.25

Cost Per 100 No.: 781.25

59

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-04

(British) :

1000 No.

Load into or unload from railway wagons, empty cement bags and
stacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.120

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

560.00

16.80

78.00

576.80

22

123.20

Composite Rates Per

1000 No.

Rs.

700.00

Cost Per 1000 No.: 700.00

Labour Rates Per

1000 No.

Rs.

700.00

Cost Per 1000 No.: 700.00

60

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-05

(British) :

tonne

Load into or unload from railway wagons and stacking white lime in
bags

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

156.25

Labour Rates Per

tonne

Rs.

156.25

LABOUR

Day

125.00

3.75

78.00

128.75

22

27.50

Per Tonne : Rs 156.25


Per Tonne : Rs 156.25

61

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-06

(British) :

tonne

Load into or unload from railway wagons structural steel, RS


joists, rails, rail fastenings etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.600

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

375.00

Labour Rates Per

tonne

Rs.

375.00

LABOUR

Day

300.00

9.00

78.00

309.00

22

66.00

Per Tonne : Rs 375.00


Per Tonne : Rs 375.00

62

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-07

(British) :

Each

Load into or unload from 45 gallon drums full, into or from railway
wagons,lead upto 50m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.080

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

40.00

1.20

78.00

41.20

22

8.80

Composite Rates Per

Each

Rs.

50.00

Cost Per Each: 50.00

Labour Rates Per

Each

Rs.

50.00

Cost Per Each: 50.00

63

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-08

(British) :

Each

Loading or unloading packages of all sorts upto 50 kg.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.070

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

35.00

1.05

78.00

36.05

22

7.70

Composite Rates Per

Each

Rs.

43.75

Cost Per Each: 43.75

Labour Rates Per

Each

Rs.

43.75

Cost Per Each: 43.75

64

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-09-a

(British) :

100 No.

Load or unload sleepers other than wooden, incl stacking, lead upto
50 m : Broad gauge

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,250.00

37.50

78.00

1,287.50

22

275.00

Composite Rates Per

100 No.

Rs.

1,562.50

Cost Per 100 No.: 1,562.50

Labour Rates Per

100 No.

Rs.

1,562.50

Cost Per 100 No.: 1,562.50

65

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-09-b

(British) :

100 No.

Load or unload sleepers other than wooden, including stacking, lead


upto 50 m : Metre gauge &

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

137.50

Composite Rates Per

100 No.

Rs.

781.25

Cost Per 100 No.: 781.25

Labour Rates Per

100 No.

Rs.

781.25

Cost Per 100 No.: 781.25

66

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-10

(British) :

tonne

Load or unload timber logs or shuttering into or from railway


wagons, including stacking within 50m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.330

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

206.25

Labour Rates Per

tonne

Rs.

206.25

LABOUR

Day

165.00

4.95

78.00

169.95

22

36.30

Per Tonne : Rs 206.25


Per Tonne : Rs 206.25

67

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-11

(British) :

tonne

Loading or unloading bhoosa in railway wagons lead upto 50 m.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

468.75

Labour Rates Per

tonne

Rs.

468.75

LABOUR

Day

375.00

11.25

78.00

386.25

22

82.50

Per Tonne : Rs 468.75


Per Tonne : Rs 468.75

68

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-12

(British) :

tonne

Load or unload timber scrap or wooden plugs into or from railway


wagons & stacking within 50m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

312.50

Labour Rates Per

tonne

Rs.

312.50

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Per Tonne : Rs 312.50


Per Tonne : Rs 312.50

69

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-13

(British) :

100 cft

Load or unload pitching stone/spawl from railway wagons of any


guage including clearing 1.5m away

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.370

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

185.00

5.55

78.00

190.55

22

40.70

Composite Rates Per

100 cft

Rs.

231.25

Per CUM : Rs 81.67

Labour Rates Per

100 cft

Rs.

231.25

Per CUM : Rs 81.67

70

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-14

(British) :

100 cft

Loading or unloading building stone including clearing away 1.5m


from rails

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.480

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

240.00

7.20

78.00

247.20

22

52.80

Composite Rates Per

100 cft

Rs.

300.00

Per CUM : Rs 105.94

Labour Rates Per

100 cft

Rs.

300.00

Per CUM : Rs 105.94

71

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-15-a

(British) :

1000 ltr

Unloading oil,bitumen or tar etc : Crude Oil (to be pumped from


tank wagon into tank)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.300

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

150.00

4.50

78.00

154.50

22

33.00

Composite Rates Per

1000 ltr

Rs.

187.50

Cost Per 1000 ltr: 187.50

Labour Rates Per

1000 ltr

Rs.

187.50

Cost Per 1000 ltr: 187.50

72

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-15-b

(British) :

1000 ltr

Unloading oil,bitumen or tar etc Crude oil (drained by gravity)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.300

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

150.00

4.50

78.00

154.50

22

33.00

Composite Rates Per

1000 ltr

Rs.

187.50

Cost Per 1000 ltr: 187.50

Labour Rates Per

1000 ltr

Rs.

187.50

Cost Per 1000 ltr: 187.50

73

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-15-c

(British) :

Ton

Unloading oil,bitumen or tar etc Crude oil materials from railway


wagons

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.057

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

28.50

0.86

78.00

29.36

22

6.27

Composite Rates Per

Ton

Rs.

35.63

Cost Per Ton: 35.63

Labour Rates Per

Ton

Rs.

35.63

Cost Per Ton: 35.63

74

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-15-d

(British) :

tonne

Unloading oil, bitumen or tar etc : Fuel Oil from tank into empty
drums including stacking within 50 m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

312.50

Labour Rates Per

tonne

Rs.

312.50

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Per Tonne : Rs 312.50


Per Tonne : Rs 312.50

75

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-15-e

(British) :

100 No.

Unloading oil,bitumen or tar etc Petrol (2 gallon tin)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.630

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

315.00

9.45

78.00

324.45

22

69.30

Composite Rates Per

100 No.

Rs.

393.75

Cost Per 100 No.: 393.75

Labour Rates Per

100 No.

Rs.

393.75

Cost Per 100 No.: 393.75

76

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-15-f

(British) :

100 No.

Unloading oil, bitumen or tar etc Kerosine oil (4 gallon tin)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

137.50

Composite Rates Per

100 No.

Rs.

781.25

Cost Per 100 No.: 781.25

Labour Rates Per

100 No.

Rs.

781.25

Cost Per 100 No.: 781.25

77

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-15-g

(British) :

100 No.

Unloading oil,bitumen or tar etc Tar & Bitumen in drums with


carriage upto 1 km

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Bullock Cart

0.250

700.00

Day

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Day

175.00

75.00

175.00

22

38.50

Composite Rates Per

100 No.

Rs.

213.50

Cost Per 100 No.: 213.50

Labour Rates Per

100 No.

Rs.

0.00

Cost Per 100 No.: 0.00

78

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-16-a

(British) :

100 cft

Removing and stacking within 50m. lead Stone, spawl, brick bats,
shingle, sand, lime etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Composite Rates Per

100 cft

Rs.

312.50

Per CUM : Rs 110.36

Labour Rates Per

100 cft

Rs.

312.50

Per CUM : Rs 110.36

79

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-16-b

(British) :

1000 No.

Removing and stacking within 50m. lead Bricks

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.450

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

725.00

21.75

78.00

746.75

22

159.50

Composite Rates Per

1000 No.

Rs.

906.25

Cost Per 1000 No.: 906.25

Labour Rates Per

1000 No.

Rs.

906.25

Cost Per 1000 No.: 906.25

80

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-16-c

(British) :

100 No.

Removing and stacking within 50m. lead Broad gauge wooden sleepers

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.800

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

400.00

12.00

78.00

412.00

22

88.00

Composite Rates Per

100 No.

Rs.

500.00

Cost Per 100 No.: 500.00

Labour Rates Per

100 No.

Rs.

500.00

Cost Per 100 No.: 500.00

81

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-16-d

(British) :

100 No.

Removing and stacking within 50m. lead Metre gauge or narrow guage
wooden sleepers

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.457

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

228.50

6.86

78.00

235.36

22

50.27

Composite Rates Per

100 No.

Rs.

285.63

Cost Per 100 No.: 285.63

Labour Rates Per

100 No.

Rs.

285.63

Cost Per 100 No.: 285.63

82

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-16-e

(British) :

tonne

Removing and stacking within 50m. lead Rails, girders, pipes,


cement etc.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.230

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

143.75

Labour Rates Per

tonne

Rs.

143.75

LABOUR

Day

115.00

3.45

78.00

118.45

22

25.30

Per Tonne : Rs 143.75


Per Tonne : Rs 143.75

83

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-16-f

(British) :

100 No.

Removing and stacking within 50m. lead Bridge and crossing timbers,
etc.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.670

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,335.00

40.05

78.00

1,375.05

22

293.70

Composite Rates Per

100 No.

Rs.

1,668.75

Cost Per 100 No.: 1,668.75

Labour Rates Per

100 No.

Rs.

1,668.75

Cost Per 100 No.: 1,668.75

84

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-17

(British) :

tonne

Load into wagons girders, rails, MS bars, pipes etc. including 50m
lead & stacking inside wagons

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.640

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

400.00

Labour Rates Per

tonne

Rs.

400.00

LABOUR

Day

320.00

9.60

78.00

329.60

22

70.40

Per Tonne : Rs 400.00


Per Tonne : Rs 400.00

85

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-18

(British) :

tonne

Unload from wagons girders, rails, MS bars, girder etc. including


50m lead but excluding stacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

156.25

Labour Rates Per

tonne

Rs.

156.25

LABOUR

Day

125.00

3.75

78.00

128.75

22

27.50

Per Tonne : Rs 156.25


Per Tonne : Rs 156.25

86

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-19

(British) :

100 No.

Load into wagons wooden baord guage sleepers including 50m lead &
stacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 No.

Rs.

1,250.00

Cost Per 100 No.: 1,250.00

Labour Rates Per

100 No.

Rs.

1,250.00

Cost Per 100 No.: 1,250.00

87

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-20

(British) :

100 No.

Unload wooden broad gauge sleepers from wagons including 50m lead
and stacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

110.00

Composite Rates Per

100 No.

Rs.

625.00

Cost Per 100 No.: 625.00

Labour Rates Per

100 No.

Rs.

625.00

Cost Per 100 No.: 625.00

88

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-21

(British) :

100 No.

Loading metre gauge or narrow guage wooden sleepers including 50m


lead & stack inside wagons

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.100

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

550.00

16.50

78.00

566.50

22

121.00

Composite Rates Per

100 No.

Rs.

687.50

Cost Per 100 No.: 687.50

Labour Rates Per

100 No.

Rs.

687.50

Cost Per 100 No.: 687.50

89

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-22

(British) :

100 No.

Unloading metre gauge or narrow guage wooden sleepers including 50m


lead but excluding stacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.530

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

265.00

7.95

78.00

272.95

22

58.30

Composite Rates Per

100 No.

Rs.

331.25

Cost Per 100 No.: 331.25

Labour Rates Per

100 No.

Rs.

331.25

Cost Per 100 No.: 331.25

90

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-23

(British) :

100 No.

Loading bridge and crossing timber including 50m lead & stacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

110.00

Composite Rates Per

100 No.

Rs.

625.00

Cost Per 100 No.: 625.00

Labour Rates Per

100 No.

Rs.

625.00

Cost Per 100 No.: 625.00

91

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-24

(British) :

100 No.

Unloading bridge and crossing timbers including 50m lead but


excluding stacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Composite Rates Per

100 No.

Rs.

312.50

Cost Per 100 No.: 312.50

Labour Rates Per

100 No.

Rs.

312.50

Cost Per 100 No.: 312.50

92

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

02-25

(British) :

tonne

Load or unload bitumen, asphalt, tar in drums, into or from


railway wagons, lead upto 50m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

312.50

Labour Rates Per

tonne

Rs.

312.50

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Per Tonne : Rs 312.50


Per Tonne : Rs 312.50

93

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-01-a

(British) :

1000 Cft

Earth excavation undressed upto single throw of kassi phaorah or


shovel etc : in ashes, sand, soft soil or silt clearance

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,875.00

56.25

78.00

1,931.25

22

412.50

Composite Rates Per

1000 Cft

Rs.

2,343.75

Per CUM : Rs 82.77

Labour Rates Per

1000 Cft

Rs.

2,343.75

Per CUM : Rs 82.77

94

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-01-b

(British) :

1000 Cft

Earth excavation undressed upto single throw of kassi phaorah or


shove etc : in ordinary soil,

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,250.00

67.50

78.00

2,317.50

22

495.00

Composite Rates Per

1000 Cft

Rs.

2,812.50

Per CUM : Rs 99.32

Labour Rates Per

1000 Cft

Rs.

2,812.50

Per CUM : Rs 99.32

95

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-02

(British) :

1000 Cft

Earth excavation in ashes, sand & soft soil or silt clearance,


undressed lead upto 25m.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,750.00

82.50

78.00

2,832.50

22

605.00

Composite Rates Per

1000 Cft

Rs.

3,437.50

Per CUM : Rs 121.39

Labour Rates Per

1000 Cft

Rs.

3,437.50

Per CUM : Rs 121.39

96

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-03-a

(British) :

1000 Cft

Bed clearance and dressing slopes of drains including removing of


weeds and roots etc. Excavated material undressed within 25m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,500.00

105.00

78.00

3,605.00

22

770.00

Composite Rates Per

1000 Cft

Rs.

4,375.00

Per CUM : Rs 154.50

Labour Rates Per

1000 Cft

Rs.

4,375.00

Per CUM : Rs 154.50

97

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-03-b

(British) :

1000 Cft

Bed clearance and dressing slopes of drains including removing of


weeds and roots etc. Excavated material dressed within 25m lead

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.740

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,870.00

116.10

78.00

3,986.10

22

851.40

Composite Rates Per

1000 Cft

Rs.

4,837.50

Per CUM : Rs 170.83

Labour Rates Per

1000 Cft

Rs.

4,837.50

Per CUM : Rs 170.83

98

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-04-a

(British) :

1000 Cft

Borrowpit excavation undressed lead upto 50m in Ordinary soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,500.00

105.00

78.00

3,605.00

22

770.00

Composite Rates Per

1000 Cft

Rs.

4,375.00

Per CUM : Rs 154.50

Labour Rates Per

1000 Cft

Rs.

4,375.00

Per CUM : Rs 154.50

99

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-04-b

(British) :

1000 Cft

Borrowpit excavation undressed lead upto 50m in Hard soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

8.600

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,300.00

129.00

78.00

4,429.00

22

946.00

Composite Rates Per

1000 Cft

Rs.

5,375.00

Per CUM : Rs 189.82

Labour Rates Per

1000 Cft

Rs.

5,375.00

Per CUM : Rs 189.82

100

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-04-c

(British) :

1000 Cft

Borrowpit excavation undressed lead upto 50m in shingle/gravel


formation

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

17.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

8,500.00

255.00

78.00

8,755.00

22

Composite Rates Per

1000 Cft

Rs.

10,625.00

Per CUM : Rs 375.22

Labour Rates Per

1000 Cft

Rs.

10,625.00

Per CUM : Rs 375.22

1,870.00

101

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-05-a

Item Name :

(British) :

1000 Cft

Embankment formation in ordinary soil & compaction by mechanical


means at optimum moistures content to 95% to 100% max. modified.
AASHTO dry density (borrow area)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

Day

500.00

Day

625.00

Dresser

0.500

Day

600.00

Day

300.00

Water Sprinkler

0.090

Day

600.00

Day

54.00

Water Carrier

0.080

Day

700.00

Day

56.00

31.05

11.54

1,066.05

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.720

Hour

1,000.00

Hour

720.00

Comp Roller

0.720

Hour

1,000.00

Hour

720.00

Grader 165 HP

1.600

Hour

4,000.00

Hour

6,400.00

Rammer Mech

0.320

Hour

500.00

Hour

160.00

Lab Test

0.080

No

700.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

66.46

22

Composite Rates Per

1000 Cft

Rs.

11,122.07

Per CUM : Rs 392.77

Labour Rates Per

1000 Cft

Rs.

1,293.75

Per CUM : Rs 45.69

56.00

8,056.00

2,000.02

102

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-05-b

Item Name :

(British) :

1000 Cft

Embankment formation in ordinary soil & compaction by mechanical


means at optimum moistures content to 90% max. modified AASHTO dry
density (borrow area)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

Day

500.00

Day

625.00

Dresser

0.500

Day

600.00

Day

300.00

Water Sprinkler

0.080

Day

600.00

Day

48.00

Water Carrier

0.070

Day

700.00

Day

49.00

30.66

11.52

1,052.66

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.720

Hour

1,000.00

Hour

720.00

Comp Roller

0.640

Hour

1,000.00

Hour

640.00

Grader 165 HP

1.600

Hour

4,000.00

Hour

6,400.00

Rammer Mech

0.320

Hour

500.00

Hour

160.00

Lab Test

0.080

No

700.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

66.48

22

Composite Rates Per

1000 Cft

Rs.

11,008.22

Per CUM : Rs 388.75

Labour Rates Per

1000 Cft

Rs.

1,277.50

Per CUM : Rs 45.11

56.00

7,976.00

1,979.56

103

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-05-c

Item Name :

(British) :

1000 Cft

Embankment formation in ordinary soil & compaction by mechanical


means at optimum moistures content to 85% max. modified AASHTO dry
density (borrow area)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

Day

500.00

Day

625.00

Dresser

0.500

Day

600.00

Day

300.00

Water Sprinkler

0.070

Day

600.00

Day

42.00

Water Carrier

0.060

Day

700.00

Day

42.00

30.27

11.50

1,039.27

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.720

Hour

1,000.00

Hour

720.00

Comp Roller

0.560

Hour

1,000.00

Hour

560.00

Grader 165 HP

1.600

Hour

4,000.00

Hour

6,400.00

Rammer Mech

0.320

Hour

500.00

Hour

160.00

Lab Test

0.080

No

700.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

66.50

22

Composite Rates Per

1000 Cft

Rs.

10,894.37

Per CUM : Rs 384.73

Labour Rates Per

1000 Cft

Rs.

1,261.25

Per CUM : Rs 44.54

56.00

7,896.00

1,959.10

104

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-06-a

(British) :

1000 Cft

Earth fill in lawns including dressing & compaction with earth


available from cutting/excavation

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

Dresser

1.000

Day

600.00

Day

600.00

Carrier

2.000

Day

400.00

Day

800.00

72.00

78.00

2,472.00

22

528.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

3,000.00

Per CUM : Rs 105.94

Labour Rates Per

1000 Cft

Rs.

3,000.00

Per CUM : Rs 105.94

105

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-06-b

(British) :

1000 Cft

Earth fill in lawns including dressing & compaction with suitable


earth borrowed.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

Rammer

1.500

Day

500.00

Day

750.00

Digger

3.000

Day

500.00

Day

1,500.00

Carrier

3.000

Day

400.00

Day

1,200.00

133.50

78.00

4,583.50

22

979.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

5,562.50

Per CUM : Rs 196.44

Labour Rates Per

1000 Cft

Rs.

5,562.50

Per CUM : Rs 196.44

106

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-07-a

(British) :

1000 Cft

Earth excavation in open cut upto 1.5m depth for drains etc &
disposal : in Ordinary Soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Dresser

1.000

Day

600.00

Day

600.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

111.00

78.00

3,811.00

22

814.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

4,625.00

Per CUM : Rs 163.33

Labour Rates Per

1000 Cft

Rs.

4,625.00

Per CUM : Rs 163.33

107

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-07-b

(British) :

1000 Cft

Earth excavation in open cut upto 1.5m depth for drains etc &
disposal : in Hard Soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.250

Day

500.00

Day

3,125.00

Dresser

1.250

Day

600.00

Day

750.00

Skilled Coolie

1.250

Day

600.00

Day

750.00

138.75

78.00

4,763.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

5,781.25

Per CUM : Rs 204.16

Labour Rates Per

1000 Cft

Rs.

5,781.25

Per CUM : Rs 204.16

1,017.50

108

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-07-c

(British) :

1000 Cft

Earth excavation in open cut upto 1.5m depth for drains etc &
disposal : in Very hard Soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.500

Day

500.00

Day

3,250.00

Dresser

1.300

Day

600.00

Day

780.00

Skilled Coolie

1.300

Day

600.00

Day

780.00

144.30

78.00

4,954.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

6,012.50

Per CUM : Rs 212.33

Labour Rates Per

1000 Cft

Rs.

6,012.50

Per CUM : Rs 212.33

1,058.20

109

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-07-d

(British) :

1000 Cft

Earth excavation in open cut upto 1.5m depth for drains etc &
disposal : in Gravel & shingle

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.250

Day

500.00

Day

3,625.00

Dresser

1.450

Day

600.00

Day

870.00

Skilled Coolie

1.450

Day

600.00

Day

870.00

160.95

78.00

5,525.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

6,706.25

Per CUM : Rs 236.83

Labour Rates Per

1000 Cft

Rs.

6,706.25

Per CUM : Rs 236.83

1,180.30

110

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-08-a
Earth excavation in open cut 1.5m
disposal : in Ordinary Soil

Detail

Qty

(British) :

1000 Cft

- 3m depth for S.W.Drains etc &

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,000.00

150.00

78.00

5,150.00

22

Composite Rates Per

1000 Cft

Rs.

6,250.00

Per CUM : Rs 220.72

Labour Rates Per

1000 Cft

Rs.

6,250.00

Per CUM : Rs 220.72

1,100.00

111

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-08-b
Earth excavation in open cut 1.5m
disposal : in Hard Soil

Detail

Qty

(British) :

1000 Cft

- 3m depth for S.W.Drains etc &

Unit

Rate (Rs)

Amount

LABOUR
Coolie

11.300

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,650.00

169.50

78.00

5,819.50

22

Composite Rates Per

1000 Cft

Rs.

7,062.50

Per CUM : Rs 249.41

Labour Rates Per

1000 Cft

Rs.

7,062.50

Per CUM : Rs 249.41

1,243.00

112

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-08-c
Earth excavation in open cut 1.5m
disposal : in Very Hard Soil

Detail

Qty

(British) :

1000 Cft

- 3m depth for S.W.Drains etc &

Unit

Rate (Rs)

Amount

LABOUR
Coolie

13.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

6,500.00

195.00

78.00

6,695.00

22

Composite Rates Per

1000 Cft

Rs.

8,125.00

Per CUM : Rs 286.93

Labour Rates Per

1000 Cft

Rs.

8,125.00

Per CUM : Rs 286.93

1,430.00

113

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-08-d

(British) :

1000 Cft

Earth excavation in open cut 1.5m - 3m depth for drains etc &
disposal : in Gravel & shingle

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

22.400

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

11,200.00

336.00

78.00

11,536.00

22

2,464.00

Composite Rates Per

1000 Cft

Rs.

14,000.00

Per CUM : Rs 494.41

Labour Rates Per

1000 Cft

Rs.

14,000.00

Per CUM : Rs 494.41

114

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-09-a

(British) :

1000 Cft

Excavation in shingle or gravel formation & rock not requiring


blast, undressed, 50m lead : Dry

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

19.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

9,500.00

285.00

78.00

9,785.00

22

Composite Rates Per

1000 Cft

Rs.

11,875.00

Per CUM : Rs 419.36

Labour Rates Per

1000 Cft

Rs.

11,875.00

Per CUM : Rs 419.36

2,090.00

115

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-09-b

(British) :

1000 Cft

Excavation in shingle or gravel formation & rock not requiring


blast, undressed, 50m lead : Wet

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

22.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

11,000.00

330.00

78.00

11,330.00

22

2,420.00

Composite Rates Per

1000 Cft

Rs.

13,750.00

Per CUM : Rs 485.58

Labour Rates Per

1000 Cft

Rs.

13,750.00

Per CUM : Rs 485.58

116

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-09-c

(British) :

1000 Cft

Excavation in shingle or gravel formation & rock not req. blast,


undressed, 50m lead : in Flowing Water

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

28.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

14,000.00

420.00

78.00

14,420.00

22

3,080.00

Composite Rates Per

1000 Cft

Rs.

17,500.00

Per CUM : Rs 618.01

Labour Rates Per

1000 Cft

Rs.

17,500.00

Per CUM : Rs 618.01

117

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-10-a

(British) :

1000 Cft

Earth excavation in irrigation channels/drains & disposal upto 25m.


& dressing : in Ordinary Soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.000

Day

500.00

Day

3,500.00

Dresser

1.000

Day

600.00

Day

600.00

123.00

78.00

4,223.00

22

902.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

5,125.00

Per CUM : Rs 180.99

Labour Rates Per

1000 Cft

Rs.

5,125.00

Per CUM : Rs 180.99

118

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-10-b

(British) :

1000 Cft

Earth excavation in irrigation channels/drains & disposal upto 25m.


& dressing : in Hard Soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

8.600

Day

500.00

Day

4,300.00

Dresser

1.000

Day

600.00

Day

600.00

147.00

78.00

5,047.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

6,125.00

Per CUM : Rs 216.30

Labour Rates Per

1000 Cft

Rs.

6,125.00

Per CUM : Rs 216.30

1,078.00

119

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-10-c

(British) :

1000 Cft

Earth excavation in irrigation channels/drains & disposal upto 25m.


& dressing : in Very Hard Soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.300

Day

500.00

Day

5,150.00

Dresser

1.000

Day

600.00

Day

600.00

172.50

78.00

5,922.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

7,187.50

Per CUM : Rs 253.82

Labour Rates Per

1000 Cft

Rs.

7,187.50

Per CUM : Rs 253.82

1,265.00

120

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-10-d

(British) :

1000 Cft

Earth excavation in irrigation channels/drains & disposal upto 25m.


& dressing : in Shingle/Gravel

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

19.000

Day

500.00

Day

9,500.00

Dresser

2.000

Day

600.00

Day

1,200.00

321.00

78.00

11,021.00

22

2,354.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

13,375.00

Per CUM : Rs 472.33

Labour Rates Per

1000 Cft

Rs.

13,375.00

Per CUM : Rs 472.33

121

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-11-a

(British) :

1000 Cft

Rock Excavation, dressing & disposal up to 50m Soft Rock, slate,


shale, schist or lateriate

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

14.000

Day

500.00

Day

7,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Dresser

9.000

Day

600.00

Day

5,400.00

414.00

78.00

14,214.00

22

3,036.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

17,250.00

Per CUM : Rs 609.18

Labour Rates Per

1000 Cft

Rs.

17,250.00

Per CUM : Rs 609.18

122

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-11-b

(British) :

1000 Cft

Rock Excavation, dressing & disposal up to 50m Medium hard rock,


requiring occasional blasting

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

3.000

200.00

No

TOTAL

2.80

MATERIAL

No

600.00

600.00

LABOUR
Coolie

24.330

Day

500.00

Day

12,165.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Dresser

2.000

Day

600.00

Day

1,200.00

Hammer Man

1.000

Day

700.00

Day

700.00

463.95

75.20

15,928.95

22

3,534.30

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

20,063.25

Per CUM : Rs 708.53

Labour Rates Per

1000 Cft

Rs.

19,331.25

Per CUM : Rs 682.68

123

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-12-a

(British) :

1000 Cft

Excavation in hard rock requiring blasting and disposal upto 25m &
dressing : Grade I

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

3.000

200.00

No

TOTAL

3.77

MATERIAL

No

600.00

600.00

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

Black Smith

0.250

Day

900.00

Day

225.00

Quarry Man

10.000

Day

700.00

Day

7,000.00

Smithy Coolie

0.250

Day

700.00

Day

175.00

Chiseller

1.000

Day

700.00

Day

700.00

340.50

74.23

11,690.50

22

2,629.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

14,919.50

Per CUM : Rs 526.88

Labour Rates Per

1000 Cft

Rs.

14,187.50

Per CUM : Rs 501.03

124

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-12-b

(British) :

1000 Cft

Excavation in hard rock requiring blasting and disposal upto 25m &
dressing : Grade II

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

5.000

200.00

No

TOTAL

5.58

MATERIAL

No

1,000.00

1,000.00

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

Black Smith

0.500

Day

900.00

Day

450.00

Quarry Man

11.000

Day

700.00

Day

7,700.00

Smithy Coolie

0.500

Day

700.00

Day

350.00

Chiseller

1.000

Day

700.00

Day

700.00

373.50

72.42

12,823.50

22

2,959.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

16,782.50

Per CUM : Rs 592.67

Labour Rates Per

1000 Cft

Rs.

15,562.50

Per CUM : Rs 549.59

125

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-12-c

(British) :

1000 Cft

Excavation in hard rock requiring blasting and disposal upto 25m &
dressing : Grade III

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

6.000

200.00

No

TOTAL

5.53

MATERIAL

No

1,200.00

1,200.00

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.750

Day

500.00

Day

375.00

Black Smith

0.750

Day

900.00

Day

675.00

Quarry Man

13.500

Day

700.00

Day

9,450.00

Smithy Coolie

0.750

Day

700.00

Day

525.00

Chiseller

1.500

Day

700.00

Day

1,050.00

452.25

72.47

15,527.25

22

3,580.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

20,307.75

Per CUM : Rs 717.16

Labour Rates Per

1000 Cft

Rs.

18,843.75

Per CUM : Rs 665.46

126

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-12-d

(British) :

1000 Cft

Excavation in hard rock requiring blasting and disposal upto 25m &
dressing : Grade IV

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

7.000

200.00

No

TOTAL

5.75

MATERIAL

No

1,400.00

1,400.00

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.750

Day

500.00

Day

375.00

Black Smith

1.000

Day

900.00

Day

900.00

Quarry Man

15.000

Day

700.00

Day

10,500.00

Smithy Coolie

1.000

Day

700.00

Day

700.00

Chiseller

2.000

Day

700.00

Day

1,400.00

506.25

72.25

17,381.25

22

4,020.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

22,801.75

Per CUM : Rs 805.24

Labour Rates Per

1000 Cft

Rs.

21,093.75

Per CUM : Rs 744.92

127

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-12-e

(British) :

1000 Cft

Excavation in hard rock requiring blasting and disposal upto 25m &
dressing : Grade V

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

8.000

200.00

No

TOTAL

5.90

MATERIAL

No

1,600.00

1,600.00

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Quarry Man

17.000

Day

700.00

Day

11,900.00

Smithy Coolie

1.000

Day

700.00

Day

700.00

Chiseller

2.500

Day

700.00

Day

1,750.00

562.50

72.10

19,312.50

22

4,477.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

25,389.50

Per CUM : Rs 896.62

Labour Rates Per

1000 Cft

Rs.

23,437.50

Per CUM : Rs 827.69

128

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-12-f

(British) :

1000 Cft

Excavation in hard rock requiring blasting and disposal upto 25m &
dressing : Grade VI

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

9.000

200.00

No

TOTAL

6.14

MATERIAL

No

1,800.00

1,800.00

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.250

Day

900.00

Day

1,125.00

Quarry Man

18.000

Day

700.00

Day

12,600.00

Smithy Coolie

1.250

Day

700.00

Day

875.00

Chiseller

3.000

Day

700.00

Day

2,100.00

606.00

71.86

20,806.00

22

4,840.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

27,446.00

Per CUM : Rs 969.25

Labour Rates Per

1000 Cft

Rs.

25,250.00

Per CUM : Rs 891.70

129

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-13-a

(British) :

1000 Cft

Excavation in hard rock requiring blasting but blasting prohibited,


dispose & dress within 25 m : Grade I

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.000

Day

500.00

Day

6,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

0.500

Day

900.00

Day

450.00

Quarry Man

20.000

Day

700.00

Day

14,000.00

Smithy Coolie

0.500

Day

700.00

Day

350.00

Chiseller

2.000

Day

700.00

Day

1,400.00

681.00

78.00

23,381.00

22

4,994.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

28,375.00

Per CUM : Rs 1,002.05

Labour Rates Per

1000 Cft

Rs.

28,375.00

Per CUM : Rs 1,002.05

130

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-13-b

(British) :

1000 Cft

Excavation in hard rock requiring blasting where blasting


prohibited, dispose & dress within 25 m : Grade II

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.000

Day

500.00

Day

6,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Quarry Man

22.000

Day

700.00

Day

15,400.00

Smithy Coolie

1.000

Day

700.00

Day

700.00

Chiseller

2.000

Day

700.00

Day

1,400.00

747.00

78.00

25,647.00

22

5,478.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

31,125.00

Per CUM : Rs 1,099.17

Labour Rates Per

1000 Cft

Rs.

31,125.00

Per CUM : Rs 1,099.17

131

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-13-c

(British) :

1000 Cft

Excavation in hard rock requiring blasting where blasting


prohibited, dispose & dress within 25 m: Grade III

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.000

Day

500.00

Day

6,000.00

Bhishti

1.500

Day

500.00

Day

750.00

Black Smith

1.500

Day

900.00

Day

1,350.00

Quarry Man

27.000

Day

700.00

Day

18,900.00

Smithy Coolie

1.500

Day

700.00

Day

1,050.00

Chiseller

3.000

Day

700.00

Day

2,100.00

904.50

78.00

31,054.50

22

6,633.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

37,687.50

Per CUM : Rs 1,330.92

Labour Rates Per

1000 Cft

Rs.

37,687.50

Per CUM : Rs 1,330.92

132

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-13-d

(British) :

1000 Cft

Excavation in hard rock requiring blasting where blasting


prohibited, dispose & dress within 25 m: Grade IV

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.000

Day

500.00

Day

6,000.00

Bhishti

1.500

Day

500.00

Day

750.00

Black Smith

2.000

Day

900.00

Day

1,800.00

Quarry Man

30.000

Day

700.00

Day

21,000.00

Smithy Coolie

2.000

Day

700.00

Day

1,400.00

Chiseller

4.000

Day

700.00

Day

2,800.00

1,012.50

78.00

34,762.50

22

7,425.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

42,187.50

Per CUM : Rs 1,489.84

Labour Rates Per

1000 Cft

Rs.

42,187.50

Per CUM : Rs 1,489.84

133

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-13-e

(British) :

1000 Cft

Excavation in hard rock requiring blasting where blasting


prohibited, dispose & dress within 25 m: Grade V

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.000

Day

500.00

Day

6,000.00

Bhishti

2.000

Day

500.00

Day

1,000.00

Black Smith

2.000

Day

900.00

Day

1,800.00

Quarry Man

34.000

Day

700.00

Day

23,800.00

Smithy Coolie

2.000

Day

700.00

Day

1,400.00

Chiseller

5.000

Day

700.00

Day

3,500.00

1,125.00

78.00

38,625.00

22

8,250.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

46,875.00

Per CUM : Rs 1,655.38

Labour Rates Per

1000 Cft

Rs.

46,875.00

Per CUM : Rs 1,655.38

134

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-13-f

(British) :

1000 Cft

Excavation in hard rock requiring blasting where blasting


prohibited, dispose & dress within 25 m: Grade VI

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.000

Day

500.00

Day

6,000.00

Bhishti

2.000

Day

500.00

Day

1,000.00

Black Smith

2.500

Day

900.00

Day

2,250.00

Quarry Man

36.000

Day

700.00

Day

25,200.00

Smithy Coolie

2.500

Day

700.00

Day

1,750.00

Chiseller

6.000

Day

700.00

Day

4,200.00

1,212.00

78.00

41,612.00

22

8,888.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

50,500.00

Per CUM : Rs 1,783.39

Labour Rates Per

1000 Cft

Rs.

50,500.00

Per CUM : Rs 1,783.39

135

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-14-a

(British) :

1000 Cft

Rehandling of earthwork Lead upto a single throw of kassi, shovel,


phaorah

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,250.00

37.50

78.00

1,287.50

22

275.00

Composite Rates Per

1000 Cft

Rs.

1,562.50

Per CUM : Rs 55.18

Labour Rates Per

1000 Cft

Rs.

1,562.50

Per CUM : Rs 55.18

136

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-14-b

(British) :

1000 Cft

Rehandling of earthwork upto a lead of 25 m.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,750.00

52.50

78.00

1,802.50

22

385.00

Composite Rates Per

1000 Cft

Rs.

2,187.50

Per CUM : Rs 77.25

Labour Rates Per

1000 Cft

Rs.

2,187.50

Per CUM : Rs 77.25

137

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-15

(British) :

1000 Cft

Rehandling of gravel work or excavated rock, lead upto 25m.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,000.00

150.00

78.00

5,150.00

22

Composite Rates Per

1000 Cft

Rs.

6,250.00

Per CUM : Rs 220.72

Labour Rates Per

1000 Cft

Rs.

6,250.00

Per CUM : Rs 220.72

1,100.00

138

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-16-a

(British) :

1000 Cft

Filling, watering and ramming earth under floor with surplus earth
from foundation, etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.500

Day

500.00

Day

250.00

Dresser

1.000

Day

600.00

Day

600.00

78.00

78.00

2,678.00

22

572.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

3,250.00

Per CUM : Rs 114.77

Labour Rates Per

1000 Cft

Rs.

3,250.00

Per CUM : Rs 114.77

139

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-16-b

(British) :

1000 Cft

Filling, watering and ramming earth under floor with earth


excavated from outside lead upto 50m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.000

Day

500.00

Day

4,500.00

Bhishti

0.500

Day

500.00

Day

250.00

Dresser

1.000

Day

600.00

Day

600.00

160.50

78.00

5,510.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

6,687.50

Per CUM : Rs 236.17

Labour Rates Per

1000 Cft

Rs.

6,687.50

Per CUM : Rs 236.17

1,177.00

140

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-17-a

(British) :

1000 Cft

Extra for every 25 m extra lead or part thereof for earthwork soft,
ordinary, hard & very hard

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.300

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

150.00

4.50

78.00

154.50

22

33.00

Composite Rates Per

1000 Cft

Rs.

187.50

Per CUM : Rs 6.62

Labour Rates Per

1000 Cft

Rs.

187.50

Per CUM : Rs 6.62

141

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-17-b

(British) :

1000 Cft

Extra for every 25 m extra lead or part thereof for gravel, shingle
or rock.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.400

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

200.00

6.00

78.00

206.00

22

44.00

Composite Rates Per

1000 Cft

Rs.

250.00

Per CUM : Rs 8.83

Labour Rates Per

1000 Cft

Rs.

250.00

Per CUM : Rs 8.83

142

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-18-a

(British) :

1000 Cft

Transportation of earth all types beyond 250 m and upto 500 m.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.100

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,550.00

106.50

78.00

3,656.50

22

781.00

Composite Rates Per

1000 Cft

Rs.

4,437.50

Per CUM : Rs 156.71

Labour Rates Per

1000 Cft

Rs.

4,437.50

Per CUM : Rs 156.71

143

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-18-b

(British) :

1000 Cft

Transportation of earth all types for every 100m extra lead beyond
500m upto 1.5 km.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.100

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

550.00

16.50

78.00

566.50

22

Composite Rates Per

1000 Cft

Rs.

687.50

Per CUM : Rs 24.28

Labour Rates Per

1000 Cft

Rs.

687.50

Per CUM : Rs 24.28

121.00

144

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-18-c

(British) :

1000 Cft

Transportation of earth all types for every 500m extra lead beyond
1.5 km. upto 8 km.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

1000 Cft

Rs.

625.00

Per CUM : Rs 22.07

Labour Rates Per

1000 Cft

Rs.

625.00

Per CUM : Rs 22.07

110.00

145

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-18-d

(British) :

1000 Cft

Transportation of earth all types for every 1 km extra lead or part


thereof beyond 8 km.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.700

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

350.00

10.50

78.00

360.50

22

77.00

Composite Rates Per

1000 Cft

Rs.

437.50

Per CUM : Rs 15.45

Labour Rates Per

1000 Cft

Rs.

437.50

Per CUM : Rs 15.45

146

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-19-a

(British) :

1000 Cft

Dressing & levelling earth to designed sections Ashes, sand, silt


or soft soil upto cut or fill 6 inches

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Dresser

0.200

Day

600.00

Day

120.00

5.40

78.00

185.40

22

39.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

225.00

Per CUM : Rs 7.95

Labour Rates Per

1000 Cft

Rs.

225.00

Per CUM : Rs 7.95

147

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-19-b

(British) :

1000 Cft

Dressing & levelling earth to designed sections Ordinary or hard


soil upto cut or fill 6 inches

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Dresser

0.500

Day

600.00

Day

300.00

10.80

78.00

370.80

22

79.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

450.00

Per CUM : Rs 15.89

Labour Rates Per

1000 Cft

Rs.

450.00

Per CUM : Rs 15.89

148

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-19-c

(British) :

1000 Cft

Dressing & levelling earth to designed section Gravel work or soft


rock not requiring blasting upto cut or fill 6 inches

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Quarry Man

1.000

Day

700.00

Day

700.00

28.50

78.00

978.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

1,187.50

Per CUM : Rs 41.94

Labour Rates Per

1000 Cft

Rs.

1,187.50

Per CUM : Rs 41.94

209.00

149

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-20

(British) :

1 Chain

Dowel dressing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Dresser

0.250

Day

600.00

Day

150.00

6.00

78.00

206.00

22

44.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

1 Chain

Rs.

250.00

Labour Rates Per

1 Chain

Rs.

250.00

LABOUR

Per Meter : Rs 8.20


Per Meter : Rs 8.20

150

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-21

(British) :

1000 Sft

Dressing slopes of banks or ground surface

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Dresser

1.250

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

750.00

22.50

78.00

772.50

22

Composite Rates Per

1000 Sft

Rs.

937.50

Per SQM : Rs 10.09

Labour Rates Per

1000 Sft

Rs.

937.50

Per SQM : Rs 10.09

165.00

151

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-22

(British) :

1000 Sft

Dressing of earthwork (done by machinery or otherwise & left


undressed) to designed section

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Dresser

1.350

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

810.00

24.30

78.00

834.30

22

Composite Rates Per

1000 Sft

Rs.

1,012.50

Per SQM : Rs 10.89

Labour Rates Per

1000 Sft

Rs.

1,012.50

Per SQM : Rs 10.89

178.20

152

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-23-a

(British) :

1000 Cft

Excavation in foundation of building, bridges etc complete : in


sand, ashes or loose soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

8.000

Day

500.00

Day

4,000.00

Dresser

1.000

Day

600.00

Day

600.00

138.00

78.00

4,738.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

5,750.00

Per CUM : Rs 203.06

Labour Rates Per

1000 Cft

Rs.

5,750.00

Per CUM : Rs 203.06

1,012.00

153

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-23-b

(British) :

1000 Cft

Excavation in foundation of building, bridges etc complete : in


ordinary soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.000

Day

500.00

Day

4,500.00

Dresser

1.500

Day

600.00

Day

900.00

162.00

78.00

5,562.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

6,750.00

Per CUM : Rs 238.37

Labour Rates Per

1000 Cft

Rs.

6,750.00

Per CUM : Rs 238.37

1,188.00

154

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-23-c

(British) :

1000 Cft

Excavation in foundation of building, bridges etc complete : in


hard soil or soft murum

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.000

Day

500.00

Day

5,000.00

Dresser

1.750

Day

600.00

Day

1,050.00

181.50

78.00

6,231.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

7,562.50

Per CUM : Rs 267.07

Labour Rates Per

1000 Cft

Rs.

7,562.50

Per CUM : Rs 267.07

1,331.00

155

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-23-d

(British) :

1000 Cft

Excavation in foundation of building, bridges etc complete : in


shingle/gravel

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

11.000

Day

500.00

Day

5,500.00

Dresser

2.300

Day

600.00

Day

1,380.00

206.40

78.00

7,086.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

8,600.00

Per CUM : Rs 303.71

Labour Rates Per

1000 Cft

Rs.

8,600.00

Per CUM : Rs 303.71

1,513.60

156

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-24

(British) :

1000 Cft

Cutting hard rock such as granite, ballast, hard lime etc with
chisels/hammers for small foundation

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

22.680

Kg

82.00

Kg

1,859.76

Charcoal

223.900

Kg

50.00

Kg

11,195.00

TOTAL

MATERIAL

19.25

13,054.76

LABOUR
Coolie

7.000

Day

500.00

Day

3,500.00

Black Smith

7.000

Day

900.00

Day

6,300.00

Skilled Coolie

14.000

Day

600.00

Day

8,400.00

Hammer Man

28.000

Day

700.00

Day

19,600.00

1,134.00

58.75

38,934.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,188.05

Composite Rates Per

1000 Cft

Rs.

63,176.81

Per CUM : Rs 2,231.07

Labour Rates Per

1000 Cft

Rs.

47,250.00

Per CUM : Rs 1,668.62

157

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-25

(British) :

1000 Cft

Extra for excavaton requiring shoring

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.080

2,600.00

Cft

TOTAL

MATERIAL

Cft

208.00

17.18

208.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

0.250

Day

800.00

Day

200.00

21.00

60.82

721.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

1,128.76

Per CUM : Rs 39.86

Labour Rates Per

1000 Cft

Rs.

875.00

Per CUM : Rs 30.90

199.76

158

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-26-a

(British) :

1000 Cft

Mixing & moistening of earthwork to OMC in layers for compaction


etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.790

Day

500.00

Day

395.00

Bhishti

0.190

Day

500.00

Day

95.00

14.70

78.00

504.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

612.50

Per CUM : Rs 21.63

Labour Rates Per

1000 Cft

Rs.

612.50

Per CUM : Rs 21.63

107.80

159

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-26-b-01

(British) :

1000 Cft

Compaction by rolling with animal driven roller or hand rammed :


Soft or sandy soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Bullock Man with Bullock

1.000

Day

800.00

Day

800.00

31.50

78.00

1,081.50

22

231.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

1,312.50

Per CUM : Rs 46.35

Labour Rates Per

1000 Cft

Rs.

1,312.50

Per CUM : Rs 46.35

160

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-26-b-02

(British) :

1000 Cft

Compaction by rolling with animal driven roller or hand rammed :


Ordinary soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Bullock Man with Bullock

1.250

Day

800.00

Day

1,000.00

37.50

78.00

1,287.50

22

275.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

1,562.50

Per CUM : Rs 55.18

Labour Rates Per

1000 Cft

Rs.

1,562.50

Per CUM : Rs 55.18

161

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-26-b-03

(British) :

1000 Cft

Compaction by rolling with animal driven roller or hand rammed :


Hard soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.970

Day

500.00

Day

485.00

Bullock Man with Bullock

1.620

Day

800.00

Day

1,296.00

53.43

78.00

1,834.43

22

391.82

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

2,226.25

Per CUM : Rs 78.62

Labour Rates Per

1000 Cft

Rs.

2,226.25

Per CUM : Rs 78.62

162

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-26-b-04

(British) :

1000 Cft

Compaction by rolling with animal driven roller or hand rammed :


Admixture of shingle

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.470

Day

500.00

Day

735.00

Bullock Man with Bullock

2.970

Day

800.00

Day

2,376.00

93.33

78.00

3,204.33

22

684.42

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

3,888.75

Per CUM : Rs 137.33

Labour Rates Per

1000 Cft

Rs.

3,888.75

Per CUM : Rs 137.33

163

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-26-c

(British) :

1000 Cft

Ramming earthwork (all types of soil)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

750.00

22.50

78.00

772.50

22

Composite Rates Per

1000 Cft

Rs.

937.50

Per CUM : Rs 33.11

Labour Rates Per

1000 Cft

Rs.

937.50

Per CUM : Rs 33.11

165.00

164

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-26-d

(British) :

1000 Cft

Ramming earthwork behind retaining wall

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

1000 Cft

Rs.

1,250.00

Per CUM : Rs 44.14

Labour Rates Per

1000 Cft

Rs.

1,250.00

Per CUM : Rs 44.14

165

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-27-a

(British) :

1000 Cft

Compaction of earth with power road roller 95% to 100% max. mod.
AASHTO dry density

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Skilled Coolie

2.000

Day

600.00

Day

1,200.00

Water Sprinkler

1.000

Day

600.00

Day

600.00

69.00

35.55

2,369.00

Hour

3,000.00

42.45

3,000.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Comp Roller

3.000

1,000.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

6,535.00

Per CUM : Rs 230.78

Labour Rates Per

1000 Cft

Rs.

2,875.00

Per CUM : Rs 101.53

1,166.00

166

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-27-b

(British) :

1000 Cft

Compaction of earth with power road roller 90% max. mod. AASHTO dry
density

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Bhishti

0.750

Day

500.00

Day

375.00

Skilled Coolie

1.500

Day

600.00

Day

900.00

Water Sprinkler

0.750

Day

600.00

Day

450.00

51.75

33.60

1,776.75

Hour

2,503.00

44.40

2,503.00

22

930.16

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Comp Roller

2.503

1,000.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

5,209.91

Per CUM : Rs 183.99

Labour Rates Per

1000 Cft

Rs.

2,156.25

Per CUM : Rs 76.15

167

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-27-c

(British) :

1000 Cft

Compaction of earth with power road roller 85% max. mod. AASHTO dry
density

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Bhishti

0.500

Day

500.00

Day

250.00

Skilled Coolie

1.500

Day

600.00

Day

900.00

Water Sprinkler

0.500

Day

600.00

Day

300.00

43.50

34.52

1,493.50

Hour

2,000.00

43.48

2,000.00

22

759.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Comp Roller

2.000

1,000.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

4,252.50

Per CUM : Rs 150.18

Labour Rates Per

1000 Cft

Rs.

1,812.50

Per CUM : Rs 64.01

168

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-28

(British) :

1000 Cft

Extra for wet earthwork

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,750.00

52.50

78.00

1,802.50

22

385.00

Composite Rates Per

1000 Cft

Rs.

2,187.50

Per CUM : Rs 77.25

Labour Rates Per

1000 Cft

Rs.

2,187.50

Per CUM : Rs 77.25

169

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-29

(British) :

1000 Cft

Extra for slush or daldal including dewatering

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

8.000

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

4,000.00

120.00

69.67

4,120.00

EQUIPMENT
Dewatering/Pumping Set

1.000

500.00

LS

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

LS

8.33

22

Composite Rates Per

1000 Cft

Rs.

5,610.00

Per CUM : Rs 198.12

Labour Rates Per

1000 Cft

Rs.

5,000.00

Per CUM : Rs 176.57

500.00

500.00

990.00

170

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-30

(British) :

1000 Cft

Extra for puddling.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.750

Day

500.00

Day

2,375.00

Bhishti

1.500

Day

500.00

Day

750.00

93.75

78.00

3,218.75

22

687.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

3,906.25

Per CUM : Rs 137.95

Labour Rates Per

1000 Cft

Rs.

3,906.25

Per CUM : Rs 137.95

171

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-31

(British) :

Rft

Earthwork on small rain water drains, along canal banks, roads,


drains, etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.010

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

6.25

Labour Rates Per

Rft

Rs.

6.25

LABOUR

Day

5.00

0.15

78.00

5.15

22

1.10

Per Meter : Rs 20.50


Per Meter : Rs 20.50

172

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-32

(British) :

1000 Cft

Filling and Compacting Soil, Earth and Boulders behind retaining


walls (Available material)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,500.00

135.00

78.00

4,635.00

22

990.00

Composite Rates Per

1000 Cft

Rs.

5,625.00

Per CUM : Rs 198.65

Labour Rates Per

1000 Cft

Rs.

5,625.00

Per CUM : Rs 198.65

173

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-33

(British) :

2500 Rft

Dag belling 75 mm deep.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Dresser

1.400

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

840.00

25.20

78.00

865.20

22

Composite Rates Per

2500 Rft

Rs.

1,050.00

Cost Per km: 1,375.50

Labour Rates Per

2500 Rft

Rs.

1,050.00

Cost Per km: 1,375.50

184.80

174

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-34

(British) :

1000 Sft

Turfing slopes of banks or lawns with grass sods including


ploughing, laying, setting & watering

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,000.00

60.00

78.00

2,060.00

22

440.00

Composite Rates Per

1000 Sft

Rs.

2,500.00

Per SQM : Rs 26.90

Labour Rates Per

1000 Sft

Rs.

2,500.00

Per SQM : Rs 26.90

175

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-35-a

(British) :

1000 Cft

Berm cutting : Lead upto single throw of phaorah or shovel, without


dressing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,250.00

67.50

78.00

2,317.50

22

495.00

Composite Rates Per

1000 Cft

Rs.

2,812.50

Per CUM : Rs 99.32

Labour Rates Per

1000 Cft

Rs.

2,812.50

Per CUM : Rs 99.32

176

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-35-b

(British) :

1000 Cft

Berm cutting : Upto 25 m lead (including dressing)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,500.00

105.00

78.00

3,605.00

22

770.00

Composite Rates Per

1000 Cft

Rs.

4,375.00

Per CUM : Rs 154.50

Labour Rates Per

1000 Cft

Rs.

4,375.00

Per CUM : Rs 154.50

177

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-36-a

(British) :

Mile

Berm trimming both sides of channels Upto 1 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.000

Day

500.00

Day

6,000.00

Dresser

2.000

Day

600.00

Day

1,200.00

216.00

78.00

7,416.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,584.00

Composite Rates Per

Mile

Rs.

9,000.00

Cost Per km: 5,592.60

Labour Rates Per

Mile

Rs.

9,000.00

Cost Per km: 5,592.60

178

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-36-b

(British) :

Mile

Berm trimming both sides of channels Over 1m to 1.5m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

15.500

Day

500.00

Day

7,750.00

Dresser

3.000

Day

600.00

Day

1,800.00

286.50

78.00

9,836.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,101.00

Composite Rates Per

Mile

Rs.

11,937.50

Cost Per km: 7,417.96

Labour Rates Per

Mile

Rs.

11,937.50

Cost Per km: 7,417.96

179

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-36-c

(British) :

Mile

Berm trimming both sides of channels Over 1.5m to 2.5m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

25.500

Day

500.00

Day

12,750.00

Dresser

4.000

Day

600.00

Day

2,400.00

454.50

78.00

15,604.50

22

3,333.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Mile

Rs.

18,937.50

Cost Per km: 11,767.76

Labour Rates Per

Mile

Rs.

18,937.50

Cost Per km: 11,767.76

180

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-37-a

(British) :

Acre

Ploughing and levelling borrow pits Upto 1m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Bullock Man with Bullock

2.000

Day

800.00

Day

1,600.00

78.00

78.00

2,678.00

22

572.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Acre

Rs.

3,250.00

Cost Per ha: 8,030.75

Labour Rates Per

Acre

Rs.

3,250.00

Cost Per ha: 8,030.75

181

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-37-b

(British) :

Acre

Ploughing and levelling borrow pits Exceeding 1m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Bullock Man with Bullock

2.490

Day

800.00

Day

1,992.00

119.76

78.00

4,111.76

22

878.24

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Acre

Rs.

4,990.00

Cost Per ha: 12,330.29

Labour Rates Per

Acre

Rs.

4,990.00

Cost Per ha: 12,330.29

182

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-38-a-01

(British) :

Chain

Making boundary or service roads complete in unploughed land : From


3 m to 6 m wide

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Dresser

0.500

Day

600.00

Day

300.00

24.00

78.00

824.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

176.00

Composite Rates Per

Chain

Rs.

1,000.00

Cost Per 50 m: 1,640.00

Labour Rates Per

Chain

Rs.

1,000.00

Cost Per 50 m: 1,640.00

183

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-38-a-02

(British) :

Chain

Making boundary or service roads complete in unploughed land : Over


6 m to 12 m wide

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Dresser

1.000

Day

600.00

Day

600.00

33.00

78.00

1,133.00

22

242.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Chain

Rs.

1,375.00

Cost Per 50 m: 2,255.00

Labour Rates Per

Chain

Rs.

1,375.00

Cost Per 50 m: 2,255.00

184

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-38-b-01

(British) :

Chain

Making boundary or service roads complete in ploughed land : From 3


m to 6m wide

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.210

Day

500.00

Day

605.00

Dresser

0.540

Day

600.00

Day

324.00

27.87

78.00

956.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

204.38

Composite Rates Per

Chain

Rs.

1,161.25

Cost Per 50 m: 1,904.45

Labour Rates Per

Chain

Rs.

1,161.25

Cost Per 50 m: 1,904.45

185

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-38-b-02

(British) :

Chain

Making boundary or service roads complete in ploughed land : Over 6


m to 12 m wide

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.520

Day

500.00

Day

760.00

Dresser

0.970

Day

600.00

Day

582.00

40.26

78.00

1,382.26

22

295.24

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Chain

Rs.

1,677.50

Cost Per 50 m: 2,751.10

Labour Rates Per

Chain

Rs.

1,677.50

Cost Per 50 m: 2,751.10

186

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-39-a

(British) :

1000 Cft

Earthwork by boats, Digging and loading into boats, upto 25m lead

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,750.00

112.50

78.00

3,862.50

22

825.00

Composite Rates Per

1000 Cft

Rs.

4,687.50

Per CUM : Rs 165.54

Labour Rates Per

1000 Cft

Rs.

4,687.50

Per CUM : Rs 165.54

187

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-39-b

(British) :

1000 Cft

Earthwork by boats, including hire of boats Carriage by boats upto


250m.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Boatman With Boat

3.000

2,500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

7,500.00

225.00

78.00

7,725.00

22

Composite Rates Per

1000 Cft

Rs.

9,375.00

Per CUM : Rs 331.08

Labour Rates Per

1000 Cft

Rs.

9,375.00

Per CUM : Rs 331.08

1,650.00

188

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-39-c

(British) :

1000 Cft

Earthwork by boats, including hiring of boats Extra for every


additional 50m beyond 250m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Boatman With Boat

0.200

2,500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

1000 Cft

Rs.

625.00

Per CUM : Rs 22.07

Labour Rates Per

1000 Cft

Rs.

625.00

Per CUM : Rs 22.07

110.00

189

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-39-d

(British) :

1000 Cft

Earthwork by boats, Unloading earth from boats

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,750.00

52.50

78.00

1,802.50

22

385.00

Composite Rates Per

1000 Cft

Rs.

2,187.50

Per CUM : Rs 77.25

Labour Rates Per

1000 Cft

Rs.

2,187.50

Per CUM : Rs 77.25

190

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-40

(British) :

1000 Cft

Unloading earth from BG trucks and clearing 1.5m from rail

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,500.00

45.00

78.00

1,545.00

22

330.00

Composite Rates Per

1000 Cft

Rs.

1,875.00

Per CUM : Rs 66.22

Labour Rates Per

1000 Cft

Rs.

1,875.00

Per CUM : Rs 66.22

191

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-41

(British) :

1000 Cft

Earthwork by tramway, digging and loading in trucks, upto 25m lead

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,500.00

105.00

78.00

3,605.00

22

770.00

Composite Rates Per

1000 Cft

Rs.

4,375.00

Per CUM : Rs 154.50

Labour Rates Per

1000 Cft

Rs.

4,375.00

Per CUM : Rs 154.50

192

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-42

(British) :

1000 Cft

Unloading earth from BG trucks and spreading upto 5m from rail

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,250.00

67.50

78.00

2,317.50

22

495.00

Composite Rates Per

1000 Cft

Rs.

2,812.50

Per CUM : Rs 99.32

Labour Rates Per

1000 Cft

Rs.

2,812.50

Per CUM : Rs 99.32

193

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-43

(British) :

1000 Cft

Supplying clean and screened river or pit sand within 150m


including removal of loose earth or overburden.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

20.000

Day

500.00

Day

10,000.00

Bullock Man with Bullock

10.000

Day

800.00

Day

8,000.00

540.00

78.00

18,540.00

22

3,960.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

22,500.00

Per CUM : Rs 794.58

Labour Rates Per

1000 Cft

Rs.

22,500.00

Per CUM : Rs 794.58

194

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-44-a

(British) :

1000 Cft

Excavation in open cut for sewers & manhole except shingle, gravel
& rock : Upto 2m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,500.00

135.00

78.00

4,635.00

22

990.00

Composite Rates Per

1000 Cft

Rs.

5,625.00

Per CUM : Rs 198.65

Labour Rates Per

1000 Cft

Rs.

5,625.00

Per CUM : Rs 198.65

195

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-44-b

(British) :

1000 Cft

Excavation in open cut for sewers & manholes except shingle, gravel
& rock : 2m to 5m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

6,000.00

180.00

78.00

6,180.00

22

Composite Rates Per

1000 Cft

Rs.

7,500.00

Per CUM : Rs 264.86

Labour Rates Per

1000 Cft

Rs.

7,500.00

Per CUM : Rs 264.86

1,320.00

196

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-44-c

(British) :

1000 Cft

Excavation in open cut for sewers & manholes except shingle, gravel
& rock : Below 5m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

16.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

8,000.00

240.00

78.00

8,240.00

22

Composite Rates Per

1000 Cft

Rs.

10,000.00

Per CUM : Rs 353.15

Labour Rates Per

1000 Cft

Rs.

10,000.00

Per CUM : Rs 353.15

1,760.00

197

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-45-a

(British) :

1000 Cft

Trench Excavation in open cutting below water level for sewers &
manholes : Upto 1.25m depth

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

0.300

Kg

140.00

Kg

42.00

M.S Sheet

14.900

Kg

125.00

Kg

1,862.50

Wood - Kiker

0.300

Cft

850.00

Cft

255.00

16.94

2,159.50

TOTAL

MATERIAL

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Carpenter

0.500

Day

800.00

Day

400.00

Surveyor

0.500

Day

1,200.00

Day

600.00

Skilled Coolie

4.000

Day

600.00

Day

2,400.00

192.00

53.21

6,592.00

Hour

1,000.00

7.85

1,000.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Dewatering/Pumping Set

2.000

500.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

11,854.59

Per CUM : Rs 418.64

Labour Rates Per

1000 Cft

Rs.

8,000.00

Per CUM : Rs 282.52

2,103.09

198

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-45-b

(British) :

1000 Cft

Trench Excavation in open cutting below water level for sewers &
manholes : 1.25m to 2.5m depth

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

0.500

Kg

140.00

Kg

70.00

M.S Sheet

20.000

Kg

125.00

Kg

2,500.00

Wood - Kiker

0.500

Cft

850.00

Cft

425.00

17.98

2,995.00

TOTAL

MATERIAL

LABOUR
Coolie

8.000

Day

500.00

Day

4,000.00

Carpenter

0.500

Day

800.00

Day

400.00

Surveyor

0.500

Day

1,200.00

Day

600.00

Skilled Coolie

5.000

Day

600.00

Day

3,000.00

240.00

51.02

8,240.00

Hour

1,500.00

9.00

1,500.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Dewatering/Pumping Set

3.000

500.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

15,483.90

Per CUM : Rs 546.81

Labour Rates Per

1000 Cft

Rs.

10,000.00

Per CUM : Rs 353.15

2,748.90

199

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-45-c

(British) :

1000 Cft

Trench Excavation in open cutting below water level for sewers &
manholes : Exceeding 2.5m depth

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

1.000

Kg

140.00

Kg

140.00

M.S Sheet

40.000

Kg

125.00

Kg

5,000.00

Wood - Kiker

1.000

Cft

850.00

Cft

850.00

22.36

5,990.00

TOTAL

MATERIAL

LABOUR
Coolie

10.000

Day

500.00

Day

5,000.00

Carpenter

1.500

Day

800.00

Day

1,200.00

Surveyor

0.500

Day

1,200.00

Day

600.00

Skilled Coolie

8.000

Day

600.00

Day

4,800.00

348.00

46.31

11,948.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Dewatering/Pumping Set

5.000

500.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

2,500.00

9.33

2,500.00

22

Composite Rates Per

1000 Cft

Rs.

24,857.80

Per CUM : Rs 877.85

Labour Rates Per

1000 Cft

Rs.

14,500.00

Per CUM : Rs 512.06

4,419.80

200

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-46

(British) :

1000 Cft

Excavation of trench in all kinds of soils except cutting in rock


for pilelines upto 1.5m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.100

Day

500.00

Day

2,550.00

Dresser

2.000

Day

600.00

Day

1,200.00

112.50

78.00

3,862.50

22

825.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Cft

Rs.

4,687.50

Per CUM : Rs 165.54

Labour Rates Per

1000 Cft

Rs.

4,687.50

Per CUM : Rs 165.54

201

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-48-a

(British) :

Each

Uprooting stump and removing within 50 m upto 2 m girth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
2.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,250.00

37.50

78.00

1,287.50

22

275.00

Composite Rates Per

Each

Rs.

1,562.50

Cost Per Each: 1,562.50

Labour Rates Per

Each

Rs.

1,562.50

Cost Per Each: 1,562.50

202

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-48-b

(British) :

Each

Uprooting stump and removing within 50 m above 2 m girth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
3.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

1,750.00

52.50

70.31

1,802.50

EQUIPMENT
0.250

Tractor with blade/plough

800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

200.00

7.69

200.00

22

429.00

Composite Rates Per

Each

Rs.

2,431.50

Cost Per Each: 2,431.50

Labour Rates Per

Each

Rs.

2,187.50

Cost Per Each: 2,187.50

203

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-48-c

(British) :

Each

Uprooting stump and removing within 50 m upto 2 m girth including


sand filling and trinches

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
24.720

Sand

2,200.00

CFT

TOTAL

MATERIAL

543.84

100 CFT

20.46

543.84

Day

1,250.00

37.50

50.02

1,287.50

LABOUR
2.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
0.250

Tractor with blade/plough

800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

200.00

7.52

200.00

22

438.64

Composite Rates Per

Each

Rs.

2,469.98

Cost Per Each: 2,469.98

Labour Rates Per

Each

Rs.

1,562.50

Cost Per Each: 1,562.50

204

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-48-d

(British) :

Each

Uprooting stump and removing within 50 m above 2 m girth including


sand filling and trinches

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
52.980

Sand

2,200.00

CFT

TOTAL

MATERIAL

100 CFT

1,165.56

28.06

1,165.56

Day

1,750.00

52.50

45.13

1,802.50

LABOUR
3.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
0.250

Tractor with blade/plough

800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

200.00

4.81

200.00

22

685.42

Composite Rates Per

Each

Rs.

3,853.48

Cost Per Each: 3,853.48

Labour Rates Per

Each

Rs.

2,187.50

Cost Per Each: 2,187.50

205

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-49-a

(British) :

Decare

Jungle clearance and removing within 50m Light Jungle

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.380

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,690.00

80.70

78.00

2,770.70

22

591.80

Composite Rates Per

Decare

Rs.

3,362.50

Cost Per Decare: 3,362.50

Labour Rates Per

Decare

Rs.

3,362.50

Cost Per Decare: 3,362.50

206

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-49-b

(British) :

Decare

Jungle clearance and removing within 50m Thick Jungle

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.760

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,380.00

161.40

78.00

5,541.40

22

1,183.60

Composite Rates Per

Decare

Rs.

6,725.00

Cost Per Decare: 6,725.00

Labour Rates Per

Decare

Rs.

6,725.00

Cost Per Decare: 6,725.00

207

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-50

(British) :

1000 Sft

Uprooting sarkanda growth & disposal within 50m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.300

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

650.00

19.50

78.00

669.50

22

Composite Rates Per

1000 Sft

Rs.

812.50

Per SQM : Rs 8.74

Labour Rates Per

1000 Sft

Rs.

812.50

Per SQM : Rs 8.74

143.00

208

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-51

(British) :

ha

Ploughing 3 times

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
8.645

Bullock Man with Bullock

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

6,916.00

207.48

78.00

7,123.48

22

1,521.52

Composite Rates Per

ha

Rs.

8,645.00

Cost Per ha: 8,645.00

Labour Rates Per

ha

Rs.

8,645.00

Cost Per ha: 8,645.00

209

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-52

(British) :

1000 Sft

Levelling, dressing and making lawns

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Dresser

5.000

Day

600.00

Day

3,000.00

165.00

78.00

5,665.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Sft

Rs.

6,875.00

Per SQM : Rs 73.98

Labour Rates Per

1000 Sft

Rs.

6,875.00

Per SQM : Rs 73.98

1,210.00

210

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-53

(British) :

1000 Sft

Turfing of lawn with Dacca Grass

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Dacca Grass

1000.000

10.00

Sft

TOTAL

MATERIAL

Sft

10,000.00

48.39

10,000.00

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Mali

5.000

Day

600.00

Day

3,000.00

165.00

29.61

5,665.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1000 Sft

Rs.

19,075.00

Per SQM : Rs 205.25

Labour Rates Per

1000 Sft

Rs.

6,875.00

Per SQM : Rs 73.98

3,410.00

211

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-54

(British) :

1000 Cft

Excavation and Clearance of shingle, gravel including sand, soft


soil and silt deposits in channel bed upto 25m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

19.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

9,500.00

285.00

78.00

9,785.00

22

Composite Rates Per

1000 Cft

Rs.

11,875.00

Per CUM : Rs 419.36

Labour Rates Per

1000 Cft

Rs.

11,875.00

Per CUM : Rs 419.36

2,090.00

212

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-55-a

(British) :

100 Ft

Clearance of choked up syphon including dewatering Upto 1.25m dia

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

50.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Ft

Rs.

31,250.00

Labour Rates Per

100 Ft

Rs.

31,250.00

Day

25,000.00

750.00

78.00

25,750.00

22

5,500.00

Per Meter : Rs 1,025.00


Per Meter : Rs 1,025.00

213

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-55-b

(British) :

100 Ft

Clearance of choked up syphon including dewatering Exceeding 1.25m


dia

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

90.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Ft

Rs.

56,250.00

Labour Rates Per

100 Ft

Rs.

56,250.00

Day

45,000.00

1,350.00

78.00

46,350.00

22

9,900.00

Per Meter : Rs 1,845.00


Per Meter : Rs 1,845.00

214

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-56

Item Name :

(British) :

1000 Sft

Clearing & Grubbing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.864

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

432.00

12.96

18.81

444.96

EQUIPMENT
Tractor With Trolly

0.622

Hour

1,000.00

Hour

622.00

Tractor with blade/plough

0.622

Hour

800.00

Hour

497.60

Tractor with Loader

0.622

Hour

800.00

Hour

497.60

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

59.19

1,617.20

22

450.82

Composite Rates Per

1000 Sft

Rs.

2,512.98

Per SQM : Rs 27.04

Labour Rates Per

1000 Sft

Rs.

540.00

Per SQM : Rs 5.81

215

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-57-a

Item Name :

(British) :

No

Removal of Tree : Girth 150mm - 300mm including removal of stump &


backfilling with sand

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
12.360

Sand

2,200.00

Cft

TOTAL

MATERIAL

100 Cft

271.92

48.74

271.92

Day

33.50

1.01

9.00

34.51

LABOUR
0.067

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.033

Hour

1,000.00

Hour

33.00

Tractor with blade/plough

0.067

Hour

800.00

Hour

53.60

Tractor with Loader

0.033

Hour

800.00

Hour

26.40

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

20.25

113.00

22

92.05

Composite Rates Per

No

Rs.

511.48

Cost Per No: 511.48

Labour Rates Per

No

Rs.

41.88

Cost Per No: 41.88

216

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-57-b

Item Name :

(British) :

No

Removal of Tree : Girth 300mm - 600mm including removal of stump &


backfilling with sand

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
24.720

Sand

2,200.00

Cft

TOTAL

MATERIAL

100 Cft

543.84

48.74

543.84

Day

67.00

2.01

9.00

69.01

LABOUR
0.134

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.066

Hour

1,000.00

Hour

66.00

Tractor with blade/plough

0.134

Hour

800.00

Hour

107.20

Tractor with Loader

0.066

Hour

800.00

Hour

52.80

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

20.25

22

Composite Rates Per

No

Rs.

1,022.95

Cost Per No: 1,022.95

Labour Rates Per

No

Rs.

83.75

Cost Per No: 83.75

226.00

184.10

217

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-57-c

Item Name :

(British) :

No

Removal of Tree : Girth over 600mm including removal of stump &


backfilling with sand

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
52.980

Sand

2,200.00

Cft

TOTAL

MATERIAL

100 Cft

1,165.56

42.76

1,165.56

Day

201.00

6.03

10.37

207.03

LABOUR
0.402

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.198

Hour

1,000.00

Hour

198.00

Tractor with blade/plough

0.402

Hour

800.00

Hour

321.60

Tractor with Loader

0.198

Hour

800.00

Hour

158.40

24.87

678.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

No

Rs.

2,500.39

Cost Per No: 2,500.39

Labour Rates Per

No

Rs.

251.25

Cost Per No: 251.25

449.80

218

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-58

(British) :

1000 Sft

Compaction of Natural Ground

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.771

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

385.50

11.57

26.00

397.07

EQUIPMENT
Tractor with blade/plough

0.623

Hour

800.00

Hour

498.40

Water Tank 1000g

0.623

Hour

350.00

Hour

218.05

Vibrator Roller 12ton

0.155

Hour

1,000.00

Hour

155.00

52.00

871.45

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Sft

Rs.

1,545.04

Per SQM : Rs 16.62

Labour Rates Per

1000 Sft

Rs.

481.88

Per SQM : Rs 5.18

276.53

219

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-59-a

Item Name :

(British) :

1000 Cft

Roadway Excavation in Surplus / Unsuitable Common Material

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.566

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

283.00

8.49

5.52

291.49

EQUIPMENT
Tractor With Trolly

4.531

Hour

1,000.00

Hour

4,531.00

Tractor with blade/plough

2.265

Hour

800.00

Hour

1,812.00

Tractor with Loader

2.265

Hour

800.00

Hour

1,812.00

72.48

8,155.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

10,302.85

Per CUM : Rs 363.84

Labour Rates Per

1000 Cft

Rs.

353.75

Per CUM : Rs 12.49

1,856.36

220

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-59-b

(British) :

1000 Cft

Roadway Excavation in Surplus / Unsuitable Rock (Hard) Material


requiring blasting.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

7.079

200.00

No

TOTAL

6.09

MATERIAL

No

1,415.80

1,415.80

LABOUR
Quarry Man

5.097

Day

700.00

Day

3,567.90

Rock Driller

1.699

Day

1,200.00

Day

2,038.80

168.20

27.11

5,774.90

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Pneumatic Drill w/ Compressor

2.265

Hour

1,800.00

Hour

4,077.00

Dozer D6 or equiv 120 HP

2.265

Hour

2,800.00

Hour

6,342.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

44.80

10,419.00

22

3,837.13

Composite Rates Per

1000 Cft

Rs.

21,446.83

Per CUM : Rs 757.39

Labour Rates Per

1000 Cft

Rs.

7,008.38

Per CUM : Rs 247.50

221

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-59-c

(British) :

1000 Cft

Roadway Excavation in Surplus / Unsuitable Rock (Medium) Material


requiring blasting

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

4.079

200.00

No

TOTAL

4.24

MATERIAL

No

815.80

815.80

LABOUR
Quarry Man

3.097

Day

700.00

Day

2,167.90

Rock Driller

0.849

Day

1,200.00

Day

1,018.80

95.60

19.57

3,282.30

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Pneumatic Drill w/ Compressor

2.265

Hour

1,800.00

Hour

4,077.00

Dozer D6 or equiv 120 HP

2.265

Hour

2,800.00

Hour

6,342.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

54.18

10,419.00

22

3,172.73

Composite Rates Per

1000 Cft

Rs.

17,689.83

Per CUM : Rs 624.71

Labour Rates Per

1000 Cft

Rs.

3,983.37

Per CUM : Rs 140.67

222

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-60-a

Item Name :

(British) :

1000 Cft

Structural Excavation in Common Material

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.344

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

4,672.00

140.16

45.67

4,812.16

Hour

3,540.00

32.33

3,540.00

22

EQUIPMENT
Tractor With Trolly

3.540

1,000.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

10,158.80

Per CUM : Rs 358.75

Labour Rates Per

1000 Cft

Rs.

5,840.00

Per CUM : Rs 206.24

1,806.64

223

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-60-b

Item Name :

(British) :

1000 Cft

Structural Excavation in Rock Material requiring blasting

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

14.158

200.00

No

TOTAL

5.32

MATERIAL

2,831.60

No

2,831.60

LABOUR
Coolie

22.653

Day

500.00

Day

11,326.50

Quarry Man

10.194

Day

700.00

Day

7,135.80

Rock Driller

3.398

Day

1,200.00

Day

4,077.60

676.20

45.37

23,216.10

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

3.540

Hour

1,000.00

Hour

3,540.00

Tractor with Loader

3.540

Hour

800.00

Hour

2,832.00

Pneumatic Drill w/ Compressor

4.531

Hour

1,800.00

Hour

8,155.80

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

27.31

14,527.80

22

8,777.85

Composite Rates Per

1000 Cft

Rs.

49,353.34

Per CUM : Rs 1,742.90

Labour Rates Per

1000 Cft

Rs.

28,174.88

Per CUM : Rs 994.99

224

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-60-c

(British) :

1000 Cft

Structural backfill using Common Material available at site.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

14.158

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

7,079.00

212.37

50.05

7,291.37

Hour

4,204.80

27.95

4,204.80

22

EQUIPMENT
Plate Compactor

9.344

450.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

13,978.61

Per CUM : Rs 493.65

Labour Rates Per

1000 Cft

Rs.

8,848.75

Per CUM : Rs 312.49

2,482.44

225

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-60-d

(British) :

1000 Cft

Structural Backfill using Granular Material brought from outside

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pitrun Gravel (NHA Specified)

1300.000

2,000.00

Cft

TOTAL

MATERIAL

26,000.00

100 Cft

60.99

26,000.00

Day

1,770.00

53.10

7.15

1,823.10

Hour

4,204.80

9.86

4,204.80

22

LABOUR
Coolie

3.540

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Plate Compactor

9.344

450.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

7,034.46

Composite Rates Per

1000 Cft

Rs.

39,062.36

Per CUM : Rs 1,379.48

Labour Rates Per

1000 Cft

Rs.

2,212.50

Per CUM : Rs 78.13

226

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-61-a

Item Name :

(British) :

1000 Cft

Formation of Embankment from Roadway Excavation in Common Material


including compaction by power roller.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.566

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

283.00

8.49

5.43

291.49

EQUIPMENT
Tractor With Trolly

3.398

Hour

1,000.00

Hour

3,398.00

Tractor with blade/plough

3.398

Hour

800.00

Hour

2,718.40

Water Tank 1000g

0.566

Hour

350.00

Hour

198.10

Vibrator Roller 12ton

0.283

Hour

1,000.00

Hour

283.00

Tractor with Loader

2.265

Hour

800.00

Hour

1,812.00

Lab Test

0.080

Job

700.00

Job

56.00

72.57

8,465.50

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

10,681.66

Per CUM : Rs 377.22

Labour Rates Per

1000 Cft

Rs.

353.75

Per CUM : Rs 12.49

1,924.67

227

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-61-b

(British) :

1000 Cft

Formation of Embankment from Roadway Excavation in Rock Material


requiring blasting and compaction of embankment by power roller.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Explosives for Blasting

7.079

200.00

No

TOTAL

5.37

MATERIAL

No

1,415.80

1,415.80

LABOUR
Quarry Man

5.097

Day

700.00

Day

3,567.90

Rock Driller

1.699

Day

1,200.00

Day

2,038.80

168.20

24.25

5,774.90

1,812.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with blade/plough

2.265

Hour.

800.00

Hour.

Water Tank 1000g

0.566

Hour

350.00

Hour

198.10

Vibrator Roller 12ton

0.283

Hour

1,000.00

Hour

283.00

Pneumatic Drill w/ Compressor

2.265

Hour

1,800.00

Hour

4,077.00

Dozer D6 or equiv 120 HP

2.265

Hour

2,800.00

Hour

6,342.00

Lab Test

0.080

Job

700.00

Job

56.00

48.39

12,768.10

22

4,353.93

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

24,312.73

Per CUM : Rs 858.60

Labour Rates Per

1000 Cft

Rs.

7,008.38

Per CUM : Rs 247.50

228

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-61-c

(British) :

1000 Cft

Formation of Embankment from Borrow Excavation in Common Material


including compaction by power roller.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

1250.000

1,400.00

Cft

TOTAL

MATERIAL

100 Cft

17,500.00

68.26

17,500.00

Day

283.50

8.51

4.11

292.01

LABOUR
Coolie

0.567

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with blade/plough

1.134

Hour

800.00

Hour

907.20

Water Tank 1000g

0.567

Hour

350.00

Hour

198.45

Vibrator Roller 12ton

0.283

Hour

1,000.00

Hour

283.00

Lab Test

0.080

Job

700.00

Job

56.00

5.63

1,444.65

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Cft

Rs.

23,466.85

Per CUM : Rs 828.72

Labour Rates Per

1000 Cft

Rs.

354.38

Per CUM : Rs 12.51

4,230.19

229

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

03-61-d

Item Name :

(British) :

1000 Cft

Formation of Embankment from Roadway Excavation in granular


Material including compaction by power roller.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

500.00

15.00

7.18

515.00

EQUIPMENT
Tractor With Trolly

3.398

Hour

1,000.00

Hour

3,398.00

Tractor with blade/plough

3.398

Hour

800.00

Hour

2,718.40

Water Tank 1000g

0.566

Hour

350.00

Hour

198.10

Vibrator Roller 12ton

0.283

Hour

1,000.00

Hour

283.00

Tractor with Loader

2.265

Hour

800.00

Hour

1,812.00

Lab Test

0.080

No

700.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

70.82

22

Composite Rates Per

1000 Cft

Rs.

10,952.91

Per CUM : Rs 386.80

Labour Rates Per

1000 Cft

Rs.

625.00

Per CUM : Rs 22.07

56.00

8,465.50

1,972.41

230

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-62-a

(British) :

1000 Sft

Subgrade Preparation in Earth Cut

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.771

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

385.50

11.57

16.24

397.07

EQUIPMENT
Tractor with blade/plough

1.245

Hour

800.00

Hour

996.00

Water Tank 1000g

1.245

Hour

350.00

Hour

435.75

Vibrator Roller 12ton

0.310

Hour

1,000.00

Hour

310.00

Lab Test

0.080

Job

700.00

Job

56.00

61.76

1,797.75

22

480.32

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Sft

Rs.

2,675.13

Per SQM : Rs 28.78

Labour Rates Per

1000 Sft

Rs.

481.88

Per SQM : Rs 5.18

231

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-62-B

(British) :

1000 Sft

Subgrade Preparation in Rock Cut

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.314

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

1,157.00

34.71

16.84

1,191.71

EQUIPMENT
Tractor with blade/plough

5.000

Hour

800.00

Hour

4,000.00

Water Tank 1000g

1.245

Hour

350.00

Hour

435.75

Vibrator Roller 12ton

0.620

Hour

1,000.00

Hour

620.00

Lab Test

0.080

Job

700.00

Job

56.00

61.16

5,111.75

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Sft

Rs.

7,682.59

Per SQM : Rs 82.66

Labour Rates Per

1000 Sft

Rs.

1,446.25

Per SQM : Rs 15.56

1,379.13

232

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-62-c

(British) :

1000 Sft

Subgrade Preparation on Existing Road

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.542

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

771.00

23.13

19.22

794.13

EQUIPMENT
Tractor with blade/plough

2.490

Hour

800.00

Hour

1,992.00

Water Tank 1000g

1.245

Hour

350.00

Hour

435.75

Vibrator Roller 12ton

0.310

Hour

1,000.00

Hour

310.00

Lab Test

0.080

Job

700.00

Job

56.00

58.78

2,793.75

22

784.25

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

1000 Sft

Rs.

4,372.13

Per SQM : Rs 47.04

Labour Rates Per

1000 Sft

Rs.

963.75

Per SQM : Rs 10.37

233

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-63-a

(British) :

1000 Cft

Earthwork by mechanical means in drains and irrigation channels in


DRY soil dressed to designed section, grades profile/with excavated
material, disposed off within 50 feet (15.2 m) lead and dressed as
directed.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

125.00

3.75

7.75

128.75

EQUIPMENT
Hire charges of Excavator
including P.O.L, crew charges

0.660

2,800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

1,848.00

70.25

1,848.00

22

434.06

Composite Rates Per

1000 Cft

Rs.

2,410.81

Per CUM : Rs 85.14

Labour Rates Per

1000 Cft

Rs.

156.25

Per CUM : Rs 5.52

234

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-63-b

(British) :

1000 Cft

Earthwork by mechanical means in drains and irrigation channels in


DRY & WET soil dressed to designed section, grades profile/with
excavated material, disposed off within 50 feet (15.2 m) lead and
dressed as directed.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

125.00

3.75

7.44

128.75

EQUIPMENT
Hire charges of Excavator
including P.O.L, crew charges

0.710

2,800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

1,986.60

70.56

1,986.60

22

464.55

Composite Rates Per

1000 Cft

Rs.

2,579.90

Per CUM : Rs 91.11

Labour Rates Per

1000 Cft

Rs.

156.25

Per CUM : Rs 5.52

235

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-63-c

(British) :

1000 Cft

Earthwork by mechanical means in drains and irrigation channels in


WET & SLUSH soil dressed to designed section, grades profile/with
excavated material, disposed off within 50 feet (15.2 m) lead and
dressed as directed.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.370

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

185.00

5.55

8.53

190.55

EQUIPMENT
Hire charges of Excavator
including P.O.L, crew charges

0.829

2,800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

2,322.32

69.47

2,322.32

22

551.61

Composite Rates Per

1000 Cft

Rs.

3,064.48

Per CUM : Rs 108.22

Labour Rates Per

1000 Cft

Rs.

231.25

Per CUM : Rs 8.17

236

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-63-d

(British) :

1000 Cft

Earthwork by mechanical means in drains and irrigation channels in


SLUSH soil dressed to designed section, grades profile/with
excavated material, disposed off within 50 feet (15.2 m) lead and
dressed as directed.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.370

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

185.00

5.55

7.86

190.55

EQUIPMENT
Hire charges of Excavator
including P.O.L, crew charges

0.954

2,800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

2,670.64

70.14

2,670.64

22

628.24

Composite Rates Per

1000 Cft

Rs.

3,489.43

Per CUM : Rs 123.23

Labour Rates Per

1000 Cft

Rs.

231.25

Per CUM : Rs 8.17

237

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-63-e

(British) :

1000 Cft

Earthwork by mechanical means in drains and irrigation channels in


DRY & WET to that of SLUSH (1:2) soil dressed to designed section,
grades profile/with excavated material, disposed off within 50 feet
(15.2 m) lead and dressed as directed.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

250.00

7.50

9.83

257.50

EQUIPMENT
Hire charges of Excavator
including P.O.L, crew charges

0.892

2,800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

2,496.48

68.17

2,496.48

22

604.23

Composite Rates Per

1000 Cft

Rs.

3,358.21

Per CUM : Rs 118.59

Labour Rates Per

1000 Cft

Rs.

312.50

Per CUM : Rs 11.04

238

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-63-f

(British) :

1000 Cft

Earthwork by mechanical means in drains and irrigation channels in


BORROW AREA soil dressed to designed section, grades profile/with
excavated material, disposed off within 50 feet (15.2 m) lead and
dressed as directed.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

125.00

3.75

7.11

128.75

EQUIPMENT
Hire charges of Excavator
including P.O.L, crew charges

0.769

2,800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

2,154.32

70.89

2,154.32

22

501.45

Composite Rates Per

1000 Cft

Rs.

2,784.52

Per CUM : Rs 98.33

Labour Rates Per

1000 Cft

Rs.

156.25

Per CUM : Rs 5.52

239

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-63-g

(British) :

1000 Cft

Earthwork by mechanical means in drains and irrigation channels in


UNDER WATER soil dressed to designed section, grades profile/with
excavated material, disposed off within 50 feet (15.2 m) lead and
dressed as directed.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

500.00

15.00

12.69

515.00

EQUIPMENT
Hire charges of Excavator
including P.O.L, crew charges

1.203

2,800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

3,368.40

65.31

3,368.40

22

851.05

Composite Rates Per

1000 Cft

Rs.

4,734.45

Per CUM : Rs 167.20

Labour Rates Per

1000 Cft

Rs.

625.00

Per CUM : Rs 22.07

240

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-64

(British) :

100 Cft

Provide, place and compact impervious clay core in dam embakement


of specified grading, permiability i/c leveling dressing and hauage
obtaining 95% modified ASHTO dry density

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Tractor with blade/plough

0.040

Hour

800.00

Hour

32.00

Water Tank 1000g

0.100

Hour

350.00

Hour

35.00

Vibrator Roller 12ton

0.100

Hour

1,000.00

Hour

100.00

Dozer D8 or equiv 200 HP

0.075

Hour

2,900.00

Hour

217.50

Dump Truck (10 m3 cap)

0.286

Hour

1,050.00

Hour

300.30

Excavator

0.048

Hour

3,000.00

Hour

142.80

75.00

827.60

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

1,009.67

Per CUM : Rs 356.56

Labour Rates Per

100 Cft

Rs.

0.00

Per CUM : Rs 0.00

182.07

241

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-65

(British) :

100 Cft

Provide , Place & compact shoulder material (sandy / silty gravel)


in Dam Embankment, of specified grading, leveling / dressing i/c
haulage for obtaining of 95% modified ASHTHO dry density.

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Tractor with blade/plough

0.040

Hour

800.00

Hour

32.00

Water Tank 1000g

0.100

Hour

350.00

Hour

35.00

Vibrator Roller 12ton

0.050

Hour

1,000.00

Hour

50.00

Dozer D8 or equiv 200 HP

0.075

Hour

2,900.00

Hour

217.50

Dump Truck (10 m3 cap)

0.286

Hour

1,050.00

Hour

300.30

Excavator

0.048

Hour

3,000.00

Hour

142.80

75.00

777.60

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

948.67

Per CUM : Rs 335.02

Labour Rates Per

100 Cft

Rs.

0.00

Per CUM : Rs 0.00

171.07

242

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-66

(British) :

100 Cft

Provide , Place & compact Fine Filter in chimney drain vertical /


horizantol on downstream of clay core

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
100.000

Sand

2,200.00

Cft

TOTAL

100 Cft

49.45

MATERIAL

2,200.00

2,200.00

LABOUR
Coolie

1.000

500.00

Hour

Sundries (Labour Only):


TOTAL

LABOUR

Hour

500.00

15.00

14.24

515.00

EQUIPMENT
Water Tank 1000g

0.100

Hour

350.00

Hour

35.00

Vibrator Roller 12ton

0.050

Hour

1,000.00

Hour

50.00

Front End Loader 3m3 cap

0.172

Hour

2,920.00

Hour

502.24

Dump Truck (10 m3 cap)

0.047

Hour

1,050.00

Hour

49.35

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

14.31

22

Composite Rates Per

100 Cft

Rs.

4,085.64

Per CUM : Rs 1,442.83

Labour Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

636.59

734.05

243

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-67

(British) :

100 Cft

Provide , Place & compact Coarse Filter (well graded gravel) in


chimney drain vertical / horizantol on downstream of fine filter
i/c leveling, moistening etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.750

500.00

No

Sundries (Labour Only):


TOTAL

LABOUR

No

1,375.00

41.25

49.61

1,416.25

EQUIPMENT
Water Tank 1000g

0.100

Hour

350.00

Hour

35.00

Front End Loader 3m3 cap

0.172

Hour

2,920.00

Hour

502.24

Dump Truck (10 m3 cap)

0.286

Hour

1,050.00

Hour

300.30

28.39

837.54

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

2,740.55

Per CUM : Rs 967.82

Labour Rates Per

100 Cft

Rs.

1,718.75

Per CUM : Rs 606.97

486.76

244

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-68

(British) :

100 Cft

Excavation for core trench of Dam Embankment/Spillway/Intake &


Outlet Structure and Irrigation System upto a minimum depth of 35
ft in common soil including removing of excavated material by
machinery in 1 KM radius

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Dozer D8 or equiv 200 HP

0.042

Hour

2,900.00

Hour

120.93

Dump Truck (10 m3 cap)

0.286

Hour

1,050.00

Hour

300.30

Excavator

0.048

Hour

3,000.00

Hour

142.80

75.00

564.03

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

688.12

Per CUM : Rs 243.01

Labour Rates Per

100 Cft

Rs.

0.00

Per CUM : Rs 0.00

124.09

245

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-68-a

(British) :

100 Cft

Excavation for core trench of Dam Embankment/Spillway/Intake &


Outlet Structure and Irrigation System upto a minimum depth of 35
ft in shingle gravel including removing of excavated material by
machinery in 1 KM radius

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Dozer D8 or equiv 200 HP

0.050

Hour

2,900.00

Hour

145.00

Dump Truck (10 m3 cap)

0.286

Hour

1,050.00

Hour

300.30

Excavator

0.048

Hour

3,000.00

Hour

142.80

75.00

588.10

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

717.48

Per CUM : Rs 253.38

Labour Rates Per

100 Cft

Rs.

0.00

Per CUM : Rs 0.00

129.38

246

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-68-b

(British) :

100 Cft

Excavation for core trench of Dam Embankment/Spillway/Intake &


Outlet Structure and Irrigation System upto design depth in Soft
Rock/Shale requiring 20% blasting i/c removing of material from
outside of the structure area.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Blasting

1.000

150.00

No

TOTAL

13.86

MATERIAL

No

150.00

150.00

EQUIPMENT
Dozer D8 or equiv 200 HP

0.063

Hour

2,900.00

Hour

181.25

Dump Truck (10 m3 cap)

0.286

Hour

1,050.00

Hour

300.30

Excavator

0.060

Hour

3,000.00

Hour

180.00

61.14

661.55

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

990.09

Per CUM : Rs 349.65

Labour Rates Per

100 Cft

Rs.

0.00

Per CUM : Rs 0.00

178.54

247

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-68-c

(British) :

100 Cft

Excavation for core trench of Dam Embankment/Spillway/Intake &


Outlet Structure and Irrigation System upto design depth in Medium
Hard Rock requiring 50% blasting i/c removing of material from
outside of the structure area.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Blasting

2.000

150.00

No

TOTAL

23.40

MATERIAL

No

300.00

300.00

EQUIPMENT
Dozer D8 or equiv 200 HP

0.063

Hour

2,900.00

Hour

181.25

Dump Truck (10 m3 cap)

0.286

Hour

1,050.00

Hour

300.30

Excavator

0.060

Hour

3,000.00

Hour

180.00

51.60

661.55

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

1,173.09

Per CUM : Rs 414.27

Labour Rates Per

100 Cft

Rs.

0.00

Per CUM : Rs 0.00

211.54

248

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

03-68-d

(British) :

100 Cft

Excavation for core trench of Dam Embankment/Spillway/Intake &


Outlet Structure and Irrigation System upto design depth in Hard
Rock requiring 75% blasting i/c removing of material from outside
of the structure area.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Blasting

3.000

150.00

No

TOTAL

30.36

MATERIAL

No

450.00

450.00

EQUIPMENT
Dozer D8 or equiv 200 HP

0.063

Hour

2,900.00

Hour

181.25

Dump Truck (10 m3 cap)

0.286

Hour

1,050.00

Hour

300.30

Excavator

0.060

Hour

3,000.00

Hour

180.00

44.64

661.55

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

1,356.09

Per CUM : Rs 478.90

Labour Rates Per

100 Cft

Rs.

0.00

Per CUM : Rs 0.00

244.54

249

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-01

(British) :

100 Cft

Dismantling dry stone masonry

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.850

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

425.00

12.75

78.00

437.75

22

93.50

Composite Rates Per

100 Cft

Rs.

531.25

Per CUM : Rs 187.61

Labour Rates Per

100 Cft

Rs.

531.25

Per CUM : Rs 187.61

250

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-02

(British) :

100 Cft

Dismantling stone masonry in mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

Composite Rates Per

100 Cft

Rs.

781.25

Per CUM : Rs 275.90

Labour Rates Per

100 Cft

Rs.

781.25

Per CUM : Rs 275.90

137.50

251

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-03

(British) :

100 Cft

Dismantling stone masonry in lime or cement mortar

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,500.00

45.00

78.00

1,545.00

22

330.00

Composite Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

252

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-04-a

(British) :

100 Cft

Dismantling dry stone or spawl pitching

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

750.00

22.50

78.00

772.50

22

Composite Rates Per

100 Cft

Rs.

937.50

Per CUM : Rs 331.08

Labour Rates Per

100 Cft

Rs.

937.50

Per CUM : Rs 331.08

165.00

253

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-04-b

(British) :

100 Cft

Dismantling stone or spawl pitching (mud grouted)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

254

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-05

(British) :

100 Cft

Dismantling stone or spawl pitching and apron in silted condition

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,250.00

37.50

78.00

1,287.50

22

275.00

Composite Rates Per

100 Cft

Rs.

1,562.50

Per CUM : Rs 551.79

Labour Rates Per

100 Cft

Rs.

1,562.50

Per CUM : Rs 551.79

255

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-06

(British) :

100 Cft

Dismantling stone pitching, cement or lime grouted

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,500.00

45.00

78.00

1,545.00

22

330.00

Composite Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

256

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-07-a

(British) :

100 Cft

Dismantling stone in Wooden crates

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

257

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-07-b

(British) :

100 Cft

Dismantling stone in Wire crates

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,250.00

37.50

78.00

1,287.50

22

275.00

Composite Rates Per

100 Cft

Rs.

1,562.50

Per CUM : Rs 551.79

Labour Rates Per

100 Cft

Rs.

1,562.50

Per CUM : Rs 551.79

258

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-08

(British) :

100 Cft

Dismantling stone ware drain including base concrete

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

1.500

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

900.00

27.00

78.00

927.00

22

Composite Rates Per

100 Cft

Rs.

1,125.00

Per CUM : Rs 397.29

Labour Rates Per

100 Cft

Rs.

1,125.00

Per CUM : Rs 397.29

198.00

259

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-09

(British) :

100 Cft

Dismantling mud/pise walling

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Composite Rates Per

100 Cft

Rs.

312.50

Per CUM : Rs 110.36

Labour Rates Per

100 Cft

Rs.

312.50

Per CUM : Rs 110.36

260

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-10

(British) :

100 Cft

Dismantling sun dried brick masonry

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

Composite Rates Per

100 Cft

Rs.

781.25

Per CUM : Rs 275.90

Labour Rates Per

100 Cft

Rs.

781.25

Per CUM : Rs 275.90

137.50

261

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-11

(British) :

100 Cft

Dismantling dry brick masonry

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.850

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

425.00

12.75

78.00

437.75

22

93.50

Composite Rates Per

100 Cft

Rs.

531.25

Per CUM : Rs 187.61

Labour Rates Per

100 Cft

Rs.

531.25

Per CUM : Rs 187.61

262

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-12

(British) :

100 Cft

Dismantling brick work in mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

875.00

26.25

78.00

901.25

22

Composite Rates Per

100 Cft

Rs.

1,093.75

Per CUM : Rs 386.25

Labour Rates Per

100 Cft

Rs.

1,093.75

Per CUM : Rs 386.25

192.50

263

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-13

(British) :

100 Cft

Dismantling brick work in lime or cement mortar

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,125.00

63.75

78.00

2,188.75

22

467.50

Composite Rates Per

100 Cft

Rs.

2,656.25

Per CUM : Rs 938.05

Labour Rates Per

100 Cft

Rs.

2,656.25

Per CUM : Rs 938.05

264

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-14

(British) :

100 Cft

Dismantling cement block masonry

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,875.00

56.25

78.00

1,931.25

22

412.50

Composite Rates Per

100 Cft

Rs.

2,343.75

Per CUM : Rs 827.69

Labour Rates Per

100 Cft

Rs.

2,343.75

Per CUM : Rs 827.69

265

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-15

(British) :

100 Cft

Dismantling Dhajji walling

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

Labour Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

110.00

266

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-16

(British) :

100 Cft

Dismantling mud concrete

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

267

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-17

(British) :

100 Cft

Dismantling lime concrete

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,375.00

41.25

78.00

1,416.25

22

302.50

Composite Rates Per

100 Cft

Rs.

1,718.75

Per CUM : Rs 606.97

Labour Rates Per

100 Cft

Rs.

1,718.75

Per CUM : Rs 606.97

268

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-18

(British) :

100 Cft

Dismantling lime or cement concrete, under water

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,250.00

157.50

78.00

5,407.50

22

1,155.00

Composite Rates Per

100 Cft

Rs.

6,562.50

Per CUM : Rs 2,317.53

Labour Rates Per

100 Cft

Rs.

6,562.50

Per CUM : Rs 2,317.53

269

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-19-a

(British) :

100 Cft

Dismantling : Plain Cement Concrete 1:4:8

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,750.00

82.50

78.00

2,832.50

22

605.00

Composite Rates Per

100 Cft

Rs.

3,437.50

Per CUM : Rs 1,213.94

Labour Rates Per

100 Cft

Rs.

3,437.50

Per CUM : Rs 1,213.94

270

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-19-b

(British) :

100 Cft

Dismantling : Plain Cement Concrete 1:3:6

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,500.00

135.00

78.00

4,635.00

22

990.00

Composite Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

271

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-19-c

(British) :

100 Cft

Dismantling : Plain Cement Concrete 1:2:4

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

11.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,500.00

165.00

78.00

5,665.00

22

1,210.00

Composite Rates Per

100 Cft

Rs.

6,875.00

Per CUM : Rs 2,427.89

Labour Rates Per

100 Cft

Rs.

6,875.00

Per CUM : Rs 2,427.89

272

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-19-d

(British) :

100 Cft

Dismantling : Cement Concrete with brick aggregate

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,500.00

45.00

78.00

1,545.00

22

330.00

Composite Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

273

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-19-e

(British) :

100 Sft

Dismantling : DPC of cement concrete 1.5" thick and clearing the


site

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.359

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

679.50

20.39

78.00

699.89

22

Composite Rates Per

100 Sft

Rs.

849.38

Per SQM : Rs 91.39

Labour Rates Per

100 Sft

Rs.

849.38

Per SQM : Rs 91.39

149.49

274

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-20

(British) :

100 Cft

Dismantling RCC, separating reinforcement, cleaning & straightening


the same

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

18.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

9,000.00

270.00

78.00

9,270.00

22

1,980.00

Composite Rates Per

100 Cft

Rs.

11,250.00

Per CUM : Rs 3,972.90

Labour Rates Per

100 Cft

Rs.

11,250.00

Per CUM : Rs 3,972.90

275

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-21

(British) :

100 Sft

Dismantling sirki sarkanda or thached roofing supported on battens


or ballies

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.600

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

300.00

9.00

78.00

309.00

22

66.00

Composite Rates Per

100 Sft

Rs.

375.00

Per SQM : Rs 40.35

Labour Rates Per

100 Sft

Rs.

375.00

Per SQM : Rs 40.35

276

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-22-a

(British) :

100 Sft

Dismantling 1st class tile roofing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

750.00

22.50

78.00

772.50

22

Composite Rates Per

100 Sft

Rs.

937.50

Per SQM : Rs 100.88

Labour Rates Per

100 Sft

Rs.

937.50

Per SQM : Rs 100.88

165.00

277

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-22-b

(British) :

100 Sft

Dismantling 2nd class tile roofing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.236

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

618.00

18.54

78.00

636.54

22

Composite Rates Per

100 Sft

Rs.

772.50

Per SQM : Rs 83.12

Labour Rates Per

100 Sft

Rs.

772.50

Per SQM : Rs 83.12

135.96

278

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-23

(British) :

100 Sft

Dismantling from any height, asbestos sheets & ridge coping

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Fitter II

0.250

Day

600.00

Day

150.00

12.00

78.00

412.00

22

88.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

500.00

Per SQM : Rs 53.80

Labour Rates Per

100 Sft

Rs.

500.00

Per SQM : Rs 53.80

279

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-24

(British) :

100 Sft

Dismantling roof of wooden planks & battens from any height

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Carpenter

0.200

Day

800.00

Day

160.00

10.80

78.00

370.80

22

79.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

450.00

Per SQM : Rs 48.42

Labour Rates Per

100 Sft

Rs.

450.00

Per SQM : Rs 48.42

280

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-25

(British) :

100 Sft

Dismantling wooden ceiling above 20' height in difficult position


including lifting along live wire

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.784

Day

500.00

Day

892.00

Carpenter

0.600

Day

800.00

Day

480.00

41.16

78.00

1,413.16

22

301.84

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,715.00

Per SQM : Rs 184.53

Labour Rates Per

100 Sft

Rs.

1,715.00

Per SQM : Rs 184.53

281

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-26

(British) :

100 Sft

Dismantling jack arch roofing, including removing joists

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

Labour Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

282

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-27

(British) :

100 Sft

Dismantling RB roof complete with mud and mud plaster including


reinforcement complete

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,250.00

37.50

78.00

1,287.50

22

275.00

Composite Rates Per

100 Sft

Rs.

1,562.50

Per SQM : Rs 168.13

Labour Rates Per

100 Sft

Rs.

1,562.50

Per SQM : Rs 168.13

283

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-28-a

(British) :

100 Sft

Stripping and stacking: Slate or tiles from the truss roofing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

0.836

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

501.60

15.05

78.00

516.65

22

Composite Rates Per

100 Sft

Rs.

627.00

Per SQM : Rs 67.47

Labour Rates Per

100 Sft

Rs.

627.00

Per SQM : Rs 67.47

110.35

284

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-28-b

(British) :

100 Sft

Stripping and stacking: GI sheet roofing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Fitter II

0.120

Day

600.00

Day

72.00

17.16

78.00

589.16

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

715.00

Per SQM : Rs 76.93

Labour Rates Per

100 Sft

Rs.

715.00

Per SQM : Rs 76.93

125.84

285

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-29

(British) :

100 Sft

Extra for dismantling CI sheet roof above 20 ft. in dificult


position including lifting along live wire

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Black Smith

1.000

Day

900.00

Day

900.00

30.75

78.00

1,055.75

22

225.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,281.25

Per SQM : Rs 137.86

Labour Rates Per

100 Sft

Rs.

1,281.25

Per SQM : Rs 137.86

286

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-30

(British) :

100 Sft

Dismantling slates or tiles including battens, purlins and planking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

Labour Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

287

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-31

(British) :

100 Sft

Dismantling brick or flagged flooring without concrete foundation

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.850

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

425.00

12.75

78.00

437.75

22

93.50

Composite Rates Per

100 Sft

Rs.

531.25

Per SQM : Rs 57.16

Labour Rates Per

100 Sft

Rs.

531.25

Per SQM : Rs 57.16

288

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-32

(British) :

100 Sft

Dismantling plank or wooden block flooring etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

Composite Rates Per

100 Sft

Rs.

781.25

Per SQM : Rs 84.06

Labour Rates Per

100 Sft

Rs.

781.25

Per SQM : Rs 84.06

137.50

289

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-33-a

(British) :

100 Rft

Disjointing RCC pipes inside trench & removing pipes & stacking
outside : 6" to 12" diameter

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

7,812.50

Labour Rates Per

100 Rft

Rs.

7,812.50

Day

6,250.00

187.50

78.00

6,437.50

22

1,375.00

Per Meter : Rs 256.25


Per Meter : Rs 256.25

290

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-33-b

(British) :

100 Rft

Disjointing RCC pipes inside trench & removing pipes & stacking
outside : 13" to 24" diameter

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

17.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

10,937.50

Labour Rates Per

100 Rft

Rs.

10,937.50

Day

8,750.00

262.50

78.00

9,012.50

22

1,925.00

Per Meter : Rs 358.75


Per Meter : Rs 358.75

291

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-33-c

(British) :

100 Rft

Disjointing RCC pipes inside trench & removing pipes & stacking
outside : 25" to 36" diameter

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

22.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

14,062.50

Labour Rates Per

100 Rft

Rs.

14,062.50

Day

11,250.00

337.50

78.00

11,587.50

22

2,475.00

Per Meter : Rs 461.25


Per Meter : Rs 461.25

292

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-33-d

(British) :

100 Rft

Disjointing RCC pipes inside trench & removing pipes & stacking
outside : Over 36" diameter

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

30.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

18,750.00

Labour Rates Per

100 Rft

Rs.

18,750.00

Day

15,000.00

450.00

78.00

15,450.00

22

3,300.00

Per Meter : Rs 615.00


Per Meter : Rs 615.00

293

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-34

(British) :

Each

Removing door with chowkat

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.150

Day

900.00

Day

135.00

Coolie

0.150

Day

500.00

Day

75.00

Carpenter

0.050

Day

800.00

Day

40.00

7.50

78.00

257.50

22

55.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

312.50

Cost Per Each: 312.50

Labour Rates Per

Each

Rs.

312.50

Cost Per Each: 312.50

294

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-35

(British) :

Each

Removing windows and sky lights with chowkat

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Coolie

0.100

Day

500.00

Day

50.00

Carpenter

0.050

Day

800.00

Day

40.00

5.40

78.00

185.40

22

39.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

295

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-36

(British) :

Each

Removing ventilators and wooden sunshades

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.050

Day

900.00

Day

45.00

Coolie

0.050

Day

500.00

Day

25.00

Carpenter

0.025

Day

800.00

Day

20.00

2.70

78.00

92.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

19.80

296

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-37-a

(British) :

Each

Dismantling: Woden beams up to 12' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.250

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

125.00

3.75

78.00

128.75

22

27.50

Composite Rates Per

Each

Rs.

156.25

Cost Per Each: 156.25

Labour Rates Per

Each

Rs.

156.25

Cost Per Each: 156.25

297

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-37-b

(British) :

Each

Dismantling: Wooden beams from 12.1' to 23' length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Composite Rates Per

Each

Rs.

312.50

Cost Per Each: 312.50

Labour Rates Per

Each

Rs.

312.50

Cost Per Each: 312.50

298

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-37-c

(British) :

600 Sft

Dismantling: Wooden partiton Jaffry Work etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.951

Day

500.00

Day

975.50

Carpenter

0.947

Day

800.00

Day

757.60

51.99

78.00

1,785.09

22

381.28

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

600 Sft

Rs.

2,166.38

Per SQM : Rs 38.85

Labour Rates Per

600 Sft

Rs.

2,166.37

Per SQM : Rs 38.85

299

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-37-d

(British) :

5 Cwt

Dismantling: Wooden trusses

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Black Smith

0.250

Day

900.00

Day

225.00

66.75

78.00

2,291.75

22

489.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

5 Cwt

Rs.

2,781.25

Cost Per 100 Kg: 1,084.69

Labour Rates Per

5 Cwt

Rs.

2,781.25

Cost Per 100 Kg: 1,084.69

300

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-37-e

(British) :

50 Rft

Dismantling: Wooden palisade fencing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

1.000

Day

800.00

Day

800.00

39.00

78.00

1,339.00

22

286.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

50 Rft

Rs.

1,625.00

Labour Rates Per

50 Rft

Rs.

1,625.00

Per Meter : Rs 106.60


Per Meter : Rs 106.60

301

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-38

(British) :

5 Cwt

Dismantling iron work of trusses, sheds, water tanks, etc excluding


cutting of rivets

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Black Smith

1.000

Day

900.00

Day

900.00

72.00

78.00

2,472.00

22

528.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

5 Cwt

Rs.

3,000.00

Cost Per 100 Kg: 1,170.00

Labour Rates Per

5 Cwt

Rs.

3,000.00

Cost Per 100 Kg: 1,170.00

302

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-39

(British) :

12 Cwt

Dismantling rolled steel beams or iron rails etc.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,500.00

75.00

78.00

2,575.00

22

550.00

Composite Rates Per

12 Cwt

Rs.

3,125.00

Cost Per 100 Kg: 512.50

Labour Rates Per

12 Cwt

Rs.

3,125.00

Cost Per 100 Kg: 512.50

303

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-40

(British) :

Each

Dismantling iron latrine

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Fitter II

0.500

Day

600.00

Day

300.00

24.00

78.00

824.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

176.00

Composite Rates Per

Each

Rs.

1,000.00

Cost Per Each: 1,000.00

Labour Rates Per

Each

Rs.

1,000.00

Cost Per Each: 1,000.00

304

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-41

(British) :

Each/25mm D

Dismantling tees, bends or sluice valves upto 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Fitter II

0.010

Day

600.00

Day

6.00

0.33

78.00

11.33

22

2.42

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each/25mm

Rs.

13.75

Cost Per Ea/25mm D: 13.75

Labour Rates Per

Each/25mm

Rs.

13.75

Cost Per Ea/25mm D: 13.75

305

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-42-a

(British) :

Each

Dismantling water column : BG

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

10.000

Day

500.00

Day

5,000.00

Black Smith

1.000

Day

900.00

Day

900.00

204.00

78.00

7,004.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,496.00

Composite Rates Per

Each

Rs.

8,500.00

Cost Per Each: 8,500.00

Labour Rates Per

Each

Rs.

8,500.00

Cost Per Each: 8,500.00

306

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-42-b

(British) :

Each

Dismantling water column : MG or NG

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

6.500

Day

500.00

Day

3,250.00

Black Smith

1.000

Day

900.00

Day

900.00

138.00

78.00

4,738.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,012.00

Composite Rates Per

Each

Rs.

5,750.00

Cost Per Each: 5,750.00

Labour Rates Per

Each

Rs.

5,750.00

Cost Per Each: 5,750.00

307

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-43

(British) :

230 Rft

Dismantling all type of wire fencing, including rolling wire into


bundles and collecting material

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

230 Rft

Rs.

1,250.00

Labour Rates Per

230 Rft

Rs.

1,250.00

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Per Meter : Rs 17.83


Per Meter : Rs 17.83

308

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-44

(British) :

100 Sft

Dismantling wire netting of tennis courts and frame work

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.400

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

200.00

6.00

78.00

206.00

22

44.00

Composite Rates Per

100 Sft

Rs.

250.00

Per SQM : Rs 26.90

Labour Rates Per

100 Sft

Rs.

250.00

Per SQM : Rs 26.90

309

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-45

(British) :

100 Sft

Dismantling cloth ceiling and supporting timber

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

375.00

11.25

78.00

386.25

22

82.50

Composite Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

310

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-46

(British) :

100 Cft

Dismantling and removing road metalling

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

311

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-47

(British) :

100 Sft

Dismantling & removing road pavement etc including screening &


stacking of by-products upto 50m.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

13.120

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

6,560.00

196.80

78.00

6,756.80

22

Composite Rates Per

100 Sft

Rs.

8,200.00

Per SQM : Rs 882.32

Labour Rates Per

100 Sft

Rs.

8,200.00

Per SQM : Rs 882.32

1,443.20

312

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-48-a

(British) :

500 Sft

Removing from walls: Mud plaster

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

500 Sft

Rs.

625.00

Per SQM : Rs 13.45

Labour Rates Per

500 Sft

Rs.

625.00

Per SQM : Rs 13.45

110.00

313

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-48-b

(British) :

250 Sft

Removing from walls: Cement or lime plaster

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

250 Sft

Rs.

625.00

Per SQM : Rs 26.90

Labour Rates Per

250 Sft

Rs.

625.00

Per SQM : Rs 26.90

110.00

314

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-49-a

(British) :

100 Sft

Scraping : White wash or colour wash

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

125.00

3.75

78.00

128.75

22

27.50

Composite Rates Per

100 Sft

Rs.

156.25

Per SQM : Rs 16.81

Labour Rates Per

100 Sft

Rs.

156.25

Per SQM : Rs 16.81

315

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-49-b

(British) :

100 Sft

Scraping : Ordinary distemper, oil bound distemper or paint off


wall

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

375.00

11.25

78.00

386.25

22

82.50

Composite Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

316

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-50

(British) :

100 Sft

Dismantling glazed or accoustics tiles etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

42.00

78.00

1,442.00

22

308.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

Labour Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

317

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-51

(British) :

100 Cft

Scraping boulders.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.399

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,699.50

50.99

78.00

1,750.49

22

373.89

Composite Rates Per

100 Cft

Rs.

2,124.38

Per CUM : Rs 750.22

Labour Rates Per

100 Cft

Rs.

2,124.38

Per CUM : Rs 750.22

318

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-52

(British) :

100 Cft

Cleaning mortar of old stones to be used in masonry

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,750.00

52.50

78.00

1,802.50

22

385.00

Composite Rates Per

100 Cft

Rs.

2,187.50

Per CUM : Rs 772.51

Labour Rates Per

100 Cft

Rs.

2,187.50

Per CUM : Rs 772.51

319

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-53

(British) :

Point

Dismantling light, fan and call bell point including casing,


capping/strip open type complete

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.010

Day

900.00

Day

9.00

Electrician II

0.050

Day

600.00

Day

30.00

1.17

78.00

40.17

22

8.58

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Point

Rs.

48.75

Cost Per Point: 48.75

Labour Rates Per

Point

Rs.

48.75

Cost Per Point: 48.75

320

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-54

(British) :

Point

Dismantling plug point & making good damaged surface (building


portion)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.010

Day

900.00

Day

9.00

Electrician II

0.040

Day

600.00

Day

24.00

0.99

78.00

33.99

22

7.26

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Point

Rs.

41.25

Cost Per Point: 41.25

Labour Rates Per

Point

Rs.

41.25

Cost Per Point: 41.25

321

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-55-a

(British) :

Rft

Dismantle GI/MS conduit/GI flexible/PVC pipes or conduit wiring of


all sizes : On surface

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.002

Day

900.00

Day

2.20

Electrician II

0.009

Day

600.00

Day

5.49

0.23

78.00

7.91

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

9.60

Labour Rates Per

Rft

Rs.

9.60

LABOUR

1.69

Per Meter : Rs 31.50


Per Meter : Rs 31.50

322

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 04 , DISMANTLING (DEMOLITION)
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

04-55-b

(British) :

Rft

Dismantle GI/MS conduit/GI flexible/PVC pipes or conduit wiring of


all sizes : Recessed in wall

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.006

Day

900.00

Day

5.49

Electrician II

0.012

Day

600.00

Day

7.32

0.38

78.00

13.19

22

2.82

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

16.01

Labour Rates Per

Rft

Rs.

16.01

LABOUR

Per Meter : Rs 52.50


Per Meter : Rs 52.50

323

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-01

(British) :

100 Cft

Lime Sand Mortar 1 : 2 (one Lime: 2 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

95.000

Cft

2,200.00

Slaked Lime

19.000

Mds

380.00

Cartage of un-slaked lime for

32.300

Cft

240.00

TOTAL

MATERIAL

2,090.00

100 Cft
Mds

7,220.00

100 Cft

77.52

63.93

9,387.52

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

14.07

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,422.75

Composite Rates Per

100 Cft

Rs.

13,484.02

Per CUM : Rs 4,761.84

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

324

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-02

(British) :

100 Cft

Lime Sand Mortar 1 : 3 (one Lime: 3 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

107.000

Cft

2,200.00

Slaked Lime

14.300

Mds

380.00

Cartage of un-slaked lime for

24.300

Cft

240.00

TOTAL

MATERIAL

2,354.00

100 Cft
Mds

5,434.00

100 Cft

58.32

62.13

7,846.32

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

15.87

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,083.69

Composite Rates Per

100 Cft

Rs.

11,603.76

Per CUM : Rs 4,097.83

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

325

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-03

(British) :

100 Cft

Lime Surkhi Mortar 1 : 1-1/2 (one Lime: 1-1/2 Surkhi)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Surkhi

73.000

Cft

75.00

Slaked Lime

19.600

Mds

380.00

Cartage of un-slaked lime for

33.300

Cft

240.00

TOTAL

MATERIAL

54.75

100 Cft
Mds

7,448.00

100 Cft

79.92

61.76

7,582.67

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

16.24

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,025.69

Composite Rates Per

100 Cft

Rs.

11,282.11

Per CUM : Rs 3,984.24

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

326

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-04

(British) :

100 Cft

Lime Surkhi Mortar 1 : 2 (one Lime: 2 Surkhi)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Surkhi

82.000

Cft

75.00

Slaked Lime

16.400

Mds

380.00

Cartage of un-slaked lime for

27.900

Cft

240.00

TOTAL

MATERIAL

61.50

100 Cft
Mds

6,232.00

100 Cft

66.96

59.74

6,360.46

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

18.26

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,756.80

Composite Rates Per

100 Cft

Rs.

9,791.01

Per CUM : Rs 3,457.67

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

327

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-05

(British) :

100 Cft

Lime Surkhi Mortar 1 : 3 (one Lime: 3 Surkhi)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Surkhi

92.000

Cft

75.00

Slaked Lime

12.400

Mds

380.00

Cartage of un-slaked lime for

21.100

Cft

240.00

TOTAL

MATERIAL

69.00

100 Cft
Mds

4,712.00

100 Cft

50.64

56.12

4,831.64

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

21.88

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,420.46

Composite Rates Per

100 Cft

Rs.

7,925.85

Per CUM : Rs 2,798.99

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

328

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-06

(British) :

100 Cft

Lime Sand And Surkhi Mortar 1 : 1 : 1 (one Lime: 1 Sand And : 1


Surkhi)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

40.330

Cft

2,200.00

100 Cft

887.26

Surkhi

40.330

Cft

75.00

100 Cft

30.25

Slaked Lime

16.130

Mds

380.00

Cartage of un-slaked lime for

27.420

Cft

240.00

TOTAL

MATERIAL

Mds

6,129.40

100 Cft

65.81

61.05

7,112.72

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

16.95

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,922.30

Composite Rates Per

100 Cft

Rs.

10,708.76

Per CUM : Rs 3,781.77

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

329

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-07

(British) :

100 Cft

Lime Sand And Surkhi Mortar 1 : 2 : 1 (one Lime: 2 Sand And : 1


Surkhi)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

60.500

Cft

2,200.00

100 Cft

1,331.00

Surkhi

30.250

Cft

75.00

100 Cft

22.69

Slaked Lime

12.010

Mds

380.00

Cartage of un-slaked lime for

20.570

Cft

240.00

TOTAL

MATERIAL

Mds

4,563.80

100 Cft

49.37

58.95

5,966.86

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

19.05

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,670.21

Composite Rates Per

100 Cft

Rs.

9,310.81

Per CUM : Rs 3,288.09

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

330

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-08

(British) :

100 Cft

Lime, Cement And Sand Mortar 1 : 1 : 3 (one Lime: One Cement And :
3 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

23.170

Bag

490.00

Sand

83.400

Cft

2,200.00

Slaked Lime

11.120

Mds

380.00

Cartage of un-slaked lime for

18.900

Cft

240.00

Cartage of cement for average

23.170

Cwt

2.50

Cwt

57.92

MATERIAL

68.63

17,516.98

TOTAL

Bag

11,353.30

100 Cft

1,834.80

Mds

4,225.60

100 Cft

45.36

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

9.37

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,211.24

Composite Rates Per

100 Cft

Rs.

23,401.97

Per CUM : Rs 8,264.34

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

331

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-09

(British) :

100 Cft

Lime, Cement And Sand Mortar 1 : 1 : 4 (one Lime: One Cement And :
4 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

19.300

Bag

490.00

Sand

92.640

Cft

2,200.00

Slaked Lime

9.260

Mds

380.00

Cartage of un-slaked lime for

15.740

Cft

240.00

Cartage of cement for average

19.300

Cwt

2.50

Cwt

48.25

MATERIAL

67.71

15,099.91

TOTAL

Bag

9,457.00

100 Cft

2,038.08

Mds

3,518.80

100 Cft

37.78

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

10.29

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,679.48

Composite Rates Per

100 Cft

Rs.

20,453.14

Per CUM : Rs 7,222.96

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

332

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-10

(British) :

100 Cft

Lime, Cement And Sand Mortar 1 : 1 : 5 (one Lime: One Cement And :
5 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

16.550

Bag

490.00

Sand

99.300

Cft

2,200.00

Slaked Lime

7.940

Mds

380.00

Cartage of un-slaked lime for

13.500

Cft

240.00

Cartage of cement for average

16.550

Cwt

2.50

Cwt

41.38

MATERIAL

66.88

13,385.07

TOTAL

Bag

8,109.50

100 Cft

2,184.60

Mds

3,017.20

100 Cft

32.40

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

11.12

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,302.22

Composite Rates Per

100 Cft

Rs.

18,361.04

Per CUM : Rs 6,484.15

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

333

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-11

(British) :

100 Cft

Lime, Cement And Sand Mortar 1 : 1 : 6 (one Lime: One Cement And :
6 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

14.500

Bag

490.00

Sand

104.000

Cft

2,200.00

Slaked Lime

6.960

Mds

380.00

Cartage of un-slaked lime for

11.830

Cft

240.00

Cartage of cement for average

14.500

Cwt

2.50

Cwt

36.25

MATERIAL

66.12

12,102.44

TOTAL

Bag

7,105.00

100 Cft

2,288.00

Mds

2,644.80

100 Cft

28.39

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

11.88

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,020.04

Composite Rates Per

100 Cft

Rs.

16,796.23

Per CUM : Rs 5,931.54

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

334

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-12

(British) :

100 Cft

Lime, Cement And Sand Mortar 1 : 1 : 7 (one Lime: One Cement And :
7sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

12.960

Bag

490.00

Sand

109.000

Cft

2,200.00

Slaked Lime

6.220

Mds

380.00

Cartage of un-slaked lime for

10.570

Cft

240.00

Cartage of cement for average

12.960

Cwt

2.50

Cwt

32.40

MATERIAL

65.47

11,169.77

TOTAL

Bag

6,350.40

100 Cft

2,398.00

Mds

2,363.60

100 Cft

25.37

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

12.53

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,814.85

Composite Rates Per

100 Cft

Rs.

15,658.37

Per CUM : Rs 5,529.71

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

335

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-13

(British) :

100 Cft

Lime, Cement And Sand Mortar 1 : 1 : 8 (one Lime: One Cement And :
8 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

11.420

Bag

490.00

Sand

110.000

Cft

2,200.00

Slaked Lime

5.480

Mds

380.00

Cartage of un-slaked lime for

9.320

Cft

240.00

Cartage of cement for average

11.420

Cwt

2.50

Cwt

28.55

MATERIAL

64.65

10,149.12

TOTAL

Bag

5,595.80

100 Cft

2,420.00

Mds

2,082.40

100 Cft

22.37

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

13.35

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,590.31

Composite Rates Per

100 Cft

Rs.

14,413.17

Per CUM : Rs 5,089.97

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

336

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-14

(British) :

100 Cft

Lime, Cement And Sand Mortar 1 : 1 : 9 (one Lime: One Cement And :
9 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

10.580

Bag

490.00

Sand

114.000

Cft

2,200.00

Slaked Lime

5.080

Mds

380.00

Cartage of un-slaked lime for

8.640

Cft

240.00

Cartage of cement for average

10.580

Cwt

2.50

Cwt

26.45

MATERIAL

64.21

9,669.79

TOTAL

Bag

5,184.20

100 Cft

2,508.00

Mds

1,930.40

100 Cft

20.74

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

13.79

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,484.85

Composite Rates Per

100 Cft

Rs.

13,828.39

Per CUM : Rs 4,883.45

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

337

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-15

(British) :

100 Cft

Lime, Cement And Sand Mortar 1 : 1 : 10 (one Lime: One Cement And :
10 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.750

Bag

490.00

Sand

117.000

Cft

2,200.00

Slaked Lime

4.680

Mds

380.00

Cartage of un-slaked lime for

7.960

Cft

240.00

Cartage of cement for average

9.750

Cwt

2.50

Cwt

24.38

MATERIAL

63.71

9,173.38

TOTAL

Bag

4,777.50

100 Cft

2,574.00

Mds

1,778.40

100 Cft

19.10

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

14.29

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,375.64

Composite Rates Per

100 Cft

Rs.

13,222.77

Per CUM : Rs 4,669.58

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

338

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-16

(British) :

100 Cft

Cement, Lime And Sand Mortar 1 : 2 : 6 (one Cement: 2 Lime And : 6


Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

11.570

Bag

490.00

Sand

83.300

Cft

2,200.00

Slaked Lime

10.960

Mds

380.00

Cartage of un-slaked lime for

18.650

Cft

240.00

Cartage of cement for average

11.570

Cwt

2.50

Cwt

28.92

MATERIAL

65.88

11,740.38

TOTAL

Bag

5,669.30

100 Cft

1,832.60

Mds

4,164.80

100 Cft

44.76

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

12.12

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,940.38

Composite Rates Per

100 Cft

Rs.

16,354.52

Per CUM : Rs 5,775.55

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

339

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-17

(British) :

100 Cft

Cement, Lime And Sand Mortar 1 : 2 : 9 (one Cement: 2 Lime And : 9


Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.960

Bag

490.00

Sand

96.770

Cft

2,200.00

Slaked Lime

8.600

Mds

380.00

Cartage of un-slaked lime for

14.620

Cft

240.00

Cartage of cement for average

9.960

Cwt

2.50

Cwt

24.90

MATERIAL

64.81

10,337.33

TOTAL

Bag

4,880.40

100 Cft

2,128.94

Mds

3,268.00

100 Cft

35.09

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

2.500

Day

400.00

Day

1,000.00

48.75

13.19

1,673.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,631.71

Composite Rates Per

100 Cft

Rs.

14,642.79

Per CUM : Rs 5,171.06

Labour Rates Per

100 Cft

Rs.

2,031.25

Per CUM : Rs 717.33

340

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-18

(British) :

100 Cft

Cement Sand Mortar 1 : 1 (one Cement: One Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

58.000

Bag

490.00

Sand

70.000

Cft

2,200.00

Cartage of cement for average

58.000

Cwt

2.50

Cwt

145.00

MATERIAL

71.90

30,105.00

TOTAL

Bag

28,420.00

100 Cft

1,540.00

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

6.10

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,909.10

Composite Rates Per

100 Cft

Rs.

38,353.10

Per CUM : Rs 13,544.28

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

341

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-19

(British) :

100 Cft

Cement Sand Mortar 1 : 1-1/2 (one Cement: 1-1/2 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

47.000

Bag

490.00

Sand

84.840

Cft

2,200.00

Cartage of cement for average

47.000

Cwt

2.50

Cwt

117.50

MATERIAL

71.29

25,013.98

TOTAL

Bag

23,030.00

100 Cft

1,866.48

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

6.71

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,789.08

Composite Rates Per

100 Cft

Rs.

32,142.06

Per CUM : Rs 11,350.87

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

342

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-20

(British) :

100 Cft

Cement Sand Mortar 1 : 2 (one Cement: 2 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

39.900

Bag

490.00

Sand

95.760

Cft

2,200.00

Cartage of cement for average

39.900

Cwt

2.50

Cwt

99.75

MATERIAL

70.77

21,757.47

TOTAL

Bag

19,551.00

100 Cft

2,106.72

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

7.23

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,072.64

Composite Rates Per

100 Cft

Rs.

28,169.11

Per CUM : Rs 9,947.84

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

343

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-21

(British) :

100 Cft

Cement Sand Mortar 1 : 2-1/2 (one Cement: 2-1/2 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

33.940

Bag

490.00

Sand

101.800

Cft

2,200.00

Cartage of cement for average

33.940

Cwt

2.50

Cwt

84.85

MATERIAL

70.19

18,955.05

TOTAL

Bag

16,630.60

100 Cft

2,239.60

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

7.81

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,456.11

Composite Rates Per

100 Cft

Rs.

24,750.16

Per CUM : Rs 8,740.44

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

344

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-22

(British) :

100 Cft

Cement Sand Mortar 1 : 3 (one Cement: 3 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

29.090

Bag

490.00

Sand

106.660

Cft

2,200.00

Cartage of cement for average

29.090

Cwt

2.50

Cwt

72.72

MATERIAL

69.58

16,673.34

TOTAL

Bag

14,254.10

100 Cft

2,346.52

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

8.42

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,954.14

Composite Rates Per

100 Cft

Rs.

21,966.48

Per CUM : Rs 7,757.40

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

345

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-23

(British) :

100 Cft

Cement Sand Mortar 1 : 4 (one Cement: 4 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

23.030

Bag

490.00

Sand

111.500

Cft

2,200.00

Cartage of cement for average

23.030

Cwt

2.50

Cwt

57.58

MATERIAL

68.54

13,795.28

TOTAL

Bag

11,284.70

100 Cft

2,453.00

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

9.46

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,320.96

Composite Rates Per

100 Cft

Rs.

18,455.24

Per CUM : Rs 6,517.41

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

346

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-24

(British) :

100 Cft

Cement Sand Mortar 1 : 5 (one Cement: 5 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

19.500

Bag

490.00

Sand

117.000

Cft

2,200.00

Cartage of cement for average

19.500

Cwt

2.50

Cwt

48.75

MATERIAL

67.77

12,177.75

TOTAL

Bag

9,555.00

100 Cft

2,574.00

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

10.23

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,965.11

Composite Rates Per

100 Cft

Rs.

16,481.86

Per CUM : Rs 5,820.52

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

347

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-25

(British) :

100 Cft

Cement Sand Mortar 1 : 6 (one Cement: 6 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

16.500

Bag

490.00

Sand

118.800

Cft

2,200.00

Cartage of cement for average

16.500

Cwt

2.50

Cwt

41.25

MATERIAL

66.90

10,739.85

TOTAL

Bag

8,085.00

100 Cft

2,613.60

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

11.10

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,648.77

Composite Rates Per

100 Cft

Rs.

14,727.62

Per CUM : Rs 5,201.01

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

348

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-26

(British) :

100 Cft

Cement Sand Mortar 1 : 7 (one Cement: 7 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

14.500

Bag

490.00

Sand

121.800

Cft

2,200.00

Cartage of cement for average

14.500

Cwt

2.50

Cwt

36.25

MATERIAL

66.23

9,820.85

TOTAL

Bag

7,105.00

100 Cft

2,679.60

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

11.77

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,446.59

Composite Rates Per

100 Cft

Rs.

13,606.44

Per CUM : Rs 4,805.07

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

349

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-27

(British) :

100 Cft

Cement Sand Mortar 1 : 8 (one Cement: 8 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

12.830

Bag

490.00

Sand

123.140

Cft

2,200.00

Cartage of cement for average

12.830

Cwt

2.50

Cwt

32.08

MATERIAL

65.56

9,027.86

TOTAL

Bag

6,286.70

100 Cft

2,709.08

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

12.44

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,272.13

Composite Rates Per

100 Cft

Rs.

12,638.98

Per CUM : Rs 4,463.42

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

350

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-28

(British) :

100 Cft

Clay Mortar.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cartage mannually including lo

100.000

50.00

Cft

TOTAL

100 Cft

1.65

MATERIAL

50.00

50.00

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

4.000

Day

400.00

Day

1,600.00

66.75

76.35

2,291.75

22

500.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,842.25

Per CUM : Rs 1,003.73

Labour Rates Per

100 Cft

Rs.

2,781.25

Per CUM : Rs 982.19

351

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-29

(British) :

100 Cft

Clay Mortar Mixed With Chipped Bhoosa Or Straw.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cartage mannually including lo

100.000

Cft

50.00

Chopped Bhoosa @ 1 Seer per Cf

2.500

Mds

600.00

TOTAL

MATERIAL

100 Cft

50.00

Mds

1,500.00

30.79

1,550.00

LABOUR
Bhishti

1.250

Day

500.00

Day

625.00

Beldar

4.000

Day

400.00

Day

1,600.00

66.75

47.21

2,291.75

22

830.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,672.25

Per CUM : Rs 1,649.99

Labour Rates Per

100 Cft

Rs.

2,781.25

Per CUM : Rs 982.19

352

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-30

(British) :

200 Cft

Clay Mortar Mixed With Cow-dung 1 : 1 (1 Clay: 1 Cow Dung).

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cow Dung

100.000

Cft

140.00

Cartage mannually including lo

100.000

Cft

50.00

Chopped Bhoosa @ 1 Seer per Cf

2.500

Mds

600.00

TOTAL

MATERIAL

Cft

14,000.00

100 Cft

50.00

Mds

1,500.00

65.15

15,550.00

LABOUR
Bhishti

1.500

Day

500.00

Day

750.00

Beldar

4.000

Day

400.00

Day

1,600.00

70.50

12.85

2,420.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,938.00

Composite Rates Per

200 Cft

Rs.

21,908.50

Per CUM : Rs 3,868.46

Labour Rates Per

200 Cft

Rs.

2,937.50

Per CUM : Rs 518.68

353

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-31
White Cement And Sand Mortar1 : 3

Detail

Qty

(British) :

100 Cft

(1 White Cement 3 Sand)

Unit

Rate (Rs)

Amount

MATERIAL
Sand

106.660

Cft

2,200.00

White Cement

29.090

Bag

700.00

Bag

20,363.00

Cartage of cement for average

29.090

Cwt

2.50

Cwt

72.72

MATERIAL

70.95

22,782.25

TOTAL

100 Cft

2,346.52

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

7.05

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,298.09

Composite Rates Per

100 Cft

Rs.

29,419.34

Per CUM : Rs 10,389.35

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

354

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-32

(British) :

100 Cft

Coloured Cement Mortar Made By Mixing White Cement And Pigment Of


Approved Shade (1 White Cement Mixed With Pigment Of Approved
Shade: 2 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

95.760

Cft

2,200.00

White Cement

39.900

Bag

700.00

Bag

27,930.00

Pigment for flooring

203.140

Kg

275.00

Kg

55,863.50

Cartage of cement

43.890

Cwt

2.50

Cwt

109.72

MATERIAL

73.88

86,009.95

TOTAL

100 Cft

2,106.72

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

4.12

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

19,208.19

Composite Rates Per

100 Cft

Rs.

106,557.14

Per CUM : Rs 37,630.33

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

355

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-33
White Cement And Sand Mortar1 : 2

Detail

Qty

(British) :

100 Cft

(1 White Cement 2 Sand)

Unit

Rate (Rs)

Amount

MATERIAL
Sand

95.760

Cft

2,200.00

White Cement

39.900

Bag

700.00

Bag

27,930.00

Cartage of cement

39.900

Cwt

2.50

Cwt

99.75

MATERIAL

71.90

30,136.47

TOTAL

100 Cft

2,106.72

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

6.10

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,916.02

Composite Rates Per

100 Cft

Rs.

38,391.50

Per CUM : Rs 13,557.84

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

356

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 05 , MORTAR
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

05-34

(British) :

100 Cft

Coloured Cement Mortar Made By Mixing Grey Cement And Pigment Of


Approved Shade (1 Grey Cement Mixed With Pigment Of Approved Shade:
2 Sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

95.760

Cft

2,200.00

White Cement

39.900

Bag

700.00

Bag

27,930.00

Pigment for flooring

203.140

Kg

275.00

Kg

55,863.50

Cartage of cement

43.890

Cwt

2.50

Cwt

109.72

MATERIAL

73.88

86,009.95

TOTAL

100 Cft

2,106.72

LABOUR
Bhishti

1.000

Day

500.00

Day

500.00

Beldar

2.000

Day

400.00

Day

800.00

39.00

4.12

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

19,208.19

Composite Rates Per

100 Cft

Rs.

106,557.14

Per CUM : Rs 37,630.33

Labour Rates Per

100 Cft

Rs.

1,625.00

Per CUM : Rs 573.86

357

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-01

(British) :

100 Cft

Mud concrete in foundation using brick ballast or stone ballast


1.5" gauge to 2" guage

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

100.000

Cft

1,260.00

100 Cft

1,260.00

Mud / Clay

50.000

Cft

1,400.00

100 Cft

700.00

TOTAL

MATERIAL

34.98

1,960.00

LABOUR
Mason

0.130

Day

900.00

Day

117.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.250

Day

500.00

Day

125.00

67.26

43.02

2,309.26

22

924.44

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

5,193.70

Per CUM : Rs 1,834.14

Labour Rates Per

100 Cft

Rs.

2,802.50

Per CUM : Rs 989.69

358

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-02

(British) :

100 Cft

Dry rammed shingle brick ballast or stone ballast 1.5" to 2" guage

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

110.000

1,260.00

Cft

TOTAL

MATERIAL

100 Cft

1,386.00

36.02

1,386.00

Day

1,500.00

45.00

41.98

1,545.00

22

634.92

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,565.92

Per CUM : Rs 1,259.29

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

359

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-03-a

(British) :

100 Cft

Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle


well graded and cleaned) in foundation & plinth (Ratio 1:3:6)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

13.000

Bag

490.00

Sand

46.000

Cft

Brick Aggregate

92.000

Cft

TOTAL

Bag

6,370.00

2,200.00

100 Cft

1,012.00

1,789.00

100 Cft

1,645.88

MATERIAL

56.41

9,027.88

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

89.25

21.59

3,064.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,640.63

Composite Rates Per

100 Cft

Rs.

14,732.76

Per CUM : Rs 5,202.83

Labour Rates Per

100 Cft

Rs.

3,718.75

Per CUM : Rs 1,313.27

360

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-03-B

(British) :

100 Cft

Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle


well graded and cleaned) in foundation & plinth (Ratio 1:4:8)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

96.000

Cft

1,260.00

Ordinary Portland Cement

9.000

Bag

490.00

Sand

48.000

Cft

2,200.00

TOTAL

MATERIAL

1,209.60

100 Cft
Bag

4,410.00

100 Cft

1,056.00

51.88

6,675.60

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

89.25

26.12

3,064.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,123.13

Composite Rates Per

100 Cft

Rs.

11,862.98

Per CUM : Rs 4,189.38

Labour Rates Per

100 Cft

Rs.

3,718.75

Per CUM : Rs 1,313.27

361

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-03-c

(British) :

100 Cft

Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle


well graded and cleaned) in foundation & plinth (Ratio 1:5:10)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

98.000

Cft

1,260.00

Ordinary Portland Cement

7.800

Bag

490.00

Sand

48.000

Cft

2,200.00

TOTAL

MATERIAL

1,234.80

100 Cft
Bag

3,822.00

100 Cft

1,056.00

50.45

6,112.80

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

89.25

27.55

3,064.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,999.32

Composite Rates Per

100 Cft

Rs.

11,176.37

Per CUM : Rs 3,946.90

Labour Rates Per

100 Cft

Rs.

3,718.75

Per CUM : Rs 1,313.27

362

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-03-d

(British) :

100 Cft

Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle


well graded and cleaned) in foundation & plinth (Ratio 1:6:12)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

98.000

Cft

1,260.00

Ordinary Portland Cement

6.600

Bag

490.00

Sand

49.000

Cft

2,200.00

TOTAL

MATERIAL

1,234.80

100 Cft
Bag

3,234.00

100 Cft

1,078.00

48.82

5,546.80

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

89.25

29.18

3,064.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,874.80

Composite Rates Per

100 Cft

Rs.

10,485.85

Per CUM : Rs 3,703.05

Labour Rates Per

100 Cft

Rs.

3,718.75

Per CUM : Rs 1,313.27

363

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-03-e

(British) :

100 Cft

Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle


well graded and cleaned) in foundation & plinth (Ratio 1:6:18)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

112.000

Cft

1,260.00

Ordinary Portland Cement

5.000

Bag

490.00

Sand

37.000

Cft

2,200.00

TOTAL

MATERIAL

1,411.20

100 Cft
Bag

2,450.00

100 Cft

814.00

45.83

4,675.20

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

89.25

32.17

3,064.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,683.04

Composite Rates Per

100 Cft

Rs.

9,422.49

Per CUM : Rs 3,327.53

Labour Rates Per

100 Cft

Rs.

3,718.75

Per CUM : Rs 1,313.27

364

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-03-f

(British) :

100 Cft

Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle


well graded and cleaned) in foundation & plinth (Ratio 1:7:20)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

111.000

Cft

1,260.00

Ordinary Portland Cement

4.500

Bag

490.00

Sand

39.000

Cft

2,200.00

TOTAL

MATERIAL

1,398.60

100 Cft
Bag

2,205.00

100 Cft

858.00

45.00

4,461.60

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

89.25

33.00

3,064.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,636.05

Composite Rates Per

100 Cft

Rs.

9,161.90

Per CUM : Rs 3,235.50

Labour Rates Per

100 Cft

Rs.

3,718.75

Per CUM : Rs 1,313.27

365

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-04-a

(British) :

100 Cft

Extra on Item 3 above, for sedimentation tank or filter beds in PHE


works (in bed)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,500.00

45.00

78.00

1,545.00

22

330.00

Composite Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

366

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-04-b

(British) :

100 Cft

Extra on Item 3 above, for sedimentation tank or filter beds in PHE


works (On slope)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,250.00

67.50

78.00

2,317.50

22

495.00

Composite Rates Per

100 Cft

Rs.

2,812.50

Per CUM : Rs 993.23

Labour Rates Per

100 Cft

Rs.

2,812.50

Per CUM : Rs 993.23

367

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-a

(British) :

100 Cft

Plain Cement Conrete including placing, compacting, finishing &


curing (Ratio 1:1:2)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

31.500

Bag

490.00

Sand

39.000

Cft

Crushed Aggregate

78.000

Cft

TOTAL

Bag

15,435.00

2,200.00

100 Cft

858.00

2,800.00

100 Cft

2,184.00

MATERIAL

61.33

18,477.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

11.97

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.70

22

1,415.80

4,971.08

Composite Rates Per

100 Cft

Rs.

27,647.97

Per CUM : Rs 9,763.80

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

368

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-b

(British) :

100 Cft

Plain Cement Concrete including placing, compacting, finishing &


curing (Ratio 1:1.5:1.5)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

31.500

Bag

490.00

Sand

58.000

Cft

Crushed Aggregate

58.000

Cft

TOTAL

Bag

15,435.00

2,200.00

100 Cft

1,276.00

2,800.00

100 Cft

1,624.00

MATERIAL

61.24

18,335.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

12.03

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.73

22

1,415.80

4,939.84

Composite Rates Per

100 Cft

Rs.

27,474.73

Per CUM : Rs 9,702.62

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

369

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-c

(British) :

100 Cft

Plain Cement Concrete including placing, compacting, finishing &


curing (Ratio 1:1.5:3)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

22.500

Bag

490.00

Sand

42.000

Cft

Crushed Aggregate

84.000

Cft

TOTAL

Bag

11,025.00

2,200.00

100 Cft

924.00

2,800.00

100 Cft

2,352.00

MATERIAL

58.23

14,301.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

14.01

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

5.76

22

1,415.80

4,052.36

Composite Rates Per

100 Cft

Rs.

22,553.25

Per CUM : Rs 7,964.61

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

370

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-d

(British) :

100 Cft

Plain Cement Concrete including placing, compacting, finishing &


curing (Ratio 1:2:3)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

21.000

Bag

490.00

Sand

52.000

Cft

Crushed Aggregate

78.000

Cft

TOTAL

Bag

10,290.00

2,200.00

100 Cft

1,144.00

2,800.00

100 Cft

2,184.00

MATERIAL

57.58

13,618.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

14.43

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

5.99

22

1,415.80

3,902.10

Composite Rates Per

100 Cft

Rs.

21,719.99

Per CUM : Rs 7,670.35

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

371

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-e

(British) :

100 Cft

Plain Cement Concrete including placing, compacting, finishing &


curing (Ratio 1:3:3)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.600

Bag

490.00

Sand

66.000

Cft

Crushed Aggregate

66.000

Cft

TOTAL

Bag

8,624.00

2,200.00

100 Cft

1,452.00

2,800.00

100 Cft

1,848.00

MATERIAL

55.74

11,924.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

15.64

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

6.62

22

1,415.80

3,529.42

Composite Rates Per

100 Cft

Rs.

19,653.31

Per CUM : Rs 6,940.51

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

372

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-f

(British) :

100 Cft

Plain Cement Concrete including placing, compacting, finishing &


curing (Ratio 1:2:4)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.600

Bag.

490.00

Sand

44.000

Cft

2,200.00

100 Cft

968.00

Crushed Aggregate

88.000

Cft

2,800.00

100 Cft

2,464.00

TOTAL

MATERIAL

8,624.00

Bag.

55.90

12,056.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

15.53

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

6.56

22

1,415.80

3,558.46

Composite Rates Per

100 Cft

Rs.

19,814.35

Per CUM : Rs 6,997.38

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

373

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-g

(British) :

100 Cft

Plain Cement Concrete including placing, compacting, finishing &


curing (Ratio 1:2:6)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

13.700

Bag

490.00

Sand

34.000

Cft

Crushed Aggregate

102.000

Cft

TOTAL

Bag

6,713.00

2,200.00

100 Cft

748.00

2,800.00

100 Cft

2,856.00

MATERIAL

53.60

10,317.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

17.04

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

7.36

22

1,415.80

3,175.88

Composite Rates Per

100 Cft

Rs.

17,692.77

Per CUM : Rs 6,248.15

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

374

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-h

(British) :

100 Cft

Plain Cement Concrete including placing, compacting, finishing &


curing (Ratio 1:3:6)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

13.000

Bag

490.00

Sand

46.000

Cft

Crushed Aggregate

92.000

Cft

TOTAL

Bag

6,370.00

2,200.00

100 Cft

1,012.00

2,800.00

100 Cft

2,576.00

MATERIAL

53.06

9,958.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

17.40

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

7.54

22

1,415.80

3,096.90

Composite Rates Per

100 Cft

Rs.

17,254.79

Per CUM : Rs 6,093.48

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

375

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-05-i

(British) :

100 Cft

Plain Cement Concrete including placing, compacting, finishing &


curing (Ratio 1:4:8)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.000

Bag

490.00

Sand

48.000

Cft

Crushed Aggregate

96.000

Cft

TOTAL

Bag

4,410.00

2,200.00

100 Cft

1,056.00

2,800.00

100 Cft

2,688.00

MATERIAL

49.83

8,154.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

3.540

Day

500.00

Day

1,770.00

Bhishti

0.750

Day

500.00

Day

375.00

81.09

19.52

2,784.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

8.65

22

1,415.80

2,700.02

Composite Rates Per

100 Cft

Rs.

15,053.91

Per CUM : Rs 5,316.24

Labour Rates Per

100 Cft

Rs.

3,378.75

Per CUM : Rs 1,193.20

376

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-a-01

(British) :

100 Cft

RCC in roof slab, beam, column & other structural members, insitu
or precast. Type A (1:1:2)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

31.500

Bag

490.00

Bag

15,435.00

Sand

39.000

Cft

2,200.00

100 Cft

858.00

Crushed Aggregate

78.000

Cft

2,800.00

100 Cft

2,184.00

Nails / Screws / Clamps

2.500

Kg

140.00

Kg

350.00

Wood - Partal

0.550

Cft

1,200.00

Cft

660.00

Mobile Oil

1.000

Ltr

140.00

Ltr

140.00

55.49

19,627.00

TOTAL

MATERIAL

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

Carpenter

0.100

Day

800.00

Day

80.00

164.40

18.49

5,644.40

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.01

22

1,419.00

5,835.72

Composite Rates Per

100 Cft

Rs.

32,526.12

Per CUM : Rs 11,486.50

Labour Rates Per

100 Cft

Rs.

6,850.00

Per CUM : Rs 2,419.06

377

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-a-02

(British) :

100 Cft

RCC in roof slab, beam, column & other structural members, insitu
or precast. Type B (1:1.5:3)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

24.000

Bag

490.00

Bag

11,760.00

Sand

46.000

Cft

2,200.00

100 Cft

1,012.00

Crushed Aggregate

84.000

Cft

2,800.00

100 Cft

2,352.00

Nails / Screws / Clamps

2.500

Kg

140.00

Kg

350.00

Wood - Partal

0.550

Cft

1,200.00

Cft

660.00

Mobile Oil

1.000

Ltr

140.00

Ltr

140.00

52.67

16,274.00

TOTAL

MATERIAL

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

Carpenter

0.100

Day

800.00

Day

80.00

164.40

20.74

5,644.40

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.59

22

1,419.00

5,098.06

Composite Rates Per

100 Cft

Rs.

28,435.46

Per CUM : Rs 10,041.90

Labour Rates Per

100 Cft

Rs.

6,850.00

Per CUM : Rs 2,419.06

378

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-a-03

(British) :

100 Cft

RCC in roof slab, beam, column & other structural members, insitu
or precast. Type C (1:2:4)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

19.100

Bag

490.00

Bag

9,359.00

Sand

48.000

Cft

2,200.00

100 Cft

1,056.00

Crushed Aggregate

88.000

Cft

2,800.00

100 Cft

2,464.00

Nails / Screws / Clamps

2.500

Kg

140.00

Kg

350.00

Wood - Partal

0.550

Cft

1,200.00

Cft

660.00

Mobile Oil

1.000

Ltr

140.00

Ltr

140.00

50.28

14,029.00

TOTAL

MATERIAL

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

Carpenter

0.100

Day

800.00

Day

80.00

164.40

22.64

5,644.40

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

5.09

22

1,419.00

4,604.16

Composite Rates Per

100 Cft

Rs.

25,696.56

Per CUM : Rs 9,074.66

Labour Rates Per

100 Cft

Rs.

6,850.00

Per CUM : Rs 2,419.06

379

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-b-01

(British) :

100 Cft

RCC in raft foundation slab, base slab of column & ret. wall etc,
not including in 06-06. Type A (1:1:2)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

31.300

Bag

490.00

Sand

39.000

Cft

Crushed Aggregate

78.000

Cft

TOTAL

Bag

15,337.00

2,200.00

100 Cft

858.00

2,800.00

100 Cft

2,184.00

MATERIAL

54.70

18,379.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

162.00

19.07

5,562.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.22

22

1,419.00

5,543.56

Composite Rates Per

100 Cft

Rs.

30,903.56

Per CUM : Rs 10,913.50

Labour Rates Per

100 Cft

Rs.

6,750.00

Per CUM : Rs 2,383.74

380

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-b-02

(British) :

100 Cft

RCC in raft foundation slab, base slab of column & ret. wall etc,
not including in 06-06 Type B (1:1.5:3)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

24.000

Bag

490.00

Sand

46.000

Cft

Crushed Aggregate

84.000

Cft

TOTAL

Bag

11,760.00

2,200.00

100 Cft

1,012.00

2,800.00

100 Cft

2,352.00

MATERIAL

51.70

15,124.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

162.00

21.46

5,562.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.416

Hour

800.00

Hour

1,132.80

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.84

22

1,415.80

4,826.76

Composite Rates Per

100 Cft

Rs.

26,928.56

Per CUM : Rs 9,509.74

Labour Rates Per

100 Cft

Rs.

6,750.00

Per CUM : Rs 2,383.74

381

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-b-03

(British) :

100 Cft

RCC in raft foundation slab, base slab of column & ret. wall etc,
not including in 06-06. Type C(1:2:4)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.600

Bag

490.00

Sand

44.000

Cft

Crushed Aggregate

88.000

Cft

TOTAL

Bag

8,624.00

2,200.00

100 Cft

968.00

2,800.00

100 Cft

2,464.00

MATERIAL

47.90

12,056.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

162.00

24.46

5,562.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

5.64

22

1,419.00

4,152.50

Composite Rates Per

100 Cft

Rs.

23,189.50

Per CUM : Rs 8,189.30

Labour Rates Per

100 Cft

Rs.

6,750.00

Per CUM : Rs 2,383.74

382

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-c-01

(British) :

100 Cft

RCC including Precast/Prestressed in slab, beam, column, lintel,


girder, etc. Type A (1:1:2)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

31.500

Bag

490.00

Bag

15,435.00

Sand

39.000

Cft

2,200.00

100 Cft

858.00

Crushed Aggregate

78.000

Cft

2,800.00

100 Cft

2,184.00

Nails / Screws / Clamps

2.500

Kg

140.00

Kg

Wood - Partal

3.000

Cft

1,200.00

Cft

Mobile Oil

1.000

Kg

140.00

Kg

TOTAL

MATERIAL

350.00
3,600.00
140.00

56.07

22,567.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

Carpenter

1.000

Day

800.00

Day

800.00

186.00

18.40

6,386.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

3.53

22

1,419.00

6,640.92

Composite Rates Per

100 Cft

Rs.

37,012.92

Per CUM : Rs 13,071.00

Labour Rates Per

100 Cft

Rs.

7,750.00

Per CUM : Rs 2,736.89

383

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-c-02

(British) :

100 Cft

RCC including Precast/Prestressed in slab, beam. column, lintels,


girder, etc. Type B (1:1.5:3)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

24.000

Bag

490.00

Bag

11,760.00

Sand

46.000

Cft

2,200.00

100 Cft

1,012.00

Crushed Aggregate

84.000

Cft

2,800.00

100 Cft

2,352.00

Nails / Screws / Clamps

2.500

Kg

140.00

Kg

Wood - Partal

3.000

Cft

1,200.00

Cft

3,600.00

Mobile Oil

1.000

Ltr

140.00

Ltr

140.00

53.70

19,214.00

TOTAL

MATERIAL

350.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

Carpenter

1.000

Day

800.00

Day

800.00

186.00

20.33

6,386.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

3.97

22

1,419.00

5,903.26

Composite Rates Per

100 Cft

Rs.

32,922.26

Per CUM : Rs 11,626.40

Labour Rates Per

100 Cft

Rs.

7,750.00

Per CUM : Rs 2,736.89

384

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-c-03

(British) :

100 Cft

RCC including Precast/Prestressed slab, column, beam, lintel,


girder etc. Type C (1:2:4).

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.600

Bag

490.00

Bag

8,624.00

Sand

44.000

Cft

2,200.00

100 Cft

968.00

Crushed Aggregate

88.000

Cft

2,800.00

100 Cft

2,464.00

Nails / Screws / Clamps

2.500

Kg

140.00

Kg

Wood - Partal

3.000

Cft

1,200.00

Cft

3,600.00

Mobile Oil

1.000

Ltr

140.00

Ltr

140.00

50.96

16,146.00

TOTAL

MATERIAL

350.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

1.500

Day

500.00

Day

750.00

Carpenter

1.000

Day

800.00

Day

800.00

186.00

22.57

6,386.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.48

22

1,419.00

5,228.30

Composite Rates Per

100 Cft

Rs.

29,179.30

Per CUM : Rs 10,304.58

Labour Rates Per

100 Cft

Rs.

7,750.00

Per CUM : Rs 2,736.89

385

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

Detail

06-06-d-01

(British) :

100 Cft

Reinforced cement concrete work as in dams, spillways, weirs,


barrages, cross drainage works and other hydrolic structures using
crushed stone aggregate(screening & washing) and coarse sand i/c
costof all labour and material and all kinds of form works, moulds,
shuttering lifting/pumping, curing, rendering and finishing the
exposed surface, cast in situ/precast excluding the cost of steel
reinforcement and
bending binding
also excludig cost of
Qtylabour forUnit
Rate (Rs)
additives which have to be paid separately. Type A (1:1:2)

Amount

MATERIAL
Ordinary Portland Cement

31.300

Bag

490.00

Bag

15,337.00

Sand

39.000

Cft

2,200.00

100 Cft

858.00

Crushed Aggregate

88.000

Cft

2,800.00

100 Cft

2,464.00

Bolts / Nuts / Screws

2.500

Kg

125.00

Kg

312.50

Wood - Partal

0.550

Cft

1,200.00

Cft

660.00

Oil & Grease

1.000

Kg

300.00

Kg

300.00

TOTAL

49.58

MATERIAL

19,931.50

LABOUR
Mason

3.000

No

900.00

No

2,700.00

Coolie

7.500

No

500.00

No

3,750.00

Bhishti

1.500

No

500.00

No

750.00

Carpenter

2.000

No

800.00

No

1,600.00

Sundries (Labour Only):


TOTAL

LABOUR

264.00

24.89

9,064.00

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

3.53

22

1,419.00

6,633.11

Composite Rates Per

100 Cft

Rs.

37,047.61

Per CUM : Rs 13,083.25

Labour Rates Per

100 Cft

Rs.

11,000.00

Per CUM : Rs 3,884.62

386

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

Detail

06-06-d-02

(British) :

100 Cft

Reinforced cement concrete work as in dams, spillways, weirs,


barrages, cross drainage works and other hydrolic structures using
crushed stone aggregate(screening & washing) and coarse sand i/c
costof all labour and material and all kinds of form works, moulds,
shuttering lifting/pumping, curing, rendering and finishing the
exposed surface, cast in situ/precast excluding the cost of steel
reinforcement and
bending binding
also excludig cost of
Qtylabour forUnit
Rate (Rs)
additives which have to be paid separately. Type B (1:1.5:3)

Amount

MATERIAL
Ordinary Portland Cement

24.000

Bag

490.00

Bag

11,760.00

Sand

46.000

Cft

2,200.00

100 Cft

1,012.00

Crushed Aggregate

84.000

Cft

2,800.00

100 Cft

2,352.00

Bolts / Nuts / Screws

2.500

Kg

125.00

Kg

312.50

Wood - Partal

0.550

Cft

1,200.00

Cft

660.00

Oil & Grease

1.000

Kg

300.00

Kg

300.00

TOTAL

46.20

MATERIAL

16,396.50

LABOUR
Mason

3.000

No

900.00

No

2,700.00

Coolie

7.500

No

500.00

No

3,750.00

Bhishti

1.500

No

500.00

No

750.00

Carpenter

2.000

No

800.00

No

1,600.00

Sundries (Labour Only):


TOTAL

LABOUR

264.00

27.80

9,064.00

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.00

22

1,419.00

5,855.41

Composite Rates Per

100 Cft

Rs.

32,734.91

Per CUM : Rs 11,560.24

Labour Rates Per

100 Cft

Rs.

11,000.00

Per CUM : Rs 3,884.62

387

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

Detail

06-06-d-03

(British) :

100 Cft

Reinforced cement concrete work as in dams, spillways, weirs,


barrages, cross drainage works and other hydrolic structures using
crushed stone aggregate(screening & washing) and coarse sand i/c
costof all labour and material and all kinds of form works, moulds,
shuttering lifting/pumping, curing, rendering and finishing the
exposed surface, cast in situ/precast excluding the cost of steel
reinforcement and
bending binding
also excludig cost of
Qtylabour forUnit
Rate (Rs)
additives which have to be paid separately. Type C (1:2:4)

Amount

MATERIAL
Ordinary Portland Cement

19.100

Bag

490.00

Bag

9,359.00

Sand

48.000

Cft

2,200.00

100 Cft

1,056.00

Crushed Aggregate

88.000

Cft

2,800.00

100 Cft

2,464.00

Bolts / Nuts / Screws

2.500

Kg

125.00

Kg

312.50

Wood - Partal

0.550

Cft

1,200.00

Cft

660.00

Oil & Grease

1.000

Kg

300.00

Kg

300.00

TOTAL

43.55

MATERIAL

14,151.50

LABOUR
Mason

3.000

No

900.00

No

2,700.00

Coolie

7.500

No

500.00

No

3,750.00

Bhishti

1.500

No

500.00

No

750.00

Carpenter

2.000

No

800.00

No

1,600.00

Sundries (Labour Only):


TOTAL

LABOUR

264.00

30.08

9,064.00

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.37

22

1,419.00

5,361.51

Composite Rates Per

100 Cft

Rs.

29,996.01

Per CUM : Rs 10,593.00

Labour Rates Per

100 Cft

Rs.

11,000.00

Per CUM : Rs 3,884.62

388

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-06-e

(British) :

100 Cft

Add extra labour for RCC in 2nd & subsequent storeys

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,125.00

63.75

78.00

2,188.75

22

467.50

Composite Rates Per

100 Cft

Rs.

2,656.25

Per CUM : Rs 938.05

Labour Rates Per

100 Cft

Rs.

2,656.25

Per CUM : Rs 938.05

389

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-07-a

(British) :

Cwt

Supply & fabricate M.S. reinforcement for cement concrete (Plain


bars)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Binding Wire

0.110

Kg

122.00

Kg

13.42

Steel Plain Bars

56.000

Kg

80.00

Kg

4,480.00

TOTAL

MATERIAL

69.58

4,493.42

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Black Smith

0.250

Day

900.00

Day

225.00

10.50

8.42

360.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cwt

Rs.

5,919.47

Labour Rates Per

Cwt

Rs.

437.50

1,065.55

Per Tonne : Rs 116,520.08


Per Tonne : Rs 8,611.84

390

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-07-b

(British) :

Cwt

Supply & fabricate M.S. reinforcement for cement concrete (Hot


rolled deformed bars Grade 60)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Binding Wire

0.110

Kg

122.00

Kg

13.42

Rfcnt Steel: Grd-60 KSM

56.000

Kg

90.00

Kg

5,040.00

TOTAL

MATERIAL

70.14

5,053.42

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Black Smith

0.250

Day

900.00

Day

225.00

10.50

7.86

360.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cwt

Rs.

6,602.67

Labour Rates Per

Cwt

Rs.

437.50

1,188.75

Per Tonne : Rs 129,968.33


Per Tonne : Rs 8,611.84

391

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-07-c

(British) :

Cwt

Supply & fabricate M.S. reinforcement for cement concrete (Hot


rolled deformed bars Grade 40)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Binding Wire

0.110

Kg

122.00

Kg

13.42

Rfcnt Steel: Grd-40 KSM

56.000

Kg

84.00

Kg

4,704.00

TOTAL

MATERIAL

69.82

4,717.42

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Black Smith

0.250

Day

900.00

Day

225.00

10.50

8.18

360.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cwt

Rs.

6,192.75

Labour Rates Per

Cwt

Rs.

437.50

1,114.83

Per Tonne : Rs 121,899.38


Per Tonne : Rs 8,611.84

392

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-08

(British) :

Cwt

Supplying & fixing high tensile steel wire in prestressing cables


in precast girders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Binding Wire

0.110

Kg

122.00

Kg

13.42

High Tensile Steel

56.000

Kg

115.00

Kg

6,440.00

TOTAL

MATERIAL

67.66

6,453.42

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Black Smith

0.500

Day

900.00

Day

450.00

21.00

10.34

721.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cwt

Rs.

8,748.17

Labour Rates Per

Cwt

Rs.

875.00

1,573.75

Per Tonne : Rs 172,200.78


Per Tonne : Rs 17,223.68

393

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-09

(British) :

100 Cft

Precast cement concrete solid or face blocks 1:2:4, including cost


of templates.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.600

Bag

490.00

Bag

8,624.00

Sand

44.000

Cft

2,200.00

100 Cft

968.00

Crushed Aggregate

88.000

Cft

2,800.00

100 Cft

2,464.00

Wood - Partal

0.430

Cft

1,200.00

TOTAL

MATERIAL

Cft

516.00

56.22

12,572.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

1.000

Day

500.00

Day

500.00

Carpenter

0.500

Day

800.00

Day

400.00

126.00

21.78

4,326.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,689.84

Composite Rates Per

100 Cft

Rs.

20,587.84

Per CUM : Rs 7,270.53

Labour Rates Per

100 Cft

Rs.

5,250.00

Per CUM : Rs 1,854.02

394

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-10

(British) :

100 Cft

Precast cem. concrete hollow blocks 1:2:4, including cost of


templates & constructing wall thereof

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.800

Bag

490.00

Bag

4,802.00

Sand

28.000

Cft

2,200.00

100 Cft

616.00

Crushed Aggregate

56.000

Cft

2,800.00

100 Cft

1,568.00

Wood - Partal

0.200

Cft

1,200.00

TOTAL

MATERIAL

Cft

240.00

32.99

7,226.00

LABOUR
Mason

4.500

Day

900.00

Day

4,050.00

Coolie

8.000

Day

500.00

Day

4,000.00

Bhishti

1.500

Day

500.00

Day

750.00

Carpenter

0.500

Day

800.00

Day

400.00

276.00

45.01

9,476.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,613.72

Composite Rates Per

100 Cft

Rs.

20,315.72

Per CUM : Rs 7,174.44

Labour Rates Per

100 Cft

Rs.

11,500.00

Per CUM : Rs 4,061.19

395

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-11

(British) :

100 Sft

Provide & fix ornamental cement jali 1:2:4 2" thick without steel.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.000

Bag

490.00

Bag

1,470.00

Sand

7.500

Cft

2,200.00

100 Cft

165.00

Crushed Aggregate

10.000

Cft

2,800.00

100 Cft

280.00

Wood - Partal

0.200

Cft

1,200.00

TOTAL

MATERIAL

Cft

240.00

27.37

2,155.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

2.500

Day

500.00

Day

1,250.00

Bhishti

0.500

Day

500.00

Day

250.00

112.50

50.63

3,862.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,316.60

Per SQM : Rs 787.27

Labour Rates Per

100 Sft

Rs.

4,687.50

Per SQM : Rs 504.38

1,299.10

396

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-12-a

(British) :

100 Cft

Extra labour for laying concrete (plain or reinforced) From


upto 40' height

Detail

Qty

Unit

20'

Rate (Rs)

Amount

LABOUR
Coolie

4.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,000.00

60.00

78.00

2,060.00

22

440.00

Composite Rates Per

100 Cft

Rs.

2,500.00

Per CUM : Rs 882.87

Labour Rates Per

100 Cft

Rs.

2,500.00

Per CUM : Rs 882.87

397

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-12-b

(British) :

100 Cft

Extra labour for laying concrete (plain or reinforced) For every


extra10' height

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

398

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-13

(British) :

100 Cft

Extra labour for work of weirs, rails or bridges, syphons &


concreting in superstructure

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

Labour Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

110.00

399

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-14

(British) :

Each

RCC spout, 2.5'x6"x5", including fixing in position

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.140

Bag

490.00

Bag

68.60

Sand

0.346

Cft

2,200.00

100 Cft

7.61

Crushed Aggregate

0.692

Cft

2,800.00

100 Cft

19.38

Steel (bars/rods/section)

3.000

Kg

82.00

Kg

246.00

Wood - Partal

0.025

Cft

1,200.00

Cft

30.00

38.62

371.59

TOTAL

MATERIAL

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

0.250

Day

500.00

Day

125.00

10.50

39.38

360.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

890.84

Cost Per Each: 890.84

Labour Rates Per

Each

Rs.

437.50

Cost Per Each: 437.50

158.75

400

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-15

(British) :

Each

Making holes upto 3" dia, 18" depth in cement concrete or stone
masonry walls and repairing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.700

Day

900.00

Day

630.00

Coolie

0.700

Day

500.00

Day

350.00

29.40

78.00

1,009.40

22

215.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

1,225.00

Cost Per Each: 1,225.00

Labour Rates Per

Each

Rs.

1,225.00

Cost Per Each: 1,225.00

401

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-16

(British) :

100 Cft

Extra labour for skipping concrete in wells

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

12.000

Day

500.00

Day

6,000.00

Bhishti

0.500

Day

500.00

Day

250.00

214.50

78.00

7,364.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,573.00

Composite Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

Labour Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

402

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-17-a

(British) :

100 Sft

Nicking cement concrete surface.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.500

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

450.00

13.50

78.00

463.50

22

99.00

Composite Rates Per

100 Sft

Rs.

562.50

Per SQM : Rs 60.53

Labour Rates Per

100 Sft

Rs.

562.50

Per SQM : Rs 60.53

403

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-17-b

(British) :

100 Sft

Nicking lime concrete surface.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.165

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

148.50

4.46

78.00

152.96

22

32.67

Composite Rates Per

100 Sft

Rs.

185.63

Per SQM : Rs 19.97

Labour Rates Per

100 Sft

Rs.

185.63

Per SQM : Rs 19.97

404

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-18-a

(British) :

100 Sft

Prepare, water and ramming surface for laying concrete (for


Headworks only) Horizontal floor

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

0.250

Day

500.00

Day

125.00

10.50

78.00

360.50

22

77.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

437.50

Per SQM : Rs 47.08

Labour Rates Per

100 Sft

Rs.

437.50

Per SQM : Rs 47.08

405

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-18-b

(British) :

100 Sft

Prepare, water and ramming surface for laying concrete (for


Headworks only) Glacis and crest

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

0.250

Day

500.00

Day

125.00

17.25

78.00

592.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

718.75

Per SQM : Rs 77.34

Labour Rates Per

100 Sft

Rs.

718.75

Per SQM : Rs 77.34

126.50

406

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-18-c

(British) :

100 Sft

Prepare, water and ramming surface for laying concrete (for


Headworks only) inverted filters

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.125

Day

900.00

Day

112.50

Coolie

0.125

Day

500.00

Day

62.50

5.25

78.00

180.25

22

38.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

218.75

Per SQM : Rs 23.54

Labour Rates Per

100 Sft

Rs.

218.75

Per SQM : Rs 23.54

407

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-19

(British) :

Rft

Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion


joint.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.583

G.I Sheet

125.00

Kg

TOTAL

MATERIAL

Kg

72.92

67.74

72.92

LABOUR
Black Smith

0.005

Day

900.00

Day

4.69

Helper

0.005

Day

600.00

Day

3.13

0.23

10.26

8.05

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

98.72

Labour Rates Per

Rft

Rs.

9.77

LABOUR

17.76

Per Meter : Rs 323.81


Per Meter : Rs 32.03

408

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-20

(British) :

Rft

Fill expansion joints with bitumen, sand & saw dust in Ratio 1:2:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

0.450

Cft

2,200.00

Coal Tar (in canisters)

0.055

Kg

110.00

Kg

6.05

Saw Dust

0.101

Kg

20.00

Kg

2.02

TOTAL

MATERIAL

100 Cft

9.90

58.67

17.97

Day

5.00

0.15

19.33

5.15

22

LABOUR
0.010

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

28.17

Labour Rates Per

Rft

Rs.

6.25

LABOUR

5.05

Per Meter : Rs 92.41


Per Meter : Rs 20.50

409

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-21-a

(British) :

Rft

Filling expansion joints with bitumen

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.250

Coal Tar (in canisters)

110.00

Kg

TOTAL

MATERIAL

Kg

27.50

26.61

27.50

Day

50.00

1.50

51.39

51.50

22

LABOUR
0.100

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

96.05

Labour Rates Per

Rft

Rs.

62.50

LABOUR

17.05

Per Meter : Rs 315.04


Per Meter : Rs 205.00

410

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-21-b

(British) :

Rft

Laying Asphaltic Mixture in Expansion Joints

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.100

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

62.50

Labour Rates Per

Rft

Rs.

62.50

LABOUR

Day

50.00

1.50

78.00

51.50

22

11.00

Per Meter : Rs 205.00


Per Meter : Rs 205.00

411

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-22-a-01

(British) :

100 Sft

Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1


layer polythene & 1 coat bitumen (1.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.250

Bag.

490.00

Sand

5.500

Cft

2,200.00

100 Cft

121.00

Crushed Aggregate

11.000

Cft

2,800.00

100 Cft

308.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag.

1,102.50

46.22

2,721.50

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

Carpenter

0.150

Day

800.00

Day

120.00

50.85

31.78

1,745.85

22

971.63

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,438.98

Per SQM : Rs 585.23

Labour Rates Per

100 Sft

Rs.

2,118.75

Per SQM : Rs 227.98

412

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-22-a-02

(British) :

100 Sft

Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1


layer polythene & 1 coat bitumen (2" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.930

Bag

490.00

Bag

1,435.70

Sand

7.500

Cft

2,200.00

100 Cft

165.00

Crushed Aggregate

15.000

Cft

2,800.00

100 Cft

420.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

49.09

3,210.70

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

Carpenter

0.150

Day

800.00

Day

120.00

50.85

28.91

1,745.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,035.80

Per SQM : Rs 649.45

Labour Rates Per

100 Sft

Rs.

2,118.75

Per SQM : Rs 227.98

1,079.25

413

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-22-a-03

(British) :

100 Sft

Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1


layer polythene & 1 coat bitumen (3" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.500

Bag

490.00

Bag

2,205.00

Sand

11.000

Cft

2,200.00

100 Cft

242.00

Crushed Aggregate

22.000

Cft

2,800.00

100 Cft

616.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

52.92

4,253.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

Carpenter

0.250

Day

800.00

Day

200.00

53.25

25.08

1,828.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,407.41

Per SQM : Rs 797.04

Labour Rates Per

100 Sft

Rs.

2,218.75

Per SQM : Rs 238.74

1,326.16

414

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-22-b-01

(British) :

100 Sft

Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1


layer polythene & 2 coats bitumen (1.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.250

Bag

490.00

Bag

1,102.50

Sand

5.500

Cft

2,200.00

100 Cft

121.00

Crushed Aggregate

11.000

Cft

2,800.00

100 Cft

308.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

1,100.00

52.75

3,271.50

LABOUR
Mason

0.150

Day

900.00

Day

135.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

Carpenter

0.150

Day

800.00

Day

120.00

41.40

25.25

1,421.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,716.23

Per SQM : Rs 615.07

Labour Rates Per

100 Sft

Rs.

1,725.00

Per SQM : Rs 185.61

1,023.33

415

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-22-b-02

(British) :

100 Sft

Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1


layer polythene & 2 coats bitumen (2" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.930

Bag

490.00

Bag

1,435.70

Sand

7.500

Cft

2,200.00

100 Cft

165.00

Crushed Aggregate

15.000

Cft

2,800.00

100 Cft

420.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

1,100.00

51.70

3,760.70

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

Carpenter

0.150

Day

800.00

Day

120.00

50.85

26.30

1,745.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,706.80

Per SQM : Rs 721.65

Labour Rates Per

100 Sft

Rs.

2,118.75

Per SQM : Rs 227.98

1,200.25

416

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-22-b-03

(British) :

100 Sft

Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1


layer polythene & 2 coats bitumen (3" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.500

Bag

490.00

Bag

2,205.00

Sand

11.000

Cft

2,200.00

100 Cft

242.00

Crushed Aggregate

22.000

Cft

2,800.00

100 Cft

616.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

1,100.00

55.50

4,803.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

Carpenter

0.140

Day

800.00

Day

112.00

50.61

22.50

1,737.61

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,968.41

Per SQM : Rs 857.40

Labour Rates Per

100 Sft

Rs.

2,108.75

Per SQM : Rs 226.90

1,427.80

417

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-a-01

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen


Ratio 1:4 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.730

Bag

490.00

Sand

3.900

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

357.70

100 Cft

85.80

38.18

1,633.50

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

39.82

1,622.25

22

705.87

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,961.62

Per SQM : Rs 426.27

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

418

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-a-02

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen


Ratio 1:4 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.100

Bag

490.00

Sand

5.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

539.00

100 Cft

121.00

40.51

1,850.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

37.49

1,622.25

22

753.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,225.75

Per SQM : Rs 454.69

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

419

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-a-03

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen


Ratio 1:3 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.920

Bag

490.00

Sand

3.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

450.80

100 Cft

77.00

39.13

1,717.80

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

38.87

1,622.25

22

724.42

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,064.47

Per SQM : Rs 437.34

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

420

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-a-04

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen


Ratio 1:3 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.380

Bag

490.00

Sand

5.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

676.20

100 Cft

110.00

41.74

1,976.20

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

36.26

1,622.25

22

781.26

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,379.71

Per SQM : Rs 471.26

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

421

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-a-05

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen


Ratio 1:2 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.200

Bag

490.00

Sand

3.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

588.00

100 Cft

66.00

40.45

1,844.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

37.55

1,622.25

22

752.18

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,218.43

Per SQM : Rs 453.90

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

422

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-a-06

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen


Ratio 1:2 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.840

Bag

490.00

Sand

4.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

901.60

100 Cft

99.00

43.63

2,190.60

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

34.37

1,622.25

22

828.43

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,641.28

Per SQM : Rs 499.40

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

423

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-b-01

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 2 coats


bitumen Ratio 1:4 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.730

Bag

490.00

Sand

4.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

357.70

100 Cft

88.00

1,100.00

43.59

2,185.70

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

34.41

1,622.25

22

827.35

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,635.30

Per SQM : Rs 498.76

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

424

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-b-02

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 2 coats


bitumen Ratio 1:4 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.100

Bag

490.00

Sand

5.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

539.00

100 Cft

121.00

1,100.00

45.28

2,400.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

32.72

1,622.25

22

874.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,896.75

Per SQM : Rs 526.89

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

425

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-b-03

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 2 coats


bitumen Ratio 1:3 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.920

Bag

490.00

Sand

3.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

450.80

100 Cft

77.00

1,100.00

44.26

2,267.80

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

33.74

1,622.25

22

845.42

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,735.47

Per SQM : Rs 509.54

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

426

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-b-04

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 2 coats


bitumen Ratio 1:3 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.380

Bag

490.00

Sand

5.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

676.20

100 Cft

110.00

1,100.00

46.20

2,526.20

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

31.80

1,622.25

22

902.26

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,050.71

Per SQM : Rs 543.46

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

427

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-b-05

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 2 coats


bitumen Ratio 1:2 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.200

Bag

490.00

Sand

3.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

588.00

100 Cft

66.00

1,100.00

45.24

2,394.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

32.76

1,622.25

22

873.18

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,889.43

Per SQM : Rs 526.10

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

428

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-23-b-06

(British) :

100 Sft

Damp proof course in c/s plaster, 1 layer polythene, 2 coats


bitumen Ratio 1:2 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.840

Bag

490.00

Sand

4.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

901.60

100 Cft

99.00

1,100.00

47.63

2,740.60

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

30.37

1,622.25

22

949.43

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,312.28

Per SQM : Rs 571.60

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

429

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-a-01

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio


1:4 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.750

Bag

490.00

Sand

4.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

367.50

100 Cft

88.00

38.32

1,645.50

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

39.68

1,622.25

22

708.51

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,976.26

Per SQM : Rs 427.85

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

430

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-a-02

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio


1:4 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.100

Bag

490.00

Sand

5.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

539.00

100 Cft

121.00

40.51

1,850.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

37.49

1,622.25

22

753.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,225.75

Per SQM : Rs 454.69

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

431

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-a-03

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio


1:3 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.950

Bag

490.00

Sand

3.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

465.50

100 Cft

77.00

39.29

1,732.50

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

38.71

1,622.25

22

727.65

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,082.40

Per SQM : Rs 439.27

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

432

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-a-04

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio


1:3 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.380

Bag

490.00

Sand

5.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

676.20

100 Cft

110.00

41.74

1,976.20

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

36.26

1,622.25

22

781.26

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,379.71

Per SQM : Rs 471.26

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

433

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-a-05

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio


1:2 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.200

Bag

490.00

Sand

3.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

588.00

100 Cft

66.00

40.45

1,844.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

37.55

1,622.25

22

752.18

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,218.43

Per SQM : Rs 453.90

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

434

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-a-06

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio


1:2 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.840

Bag

490.00

Sand

4.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

TOTAL

MATERIAL

Bag

901.60

100 Cft

99.00

43.63

2,190.60

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

34.37

1,622.25

22

828.43

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,641.28

Per SQM : Rs 499.40

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

435

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-b-01

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio


1:4 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.750

Bag

490.00

Sand

4.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

367.50

100 Cft

88.00

1,100.00

43.67

2,195.50

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

34.33

1,622.25

22

829.51

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,647.26

Per SQM : Rs 500.05

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

436

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-b-02

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio


1:4 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.100

Bag

490.00

Sand

5.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

539.00

100 Cft

121.00

1,100.00

45.28

2,400.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

32.72

1,622.25

22

874.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,896.75

Per SQM : Rs 526.89

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

437

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-b-03

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio


1:3 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.960

Bag

490.00

Sand

3.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

470.40

100 Cft

77.00

1,100.00

44.42

2,287.40

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

33.58

1,622.25

22

849.73

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,759.38

Per SQM : Rs 512.11

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

438

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-b-04

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio


1:3 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.380

Bag

490.00

Sand

5.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

676.20

100 Cft

110.00

1,100.00

46.20

2,526.20

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

31.80

1,622.25

22

902.26

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,050.71

Per SQM : Rs 543.46

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

439

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-b-05

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio


1:2 (0.5" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.200

Bag

490.00

Sand

3.000

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

588.00

100 Cft

66.00

1,100.00

45.24

2,394.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

32.76

1,622.25

22

873.18

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,889.43

Per SQM : Rs 526.10

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

440

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-24-b-06

(British) :

100 Sft

V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio


1:2 (0.75" thick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.840

Bag

490.00

Sand

4.500

Cft

2,200.00

Polythene Sheet

100.000

Sft

6.00

Sft

600.00

Fuel Wood

0.100

Mds

400.00

Mds

40.00

Coal Tar (in canisters)

10.000

Kg

110.00

Kg

TOTAL

MATERIAL

Bag

901.60

100 Cft

99.00

1,100.00

47.63

2,740.60

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

47.25

30.37

1,622.25

22

949.43

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,312.28

Per SQM : Rs 571.60

Labour Rates Per

100 Sft

Rs.

1,968.75

Per SQM : Rs 211.84

441

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-25

(British) :

100 Cft

Grouting concrete between the grooves of gates including shuttering

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Carpenter

0.500

Day

800.00

Day

400.00

184.50

78.00

6,334.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,353.00

Composite Rates Per

100 Cft

Rs.

7,687.50

Per CUM : Rs 2,714.82

Labour Rates Per

100 Cft

Rs.

7,687.50

Per CUM : Rs 2,714.82

442

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-26

(British) :

1000 Sft

Chisel dressing concrete surface on sides of grooves

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
2.500

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,250.00

67.50

78.00

2,317.50

22

495.00

Composite Rates Per

1000 Sft

Rs.

2,812.50

Per SQM : Rs 30.26

Labour Rates Per

1000 Sft

Rs.

2,812.50

Per SQM : Rs 30.26

443

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-27

(British) :

100 Sft

Laying and ramming dry ballast or kankar

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.090

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

6,045.00

181.35

78.00

6,226.35

22

Composite Rates Per

100 Sft

Rs.

7,556.25

Per SQM : Rs 813.05

Labour Rates Per

100 Sft

Rs.

7,556.25

Per SQM : Rs 813.05

1,329.90

444

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-28

(British) :

100 No

Hoisting & placing in position RCC shelves

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

3.130

Day

900.00

Day

2,817.00

Coolie

9.400

Day

500.00

Day

4,700.00

225.51

78.00

7,742.51

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No

Rs.

9,396.25

Cost Per No: 93.96

Labour Rates Per

100 No

Rs.

9,396.25

Cost Per No: 93.96

1,653.74

445

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-29-a

(British) :

100 Cft

Breaking brick ballast, screening & stacking 2" ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,500.00

45.00

78.00

1,545.00

22

330.00

Composite Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

446

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-29-b

(British) :

100 Cft

Breaking brick ballast, screening & stacking 1.5" ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,750.00

52.50

78.00

1,802.50

22

385.00

Composite Rates Per

100 Cft

Rs.

2,187.50

Per CUM : Rs 772.51

Labour Rates Per

100 Cft

Rs.

2,187.50

Per CUM : Rs 772.51

447

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-29-c

(British) :

100 Cft

Breaking brick ballast, screening & stacking 1" ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,000.00

60.00

78.00

2,060.00

22

440.00

Composite Rates Per

100 Cft

Rs.

2,500.00

Per CUM : Rs 882.87

Labour Rates Per

100 Cft

Rs.

2,500.00

Per CUM : Rs 882.87

448

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-29-d

(British) :

100 Cft

Breaking brick ballast, screening & stacking. Jhama ballast 3/4"


ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,250.00

67.50

78.00

2,317.50

22

495.00

Composite Rates Per

100 Cft

Rs.

2,812.50

Per CUM : Rs 993.23

Labour Rates Per

100 Cft

Rs.

2,812.50

Per CUM : Rs 993.23

449

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

06-30

Item Name :

(British) :

100 Rft

Supply & fix broken glasses on court yard walls, including 1:3:6
cement concrete coping

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Broken Glass Pieces

100.000

15.00

Kg

TOTAL

MATERIAL

Kg

1,500.00

36.52

1,500.00

LABOUR
Mason

0.097

Day

900.00

Day

87.30

Coolie

2.987

Day

500.00

Day

1,493.50

47.42

41.48

1,628.22

22

677.78

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

3,806.00

Labour Rates Per

100 Rft

Rs.

1,976.00

Per Meter : Rs 124.84


Per Meter : Rs 64.81

450

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-31

(British) :

100 Cft

Crushing stone ballast by machine

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.830

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,415.00

42.45

78.00

1,457.45

22

311.30

Composite Rates Per

100 Cft

Rs.

1,768.75

Per CUM : Rs 624.63

Labour Rates Per

100 Cft

Rs.

1,768.75

Per CUM : Rs 624.63

451

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-32-a

(British) :

100 Cft

Breaking stone ballast screened & stacked 2" ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,750.00

52.50

78.00

1,802.50

22

385.00

Composite Rates Per

100 Cft

Rs.

2,187.50

Per CUM : Rs 772.51

Labour Rates Per

100 Cft

Rs.

2,187.50

Per CUM : Rs 772.51

452

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-32-b

(British) :

100 Cft

Breaking stone ballast screened & stacked 1.5" ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,000.00

60.00

78.00

2,060.00

22

440.00

Composite Rates Per

100 Cft

Rs.

2,500.00

Per CUM : Rs 882.87

Labour Rates Per

100 Cft

Rs.

2,500.00

Per CUM : Rs 882.87

453

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-32-c

(British) :

100 Cft

Breaking stone ballast screened & stacked 1" ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,250.00

67.50

78.00

2,317.50

22

495.00

Composite Rates Per

100 Cft

Rs.

2,812.50

Per CUM : Rs 993.23

Labour Rates Per

100 Cft

Rs.

2,812.50

Per CUM : Rs 993.23

454

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-32-d

(British) :

100 Cft

Breaking stone ballast screened & stacked 0.5" ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,000.00

90.00

78.00

3,090.00

22

660.00

Composite Rates Per

100 Cft

Rs.

3,750.00

Per CUM : Rs 1,324.30

Labour Rates Per

100 Cft

Rs.

3,750.00

Per CUM : Rs 1,324.30

455

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-32-e

(British) :

100 Cft

Breaking stone ballast screened & stacked 1/8" to 1/4" ring

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,000.00

150.00

78.00

5,150.00

22

1,100.00

Composite Rates Per

100 Cft

Rs.

6,250.00

Per CUM : Rs 2,207.17

Labour Rates Per

100 Cft

Rs.

6,250.00

Per CUM : Rs 2,207.17

456

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-33

(British) :

100 Cft

Screening and stacking stone ballast, shingle or bajri etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

Labour Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

110.00

457

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-34

(British) :

100 Cft

Washing ballast, bajri or shingle

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

Labour Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

110.00

458

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-35

(British) :

Each

Erecting and carting sun shades of precast RCC (upto 5"x 2.5")

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Coolie

0.500

Day

500.00

Day

250.00

10.20

78.00

350.20

22

74.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

425.00

Cost Per Each: 425.00

Labour Rates Per

Each

Rs.

425.00

Cost Per Each: 425.00

459

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-36-a

(British) :

100 Cft

PCC 1:3:6 in mass concrete less formwork using 50% boulders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.590

Bag

490.00

Bag

3,229.10

Sand

25.340

Cft

2,200.00

100 Cft

557.48

Crushed Aggregate

50.680

Cft

2,800.00

100 Cft

1,419.04

Boulder (Screened/Washed)

50.000

Cft

1,900.00

100 Cft

950.00

TOTAL

MATERIAL

50.05

6,155.62

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

4.300

Day

500.00

Day

2,150.00

Bhishti

0.720

Day

500.00

Day

360.00

92.04

27.95

3,160.04

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,029.20

Composite Rates Per

100 Cft

Rs.

11,344.86

Per CUM : Rs 4,006.40

Labour Rates Per

100 Cft

Rs.

3,835.00

Per CUM : Rs 1,354.32

460

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-36-b

(British) :

100 Cft

PCC 1:3:6 in mass concrete less formwork using 40% boulders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

7.900

Bag

490.00

Bag

3,871.00

Sand

30.410

Cft

2,200.00

100 Cft

669.02

Crushed Aggregate

60.820

Cft

2,800.00

100 Cft

1,702.96

Boulder (Screened/Washed)

40.000

Cft

1,900.00

100 Cft

760.00

TOTAL

MATERIAL

52.18

7,002.98

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

4.300

Day

500.00

Day

2,150.00

Bhishti

0.710

Day

500.00

Day

355.00

91.89

25.82

3,154.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,214.52

Composite Rates Per

100 Cft

Rs.

12,372.39

Per CUM : Rs 4,369.27

Labour Rates Per

100 Cft

Rs.

3,828.75

Per CUM : Rs 1,352.11

461

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-36-c

(British) :

100 Cft

PCC 1:3:6 in mass concrete less formwork using 30% boulders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.230

Bag

490.00

Bag

4,522.70

Sand

35.480

Cft

2,200.00

100 Cft

780.56

Crushed Aggregate

71.000

Cft

2,800.00

100 Cft

1,988.00

Boulder (Screened/Washed)

30.000

Cft

1,900.00

100 Cft

570.00

TOTAL

MATERIAL

53.97

7,861.26

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

4.300

Day

500.00

Day

2,150.00

Bhishti

0.710

Day

500.00

Day

355.00

91.89

24.03

3,154.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,403.34

Composite Rates Per

100 Cft

Rs.

13,419.49

Per CUM : Rs 4,739.05

Labour Rates Per

100 Cft

Rs.

3,828.75

Per CUM : Rs 1,352.11

462

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-37-a

(British) :

100 Cft

PCC 1:4:8 in mass concrete less formwork using 50% boulders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.500

Bag

490.00

Bag

2,205.00

Sand

25.000

Cft

2,200.00

100 Cft

550.00

Crushed Aggregate

50.000

Cft

2,800.00

100 Cft

1,400.00

Boulder (Screened/Washed)

50.000

Cft

1,900.00

100 Cft

950.00

TOTAL

MATERIAL

46.88

5,105.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

4.300

Day

500.00

Day

2,150.00

Bhishti

0.710

Day

500.00

Day

355.00

91.89

31.13

3,154.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,796.96

Composite Rates Per

100 Cft

Rs.

10,056.85

Per CUM : Rs 3,551.55

Labour Rates Per

100 Cft

Rs.

3,828.75

Per CUM : Rs 1,352.11

463

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-37-b

(British) :

100 Cft

PCC 1:4:8 in mass concrete less formwork using 40% boulders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

5.400

Bag

490.00

Bag

2,646.00

Sand

30.000

Cft

2,200.00

100 Cft

660.00

Crushed Aggregate

60.000

Cft

2,800.00

100 Cft

1,680.00

Boulder (Screened/Washed)

40.000

Cft

1,900.00

100 Cft

760.00

TOTAL

MATERIAL

48.92

5,746.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

4.300

Day

500.00

Day

2,150.00

Bhishti

0.710

Day

500.00

Day

355.00

91.89

29.08

3,154.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,937.98

Composite Rates Per

100 Cft

Rs.

10,838.87

Per CUM : Rs 3,827.71

Labour Rates Per

100 Cft

Rs.

3,828.75

Per CUM : Rs 1,352.11

464

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-37-c

(British) :

100 Cft

PCC 1:4:8 in mass concrete less formwork using 30% boulders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.300

Bag

490.00

Bag

3,087.00

Sand

35.000

Cft

2,200.00

100 Cft

770.00

Crushed Aggregate

70.000

Cft

2,800.00

100 Cft

1,960.00

Boulder (Screened/Washed)

30.000

Cft

1,900.00

100 Cft

570.00

TOTAL

MATERIAL

50.69

6,387.00

LABOUR
Mason

0.620

Day

900.00

Day

558.00

Coolie

4.300

Day

500.00

Day

2,150.00

Bhishti

0.710

Day

500.00

Day

355.00

91.89

27.31

3,154.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,079.00

Composite Rates Per

100 Cft

Rs.

11,620.89

Per CUM : Rs 4,103.88

Labour Rates Per

100 Cft

Rs.

3,828.75

Per CUM : Rs 1,352.11

465

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-38-a

(British) :

100 Sft

Erecting & removing formwork to concrete in any shape / position


(Horizontal)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

0.183

Cft

1,200.00

Cft

219.60

Mobile Oil

0.500

Ltr

140.00

Ltr

70.00

289.60

TOTAL

5.89

MATERIAL

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

3.000

Day

800.00

Day

2,400.00

102.00

72.11

3,502.00

22

811.71

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,603.31

Per SQM : Rs 495.32

Labour Rates Per

100 Sft

Rs.

4,250.00

Per SQM : Rs 457.30

466

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-38-b

(British) :

100 Sft

Erecting & removing formwork to concrete in any shape / position


(Vertical)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

0.217

Cft

1,200.00

Cft

260.40

Mobile Oil

0.500

Ltr

140.00

Ltr

70.00

330.40

TOTAL

5.86

MATERIAL

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Carpenter

3.000

Day

800.00

Day

2,400.00

117.00

72.14

4,017.00

22

930.69

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,278.09

Per SQM : Rs 567.92

Labour Rates Per

100 Sft

Rs.

4,875.00

Per SQM : Rs 524.55

467

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-39-a

(British) :

100 Sft

Erection and removal of steel Form work for RCC or Plain Concrete
horizontal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

28.000

Kg

82.00

Kg

2,296.00

M.S Sheet

30.000

Kg

125.00

Kg

3,750.00

Bolts / Nuts / Screws

0.250

Doz

125.00

Doz

31.25

Welding Rod

0.080

Pkt

400.00

Pkt

32.00

Mobile Oil

0.100

Ltr

140.00

Ltr

14.00

Steel Pipes 12 Ft with Clamps

0.190

No

450.00

No

85.50

TOTAL

MATERIAL

69.67

6,208.75

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Black Smith

0.250

Day

900.00

Day

225.00

14.25

8.33

489.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,168.43

Per SQM : Rs 878.92

Labour Rates Per

100 Sft

Rs.

593.75

Per SQM : Rs 63.89

1,470.43

468

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-39-b

(British) :

100 Sft

Erection and removal of steel Form work for RCC or Plain Concrete
vertical

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

28.000

Kg

82.00

Kg

2,296.00

M.S Sheet

30.000

Kg

125.00

Kg

3,750.00

Bolts / Nuts / Screws

0.250

Doz

125.00

Doz

31.25

Welding Rod

0.080

Pkt

400.00

Pkt

32.00

Mobile Oil

0.100

Ltr

140.00

Ltr

14.00

Steel Pipes 12 Ft with Clamps

0.090

No

450.00

No

40.50

TOTAL

MATERIAL

70.75

6,163.75

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Black Smith

0.300

Day

900.00

Day

270.00

11.10

7.25

381.10

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,982.28

Per SQM : Rs 858.89

Labour Rates Per

100 Sft

Rs.

462.50

Per SQM : Rs 49.77

1,437.43

469

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-a

(British) :

100 Cft

Class A1 concrete in reinforcement/non reinforcement concrete


structure with minimum cylinder compressive strength 3000 psi on 28
days other than concrete in water and piles with consistency range
in slump 25-75 mm with water cement ratio 0.58

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.000

Bag

490.00

Sand

44.000

Cft

Crushed Aggregate

88.000

Cft

TOTAL

Bag

8,330.00

2,200.00

100 Cft

968.00

2,800.00

100 Cft

2,464.00

MATERIAL

50.90

11,762.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

20.96

4,274.50

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

6.14

22

1,419.00

3,812.82

Composite Rates Per

100 Cft

Rs.

21,268.32

Per CUM : Rs 7,510.84

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

470

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-b

(British) :

100 Cft

Class A2 cement concrete for concrete place under water with


minimum cylinder compressive strength 3500 psi on 28 days with
consistency range in slump 100-150 mm with water cement ratio 0.58

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

20.000

Bag

490.00

Sand

43.000

Cft

Crushed Aggregate

86.000

Cft

TOTAL

Bag

9,800.00

2,200.00

100 Cft

946.00

2,800.00

100 Cft

2,408.00

MATERIAL

53.50

13,154.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

19.88

4,274.50

Hour

1,136.00

4.62

1,136.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4,056.80

Composite Rates Per

100 Cft

Rs.

22,621.30

Per CUM : Rs 7,988.64

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

471

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-c

(British) :

100 Cft

Class A3 cement concrete for concrete in pile with minimum cylinder


compressive strenght 4000 psi on 28 days other than concrete in
water and piles with consistency range in slump 100-150 mm with
water cement ratio 0.58

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

23.000

Bag

490.00

Sand

42.000

Cft

Crushed Aggregate

84.000

Cft

TOTAL

Bag

11,270.00

2,200.00

100 Cft

924.00

2,800.00

100 Cft

2,352.00

MATERIAL

54.24

14,546.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

18.47

4,274.50

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

5.29

22

1,419.00

4,425.30

Composite Rates Per

100 Cft

Rs.

24,664.80

Per CUM : Rs 8,710.30

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

472

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-d

(British) :

100 Cft

Class B concrete for concrete in pile specified works only with


minimum cylinder compressive strenght 2418 psi on 28 days and
consistency range in slump 25-75 mm with water cement ratio 0.65

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

14.000

Bag

490.00

Sand

46.000

Cft

Crushed Aggregate

92.000

Cft

TOTAL

Bag

6,860.00

2,200.00

100 Cft

1,012.00

2,800.00

100 Cft

2,576.00

MATERIAL

48.92

10,448.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

22.43

4,274.50

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

6.64

22

1,419.00

3,523.74

Composite Rates Per

100 Cft

Rs.

19,665.24

Per CUM : Rs 6,944.72

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

473

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-e

(British) :

100 Cft

Class C concrete for concrete for cribbing or otherwise specified


in special provision with minimum cylinder compressive strength
3000 psi on 28 days and consistency range in slump 25-75 mm with
water cement ratio 0.58

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

16.000

Bag

490.00

Sand

45.000

Cft

Crushed Aggregate

90.000

Cft

TOTAL

Bag

7,840.00

2,200.00

100 Cft

990.00

2,800.00

100 Cft

2,520.00

MATERIAL

50.31

11,350.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

21.40

4,274.50

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

6.29

22

1,419.00

3,722.18

Composite Rates Per

100 Cft

Rs.

20,765.68

Per CUM : Rs 7,333.34

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

474

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-f

(British) :

100 Cft

Class D1 concrete for concrete in pre-stressed & post tensioned


with minimum cylinder compressive strength 4978.12 psi on 28 days
and consistency range in slump 50-100 mm with water cement ratio
0.40

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

25.000

Bag

490.00

Sand

41.000

Cft

Crushed Aggregate

82.000

Cft

TOTAL

Bag

12,250.00

2,200.00

100 Cft

902.00

2,800.00

100 Cft

2,296.00

MATERIAL

55.13

15,448.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

17.81

4,274.50

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

5.06

22

1,419.00

4,623.74

Composite Rates Per

100 Cft

Rs.

25,765.24

Per CUM : Rs 9,098.92

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

475

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-g

(British) :

100 Cft

Class D2 concrete for concrete in pre-stressed & post tensioned


with minimum cylinder compressive strength 6045 psi on 28 days and
consistency range in slump 50-100 mm with water cement ratio 0.40

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

28.000

Bag

490.00

Sand

40.000

Cft

Crushed Aggregate

80.000

Cft

TOTAL

Bag

13,720.00

2,200.00

100 Cft

880.00

2,800.00

100 Cft

2,240.00

MATERIAL

56.36

16,840.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

16.89

4,274.50

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.75

22

1,419.00

4,929.98

Composite Rates Per

100 Cft

Rs.

27,463.48

Per CUM : Rs 9,698.65

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

476

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-h

(British) :

100 Cft

Class D3 concrete for concrete in pre-stressed & post tensioned


with minimum cylinder compressive strength 7112 psi on 28 days and
consistency range in slump 50-100 mm with water cement ratio 0.40

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

31.000

Bag

490.00

Sand

38.420

Cft

Crushed Aggregate

76.840

Cft

TOTAL

Bag

15,190.00

2,200.00

100 Cft

845.24

2,800.00

100 Cft

2,151.52

MATERIAL

57.42

18,186.76

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

16.10

4,274.50

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

Hour

800.00

Hour

1,136.00

Concrete Vibrator

2.830

Hour

100.00

Hour

283.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.48

22

1,419.00

5,226.27

Composite Rates Per

100 Cft

Rs.

29,106.53

Per CUM : Rs 10,278.88

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

477

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-i

(British) :

100 Cft

Class Y concrete for concrete use as filler in steel grid, Bridge


floor, in then reinforced section etc with minimum cylinder
compressive strength 2575 psi on 28 days and consistency range in
slump 50-100 mm with water cement ratio 0.58

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

23.000

Bag

490.00

Sand

42.000

Cft

Crushed Aggregate

84.000

Cft

TOTAL

Bag

11,270.00

2,200.00

100 Cft

924.00

2,800.00

100 Cft

2,352.00

MATERIAL

55.01

14,546.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

18.69

4,274.50

Hour

1,136.00

4.30

1,136.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4,363.04

Composite Rates Per

100 Cft

Rs.

24,319.54

Per CUM : Rs 8,588.37

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

478

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 06 , CONCRETE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

06-40-j

(British) :

100 Cft

Lean concrete for use as thin layer under neath footings with
cylinder compressive strength of 1423 psi on 28 days.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

10.000

Bag

490.00

Sand

44.000

Cft

Crushed Aggregate

88.000

Cft

TOTAL

Bag

4,900.00

2,200.00

100 Cft

968.00

2,800.00

100 Cft

2,464.00

MATERIAL

45.89

8,332.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

25.86

4,274.50

Hour

1,136.00

6.26

1,136.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Concrete Mixer 1 Bag

1.420

800.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

2,995.96

Composite Rates Per

100 Cft

Rs.

16,738.46

Per CUM : Rs 5,911.14

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

479

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-01-a

(British) :

100 Cft

Pacca brickwork in mud mortar in buildings in foundation and plinth

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

35.000

Cft

1,400.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

490.00

100 Cft

11,475.00

1,000 No

60.35

11,965.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.650

Day

500.00

Day

1,325.00

Bhishti

0.460

Day

500.00

Day

230.00

87.15

17.65

2,992.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,271.40

Composite Rates Per

100 Cft

Rs.

18,228.55

Per CUM : Rs 6,437.36

Labour Rates Per

100 Cft

Rs.

3,631.25

Per CUM : Rs 1,282.37

480

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-01-b

(British) :

100 Cft

Pacca brickwork in mud mortar in buildings in ground floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

35.000

Cft

1,400.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

490.00

100 Cft

11,475.00

1,000 No
1

Sft

300.00

57.05

12,265.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.660

Day

500.00

Day

1,830.00

Bhishti

0.460

Day

500.00

Day

230.00

115.80

20.95

3,975.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,547.50

Composite Rates Per

100 Cft

Rs.

19,788.30

Per CUM : Rs 6,988.18

Labour Rates Per

100 Cft

Rs.

4,825.00

Per CUM : Rs 1,703.93

481

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-02-a

(British) :

100 Cft

Add extra on Item 07-01 for brickwork in First floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

20.000

15.00

Sft

TOTAL

MATERIAL

Sft

300.00

21.95

300.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

56.05

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,272.25

Per CUM : Rs 449.29

Labour Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

225.50

482

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-02-b

(British) :

100 Cft

Add extra on Item 07-01 for brickwork in Second floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

20.000

15.00

Sft

TOTAL

MATERIAL

Sft

300.00

11.39

300.00

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

2.000

Day

500.00

Day

1,000.00

50.25

66.61

1,725.25

22

434.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,459.75

Per CUM : Rs 868.65

Labour Rates Per

100 Cft

Rs.

2,093.75

Per CUM : Rs 739.40

483

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-02-c

(British) :

100 Cft

Add extra on Item 07-01 for brickwork in Third floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

20.000

15.00

Sft

TOTAL

7.69

MATERIAL

Sft

300.00

300.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

3.000

Day

500.00

Day

1,500.00

78.75

70.31

2,703.75

22

643.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,647.25

Per CUM : Rs 1,288.02

Labour Rates Per

100 Cft

Rs.

3,281.25

Per CUM : Rs 1,158.76

484

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-02-d

(British) :

100 Cft

Add extra on Item 07-01 for brickwork in Fourth & subsequent


floors.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

20.000

15.00

Sft

TOTAL

5.81

MATERIAL

Sft

300.00

300.00

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

4.000

Day

500.00

Day

2,000.00

107.25

72.19

3,682.25

22

852.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,834.75

Per CUM : Rs 1,707.38

Labour Rates Per

100 Cft

Rs.

4,468.75

Per CUM : Rs 1,578.13

485

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-03-a

(British) :

100 Cft

Pacca brick work in mud mortar other than building Upto 20 ft.
height

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

35.000

Cft

1,400.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

490.00

100 Cft

11,475.00

1,000 No

56.03

11,965.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

121.50

21.97

4,171.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,523.30

Composite Rates Per

100 Cft

Rs.

19,659.80

Per CUM : Rs 6,942.80

Labour Rates Per

100 Cft

Rs.

5,062.50

Per CUM : Rs 1,787.81

486

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-03-b

(British) :

100 Cft

Pacca brick work in mud mortar other than building Extra labour for
each 5 ft. addl. height or part

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

78.00

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

Labour Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

159.50

487

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-a-01

(British) :

100 Cft

Pacca brick work in foundation and plinth in Cement, sand mortar


1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

8.000

Bag

490.00

Sand

20.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

3,920.00

100 Cft

440.00

11,475.00

1,000 No

60.36

15,835.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

17.64

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,328.50

Composite Rates Per

100 Cft

Rs.

24,118.70

Per CUM : Rs 8,517.45

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

488

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-a-02

(British) :

100 Cft

Pacca brick work in foundation and plinth in Cement, sand mortar


1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

11,475.00

1,000 No

59.64

14,910.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

18.36

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,125.00

Composite Rates Per

100 Cft

Rs.

22,990.20

Per CUM : Rs 8,118.92

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

489

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-a-03

(British) :

100 Cft

Pacca brick work in foundation and plinth in Cement, sand mortar


1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.800

Bag

490.00

Sand

24.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

2,352.00

100 Cft

528.00

11,475.00

1,000 No

59.17

14,355.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

18.83

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,002.90

Composite Rates Per

100 Cft

Rs.

22,313.10

Per CUM : Rs 7,879.80

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

490

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-a-04

(British) :

100 Cft

Pacca brick work in foundation and plinth in Cement, sand mortar


1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Sand

23.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

1,960.00

100 Cft

506.00

11,475.00

1,000 No

58.80

13,941.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.20

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,911.82

Composite Rates Per

100 Cft

Rs.

21,808.02

Per CUM : Rs 7,701.44

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

491

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-a-05

(British) :

100 Cft

Pacca brick work in foundation and plinth in Cement, sand mortar


1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.440

Bag

490.00

Sand

25.700

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

1,685.60

100 Cft

565.40

11,475.00

1,000 No

58.60

13,726.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.40

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,864.52

Composite Rates Per

100 Cft

Rs.

21,545.72

Per CUM : Rs 7,608.81

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

492

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-a-06

(British) :

100 Cft

Pacca brick work in foundation and plinth in Cement, sand mortar


1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.000

Bag

490.00

Sand

26.500

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

1,470.00

100 Cft

583.00

11,475.00

1,000 No

58.42

13,528.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.58

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,820.96

Composite Rates Per

100 Cft

Rs.

21,304.16

Per CUM : Rs 7,523.50

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

493

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-a-07

(British) :

100 Cft

Pacca brick work in foundation and plinth in Cement, sand mortar


1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.660

Bag

490.00

Sand

26.670

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

1,303.40

100 Cft

586.74

11,475.00

1,000 No

58.26

13,365.14

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.74

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,785.13

Composite Rates Per

100 Cft

Rs.

21,105.47

Per CUM : Rs 7,453.33

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

494

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-b-01

(British) :

100 Cft

Pacca brick work in foundation and plinth in Lime, cement, sand


mortar 1:1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.200

Bag.

490.00

Sand

24.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

White Lime

1.600

Mds

400.00

TOTAL

MATERIAL

1,568.00

Bag.

528.00

100 Cft

11,475.00

1,000 No
1

Mds

640.00

59.05

14,211.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

18.95

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,971.22

Composite Rates Per

100 Cft

Rs.

22,137.42

Per CUM : Rs 7,817.76

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

495

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-b-02

(British) :

100 Cft

Pacca brick work in foundation and plinth in Lime, cement, sand


mortar 1:1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.850

Bag

490.00

Sand

24.740

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

White Lime

1.420

Mds

400.00

TOTAL

MATERIAL

Bag

1,396.50

100 Cft

544.28

11,475.00

1,000 No
1

Mds

568.00

58.84

13,983.78

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.16

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,921.23

Composite Rates Per

100 Cft

Rs.

21,860.21

Per CUM : Rs 7,719.87

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

496

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-b-03

(British) :

100 Cft

Pacca brick work in foundation and plinth in Lime, cement, sand


mortar 1:1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.560

Bag

490.00

Sand

25.600

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

White Lime

1.280

Mds

400.00

TOTAL

MATERIAL

Bag

1,254.40

100 Cft

563.20

11,475.00

1,000 No
1

Mds

512.00

54.94

13,804.60

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

23.06

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,145.81

Composite Rates Per

100 Cft

Rs.

23,141.61

Per CUM : Rs 8,172.39

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

497

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-b-04

(British) :

100 Cft

Pacca brick work in foundation and plinth in Lime, cement, sand


mortar 1:1:9

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.320

Bag

490.00

Sand

26.200

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

White Lime

1.160

Mds

400.00

TOTAL

MATERIAL

Bag

1,136.80

100 Cft

576.40

11,475.00

1,000 No
1

Mds

464.00

58.54

13,652.20

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.46

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,848.28

Composite Rates Per

100 Cft

Rs.

21,455.68

Per CUM : Rs 7,577.01

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

498

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-b-05

(British) :

100 Cft

Pacca brick work in foundation and plinth in Lime, cement, sand


mortar 1:1:10

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.140

Bag

490.00

Sand

26.660

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

White Lime

1.070

Mds

400.00

TOTAL

MATERIAL

Bag

1,048.60

100 Cft

586.52

11,475.00

1,000 No
1

Mds

428.00

58.43

13,538.12

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.57

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,823.19

Composite Rates Per

100 Cft

Rs.

21,316.51

Per CUM : Rs 7,527.86

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

499

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-c

(British) :

100 Cft

Pacca brick work in foundation and plinth in Lime, sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

23.330

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

White Lime

4.670

Mds

400.00

TOTAL

MATERIAL

513.26

100 Cft

11,475.00

1,000 No
1

Mds

1,868.00

58.73

13,856.26

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.27

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,893.18

Composite Rates Per

100 Cft

Rs.

21,704.64

Per CUM : Rs 7,664.93

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

500

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-c-01

(British) :

100 Cft

Pacca brick work in foundation and plinth in lime, sand, surkhi


1:1:1

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

11.670

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Surkhi

11.660

Cft

75.00

White Lime

4.340

Mds

400.00

TOTAL

MATERIAL

256.74

100 Cft

11,475.00

1,000 No

8.74

100 Cft
1

Mds

1,736.00

58.37

13,476.48

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.63

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,809.63

Composite Rates Per

100 Cft

Rs.

21,241.31

Per CUM : Rs 7,501.31

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

501

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-c-02

(British) :

100 Cft

Pacca brick work in foundation and plinth in lime, coarse cinder.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

White Lime

6.400

Mds

400.00

Cinder including Cartage

16.000

Cft

15.00

TOTAL

MATERIAL

11,475.00

1,000 No
Mds

2,560.00

100 Cft

2.40

58.89

14,037.40

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.11

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,933.03

Composite Rates Per

100 Cft

Rs.

21,925.63

Per CUM : Rs 7,742.97

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

502

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-c-03

(British) :

100 Cft

Pacca brick work in foundation and plinth in lime, surkhi mortar


2:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Surkhi

21.000

Cft

75.00

White Lime

5.600

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No

15.75

100 Cft
1

Mds

2,240.00

58.61

13,730.75

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.39

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,865.57

Composite Rates Per

100 Cft

Rs.

21,551.52

Per CUM : Rs 7,610.85

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

503

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-c-04

(British) :

100 Cft

Pacca brick work in foundation and plinth in lime, surkhi mortar


1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Surkhi

23.330

Cft

75.00

White Lime

4.670

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No

17.50

100 Cft
1

Mds

1,868.00

58.26

13,360.50

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

19.74

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,784.11

Composite Rates Per

100 Cft

Rs.

21,099.81

Per CUM : Rs 7,451.33

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

504

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-04-c-05

(British) :

100 Cft

Pacca brick work in foundation and plinth in lime, surkhi mortar


1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Surkhi

26.250

Cft

75.00

White Lime

3.500

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No

19.69

100 Cft
1

Mds

1,400.00

57.79

12,894.69

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.330

Day

500.00

Day

1,665.00

Bhishti

0.750

Day

500.00

Day

375.00

115.20

20.21

3,955.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,681.63

Composite Rates Per

100 Cft

Rs.

20,531.52

Per CUM : Rs 7,250.64

Labour Rates Per

100 Cft

Rs.

4,800.00

Per CUM : Rs 1,695.11

505

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-a-01

(British) :

100 Cft

Pacca brick work in ground floor Cement, sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

8.000

Bag

490.00

Sand

20.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

3,920.00

100 Cft

440.00

11,475.00

1,000 No
1

Sft

300.00

57.39

16,135.00

LABOUR
Mason

2.400

Day

900.00

Day

2,160.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

148.50

20.61

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,638.70

Composite Rates Per

100 Cft

Rs.

25,872.20

Per CUM : Rs 9,136.69

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

506

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-a-02

(British) :

100 Cft

Pacca brick work in ground floor Cement, sand mortar 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

11,475.00

1,000 No
1

Sft

300.00

56.58

15,210.00

LABOUR
Mason

2.400

Day

900.00

Day

2,160.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

148.50

21.42

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,435.20

Composite Rates Per

100 Cft

Rs.

24,743.70

Per CUM : Rs 8,738.16

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

507

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-a-03

(British) :

100 Cft

Pacca brick work in ground floor Cement, sand mortar 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.800

Bag

490.00

Sand

24.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

2,352.00

100 Cft

528.00

11,475.00

1,000 No
1

Sft

300.00

56.06

14,655.00

LABOUR
Mason

2.400

Day

900.00

Day

2,160.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day.

500.00

Day.

375.00

148.50

21.94

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,313.10

Composite Rates Per

100 Cft

Rs.

24,066.60

Per CUM : Rs 8,499.05

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

508

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-a-04

(British) :

100 Cft

Pacca brick work in ground floor Cement, sand mortar 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Sand

25.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,960.00

100 Cft

550.00

11,475.00

1,000 No
1

Sft

300.00

55.70

14,285.00

LABOUR
Mason

2.400

Day

900.00

Day

2,160.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

148.50

22.30

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,231.70

Composite Rates Per

100 Cft

Rs.

23,615.20

Per CUM : Rs 8,339.64

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

509

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-a-05

(British) :

100 Cft

Pacca brick work in ground floor Cement, sand mortar 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.440

Bag

490.00

Sand

25.700

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,685.60

100 Cft

565.40

11,475.00

1,000 No
1

Sft

300.00

55.44

14,026.00

LABOUR
Mason

2.400

Day

900.00

Day

2,160.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

148.50

22.56

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,174.72

Composite Rates Per

100 Cft

Rs.

23,299.22

Per CUM : Rs 8,228.05

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

510

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-a-06

(British) :

100 Cft

Pacca brick work in ground floor Cement, sand mortar 1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.000

Bag

490.00

Sand

26.500

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,470.00

100 Cft

583.00

11,475.00

1,000 No
1

Sft

300.00

55.23

13,828.00

LABOUR
Mason

2.400

Day

900.00

Day

2,160.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

148.50

22.77

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,131.16

Composite Rates Per

100 Cft

Rs.

23,057.66

Per CUM : Rs 8,142.74

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

511

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-a-07

(British) :

100 Cft

Pacca brick work in ground floor Cement, sand mortar 1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.660

Bag

490.00

Sand

26.670

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,303.40

100 Cft

586.74

11,475.00

1,000 No
1

Sft

300.00

55.06

13,665.14

LABOUR
Mason

2.400

Day

900.00

Day

2,160.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

148.50

22.94

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,095.33

Composite Rates Per

100 Cft

Rs.

22,858.97

Per CUM : Rs 8,072.58

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

512

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-b-01

(British) :

100 Cft

Pacca brick work in ground floor Lime, cement, sand mortar 1:1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.220

Bag

490.00

Sand

24.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.600

Mds

400.00

Mds

640.00

55.68

14,520.80

TOTAL

MATERIAL

Bag

1,577.80

100 Cft

528.00

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

22.32

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,303.38

Composite Rates Per

100 Cft

Rs.

24,015.38

Per CUM : Rs 8,480.96

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

513

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-b-02

(British) :

100 Cft

Pacca brick work in ground floor Lime, cement, sand mortar 1:1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.850

Bag

490.00

Sand

24.740

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.420

Mds

400.00

Mds

568.00

55.44

14,283.78

TOTAL

MATERIAL

Bag

1,396.50

100 Cft

544.28

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

22.56

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,251.23

Composite Rates Per

100 Cft

Rs.

23,726.21

Per CUM : Rs 8,378.84

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

514

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-b-03

(British) :

100 Cft

Pacca brick work in ground floor Lime, cement, sand mortar 1:1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.560

Bag

490.00

Sand

25.600

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.280

Mds

400.00

Mds

512.00

55.26

14,104.60

TOTAL

MATERIAL

Bag

1,254.40

100 Cft

563.20

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

22.74

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,211.81

Composite Rates Per

100 Cft

Rs.

23,507.61

Per CUM : Rs 8,301.64

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

515

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-b-04

(British) :

100 Cft

Pacca brick work in ground floor Lime, cement, sand mortar 1:1:9

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.320

Bag

490.00

Sand

26.200

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.160

Mds

400.00

Mds

464.00

55.10

13,952.20

TOTAL

MATERIAL

Bag

1,136.80

100 Cft

576.40

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

22.90

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,178.28

Composite Rates Per

100 Cft

Rs.

23,321.68

Per CUM : Rs 8,235.98

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

516

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-b-05

(British) :

100 Cft

Pacca brick work in ground floor Lime, cement, sand mortar 1:1:10

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.140

Bag

490.00

Sand

26.660

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.070

Mds

400.00

Mds

428.00

54.98

13,838.12

TOTAL

MATERIAL

Bag

1,048.60

100 Cft

586.52

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

23.02

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,153.19

Composite Rates Per

100 Cft

Rs.

23,182.51

Per CUM : Rs 8,186.83

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

517

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-c

(British) :

100 Cft

Pacca brick work in ground floor Lime, sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

23.330

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

4.670

Mds

400.00

Mds

1,868.00

55.31

14,156.26

TOTAL

MATERIAL

513.26

100 Cft

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

22.69

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,223.18

Composite Rates Per

100 Cft

Rs.

23,570.64

Per CUM : Rs 8,323.90

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

518

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-c-01

(British) :

100 Cft

Pacca brick work in foundation and plinth in lime, sand, surkhi


1:1:1.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

11.670

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Surkhi

11.660

Cft

75.00

White Lime

4.340

Mds

400.00

TOTAL

MATERIAL

256.74

100 Cft

11,475.00

1,000 No

8.74

100 Cft
1

Mds

1,736.00

54.59

13,476.48

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

23.41

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,073.63

Composite Rates Per

100 Cft

Rs.

22,741.31

Per CUM : Rs 8,031.03

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

519

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-c-02
Pacca brick work in Ground floor

Detail

Qty

(British) :

100 Cft

lime, coarse cinder.

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

White Lime

6.400

Mds

400.00

Cinder including Cartage

16.000

Cft

15.00

TOTAL

MATERIAL

11,475.00

1,000 No
Mds

2,560.00

100 Cft

2.40

55.19

14,037.40

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

22.81

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,197.03

Composite Rates Per

100 Cft

Rs.

23,425.63

Per CUM : Rs 8,272.69

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

520

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-c-03
Pacca brick work in Ground floor

Detail

Qty

(British) :

100 Cft

lime, surkhi mortar 2:3

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Surkhi

21.000

Cft

75.00

White Lime

5.600

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No

15.75

100 Cft
1

Mds

2,240.00

54.86

13,730.75

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

23.14

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,129.57

Composite Rates Per

100 Cft

Rs.

23,051.52

Per CUM : Rs 8,140.57

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

521

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-c-04
Pacca brick work in Ground floor

Detail

Qty

(British) :

100 Cft

lime, surkhi mortar 1:2

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Surkhi

23.330

Cft

75.00

White Lime

4.670

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No

17.50

100 Cft
1

Mds

1,868.00

54.46

13,360.50

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

23.54

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,048.11

Composite Rates Per

100 Cft

Rs.

22,599.81

Per CUM : Rs 7,981.05

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

522

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-05-c-05
Pacca brick work in Ground floor

Detail

Qty

(British) :

100 Cft

lime, surkhi mortar 1:3

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Surkhi

26.250

Cft

75.00

White Lime

3.500

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No

19.69

100 Cft
1

Mds

1,400.00

53.92

12,894.69

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

24.08

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,945.63

Composite Rates Per

100 Cft

Rs.

22,031.52

Per CUM : Rs 7,780.36

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

523

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-06-a

(British) :

100 Cft

Add extra on item No.07-05 for brick work in First floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

20.000

15.00

Sft

TOTAL

MATERIAL

Sft

300.00

21.95

300.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

56.05

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,272.25

Per CUM : Rs 449.29

Labour Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

225.50

524

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-06-b

(British) :

100 Cft

Add extra on item No.07-05 for brick work in in Second floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

20.000

15.00

Sft

TOTAL

MATERIAL

Sft

300.00

11.39

300.00

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

2.000

Day

500.00

Day

1,000.00

50.25

66.61

1,725.25

22

434.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,459.75

Per CUM : Rs 868.65

Labour Rates Per

100 Cft

Rs.

2,093.75

Per CUM : Rs 739.40

525

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-06-c

(British) :

100 Cft

Add extra on item No.07-05 for brick work in Third floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

20.000

15.00

Sft

TOTAL

7.69

MATERIAL

Sft

300.00

300.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

3.000

Day

500.00

Day

1,500.00

78.75

70.31

2,703.75

22

643.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,647.25

Per CUM : Rs 1,288.02

Labour Rates Per

100 Cft

Rs.

3,281.25

Per CUM : Rs 1,158.76

526

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-06-d

(British) :

100 Cft

Add extra on item No.07-05 for brick work in in Fourth & subsequent
floors.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

20.000

15.00

Sft

TOTAL

4.92

MATERIAL

Sft

300.00

300.00

LABOUR
Mason

2.250

Day

900.00

Day

2,025.00

Coolie

4.500

Day

500.00

Day

2,250.00

128.25

73.08

4,403.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,006.50

Composite Rates Per

100 Cft

Rs.

5,709.75

Per CUM : Rs 2,016.38

Labour Rates Per

100 Cft

Rs.

5,343.75

Per CUM : Rs 1,887.13

527

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-a-01

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Cement,
sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

8.000

Bag

490.00

Sand

20.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

3,920.00

100 Cft

440.00

11,475.00

1,000 No
1

Sft

300.00

58.64

16,135.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

19.36

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,539.70

Composite Rates Per

100 Cft

Rs.

25,309.70

Per CUM : Rs 8,938.04

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

528

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-a-02

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Cement,
sand mortar 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

11,475.00

1,000 No
1

Sft

300.00

57.15

15,210.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.500

Day

500.00

Day

2,250.00

Bhishti

0.500

Day

500.00

Day

250.00

142.50

20.85

4,892.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,391.20

Composite Rates Per

100 Cft

Rs.

24,493.70

Per CUM : Rs 8,649.88

Labour Rates Per

100 Cft

Rs.

5,937.50

Per CUM : Rs 2,096.81

529

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-a-03

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Cement,
sand mortar 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.800

Bag

490.00

Sand

24.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

2,352.00

100 Cft

528.00

11,475.00

1,000 No
1

Sft

300.00

57.38

14,655.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

20.62

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,214.10

Composite Rates Per

100 Cft

Rs.

23,504.10

Per CUM : Rs 8,300.40

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

530

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-a-04

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Cement,
sand mortar 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Sand

25.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,960.00

100 Cft

550.00

11,475.00

1,000 No
1

Sft

300.00

57.03

14,285.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

20.97

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,132.70

Composite Rates Per

100 Cft

Rs.

23,052.70

Per CUM : Rs 8,140.99

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

531

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-a-05

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Cement,
sand mortar 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.440

Bag

490.00

Sand

25.700

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,685.60

100 Cft

565.40

11,475.00

1,000 No
1

Sft

300.00

56.78

14,026.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

21.22

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,075.72

Composite Rates Per

100 Cft

Rs.

22,736.72

Per CUM : Rs 8,029.40

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

532

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-a-06

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Cement,
sand mortar 1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.000

Bag

490.00

Sand

26.500

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,470.00

100 Cft

583.00

11,475.00

1,000 No
1

Sft

300.00

56.59

13,828.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

21.41

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,032.16

Composite Rates Per

100 Cft

Rs.

22,495.16

Per CUM : Rs 7,944.10

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

533

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-a-07

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Cement,
sand mortar 1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.660

Bag

490.00

Sand

26.670

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,303.40

100 Cft

586.74

11,475.00

1,000 No
1

Sft

300.00

56.42

13,665.14

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

21.58

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,996.33

Composite Rates Per

100 Cft

Rs.

22,296.47

Per CUM : Rs 7,873.93

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

534

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-b-01

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Lime,
cement, sand mortar 1:1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.200

Bag

490.00

Sand

24.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.600

Mds

400.00

Mds

640.00

57.25

14,511.00

TOTAL

MATERIAL

Bag

1,568.00

100 Cft

528.00

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day.

500.00

Day.

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

20.75

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,182.42

Composite Rates Per

100 Cft

Rs.

23,328.42

Per CUM : Rs 8,238.36

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

535

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-b-02

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Lime,
cement, sand mortar 1:1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.850

Bag

490.00

Sand

24.780

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.420

Mds

400.00

Mds

568.00

57.03

14,284.66

TOTAL

MATERIAL

Bag

1,396.50

100 Cft

545.16

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

20.97

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,132.63

Composite Rates Per

100 Cft

Rs.

23,052.29

Per CUM : Rs 8,140.85

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

536

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-b-03

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Lime,
cement, sand mortar 1:1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.560

Bag

490.00

Sand

25.600

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.280

Mds

400.00

Mds

512.00

56.86

14,104.60

TOTAL

MATERIAL

Bag

1,254.40

100 Cft

563.20

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

21.14

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,093.01

Composite Rates Per

100 Cft

Rs.

22,832.61

Per CUM : Rs 8,063.27

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

537

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-b-04

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Lime,
cement, sand mortar 1:1:9

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.320

Bag

490.00

Sand

26.200

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.160

Mds

400.00

Mds

464.00

56.71

13,952.20

TOTAL

MATERIAL

Bag

1,136.80

100 Cft

576.40

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

21.29

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,059.48

Composite Rates Per

100 Cft

Rs.

22,646.68

Per CUM : Rs 7,997.61

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

538

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-b-05

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Lime,
cement, sand mortar 1:1:10

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.140

Bag

490.00

Sand

26.660

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.070

Mds

400.00

Mds

428.00

56.60

13,838.12

TOTAL

MATERIAL

Bag

1,048.60

100 Cft

586.52

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

21.40

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,034.39

Composite Rates Per

100 Cft

Rs.

22,507.51

Per CUM : Rs 7,948.46

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

539

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-c

(British) :

100 Cft

Pacca brick work other than building upto 10 ft. height : Lime,
sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

23.330

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

4.670

Mds

400.00

Mds

1,868.00

56.91

14,156.26

TOTAL

MATERIAL

513.26

100 Cft

11,475.00

1,000 No

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

21.09

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,104.38

Composite Rates Per

100 Cft

Rs.

22,895.64

Per CUM : Rs 8,085.53

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

540

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-c-01

(British) :

100 Cft

Pacca brick work in other than building upto 10 ft height in


sand, surkhi 1:1:1

Detail

Qty

Unit

lime,

Rate (Rs)

Amount

MATERIAL
Sand

11.670

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Surkhi

11.670

Cft

75.00

White Lime

4.340

Mds

400.00

TOTAL

MATERIAL

256.74

100 Cft

11,475.00

1,000 No
Sft

300.00

100 Cft

8.75

Mds

1,736.00

50.34

13,776.49

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

5.000

Day

500.00

Day

2,500.00

202.50

27.66

6,952.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,515.83

Composite Rates Per

100 Cft

Rs.

25,244.82

Per CUM : Rs 8,915.13

Labour Rates Per

100 Cft

Rs.

8,437.50

Per CUM : Rs 2,979.68

541

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-c-02

(British) :

100 Cft

Pacca brick work in other than building upto 10 ft height in


coarse cinder 1:1

Detail

Qty

Unit

lime,

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

6.400

Mds

400.00

Mds

2,560.00

Cinder including Cartage

16.000

Cft

15.00

100 Cft

2.40

TOTAL

MATERIAL

11,475.00

1,000 No

57.08

14,337.40

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

20.92

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,144.23

Composite Rates Per

100 Cft

Rs.

23,116.63

Per CUM : Rs 8,163.57

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

542

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-c-03

(British) :

100 Cft

Pacca brick work in other than building upto 10 ft height in


surkhi mortar 2:3

Detail

Qty

Unit

lime,

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Surkhi

21.000

Cft

75.00

White Lime

5.600

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No
Sft

300.00

100 Cft

15.75

Mds

2,240.00

56.79

14,030.75

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

135.00

21.21

4,635.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,076.77

Composite Rates Per

100 Cft

Rs.

22,742.52

Per CUM : Rs 8,031.45

Labour Rates Per

100 Cft

Rs.

5,625.00

Per CUM : Rs 1,986.45

543

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-c-04

(British) :

100 Cft

Pacca brick work in other than building upto 10 ft height in


surkhi mortar 1:2

Detail

Qty

Unit

lime,

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Surkhi

23.330

Cft

75.00

White Lime

4.670

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No
Sft

300.00

100 Cft

17.50

Mds

1,868.00

58.85

13,660.50

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

2.500

Day

500.00

Day

1,250.00

Bhishti

0.500

Day

500.00

Day

250.00

112.50

19.15

3,862.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,830.31

Composite Rates Per

100 Cft

Rs.

21,353.31

Per CUM : Rs 7,540.86

Labour Rates Per

100 Cft

Rs.

4,687.50

Per CUM : Rs 1,655.38

544

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-07-c-05

(British) :

100 Cft

Pacca brick work in other than building upto 10 ft height in


surkhi mortar 1:3

Detail

Qty

Unit

lime,

Rate (Rs)

Amount

MATERIAL
Burnt Brick

1350.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Surkhi

26.250

Cft

75.00

White Lime

3.500

Mds

400.00

TOTAL

MATERIAL

11,475.00

1,000 No
Sft

300.00

100 Cft

19.69

Mds

1,400.00

54.27

13,194.69

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

23.73

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,011.63

Composite Rates Per

100 Cft

Rs.

22,397.52

Per CUM : Rs 7,909.62

Labour Rates Per

100 Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

545

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-08

(British) :

100 Cft

Add extra on item No. 07-07 for every 10 ft. additional height, or
part thereof

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

4.000

15.00

Sft

TOTAL

5.73

MATERIAL

Sft

60.00

60.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

72.27

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

979.45

Per CUM : Rs 345.89

Labour Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

172.70

546

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-09

(British) :

100 Cft

Extra labour for arch work in brick masonry, including labour for
centring and decentring

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

10.000

15.00

Sft

TOTAL

5.49

MATERIAL

Sft

150.00

150.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

2.000

Day

500.00

Day

1,000.00

57.00

72.51

1,957.00

22

451.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,558.00

Per CUM : Rs 903.35

Labour Rates Per

100 Cft

Rs.

2,375.00

Per CUM : Rs 838.72

547

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-10

(British) :

100 Cft

Extra for pacca brick work in steining of wells or any other


circular masonry.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

70.000

8,500.00

No

TOTAL

MATERIAL

1,000 No

595.00

25.94

595.00

Day

1,125.00

33.75

52.06

1,158.75

22

378.40

LABOUR
1.250

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,132.15

Per CUM : Rs 752.96

Labour Rates Per

100 Cft

Rs.

1,406.25

Per CUM : Rs 496.61

548

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-11

(British) :

100 Cft

Extra labour for profile & flared walls

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

42.00

78.00

1,442.00

22

308.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,750.00

Per CUM : Rs 618.01

Labour Rates Per

100 Cft

Rs.

1,750.00

Per CUM : Rs 618.01

549

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-12-a

(British) :

100 Cft

Extra labour for pacca brick work in pier/abutment From 10 ft.to 20


ft. height.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.000

Day

500.00

Day

500.00

28.50

78.00

978.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,187.50

Per CUM : Rs 419.36

Labour Rates Per

100 Cft

Rs.

1,187.50

Per CUM : Rs 419.36

209.00

550

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-12-b

(British) :

100 Cft

Extra labour for pacca brick work in pier/abutment Exceeding 20 ft


height.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

49.50

78.00

1,699.50

22

363.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,062.50

Per CUM : Rs 728.37

Labour Rates Per

100 Cft

Rs.

2,062.50

Per CUM : Rs 728.37

551

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-13

(British) :

100 Sft

Extra for face work (half brick thick) using special bricks instead
of first class bricks.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.000

Day

500.00

Day

500.00

28.50

78.00

978.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,187.50

Per SQM : Rs 127.78

Labour Rates Per

100 Sft

Rs.

1,187.50

Per SQM : Rs 127.78

209.00

552

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-14

(British) :

100 Cft

Reinforced brick work in lintel of openings, laid in 1:3 cement


mortar complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

10.950

Bag

490.00

Sand

41.200

Cft

2,200.00

Burnt Brick

1005.000

No

8,500.00

Centering Wood

0.700

Cft

1,000.00

TOTAL

MATERIAL

Bag

5,365.50

100 Cft

906.40

8,542.50

1,000 No
1

Cft

700.00

41.73

15,514.40

LABOUR
Mason

6.330

Day

900.00

Day

5,697.00

Coolie

11.100

Day

500.00

Day

5,550.00

Bhishti

2.250

Day

500.00

Day

1,125.00

371.16

36.27

12,743.16

22

6,135.01

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

34,392.57

Per CUM : Rs 12,145.63

Labour Rates Per

100 Cft

Rs.

15,465.00

Per CUM : Rs 5,461.42

553

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-15-a

(British) :

100 No

Extra for dressing or chamfering bricks for Special architectural


bricks

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

3.000

Day

900.00

Day

2,700.00

Coolie

0.500

Day

500.00

Day

250.00

88.50

78.00

3,038.50

22

649.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No

Rs.

3,687.50

Cost Per 100 No.: 3,687.50

Labour Rates Per

100 No

Rs.

3,687.50

Cost Per 100 No.: 3,687.50

554

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-15-b

(British) :

100 No

Extra for dressing or chamfering bricks for all other purposes.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

0.500

Day

500.00

Day

250.00

61.50

78.00

2,111.50

22

451.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No

Rs.

2,562.50

Cost Per 100 No.: 2,562.50

Labour Rates Per

100 No

Rs.

2,562.50

Cost Per 100 No.: 2,562.50

555

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-a

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

8.750

Cft

1,400.00

Burnt Brick (Perforated)

338.000

No

8,500.00

TOTAL

MATERIAL

100 Cft
1,000 No

122.50
2,873.00

45.61

2,995.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.830

Day

500.00

Day

915.00

Bhishti

0.230

Day

500.00

Day

115.00

57.90

32.39

1,987.90

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,067.01

Per SQM : Rs 652.81

Labour Rates Per

100 Sft

Rs.

2,412.50

Per SQM : Rs 259.59

1,083.61

556

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-b-01

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Cement,
sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.000

Bag

490.00

Sand

5.000

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Burnt Brick (Perforated)

338.000

No

8,500.00

TOTAL

MATERIAL

Bag

980.00

100 Cft

110.00

Sft

1,000 No

300.00
2,873.00

47.10

4,263.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

30.90

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,357.11

Per SQM : Rs 899.23

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,493.36

557

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-b-02

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Cement,
sand mortar 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.500

Bag.

490.00

Sand

5.600

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Burnt Brick (Perforated)

338.000

No

8,500.00

TOTAL

MATERIAL

Bag.

100 Cft
1

Sft

1,000 No

735.00
123.20
300.00
2,873.00

46.12

4,031.20

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

31.88

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,074.31

Per SQM : Rs 868.80

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,442.36

558

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-b-03

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Cement,
sand mortar 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.200

Bag

490.00

Sand

6.000

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Burnt Brick (Perforated)

338.000

No

8,500.00

TOTAL

MATERIAL

Bag

588.00

100 Cft

132.00

Sft

1,000 No

300.00
2,873.00

45.49

3,893.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

32.51

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,905.71

Per SQM : Rs 850.65

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,411.96

559

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-b-04

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Cement,
sand mortar 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.000

Bag

490.00

Sand

6.250

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Burnt Brick (Perforated)

338.000

No

8,500.00

TOTAL

MATERIAL

Bag

490.00

100 Cft

137.50

Sft

1,000 No

300.00
2,873.00

45.06

3,800.50

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

32.94

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,792.86

Per SQM : Rs 838.51

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,391.61

560

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-b-05

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Cement,
sand mortar 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.860

Bag

490.00

Sand

6.400

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Burnt Brick (Perforated)

338.000

No

8,500.00

TOTAL

MATERIAL

Bag

421.40

100 Cft

140.80

Sft

1,000 No

300.00
2,873.00

44.75

3,735.20

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

33.25

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,713.19

Per SQM : Rs 829.94

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,377.24

561

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-b-06

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Cement,
sand mortar 1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.750

Bag

490.00

Sand

6.650

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Burnt Brick (Perforated)

338.000

No

8,500.00

TOTAL

MATERIAL

Bag

367.50

100 Cft

146.30

Sft

1,000 No

300.00
2,873.00

44.51

3,686.80

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

33.49

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,654.15

Per SQM : Rs 823.59

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,366.60

562

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-b-07

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Cement,
sand mortar 1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.670

Bag

490.00

Sand

6.670

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Burnt Brick (Perforated)

338.000

No

8,500.00

TOTAL

MATERIAL

Bag

328.30

100 Cft

146.74

Sft

1,000 No

300.00
2,873.00

44.32

3,648.04

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.421

Day

500.00

Day

1,210.50

Bhishti

0.380

Day

500.00

Day

190.00

75.77

33.68

2,601.27

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,607.48

Per SQM : Rs 818.57

Labour Rates Per

100 Sft

Rs.

3,156.88

Per SQM : Rs 339.68

1,358.18

563

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-c-01

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Lime,
cement, sand mortar 1:1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.800

Bag

490.00

Sand

6.000

Cft

2,200.00

Burnt Brick

338.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.400

Mds

400.00

Mds

160.00

45.33

3,857.00

TOTAL

MATERIAL

Bag

392.00

100 Cft

132.00

1,000 No

2,873.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

32.67

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,861.79

Per SQM : Rs 845.93

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,404.04

564

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-c-02

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Lime,
cement, sand mortar 1:1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.710

Bag

490.00

Sand

6.130

Cft

2,200.00

Burnt Brick

338.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.380

Mds

400.00

Mds

152.00

45.10

3,807.76

TOTAL

MATERIAL

Bag

347.90

100 Cft

134.86

1,000 No

2,873.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

32.90

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,801.72

Per SQM : Rs 839.46

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,393.21

565

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-c-03

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Lime,
cement, sand mortar 1:1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.640

Bag

490.00

Sand

6.400

Cft

2,200.00

Burnt Brick

338.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.330

Mds

400.00

Mds

132.00

44.87

3,759.40

TOTAL

MATERIAL

Bag

313.60

100 Cft

140.80

1,000 No

2,873.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

33.13

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,742.72

Per SQM : Rs 833.12

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,382.57

566

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-c-04

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Lime,
cement, sand mortar 1:1:9

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.580

Bag

490.00

Sand

6.500

Cft

2,200.00

Burnt Brick

338.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.290

Mds

400.00

Mds

116.00

44.66

3,716.20

TOTAL

MATERIAL

Bag

284.20

100 Cft

143.00

1,000 No

2,873.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

33.34

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,690.01

Per SQM : Rs 827.45

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,373.06

567

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-c-05

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Lime,
cement, sand mortar 1:1:10

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.540

Bag

490.00

Sand

6.670

Cft

2,200.00

Burnt Brick

338.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.270

Mds

400.00

Mds

108.00

44.54

3,692.34

TOTAL

MATERIAL

Bag

264.60

100 Cft

146.74

1,000 No

2,873.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

33.46

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,660.90

Per SQM : Rs 824.31

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,367.81

568

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-16-d

(British) :

100 Sft

Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, sand
mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

5.580

Cft

2,200.00

Burnt Brick

338.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

1.170

Mds

400.00

Mds

468.00

44.89

3,763.76

TOTAL

MATERIAL

100 Cft
1,000 No

122.76
2,873.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

2.420

Day

500.00

Day

1,210.00

Bhishti

0.380

Day

500.00

Day

190.00

75.75

33.11

2,600.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,748.04

Per SQM : Rs 833.69

Labour Rates Per

100 Sft

Rs.

3,156.25

Per SQM : Rs 339.61

1,383.53

569

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-17-a

(British) :

100 Sft

Add extra on item No. 07-16 for pacca brick work in First floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

4.000

15.00

Sft

TOTAL

MATERIAL

Sft

60.00

10.65

60.00

LABOUR
Mason

0.125

Day

900.00

Day

112.50

Coolie

0.500

Day

500.00

Day

250.00

10.88

67.35

373.38

22

92.95

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

526.33

Per SQM : Rs 56.63

Labour Rates Per

100 Sft

Rs.

453.13

Per SQM : Rs 48.76

570

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-17-b

(British) :

100 Sft

Add extra on item No. 07-16 for pacca brick work in Second floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

4.000

15.00

Sft

TOTAL

5.01

MATERIAL

Sft

60.00

60.00

LABOUR
Mason

0.375

Day

900.00

Day

337.50

Coolie

1.000

Day

500.00

Day

500.00

25.13

72.99

862.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,120.08

Per SQM : Rs 120.52

Labour Rates Per

100 Sft

Rs.

1,046.88

Per SQM : Rs 112.64

197.45

571

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-17-c

(British) :

100 Sft

Add extra on item No. 07-16 for pacca brick work in Third floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

5.000

15.00

Sft

TOTAL

4.05

MATERIAL

Sft

75.00

75.00

LABOUR
Mason

0.625

Day

900.00

Day

562.50

Coolie

1.500

Day

500.00

Day

750.00

39.38

73.95

1,351.88

22

305.25

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,732.13

Per SQM : Rs 186.38

Labour Rates Per

100 Sft

Rs.

1,640.63

Per SQM : Rs 176.53

572

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-17-d

(British) :

100 Sft

Add extra on item No. 07-16 for pacca brick work in Fourth &
subsequent floors.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

7.000

15.00

Sft

TOTAL

3.51

MATERIAL

Sft

105.00

105.00

LABOUR
Mason

1.125

Day

900.00

Day

1,012.50

Coolie

2.250

Day

500.00

Day

1,125.00

64.13

74.49

2,201.63

22

493.35

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,799.98

Per SQM : Rs 301.28

Labour Rates Per

100 Sft

Rs.

2,671.88

Per SQM : Rs 287.49

573

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-a

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

17.500

Cft

1,400.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

245.00

100 Cft

5,737.50

1,000 No
1

Sft

300.00

51.34

6,282.50

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.750

Day

500.00

Day

1,375.00

Bhishti

0.340

Day

500.00

Day

170.00

86.85

26.66

2,981.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,019.05

Composite Rates Per

100 Sft

Rs.

11,283.40

Per SQM : Rs 1,214.09

Labour Rates Per

100 Sft

Rs.

3,618.75

Per SQM : Rs 389.38

574

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-b-01

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand
mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Sand

10.000

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,960.00

100 Cft

220.00

5,737.50

1,000 No
1

Sft

300.00

51.62

8,217.50

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

26.38

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,626.69

Composite Rates Per

100 Sft

Rs.

14,677.85

Per SQM : Rs 1,579.34

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

575

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-b-02

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand
mortar 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.000

Bag

490.00

Sand

11.250

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,470.00

100 Cft

247.50

5,737.50

1,000 No
1

Sft

300.00

50.68

7,755.00

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

27.32

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,524.94

Composite Rates Per

100 Sft

Rs.

14,113.60

Per SQM : Rs 1,518.62

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

576

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-b-03

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand
mortar 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.400

Bag

490.00

Sand

12.000

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

1,176.00

100 Cft

264.00

5,737.50

1,000 No
1

Sft

300.00

50.07

7,477.50

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

27.93

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,463.89

Composite Rates Per

100 Sft

Rs.

13,775.05

Per SQM : Rs 1,482.20

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

577

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-b-04

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand
mortar 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.000

Bag

490.00

Sand

12.500

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

980.00

100 Cft

275.00

5,737.50

1,000 No
1

Sft

300.00

49.66

7,292.50

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.34

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,423.19

Composite Rates Per

100 Sft

Rs.

13,549.35

Per SQM : Rs 1,457.91

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

578

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-b-05

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand
mortar 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.720

Bag

490.00

Sand

12.800

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

842.80

100 Cft

281.60

5,737.50

1,000 No
1

Sft

300.00

49.35

7,161.90

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.65

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,394.46

Composite Rates Per

100 Sft

Rs.

13,390.02

Per SQM : Rs 1,440.77

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

579

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-b-06

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand
mortar 1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.500

Bag

490.00

Sand

13.130

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

735.00

100 Cft

288.86

5,737.50

1,000 No
1

Sft

300.00

49.11

7,061.36

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.89

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,372.34

Composite Rates Per

100 Sft

Rs.

13,267.36

Per SQM : Rs 1,427.57

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

580

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-b-07

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand
mortar 1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.330

Bag

490.00

Sand

13.340

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

TOTAL

MATERIAL

Bag

651.70

100 Cft

293.48

5,737.50

1,000 No
1

Sft

300.00

48.92

6,982.68

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

29.08

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,355.03

Composite Rates Per

100 Sft

Rs.

13,171.37

Per SQM : Rs 1,417.24

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

581

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-c-01

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Lime,


cement, sand mortar 1:1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.600

Bag

490.00

Sand

12.000

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.800

Mds

400.00

Mds

320.00

49.91

7,405.50

TOTAL

MATERIAL

Bag

784.00

100 Cft

264.00

5,737.50

1,000 No

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.09

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,448.05

Composite Rates Per

100 Sft

Rs.

13,687.21

Per SQM : Rs 1,472.74

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

582

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-c-02

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Lime,


cement, sand mortar 1:1:7

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.420

Bag

490.00

Sand

12.390

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.710

Mds

400.00

Mds

284.00

49.65

7,289.88

TOTAL

MATERIAL

Bag

695.80

100 Cft

272.58

5,737.50

1,000 No

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.35

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,422.61

Composite Rates Per

100 Sft

Rs.

13,546.15

Per SQM : Rs 1,457.57

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

583

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-c-03

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Lime,


cement, sand mortar 1:1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.290

Bag

490.00

Sand

12.750

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.650

Mds

400.00

Mds

260.00

49.47

7,210.10

TOTAL

MATERIAL

Bag

632.10

100 Cft

280.50

5,737.50

1,000 No

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.53

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,405.06

Composite Rates Per

100 Sft

Rs.

13,448.82

Per SQM : Rs 1,447.09

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

584

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-c-04

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Lime,


cement, sand mortar 1:1:9

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.160

Bag

490.00

Sand

13.100

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.580

Mds

400.00

Mds

232.00

49.27

7,126.10

TOTAL

MATERIAL

Bag

568.40

100 Cft

288.20

5,737.50

1,000 No

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.73

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,386.58

Composite Rates Per

100 Sft

Rs.

13,346.34

Per SQM : Rs 1,436.07

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

585

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-c-05

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Lime,


cement, sand mortar 1:1:10

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.070

Bag

490.00

Sand

13.330

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

0.540

Mds

400.00

Mds

216.00

49.14

7,071.06

TOTAL

MATERIAL

Bag

524.30

100 Cft

293.26

5,737.50

1,000 No

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.86

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,374.47

Composite Rates Per

100 Sft

Rs.

13,279.19

Per SQM : Rs 1,428.84

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

586

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-18-d

(British) :

100 Sft

Perf. pacca brick wall 1 brick thick in ground floor : Lime, sand
mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

11.670

Cft

2,200.00

Burnt Brick

675.000

No

8,500.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

White Lime

2.230

Mds

400.00

Mds

892.00

49.41

7,186.24

TOTAL

MATERIAL

256.74

100 Cft

5,737.50

1,000 No

LABOUR
Mason

1.880

Day

900.00

Day

1,692.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.560

Day

500.00

Day

280.00

111.66

28.59

3,833.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,399.81

Composite Rates Per

100 Sft

Rs.

13,419.71

Per SQM : Rs 1,443.96

Labour Rates Per

100 Sft

Rs.

4,652.50

Per SQM : Rs 500.61

587

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-19-a

(British) :

100 Sft

Add extra on item No. 07-18 for perf. pacca brick work in First
floor

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.190

Day

900.00

Day

171.00

Coolie

0.750

Day

500.00

Day

375.00

16.38

78.00

562.38

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

682.50

Per SQM : Rs 73.44

Labour Rates Per

100 Sft

Rs.

682.50

Per SQM : Rs 73.44

120.12

588

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-19-b

(British) :

100 Sft

Add extra on item No. 07-18 for perf. pacca brick work in Second
floor

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

2.000

Day

500.00

Day

1,000.00

50.25

78.00

1,725.25

22

368.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,093.75

Per SQM : Rs 225.29

Labour Rates Per

100 Sft

Rs.

2,093.75

Per SQM : Rs 225.29

589

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-19-c

(British) :

100 Sft

Add extra on item No. 07-18 for perf. pacca brick work in Third
floor

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

3.250

Day

500.00

Day

1,625.00

89.25

78.00

3,064.25

22

654.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,718.75

Per SQM : Rs 400.14

Labour Rates Per

100 Sft

Rs.

3,718.75

Per SQM : Rs 400.14

590

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-19-d

(British) :

100 Sft

Add extra on item No. 07-18 for perf. pacca brck work in Fourth &
subsequent floors

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

2.250

Day

900.00

Day

2,025.00

Coolie

4.500

Day

500.00

Day

2,250.00

128.25

78.00

4,403.25

22

940.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,343.75

Per SQM : Rs 574.99

Labour Rates Per

100 Sft

Rs.

5,343.75

Per SQM : Rs 574.99

591

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-20-a

(British) :

100 Cft

Fire brick masonry in fire-clay mortar Upto 20 ft. height including


all charges

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

10.000

Sft

15.00

Sft

150.00

Alumina Cement

8.800

Bag

600.00

Bag

5,280.00

Fire Brick Crush

22.000

Cft

1,400.00

100 Cft

308.00

Fire Bricks

1350.000

Cft

8,500.00

1,000 Cft

11,475.00

TOTAL

MATERIAL

58.25

17,213.00

LABOUR
Mason

3.000

Day

900.00

Day

2,700.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

148.50

19.75

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,875.86

Composite Rates Per

100 Cft

Rs.

27,187.36

Per CUM : Rs 9,601.13

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

592

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-20-b

(British) :

100 Cft

Fire brick masonry in fire-clay mortar. Extra for every 5 ft.


additional height, or part thereof

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

10.000

15.00

Sft

TOTAL

MATERIAL

Sft

150.00

12.86

150.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

65.14

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,089.25

Per CUM : Rs 384.67

Labour Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

192.50

593

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-21-a

(British) :

100 Sft

1st class brick wall laid in 1:3 c/s mortar reinfd 4.5" thick wall
with hoop iron bonding 6" apart

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.440

Bag

490.00

Sand

9.000

Cft

2,200.00

Steel (bars/rods/section)

0.164

Kg

82.00

Burnt Brick

525.000

No

8,500.00

TOTAL

MATERIAL

Bag

1,195.60

100 Cft

198.00

Kg

13.45

1,000 No

4,462.50

58.08

5,869.55

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.250

Day

500.00

Day

125.00

Black Smith

0.067

Day

900.00

Day

60.30

51.31

19.92

1,761.61

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,667.57

Composite Rates Per

100 Sft

Rs.

9,298.72

Per SQM : Rs 1,000.54

Labour Rates Per

100 Sft

Rs.

2,137.88

Per SQM : Rs 230.04

594

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-21-b

(British) :

100 Sft

1st class brick wall laid in 1:3 c/s mortar reinfd 4.5" thick wall
with hoop iron bonding 12" apart

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.440

Bag

490.00

Sand

9.000

Cft

2,200.00

Steel (bars/rods/section)

0.082

Kg

82.00

Burnt Brick

525.000

No

8,500.00

TOTAL

MATERIAL

Bag

1,195.60

100 Cft

198.00

Kg

6.72

1,000 No

4,462.50

58.06

5,862.82

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.250

Day

500.00

Day

125.00

Black Smith

0.067

Day

900.00

Day

60.30

51.31

19.94

1,761.61

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

9,290.52

Per SQM : Rs 999.66

Labour Rates Per

100 Sft

Rs.

2,137.88

Per SQM : Rs 230.04

1,666.09

595

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-21-c

(British) :

100 Sft

1st class brick wall laid in 1:3 c/s mortar reinfd 3" thick wall
with hoop iron bonding 6" apart

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.800

Bag

490.00

Sand

6.500

Cft

2,200.00

Steel (bars/rods/section)

0.164

Kg

82.00

Burnt Brick

350.000

No

8,500.00

TOTAL

MATERIAL

Bag

882.00

100 Cft

143.00

Kg

13.45

1,000 No

2,975.00

56.28

4,013.45

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.200

Day

500.00

Day

100.00

Black Smith

0.067

Day

900.00

Day

60.30

40.06

21.72

1,375.36

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,565.53

Per SQM : Rs 706.45

Labour Rates Per

100 Sft

Rs.

1,669.13

Per SQM : Rs 179.60

1,176.72

596

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-21-d

(British) :

100 Sft

1st class brick wall laid in 1:3 c/s mortar reinfd 3" thick wall
with hoop iron banding 12" apart

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.800

Bag

490.00

Sand

6.500

Cft

2,200.00

Steel (bars/rods/section)

0.082

Kg

82.00

Burnt Brick

350.000

No

8,500.00

TOTAL

MATERIAL

Bag

882.00

100 Cft

143.00

Kg

6.72

1,000 No

2,975.00

55.94

4,006.72

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.200

Day

500.00

Day

100.00

Black Smith

0.100

Day

900.00

Day

90.00

40.95

22.06

1,405.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,594.45

Per SQM : Rs 709.56

Labour Rates Per

100 Sft

Rs.

1,706.25

Per SQM : Rs 183.59

1,181.78

597

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-22

(British) :

100 Cft

Ghilafi work (1.5 brick thick wall)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

36.500

Cft

1,400.00

Burnt Brick

675.000

No

8,500.00

1,000 No

5,737.50

Sundried Bricks

675.000

No

3,500.00

1,000 No

2,362.50

TOTAL

MATERIAL

511.00

100 Cft

45.77

8,611.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

165.00

32.23

5,665.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,104.42

Composite Rates Per

100 Cft

Rs.

17,380.42

Per CUM : Rs 6,137.84

Labour Rates Per

100 Cft

Rs.

6,875.00

Per CUM : Rs 2,427.89

598

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-23

(British) :

100 Cft

Dry brick pitching

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

20.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

440.00

100 Cft

11,475.00

1,000 No

64.69

11,915.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

2.000

Day

500.00

Day

1,000.00

57.00

13.31

1,957.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,039.30

Composite Rates Per

100 Cft

Rs.

16,911.30

Per CUM : Rs 5,972.17

Labour Rates Per

100 Cft

Rs.

2,375.00

Per CUM : Rs 838.72

599

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-24

(British) :

100 Cft

Sun dried bricks in mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

35.000

Cft

1,400.00

Sundried Bricks

1350.000

No

3,500.00

TOTAL

MATERIAL

490.00

100 Cft

4,725.00

1,000 No

46.34

5,215.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.250

Day

500.00

Day

125.00

96.75

31.66

3,321.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,856.80

Composite Rates Per

100 Cft

Rs.

10,393.55

Per CUM : Rs 3,670.45

Labour Rates Per

100 Cft

Rs.

4,031.25

Per CUM : Rs 1,423.62

600

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-25

(British) :

100 Cft

Pise wall (mud walling)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

130.000

1,400.00

Cft

TOTAL

MATERIAL

100 Cft

1,820.00

39.91

1,820.00

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

48.00

38.09

1,648.00

22

752.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,220.40

Per CUM : Rs 1,490.42

Labour Rates Per

100 Cft

Rs.

2,000.00

Per CUM : Rs 706.29

601

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-26-a

(British) :

100 Rft

Eave brick moulded in 1:3 c/s mortar 3" thick drip course cornice

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.500

Bag

490.00

Sand

5.000

Cft

2,200.00

Burnt Brick

280.000

No

8,500.00

TOTAL

Bag

735.00

100 Cft

110.00

41.70

MATERIAL

2,380.00

1,000 No

3,225.00

1,575.00

LABOUR
Mason

1.750

Day.

900.00

Day.

Coolie

1.750

Day

500.00

Day

875.00

Bhishti

0.250

Day

500.00

Day

125.00

77.25

36.30

2,652.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

7,153.25

Labour Rates Per

100 Rft

Rs.

3,218.75

1,276.00

Per Meter : Rs 234.63


Per Meter : Rs 105.58

602

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-26-b

(British) :

100 Rft

Eave brick moulded in 1:3 c/s mortar 4.5" thick drip course cornice

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.750

Bag

490.00

Sand

6.000

Cft

2,200.00

Burnt Brick

420.000

No

8,500.00

TOTAL

MATERIAL

Bag

857.50

100 Cft

132.00

3,570.00

1,000 No

45.69

4,559.50

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

87.75

32.31

3,012.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

9,218.84

Labour Rates Per

100 Rft

Rs.

3,656.25

1,646.59

Per Meter : Rs 302.38


Per Meter : Rs 119.93

603

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-26-c

(British) :

100 Rft

Eave brick moulded in 1:3 c/s mortar 4.5" thick eave brick with
back brick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.200

Bag

490.00

Sand

5.000

Cft

2,200.00

Burnt Brick

440.000

No

8,500.00

1,000 No

3,740.00

Burnt Brick (Perforated)

44.000

No

8,500.00

1,000 No

374.00

TOTAL

MATERIAL

Bag

588.00

100 Cft

110.00

49.87

4,812.00

1,800.00

LABOUR
Mason

2.000

Day

900.00

Day

Coolie

1.000

Day.

500.00

Day.

500.00

Bhishti

0.250

Day

500.00

Day

125.00

72.75

28.13

2,497.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

8,901.89

Labour Rates Per

100 Rft

Rs.

3,031.25

1,592.14

Per Meter : Rs 291.98


Per Meter : Rs 99.43

604

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-27-a

(British) :

100 Rft

Laying dressed or moulded brick cornices in c/s mortar, plaster or


paint (1 brick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.600

Bag

490.00

Sand

6.000

Cft

2,200.00

Burnt Brick

75.000

No

8,500.00

TOTAL

MATERIAL

Bag

784.00

100 Cft

132.00

637.50

1,000 No

26.02

1,553.50

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.250

Day

500.00

Day

125.00

87.75

51.98

3,012.75

22

985.27

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

5,551.52

Labour Rates Per

100 Rft

Rs.

3,656.25

Per Meter : Rs 182.09


Per Meter : Rs 119.93

605

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-27-b

(British) :

100 Rft

Laying dressed or moulded brick cornices c/s mortar, plaster or


paint (2 brick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

5.000

Bag

490.00

Sand

18.000

Cft

2,200.00

Burnt Brick

225.000

No

8,500.00

TOTAL

MATERIAL

Bag

2,450.00

100 Cft

396.00

1,912.50

1,000 No

39.29

4,758.50

LABOUR
Mason

3.000

Day

900.00

Day

2,700.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

0.250

Day

500.00

Day

125.00

129.75

38.71

4,454.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

11,211.62

Labour Rates Per

100 Rft

Rs.

5,406.25

1,998.37

Per Meter : Rs 367.74


Per Meter : Rs 177.33

606

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-27-c

(British) :

100 Rft

Laying dressed or moulded brick cornices c/s mortar, plaster or


paint (3 brick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

8.000

Bag

490.00

Sand

28.000

Cft

2,200.00

Burnt Brick

450.000

No

8,500.00

TOTAL

MATERIAL

Bag

3,920.00

100 Cft

616.00

3,825.00

1,000 No

44.39

8,361.00

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.330

Day

500.00

Day

165.00

172.95

33.61

5,937.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

17,406.67

Labour Rates Per

100 Rft

Rs.

7,206.25

3,107.72

Per Meter : Rs 570.94


Per Meter : Rs 236.37

607

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-27-d

(British) :

100 Rft

Laying dressed or moulded brick cornices c/s mortar, plaster or


paint (4 brick)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

10.000

Bag

490.00

Sand

37.000

Cft

2,200.00

Burnt Brick

752.000

No

8,500.00

TOTAL

MATERIAL

Bag

4,900.00

100 Cft

814.00

6,392.00

1,000 No

46.91

12,106.00

LABOUR
Mason

5.000

Day

900.00

Day

4,500.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

217.50

31.09

7,467.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

23,831.82

Labour Rates Per

100 Rft

Rs.

9,062.50

4,258.32

Per Meter : Rs 781.68


Per Meter : Rs 297.25

608

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-28

(British) :

1000 No.

Cleaning bricks dismantled from kacha pacca masonry

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

110.00

Composite Rates Per

1000 No.

Rs.

625.00

Cost Per 1000 No.: 625.00

Labour Rates Per

1000 No.

Rs.

625.00

Cost Per 1000 No.: 625.00

609

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-29

(British) :

1000 No.

Scraping bricks dismantled from pacca masonry

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
1.000

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

900.00

27.00

78.00

927.00

22

198.00

Composite Rates Per

1000 No.

Rs.

1,125.00

Cost Per 1000 No.: 1,125.00

Labour Rates Per

1000 No.

Rs.

1,125.00

Cost Per 1000 No.: 1,125.00

610

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-30

(British) :

100 Cft

Supplying and filling sand under floor or plugging in wells

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
110.000

Sand

2,200.00

Cft

TOTAL

MATERIAL

100 Cft

2,420.00

70.31

2,420.00

LABOUR
Coolie

0.187

Day

500.00

Day

93.50

Bhishti

0.040

Day

500.00

Day

20.00

Dresser

0.080

Day

600.00

Day

48.00

4.85

7.69

166.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,154.28

Per CUM : Rs 1,113.92

Labour Rates Per

100 Cft

Rs.

201.88

Per CUM : Rs 71.29

567.93

611

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-31

(British) :

100 Rft

Provide & lay 2" thick & 15" projected tile band, laid in 1:2 c/s
mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.400

Bag

490.00

Sand

10.000

Cft

2,200.00

Iron Sheet

1.000

Kg

120.00

Brick Tile (12"x6"x2")

60.000

No

14,000.00

TOTAL

MATERIAL

Bag

196.00

100 Cft

220.00

Kg

120.00

1,000 No

840.00

11.50

1,376.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

10.000

Day

500.00

Day

5,000.00

Bhishti

2.500

Day

500.00

Day

1,250.00

Black Smith

0.500

Day

900.00

Day

450.00

228.00

66.50

7,828.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

11,178.72

Labour Rates Per

100 Rft

Rs.

9,500.00

1,974.72

Per Meter : Rs 366.66


Per Meter : Rs 311.60

612

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-32-a

(British) :

100 Sft

First class brick tiles clad by laying tiles in stretcher course,


in cement sand mortar 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.750

Bag

490.00

Sand

10.000

Cft

2,200.00

Iron Sheet

0.600

Kg

120.00

Brick Tile (12"x6"x2")

200.000

No

14,000.00

TOTAL

MATERIAL

Bag

1,347.50

100 Cft

220.00

Kg

72.00

1,000 No

2,800.00

52.15

4,439.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

Black Smith

0.050

Day

900.00

Day

45.00

58.35

25.85

2,003.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,847.44

Per SQM : Rs 844.38

Labour Rates Per

100 Sft

Rs.

2,431.25

Per SQM : Rs 261.60

1,404.59

613

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-32-b

(British) :

100 Sft

First class brick tiles clad by laying tiles in stretcher course,


in cement sand mortar 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.250

Bag

490.00

Sand

14.870

Cft

2,200.00

Iron Sheet

0.600

Kg

120.00

Brick Tile (12"x6"x2")

200.000

No

14,000.00

TOTAL

MATERIAL

Bag

1,102.50

100 Cft

327.14

Kg

72.00

1,000 No

2,800.00

51.65

4,301.64

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

Black Smith

0.050

Day

900.00

Day

45.00

58.35

26.35

2,003.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,679.25

Per SQM : Rs 826.29

Labour Rates Per

100 Sft

Rs.

2,431.25

Per SQM : Rs 261.60

1,374.26

614

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-33

(British) :

100 Sft

Chamfering sides of head regulators and masonry walls to increase


width

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

3.996

Day

900.00

Day

3,596.40

Coolie

3.996

Day

500.00

Day

1,998.00

167.83

78.00

5,762.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,993.00

Per SQM : Rs 752.45

Labour Rates Per

100 Sft

Rs.

6,993.00

Per SQM : Rs 752.45

1,230.77

615

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-34

(British) :

Each

Replacing kallar eaten bricks

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Burnt Brick

8,500.00

No

TOTAL

MATERIAL

1,000 No

8.50

17.47

8.50

LABOUR
Mason

0.020

Day

900.00

Day

18.00

Coolie

0.020

Day

500.00

Day

10.00

0.84

60.53

28.84

22

8.03

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

45.37

Cost Per Each: 45.37

Labour Rates Per

Each

Rs.

35.00

Cost Per Each: 35.00

616

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-35

(British) :

Each

Repairing corners of bridges & other hydraulic masonry works

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

0.250

Day

500.00

Day

125.00

10.50

78.00

360.50

22

77.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

437.50

Cost Per Each: 437.50

Labour Rates Per

Each

Rs.

437.50

Cost Per Each: 437.50

617

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-36

(British) :

100 Rft

Extra labour for drains of bath rooms etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

2.987

Day

900.00

Day

2,688.30

Coolie

2.987

Day

500.00

Day

1,493.50

125.45

78.00

4,307.25

22

920.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

5,227.25

Labour Rates Per

100 Rft

Rs.

5,227.25

Per Meter : Rs 171.45


Per Meter : Rs 171.45

618

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-37

(British) :

Each

Maroo corners

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.130

Day

900.00

Day

117.00

Coolie

0.130

Day

500.00

Day

65.00

5.46

78.00

187.46

22

40.04

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

227.50

Cost Per Each: 227.50

Labour Rates Per

Each

Rs.

227.50

Cost Per Each: 227.50

619

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-38-a

(British) :

100Cft

Masonry with Facing/Machine/Special Bricks in cement sand mortar


1:2 upto 10 ft. height

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

8.000

Bag

490.00

Sand

20.000

Cft

2,200.00

Scaffolding

20.020

Sft

15.00

Sft

Facing / Machine Bricks

1350.000

Each

12.00

Each

16,200.00

60.12

20,860.30

TOTAL

MATERIAL

Bag

3,920.00

100 Cft

440.00

300.30

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

1.000

Day

500.00

Day

500.00

154.95

17.88

5,319.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,725.57

Composite Rates Per

100Cft

Rs.

31,905.82

Per CUM : Rs 11,267.44

Labour Rates Per

100Cft

Rs.

6,456.25

Per CUM : Rs 2,280.01

620

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-38-b

(British) :

100Cft

Masonry using Facing/Machine/Special bricks in cement sand mortar


1:3 upto 10 ft. height

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.510

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Sft

Facing / Machine Bricks

1350.000

Each

12.00

Each

16,200.00

59.86

19,935.22

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.22

300.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

18.14

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,494.55

Composite Rates Per

100Cft

Rs.

30,620.97

Per CUM : Rs 10,813.70

Labour Rates Per

100Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

621

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-38-c

(British) :

100Cft

Masonry using Facing/Machine/Special bricks in cement sand mortar


1:4 upto 10 ft. height

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.800

Bag

490.00

Sand

24.000

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Sft

Facing / Machine Bricks

1350.000

Each

12.00

Each

16,200.00

59.52

19,380.00

TOTAL

MATERIAL

Bag

2,352.00

100 Cft

528.00

300.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

4.830

Day

500.00

Day

2,415.00

Bhishti

0.750

Day

500.00

Day

375.00

151.20

18.48

5,191.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,372.40

Composite Rates Per

100Cft

Rs.

29,943.60

Per CUM : Rs 10,574.49

Labour Rates Per

100Cft

Rs.

6,300.00

Per CUM : Rs 2,224.83

622

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-39

(British) :

100Cft

Add extra on Item 07-38 for every 10 ft additional height or part


thereof

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scaffolding

1.300

15.00

Sft

TOTAL

5.26

MATERIAL

Sft

19.50

19.50

LABOUR
Mason

0.090

Day

900.00

Day

81.00

Coolie

0.355

Day

500.00

Day

177.50

7.76

72.74

266.26

22

61.16

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100Cft

Rs.

346.92

Per CUM : Rs 122.51

Labour Rates Per

100Cft

Rs.

323.13

Per CUM : Rs 114.11

623

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-40

(British) :

100Cft

Masonry with Machine/Special Bricks in 1:3 c/s mortar in circular


core wall of Overhead Reservoir

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.600

Bag

490.00

Sand

24.800

Cft

2,200.00

Scaffolding

36.700

Sft

15.00

Sft

Facing / Machine Bricks

1485.000

Each

12.00

Each

17,820.00

53.37

22,150.10

TOTAL

MATERIAL

Bag

3,234.00

100 Cft

545.60

550.50

LABOUR
Mason

3.750

Day

900.00

Day

3,375.00

Coolie

9.400

Day

500.00

Day

4,700.00

Bhishti

1.800

Day

500.00

Day

900.00

269.25

24.63

9,244.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,847.52

Composite Rates Per

100Cft

Rs.

38,241.87

Per CUM : Rs 13,505.00

Labour Rates Per

100Cft

Rs.

11,218.75

Per CUM : Rs 3,961.87

624

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-41-a

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:2 cement


sand mortar using Hollow Block 16"x8"x8" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Sand

10.000

Cft

2,200.00

Hollow Block 16"X8"X8"

170.000

No

60.00

TOTAL

MATERIAL

Bag

1,960.00

100 Cft

220.00

10,200.00

No

61.98

12,380.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.02

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,295.60

Composite Rates Per

100Cft

Rs.

18,353.60

Per CUM : Rs 6,481.52

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

625

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-41-b

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:3 cement


sand mortar using Hollow Block 16"x8"x8" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.000

Bag

490.00

Sand

11.500

Cft

2,200.00

Hollow Block 16"X8"X8"

170.000

No

60.00

TOTAL

MATERIAL

Bag

1,470.00

100 Cft

253.00

10,200.00

No

61.57

11,923.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.43

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,195.06

Composite Rates Per

100Cft

Rs.

17,796.06

Per CUM : Rs 6,284.63

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

626

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-41-c

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:4 cement


sand mortar using Hollow Block 16"x8"x8" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.400

Bag

490.00

Sand

12.000

Cft

2,200.00

Hollow Block 16"X8"X8"

170.000

No

60.00

TOTAL

MATERIAL

Bag

1,176.00

100 Cft

264.00

10,200.00

No

61.31

11,640.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.69

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,132.80

Composite Rates Per

100Cft

Rs.

17,450.80

Per CUM : Rs 6,162.70

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

627

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-41-d

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:5 cement


sand mortar using Hollow Block 16"x8"x8" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.000

Bag

490.00

Sand

12.500

Cft

2,200.00

Hollow Block 16"X8"X8"

170.000

No

60.00

TOTAL

MATERIAL

Bag

980.00

100 Cft

275.00

10,200.00

No

61.13

11,455.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.87

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,092.10

Composite Rates Per

100Cft

Rs.

17,225.10

Per CUM : Rs 6,082.99

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

628

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-41-e

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:6 cement


sand mortar using Hollow Block 16"x8"x8" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.750

Bag

490.00

Sand

12.900

Cft

2,200.00

Hollow Block 16"X8"X8"

170.000

No

60.00

TOTAL

MATERIAL

Bag

857.50

100 Cft

283.80

10,200.00

No

61.01

11,341.30

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.99

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,067.09

Composite Rates Per

100Cft

Rs.

17,086.39

Per CUM : Rs 6,034.01

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

629

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-41-f

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:7 cement


sand mortar using Hollow Block 16"x8"x8" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.500

Bag

490.00

Sand

13.300

Cft

2,200.00

Hollow Block 16"X8"X8"

170.000

No

60.00

TOTAL

MATERIAL

Bag

735.00

100 Cft

292.60

10,200.00

No

60.90

11,227.60

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

17.10

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,042.07

Composite Rates Per

100Cft

Rs.

16,947.67

Per CUM : Rs 5,985.02

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

630

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-41-g

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:8 cement


sand mortar using Hollow Block 16"x8"x8" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.330

Bag

490.00

Sand

13.300

Cft

2,200.00

Hollow Block 16"X8"X8"

170.000

No

60.00

TOTAL

MATERIAL

Bag

651.70

100 Cft

292.60

10,200.00

No

60.81

11,144.30

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

17.19

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,023.75

Composite Rates Per

100Cft

Rs.

16,846.05

Per CUM : Rs 5,949.13

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

631

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-42-a

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:2 cement


sand mortar using Hollow Block 16"x8"x6" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.800

Bag

490.00

Sand

12.000

Cft

2,200.00

225.000

No

55.00

Hollow Block

16"X8"X6"

TOTAL

MATERIAL

Bag

2,352.00

100 Cft

264.00

12,375.00

No

62.34

14,991.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

15.66

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,967.92

Composite Rates Per

100Cft

Rs.

22,095.27

Per CUM : Rs 7,802.88

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

632

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-42-b

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:3 cement


sand mortar using Hollow Block 16"x8"x6" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.600

Bag

490.00

Sand

13.500

Cft

2,200.00

225.000

No

55.00

Hollow Block

16"X8"X6"

TOTAL

MATERIAL

Bag

1,764.00

100 Cft

297.00

12,375.00

No

61.94

14,436.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

16.06

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,845.82

Composite Rates Per

100Cft

Rs.

21,418.17

Per CUM : Rs 7,563.76

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

633

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-42-c

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:4 cement


sand mortar using Hollow Block 16"x8"x6" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.880

Bag

490.00

Sand

14.400

Cft

2,200.00

225.000

No

55.00

Hollow Block

16"X8"X6"

TOTAL

MATERIAL

Bag

1,411.20

100 Cft

316.80

12,375.00

No

61.68

14,103.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

16.32

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,772.56

Composite Rates Per

100Cft

Rs.

21,011.91

Per CUM : Rs 7,420.29

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

634

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-42-d

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:5 cement


sand mortar using Hollow Block 16"x8"x6" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.400

Bag

490.00

Sand

15.000

Cft

2,200.00

225.000

No

55.00

Hollow Block

16"X8"X6"

TOTAL

MATERIAL

Bag

1,176.00

100 Cft

330.00

12,375.00

No

61.51

13,881.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

16.49

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,723.72

Composite Rates Per

100Cft

Rs.

20,741.07

Per CUM : Rs 7,324.65

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

635

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-42-e

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:6 cement


sand mortar using Hollow Block 16"x8"x6" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.060

Bag

490.00

Sand

15.400

Cft

2,200.00

225.000

No

55.00

Hollow Block

16"X8"X6"

TOTAL

MATERIAL

Bag

1,009.40

100 Cft

338.80

12,375.00

No

61.38

13,723.20

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

16.62

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,689.00

Composite Rates Per

100Cft

Rs.

20,548.55

Per CUM : Rs 7,256.66

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

636

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-42-f

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:7 cement


sand mortar using Hollow Block 16"x8"x6" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.800

Bag

490.00

Sand

15.900

Cft

2,200.00

225.000

No

55.00

Hollow Block

16"X8"X6"

TOTAL

MATERIAL

Bag

882.00

100 Cft

349.80

12,375.00

No

61.29

13,606.80

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

16.71

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,663.40

Composite Rates Per

100Cft

Rs.

20,406.55

Per CUM : Rs 7,206.51

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

637

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-42-g

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:8 cement


sand mortar using Hollow Block 16"x8"x6" factory manufactured with
1.5" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.600

Bag

490.00

Sand

16.000

Cft

2,200.00

225.000

No

55.00

Hollow Block

16"X8"X6"

TOTAL

MATERIAL

Bag

784.00

100 Cft

352.00

12,375.00

No

61.21

13,511.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

16.79

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,642.32

Composite Rates Per

100Cft

Rs.

20,289.67

Per CUM : Rs 7,165.24

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

638

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-43-a

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:2 cement


sand mortar using Hollow Block 16"x8"x4" factory manufactured with
1.25" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

5.600

Bag

490.00

Sand

14.000

Cft

2,200.00

Hollow Block 16"X8"X4"

321.000

No

50.00

TOTAL

MATERIAL

Bag

2,744.00

100 Cft

308.00

16,050.00

No

63.34

19,102.00

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

14.66

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,975.74

Composite Rates Per

100Cft

Rs.

27,698.19

Per CUM : Rs 9,781.53

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

639

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-43-b

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:3 cement


sand mortar using Hollow Block 16"x8"x4" factory manufactured with
1.25" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.200

Bag

490.00

Sand

15.800

Cft

2,200.00

Hollow Block 16"X8"X4"

321.000

No

50.00

TOTAL

MATERIAL

Bag

2,058.00

100 Cft

347.60

16,050.00

No

63.00

18,455.60

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

15.00

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,833.53

Composite Rates Per

100Cft

Rs.

26,909.58

Per CUM : Rs 9,503.04

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

640

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-43-c

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:4 cement


sand mortar using Hollow Block 16"x8"x4" factory manufactured with
1.25" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.360

Bag

490.00

Sand

16.800

Cft

2,200.00

Hollow Block 16"X8"X4"

321.000

No

50.00

TOTAL

MATERIAL

Bag

1,646.40

100 Cft

369.60

16,050.00

No

62.78

18,066.00

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

15.22

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,747.82

Composite Rates Per

100Cft

Rs.

26,434.27

Per CUM : Rs 9,335.18

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

641

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-43-d

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:5 cement


sand mortar using Hollow Block 16"x8"x4" factory manufactured with
1.25" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.800

Bag

490.00

Sand

17.500

Cft

2,200.00

Hollow Block 16"X8"X4"

321.000

No

50.00

TOTAL

MATERIAL

Bag

1,372.00

100 Cft

385.00

16,050.00

No

62.64

17,807.00

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

15.36

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,690.84

Composite Rates Per

100Cft

Rs.

26,118.29

Per CUM : Rs 9,223.60

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

642

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-43-e

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:6 cement


sand mortar using Hollow Block 16"x8"x4" factory manufactured with
1.25" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.410

Bag

490.00

Sand

18.000

Cft

2,200.00

Hollow Block 16"X8"X4"

321.000

No

50.00

TOTAL

MATERIAL

Bag

1,180.90

100 Cft

396.00

16,050.00

No

62.53

17,626.90

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

15.47

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,651.22

Composite Rates Per

100Cft

Rs.

25,898.57

Per CUM : Rs 9,146.00

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

643

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-43-f

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:7 cement


sand mortar using Hollow Block 16"x8"x4" factory manufactured with
1.25" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.100

Bag

490.00

Sand

18.600

Cft

2,200.00

Hollow Block 16"X8"X4"

321.000

No

50.00

TOTAL

MATERIAL

Bag

1,029.00

100 Cft

409.20

16,050.00

No

62.45

17,488.20

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

15.55

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,620.70

Composite Rates Per

100Cft

Rs.

25,729.35

Per CUM : Rs 9,086.24

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

644

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-43-g

(British) :

100Cft

Hollow Block Masonry in walls upto 20 feet height in 1:8 cement


sand mortar using Hollow Block 16"x8"x4" factory manufactured with
1.25" wall thickness and strenght of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.860

Bag

490.00

Sand

18.700

Cft

2,200.00

Hollow Block 16"X8"X4"

321.000

No

50.00

TOTAL

MATERIAL

Bag

911.40

100 Cft

411.40

16,050.00

No

62.38

17,372.80

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

15.62

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,595.32

Composite Rates Per

100Cft

Rs.

25,588.57

Per CUM : Rs 9,036.53

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

645

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-44-a

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand
mortar using 16"x8"x8" factory manufactured solid blocks with
strength of 2100 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Sand

10.000

Cft

2,200.00

Solid Block 16"X8"X8"

170.000

No

65.00

TOTAL

MATERIAL

Bag

1,960.00

100 Cft

220.00

11,050.00

No

62.68

13,230.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

15.32

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,482.60

Composite Rates Per

100Cft

Rs.

19,390.60

Per CUM : Rs 6,847.73

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

646

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-44-b

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand
mortar using 16"x8"x8" factory manufactured solid blocks with
strength of 2100 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.000

Bag

490.00

Sand

11.500

Cft

2,200.00

Solid Block 16"X8"X8"

170.000

No

65.00

TOTAL

MATERIAL

Bag

1,470.00

100 Cft

253.00

11,050.00

No

62.32

12,773.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

15.68

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,382.06

Composite Rates Per

100Cft

Rs.

18,833.06

Per CUM : Rs 6,650.84

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

647

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-44-c

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand
mortar using 16"x8"x8" factory manufactured solid blocks with
strength of 2100 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.400

Bag

490.00

Sand

12.000

Cft

2,200.00

Solid Block 16"X8"X8"

170.000

No

65.00

TOTAL

MATERIAL

Bag

1,176.00

100 Cft

264.00

11,050.00

No

62.08

12,490.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

15.92

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,319.80

Composite Rates Per

100Cft

Rs.

18,487.80

Per CUM : Rs 6,528.91

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

648

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-44-d

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand
mortar using 16"x8"x8" factory manufactured solid blocks with
strength of 2100 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.000

Bag

490.00

Sand

12.500

Cft

2,200.00

Solid Block 16"X8"X8"

170.000

No

65.00

TOTAL

MATERIAL

Bag

980.00

100 Cft

275.00

11,050.00

No

61.92

12,305.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.08

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,279.10

Composite Rates Per

100Cft

Rs.

18,262.10

Per CUM : Rs 6,449.21

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

649

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-44-e

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand
mortar using 16"x8"x8" factory manufactured solid blocks with
strength of 2100 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.750

Bag

490.00

Sand

12.900

Cft

2,200.00

Solid Block 16"X8"X8"

170.000

No

65.00

TOTAL

MATERIAL

Bag

857.50

100 Cft

283.80

11,050.00

No

61.82

12,191.30

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.18

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,254.09

Composite Rates Per

100Cft

Rs.

18,123.39

Per CUM : Rs 6,400.22

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

650

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-44-f

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand
mortar using 16"x8"x8" factory manufactured solid blocks with
strength of 2100 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.500

Bag

490.00

Sand

13.300

Cft

2,200.00

Solid Block 16"X8"X8"

170.000

No

65.00

TOTAL

MATERIAL

Bag

735.00

100 Cft

292.60

11,050.00

No

61.71

12,077.60

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.29

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,229.07

Composite Rates Per

100Cft

Rs.

17,984.67

Per CUM : Rs 6,351.23

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

651

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-44-g

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand
mortar using 16"x8"x8" factory manufactured solid blocks with
strength of 2100 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.330

Bag

490.00

Sand

13.300

Cft

2,200.00

Solid Block 16"X8"X8"

170.000

No

65.00

TOTAL

MATERIAL

Bag

651.70

100 Cft

292.60

11,050.00

No

61.64

11,994.30

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

16.36

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,210.75

Composite Rates Per

100Cft

Rs.

17,883.05

Per CUM : Rs 6,315.34

Labour Rates Per

100Cft

Rs.

3,250.00

Per CUM : Rs 1,147.73

652

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-45-a

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand
mortar using 16"x8"x6" factory manufactured solid blocks with
strength of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.800

Bag

490.00

Sand

12.000

Cft

2,200.00

225.000

No

60.00

Solid Block

16"X8"X6"

TOTAL

MATERIAL

Bag

2,352.00

100 Cft

264.00

13,500.00

No

63.08

16,116.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

14.92

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,215.42

Composite Rates Per

100Cft

Rs.

23,467.77

Per CUM : Rs 8,287.57

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

653

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-45-b

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand
mortar using 16"x8"x6" factory manufactured solid blocks with
strength of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.600

Bag

490.00

Sand

13.500

Cft

2,200.00

225.000

No

60.00

Solid Block

16"X8"X6"

TOTAL

MATERIAL

Bag

1,764.00

100 Cft

297.00

13,500.00

No

62.73

15,561.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

15.27

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,093.32

Composite Rates Per

100Cft

Rs.

22,790.67

Per CUM : Rs 8,048.46

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

654

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-45-c

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand
mortar using 16"x8"x6" factory manufactured solid blocks with
strength of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.880

Bag

490.00

Sand

14.400

Cft

2,200.00

225.000

No

60.00

Solid Block

16"X8"X6"

TOTAL

MATERIAL

Bag

1,411.20

100 Cft

316.80

13,500.00

No

62.50

15,228.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

15.50

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,020.06

Composite Rates Per

100Cft

Rs.

22,384.41

Per CUM : Rs 7,904.99

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

655

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-45-d

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand
mortar using 16"x8"x6" factory manufactured solid blocks with
strength of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.400

Bag

490.00

Sand

15.000

Cft

2,200.00

225.000

No

60.00

Solid Block

16"X8"X6"

TOTAL

MATERIAL

Bag

1,176.00

100 Cft

330.00

13,500.00

No

62.35

15,006.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

15.65

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,971.22

Composite Rates Per

100Cft

Rs.

22,113.57

Per CUM : Rs 7,809.34

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

656

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-45-e

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand
mortar using 16"x8"x6" factory manufactured solid blocks with
strength of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.060

Bag

490.00

Sand

15.400

Cft

2,200.00

225.000

No

60.00

Solid Block

16"X8"X6"

TOTAL

MATERIAL

Bag

1,009.40

100 Cft

338.80

13,500.00

No

62.24

14,848.20

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

15.76

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,936.50

Composite Rates Per

100Cft

Rs.

21,921.05

Per CUM : Rs 7,741.35

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

657

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-45-f

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand
mortar using 16"x8"x6" factory manufactured solid blocks with
strength of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.800

Bag

490.00

Sand

15.900

Cft

2,200.00

225.000

No

60.00

Solid Block

16"X8"X6"

TOTAL

MATERIAL

Bag

882.00

100 Cft

349.80

13,500.00

No

62.15

14,731.80

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

15.85

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,910.90

Composite Rates Per

100Cft

Rs.

21,779.05

Per CUM : Rs 7,691.20

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

658

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-45-g

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand
mortar using 16"x8"x6" factory manufactured solid blocks with
strength of 1900 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.600

Bag

490.00

Sand

16.000

Cft

2,200.00

225.000

No

60.00

Solid Block

16"X8"X6"

TOTAL

MATERIAL

Bag

784.00

100 Cft

352.00

13,500.00

No

62.08

14,636.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.890

Day

500.00

Day

1,445.00

Bhishti

0.500

Day

500.00

Day

250.00

91.35

15.92

3,136.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,889.82

Composite Rates Per

100Cft

Rs.

21,662.17

Per CUM : Rs 7,649.93

Labour Rates Per

100Cft

Rs.

3,806.25

Per CUM : Rs 1,344.17

659

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-46-a

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand
mortar using 16"x8"x4" factory manufactured solid blocks with
strength of 1800 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

5.600

Bag

490.00

Sand

14.000

Cft

2,200.00

Solid Block 16"X8"X4"

321.000

No

55.00

TOTAL

MATERIAL

Bag

2,744.00

100 Cft

308.00

17,655.00

No

64.12

20,707.00

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

13.88

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,328.84

Composite Rates Per

100Cft

Rs.

29,656.29

Per CUM : Rs 10,473.03

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

660

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-46-b

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand
mortar using 16"x8"x4" factory manufactured solid blocks with
strength of 1800 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.200

Bag

490.00

Sand

15.800

Cft

2,200.00

Solid Block 16"X8"X4"

321.000

No

55.00

TOTAL

MATERIAL

Bag

2,058.00

100 Cft

347.60

17,655.00

No

63.82

20,060.60

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

14.18

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,186.63

Composite Rates Per

100Cft

Rs.

28,867.68

Per CUM : Rs 10,194.54

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

661

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-46-c

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand
mortar using 16"x8"x4" factory manufactured solid blocks with
strength of 1800 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.360

Bag

490.00

Sand

16.800

Cft

2,200.00

Solid Block 16"X8"X4"

321.000

No

55.00

TOTAL

MATERIAL

Bag

1,646.40

100 Cft

369.60

17,655.00

No

63.63

19,671.00

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

14.37

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,100.92

Composite Rates Per

100Cft

Rs.

28,392.37

Per CUM : Rs 10,026.68

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

662

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-46-d

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand
mortar using 16"x8"x4" factory manufactured solid blocks with
strength of 1800 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.800

Bag

490.00

Sand

17.500

Cft

2,200.00

Solid Block 16"X8"X4"

321.000

No

55.00

TOTAL

MATERIAL

Bag

1,372.00

100 Cft

385.00

17,655.00

No

63.50

19,412.00

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

14.50

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,043.94

Composite Rates Per

100Cft

Rs.

28,076.39

Per CUM : Rs 9,915.09

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

663

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-46-e

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand
mortar using 16"x8"x4" factory manufactured solid blocks with
strength of 1800 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.410

Bag

490.00

Sand

18.000

Cft

2,200.00

Solid Block 16"X8"X4"

321.000

No

55.00

TOTAL

MATERIAL

Bag

1,180.90

100 Cft

396.00

17,655.00

No

63.41

19,231.90

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

14.59

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,004.32

Composite Rates Per

100Cft

Rs.

27,856.67

Per CUM : Rs 9,837.50

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

664

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-46-f

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand
mortar using 16"x8"x4" factory manufactured solid blocks with
strength of 1800 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.100

Bag

490.00

Sand

18.600

Cft

2,200.00

Solid Block 16"X8"X4"

321.000

No

55.00

TOTAL

MATERIAL

Bag

1,029.00

100 Cft

409.20

17,655.00

No

63.34

19,093.20

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

14.66

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,973.80

Composite Rates Per

100Cft

Rs.

27,687.45

Per CUM : Rs 9,777.74

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

665

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 07 , BRICK MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

07-46-g

(British) :

100Cft

Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand
mortar using 16"x8"x4" factory manufactured solid blocks with
strength of 1800 psi.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.860

Bag

490.00

Sand

18.700

Cft

2,200.00

Solid Block 16"X8"X4"

321.000

No

55.00

TOTAL

MATERIAL

Bag

911.40

100 Cft

411.40

17,655.00

No

63.28

18,977.80

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

3.380

Day

500.00

Day

1,690.00

Bhishti

0.500

Day

500.00

Day

250.00

105.45

14.72

3,620.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,948.42

Composite Rates Per

100Cft

Rs.

27,546.67

Per CUM : Rs 9,728.02

Labour Rates Per

100Cft

Rs.

4,393.75

Per CUM : Rs 1,551.64

666

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-a

(British) :

100 Cft

Random rubble masonry in foundn. & plinth Dry masonry.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

40.43

3,860.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.000

Day

500.00

Day

1,500.00

99.00

37.57

3,399.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,575.20

Composite Rates Per

100 Cft

Rs.

8,834.20

Per CUM : Rs 3,119.77

Labour Rates Per

100 Cft

Rs.

4,125.00

Per CUM : Rs 1,456.73

667

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-b

(British) :

100 Cft

Random rubble masonry in foundn. & plinth in mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Loose Earth

45.000

Cft

1,600.00

100 Cft

720.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

39.46

4,580.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.250

Day

500.00

Day

125.00

123.75

38.54

4,248.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,915.10

Composite Rates Per

100 Cft

Rs.

10,743.85

Per CUM : Rs 3,794.16

Labour Rates Per

100 Cft

Rs.

5,156.25

Per CUM : Rs 1,820.91

668

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-c-01

(British) :

100 Cft

Random rubble masonry (Un coursed) in foundn. & plinth in lime,


sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

30.000

Cft

2,200.00

100 Cft

660.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

White Lime

6.000

Mds

400.00

TOTAL

MATERIAL

Mds

2,400.00

39.11

6,920.00

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

190.50

38.89

6,540.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,919.40

Composite Rates Per

100 Cft

Rs.

16,379.90

Per CUM : Rs 5,784.51

Labour Rates Per

100 Cft

Rs.

7,937.50

Per CUM : Rs 2,803.10

669

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-c-02

(British) :

100 Cft

Random rubble masonry (Un coursed) in foundn. & plinth in lime,


sand mortar, Surkhi Ratio 1:1:1

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

15.000

Cft

2,200.00

100 Cft

330.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

Surkhi

15.000

Cft

75.00

100 Cft

11.25

White Lime

6.000

Mds

400.00

TOTAL

MATERIAL

Mds

2,400.00

38.23

6,601.25

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

190.50

39.77

6,540.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,849.28

Composite Rates Per

100 Cft

Rs.

15,991.03

Per CUM : Rs 5,647.18

Labour Rates Per

100 Cft

Rs.

7,937.50

Per CUM : Rs 2,803.10

670

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-c-03

(British) :

100 Cft

Random rubble masonry (Un coursed) in foundn. & plinth in lime,


Surkhi Ratio 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

Surkhi

30.000

Cft

75.00

100 Cft

22.50

White Lime

6.000

Mds

400.00

TOTAL

MATERIAL

Mds

2,400.00

37.30

6,282.50

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

190.50

40.70

6,540.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,779.15

Composite Rates Per

100 Cft

Rs.

15,602.15

Per CUM : Rs 5,509.85

Labour Rates Per

100 Cft

Rs.

7,937.50

Per CUM : Rs 2,803.10

671

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-d-01

(British) :

100 Cft

Random rubble masonry in foundn. & plinth in cement, sand mortar :


Ratio 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.000

Bag

490.00

Bag

4,410.00

Sand

33.750

Cft

2,200.00

100 Cft

742.50

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

44.00

9,012.50

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

190.50

34.00

6,540.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,379.75

Composite Rates Per

100 Cft

Rs.

18,932.75

Per CUM : Rs 6,686.04

Labour Rates Per

100 Cft

Rs.

7,937.50

Per CUM : Rs 2,803.10

672

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-d-02

(British) :

100 Cft

Random rubble masonry in foundn. & plinth in cement, sand mortar :


Ratio 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

7.200

Bag

490.00

Bag

3,528.00

Sand

36.000

Cft

2,200.00

100 Cft

792.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

42.22

8,180.00

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

190.50

35.78

6,540.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,196.60

Composite Rates Per

100 Cft

Rs.

17,917.10

Per CUM : Rs 6,327.37

Labour Rates Per

100 Cft

Rs.

7,937.50

Per CUM : Rs 2,803.10

673

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-d-03

(British) :

100 Cft

Random rubble masonry in foundn. & plinth in cement, sand mortar :


Ratio 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

5.140

Bag

490.00

Bag

2,518.60

Sand

38.570

Cft

2,200.00

100 Cft

848.54

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

39.92

7,227.14

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

190.50

38.08

6,540.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,986.97

Composite Rates Per

100 Cft

Rs.

16,754.61

Per CUM : Rs 5,916.84

Labour Rates Per

100 Cft

Rs.

7,937.50

Per CUM : Rs 2,803.10

674

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-01-d-04

(British) :

100 Cft

Random rubble masonry in foundn. & plinth in cement, sand mortar :


Ratio 1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Bag

1,960.00

Sand

40.000

Cft

2,200.00

100 Cft

880.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

38.51

6,700.00

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

190.50

39.49

6,540.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,871.00

Composite Rates Per

100 Cft

Rs.

16,111.50

Per CUM : Rs 5,689.73

Labour Rates Per

100 Cft

Rs.

7,937.50

Per CUM : Rs 2,803.10

675

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-a

(British) :

100 Cft

Coursed rubble masonry in foundn. & plinth dry masonry.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

35.92

3,860.00

LABOUR
Mason

3.000

Day

900.00

Day

2,700.00

Coolie

3.000

Day

500.00

Day

1,500.00

126.00

42.08

4,326.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,773.20

Composite Rates Per

100 Cft

Rs.

9,959.20

Per CUM : Rs 3,517.06

Labour Rates Per

100 Cft

Rs.

5,250.00

Per CUM : Rs 1,854.02

676

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-b

(British) :

100 Cft

Coursed rubble masonry in foundn. & plinth in mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Loose Earth

45.000

Cft

1,600.00

100 Cft

720.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

32.93

4,580.00

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

175.50

45.07

6,025.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,294.60

Composite Rates Per

100 Cft

Rs.

12,900.10

Per CUM : Rs 4,555.63

Labour Rates Per

100 Cft

Rs.

7,312.50

Per CUM : Rs 2,582.39

677

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-c-01

(British) :

100 Cft

Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in


lime, sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

26.670

Cft

2,200.00

100 Cft

586.74

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

White Lime

5.330

Mds

400.00

TOTAL

MATERIAL

Mds

2,132.00

35.94

6,578.74

LABOUR
Mason

4.750

Day

900.00

Day

4,275.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

214.50

42.06

7,364.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,020.32

Composite Rates Per

100 Cft

Rs.

16,963.56

Per CUM : Rs 5,990.63

Labour Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

678

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-c-02

Coursed rubble masonry (Hammer Dressed)


lime, sand mortar, Surkhi Ratio 1:1:1

Detail

Qty

Unit

(British) :

100 Cft

in foundn. & plinth in

Rate (Rs)

Amount

MATERIAL
Sand

13.330

Cft

2,200.00

100 Cft

293.26

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

Surkhi

13.330

Cft

75.00

100 Cft

10.00

White Lime

5.330

Mds

400.00

TOTAL

MATERIAL

Mds

2,132.00

36.53

6,790.26

LABOUR
Mason

4.750

Day

900.00

Day

4,275.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

214.50

41.47

7,364.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,066.86

Composite Rates Per

100 Cft

Rs.

17,221.61

Per CUM : Rs 6,081.76

Labour Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

679

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-c-03

Coursed rubble masonry (Hammer Dressed)


lime, Surkhi Ratio 1:2

Detail

Qty

Unit

(British) :

100 Cft

in foundn. & plinth in

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

Surkhi

26.670

Cft

75.00

100 Cft

20.00

White Lime

5.330

Mds

400.00

TOTAL

MATERIAL

Mds

2,132.00

35.73

6,507.00

LABOUR
Mason

4.750

Day

900.00

Day

4,275.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

214.50

42.27

7,364.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,004.54

Composite Rates Per

100 Cft

Rs.

16,876.04

Per CUM : Rs 5,959.72

Labour Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

680

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-d-01

Coursed rubble masonry (Hammer Dressed)


cement,sand mortar : Ratio 1:3

Detail

Qty

Unit

(British) :

100 Cft

in foundn. & plinth in

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

8.000

Bag

490.00

Bag

3,920.00

Sand

30.000

Cft

2,200.00

100 Cft

660.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

TOTAL

MATERIAL

41.66

8,935.00

LABOUR
Mason

4.750

Day

900.00

Day

4,275.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

214.50

36.34

7,364.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,538.70

Composite Rates Per

100 Cft

Rs.

19,838.20

Per CUM : Rs 7,005.80

Labour Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

681

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-d-02

(British) :

100 Cft

Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in


cement,sand mortar : Ratio 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.400

Bag

490.00

Bag

3,136.00

Sand

32.000

Cft

2,200.00

100 Cft

704.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

TOTAL

MATERIAL

40.05

8,195.00

LABOUR
Mason

4.750

Day

900.00

Day

4,275.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

214.50

37.95

7,364.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,375.90

Composite Rates Per

100 Cft

Rs.

18,935.40

Per CUM : Rs 6,686.98

Labour Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

682

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-d-03

(British) :

100 Cft

Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in


cement,sand mortar : Ratio 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.570

Bag

490.00

Bag

2,239.30

Sand

34.000

Cft

2,200.00

100 Cft

748.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

TOTAL

MATERIAL

38.00

7,342.30

LABOUR
Mason

4.750

Day

900.00

Day

4,275.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

214.50

40.00

7,364.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,188.31

Composite Rates Per

100 Cft

Rs.

17,895.11

Per CUM : Rs 6,319.60

Labour Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

683

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-02-d-04

Coursed rubble masonry (Hammer Dressed)


cement,sand mortar : Ratio 1:8

Detail

Qty

Unit

(British) :

100 Cft

in foundn. & plinth in

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.560

Bag

490.00

Bag

1,744.40

Sand

35.600

Cft

2,200.00

100 Cft

783.20

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

TOTAL

MATERIAL

36.79

6,882.60

LABOUR
Mason

4.750

Day

900.00

Day

4,275.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

214.50

41.21

7,364.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,087.17

Composite Rates Per

100 Cft

Rs.

17,334.27

Per CUM : Rs 6,121.55

Labour Rates Per

100 Cft

Rs.

8,937.50

Per CUM : Rs 3,156.25

684

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-a

(British) :

100 Cft

Random rubble masonry in ground floor Dry masonry.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

38.04

3,860.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

3.000

Day

500.00

Day

1,500.00

112.50

39.96

3,862.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,674.20

Composite Rates Per

100 Cft

Rs.

9,396.70

Per CUM : Rs 3,318.42

Labour Rates Per

100 Cft

Rs.

4,687.50

Per CUM : Rs 1,655.38

685

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-b

(British) :

100 Cft

Random rubble masonry in ground floor in mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

45.000

Cft

1,400.00

100 Cft

630.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

35.67

4,490.00

LABOUR
Mason

3.000

Day

900.00

Day

2,700.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

148.50

42.33

5,098.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,076.80

Composite Rates Per

100 Cft

Rs.

11,665.30

Per CUM : Rs 4,119.57

Labour Rates Per

100 Cft

Rs.

6,187.50

Per CUM : Rs 2,185.10

686

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-c-01

(British) :

100 Cft

Random rubble masonry in ground floor in lime, sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

30.000

Cft

2,200.00

100 Cft

660.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

White Lime

6.000

Mds

400.00

TOTAL

MATERIAL

Mds

2,400.00

37.49

6,920.00

LABOUR
Mason

4.500

Day

900.00

Day

4,050.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

207.75

40.51

7,132.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,045.90

Composite Rates Per

100 Cft

Rs.

17,098.65

Per CUM : Rs 6,038.34

Labour Rates Per

100 Cft

Rs.

8,656.25

Per CUM : Rs 3,056.93

687

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-c-02

(British) :

100 Cft

Random rubble masonry in ground floor in lime, sand mortar, Surkhi


Ratio 1:1:1

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

15.000

Cft

2,200.00

100 Cft

330.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

Surkhi

15.000

Cft

75.00

100 Cft

11.25

White Lime

6.000

Mds

400.00

TOTAL

MATERIAL

Mds

2,400.00

36.60

6,601.25

LABOUR
Mason

4.500

Day

900.00

Day

4,050.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

207.75

41.40

7,132.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,975.78

Composite Rates Per

100 Cft

Rs.

16,709.78

Per CUM : Rs 5,901.01

Labour Rates Per

100 Cft

Rs.

8,656.25

Per CUM : Rs 3,056.93

688

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-c-03

(British) :

100 Cft

Random rubble masonry in ground floor in lime, Surkhi Ratio 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

Surkhi

30.000

Cft

75.00

100 Cft

22.50

White Lime

6.000

Mds

400.00

TOTAL

MATERIAL

Mds

2,400.00

35.68

6,282.50

LABOUR
Mason

4.500

Day

900.00

Day

4,050.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

207.75

42.32

7,132.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,905.65

Composite Rates Per

100 Cft

Rs.

16,320.90

Per CUM : Rs 5,763.68

Labour Rates Per

100 Cft

Rs.

8,656.25

Per CUM : Rs 3,056.93

689

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-d-01

(British) :

100 Cft

Random rubble masonry in ground floor in cement,sand mortar : Ratio


1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.000

Bag

490.00

Bag

4,410.00

Sand

33.750

Cft

2,200.00

100 Cft

742.50

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

42.41

9,012.50

LABOUR
Mason

4.500

Day

900.00

Day

4,050.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

207.75

35.59

7,132.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,506.25

Composite Rates Per

100 Cft

Rs.

19,651.50

Per CUM : Rs 6,939.87

Labour Rates Per

100 Cft

Rs.

8,656.25

Per CUM : Rs 3,056.93

690

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-d-02

(British) :

100 Cft

Random rubble masonry in ground floor in cement,sand mortar : Ratio


1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

7.200

Bag

490.00

Bag

3,528.00

Sand

36.000

Cft

2,200.00

100 Cft

792.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

40.62

8,180.00

LABOUR
Mason

4.500

Day

900.00

Day

4,050.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

207.75

37.38

7,132.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,323.10

Composite Rates Per

100 Cft

Rs.

18,635.85

Per CUM : Rs 6,581.19

Labour Rates Per

100 Cft

Rs.

8,656.25

Per CUM : Rs 3,056.93

691

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-d-03

(British) :

100 Cft

Random rubble masonry in ground floor in cement,sand mortar : Ratio


1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

5.140

Bag

490.00

Bag

2,518.60

Sand

38.570

Cft

2,200.00

100 Cft

848.54

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

38.30

7,227.14

LABOUR
Mason

4.500

Day

900.00

Day

4,050.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

207.75

39.70

7,132.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,113.47

Composite Rates Per

100 Cft

Rs.

17,473.36

Per CUM : Rs 6,170.66

Labour Rates Per

100 Cft

Rs.

8,656.25

Per CUM : Rs 3,056.93

692

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-03-d-04

(British) :

100 Cft

Random rubble masonry in ground floor in cement,sand mortar : Ratio


1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Bag

1,960.00

Sand

40.000

Cft

2,200.00

100 Cft

880.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

36.88

6,700.00

LABOUR
Mason

4.500

Day

900.00

Day

4,050.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

207.75

41.12

7,132.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,997.50

Composite Rates Per

100 Cft

Rs.

16,830.25

Per CUM : Rs 5,943.55

Labour Rates Per

100 Cft

Rs.

8,656.25

Per CUM : Rs 3,056.93

693

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-a

(British) :

100 Cft

Coursed rubble masonry in ground floor Dry masonry.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

33.05

3,860.00

LABOUR
Mason

3.500

Day

900.00

Day

3,150.00

Coolie

3.500

Day

500.00

Day

1,750.00

147.00

44.95

5,047.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,927.20

Composite Rates Per

100 Cft

Rs.

10,834.20

Per CUM : Rs 3,826.07

Labour Rates Per

100 Cft

Rs.

6,125.00

Per CUM : Rs 2,163.03

694

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-b

(British) :

100 Cft

Coursed rubble masonry in ground floor in mud mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

45.000

Cft

1,400.00

100 Cft

630.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

TOTAL

MATERIAL

27.63

4,490.00

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

231.00

50.37

7,931.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,681.80

Composite Rates Per

100 Cft

Rs.

15,102.80

Per CUM : Rs 5,333.51

Labour Rates Per

100 Cft

Rs.

9,625.00

Per CUM : Rs 3,399.04

695

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-c-01

(British) :

100 Cft

Coursed rubble masonry in ground floor in lime, sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

26.570

Cft

2,200.00

100 Cft

584.54

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

20.000

Cft

3,300.00

100 Cft

660.00

White Lime

5.330

Mds

400.00

TOTAL

MATERIAL

Mds

2,132.00

33.66

6,576.54

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

0.750

Day

500.00

Day

375.00

242.25

44.34

8,317.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,223.34

Composite Rates Per

100 Cft

Rs.

18,117.13

Per CUM : Rs 6,398.01

Labour Rates Per

100 Cft

Rs.

10,093.75

Per CUM : Rs 3,564.58

696

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-c-02

(British) :

100 Cft

Coursed rubble masonry in ground floor in lime, sand mortar, Surkhi


Ratio 1:1:1

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

13.330

Cft

2,200.00

100 Cft

293.26

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

Surkhi

13.330

Cft

75.00

100 Cft

10.00

White Lime

5.330

Mds

400.00

TOTAL

MATERIAL

Mds

2,132.00

34.26

6,790.26

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

0.750

Day

500.00

Day

375.00

242.25

43.74

8,317.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,270.36

Composite Rates Per

100 Cft

Rs.

18,377.86

Per CUM : Rs 6,490.09

Labour Rates Per

100 Cft

Rs.

10,093.75

Per CUM : Rs 3,564.58

697

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-c-03

(British) :

Coursed rubble masonry in ground floor in lime,

Detail

Qty

Unit

100 Cft

Surkhi Ratio 1:2

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

Surkhi

26.570

Cft

75.00

100 Cft

19.93

White Lime

5.330

Mds

400.00

TOTAL

MATERIAL

Mds

2,132.00

33.47

6,506.93

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

0.750

Day

500.00

Day

375.00

242.25

44.53

8,317.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,208.02

Composite Rates Per

100 Cft

Rs.

18,032.20

Per CUM : Rs 6,368.02

Labour Rates Per

100 Cft

Rs.

10,093.75

Per CUM : Rs 3,564.58

698

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-d-01

(British) :

100 Cft

Coursed rubble masonry in ground floor in cement,sand mortar :


Ratio 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

8.000

Bag

490.00

Bag

3,920.00

Sand

30.000

Cft

2,200.00

100 Cft

660.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

TOTAL

MATERIAL

39.40

8,935.00

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

0.750

Day

500.00

Day

375.00

242.25

38.60

8,317.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,742.20

Composite Rates Per

100 Cft

Rs.

20,994.45

Per CUM : Rs 7,414.13

Labour Rates Per

100 Cft

Rs.

10,093.75

Per CUM : Rs 3,564.58

699

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-d-02

(British) :

100 Cft

Coursed rubble masonry in ground floor in cement,sand mortar :


Ratio 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.400

Bag

490.00

Bag

3,136.00

Sand

32.000

Cft

2,200.00

100 Cft

704.00

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

TOTAL

MATERIAL

37.78

8,195.00

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

0.750

Day

500.00

Day

375.00

242.25

40.22

8,317.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,579.40

Composite Rates Per

100 Cft

Rs.

20,091.65

Per CUM : Rs 7,095.31

Labour Rates Per

100 Cft

Rs.

10,093.75

Per CUM : Rs 3,564.58

700

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-d-03

(British) :

100 Cft

Coursed rubble masonry in ground floor in cement,sand mortar :


Ratio 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.570

Bag

490.00

Bag

2,239.30

Sand

34.200

Cft

2,200.00

100 Cft

752.40

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

TOTAL

MATERIAL

35.73

7,346.70

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

0.750

Day

500.00

Day

375.00

242.25

42.27

8,317.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,392.77

Composite Rates Per

100 Cft

Rs.

19,056.72

Per CUM : Rs 6,729.82

Labour Rates Per

100 Cft

Rs.

10,093.75

Per CUM : Rs 3,564.58

701

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-04-d-04

(British) :

100 Cft

Coursed rubble masonry in ground floor in cement,sand mortar :


Ratio 1:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.560

Bag

490.00

Bag

1,744.40

Sand

36.600

Cft

2,200.00

100 Cft

805.20

Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Through Stone

35.000

Cft

3,300.00

100 Cft

1,155.00

TOTAL

MATERIAL

34.57

6,904.60

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

0.750

Day

500.00

Day

375.00

242.25

43.43

8,317.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,295.51

Composite Rates Per

100 Cft

Rs.

18,517.36

Per CUM : Rs 6,539.35

Labour Rates Per

100 Cft

Rs.

10,093.75

Per CUM : Rs 3,564.58

702

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-05-a-01

(British) :

100 Cft

Ashlar block masonry in ground floor in lime, sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

20.000

Cft

2,200.00

Steel (bars/rods/section)

1.820

Kg

82.00

Kg

149.24

Charcoal

13.630

Kg

50.00

Kg

681.50

Quarried Stone

200.000

Cft

3,200.00

White Lime

4.000

Mds

400.00

TOTAL

MATERIAL

440.00

100 Cft

6,400.00

100 Cft
1

Mds

1,600.00

22.02

9,270.74

LABOUR
Mason

17.000

Day

900.00

Day

15,300.00

Coolie

10.000

Day

500.00

Day

5,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Bellowman

1.000

Day

600.00

Day

600.00

669.00

55.98

22,969.00

22

6,945.56

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

39,185.30

Per CUM : Rs 13,838.17

Labour Rates Per

100 Cft

Rs.

27,875.00

Per CUM : Rs 9,843.97

703

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-05-a-02

(British) :

100 Cft

Ashlar block masonry in ground floor in lime, sand mortar, Surkhi


Ratio 1:1:1

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

10.000

Cft

2,200.00

Steel (bars/rods/section)

1.820

Kg

82.00

Kg

149.24

Charcoal

13.630

Kg

50.00

Kg

681.50

Quarried Stone

200.000

Cft

3,200.00

100 Cft

6,400.00

Surkhi

10.000

Cft

75.00

100 Cft

7.50

White Lime

4.000

Mds

400.00

TOTAL

MATERIAL

220.00

100 Cft

Mds

1,600.00

21.66

9,058.24

LABOUR
Mason

17.000

Day

900.00

Day

15,300.00

Coolie

10.000

Day

500.00

Day

5,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Bellowman

1.000

Day

600.00

Day

600.00

669.00

56.34

22,969.00

22

6,898.81

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

38,926.05

Per CUM : Rs 13,746.62

Labour Rates Per

100 Cft

Rs.

27,875.00

Per CUM : Rs 9,843.97

704

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-05-a-03

(British) :

Ashlar block masonry in ground floor in lime,

Detail

Qty

Unit

100 Cft

Surkhi Ratio 1:2

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

1.820

Kg

82.00

Kg

149.24

Charcoal

13.630

Kg

50.00

Kg

681.50

Quarried Stone

200.000

Cft

3,200.00

100 Cft

6,400.00

Surkhi

20.000

Cft

75.00

100 Cft

15.00

White Lime

4.000

Mds

400.00

TOTAL

MATERIAL

Mds

1,600.00

21.30

8,845.74

LABOUR
Mason

17.000

Day

900.00

Day

15,300.00

Coolie

10.000

Day

500.00

Day

5,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Bellowman

1.000

Day

600.00

Day

600.00

669.00

56.70

22,969.00

22

6,852.06

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

38,666.80

Per CUM : Rs 13,655.07

Labour Rates Per

100 Cft

Rs.

27,875.00

Per CUM : Rs 9,843.97

705

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-05-b-01

(British) :

100 Cft

Ashlar block masonry in ground floor in cement,sand mortar : Ratio


1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

Steel (bars/rods/section)

1.820

Kg

82.00

Kg

149.24

Charcoal

13.630

Kg

50.00

Kg

681.50

Quarried Stone

200.000

Cft

3,200.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

6,400.00

100 Cft

24.27

10,665.74

LABOUR
Mason

17.000

Day

900.00

Day

15,300.00

Coolie

10.000

Day

500.00

Day

5,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Bellowman

1.000

Day

600.00

Day

600.00

669.00

53.73

22,969.00

22

7,252.46

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

40,887.20

Per CUM : Rs 14,439.19

Labour Rates Per

100 Cft

Rs.

27,875.00

Per CUM : Rs 9,843.97

706

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-05-b-02

(British) :

100 Cft

Ashlar block masonry in ground floor in cement,sand mortar : Ratio


1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.800

Bag

490.00

Sand

24.000

Cft

2,200.00

Steel (bars/rods/section)

1.820

Kg

82.00

Kg

149.24

Charcoal

13.630

Kg

50.00

Kg

681.50

Quarried Stone

200.000

Cft

3,200.00

TOTAL

MATERIAL

Bag

2,352.00

100 Cft

528.00

6,400.00

100 Cft

23.40

10,110.74

LABOUR
Mason

17.000

Day

900.00

Day

15,300.00

Coolie

10.000

Day

500.00

Day

5,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Bellowman

1.000

Day

600.00

Day

600.00

669.00

54.60

22,969.00

22

7,130.36

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

40,210.10

Per CUM : Rs 14,200.08

Labour Rates Per

100 Cft

Rs.

27,875.00

Per CUM : Rs 9,843.97

707

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-05-b-03

(British) :

100 Cft

Ashlar block masonry in ground floor in cement,sand mortar : Ratio


1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.440

Bag

490.00

Sand

25.700

Cft

2,200.00

Steel (bars/rods/section)

1.820

Kg

82.00

Kg

149.24

Charcoal

13.630

Kg

50.00

Kg

681.50

Quarried Stone

200.000

Cft

3,200.00

TOTAL

MATERIAL

Bag

1,685.60

100 Cft

565.40

6,400.00

100 Cft

22.38

9,481.74

LABOUR
Mason

17.000

Day

900.00

Day

15,300.00

Coolie

10.000

Day

500.00

Day

5,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Bellowman

1.000

Day

600.00

Day

600.00

669.00

55.62

22,969.00

22

6,991.98

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

39,442.72

Per CUM : Rs 13,929.08

Labour Rates Per

100 Cft

Rs.

27,875.00

Per CUM : Rs 9,843.97

708

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-06-a-01

(British) :

100 Cft

Ashlar fine masonry in ground floor in lime, sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

10.000

Cft

2,200.00

Steel (bars/rods/section)

2.270

Kg

82.00

Kg

186.14

Charcoal

27.270

Kg

50.00

Kg

1,363.50

Quarried Stone

250.000

Cft

3,200.00

White Lime

2.000

Mds

400.00

TOTAL

MATERIAL

220.00

100 Cft

100 Cft

8,000.00

Mds

800.00

14.87

10,569.64

LABOUR
Mason

40.000

Day

900.00

Day

36,000.00

Coolie

8.000

Day

500.00

Day

4,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.500

Day

900.00

Day

1,350.00

Bellowman

1.500

Day

600.00

Day

900.00

1,282.50

63.13

44,032.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,730.32

Composite Rates Per

100 Cft

Rs.

66,332.46

Per CUM : Rs 23,425.11

Labour Rates Per

100 Cft

Rs.

53,437.50

Per CUM : Rs 18,871.29

709

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-06-a-02

(British) :

100 Cft

Ashlar fine masonry in ground floor in lime, sand mortar, Surkhi


Ratio 1:1:1

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

5.000

Cft

2,200.00

Steel (bars/rods/section)

2.270

Kg

82.00

Kg

186.14

Charcoal

27.270

Kg

50.00

Kg

1,363.50

Quarried Stone

250.000

Cft

3,200.00

100 Cft

8,000.00

Surkhi

5.000

Cft

75.00

100 Cft

3.75

White Lime

2.000

Mds

400.00

TOTAL

MATERIAL

110.00

100 Cft

Mds

800.00

14.75

10,463.39

LABOUR
Mason

40.000

Day

900.00

Day

36,000.00

Coolie

8.000

Day

500.00

Day

4,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.500

Day

900.00

Day

1,350.00

Bellowman

1.500

Day

600.00

Day

900.00

1,282.50

63.25

44,032.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,706.95

Composite Rates Per

100 Cft

Rs.

66,202.84

Per CUM : Rs 23,379.33

Labour Rates Per

100 Cft

Rs.

53,437.50

Per CUM : Rs 18,871.29

710

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-06-a-03

(British) :

Ashlar fine masonry in ground floor in lime,

Detail

Qty

Unit

100 Cft

Surkhi Ratio 1:2

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

2.270

Kg

82.00

Kg

186.14

Charcoal

27.270

Kg

50.00

Kg

1,363.50

Quarried Stone

250.000

Cft

3,200.00

100 Cft

8,000.00

Surkhi

10.000

Cft

75.00

100 Cft

7.50

White Lime

2.000

Mds

400.00

TOTAL

MATERIAL

Mds

800.00

14.63

10,357.14

LABOUR
Mason

40.000

Day

900.00

Day

36,000.00

Coolie

8.000

Day

500.00

Day

4,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.500

Day

900.00

Day

1,350.00

Bellowman

1.500

Day

600.00

Day

900.00

1,282.50

63.37

44,032.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,683.57

Composite Rates Per

100 Cft

Rs.

66,073.21

Per CUM : Rs 23,333.56

Labour Rates Per

100 Cft

Rs.

53,437.50

Per CUM : Rs 18,871.29

711

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-06-b-01

(British) :

100 Cft

Ashlar fine masonry in ground floor in cement,sand mortar : Ratio


1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.000

Bag

490.00

Sand

11.250

Cft

2,200.00

Steel (bars/rods/section)

2.270

Kg

82.00

Kg

186.14

Charcoal

27.270

Kg

50.00

Kg

1,363.50

Quarried Stone

250.000

Cft

3,200.00

TOTAL

MATERIAL

Bag

1,470.00

100 Cft

247.50

100 Cft

8,000.00

15.64

11,267.14

LABOUR
Mason

40.000

Day

900.00

Day

36,000.00

Coolie

8.000

Day

500.00

Day

4,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.500

Day

900.00

Day

1,350.00

Bellowman

1.500

Day

600.00

Day

900.00

1,282.50

62.36

44,032.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,883.77

Composite Rates Per

100 Cft

Rs.

67,183.41

Per CUM : Rs 23,725.62

Labour Rates Per

100 Cft

Rs.

53,437.50

Per CUM : Rs 18,871.29

712

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-06-b-02

(British) :

100 Cft

Ashlar fine masonry in ground floor in cement,sand mortar : Ratio


1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.400

Bag

490.00

Sand

12.000

Cft

2,200.00

Steel (bars/rods/section)

2.270

Kg

82.00

Kg

186.14

Charcoal

27.270

Kg

50.00

Kg

1,363.50

Quarried Stone

250.000

Cft

3,200.00

TOTAL

MATERIAL

Bag

1,176.00

100 Cft

264.00

100 Cft

8,000.00

15.34

10,989.64

LABOUR
Mason

40.000

Day

900.00

Day

36,000.00

Coolie

8.000

Day

500.00

Day

4,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.500

Day

900.00

Day

1,350.00

Bellowman

1.500

Day

600.00

Day

900.00

1,282.50

62.66

44,032.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,822.72

Composite Rates Per

100 Cft

Rs.

66,844.86

Per CUM : Rs 23,606.06

Labour Rates Per

100 Cft

Rs.

53,437.50

Per CUM : Rs 18,871.29

713

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-06-b-03

(British) :

100 Cft

Ashlar fine masonry in ground floor in cement,sand mortar : Ratio


1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.730

Bag

490.00

Sand

12.840

Cft

2,200.00

Steel (bars/rods/section)

2.270

Kg

82.00

Kg

186.14

Charcoal

27.270

Kg

50.00

Kg

1,363.50

Quarried Stone

250.000

Cft

3,200.00

TOTAL

MATERIAL

Bag

847.70

100 Cft

282.48

100 Cft

8,000.00

14.99

10,679.82

LABOUR
Mason

40.000

Day

900.00

Day

36,000.00

Coolie

8.000

Day

500.00

Day

4,000.00

Bhishti

1.000

Day

500.00

Day

500.00

Black Smith

1.500

Day

900.00

Day

1,350.00

Bellowman

1.500

Day

600.00

Day

900.00

1,282.50

63.01

44,032.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,754.56

Composite Rates Per

100 Cft

Rs.

66,466.88

Per CUM : Rs 23,472.58

Labour Rates Per

100 Cft

Rs.

53,437.50

Per CUM : Rs 18,871.29

714

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-07-a

(British) :

100 Cft

Extra labour on items 08-03-a-01 to 08-06-b-03 for work in First


floor

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.400

Day

900.00

Day

360.00

Coolie

1.350

Day

500.00

Day

675.00

31.05

78.00

1,066.05

22

227.70

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,293.75

Per CUM : Rs 456.88

Labour Rates Per

100 Cft

Rs.

1,293.75

Per CUM : Rs 456.88

715

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-07-b

(British) :

100 Cft

Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Second


floor

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.200

Day

900.00

Day

1,080.00

Coolie

2.600

Day

500.00

Day

1,300.00

71.40

78.00

2,451.40

22

523.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,975.00

Per CUM : Rs 1,050.61

Labour Rates Per

100 Cft

Rs.

2,975.00

Per CUM : Rs 1,050.61

716

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-07-c

(British) :

100 Cft

Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Third


floor

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.900

Day

500.00

Day

1,950.00

112.50

78.00

3,862.50

22

825.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,687.50

Per CUM : Rs 1,655.38

Labour Rates Per

100 Cft

Rs.

4,687.50

Per CUM : Rs 1,655.38

717

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-07-d

(British) :

100 Cft

Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Fourth &


subsequent floors

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

3.500

Day

900.00

Day

3,150.00

Coolie

5.600

Day

500.00

Day

2,800.00

178.50

78.00

6,128.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,309.00

Composite Rates Per

100 Cft

Rs.

7,437.50

Per CUM : Rs 2,626.53

Labour Rates Per

100 Cft

Rs.

7,437.50

Per CUM : Rs 2,626.53

718

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-08

(British) :

100 Cft

Extra labour on items 08-03-a-01 to 08-06-b-03 for every 5'


additional height, other than building

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.000

Day

500.00

Day

500.00

28.50

78.00

978.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,187.50

Per CUM : Rs 419.36

Labour Rates Per

100 Cft

Rs.

1,187.50

Per CUM : Rs 419.36

209.00

719

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-09

(British) :

100 Cft

Extra labour for arch work in stone masonry including centring &
decentring etc.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

114.00

78.00

3,914.00

22

836.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,750.00

Per CUM : Rs 1,677.45

Labour Rates Per

100 Cft

Rs.

4,750.00

Per CUM : Rs 1,677.45

720

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-10-a

(British) :

100 Cft

Extra labour for coping & caps etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
20.000

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

18,000.00

540.00

78.00

18,540.00

22

3,960.00

Composite Rates Per

100 Cft

Rs.

22,500.00

Per CUM : Rs 7,945.81

Labour Rates Per

100 Cft

Rs.

22,500.00

Per CUM : Rs 7,945.81

721

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-10-b

(British) :

100 Cft

Extra labour for cornice & string course

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
20.000

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

18,000.00

540.00

78.00

18,540.00

22

3,960.00

Composite Rates Per

100 Cft

Rs.

22,500.00

Per CUM : Rs 7,945.81

Labour Rates Per

100 Cft

Rs.

22,500.00

Per CUM : Rs 7,945.81

722

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-11-a

(British) :

100 Sft

Dressing stones : Hammer dressed

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

5.000

Day

900.00

Day

4,500.00

Coolie

2.500

Day

500.00

Day

1,250.00

172.50

78.00

5,922.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,187.50

Per SQM : Rs 773.38

Labour Rates Per

100 Sft

Rs.

7,187.50

Per SQM : Rs 773.38

1,265.00

723

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-11-b

(British) :

100 Sft

Dressing stones : Rough tooled dressed

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

10.000

Day

900.00

Day

9,000.00

Coolie

4.000

Day

500.00

Day

2,000.00

330.00

78.00

11,330.00

22

2,420.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

13,750.00

Per SQM : Rs 1,479.50

Labour Rates Per

100 Sft

Rs.

13,750.00

Per SQM : Rs 1,479.50

724

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-11-c

(British) :

100 Sft

Dressing stones : Chisel dressed

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

12.000

Day

900.00

Day

10,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

399.00

78.00

13,699.00

22

2,926.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

16,625.00

Per SQM : Rs 1,788.85

Labour Rates Per

100 Sft

Rs.

16,625.00

Per SQM : Rs 1,788.85

725

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-11-d

(British) :

100 Sft

Dressing stones : Fine dressed

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

28.000

Day

900.00

Day

25,200.00

Coolie

5.000

Day

500.00

Day

2,500.00

Black Smith

1.000

Day

900.00

Day

900.00

858.00

78.00

29,458.00

22

6,292.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

35,750.00

Per SQM : Rs 3,846.70

Labour Rates Per

100 Sft

Rs.

35,750.00

Per SQM : Rs 3,846.70

726

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-12

(British) :

100 Sft

Dhajji walling 5"x5" thick deodar framing with stone laid in 1:6
c/s mortar & 1:4 c/s plaster

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.700

Bag

490.00

Sand

17.000

Cft

2,200.00

Steel (bars/rods/section)

0.590

Kg

82.00

Kg

48.38

Charcoal

3.860

Kg

50.00

Kg

193.00

Nails / Screws / Clamps

0.450

Kg

140.00

Kg

63.00

Quarried Stone

48.000

Cft

3,200.00

Wood Deodar

1.630

Cft

2,600.00

TOTAL

MATERIAL

Bag

833.00

100 Cft

374.00

1,536.00

100 Cft
1

Cft

4,238.00

34.55

7,285.38

LABOUR
Mason

5.500

Day

900.00

Day

4,950.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.200

Day

500.00

Day

100.00

Carpenter

1.700

Day

800.00

Day

1,360.00

Bellowman

0.200

Day

600.00

Day

120.00

255.90

43.45

8,785.90

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,479.38

Composite Rates Per

100 Sft

Rs.

19,550.66

Per SQM : Rs 2,103.65

Labour Rates Per

100 Sft

Rs.

10,662.50

Per SQM : Rs 1,147.29

727

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-13

(British) :

100 Cft

Provide & fix stone blocks from 2 cft. to 6 cft. each, including
lift upto 20 ft.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

120.000

3,200.00

Cft

TOTAL

100 Cft

7.67

MATERIAL

3,840.00

3,840.00

LABOUR
Mason

18.000

Day

900.00

Day

16,200.00

Coolie

18.000

Day

500.00

Day

9,000.00

Bhishti

3.000

Day

500.00

Day

1,500.00

Chiseller

10.000

Day

700.00

Day

7,000.00

1,011.00

70.33

34,711.00

22

8,258.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

46,809.80

Per CUM : Rs 16,530.74

Labour Rates Per

100 Cft

Rs.

42,125.00

Per CUM : Rs 14,876.32

728

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-14

(British) :

100 Cft

Providing and fixing stone blocks, under 2 cft. each, including


lift upto 20 ft.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

120.000

3,200.00

Cft

TOTAL

MATERIAL

3,840.00

100 Cft

14.89

3,840.00

LABOUR
Mason

10.000

Day

900.00

Day

9,000.00

Coolie

10.000

Day

500.00

Day

5,000.00

Bhishti

3.000

Day

500.00

Day

1,500.00

465.00

63.11

15,965.00

22

4,254.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

24,059.80

Per CUM : Rs 8,496.65

Labour Rates Per

100 Cft

Rs.

19,375.00

Per CUM : Rs 6,842.22

729

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 08 , STONE MASONRY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

08-15

(British) :

100 Cft

Provide & lay stone/boulder dry hand packed as filling behind


retaining walls or in pitching

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

135.000

3,200.00

Cft

TOTAL

MATERIAL

4,320.00

100 Cft

59.78

4,320.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

33.00

18.22

1,133.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,192.40

Composite Rates Per

100 Cft

Rs.

6,645.40

Per CUM : Rs 2,346.80

Labour Rates Per

100 Cft

Rs.

1,375.00

Per CUM : Rs 485.58

730

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-01

(British) :

100 Sft

First class tile roofing including earth, mud plaster, gobri


leeping, cement plaster etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

55.000

Cft

1,400.00

Ordinary Portland Cement

1.790

Bag

490.00

Sand

13.000

Cft

2,200.00

Fuel Wood

0.200

Mds

400.00

Mds

80.00

Bhoosa

17.000

Sr

15.00

Sr

255.00

Clay (fine)

0.750

Cft

1,200.00

Cow Dung

0.750

Cft

140.00

Cft

Coal Tar (in canisters)

15.450

Kg

110.00

Kg

Brick Tile (12"x6"x2")

400.000

Cft

14,000.00

TOTAL

MATERIAL

770.00

100 Cft
Bag

877.10

100 Cft

286.00

9.00

100 Cft

105.00
1,699.50
5,600.00

1,000 Cft

43.76

9,681.60

LABOUR
Mason

3.650

Day

900.00

Day

3,285.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.250

Day

500.00

Day

625.00

207.30

34.24

7,117.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,650.15

Composite Rates Per

100 Sft

Rs.

20,449.05

Per SQM : Rs 2,200.32

Labour Rates Per

100 Sft

Rs.

8,637.50

Per SQM : Rs 929.40

731

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-02

(British) :

100 Sft

Second class tile roofing consisting of 4" earth and 1" mud plaster
with gobri leeping etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

55.000

Cft

1,400.00

Ordinary Portland Cement

1.200

Bag

490.00

Sand

9.000

Cft

2,200.00

Fuel Wood

0.200

Mds

400.00

Mds

80.00

Bhoosa

17.000

Sr

15.00

Sr

255.00

Clay (fine)

0.750

Cft

1,200.00

Cow Dung

0.750

Cft

140.00

Cft

Coal Tar (in canisters)

15.450

Kg

110.00

Kg

1,699.50

Ceramic Tile 6"x6" White

200.000

No

15.00

No

3,000.00

TOTAL

MATERIAL

770.00

100 Cft
Bag

588.00

100 Cft

198.00

9.00

100 Cft

105.00

42.06

6,704.50

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

1.000

Day

500.00

Day

500.00

157.50

35.94

5,407.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,629.99

Composite Rates Per

100 Sft

Rs.

14,741.99

Per SQM : Rs 1,586.24

Labour Rates Per

100 Sft

Rs.

6,562.50

Per SQM : Rs 706.13

732

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-03

(British) :

100 Sft

Covering mud roof with coal tar and fine sand

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

0.850

Cft

2,200.00

Fuel Wood

0.060

Mds

400.00

Mds

24.00

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

Kerosene Oil

2.500

Ltr

120.00

Ltr

300.00

59.48

892.70

TOTAL

MATERIAL

100 Cft

18.70

LABOUR
Mason

0.120

Day

900.00

Day

108.00

Coolie

0.250

Day

500.00

Day

125.00

6.99

18.52

239.99

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,380.34

Per SQM : Rs 148.53

Labour Rates Per

100 Sft

Rs.

291.25

Per SQM : Rs 31.34

247.65

733

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-04-a

(British) :

100 Sft

Filling spaces in between wooden battens over beams, filled with


deodar wood pieces

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.650

Cft

2,600.00

Cft

Wire Nails

0.100

Kg

125.00

Kg

TOTAL

MATERIAL

1,690.00
12.50

54.28

1,702.50

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Carpenter

0.500

Day

800.00

Day

400.00

19.50

23.72

669.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,889.55

Per SQM : Rs 310.92

Labour Rates Per

100 Sft

Rs.

812.50

Per SQM : Rs 87.43

517.55

734

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-04-b

(British) :

100 Sft

Filling spaces in between RCC battens, filled with PCC block 1:3:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.450

Bag

490.00

Sand

2.000

Cft

Crushed Aggregate

4.000

Cft

TOTAL

Bag

220.50

2,200.00

100 Cft

44.00

2,800.00

100 Cft

112.00

MATERIAL

20.29

376.50

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.130

Day

500.00

Day

65.00

30.45

57.71

1,045.45

22

306.13

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,728.08

Per SQM : Rs 185.94

Labour Rates Per

100 Sft

Rs.

1,268.75

Per SQM : Rs 136.52

735

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-04-c

(British) :

100 Sft

Filling spaces in between spacers filled with bricks

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.200

Bag

490.00

Sand

1.000

Cft

2,200.00

Burnt Brick

45.000

No

8,500.00

TOTAL

MATERIAL

Bag

98.00

100 Cft

22.00

1,000 No

382.50

47.68

502.50

LABOUR
Mason

0.170

Day

900.00

Day

153.00

Coolie

0.170

Day

500.00

Day

85.00

Bhishti

0.100

Day

500.00

Day

50.00

8.64

30.32

296.64

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

973.05

Per SQM : Rs 104.70

Labour Rates Per

100 Sft

Rs.

360.00

Per SQM : Rs 38.74

173.91

736

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-05

(British) :

100 Sft

Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1" mud
plaster on top of RC roof slab

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

55.000

Cft

1,400.00

Ordinary Portland Cement

0.510

Bag

490.00

Sand

3.000

Cft

2,200.00

Fuel Wood

0.200

Mds

400.00

Mds

Coal Tar (in canisters)

15.450

Kg

110.00

Kg

Brick Tile (12"x6"x2")

350.000

Cft

14,000.00

TOTAL

MATERIAL

770.00

100 Cft
Bag

249.90

100 Cft

66.00

80.00
1,699.50
4,900.00

1,000 Cft

58.89

7,765.40

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

63.75

19.11

2,188.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,175.89

Composite Rates Per

100 Sft

Rs.

12,130.04

Per SQM : Rs 1,305.19

Labour Rates Per

100 Sft

Rs.

2,656.25

Per SQM : Rs 285.81

737

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-06-a

(British) :

100 Sft

Jack arch roof 4.5" thick laid in 1:5 c/s mortar a) cement concrete
in haunches 1:6:12

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

45.000

Cft

1,400.00

Ordinary Portland Cement

4.850

Bag

490.00

Sand

32.000

Cft

Crushed Aggregate

34.000

Fuel Wood

630.00

100 Cft
Bag

2,376.50

2,200.00

100 Cft

704.00

Cft

2,800.00

100 Cft

952.00

0.200

Mds

400.00

Burnt Brick

550.000

No

8,500.00

Bhoosa

17.000

Sr

15.00

Clay (fine)

0.750

Cft

1,200.00

Cow Dung

0.750

Cft

140.00

Cft

Coal Tar (in canisters)

15.450

Kg

110.00

Kg

TOTAL

MATERIAL

80.00

Mds

4,675.00

1,000 No
1

255.00

Sr

9.00

100 Cft

105.00
1,699.50

45.25

11,486.00

LABOUR
Mason

3.500

Day

900.00

Day

3,150.00

Coolie

7.000

Day

500.00

Day

3,500.00

Bhishti

1.000

Day

500.00

Day

500.00

Carpenter

0.500

Day

800.00

Day

400.00

226.50

32.75

7,776.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,187.92

Composite Rates Per

100 Sft

Rs.

23,450.42

Per SQM : Rs 2,523.27

Labour Rates Per

100 Sft

Rs.

9,437.50

Per SQM : Rs 1,015.48

738

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-06-b

(British) :

100 Sft

Jack arch roof 4.5" thick laid in 1:5 c/s mortar b) cement concrete
in haunches 1:3:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

55.000

Cft

1,400.00

Ordinary Portland Cement

6.980

Bag

490.00

Sand

31.000

Cft

Crushed Aggregate

34.000

Fuel Wood

770.00

100 Cft
Bag

3,420.20

2,200.00

100 Cft

682.00

Cft

2,800.00

100 Cft

952.00

0.200

Mds

400.00

Burnt Brick

550.000

No

8,500.00

Bhoosa

17.000

Sr

15.00

Clay (fine)

0.750

Cft

1,200.00

Cow Dung

0.750

Cft

140.00

Cft

Coal Tar (in canisters)

15.450

Kg

110.00

Kg

TOTAL

MATERIAL

80.00

Mds

4,675.00

1,000 No
1

255.00

Sr

9.00

100 Cft

105.00
1,699.50

46.96

12,647.70

LABOUR
Mason

3.500

Day

900.00

Day

3,150.00

Coolie

7.000

Day

500.00

Day

3,500.00

Bhishti

1.000

Day

500.00

Day

500.00

Carpenter

0.500

Day

800.00

Day

400.00

226.50

31.04

7,776.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,443.49

Composite Rates Per

100 Sft

Rs.

24,867.69

Per SQM : Rs 2,675.76

Labour Rates Per

100 Sft

Rs.

9,437.50

Per SQM : Rs 1,015.48

739

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-07-a

(British) :

100 Sft

Jack arch roofing 4.5"thick laid in 1:5 c/s mortar complete. Cement
concrete in haunches 1:6:12

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

5.360

Bag

490.00

Bag

2,626.40

Sand

36.000

Cft

2,200.00

100 Cft

792.00

Crushed Aggregate

35.000

Cft

2,800.00

100 Cft

980.00

Fuel Wood

0.200

Mds

400.00

Burnt Brick

550.000

No

8,500.00

Coal Tar (in canisters)

15.450

Kg

110.00

TOTAL

MATERIAL

80.00

Mds

4,675.00

1,000 No
1

1,699.50

Kg

47.94

10,852.90

LABOUR
Mason

2.750

Day

900.00

Day

2,475.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

1.000

Day

500.00

Day

500.00

Carpenter

0.500

Day

800.00

Day

400.00

183.75

30.06

6,308.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,735.14

Composite Rates Per

100 Sft

Rs.

20,896.79

Per SQM : Rs 2,248.49

Labour Rates Per

100 Sft

Rs.

7,656.25

Per SQM : Rs 823.81

740

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-07-b

(British) :

100 Sft

Jack arch roofing 4.5"thick laid in 1:5 cement mortar, including


complete. Cement concrete in haunches 1:3:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

7.500

Bag

490.00

Bag

3,675.00

Sand

35.000

Cft

2,200.00

100 Cft

770.00

Crushed Aggregate

34.000

Cft

2,800.00

100 Cft

952.00

Fuel Wood

0.200

Mds

400.00

Burnt Brick

550.000

No

8,500.00

Coal Tar (in canisters)

15.450

Kg

110.00

TOTAL

MATERIAL

80.00

Mds

4,675.00

1,000 No
1

1,699.50

Kg

49.45

11,851.50

LABOUR
Mason

2.750

Day

900.00

Day

2,475.00

Coolie

5.500

Day

500.00

Day

2,750.00

Bhishti

1.000

Day

500.00

Day

500.00

Carpenter

0.500

Day

800.00

Day

400.00

183.75

28.55

6,308.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,954.83

Composite Rates Per

100 Sft

Rs.

22,115.08

Per SQM : Rs 2,379.58

Labour Rates Per

100 Sft

Rs.

7,656.25

Per SQM : Rs 823.81

741

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-08

(British) :

100 Sft

Extra for vaulted jack arch roofing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Carpenter

1.000

Day

800.00

Day

800.00

51.00

78.00

1,751.00

22

374.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,125.00

Per SQM : Rs 228.65

Labour Rates Per

100 Sft

Rs.

2,125.00

Per SQM : Rs 228.65

742

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-09

(British) :

100 Sft

Jack arch roofing of shingle & cement concrete 1:3:6, 4.5" at crown
& 1/2" cem. plaster complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

7.580

Bag

490.00

Sand

28.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

3,714.20

100 Cft

616.00

30.70

4,330.20

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

9.000

Day

500.00

Day

4,500.00

Bhishti

1.000

Day

500.00

Day

500.00

Carpenter

1.000

Day

800.00

Day

800.00

187.50

47.30

6,437.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,327.64

Composite Rates Per

100 Sft

Rs.

13,095.34

Per SQM : Rs 1,409.06

Labour Rates Per

100 Sft

Rs.

7,812.50

Per SQM : Rs 840.63

743

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-10-a

(British) :

100 Sft

Earth filling over roof including watering, ramming etc 3" thick
earth filling and 1" mud plaster

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

45.000

Cft

1,400.00

Bhoosa

17.000

Sr

15.00

Clay (fine)

0.750

Cft

1,200.00

Cow Dung

0.750

Cft

140.00

TOTAL

MATERIAL

100 Cft
1

Sr

100 Cft

630.00
255.00
9.00

Cft

105.00

44.95

999.00

LABOUR
Mason

0.120

Day

900.00

Day

108.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.120

Day

500.00

Day

60.00

20.04

33.05

688.04

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,053.78

Per SQM : Rs 220.99

Labour Rates Per

100 Sft

Rs.

835.00

Per SQM : Rs 89.85

366.74

744

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-10-b

(British) :

100 Sft

Earth filling over roof including watering, ramming etc 4" thick
earth filling and 1" mud plaster

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

55.000

Cft

1,400.00

Bhoosa

17.000

Sr

15.00

Clay (fine)

0.750

Cft

1,200.00

Cow Dung

0.750

Cft

140.00

TOTAL

MATERIAL

100 Cft
1

Sr

100 Cft

770.00
255.00
9.00

Cft

105.00

46.50

1,139.00

LABOUR
Mason

0.120

Day

900.00

Day

108.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.180

Day

500.00

Day

90.00

20.94

31.50

718.94

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,262.08

Per SQM : Rs 243.40

Labour Rates Per

100 Sft

Rs.

872.50

Per SQM : Rs 93.88

404.14

745

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-11

(British) :

100 Sft

1/8" thick gobri leeping on roofs or floors

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clay (fine)

0.750

Cft

1,200.00

Cow Dung

0.750

Cft

140.00

TOTAL

MATERIAL

100 Cft

9.00

Cft

105.00

33.93

114.00

LABOUR
Mason

0.120

Day

900.00

Day

108.00

Bhishti

0.060

Day

500.00

Day

30.00

4.14

44.07

142.14

22

55.44

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

311.58

Per SQM : Rs 33.53

Labour Rates Per

100 Sft

Rs.

172.50

Per SQM : Rs 18.56

746

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-12

(British) :

100 Sft

2 coats of bitumen laid hot using 34 lbs. for %sft over roof &
blinded with sand at 1 cft per % sft

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

1.000

Cft

2,200.00

Fuel Wood

0.120

Mds

400.00

Mds

Coal Tar (in canisters)

15.450

Kg

110.00

Kg

TOTAL

MATERIAL

100 Cft

22.00
48.00
1,699.50

58.48

1,769.50

Day

500.00

15.00

19.52

515.00

22

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,783.79

Per SQM : Rs 299.54

Labour Rates Per

100 Sft

Rs.

625.00

Per SQM : Rs 67.25

499.29

747

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-13-a

(British) :

100 Sft

Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc.
complete : 20 BWG

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Sheet

102.000

Kg

125.00

Kg

G.I Bolt & Nuts

1.500

Doz

144.00

Doz

216.00

Limpet Washer

2.000

Doz

60.00

Doz

120.00

Bolts / Nuts / Screws

2.000

Doz

125.00

Doz

250.00

Bitumen Washer

42.000

No

1.00

No

42.00

Tie Rod Brass

10.000

Kg

75.00

Kg

750.00

TOTAL

MATERIAL

12,750.00

68.24

14,128.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

42.00

9.76

1,442.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,416.16

Composite Rates Per

100 Sft

Rs.

18,986.16

Per SQM : Rs 2,042.91

Labour Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

748

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-13-b

(British) :

100 Sft

Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc.
complete : 22 BWG

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Sheet

86.000

Kg

125.00

Kg

G.I Bolt & Nuts

1.500

Doz

144.00

Doz

216.00

Limpet Washer

2.000

Doz

60.00

Doz

120.00

Bolts / Nuts / Screws

2.000

Doz

125.00

Doz

250.00

Bitumen Washer

42.000

No

1.00

No

42.00

Tie Rod Brass

10.000

Kg

75.00

Kg

750.00

TOTAL

MATERIAL

10,750.00

67.24

12,128.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

42.00

10.76

1,442.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,976.16

Composite Rates Per

100 Sft

Rs.

16,546.16

Per SQM : Rs 1,780.37

Labour Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

749

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-13-c

(British) :

100 Sft

Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc.
complete : 24 BWG

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Sheet

68.000

Kg

125.00

Kg

G.I Bolt & Nuts

1.500

Doz

144.00

Doz

216.00

Limpet Washer

2.000

Doz

60.00

Doz

120.00

Bolts / Nuts / Screws

2.000

Doz

125.00

Doz

250.00

Bitumen Washer

42.000

No

1.00

No

42.00

Tie Rod Brass

10.000

Kg

75.00

Kg

750.00

TOTAL

MATERIAL

8,500.00

65.69

9,878.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

42.00

12.31

1,442.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,481.16

Composite Rates Per

100 Sft

Rs.

13,801.16

Per SQM : Rs 1,485.00

Labour Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

750

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-14

(British) :

Rft

Khassi parnalas in c/s mortar 1:2, 12" outside width finished


smooth with a floating coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.043

Bag

490.00

Sand

0.083

Cft

2,200.00

TOTAL

MATERIAL

Bag

20.83

100 Cft

1.83

16.25

22.66

LABOUR
Mason

0.056

Day

900.00

Day

50.25

Coolie

0.056

Day

500.00

Day

27.92

Bhishti

0.008

Day

500.00

Day

3.75

2.46

61.75

84.37

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

130.04

Labour Rates Per

Rft

Rs.

102.40

LABOUR

23.01

Per Meter : Rs 426.53


Per Meter : Rs 335.86

751

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-15

(British) :

Each

Khuras on roof 2'x2'x6"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.300

Bag

490.00

Sand

1.000

Cft

Crushed Aggregate

2.000

Cft

TOTAL

Bag

147.00

2,200.00

100 Cft

22.00

2,800.00

100 Cft

56.00

MATERIAL

31.84

225.00

LABOUR
Mason

0.200

Day

900.00

Day

180.00

Coolie

0.200

Day

500.00

Day

100.00

Bhishti

0.050

Day

500.00

Day

25.00

9.15

46.16

314.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

655.75

Cost Per Each: 655.75

Labour Rates Per

Each

Rs.

381.25

Cost Per Each: 381.25

116.60

752

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-16

(British) :

Each

Bottom khuras of brick masonry in c/s mortar 1:6,4'x2'x4.5" over 3"


cem. concrete 1:4:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

2.000

Cft

1,260.00

Ordinary Portland Cement

0.370

Bag

490.00

Sand

2.000

Cft

2,200.00

Burnt Brick

42.000

No

8,500.00

TOTAL

MATERIAL

25.20

100 Cft
Bag

181.30

100 Cft

44.00

357.00

1,000 No

49.93

607.50

LABOUR
Mason

0.200

Day

900.00

Day

180.00

Coolie

0.200

Day

500.00

Day

100.00

Bhishti

0.050

Day

500.00

Day

25.00

9.15

28.07

314.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

200.75

Composite Rates Per

Each

Rs.

1,122.40

Cost Per Each: 1,122.40

Labour Rates Per

Each

Rs.

381.25

Cost Per Each: 381.25

753

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-17-a

(British) :

Rft

Plain GI sheets 22 SWG rain water down pipe a) 4" diameter down
pipe

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Sheet

0.680

Kg

125.00

Kg

84.98

Bolts / Nuts / Screws

0.152

Doz

125.00

Doz

19.05

46.43

104.04

TOTAL

MATERIAL

LABOUR
Mason

0.030

Day

900.00

Day

27.44

Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter II

0.030

Day

700.00

Day

21.34

1.92

31.57

65.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

206.96

Labour Rates Per

Rft

Rs.

80.03

LABOUR

36.97

Per Meter : Rs 678.83


Per Meter : Rs 262.50

754

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-17-b

(British) :

Rft

Plain GI sheets 22 SWG rain water down pipe b) 5" diameter down
pipe

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Sheet

0.860

Kg

125.00

Kg

107.47

Bolts / Nuts / Screws

0.152

Doz

125.00

Doz

19.05

49.80

126.52

TOTAL

MATERIAL

LABOUR
Mason

0.030

Day

900.00

Day

27.44

Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter II

0.030

Day

700.00

Day

21.34

1.92

28.20

65.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

234.39

Labour Rates Per

Rft

Rs.

80.03

LABOUR

41.92

Per Meter : Rs 768.80


Per Meter : Rs 262.50

755

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-18

(British) :

100 Sft

Plain galvanized iron sheet flashing, 22 guage

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Sheet

45.353

Kg

125.00

Kg

Bolts / Nuts / Screws

2.323

Doz

125.00

Doz

290.43

30.53

5,959.57

TOTAL

MATERIAL

5,669.15

LABOUR
Mason

5.019

Day

900.00

Day

4,516.73

Coolie

2.974

Day

500.00

Day

1,486.99

Black Smith

2.974

Day

900.00

Day

2,676.58

260.41

47.47

8,940.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,220.77

Composite Rates Per

100 Sft

Rs.

18,121.05

Per SQM : Rs 1,949.83

Labour Rates Per

100 Sft

Rs.

10,850.37

Per SQM : Rs 1,167.50

756

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

09-19-a

Item Name :

(British) :

Rft

Cast iron rain water down pipe fixed in position excluding heads &
shoes : 4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.024

Bag

490.00

Bag

11.96

Hold Fast With Bolt

0.169

Kg

170.00

Kg

28.81

Lead

0.038

Kg

250.00

Kg

9.62

Paint : Enamel

0.017

Ltr

495.00

Ltr

8.39

Cast Iron Pipe 4"

1.017

RFT

450.00

RFT

457.63

68.69

516.41

TOTAL

MATERIAL

LABOUR
Mason

0.034

Day

900.00

Day

30.51

Coolie

0.034

Day

500.00

Day

16.95

1.42

9.31

48.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

689.34

Labour Rates Per

Rft

Rs.

59.32

LABOUR

124.05

Per Meter : Rs 2,261.04


Per Meter : Rs 194.58

757

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

09-19-b

Item Name :

(British) :

Rft

Cast iron rain water down pipe fixed in position excluding heads &
shoes : 3" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.024

Bag

490.00

Bag

11.96

Hold Fast With Bolt

0.169

Kg

170.00

Kg

28.81

Lead

0.038

Kg

250.00

Kg

9.62

Paint : Enamel

0.017

Ltr

495.00

Ltr

8.39

Cast Iron Pipe 3"

1.017

RFT

350.00

RFT

356.07

67.30

414.86

TOTAL

MATERIAL

LABOUR
Mason

0.034

Day

900.00

Day

30.51

Coolie

0.034

Day

500.00

Day

16.95

1.42

10.70

48.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

565.45

Labour Rates Per

Rft

Rs.

59.32

LABOUR

101.71

Per Meter : Rs 1,854.66


Per Meter : Rs 194.58

758

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

09-20

Item Name :

(British) :

Each

Heads for cast iron rain water down pipe fixed in place including
cost of clamp holdfast and painting

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.144

Bag

490.00

Bag

70.56

Hold Fast With Bolt

1.000

Kg

170.00

Kg

170.00

Lead

0.227

Kg

250.00

Kg

56.75

Shoe Head Offs

1.000

No

1,050.00

No

1,050.00

Paint : Enamel

0.050

Ltr

495.00

Ltr

24.75

66.30

1,372.06

TOTAL

MATERIAL

LABOUR
Mason

0.090

Day

900.00

Day

81.00

Coolie

0.090

Day

500.00

Day

45.00

Fitter II

0.090

Day

600.00

Day

54.00

5.40

11.70

185.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

341.45

Composite Rates Per

Each

Rs.

1,898.91

Cost Per Each: 1,898.91

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

759

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

09-21

Item Name :

(British) :

Each

Shoes, bends or offsets for cast iron ran water down pipe,
including fixing & painting

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.144

Bag

490.00

Bag

70.56

Hold Fast With Bolt

1.000

Kg

170.00

Kg

170.00

Lead

0.227

Kg

250.00

Kg

56.75

Shoe Head Offs

1.000

No

1,050.00

No

1,050.00

Paint : Enamel

0.050

Ltr

495.00

Ltr

24.75

69.67

1,372.06

TOTAL

MATERIAL

LABOUR
Mason

0.050

Day

900.00

Day

45.00

Coolie

0.050

Day

500.00

Day

25.00

Pipe Fitter II

0.050

Day

700.00

Day

35.00

3.15

8.33

108.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

324.95

Composite Rates Per

Each

Rs.

1,805.16

Cost Per Each: 1,805.16

Labour Rates Per

Each

Rs.

131.25

Cost Per Each: 131.25

760

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-22

(British) :

Each

Plain GI sheet spouts fixed in position, including paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.144

Bag

490.00

Bag

70.56

G.I Sheet

0.680

Kg

125.00

Kg

85.00

Paint : Enamel

0.100

Ltr

495.00

Ltr

49.50

35.35

205.06

TOTAL

MATERIAL

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Coolie

0.100

Day

500.00

Day

50.00

Black Smith

0.100

Day

900.00

Day

90.00

6.90

42.65

236.90

22

95.71

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

537.67

Cost Per Each: 537.67

Labour Rates Per

Each

Rs.

287.50

Cost Per Each: 287.50

761

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-23

(British) :

100 Sft

Laying 1/2" thick deodar ceiling complete, including sawing,


planing & fixing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

2.000

Kg

140.00

Kg

Wood Deodar

5.000

Cft

2,600.00

Cft

13,000.00

55.39

13,280.00

TOTAL

MATERIAL

280.00

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Carpenter

4.000

Day

800.00

Day

3,200.00

141.00

22.61

4,841.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,955.60

Composite Rates Per

100 Sft

Rs.

22,076.60

Per SQM : Rs 2,375.44

Labour Rates Per

100 Sft

Rs.

5,875.00

Per SQM : Rs 632.15

762

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-24-a

(British) :

100 Sft

Flat sheet roof with GI plain sheets, including batten rolls,


screws, clips etc : 22 BWG

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

0.600

Kg

140.00

Kg

Wood Deodar

0.728

Cft

2,600.00

Cft

1,891.50

G.I Sheet

80.750

Kg

125.00

Kg

10,093.75

TOTAL

MATERIAL

84.00

57.77

12,069.25

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Carpenter

0.375

Day

800.00

Day

300.00

Black Smith

2.000

Day

900.00

Day

1,800.00

108.00

20.23

3,708.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,447.24

Composite Rates Per

100 Sft

Rs.

19,224.49

Per SQM : Rs 2,068.55

Labour Rates Per

100 Sft

Rs.

4,500.00

Per SQM : Rs 484.20

763

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-24-b

(British) :

100 Sft

Flat sheet roof with GI plain sheets, including batten rolls,


screws, clips etc : 24 BWG

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

0.738

Kg

140.00

Kg

Wood Deodar

0.728

Cft

2,600.00

Cft

1,891.50

G.I Sheet

69.250

Kg

125.00

Kg

8,656.25

TOTAL

MATERIAL

103.39

56.05

10,651.14

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Carpenter

0.375

Day

800.00

Day

300.00

Black Smith

2.000

Day

900.00

Day

1,800.00

108.00

21.95

3,708.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,135.25

Composite Rates Per

100 Sft

Rs.

17,494.39

Per SQM : Rs 1,882.40

Labour Rates Per

100 Sft

Rs.

4,500.00

Per SQM : Rs 484.20

764

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

09-25

Item Name :

(British) :

100 Sft

Asbestos cement corrugated sheet roofing including overlaps, GI


hooks, bolts, nuts etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Bolt & Nuts

2.000

Doz

144.00

Doz

288.00

Limpet Washer

7.000

Doz

60.00

Doz

420.00

Hold Fast With Bolt

1.500

Kg

170.00

Kg

255.00

Corrugated AC Sheet

125.000

Sft

85.00

Sft

10,625.00

64.92

11,588.00

TOTAL

MATERIAL

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

1.000

Day

800.00

Day

800.00

54.00

13.08

1,854.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,945.36

Composite Rates Per

100 Sft

Rs.

16,387.36

Per SQM : Rs 1,763.28

Labour Rates Per

100 Sft

Rs.

2,250.00

Per SQM : Rs 242.10

765

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-26

(British) :

100 Sft

Extra labour for erection of GI sheets, flat sheet or asbestos


sheet roofing above 20' height

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Fitter II

0.100

Day

700.00

Day

70.00

9.60

78.00

329.60

22

70.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

400.00

Per SQM : Rs 43.04

Labour Rates Per

100 Sft

Rs.

400.00

Per SQM : Rs 43.04

766

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

09-27

Item Name :

(British) :

100 RFT

Fixing asbestos cement sheet ridges and valleys 1/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Bolt & Nuts

10.000

Doz

144.00

Doz

1,440.00

Limpet Washer

21.000

Doz

60.00

Doz

1,260.00

Corrugated AC Sheet

32.000

Sft

85.00

Sft

2,720.00

53.35

5,420.00

TOTAL

MATERIAL

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

1.500

Day

800.00

Day

1,200.00

66.00

24.65

2,266.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 RFT

Rs.

9,362.40

Labour Rates Per

100 RFT

Rs.

2,750.00

1,676.40

Per Meter : Rs 307.09


Per Meter : Rs 90.20

767

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-28-a

(British) :

Rft

Plain GI sheet ridging including fixture complete 6" lap & 18"
overall of 22 gauge GI sheet ridging

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.079

Cft

2,600.00

Cft

206.10

G.I Sheet

0.951

Kg

125.00

Kg

118.90

Limpet Washer

0.152

Doz

60.00

Doz

9.15

Hook

1.524

No

20.00

No

30.49

TOTAL

MATERIAL

61.19

364.63

LABOUR
Coolie

0.061

Day

500.00

Day

30.49

Carpenter

0.030

Day

800.00

Day

24.39

Black Smith

0.030

Day

900.00

Day

27.44

2.47

16.81

84.79

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

547.75

Labour Rates Per

Rft

Rs.

102.90

LABOUR

98.33

Per Meter : Rs 1,796.62


Per Meter : Rs 337.50

768

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-28-b

(British) :

Rft

Plain GI sheet ridging including fixture complete 9" lap & 24"
overall, of 24 gauge GI sheet ridging

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.070

Cft

2,600.00

Cft

182.32

G.I Sheet

1.134

Kg

125.00

Kg

141.77

Limpet Washer

0.152

Doz

60.00

Doz

9.15

Hook

1.524

No

20.00

No

30.49

TOTAL

MATERIAL

61.16

363.72

LABOUR
Coolie

0.061

Day

500.00

Day

30.49

Carpenter

0.030

Day

800.00

Day

24.39

Black Smith

0.030

Day

900.00

Day

27.44

2.47

16.84

84.79

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

546.63

Labour Rates Per

Rft

Rs.

102.90

LABOUR

98.13

Per Meter : Rs 1,792.96


Per Meter : Rs 337.50

769

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-28-c

(British) :

Rft

Plain GI sheet ridging including fixture complete 12" lap & 30


overall, of 22 gauge GI sheet ridging

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.070

Cft

2,600.00

Cft

182.32

G.I Sheet

1.634

Kg

125.00

Kg

204.27

Limpet Washer

0.152

Doz

60.00

Doz

9.15

Hook

1.524

No

20.00

No

30.49

TOTAL

MATERIAL

62.86

426.22

LABOUR
Coolie

0.061

Day

500.00

Day

30.49

Carpenter

0.030

Day

800.00

Day

24.39

Black Smith

0.030

Day

900.00

Day

27.44

2.47

15.14

84.79

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

622.88

Labour Rates Per

Rft

Rs.

102.90

LABOUR

111.88

Per Meter : Rs 2,043.06


Per Meter : Rs 337.50

770

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-29

(British) :

Rft

Plain 22 gauge GI sheet gutter semi circular 8" diameter

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Sheet

0.689

Kg

125.00

Kg

86.13

Bolts / Nuts / Screws

0.610

Doz

125.00

Doz

76.22

59.39

162.35

TOTAL

MATERIAL

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Black Smith

0.030

Day

900.00

Day

27.44

1.28

18.61

43.96

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

251.42

Labour Rates Per

Rft

Rs.

53.35

LABOUR

45.11

Per Meter : Rs 824.65


Per Meter : Rs 175.00

771

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-30

(British) :

Each

Fixing water spouse or parnala.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

0.250

Day

500.00

Day

125.00

10.50

78.00

360.50

22

77.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

437.50

Cost Per Each: 437.50

Labour Rates Per

Each

Rs.

437.50

Cost Per Each: 437.50

772

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-31

(British) :

Each

Making masonry ventilators in c/s mortar 1:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.186

Bag

490.00

Sand

1.000

Cft

2,200.00

Burnt Brick

50.000

No

8,500.00

TOTAL

MATERIAL

Bag

91.14

100 Cft

22.00

425.00

1,000 No

20.82

538.14

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

42.00

57.18

1,442.00

22

426.39

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

2,406.53

Cost Per Each: 2,406.53

Labour Rates Per

Each

Rs.

1,750.00

Cost Per Each: 1,750.00

773

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-32

(British) :

Rft

Making drip course 2"x1/2" under RCC slab edges in outer opening,
in c/s mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.002

Bag

490.00

Sand

0.006

Cft

2,200.00

TOTAL

Bag

1.05

100 Cft

0.13

7.51

MATERIAL

1.18

LABOUR
Mason

0.005

Day

900.00

Day

4.12

Coolie

0.008

Day

500.00

Day

3.81

Bhishti

0.002

Day

500.00

Day

1.22

Skilled Coolie

0.002

Day

600.00

Day

1.46

0.32

70.49

10.93

22

2.59

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

14.70

Labour Rates Per

Rft

Rs.

13.26

LABOUR

Per Meter : Rs 48.22


Per Meter : Rs 43.50

774

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-33

(British) :

100 Sft

Supply and laying of twin GI sheet 20 SWG painted with bitumen &
polythene fim complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

0.099

Kg

97.00

Kg

9.60

Polythene Sheet

12.093

Sft

6.00

Sft

72.56

Coal Tar (in canisters)

5.000

Kg

110.00

Kg

550.00

G.I Sheet

150.190

Kg

125.00

Kg

18,773.75

TOTAL

MATERIAL

65.37

19,405.91

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

Skilled Coolie

0.930

Day

600.00

Day

558.00

85.74

12.63

2,943.74

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,898.06

Composite Rates Per

100 Sft

Rs.

27,247.71

Per SQM : Rs 2,931.85

Labour Rates Per

100 Sft

Rs.

3,572.50

Per SQM : Rs 384.40

775

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-34-a

(British) :

Sft

Provide & lay roof insulation complete with Thermopore sheet 1/2"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

0.017

Cft

1,400.00

Ordinary Portland Cement

0.014

Bag

490.00

Sand

0.012

Cft

2,200.00

Polythene Sheet

1.000

Sft

6.00

Sft

6.00

Coal Tar (in canisters)

0.045

Kg

110.00

Kg

4.92

Thermopore Sheet 0.5"

1.000

Sft

15.00

Sft

15.00

Brick Tile 9"x4.5"x1.5"

3.601

No

15,000.00

TOTAL

MATERIAL

100 Cft

0.24

Bag

6.83

100 Cft

0.27

1,000 No

54.02

59.58

87.27

LABOUR
Mason

0.010

Day

900.00

Day

9.03

Coolie

0.010

Day

500.00

Day

5.02

Bhishti

0.005

Day

500.00

Day

2.51

Skilled Coolie

0.010

Day

600.00

Day

6.02

0.68

18.42

23.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

134.70

Per SQM : Rs 1,449.38

Labour Rates Per

Sft

Rs.

28.23

Per SQM : Rs 303.75

24.17

776

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-34-b

(British) :

Sft

Provide & lay roof insulation complete with Thermopore sheet 3/4"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

0.180

Cft

1,400.00

Ordinary Portland Cement

0.014

Bag

490.00

Sand

0.131

Cft

2,200.00

Coal Tar (in canisters)

0.045

Kg

110.00

Brick Tile 9"x4.5"x1.5"

3.601

No

15,000.00

Thermopore Sheet 0.75"

1.000

Sft

16.00

TOTAL

MATERIAL

100 Cft

2.52

Bag

6.83

100 Cft

2.88

Kg

4.92

1,000 No

54.02

Sft

16.00

59.57

87.17

LABOUR
Mason

0.010

Day

900.00

Day

9.03

Coolie

0.010

Day

500.00

Day

5.02

Bhishti

0.005

Day

500.00

Day

2.51

Skilled Coolie

0.010

Day

600.00

Day

6.02

0.68

18.43

23.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

134.58

Per SQM : Rs 1,448.10

Labour Rates Per

Sft

Rs.

28.23

Per SQM : Rs 303.75

24.15

777

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

09-34-c

Item Name :

(British) :

Sft

Provide & lay roof insulation complete with Thermopore sheet 1"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

0.180

Cft

1,400.00

Ordinary Portland Cement

0.014

Bag

490.00

Sand

0.131

Cft

2,200.00

Coal Tar (in canisters)

0.045

Kg

110.00

Brick Tile 9"x4.5"x1.5"

3.601

No

15,000.00

Thermopore Sheet 1"

1.000

Sft

18.00

TOTAL

MATERIAL

100 Cft

2.52

Bag

6.83

100 Cft

2.88

Kg

4.92

1,000 No

54.02

Sft

18.00

59.84

89.17

LABOUR
Mason

0.010

Day

900.00

Day

9.03

Coolie

0.010

Day

500.00

Day

5.02

Bhishti

0.005

Day

500.00

Day

2.51

Skilled Coolie

0.010

Day

600.00

Day

6.02

0.68

18.16

23.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

137.02

Per SQM : Rs 1,474.35

Labour Rates Per

Sft

Rs.

28.23

Per SQM : Rs 303.75

24.59

778

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-35

(British) :

Rft

Providing and fixing AC rain water down pipe 4" dia, with shoe,
tee, bend & clamp etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

0.300

Kg

140.00

Kg

42.00

Shoe Head Offs

0.300

No

1,050.00

No

315.00

A.C.pipe (b) 4"

1.000

RFT

190.00

RFT

190.00

69.01

547.00

TOTAL

MATERIAL

LABOUR
Mason

0.025

Day

900.00

Day

22.50

Coolie

0.050

Day

500.00

Day

25.00

1.43

8.99

48.93

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

726.72

Labour Rates Per

Rft

Rs.

59.38

LABOUR

130.79

Per Meter : Rs 2,383.63


Per Meter : Rs 194.75

779

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-36-a

(British) :

Rft

Making jharries in existing brick masonry For slabs upto 6" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.049

Bag

490.00

Sand

0.020

Cft

2,200.00

TOTAL

MATERIAL

Bag

23.90

100 Cft

0.45

35.41

24.35

LABOUR
Mason

0.010

Day

900.00

Day

9.05

Coolie

0.010

Day

500.00

Day

5.03

Bhishti

0.002

Day

500.00

Day

1.07

Skilled Coolie

0.020

Day

600.00

Day

12.07

0.82

42.59

28.04

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

63.74

Labour Rates Per

Rft

Rs.

34.03

LABOUR

11.35

Per Meter : Rs 209.07


Per Meter : Rs 111.63

780

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-36-b

(British) :

Rft

Making jharries in existing brick masonry For slabs exceeding 6" to


12" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.006

Bag

490.00

Sand

0.021

Cft

2,200.00

TOTAL

Bag

2.99

100 Cft

0.47

3.58

MATERIAL

3.46

LABOUR
Mason

0.049

Day

900.00

Day

44.10

Coolie

0.015

Day

500.00

Day

7.47

Bhishti

0.005

Day

500.00

Day

2.44

Skilled Coolie

0.025

Day

600.00

Day

15.00

2.07

74.42

71.08

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

90.48

Labour Rates Per

Rft

Rs.

86.26

LABOUR

15.94

Per Meter : Rs 296.77


Per Meter : Rs 282.93

781

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-37-a

(British) :

Each

Making recess in existing brick masonry a) upto 1.0' height of


girder or beam

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.050

Bag

490.00

Sand

0.020

Cft

2,200.00

TOTAL

Bag

24.50

100 Cft

0.44

6.34

MATERIAL

24.94

LABOUR
Mason

0.150

Day

900.00

Day

135.00

Coolie

0.100

Day

500.00

Day

50.00

Bhishti

0.050

Day

500.00

Day

25.00

Skilled Coolie

0.100

Day

600.00

Day

60.00

8.10

71.66

278.10

22

64.89

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

367.93

Cost Per Each: 367.93

Labour Rates Per

Each

Rs.

337.50

Cost Per Each: 337.50

782

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-37-b

(British) :

Each

Making recess in existing brick masonry b) for every 6" additional


height or part thereof

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.025

Bag

490.00

Sand

0.100

Cft

2,200.00

TOTAL

Bag

12.25

100 Cft

2.20

8.54

MATERIAL

14.45

LABOUR
Mason

0.050

Day

900.00

Day

45.00

Coolie

0.050

Day

500.00

Day

25.00

Bhishti

0.025

Day

500.00

Day

12.50

Skilled Coolie

0.050

Day

600.00

Day

30.00

3.38

69.46

115.88

22

27.93

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

158.25

Cost Per Each: 158.25

Labour Rates Per

Each

Rs.

140.63

Cost Per Each: 140.63

783

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-38
Hoisting

RS

(British) :

Each

Beams & wooden beams and placing in position

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.120

Day

900.00

Day

108.00

Coolie

0.350

Day

500.00

Day

175.00

8.49

78.00

291.49

22

62.26

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

353.75

Cost Per Each: 353.75

Labour Rates Per

Each

Rs.

353.75

Cost Per Each: 353.75

784

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-39

(British) :

Each

Hoisting and placing in position sahl ballies, over roof

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.033

Day

900.00

Day

29.70

Coolie

0.033

Day

500.00

Day

16.50

1.39

78.00

47.59

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

57.75

Cost Per Each: 57.75

Labour Rates Per

Each

Rs.

57.75

Cost Per Each: 57.75

10.16

785

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-40-a
Hoist precast

(British) :

Each

RCC/pre-stressed conc. battens a) From 5' to 6' long

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.017

Day

900.00

Day

15.30

Coolie

0.050

Day

500.00

Day

25.00

1.21

78.00

41.51

22

8.87

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

50.38

Cost Per Each: 50.38

Labour Rates Per

Each

Rs.

50.38

Cost Per Each: 50.38

786

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-40-b
Hoist precast

(British) :

Each

RCC/pre-stressed conc. battens b) Over 6' to 7' long

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.025

Day

900.00

Day

22.50

Coolie

0.075

Day

500.00

Day

37.50

1.80

78.00

61.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

75.00

Cost Per Each: 75.00

Labour Rates Per

Each

Rs.

75.00

Cost Per Each: 75.00

13.20

787

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-40-c
Hoist precast

(British) :

Each

RCC/pre-stressed conc. battens c) Over 7' to 8' long

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.033

Day

900.00

Day

29.70

Coolie

0.100

Day

500.00

Day

50.00

2.39

78.00

82.09

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

99.63

Cost Per Each: 99.63

Labour Rates Per

Each

Rs.

99.63

Cost Per Each: 99.63

17.53

788

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-40-d
Hoist precast

(British) :

Each

RCC/pre-stressed conc. battens d) Over 8' to 9' long

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.040

Day

900.00

Day

36.00

Coolie

0.120

Day

500.00

Day

60.00

2.88

78.00

98.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

120.00

Cost Per Each: 120.00

Labour Rates Per

Each

Rs.

120.00

Cost Per Each: 120.00

21.12

789

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-40-e
Hoist precast
length

(British) :

Each

RCC/pre-stressed conc. battens e) Exceeding 9'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.050

Day

900.00

Day

45.00

Coolie

0.150

Day

500.00

Day

75.00

3.60

78.00

123.60

22

26.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

Labour Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

790

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-a

(British) :

Each

Hoisting and placing in position RCC troughs Upto 10' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.050

Day

900.00

Day

45.00

Coolie

0.150

Day

500.00

Day

75.00

3.60

78.00

123.60

22

26.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

Labour Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

791

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-b

(British) :

Each

Hoisting and placing in position RCC troughs Upto 11' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.067

Day

900.00

Day

60.30

Coolie

0.200

Day

500.00

Day

100.00

4.81

78.00

165.11

22

35.27

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

200.38

Cost Per Each: 200.38

Labour Rates Per

Each

Rs.

200.38

Cost Per Each: 200.38

792

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-c

(British) :

Each

Hoisting and placing in position RCC troughs Upto 12' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.083

Day

900.00

Day

74.70

Coolie

0.250

Day

500.00

Day

125.00

5.99

78.00

205.69

22

43.93

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

249.62

Cost Per Each: 249.62

Labour Rates Per

Each

Rs.

249.62

Cost Per Each: 249.62

793

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-d

(British) :

Each

Hoisting and placing in position RCC troughs Upto 13' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.090

Day

900.00

Day

81.00

Coolie

0.272

Day

500.00

Day

136.00

6.51

78.00

223.51

22

47.74

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

271.25

Cost Per Each: 271.25

Labour Rates Per

Each

Rs.

271.25

Cost Per Each: 271.25

794

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-e

(British) :

Each

Hoisting and placing in position RCC troughs Upto 14' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Coolie

0.300

Day

500.00

Day

150.00

7.20

78.00

247.20

22

52.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

300.00

Cost Per Each: 300.00

Labour Rates Per

Each

Rs.

300.00

Cost Per Each: 300.00

795

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-f

(British) :

Each

Hoisting and placing in position RCC troughs Upto 15' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.110

Day

900.00

Day

99.00

Coolie

0.330

Day

500.00

Day

165.00

7.92

78.00

271.92

22

58.08

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

330.00

Cost Per Each: 330.00

Labour Rates Per

Each

Rs.

330.00

Cost Per Each: 330.00

796

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-g

(British) :

Each

Hoisting and placing in position RCC troughs Upto 16' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.125

Day

900.00

Day

112.50

Coolie

0.375

Day

500.00

Day

187.50

9.00

78.00

309.00

22

66.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

375.00

Cost Per Each: 375.00

Labour Rates Per

Each

Rs.

375.00

Cost Per Each: 375.00

797

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-h

(British) :

Each

Hoisting and placing in position RCC troughs Upto 17' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.142

Day

900.00

Day

127.80

Coolie

0.428

Day

500.00

Day

214.00

10.25

78.00

352.05

22

75.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

427.25

Cost Per Each: 427.25

Labour Rates Per

Each

Rs.

427.25

Cost Per Each: 427.25

798

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-i

(British) :

Each

Hoisting and placing in position RCC troughs Upto 18' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.167

Day

900.00

Day

150.30

Coolie

0.500

Day

500.00

Day

250.00

12.01

78.00

412.31

22

88.07

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

500.38

Cost Per Each: 500.38

Labour Rates Per

Each

Rs.

500.38

Cost Per Each: 500.38

799

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-j

(British) :

Each

Hoisting and placing in position RCC troughs Upto 19' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.200

Day

900.00

Day

180.00

Coolie

0.600

Day

500.00

Day

300.00

14.40

78.00

494.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

600.00

Cost Per Each: 600.00

Labour Rates Per

Each

Rs.

600.00

Cost Per Each: 600.00

105.60

800

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-41-k

(British) :

Each

Hoisting and placing in position RCC troughs Upto 20' in length

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

0.750

Day

500.00

Day

375.00

18.00

78.00

618.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

132.00

801

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-42-a

(British) :

Each

Hoist & place in position RCC inverted battens Upto 10' span

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.033

Day

900.00

Day

29.70

Coolie

0.133

Day

500.00

Day

66.50

2.89

78.00

99.09

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

120.25

Cost Per Each: 120.25

Labour Rates Per

Each

Rs.

120.25

Cost Per Each: 120.25

21.16

802

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-42-b

(British) :

Each

Hoist & place in position RCC inverted battens Upto 12' span

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.066

Day

900.00

Day

59.40

Coolie

0.266

Day

500.00

Day

133.00

5.77

78.00

198.17

22

42.33

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

240.50

Cost Per Each: 240.50

Labour Rates Per

Each

Rs.

240.50

Cost Per Each: 240.50

803

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-42-c

(British) :

Each

Hoist & place in position RCC inverted battens Upto 13' span

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.083

Day

900.00

Day

74.70

Coolie

0.333

Day

500.00

Day

166.50

7.24

78.00

248.44

22

53.06

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

301.50

Cost Per Each: 301.50

Labour Rates Per

Each

Rs.

301.50

Cost Per Each: 301.50

804

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-42-d

(British) :

Each

Hoist & place in position RCC inverted battens Upto 14' span

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Coolie

0.400

Day

500.00

Day

200.00

8.70

78.00

298.70

22

63.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

362.50

Cost Per Each: 362.50

Labour Rates Per

Each

Rs.

362.50

Cost Per Each: 362.50

805

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-42-e

(British) :

Each

Hoist & place in position RCC inverted battens Upto 15' span

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.110

Day

900.00

Day

99.00

Coolie

0.440

Day

500.00

Day

220.00

9.57

78.00

328.57

22

70.18

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

398.75

Cost Per Each: 398.75

Labour Rates Per

Each

Rs.

398.75

Cost Per Each: 398.75

806

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-42-f

(British) :

Each

Hoist & place in position RCC inverted battens Upto 16' span

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.125

Day

900.00

Day

112.50

Coolie

0.500

Day

500.00

Day

250.00

10.88

78.00

373.38

22

79.75

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

453.13

Cost Per Each: 453.13

Labour Rates Per

Each

Rs.

453.13

Cost Per Each: 453.13

807

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-42-g

(British) :

Each

Hoist & place in position RCC inverted battens Upto 18' span

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.167

Day

900.00

Day

150.30

Coolie

0.668

Day

500.00

Day

334.00

14.53

78.00

498.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

605.38

Cost Per Each: 605.38

Labour Rates Per

Each

Rs.

605.38

Cost Per Each: 605.38

106.55

808

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-42-h

(British) :

Each

Hoist & place in position RCC inverted battens Upto 20' span

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

78.00

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

906.25

Cost Per Each: 906.25

Labour Rates Per

Each

Rs.

906.25

Cost Per Each: 906.25

159.50

809

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-43

(British) :

Each

RCC spout including fixing in position, with top and bottom khuras

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.250

Bag

490.00

Sand

1.000

Cft

2,200.00

Steel (bars/rods/section)

0.750

Kg

82.00

TOTAL

MATERIAL

Bag

122.50

100 Cft

22.00

Kg

61.50

22.20

206.00

LABOUR
Mason

0.350

Day

900.00

Day

315.00

Coolie

0.350

Day

500.00

Day

175.00

14.70

55.80

504.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

863.82

Cost Per Each: 863.82

Labour Rates Per

Each

Rs.

612.50

Cost Per Each: 612.50

153.12

810

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-44

(British) :

100 Sft

P/F Burnt Brick Tile Roofing over Tee Iron and Steel Girder, in 1:6
c/s mortar (12' max span)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

3.680

Cft

1,400.00

Ordinary Portland Cement

0.325

Bag

490.00

Sand

0.023

Cft

2,200.00

Steel (Struct. Sections)

198.230

Kg

97.00

Kg

Polythene Sheet

100.000

Sft

6.00

Sft

Brick Tile 9"x4.5"x1.5"

355.720

No

15,000.00

Asphalt

26.040

Kg

85.00

Kg

2,213.40

Steel Girder 8"x4"x3/16

15.330

Ft

230.00

Ft

3,525.90

TOTAL

MATERIAL

51.52

100 Cft
Bag

159.25

100 Cft

0.51

19,228.31
600.00
5,335.80

1,000 No

65.40

31,114.69

LABOUR
Mason

2.669

Day

900.00

Day

2,402.10

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.335

Day

500.00

Day

167.25

137.08

12.60

4,706.43

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

7,850.49

Composite Rates Per

100 Sft

Rs.

43,671.60

Per SQM : Rs 4,699.06

Labour Rates Per

100 Sft

Rs.

5,711.69

Per SQM : Rs 614.58

811

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 09 , ROOFING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

09-45

(British) :

Sft

Providing and Laying Prestressed Roof of Slab/Girder, 2" thick PCC


1:2:4 with chicken mesh, polythene, mud, tar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

0.427

Cft

1,400.00

Ordinary Portland Cement

0.028

Bag

490.00

Sand

0.003

Cft

Crushed Aggregate

0.003

Polythene Sheet

100 Cft

5.97

Bag

13.80

2,200.00

100 Cft

0.07

Cft

2,800.00

100 Cft

0.09

1.000

Sft

6.00

Sft

6.00

Asphalt

0.260

Kg

85.00

Kg

22.10

Izhar Precast Roofing

1.000

Sft

90.00

Sft

90.00

57.92

138.04

TOTAL

MATERIAL

LABOUR
Mason

0.020

Day

900.00

Day

18.40

Coolie

0.040

Day

500.00

Day

19.98

Bhishti

0.005

Day

500.00

Day

2.32

1.22

20.08

41.93

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

219.29

Per SQM : Rs 2,359.53

Labour Rates Per

Sft

Rs.

50.88

Per SQM : Rs 547.50

39.32

812

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-01

(British) :

100 Sft

Laying murum flooring complete as per specs

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

80.000

Cft

1,260.00

100 Cft

1,008.00

Fine Powdered Moorum

9.000

Cft

3,600.00

100 Cft

324.00

Hard Moorum

55.000

Cft

4,000.00

100 Cft

2,200.00

TOTAL

MATERIAL

46.21

3,532.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

0.500

Day

500.00

Day

250.00

66.00

31.79

2,266.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,059.04

Per SQM : Rs 759.55

Labour Rates Per

100 Sft

Rs.

2,750.00

Per SQM : Rs 295.90

1,261.04

813

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-02

(British) :

100 Sft

Earth flooring 6" thick consolidated layer of moistened earth,


including ramming

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Loose Earth

70.000

1,600.00

Cft

TOTAL

MATERIAL

100 Cft

1,120.00

45.22

1,120.00

LABOUR
Mason

0.125

Day

900.00

Day

112.50

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

22.13

32.78

759.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,288.28

Per SQM : Rs 246.22

Labour Rates Per

100 Sft

Rs.

921.88

Per SQM : Rs 99.19

408.65

814

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-03-a

(British) :

100 Cft

Provide, lay, water & ram clean coarse sand under floor / brick
paving, complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
35.350

Sand

2,200.00

Cft

TOTAL

MATERIAL

100 Cft

777.70

15.82

777.70

LABOUR
Mason

0.493

Day

900.00

Day

443.70

Coolie

4.110

Day

500.00

Day

2,055.00

Bhishti

0.820

Day

500.00

Day

410.00

87.26

62.18

2,995.96

22

811.01

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,584.67

Per CUM : Rs 1,619.06

Labour Rates Per

100 Cft

Rs.

3,635.87

Per CUM : Rs 1,284.00

815

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-03-b

(British) :

100 Cft

Provide, lay, water & ram brick ballast 1.5" to 2" guage mixed with
25% sand for floor foundations

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

35.350

Cft

2,200.00

100 Cft

777.70

Rubble Or Broken Brick

105.000

Cft

3,167.00

100 Cft

3,325.35

TOTAL

MATERIAL

31.01

4,103.05

LABOUR
Mason

0.986

Day

900.00

Day

887.40

Coolie

8.221

Day

500.00

Day

4,110.50

Bhishti

1.644

Day

500.00

Day

822.00

174.60

46.99

5,994.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,183.05

Composite Rates Per

100 Cft

Rs.

12,280.60

Per CUM : Rs 4,336.86

Labour Rates Per

100 Cft

Rs.

7,274.87

Per CUM : Rs 2,569.10

816

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-04

(British) :

100 Sft

Mud floor of 6" thick consolidated layer of moist earth & finished
off with 1" mud plaster

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Loose Earth

82.000

Cft

1,600.00

Bhoosa

17.000

Sr

15.00

Clay (fine)

0.750

Cft

1,200.00

Cow Dung

0.750

Cft

140.00

TOTAL

MATERIAL

100 Cft
1

Sr

100 Cft

1,312.00
255.00
9.00

Cft

105.00

40.27

1,681.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

43.50

37.73

1,493.50

22

688.82

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,863.32

Per SQM : Rs 415.69

Labour Rates Per

100 Sft

Rs.

1,812.50

Per SQM : Rs 195.03

817

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-05

(British) :

100 Sft

Dry brick paving laid flat,sand grouted, including prep. of bed, by


1/2" thick mud plaster

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

6.000

Cft

1,400.00

100 Cft

84.00

Sand

5.000

Cft

2,200.00

100 Cft

110.00

Burnt Brick

350.000

No

8,500.00

TOTAL

MATERIAL

1,000 No

2,975.00

57.35

3,169.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.050

Day

500.00

Day

25.00

29.25

20.65

1,004.25

22

911.68

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,084.93

Per SQM : Rs 547.14

Labour Rates Per

100 Sft

Rs.

1,218.75

Per SQM : Rs 131.14

818

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-06

(British) :

100 Sft

Dry brick on edge paving, sand grouted, including prep. of bed, by


1/2" thick mud plaster

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

6.000

Cft

1,400.00

100 Cft

84.00

Sand

6.000

Cft

2,200.00

100 Cft

132.00

Burnt Brick

525.000

No

8,500.00

TOTAL

MATERIAL

1,000 No

4,462.50

57.88

4,678.50

LABOUR
Mason

0.660

Day

900.00

Day

594.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.080

Day

500.00

Day

40.00

41.52

20.12

1,425.52

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,437.77

Per SQM : Rs 800.30

Labour Rates Per

100 Sft

Rs.

1,730.00

Per SQM : Rs 186.15

1,333.75

819

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-07

(British) :

100 Sft

Grouting 4.5" dry brick work with cement sand mortar 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.710

Bag

490.00

Sand

4.500

Cft

2,200.00

TOTAL

MATERIAL

Bag

347.90

100 Cft

99.00

23.99

446.90

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

0.500

Day

500.00

Day

250.00

Bhishti

0.500

Day

500.00

Day

250.00

28.50

54.01

978.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,732.72

Per SQM : Rs 186.44

Labour Rates Per

100 Sft

Rs.

1,187.50

Per SQM : Rs 127.78

307.32

820

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-08

(British) :

100 Sft

Flat brick flooring laid in 1:6 c/s mortar over a bed of 3/4" thick
cement mortar 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.320

Bag

490.00

Sand

10.000

Cft

2,200.00

Burnt Brick

350.000

No

8,500.00

TOTAL

MATERIAL

Bag

646.80

100 Cft

220.00

1,000 No

2,975.00

52.23

3,841.80

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

day

500.00

day

250.00

50.25

25.77

1,725.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,780.75

Per SQM : Rs 729.61

Labour Rates Per

100 Sft

Rs.

2,093.75

Per SQM : Rs 225.29

1,213.70

821

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-09

(British) :

100 Sft

Brick on edge flooring, laid in 1:6 c/s mortar, over a bed of 3/4"
thick cement mortar 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.670

Bag

490.00

Sand

13.000

Cft

2,200.00

Burnt Brick

525.000

No

8,500.00

TOTAL

MATERIAL

Bag

818.30

100 Cft

286.00

4,462.50

1,000 No

54.10

5,566.80

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

day

500.00

day

250.00

64.50

23.90

2,214.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,697.70

Composite Rates Per

100 Sft

Rs.

9,479.00

Per SQM : Rs 1,019.94

Labour Rates Per

100 Sft

Rs.

2,687.50

Per SQM : Rs 289.18

822

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-10

(British) :

100 Sft

Brick tiles (12"x6"x2") laid in 1:6 c/s mortar, over a bed of 3/4"
thick c/s mortar 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.120

Bag

490.00

Sand

8.000

Cft

Brick Tile (12"x6"x2")

210.000

Cft

TOTAL

Bag

548.80

2,200.00

100 Cft

176.00

14,000.00

1,000 Cft

2,940.00

MATERIAL

51.47

3,664.80

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

50.25

26.53

1,725.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,564.81

Per SQM : Rs 706.37

Labour Rates Per

100 Sft

Rs.

2,093.75

Per SQM : Rs 225.29

1,174.76

823

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-11

(British) :

100 Sft

Brick tiles (9"x4.5"x1.5") laid flat in 1:3 c/s mortar over a bed
of 3/4" thick cement mortar 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.420

Bag

490.00

Sand

12.000

Cft

2,200.00

Brick Tiles 10"x5"x1.5"

350.000

No

11,000.00

TOTAL

MATERIAL

Bag

695.80

100 Cft

264.00

1,000 No

3,850.00

53.76

4,809.80

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

57.00

24.24

1,957.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,242.96

Per SQM : Rs 886.94

Labour Rates Per

100 Sft

Rs.

2,375.00

Per SQM : Rs 255.55

1,476.16

824

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-12

(British) :

100 Sft

Cement tiles (8"x8"x3/4") laid flat in 1:2 c/s mortar, over 3/4"
thick bed of c/s mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

CC Tile 17x12x1

240.000

No

100,000.00 1,000 No

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

24,000.00

68.25

25,447.60

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.330

Day

500.00

Day

165.00

75.45

9.75

2,590.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,151.77

Composite Rates Per

100 Sft

Rs.

34,189.82

Per SQM : Rs 3,678.82

Labour Rates Per

100 Sft

Rs.

3,143.75

Per SQM : Rs 338.27

825

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-13-a

(British) :

100 Sft

Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of
c/s mortar 1:2 : 12" x 12" x 1"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

CC Tile 17x12x1

105.000

No

100,000.00 1,000 No

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

10,500.00

61.96

11,947.60

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.330

Day

500.00

Day

165.00

75.45

16.04

2,590.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,181.77

Composite Rates Per

100 Sft

Rs.

17,719.82

Per SQM : Rs 1,906.65

Labour Rates Per

100 Sft

Rs.

3,143.75

Per SQM : Rs 338.27

826

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-13-b

(British) :

100 Sft

Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of
c/s mortar 1:2 : 9" x 9" x 3/4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

CC Tiles 9x9x0.75

186.000

No

3,500.00

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

1,000 No

651.00

34.12

2,098.60

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.330

Day

500.00

Day

165.00

75.45

43.88

2,590.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,704.04

Per SQM : Rs 613.75

Labour Rates Per

100 Sft

Rs.

3,143.75

Per SQM : Rs 338.27

1,014.99

827

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-13-c

(British) :

100 Sft

Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of
c/s mortar 1:2 : 6" x 6" x 3/4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

CC Tiles 6x6x0.75

420.000

No

10,000.00

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

4,200.00

1,000 No

51.89

5,647.60

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.330

Day

500.00

Day

165.00

75.45

26.11

2,590.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,795.77

Composite Rates Per

100 Sft

Rs.

10,033.82

Per SQM : Rs 1,079.64

Labour Rates Per

100 Sft

Rs.

3,143.75

Per SQM : Rs 338.27

828

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-14

(British) :

100 Sft

Coloured cement tile (8"x8"x3/4") of dark shade laid flat in 1:2


c/s mortar over 3/4" mortar bed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

CC Tiles 8x8x0.75

240.000

No

11,000.00

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

1,000 No

2,640.00

46.43

4,087.60

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.330

Day

500.00

Day

165.00

75.45

31.57

2,590.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,130.62

Per SQM : Rs 874.85

Labour Rates Per

100 Sft

Rs.

3,143.75

Per SQM : Rs 338.27

1,452.57

829

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-a

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels : 1" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.520

Bag

490.00

Bag

744.80

Sand

3.700

Cft

2,200.00

100 Cft

81.40

Crushed Aggregate

7.400

Cft

2,800.00

100 Cft

207.20

Glass Panel

5.000

Sft

40.00

TOTAL

MATERIAL

Sft

200.00

35.13

1,233.40

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

0.500

Day

500.00

Day

250.00

Bhishti

0.100

Day

500.00

Day

50.00

Carpenter

0.250

Day

800.00

Day

200.00

42.00

42.87

1,442.00

22

579.35

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,254.75

Per SQM : Rs 350.21

Labour Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

830

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-b

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels: 1.5" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.000

Bag

490.00

Bag

980.00

Sand

5.000

Cft

2,200.00

100 Cft

110.00

Crushed Aggregate

10.000

Cft

2,800.00

100 Cft

280.00

Glass Panel

6.250

Sft

40.00

TOTAL

MATERIAL

Sft

250.00

36.87

1,620.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.150

Day

500.00

Day

75.00

Carpenter

0.250

Day

800.00

Day

200.00

50.25

41.13

1,725.25

22

724.90

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,070.15

Per SQM : Rs 437.95

Labour Rates Per

100 Sft

Rs.

2,093.75

Per SQM : Rs 225.29

831

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-c

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels: 1.5" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.240

Bag

490.00

Bag

1,097.60

Sand

5.500

Cft

2,200.00

100 Cft

121.00

Crushed Aggregate

11.000

Cft

2,800.00

100 Cft

308.00

Glass Panel

7.500

Sft

40.00

TOTAL

MATERIAL

Sft

300.00

39.12

1,826.60

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.150

Day

500.00

Day

75.00

Carpenter

0.250

Day

800.00

Day

200.00

50.25

38.88

1,725.25

22

770.35

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,322.20

Per SQM : Rs 465.07

Labour Rates Per

100 Sft

Rs.

2,093.75

Per SQM : Rs 225.29

832

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-d

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels : 1.75" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.750

Bag

490.00

Bag

1,347.50

Sand

6.500

Cft

2,200.00

100 Cft

143.00

Crushed Aggregate

13.000

Cft

2,800.00

100 Cft

364.00

Glass Panel

10.000

Sft

40.00

TOTAL

MATERIAL

Sft

400.00

43.03

2,254.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.150

Day

500.00

Day

75.00

Carpenter

0.250

Day

800.00

Day

200.00

50.25

34.97

1,725.25

22

864.49

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,844.24

Per SQM : Rs 521.24

Labour Rates Per

100 Sft

Rs.

2,093.75

Per SQM : Rs 225.29

833

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-e

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels : 2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.050

Bag

490.00

Bag

1,494.50

Sand

7.400

Cft

2,200.00

100 Cft

162.80

Crushed Aggregate

14.700

Cft

2,800.00

100 Cft

411.60

Glass Panel

10.000

Sft

40.00

TOTAL

MATERIAL

Sft

400.00

42.14

2,468.90

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.150

Day

500.00

Day

75.00

Carpenter

0.250

Day

800.00

Day

200.00

57.75

35.86

1,982.75

22

966.66

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,418.31

Per SQM : Rs 583.01

Labour Rates Per

100 Sft

Rs.

2,406.25

Per SQM : Rs 258.91

834

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-f

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels: 2.25" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.500

Bag

490.00

Bag

1,715.00

Sand

8.500

Cft

2,200.00

100 Cft

187.00

Crushed Aggregate

17.000

Cft

2,800.00

100 Cft

476.00

Glass Panel

11.250

Sft

40.00

TOTAL

MATERIAL

Sft

450.00

38.02

2,828.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

Carpenter

0.500

Day

800.00

Day

400.00

82.50

39.98

2,832.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,887.66

Per SQM : Rs 741.11

Labour Rates Per

100 Sft

Rs.

3,437.50

Per SQM : Rs 369.88

1,227.16

835

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-g

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels: 2.5" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.750

Bag

490.00

Bag

1,837.50

Sand

9.490

Cft

2,200.00

100 Cft

208.78

Crushed Aggregate

19.000

Cft

2,800.00

100 Cft

532.00

Glass Panel

12.750

Sft

40.00

TOTAL

MATERIAL

Sft

510.00

38.84

3,088.28

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

1.750

Day

500.00

Day

875.00

Bhishti

0.500

Day

500.00

Day

250.00

Carpenter

0.500

Day

800.00

Day

400.00

86.25

39.16

2,961.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,361.45

Per SQM : Rs 792.09

Labour Rates Per

100 Sft

Rs.

3,593.75

Per SQM : Rs 386.69

1,311.92

836

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-h

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels: 2.75" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.000

Bag

490.00

Bag

1,960.00

Sand

10.500

Cft

2,200.00

100 Cft

231.00

Crushed Aggregate

21.000

Cft

2,800.00

100 Cft

588.00

Glass Panel

14.250

Sft

40.00

TOTAL

MATERIAL

Sft

570.00

37.08

3,349.00

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

Carpenter

0.750

Day

800.00

Day

600.00

102.75

40.92

3,527.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,367.03

Per SQM : Rs 900.29

Labour Rates Per

100 Sft

Rs.

4,281.25

Per SQM : Rs 460.66

1,490.28

837

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-15-i

(British) :

100 Sft

Provide & lay topping of concrete 1:2:4, including surface


finishing & dividing in panels : 3" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

4.470

Bag

490.00

Bag

2,190.30

Sand

11.000

Cft

2,200.00

100 Cft

242.00

Crushed Aggregate

22.000

Cft

2,800.00

100 Cft

616.00

Glass Panel

15.000

Sft

40.00

TOTAL

MATERIAL

Sft

600.00

39.81

3,648.30

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

Carpenter

0.500

Day

800.00

Day

400.00

96.75

38.19

3,321.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,482.18

Per SQM : Rs 912.68

Labour Rates Per

100 Sft

Rs.

4,031.25

Per SQM : Rs 433.76

1,512.13

838

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-16-a

(British) :

100 Sft

Provide & laying conglomerate floor (two coat work) with top layer
of 1/2" thick wearing surface of one part of cement 2 parts of
stone chips passing 3/16" sieve over bottom layer of cement
concrete (1:3:6) including surface finishing & dividing in panels:
1.5" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Bag

1,078.00

Sand

3.280

Cft

2,200.00

100 Cft

72.16

Crushed Aggregate

6.560

Cft

2,800.00

100 Cft

183.68

Stone Chips

3.280

Cft

4,000.00

100 Cft

131.20

TOTAL

MATERIAL

23.81

1,465.04

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

0.500

Day

500.00

Day

250.00

Bhishti

1.000

Day

500.00

Day

500.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

94.50

54.19

3,244.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,724.85

Per SQM : Rs 615.99

Labour Rates Per

100 Sft

Rs.

3,937.50

Per SQM : Rs 423.68

1,015.31

839

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-16-b

(British) :

100 Sft

Provide & laying conglomerate floor (two coat work) with top layer
of 1/2" thick wearing surface of one part of cement 2 parts of
stone chips passing 3/16" sieve over bottom layer of cement
concrete (1:3:6) including surface finishing & dividing in panels:
1.75" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.400

Bag

490.00

Bag

1,176.00

Sand

4.000

Cft

2,200.00

100 Cft

88.00

Crushed Aggregate

8.000

Cft

2,800.00

100 Cft

224.00

Stone Chips

3.280

Cft

4,000.00

100 Cft

131.20

TOTAL

MATERIAL

31.39

1,619.20

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

0.500

Day

500.00

Day

250.00

Bhishti

1.000

Day

500.00

Day

500.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

67.50

46.61

2,317.50

22

851.22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,787.92

Per SQM : Rs 515.18

Labour Rates Per

100 Sft

Rs.

2,812.50

Per SQM : Rs 302.63

840

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-16-c

(British) :

100 Sft

Provide & laying conglomerate floor (two coat work) with top layer
of 1/2" thick wearing surface of one part of cement 2 parts of
stone chips passing 3/16" sieve over bottom layer of cement
concrete (1:3:6) including surface finishing & dividing in panels :
2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.600

Bag

490.00

Bag

1,274.00

Sand

4.790

Cft

2,200.00

100 Cft

105.38

Crushed Aggregate

9.580

Cft

2,800.00

100 Cft

268.24

Stone Chips

3.280

Cft

4,000.00

100 Cft

131.20

TOTAL

MATERIAL

31.18

1,778.82

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

1.000

Day

500.00

Day

500.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

75.00

46.82

2,575.00

22

941.34

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,295.16

Per SQM : Rs 569.76

Labour Rates Per

100 Sft

Rs.

3,125.00

Per SQM : Rs 336.25

841

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-17

(British) :

100 Sft

Add extra in cement concrete floor topping if finished with pigment


and polishing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.510

Bag

490.00

Bag

249.90

Pigment Polish

2.000

Kg

200.00

Kg

400.00

TOTAL

MATERIAL

36.11

649.90

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Bhishti

0.500

Day

500.00

Day

250.00

21.00

41.89

721.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,667.88

Per SQM : Rs 179.46

Labour Rates Per

100 Sft

Rs.

875.00

Per SQM : Rs 94.15

296.98

842

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-18

(British) :

100 Sft

Extra labour for each storey above ground for mosaic, conglomerate,
tiles, stone & wood floor

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Bhishti

0.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

375.00

11.25

78.00

386.25

22

82.50

Composite Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

843

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-19-a

(British) :

100 Sft

Flag stone flooring in lime mortar 1:2, over 3/4" bedding : 2"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.420

Bag

490.00

Sand

12.000

Cft

2,200.00

Charcoal

2.000

Kg

50.00

Dressed Stone

25.000

Cft

4,500.00

TOTAL

MATERIAL

Bag

695.80

100 Cft

264.00

Kg

100 Cft

100.00
1,125.00

25.37

2,184.80

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

0.750

Day

500.00

Day

375.00

Black Smith

0.100

Day

900.00

Day

90.00

Bellowman

0.100

Day

600.00

Day

60.00

128.25

52.63

4,403.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,009.21

Per SQM : Rs 861.79

Labour Rates Per

100 Sft

Rs.

5,343.75

Per SQM : Rs 574.99

1,421.16

844

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-19-b

(British) :

100 Sft

Flag stone flooring in lime mortar 1:2, over 3/4" bedding : 3"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.780

Bag

490.00

Sand

0.150

Cft

2,200.00

Charcoal

2.000

Kg

50.00

Dressed Stone

37.500

Cft

4,500.00

TOTAL

MATERIAL

Bag

872.20

100 Cft

3.30

Kg

100 Cft

100.00
1,687.50

30.16

2,663.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

0.120

Day

500.00

Day

60.00

Black Smith

0.100

Day

900.00

Day

90.00

Bellowman

0.100

Day

600.00

Day

60.00

118.80

47.84

4,078.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,198.86

Per SQM : Rs 882.20

Labour Rates Per

100 Sft

Rs.

4,950.00

Per SQM : Rs 532.62

1,457.06

845

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-20-a

(British) :

100 Sft

Asphalt floor, including base preparation, remelting, setting out &


finish : 1" thick topping

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Coal Tar (in canisters)

119.800

Kg

110.00

Fine Grit / Aggregate

10.000

Cft

3,100.00

Coal

40.000

Kg

40.00

TOTAL

MATERIAL

13,178.00

Kg

310.00

100 Cft
1

1,600.00

Kg

68.53

15,088.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

0.250

Day

800.00

Day

200.00

42.75

9.47

1,467.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,632.86

Composite Rates Per

100 Sft

Rs.

20,188.61

Per SQM : Rs 2,172.29

Labour Rates Per

100 Sft

Rs.

1,781.25

Per SQM : Rs 191.66

846

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-20-b

(British) :

100 Sft

Asphalt floor, including base preparation, remelting, setting out &


finish : 1/2" thick topping

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Coal Tar (in canisters)

59.900

Kg

110.00

Fine Grit / Aggregate

5.000

Cft

3,100.00

Coal

20.000

Kg

40.00

TOTAL

MATERIAL

6,589.00

Kg

155.00

100 Cft
1

800.00

Kg

64.56

7,544.00

LABOUR
Mason

0.300

Day

900.00

Day

270.00

Coolie

1.500

Day

500.00

Day

750.00

Carpenter

0.250

Day

800.00

Day

200.00

36.60

13.44

1,256.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,928.08

Composite Rates Per

100 Sft

Rs.

10,728.68

Per SQM : Rs 1,154.41

Labour Rates Per

100 Sft

Rs.

1,525.00

Per SQM : Rs 164.09

847

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-20-c

(British) :

100 Sft

Asphalt floor, including base preparation, remelting, setting out &


finish : 1/4" thick topping

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Coal Tar (in canisters)

30.000

Kg

110.00

Fine Grit / Aggregate

2.500

Cft

3,100.00

Coal

10.000

Kg

40.00

TOTAL

MATERIAL

Kg

100 Cft
1

Kg

3,300.00
77.50
400.00

61.30

3,777.50

LABOUR
Mason

0.160

Day

900.00

Day

144.00

Coolie

1.000

Day

500.00

Day

500.00

Carpenter

0.250

Day

800.00

Day

200.00

25.32

16.70

869.32

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,663.55

Per SQM : Rs 609.40

Labour Rates Per

100 Sft

Rs.

1,055.00

Per SQM : Rs 113.52

1,016.73

848

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-21-a

(British) :

100 Sft

1.375" thick mosaic flooring, including rubbing and polishing


complete : Using grey cement

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.050

Bag

490.00

Bag

1,494.50

Sand

37.000

Cft

2,200.00

100 Cft

814.00

Crushed Aggregate

7.400

Cft

2,800.00

100 Cft

207.20

Fine Grit / Aggregate

1.500

Cft

3,100.00

100 Cft

46.50

Grinding Stone

0.700

No

220.00

No

154.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

Marble Chips

10.000

Bag

50.00

Bag

500.00

27.54

3,366.20

TOTAL

MATERIAL

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

7.250

Day

500.00

Day

3,625.00

Bhishti

0.750

Day

500.00

Day

375.00

174.00

50.46

5,974.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,016.56

Composite Rates Per

100 Sft

Rs.

11,356.76

Per SQM : Rs 1,221.99

Labour Rates Per

100 Sft

Rs.

7,250.00

Per SQM : Rs 780.10

849

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-21-b

(British) :

100 Sft

1.375" thick mosaic flooring, including rubbing and polishing


complete : Using white cement

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.520

Bag

490.00

Bag

744.80

Sand

3.700

Cft

2,200.00

100 Cft

81.40

Crushed Aggregate

7.400

Cft

2,800.00

100 Cft

207.20

Fine Grit / Aggregate

1.500

Cft

3,100.00

100 Cft

46.50

Grinding Stone

0.700

No

220.00

No

154.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

Marble Chips

10.000

Bag

50.00

Bag

500.00

White Cement

1.520

Bag

700.00

Bag

1,064.00

25.27

2,947.90

TOTAL

MATERIAL

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

7.250

Day

500.00

Day

3,625.00

Bhishti

0.750

Day

500.00

Day

375.00

174.00

52.73

5,974.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,924.54

Composite Rates Per

100 Sft

Rs.

10,846.44

Per SQM : Rs 1,167.08

Labour Rates Per

100 Sft

Rs.

7,250.00

Per SQM : Rs 780.10

850

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-22-a

(British) :

100 Sft

1.5" thick mosaic flooring, including rubbing & polishing complete


: Using grey cement

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.300

Bag

490.00

Bag

1,617.00

Sand

3.700

Cft

2,200.00

100 Cft

81.40

Crushed Aggregate

7.400

Cft

2,800.00

100 Cft

207.20

Fine Grit / Aggregate

1.800

Cft

3,100.00

100 Cft

55.80

Grinding Stone

0.700

No

220.00

No

154.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

Marble Chips

13.000

Bag

50.00

Bag

650.00

24.66

2,915.40

TOTAL

MATERIAL

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

0.800

Day

500.00

Day

400.00

178.50

53.34

6,128.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,950.39

Composite Rates Per

100 Sft

Rs.

10,994.29

Per SQM : Rs 1,182.99

Labour Rates Per

100 Sft

Rs.

7,437.50

Per SQM : Rs 800.28

851

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-22-b

(British) :

100 Sft

1.5" thick mosaic flooring, including rubbing & polishing complete


: Using white cement

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.500

Bag

490.00

Bag

735.00

Sand

3.700

Cft

2,200.00

100 Cft

81.40

Crushed Aggregate

7.400

Cft

2,800.00

100 Cft

207.20

Fine Grit / Aggregate

1.800

Cft

3,100.00

100 Cft

55.80

Grinding Stone

0.700

No

220.00

No

154.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

Marble Chips

13.000

Bag

50.00

Bag

650.00

White Cement

1.780

Bag

700.00

Bag

1,246.00

26.65

3,279.40

TOTAL

MATERIAL

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

7.500

Day

500.00

Day

3,750.00

Bhishti

0.800

Day

500.00

Day

400.00

178.50

51.35

6,128.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,030.47

Composite Rates Per

100 Sft

Rs.

11,438.37

Per SQM : Rs 1,230.77

Labour Rates Per

100 Sft

Rs.

7,437.50

Per SQM : Rs 800.28

852

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-23

(British) :

100 Sft

Laying floor of mosaic marble chips tiles of approved shade


including finishing complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.670

Bag

490.00

Sand

7.000

Cft

2,200.00

Grinding Stone

0.700

No

220.00

No

154.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

White Cement

0.100

Bag

700.00

Bag

70.00

Mosaic Tile

105.000

No

60.00

No

TOTAL

MATERIAL

Bag

1,308.30

100 Cft

154.00

6,300.00

54.19

8,136.30

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.650

Day

500.00

Day

325.00

93.75

23.81

3,218.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,477.49

Composite Rates Per

100 Sft

Rs.

13,832.54

Per SQM : Rs 1,488.38

Labour Rates Per

100 Sft

Rs.

3,906.25

Per SQM : Rs 420.31

853

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-24

(British) :

100 Sft

Lay floor of white glazed tile 1/4" thick in white cement 1:2 over
3/4" thick cement mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

White Cement

0.100

Bag

700.00

Bag

Ceramic Tile 6"x6" White

420.000

No

15.00

No

TOTAL

Bag

1,078.00

100 Cft

114.40

48.84

MATERIAL

70.00
6,300.00

7,562.40

LABOUR
Mason

2.000

Day.

900.00

Day.

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

121.50

29.16

4,171.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,554.73

Composite Rates Per

100 Sft

Rs.

14,288.63

Per SQM : Rs 1,537.46

Labour Rates Per

100 Sft

Rs.

5,062.50

Per SQM : Rs 544.73

854

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-25

(British) :

100 Sft

Lay floor of approved coloured glazed tiles 1/4" thick laid in


white cement & pigment complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

Pigment Polish

0.230

Kg

200.00

Kg

46.00

White Cement

0.100

Bag

700.00

Bag

70.00

Ceramic Tile 6"x6" White

420.000

No

15.00

No

TOTAL

MATERIAL

Bag

1,078.00

100 Cft

114.40

6,300.00

48.95

7,608.40

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

121.50

29.05

4,171.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,564.85

Composite Rates Per

100 Sft

Rs.

14,344.75

Per SQM : Rs 1,543.49

Labour Rates Per

100 Sft

Rs.

5,062.50

Per SQM : Rs 544.73

855

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-26-a

(British) :

100 Sft

Provide & lay marble fine dressed stone flooring on surface in


white cement complete: 3/4" thick (Badel, Silky black, Sunny white,
Sunny Grey or eq)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

White Cement

0.100

Bag

700.00

Bag

70.00

Marble Fine 3/4 Inch Thick

105.000

No

55.00

No

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

5,775.00

36.15

7,442.60

LABOUR
Mason

5.000

Day

900.00

Day

4,500.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.000

Day

500.00

Day

500.00

240.00

41.85

8,240.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,397.37

Composite Rates Per

100 Sft

Rs.

19,079.97

Per SQM : Rs 2,053.01

Labour Rates Per

100 Sft

Rs.

10,000.00

Per SQM : Rs 1,076.00

856

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-26-b

(British) :

100 Sft

Provide & lay marble fine dressed stone flooring on surface in


white cement complete: 1" thick (Badel, Silky black, Sunny white,
Sunny Grey or eq)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

White Cement

0.100

Bag

700.00

Bag

70.00

Marble Fine 1 Inch Thick

105.000

Sft

70.00

Sft

7,350.00

39.74

9,017.60

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

LABOUR
Mason

5.000

Day

900.00

Day

4,500.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.000

Day

500.00

Day

500.00

240.00

38.26

8,240.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,743.87

Composite Rates Per

100 Sft

Rs.

21,001.47

Per SQM : Rs 2,259.76

Labour Rates Per

100 Sft

Rs.

10,000.00

Per SQM : Rs 1,076.00

857

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-26-c

(British) :

100 Sft

Provide & lay marble fine dressed stone flooring on surface in


white cement complete: 1/2" thick (Badel, Silky black, Sunny white,
Sunny Grey or eq)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

White Cement

0.100

Bag

700.00

Bag

70.00

Marble fine 1/2" thick

105.000

Sft

80.00

Sft

8,400.00

41.79

10,067.60

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

LABOUR
Mason

5.000

Day

900.00

Day

4,500.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.000

Day

500.00

Day

500.00

240.00

36.21

8,240.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,974.87

Composite Rates Per

100 Sft

Rs.

22,282.47

Per SQM : Rs 2,397.59

Labour Rates Per

100 Sft

Rs.

10,000.00

Per SQM : Rs 1,076.00

858

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-26-d

(British) :

100 Sft

Providing and Laying marble fine dressed stone 4-5 feet and 12"
wide 1" thick for stairs steps.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.250

Bag

490.00

Sand

5.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

Marble Fine 1 Inch Thick

105.000

Sft

70.00

Sft

7,350.00

38.01

8,222.50

TOTAL

MATERIAL

Bag

612.50

100 Cft

110.00

150.00

LABOUR
Mason

5.000

Day

900.00

Day

4,500.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.000

Day

500.00

Day

500.00

240.00

39.99

8,240.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,568.95

Composite Rates Per

100 Sft

Rs.

20,031.45

Per SQM : Rs 2,155.38

Labour Rates Per

100 Sft

Rs.

10,000.00

Per SQM : Rs 1,076.00

859

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-26-e

(British) :

100 Sft

Providing and Laying marble fine dressed stone 7x1.5 feet and
1" thick for stairs steps.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.250

Bag

490.00

Sand

5.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

Marble Fine 1 Inch Thick

105.000

Sft

70.00

Sft

7,350.00

38.01

8,222.50

TOTAL

MATERIAL

Bag

612.50

100 Cft

110.00

150.00

LABOUR
Mason

5.000

Day

900.00

Day

4,500.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

1.000

Day

500.00

Day

500.00

240.00

39.99

8,240.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,568.95

Composite Rates Per

100 Sft

Rs.

20,031.45

Per SQM : Rs 2,155.38

Labour Rates Per

100 Sft

Rs.

10,000.00

Per SQM : Rs 1,076.00

860

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-26-f

(British) :

100 Rft

Providing and fixing glazed tile colour printed border 2" wide

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.500

Bag

490.00

Sand

2.000

Cft

2,200.00

White Cement

0.050

Bag

700.00

Bag

35.00

Glazed tile colour printed bor

105.000

Rft

150.00

Rft

15,750.00

71.55

16,074.00

TOTAL

MATERIAL

Bag

245.00

100 Cft

44.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.100

Day

500.00

Day

50.00

23.25

6.45

798.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

20,579.03

Labour Rates Per

100 Rft

Rs.

968.75

3,706.78

Per Meter : Rs 674.99


Per Meter : Rs 31.78

861

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-26-g

(British) :

100 Rft

Providing and fixing glazed tile colour printed border 3" wide

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.500

Bag

490.00

Sand

2.000

Cft

2,200.00

White Cement

0.050

Bag

700.00

Bag

35.00

Glazed tile colour printed bor

105.000

Rft

150.00

Rft

15,750.00

71.55

16,074.00

TOTAL

MATERIAL

Bag

245.00

100 Cft

44.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.100

Day

500.00

Day

50.00

23.25

6.45

798.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

20,579.03

Labour Rates Per

100 Rft

Rs.

968.75

3,706.78

Per Meter : Rs 674.99


Per Meter : Rs 31.78

862

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-26-h

(British) :

100 Rft

Providing and fixing glazed tile colour printed border 4" wide

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.500

Bag

490.00

Sand

2.000

Cft

2,200.00

White Cement

0.050

Bag

700.00

Bag

35.00

Glazed tile colour printed bor

105.000

Rft

150.00

Rft

15,750.00

71.55

16,074.00

TOTAL

MATERIAL

Bag

245.00

100 Cft

44.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.100

Day

500.00

Day

50.00

23.25

6.45

798.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

20,579.03

Labour Rates Per

100 Rft

Rs.

968.75

3,706.78

Per Meter : Rs 674.99


Per Meter : Rs 31.78

863

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-27

(British) :

100 Sft

Rubbing and polishing old grit/mosaic floor, including repairing


voids, uneven surface, complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Grinding Stone

0.100

No

220.00

No

22.00

Polish Wax

0.100

Pack

300.00

Pack

30.00

52.00

TOTAL

0.95

MATERIAL

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

121.50

77.05

4,171.50

22

902.44

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,125.94

Per SQM : Rs 551.55

Labour Rates Per

100 Sft

Rs.

5,062.50

Per SQM : Rs 544.73

864

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-28

(British) :

100 Sft

Rubbing & polishing grit floor, including repairing voids, uneen


surface, complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Grinding Stone

0.530

No

220.00

No

Polish Wax

0.100

Pack

300.00

Pack

TOTAL

6.44

MATERIAL

116.60
30.00

146.60

LABOUR
Mason

0.260

Day

900.00

Day

234.00

Coolie

0.590

Day

500.00

Day

295.00

Skilled Coolie

1.720

Day

600.00

Day

1,032.00

46.83

71.56

1,607.83

22

375.67

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,130.10

Per SQM : Rs 229.20

Labour Rates Per

100 Sft

Rs.

1,951.25

Per SQM : Rs 209.95

865

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-29

(British) :

100 Sft

Cleaning and washing mosaic or marble floor with caustic soda


mixture

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Caustic Soda

0.270

Kg

140.00

Kg

37.80

Cloth

2.800

Mtr

50.00

Mtr

140.00

35.48

177.80

TOTAL

MATERIAL

LABOUR
Bhishti

0.120

Day

500.00

Day

60.00

Skilled Coolie

0.230

Day

600.00

Day

138.00

5.94

42.52

203.94

22

82.68

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

464.42

Per SQM : Rs 49.97

Labour Rates Per

100 Sft

Rs.

247.50

Per SQM : Rs 26.63

866

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-30

(British) :

100 Sft

Shisham wood boarding or strip flooring 3/4" thick including 2


coats of bitumen laid hot complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.130

Mds

400.00

Mds

Coal Tar (in canisters)

15.880

Kg

110.00

Kg

1,746.80

Wood Deodar

3.440

Cft

2,600.00

Cft

8,944.00

Wood - Shishim

11.480

Cft

1,800.00

Cft

20,664.00

Sand Paper

1.500

Doz

260.00

Doz

390.00

Screw

0.840

Pkt

90.00

Pkt

75.60

56.41

31,872.40

TOTAL

MATERIAL

52.00

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Carpenter

10.000

Day

800.00

Day

8,000.00

315.00

21.59

10,815.00

22

9,321.93

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

52,009.33

Per SQM : Rs 5,596.20

Labour Rates Per

100 Sft

Rs.

13,125.00

Per SQM : Rs 1,412.25

867

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-31

(British) :

100 Sft

Deodar wood boarding or strip flooring 3/4" thick including 2 coats


of bitumen laid hot complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.130

Mds

400.00

Mds

Coal Tar (in canisters)

15.420

Kg

110.00

Kg

1,696.20

Wood Deodar

13.280

Cft

2,600.00

Cft

34,528.00

Sand Paper

1.000

Doz

260.00

Doz

260.00

Screw

0.840

Pkt

90.00

Pkt

75.60

61.83

36,611.80

TOTAL

MATERIAL

52.00

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Carpenter

6.000

Day

800.00

Day

4,800.00

234.00

16.17

8,034.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

9,770.60

Composite Rates Per

100 Sft

Rs.

54,416.40

Per SQM : Rs 5,855.20

Labour Rates Per

100 Sft

Rs.

9,750.00

Per SQM : Rs 1,049.10

868

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-32

(British) :

100 Sft

Teak wood boarding or strip flooring 1/2" thick including 2 coats


of bitumen laid hot complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.130

Mds

400.00

Mds

Coal Tar (in canisters)

15.420

Kg

110.00

Kg

1,696.20

Wood Deodar

3.440

Cft

2,600.00

Cft

8,944.00

Sand Paper

2.000

Doz

260.00

Doz

520.00

Wood - Teak

5.280

Cft

7,600.00

Cft

40,128.00

Screw

0.840

Pkt

90.00

Pkt

75.60

62.28

51,415.80

TOTAL

MATERIAL

52.00

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Carpenter

10.000

Day

800.00

Day

8,000.00

315.00

15.72

10,815.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

13,621.48

Composite Rates Per

100 Sft

Rs.

75,852.28

Per SQM : Rs 8,161.70

Labour Rates Per

100 Sft

Rs.

13,125.00

Per SQM : Rs 1,412.25

869

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-33

(British) :

100 Sft

Shisham wood block flooring 1" thick out to required size, fixed on
a layer of bitumen base

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.130

Mds

400.00

Mds

Coal Tar (in canisters)

36.290

Kg

110.00

Kg

3,991.90

Wood - Shishim

16.660

Cft

1,800.00

Cft

29,988.00

Sand Paper

2.000

Doz

260.00

Doz

520.00

61.19

34,551.90

TOTAL

MATERIAL

52.00

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Carpenter

6.000

Day

800.00

Day

4,800.00

234.00

16.81

8,034.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

9,317.42

Composite Rates Per

100 Sft

Rs.

51,903.32

Per SQM : Rs 5,584.80

Labour Rates Per

100 Sft

Rs.

9,750.00

Per SQM : Rs 1,049.10

870

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-34

(British) :

100 Sft

Teak wood block 1" thick cut to required size, fixed on a layer of
asphalt bitumen laid on base

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.130

Mds

400.00

Mds

Coal Tar (in canisters)

36.290

Kg

110.00

Kg

Sand Paper

2.000

Doz

260.00

Doz

520.00

Wood - Teak

11.660

Cft

7,600.00

Cft

88,616.00

67.40

93,179.90

TOTAL

MATERIAL

52.00
3,991.90

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Carpenter

10.000

Day

800.00

Day

8,000.00

315.00

10.60

10,815.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

22,809.58

Composite Rates Per

100 Sft

Rs.

126,804.48

Per SQM : Rs 13,644.16

Labour Rates Per

100 Sft

Rs.

13,125.00

Per SQM : Rs 1,412.25

871

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-35-a

(British) :

100 Sft

Laying wooden paving of hard wood on edge in coal tar & asphalt :
Shisham wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.130

Mds

400.00

Mds

Coal Tar (in canisters)

15.420

Kg

110.00

Kg

1,696.20

Wood - Shishim

10.830

Cft

1,800.00

Cft

19,494.00

65.18

21,242.20

TOTAL

MATERIAL

52.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

3.000

Day

500.00

Day

1,500.00

Carpenter

1.000

Day

800.00

Day

800.00

96.00

12.82

3,296.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,377.28

Composite Rates Per

100 Sft

Rs.

29,915.48

Per SQM : Rs 3,218.91

Labour Rates Per

100 Sft

Rs.

4,000.00

Per SQM : Rs 430.40

872

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-35-b

(British) :

100 Sft

Laying wooden paving of hard wood on edge in coal tar & asphalt :
Kikar wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.130

Mds

400.00

Mds

Coal Tar (in canisters)

15.420

Kg

110.00

Kg

1,696.20

Wood - Kiker

11.660

Cft

850.00

Cft

9,911.00

58.85

11,659.20

TOTAL

MATERIAL

52.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

3.000

Day

500.00

Day

1,500.00

Carpenter

1.000

Day

800.00

Day

800.00

96.00

19.15

3,296.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,269.02

Composite Rates Per

100 Sft

Rs.

18,224.22

Per SQM : Rs 1,960.93

Labour Rates Per

100 Sft

Rs.

4,000.00

Per SQM : Rs 430.40

873

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-36-a

(British) :

100 Sft

Tile skirting laid in 1:2 c/s mortar over 3/4" thick cement mortar
1:2 complete : Cement tiles

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.490

Bag

490.00

Sand

6.000

Cft

2,200.00

CC Tiles 9x9x0.75

240.000

No

3,500.00

Pigment for flooring

0.500

Kg

275.00

TOTAL

MATERIAL

Bag

1,220.10

100 Cft

132.00

1,000 No
1

Kg

840.00
137.50

34.30

2,329.60

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.500

Day

500.00

Day

1,250.00

Bhishti

0.330

Day

500.00

Day

165.00

82.95

43.70

2,847.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,298.36

Per SQM : Rs 677.70

Labour Rates Per

100 Sft

Rs.

3,456.25

Per SQM : Rs 371.89

1,120.81

874

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-36-b

(British) :

100 Sft

Tile skirting laid in 1:2 c/s mortar over 3/4" thick cement mortar
1:2 complete : Mosaic tiles

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.490

Bag

490.00

Sand

6.000

Cft

2,200.00

White Cement

0.080

Bag

700.00

Bag

Mosaic Tile

420.000

No

60.00

No

25,200.00

Pigment for flooring

0.500

Kg

275.00

Kg

137.50

TOTAL

MATERIAL

Bag

1,220.10

100 Cft

132.00

56.00

67.04

26,745.60

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

2.500

Day

500.00

Day

1,250.00

Bhishti

0.250

Day

500.00

Day

125.00

95.25

10.96

3,270.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,582.53

Composite Rates Per

100 Sft

Rs.

36,598.38

Per SQM : Rs 3,937.99

Labour Rates Per

100 Sft

Rs.

3,968.75

Per SQM : Rs 427.04

875

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-37-a

(British) :

100 Sft

Provide grey cement skirting 3/8" thick complete 1:2 cement, sand
mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.270

Bag

490.00

Sand

3.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

622.30

100 Cft

66.00

13.40

688.30

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.330

Day

500.00

Day

165.00

94.95

64.60

3,259.95

22

847.73

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,795.98

Per SQM : Rs 516.05

Labour Rates Per

100 Sft

Rs.

3,956.25

Per SQM : Rs 425.69

876

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-37-b

(British) :

100 Sft

Provide grey cement skirting 3/8" thick complete 1:3 cement, sand
mortar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.020

Bag

490.00

Sand

3.500

Cft

2,200.00

TOTAL

MATERIAL

Bag

499.80

100 Cft

77.00

11.56

576.80

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.330

Day

500.00

Day

165.00

94.95

66.44

3,259.95

22

823.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,659.95

Per SQM : Rs 501.41

Labour Rates Per

100 Sft

Rs.

3,956.25

Per SQM : Rs 425.69

877

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-37-c

(British) :

100 Sft

Provide grey cement skirting 3/8" thick complete Extra if skirting


or dado is finished with pigment

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pigment for flooring

2.753

275.00

Kg

TOTAL

MATERIAL

Kg

757.08

53.71

757.08

Day

300.00

9.00

24.29

309.00

22

LABOUR
Skilled Coolie

0.500

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,298.63

Per SQM : Rs 139.73

Labour Rates Per

100 Sft

Rs.

375.00

Per SQM : Rs 40.35

232.56

878

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-38-a

(British) :

100 Sft

Glazed tile 1/4" thick dado jointed in white cement complete :


White Plain tiles

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

White Cement

0.100

Bag

700.00

Bag

Ceramic Tile 6"x6" White

420.000

No

15.00

No

TOTAL

MATERIAL

Bag

1,078.00

100 Cft

114.40

70.00
6,300.00

46.83

7,562.40

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

136.50

31.17

4,686.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,664.73

Composite Rates Per

100 Sft

Rs.

14,913.63

Per SQM : Rs 1,604.71

Labour Rates Per

100 Sft

Rs.

5,687.50

Per SQM : Rs 611.98

879

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-38-b

(British) :

100 Sft

Glazed tile 1/4" thick dado jointed in white cement complete :


Coloured Plain tiles

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.000

Bag

490.00

Sand

5.200

Cft

2,200.00

White Cement

0.100

Bag

700.00

Bag

Ceramic Tile 6"x6" White

420.000

No

15.00

No

TOTAL

MATERIAL

Bag

980.00

100 Cft

114.40

70.00
6,300.00

46.60

7,464.40

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

136.50

31.40

4,686.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,643.17

Composite Rates Per

100 Sft

Rs.

14,794.07

Per SQM : Rs 1,591.84

Labour Rates Per

100 Sft

Rs.

5,687.50

Per SQM : Rs 611.98

880

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-38-c

(British) :

100 Sft

Glazed tile 1/4" thick dado jointed in white cement complete :


Printed tiles

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

White Cement

0.100

Bag

700.00

Bag

Ceramic Tile 6"x6" White

420.000

No

15.00

No

TOTAL

MATERIAL

Bag

1,078.00

100 Cft

114.40

70.00
6,300.00

46.83

7,562.40

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

136.50

31.17

4,686.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,664.73

Composite Rates Per

100 Sft

Rs.

14,913.63

Per SQM : Rs 1,604.71

Labour Rates Per

100 Sft

Rs.

5,687.50

Per SQM : Rs 611.98

881

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-39

(British) :

100 Sft

Glazed tile dado 1/4" thick in pigment over 1:2 c/s mortar 3/4"
thick including finishing complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

White Cement

0.100

Bag

700.00

Bag

Ceramic Tile 6"x6" White

420.000

No

15.00

No

6,300.00

Pigment for flooring

0.500

Kg

275.00

Kg

137.50

TOTAL

MATERIAL

Bag

1,078.00

100 Cft

114.40

70.00

47.14

7,699.90

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.500

Day

500.00

Day

250.00

136.50

30.86

4,686.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,694.98

Composite Rates Per

100 Sft

Rs.

15,081.38

Per SQM : Rs 1,622.76

Labour Rates Per

100 Sft

Rs.

5,687.50

Per SQM : Rs 611.98

882

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-40-a-01

(British) :

100 Sft

Mosaic dado or skirting complete as per specs Using grey cement :


3/8" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.290

Bag

490.00

Bag

1,122.10

Sand

4.500

Cft

2,200.00

100 Cft

99.00

Fine Grit / Aggregate

1.500

Cft

3,100.00

100 Cft

46.50

Grinding Stone

0.700

No

220.00

No

154.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

Marble Chips

10.000

Bag

50.00

Bag

500.00

20.25

2,071.60

TOTAL

MATERIAL

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

1.000

Day

500.00

Day

500.00

168.00

57.75

5,768.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,687.75

Composite Rates Per

100 Sft

Rs.

9,527.35

Per SQM : Rs 1,025.14

Labour Rates Per

100 Sft

Rs.

7,000.00

Per SQM : Rs 753.20

883

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-40-a-02

(British) :

100 Sft

Mosaic dado or skirting complete as per specs Using grey cement :


1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.950

Bag

490.00

Bag

1,445.50

Sand

4.500

Cft

2,200.00

100 Cft

99.00

Fine Grit / Aggregate

1.800

Cft

3,100.00

100 Cft

55.80

Grinding Stone

0.700

No

220.00

No

154.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

Marble Chips

13.000

Bag

50.00

Bag

650.00

23.49

2,554.30

TOTAL

MATERIAL

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

1.000

Day

500.00

Day

500.00

168.00

54.51

5,768.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,793.95

Composite Rates Per

100 Sft

Rs.

10,116.25

Per SQM : Rs 1,088.51

Labour Rates Per

100 Sft

Rs.

7,000.00

Per SQM : Rs 753.20

884

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-40-b-01

(British) :

100 Sft

Mosaic dado or skirting complete as per specs Using white cement :


3/8" thick including grinding and polishing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.900

Bag

490.00

Bag

441.00

Sand

4.500

Cft

2,200.00

100 Cft

99.00

Fine Grit / Aggregate

1.500

Cft

3,100.00

100 Cft

46.50

Polish Wax

0.500

Pack

300.00

Pack

150.00

Marble Chips

10.000

Bag

50.00

Bag

500.00

White Cement

1.390

Bag

700.00

Bag

973.00

21.22

2,209.50

TOTAL

MATERIAL

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

1.000

Day

500.00

Day

500.00

168.00

56.78

5,768.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,718.09

Composite Rates Per

100 Sft

Rs.

9,695.59

Per SQM : Rs 1,043.25

Labour Rates Per

100 Sft

Rs.

7,000.00

Per SQM : Rs 753.20

885

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-40-b-02

(British) :

100 Sft

Mosaic dado or skirting complete as per specs Using white cement :


1/2" thick including grinding and polishing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.900

Bag

490.00

Bag

441.00

Sand

4.500

Cft

2,200.00

100 Cft

99.00

Fine Grit / Aggregate

2.000

Cft

3,100.00

100 Cft

62.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

Marble Chips

13.000

Bag

50.00

Bag

650.00

White Cement

2.050

Bag

700.00

Bag

1,435.00

25.22

2,837.00

TOTAL

MATERIAL

LABOUR
Mason

4.000

Day

900.00

Day

3,600.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

1.000

Day

500.00

Day

500.00

168.00

52.78

5,768.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,856.14

Composite Rates Per

100 Sft

Rs.

10,461.14

Per SQM : Rs 1,125.62

Labour Rates Per

100 Sft

Rs.

7,000.00

Per SQM : Rs 753.20

886

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-41-a

(British) :

100 Sft

Provide & lay marble fine dressed and polished stone dado or
skirting in white cement complete : 3/8" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.100

Bag

490.00

Sand

3.000

Cft

2,200.00

White Cement

0.150

Bag

700.00

Bag

105.00

Marble Fine 3/8 inch Thick

100.000

Sft

80.00

Sft

8,000.00

57.76

8,710.00

TOTAL

MATERIAL

Bag

539.00

100 Cft

66.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

20.24

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,488.20

Composite Rates Per

100 Sft

Rs.

13,876.20

Per SQM : Rs 1,493.08

Labour Rates Per

100 Sft

Rs.

3,250.00

Per SQM : Rs 349.70

887

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-41-b

(British) :

100 Sft

Provide & lay marble fine dressed and polished stone dado or
skirting in white cement complete : 1/2" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.750

Bag

490.00

Sand

5.000

Cft

2,200.00

White Cement

0.250

Bag

700.00

Bag

175.00

Marble fine 1/2" thick

100.000

Sft

80.00

Sft

8,000.00

58.39

9,142.50

TOTAL

MATERIAL

Bag

857.50

100 Cft

110.00

LABOUR
Mason

1.500

Day

900.00

Day

1,350.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

78.00

19.61

2,678.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,583.35

Composite Rates Per

100 Sft

Rs.

14,403.85

Per SQM : Rs 1,549.85

Labour Rates Per

100 Sft

Rs.

3,250.00

Per SQM : Rs 349.70

888

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-42

(British) :

100 Sft

Rubber flooring, consisting of 12"x12"x1/8" rubber tiles laid on


firm foundation

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Rubber Vinyl Tile

100.000

No

75.00

No

Adhesive Mixture

1.390

Ltr

450.00

Ltr

625.50

Brush II

1.000

No

180.00

No

180.00

TOTAL

MATERIAL

7,500.00

61.06

8,305.50

LABOUR
Mason

0.995

Day

900.00

Day

895.50

Coolie

2.000

Day

500.00

Day

1,000.00

56.87

16.94

1,952.37

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,244.22

Composite Rates Per

100 Sft

Rs.

12,502.09

Per SQM : Rs 1,345.22

Labour Rates Per

100 Sft

Rs.

2,369.38

Per SQM : Rs 254.94

889

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-43-a

(British) :

100 Rft

Provide & fix glass strip 1.5" wide for dividing the floors into
panels : 5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Glass Strip 5mm

105.000

6.00

MATERIAL

68.04

630.00

Ft

TOTAL

Ft

630.00

LABOUR
Mason

0.021

Day

900.00

Day

18.90

Coolie

0.091

Day

500.00

Day

45.50

1.93

9.96

66.33

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 Rft

Rs.

849.10

Labour Rates Per

100 Rft

Rs.

80.50

LABOUR

152.77

Per Meter : Rs 27.85


Per Meter : Rs 2.64

890

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-43-b

(British) :

100 Rft

Provide & fix glass strip 1.5" wide for dividing the floors into
panels : 3mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Glass Strip 5mm

105.000

6.00

MATERIAL

68.04

630.00

Ft

TOTAL

Ft

630.00

LABOUR
Mason

0.021

Day

900.00

Day

18.90

Coolie

0.091

Day

500.00

Day

45.50

1.93

9.96

66.33

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 Rft

Rs.

849.10

Labour Rates Per

100 Rft

Rs.

80.50

LABOUR

152.77

Per Meter : Rs 27.85


Per Meter : Rs 2.64

891

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-43-c

(British) :

100 Rft

Providing and Fixing marble strip 1.5 inch wide 3/8 inch thick for
dividing the floor into panels

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Marble strip 1-1/2"x3/8"

105.000

5.00

Rft

525.00

MATERIAL

66.81

525.00

Rft

TOTAL

LABOUR
Mason

0.021

Day

900.00

Day

18.90

Coolie

0.091

Day

500.00

Day

45.50

1.93

11.19

66.33

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 Rft

Rs.

721.00

Labour Rates Per

100 Rft

Rs.

80.50

LABOUR

129.67

Per Meter : Rs 23.65


Per Meter : Rs 2.64

892

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-43-d

(British) :

100 Rft

Providing and Fixing marble strip 2" wide and 3/8" thick for
dividing the floor into panels

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Marble strip 2"x3/8"

105.000

6.00

Rft

630.00

MATERIAL

68.04

630.00

Rft

TOTAL

LABOUR
Mason

0.021

Day

900.00

Day

18.90

Coolie

0.091

Day

500.00

Day

45.50

1.93

9.96

66.33

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 Rft

Rs.

849.10

Labour Rates Per

100 Rft

Rs.

80.50

LABOUR

152.77

Per Meter : Rs 27.85


Per Meter : Rs 2.64

893

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-44

(British) :

100 Sft

P/F Vinyl Tiles or Vinyl Sheet flooring over firm foundation

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Adhesive Mixture

2.500

Ltr

450.00

Ltr

Brush II

1.000

No

180.00

No

180.00

Vinyl Flooring Sheet

105.000

No

85.00

No

8,925.00

TOTAL

MATERIAL

1,125.00

63.78

10,230.00

LABOUR
Fitter I

1.500

Day

800.00

Day

1,200.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

54.00

14.22

1,854.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,646.60

Composite Rates Per

100 Sft

Rs.

14,730.60

Per SQM : Rs 1,585.01

Labour Rates Per

100 Sft

Rs.

2,250.00

Per SQM : Rs 242.10

894

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

10-45

Item Name :

(British) :

100 Sft

P/F Precast Concrete 7000 psi TUFF Tiles over bed of 2" thick sand
& 4" thick brick ballast comp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Ballast /Stone Ballast

5.900

Cft

1,260.00

100 Cft

74.34

Sand

18.000

Cft

2,200.00

100 Cft

396.00

TUFF Tiles 7000 psi

100.000

Sft

40.00

TOTAL

MATERIAL

Sft

4,000.00

51.82

4,470.34

Day

2,000.00

60.00

26.18

2,060.00

22

LABOUR
Coolie

4.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,953.81

Per SQM : Rs 855.83

Labour Rates Per

100 Sft

Rs.

2,500.00

Per SQM : Rs 269.00

1,423.47

895

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-46-a

(British) :

100 Sft

P/F Ceramic Floor Tiles (Emco, National or eq) Size : 12" x 12"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.920

Bag

490.00

Sand

4.000

Cft

2,200.00

White Cement

0.270

Bag

700.00

Bag

189.00

Ceramic Tile 12" x 12"

100.000

Sft

70.00

Sft

7,000.00

50.72

7,727.80

TOTAL

MATERIAL

Bag

450.80

100 Cft

88.00

LABOUR
Mason

3.000

Day

900.00

Day

2,700.00

Coolie

2.000

Day

500.00

Day

1,000.00

111.00

27.28

3,811.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,514.12

Composite Rates Per

100 Sft

Rs.

14,052.92

Per SQM : Rs 1,512.09

Labour Rates Per

100 Sft

Rs.

4,625.00

Per SQM : Rs 497.65

896

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-46-b

(British) :

100 Sft

P/F Ceramic Floor Tiles (Emco, National or eq) Size 20" x 20"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.920

Bag

490.00

Sand

4.000

Cft

2,200.00

White Cement

0.270

Bag

700.00

Bag

189.00

Ceramic Tile 20" x 20"

100.000

Sft

145.00

Sft

14,500.00

60.34

15,227.80

TOTAL

MATERIAL

Bag

450.80

100 Cft

88.00

LABOUR
Mason

3.000

Day

900.00

Day

2,700.00

Coolie

2.000

Day

500.00

Day

1,000.00

111.00

17.66

3,811.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,164.12

Composite Rates Per

100 Sft

Rs.

23,202.92

Per SQM : Rs 2,496.63

Labour Rates Per

100 Sft

Rs.

4,625.00

Per SQM : Rs 497.65

897

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-47

(British) :

100 Sft

Burnt brick (1st class) pavement on edge grouted with sand


including preparation of bed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

6.000

Cft

1,400.00

100 Cft

84.00

Sand

13.000

Cft

2,200.00

100 Cft

286.00

Burnt Brick

525.000

No

8,500.00

TOTAL

MATERIAL

1,000 No

4,462.50

51.91

4,832.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.500

Day

500.00

Day

250.00

64.50

26.09

2,214.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,583.15

Per SQM : Rs 923.55

Labour Rates Per

100 Sft

Rs.

2,687.50

Per SQM : Rs 289.18

1,536.15

898

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-48-a

(British) :

100 Sft

Porceline tile floor 1/4" thick laid cement 1:2 or 3/4" thick
cement mortar 1:2 (Local Master Tiles)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

Porciline tiles 12x12" Master

100.000

No

125.00

No

Filler

1.000

Pkt

130.00

Pkt

130.00

58.00

13,822.40

TOTAL

MATERIAL

Bag

1,078.00

100 Cft

114.40

12,500.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

121.50

20.00

4,171.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,931.93

Composite Rates Per

100 Sft

Rs.

21,925.83

Per SQM : Rs 2,359.22

Labour Rates Per

100 Sft

Rs.

5,062.50

Per SQM : Rs 544.73

899

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-48-b

(British) :

100 Sft

Porceline tile floor 1/4" thick laid cement 1:2 over 3/4" thick
cement mortar 1:2 (Imported Tiles)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

Porciline tiles 12x24"


Imported
Filler

50.000

No

250.00

No

1.000

Pkt

130.00

Pkt

130.00

58.00

13,822.40

TOTAL

MATERIAL

Bag

1,078.00

100 Cft

114.40

12,500.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

121.50

20.00

4,171.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,931.93

Composite Rates Per

100 Sft

Rs.

21,925.83

Per SQM : Rs 2,359.22

Labour Rates Per

100 Sft

Rs.

5,062.50

Per SQM : Rs 544.73

900

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-48-c

(British) :

100 Sft

Granitto tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement
mortar 1:2 (Imported Tiles UAE) 24"x24"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

Granitto tiles (UAE) 24"x24"

25.000

No

900.00

No

Filler

1.000

Pkt

130.00

Pkt

130.00

64.10

23,822.40

TOTAL

MATERIAL

Bag

1,078.00

100 Cft

114.40

22,500.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

121.50

13.90

4,171.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,131.93

Composite Rates Per

100 Sft

Rs.

34,125.83

Per SQM : Rs 3,671.94

Labour Rates Per

100 Sft

Rs.

5,062.50

Per SQM : Rs 544.73

901

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-48-d

(British) :

100 Sft

Granitto tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement
mortar 1:2 (Imported Tiles UAE) 16"x16"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.200

Bag

490.00

Sand

5.200

Cft

2,200.00

Granitto tiles (UAE) 16"x16"

57.000

No

335.00

No

Filler

1.000

Pkt

130.00

Pkt

130.00

62.59

20,417.40

TOTAL

MATERIAL

Bag

1,078.00

100 Cft

114.40

19,095.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.500

Day

500.00

Day

250.00

121.50

15.41

4,171.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,382.83

Composite Rates Per

100 Sft

Rs.

29,971.73

Per SQM : Rs 3,224.96

Labour Rates Per

100 Sft

Rs.

5,062.50

Per SQM : Rs 544.73

902

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-49-a

(British) :

100 Sft

Providing and Laying marble fine dressed stone flooring on surface


in white cement complete using indian green marble 12"x12"x3/4"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

White Cement

0.100

Bag

700.00

Bag

70.00

Indian green marble fine dress

100.000

No

300.00

No

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

30,000.00

65.13

31,667.60

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

1.000

Day

500.00

Day

500.00

144.00

12.87

4,944.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

8,022.87

Composite Rates Per

100 Sft

Rs.

44,634.47

Per SQM : Rs 4,802.67

Labour Rates Per

100 Sft

Rs.

6,000.00

Per SQM : Rs 645.60

903

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-49-b

(British) :

100 Sft

Providing and Laying marble fine dressed stone flooring on surface


in white cement complete using Trevera marble 12"x12"x3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

White Cement

0.100

Bag

700.00

Bag

70.00

Trevera Marble fine dressed 3/

100.000

No

75.00

No

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

7,500.00

49.23

9,167.60

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

1.000

Day

500.00

Day

500.00

144.00

28.77

4,944.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,072.87

Composite Rates Per

100 Sft

Rs.

17,184.47

Per SQM : Rs 1,849.05

Labour Rates Per

100 Sft

Rs.

6,000.00

Per SQM : Rs 645.60

904

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-49-c

(British) :

100 Sft

Providing and Laying marble fine dressed stone flooring on surface


in white cement complete using Botocina marble 12"x12"x3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

White Cement

0.100

Bag

700.00

Bag

70.00

Botocina Marble fine dressed 3

100.000

No

95.00

No

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

9,500.00

52.45

11,167.60

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

1.000

Day

500.00

Day

500.00

144.00

25.55

4,944.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,512.87

Composite Rates Per

100 Sft

Rs.

19,624.47

Per SQM : Rs 2,111.59

Labour Rates Per

100 Sft

Rs.

6,000.00

Per SQM : Rs 645.60

905

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-49-d

(British) :

100 Sft

Providing and Laying marble fine dressed stone flooring on surface


in white cement complete using Veroona/Lasbela marble 12"x12"x3/4"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.640

Bag

490.00

Sand

7.000

Cft

2,200.00

Polish Wax

0.500

Pack

300.00

Pack

150.00

White Cement

0.100

Bag

700.00

Bag

70.00

Veroona Marble fine dressed 3/

100.000

No

90.00

No

TOTAL

MATERIAL

Bag

1,293.60

100 Cft

154.00

9,000.00

51.73

10,667.60

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

1.000

Day

500.00

Day

500.00

144.00

26.27

4,944.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,402.87

Composite Rates Per

100 Sft

Rs.

19,014.47

Per SQM : Rs 2,045.96

Labour Rates Per

100 Sft

Rs.

6,000.00

Per SQM : Rs 645.60

906

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-50

(British) :

100 Sft

Chemical polishing of marble floor/Dado

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Grinding Stone

4.000

No

220.00

No

880.00

Polish Wax

0.500

Pkt

300.00

Pkt

150.00

39.02

1,030.00

TOTAL

MATERIAL

LABOUR
Coolie

1.000

No

500.00

No

500.00

Polisher

0.500

Day

900.00

Day

450.00

28.50

38.98

978.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,444.10

Per SQM : Rs 262.99

Labour Rates Per

100 Sft

Rs.

1,187.50

Per SQM : Rs 127.78

435.60

907

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 10 , FLOORING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

10-51

(British) :

Sft

Replaced coloured glass panes of sizes upto 4 mm thickness with


iron, nails and putty including removing broken ones if required in
all floors.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Coloured glass panes of size
upto 4mm
Putty and Nails

1.000

Sft

110.00

Sft

110.00

1.000

Ls

50.00

Ls

50.00

TOTAL

MATERIAL

61.98

160.00

LABOUR
Coolie

0.028

Day

500.00

Day

14.00

Glazier

0.028

Day

700.00

Day

19.60

1.01

16.02

34.61

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

237.20

Per SQM : Rs 2,552.27

Labour Rates Per

Sft

Rs.

42.00

Per SQM : Rs 451.92

42.59

908

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-01-a

(British) :

100 Sft

Mud plaster on walls (excluding gobri leeping) upto 20' height :


1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

6.000

Cft

1,400.00

Bhoosa

8.000

Sr

15.00

TOTAL

MATERIAL

100 Cft
1

Sr

84.00
120.00

24.21

204.00

LABOUR
Mason

0.170

Day

900.00

Day

153.00

Coolie

0.500

Day

500.00

Day

250.00

Bhishti

0.050

Day

500.00

Day

25.00

12.84

53.79

440.84

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

783.88

Per SQM : Rs 84.35

Labour Rates Per

100 Sft

Rs.

535.00

Per SQM : Rs 57.57

139.04

909

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-01-b

(British) :

100 Sft

Mud plaster on walls (excluding gobri leeping) upto 20' height : 1"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

12.000

Cft

1,400.00

Bhoosa

16.000

Sr

15.00

TOTAL

MATERIAL

100 Cft
1

Sr

168.00
240.00

30.66

408.00

LABOUR
Mason

0.200

Day

900.00

Day

180.00

Coolie

0.750

Day

500.00

Day

375.00

Bhishti

0.070

Day

500.00

Day

35.00

17.70

47.34

607.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,235.26

Per SQM : Rs 132.91

Labour Rates Per

100 Sft

Rs.

737.50

Per SQM : Rs 79.36

219.56

910

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-02-a

(British) :

100 Sft

Mud plaster on floor / roof (excluding gobri leeping) upto 20'


height : 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

6.000

Cft

1,400.00

Bhoosa

8.000

Sr

15.00

TOTAL

MATERIAL

100 Cft
1

Sr

84.00
120.00

25.98

204.00

LABOUR
Mason

0.150

Day

900.00

Day

135.00

Coolie

0.450

Day

500.00

Day

225.00

Bhishti

0.050

Day

500.00

Day

25.00

11.55

52.02

396.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

730.13

Per SQM : Rs 78.56

Labour Rates Per

100 Sft

Rs.

481.25

Per SQM : Rs 51.78

129.58

911

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-02-b

(British) :

100 Sft

Mud plaster on floor / roof (excluding gobri leeping) upto 20'


height : 1" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

12.000

Cft

1,400.00

Bhoosa

16.000

Sr

15.00

TOTAL

MATERIAL

100 Cft
1

Sr

168.00
240.00

26.89

408.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.010

Day

500.00

Day

5.00

21.90

51.11

751.90

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,410.26

Per SQM : Rs 151.74

Labour Rates Per

100 Sft

Rs.

912.50

Per SQM : Rs 98.19

250.36

912

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-03-a

(British) :

100 Sft

Cement lime plaster 1:7:12 (c/l/s) upto 20' height 1/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.100

Bag

490.00

Sand

1.400

Cft

2,200.00

White Lime

0.317

Mds

400.00

TOTAL

MATERIAL

Bag

49.00

100 Cft

30.80

Mds

126.80

10.28

206.60

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

67.72

1,339.00

22

331.45

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,877.05

Per SQM : Rs 201.97

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

913

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-03-b

(British) :

100 Sft

Cement lime plaster 1:7:12 (c/l/s) upto 20' height 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.200

Bag

490.00

Sand

2.800

Cft

2,200.00

White Lime

0.635

Mds

400.00

TOTAL

MATERIAL

Bag

98.00

100 Cft

61.60

Mds

254.00

18.10

413.60

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

59.90

1,339.00

22

376.99

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,129.59

Per SQM : Rs 229.14

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

914

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-04-a

(British) :

100 Sft

Cement Neru plaster 1:2 (c/s) upto 20' height 1/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.610

Bag

490.00

Sand

1.540

Cft

2,200.00

Jute Chopped

1.400

Kg

150.00

TOTAL

MATERIAL

Bag

298.90

100 Cft

33.88

Kg

210.00

22.09

542.78

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

55.91

1,339.00

22

405.41

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,287.19

Per SQM : Rs 246.10

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

915

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-04-b

(British) :

100 Sft

Cement Neru plaster 1:2 (c/s) upto 20' height 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.940

Bag

490.00

Sand

3.080

Cft

2,200.00

Jute Chopped

2.800

Kg

150.00

TOTAL

MATERIAL

Bag

460.60

100 Cft

67.76

Kg

420.00

31.64

948.36

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

46.36

1,339.00

22

494.64

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,782.00

Per SQM : Rs 299.34

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

916

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-05

(British) :

100 Sft

2" stucco cement plaster 1:2:4 (c/s/shingle) upto 20' height

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.010

Bag

490.00

Sand

7.600

Cft

Crushed Aggregate

15.000

Cft

TOTAL

Bag

1,474.90

2,200.00

100 Cft

167.20

2,800.00

100 Cft

420.00

MATERIAL

30.25

2,062.10

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.300

Day

500.00

Day

150.00

91.50

47.75

3,141.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,328.26

Per SQM : Rs 680.92

Labour Rates Per

100 Sft

Rs.

3,812.50

Per SQM : Rs 410.23

1,124.66

917

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-06-a

(British) :

100 Sft

Provide/lay machine sprayed plaster 1/2" thick using cement & zero
guage chips : Ratio 1:1

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.100

Bag

490.00

Sand

1.500

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

Marble Chips

0.084

Bag

50.00

Bag

4.20

22.79

876.20

TOTAL

MATERIAL

Bag

539.00

100 Cft

33.00

LABOUR
Mason

0.330

Day

900.00

Day

297.00

Coolie

0.650

Day

500.00

Day

325.00

Bhishti

0.350

Day

500.00

Day

175.00

Spray Man

0.350

Day

600.00

Day

210.00

30.21

29.19

1,037.21

Hour

1,000.00

26.01

1,000.00

22

634.30

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Spray Machine

4.000

250.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

3,547.71

Per SQM : Rs 381.73

Labour Rates Per

100 Sft

Rs.

1,258.75

Per SQM : Rs 135.44

918

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-06-b

(British) :

100 Sft

Provide/lay machine sprayed plaster 1/2" thick using cement & zero
guage chips : Ratio 1:1.5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.900

Bag

490.00

Sand

1.600

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

Marble Chips

0.091

Bag

50.00

Bag

4.55

20.93

780.75

TOTAL

MATERIAL

Bag

441.00

100 Cft

35.20

LABOUR
Mason

0.330

Day

900.00

Day

297.00

Coolie

0.670

Day

500.00

Day

335.00

Bhishti

0.350

Day

500.00

Day

175.00

Spray Man

0.350

Day

600.00

Day

210.00

30.51

30.26

1,047.51

Hour

1,000.00

26.81

1,000.00

22

615.51

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Spray Machine

4.000

250.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

3,443.77

Per SQM : Rs 370.55

Labour Rates Per

100 Sft

Rs.

1,271.25

Per SQM : Rs 136.79

919

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-06-c

(British) :

100 Sft

Provide/lay machine sprayed plaster 1/2" thick using cement & zero
guage chips : Ratio 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.800

Bag

490.00

Sand

1.600

Cft

2,200.00

Scaffolding

20.000

Sft

15.00

Sft

300.00

Marble Chips

0.100

Bag

50.00

Bag

5.00

19.85

732.20

TOTAL

MATERIAL

Bag

392.00

100 Cft

35.20

LABOUR
Mason

0.360

Day

900.00

Day

324.00

Coolie

0.650

Day

500.00

Day

325.00

Bhishti

0.350

Day

500.00

Day

175.00

Spray Man

0.350

Day

600.00

Day

210.00

31.02

31.03

1,065.02

Hour

1,000.00

27.11

1,000.00

22

608.56

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Spray Machine

4.000

250.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

3,405.78

Per SQM : Rs 366.46

Labour Rates Per

100 Sft

Rs.

1,292.50

Per SQM : Rs 139.07

920

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-07-a

(British) :

100 Sft

Cement plaster 1:2, upto 20' height 3/8" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.980

Bag

490.00

Sand

2.500

Cft

2,200.00

TOTAL

MATERIAL

Bag

480.20

100 Cft

55.00

21.87

535.20

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

56.13

1,339.00

22

403.74

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,277.94

Per SQM : Rs 245.11

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

921

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-07-b

(British) :

100 Sft

Cement plaster 1:2, upto 20' height 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.270

Bag

490.00

Sand

3.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

622.30

100 Cft

66.00

25.96

688.30

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

52.04

1,339.00

22

437.43

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,464.73

Per SQM : Rs 265.20

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

922

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-07-c

(British) :

100 Sft

Cement plaster 1:2, upto 20' height 3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.950

Bag

490.00

Sand

5.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

955.50

100 Cft

110.00

29.43

1,065.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.250

Day

500.00

Day

125.00

49.50

48.57

1,699.50

22

597.41

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,362.41

Per SQM : Rs 361.80

Labour Rates Per

100 Sft

Rs.

2,062.50

Per SQM : Rs 221.93

923

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-08-a

(British) :

100 Sft

Cement plaster 1:3 upto 20' height 3/8" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.670

Bag

490.00

Sand

2.550

Cft

2,200.00

TOTAL

MATERIAL

Bag

328.30

100 Cft

56.10

17.12

384.40

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

60.88

1,339.00

22

370.57

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,093.97

Per SQM : Rs 225.31

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

924

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-08-b

(British) :

100 Sft

Cement plaster 1:3 upto 20' height 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.890

Bag

490.00

Sand

3.400

Cft

2,200.00

TOTAL

MATERIAL

Bag

436.10

100 Cft

74.80

21.16

510.90

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

56.84

1,339.00

22

398.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,248.30

Per SQM : Rs 241.92

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

925

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-08-c

(British) :

100 Sft

Cement plaster 1:3 upto 20' height 3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.340

Bag

490.00

Sand

5.100

Cft

2,200.00

TOTAL

MATERIAL

Bag

656.60

100 Cft

112.20

23.84

768.80

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.250

Day

500.00

Day

125.00

49.50

54.16

1,699.50

22

532.14

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,000.44

Per SQM : Rs 322.85

Labour Rates Per

100 Sft

Rs.

2,062.50

Per SQM : Rs 221.93

926

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-09-a

(British) :

100 Sft

Cement plaster 1:4 upto 20' height 3/8" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.580

Bag

490.00

Sand

3.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

284.20

100 Cft

66.00

15.92

350.20

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

62.08

1,339.00

22

363.04

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,052.24

Per SQM : Rs 220.82

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

927

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-09-b

(British) :

100 Sft

Cement plaster 1:4 upto 20' height 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.740

Bag

490.00

Sand

3.600

Cft

2,200.00

TOTAL

MATERIAL

Bag

362.60

100 Cft

79.20

19.02

441.80

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

58.98

1,339.00

22

383.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,164.00

Per SQM : Rs 232.85

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

928

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-09-c

(British) :

100 Sft

Cement plaster 1:4 upto 20' height 3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.160

Bag

490.00

Sand

5.500

Cft

2,200.00

TOTAL

MATERIAL

Bag

568.40

100 Cft

121.00

22.10

689.40

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.250

Day

500.00

Day

125.00

49.50

55.90

1,699.50

22

514.67

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,903.57

Per SQM : Rs 312.42

Labour Rates Per

100 Sft

Rs.

2,062.50

Per SQM : Rs 221.93

929

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-10-a

(British) :

100 Sft

Cement plaster 3/8" thick under soffit of RCC roof slabs only upto
20' height : (1:2)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.750

Bag

490.00

Sand

2.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

367.50

100 Cft

44.00

14.97

411.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.500

Day

500.00

Day

250.00

49.50

63.03

1,699.50

22

453.53

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,564.53

Per SQM : Rs 275.94

Labour Rates Per

100 Sft

Rs.

2,062.50

Per SQM : Rs 221.93

930

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-10-b

(British) :

100 Sft

Cement plaster 3/8" thick under soffit of RCC roof slabs only upto
20' height : (1:3)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.710

Bag

490.00

Sand

2.790

Cft

2,200.00

TOTAL

MATERIAL

Bag

347.90

100 Cft

61.38

14.91

409.28

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.500

Day

500.00

Day

250.00

49.50

63.09

1,699.50

22

453.04

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,561.82

Per SQM : Rs 275.65

Labour Rates Per

100 Sft

Rs.

2,062.50

Per SQM : Rs 221.93

931

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-10-c

(British) :

100 Sft

Cement plaster 3/8" thick under soffit of RCC roof slabs only upto
20' height : (1:4)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.460

Bag

490.00

Sand

2.400

Cft

2,200.00

TOTAL

MATERIAL

Bag

225.40

100 Cft

52.80

10.82

278.20

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.500

Day

500.00

Day

250.00

49.50

67.18

1,699.50

22

424.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,401.90

Per SQM : Rs 258.44

Labour Rates Per

100 Sft

Rs.

2,062.50

Per SQM : Rs 221.93

932

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-11-a

(British) :

100 Sft

Cement plaster 1:5, upto 20' height 3/8" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.510

Bag

490.00

Sand

3.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

249.90

100 Cft

66.00

14.66

315.90

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

63.34

1,339.00

22

355.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,010.40

Per SQM : Rs 216.32

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

933

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-11-b

(British) :

100 Sft

Cement plaster 1:5, upto 20' height 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.670

Bag

490.00

Sand

4.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

328.30

100 Cft

88.00

18.19

416.30

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

59.81

1,339.00

22

377.59

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,132.89

Per SQM : Rs 229.50

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

934

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-11-c

(British) :

100 Sft

Cement Plaster 1:5, upto 20' height 3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.020

Bag

490.00

Sand

6.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

499.80

100 Cft

132.00

20.77

631.80

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.250

Day

500.00

Day

125.00

49.50

57.23

1,699.50

22

502.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,833.30

Per SQM : Rs 304.86

Labour Rates Per

100 Sft

Rs.

2,062.50

Per SQM : Rs 221.93

935

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-12-a

(British) :

100 Sft

Cement plaster 1:6, upto 20' height 3/8" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.410

Bag

490.00

Sand

3.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

200.90

100 Cft

66.00

12.78

266.90

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

65.22

1,339.00

22

344.72

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,950.62

Per SQM : Rs 209.89

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

936

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-12-b

(British) :

100 Sft

Cement plaster 1:6, upto 20' height 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.540

Bag

490.00

Sand

4.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

264.60

100 Cft

88.00

16.00

352.60

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

62.00

1,339.00

22

363.57

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,055.17

Per SQM : Rs 221.14

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

937

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-12-c

(British) :

100 Sft

Cement plaster 1:6, upto 20' height 3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.810

Bag

490.00

Sand

6.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

396.90

100 Cft

132.00

18.21

528.90

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.250

Day

500.00

Day

125.00

49.50

59.79

1,699.50

22

479.36

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,707.76

Per SQM : Rs 291.35

Labour Rates Per

100 Sft

Rs.

2,062.50

Per SQM : Rs 221.93

938

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-13

(British) :

100 Sft

Applying floating coat of cement 1/32" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.410

490.00

Bag

TOTAL

MATERIAL

Bag

200.90

14.34

200.90

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

0.250

Day

500.00

Day

125.00

Bhishti

0.100

Day

500.00

Day

50.00

25.50

63.66

875.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,307.60

Per SQM : Rs 140.70

Labour Rates Per

100 Sft

Rs.

1,062.50

Per SQM : Rs 114.33

231.20

939

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-14

(British) :

100 Sft

Lime pointing flush upto 20' height, including racking joints in


lime sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

1.800

Cft

2,200.00

White Lime

0.340

Mds

400.00

TOTAL

MATERIAL

100 Cft

39.60

Mds

136.00

11.70

175.60

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

0.750

Day

500.00

Day

375.00

Bhishti

0.250

Day

500.00

Day

125.00

28.50

66.30

978.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,401.73

Per SQM : Rs 150.83

Labour Rates Per

100 Sft

Rs.

1,187.50

Per SQM : Rs 127.78

247.63

940

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-15

(British) :

100 Sft

Lime pointing struck joints on walls, upto 20' height including


racking joints, in lime sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

1.800

Cft

2,200.00

White Lime

0.340

Mds

400.00

TOTAL

100 Cft
1

7.74

MATERIAL

39.60

Mds

136.00

175.60

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

45.75

70.26

1,570.75

22

374.13

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,120.48

Per SQM : Rs 228.16

Labour Rates Per

100 Sft

Rs.

1,906.25

Per SQM : Rs 205.11

941

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-16-a

(British) :

100 Sft

Cement pointing flush, upto 20' height Ratio 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.730

Bag

490.00

Sand

1.800

Cft

2,200.00

TOTAL

MATERIAL

Bag

357.70

100 Cft

39.60

17.56

397.30

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

60.44

1,339.00

22

373.41

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,109.71

Per SQM : Rs 227.00

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

942

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-16-b

(British) :

100 Sft

Cement pointing flush, upto 20' height Ratio 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.550

Bag

490.00

Sand

2.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

269.50

100 Cft

44.00

14.57

313.50

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

39.00

63.43

1,339.00

22

354.97

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,007.47

Per SQM : Rs 216.00

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

943

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-17-a

(British) :

100 Sft

Cement pointing 1:2 flush, on floor

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.730

Bag

490.00

Sand

1.800

Cft

2,200.00

TOTAL

MATERIAL

Bag

357.70

100 Cft

39.60

22.12

397.30

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

0.750

Day

500.00

Day

375.00

Bhishti

0.250

Day

500.00

Day

125.00

28.50

55.88

978.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,672.21

Per SQM : Rs 179.93

Labour Rates Per

100 Sft

Rs.

1,187.50

Per SQM : Rs 127.78

296.41

944

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-18-a

(British) :

100 Sft

Cement pointing struck joints, on walls, upto 20' height : Ratio


1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.730

Bag

490.00

Sand

1.800

Cft

2,200.00

TOTAL

MATERIAL

Bag

357.70

100 Cft

39.60

15.50

397.30

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

45.75

62.50

1,570.75

22

422.91

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,390.96

Per SQM : Rs 257.27

Labour Rates Per

100 Sft

Rs.

1,906.25

Per SQM : Rs 205.11

945

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-18-b

(British) :

100 Sft

Cement pointing struck joints, on walls, upto 20' height : Ratio


1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.550

Bag

490.00

Sand

2.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

269.50

100 Cft

44.00

12.79

313.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

45.75

65.21

1,570.75

22

404.47

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,288.72

Per SQM : Rs 246.27

Labour Rates Per

100 Sft

Rs.

1,906.25

Per SQM : Rs 205.11

946

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-19-a

(British) :

100 Sft

Pointing flush on stone work, upto 20' height in lime sand mortar
1:2 (lime, sand)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

2.000

Cft

2,200.00

White Lime

0.450

Mds

400.00

TOTAL

MATERIAL

100 Cft

44.00

Mds

180.00

11.21

224.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

0.500

Day

500.00

Day

250.00

Bhishti

0.250

Day

500.00

Day

125.00

38.25

66.79

1,313.25

22

329.78

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,867.03

Per SQM : Rs 200.89

Labour Rates Per

100 Sft

Rs.

1,593.75

Per SQM : Rs 171.49

947

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-19-b

(British) :

100 Sft

Pointing flush on stone work, upto 20' height in cement sand mortar
1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.550

Bag

490.00

Sand

2.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

269.50

100 Cft

44.00

14.80

313.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

0.500

Day

500.00

Day

250.00

Bhishti

0.250

Day

500.00

Day

125.00

38.25

63.20

1,313.25

22

349.47

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,976.22

Per SQM : Rs 212.64

Labour Rates Per

100 Sft

Rs.

1,593.75

Per SQM : Rs 171.49

948

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-19-c-01

(British) :

100 Sft

Pointing flush on stone work, upto 20' height On stone work raised
: in lime sand mortar 1:2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

2.000

Cft

2,200.00

White Lime

0.450

Mds

400.00

TOTAL

100 Cft
1

6.34

MATERIAL

44.00

Mds

180.00

224.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

72.75

71.66

2,497.75

22

582.78

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,304.53

Per SQM : Rs 355.57

Labour Rates Per

100 Sft

Rs.

3,031.25

Per SQM : Rs 326.16

949

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-19-c-02

(British) :

100 Sft

Pointing flush on stone work, upto 20' height On stone work raised
: in c/s mortar 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.550

Bag

490.00

Sand

2.000

Cft

2,200.00

TOTAL

Bag

269.50

100 Cft

44.00

8.59

MATERIAL

313.50

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

72.75

69.41

2,497.75

22

602.47

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,413.72

Per SQM : Rs 367.32

Labour Rates Per

100 Sft

Rs.

3,031.25

Per SQM : Rs 326.16

950

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-20

(British) :

100 Sft

Racking and washing joints of stone masonry (old work)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

18.75

78.00

643.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

781.25

Per SQM : Rs 84.06

Labour Rates Per

100 Sft

Rs.

781.25

Per SQM : Rs 84.06

137.50

951

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-21

(British) :

100 Sft

Racking and washing joints of brick masonry (old work)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Bhishti

0.250

Day

500.00

Day

125.00

11.25

78.00

386.25

22

82.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

952

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-22

(British) :

100 Sft

Priming coat of chalk under distemper

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.910

Chalk

20.00

Kg

TOTAL

8.63

MATERIAL

Kg

18.20

18.20

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Coolie

0.100

Day

500.00

Day

50.00

4.20

69.37

144.20

22

34.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

197.20

Per SQM : Rs 21.22

Labour Rates Per

100 Sft

Rs.

175.00

Per SQM : Rs 18.83

953

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-23-a-01

(British) :

100 Sft

Distempering New surface : One coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand Paper

0.250

Doz

260.00

Doz

65.00

Paint : Distemper

0.530

Ltr

240.00

Ltr

127.20

Brush III

0.020

No

140.00

No

TOTAL

MATERIAL

2.80

25.66

195.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

11.25

52.34

386.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

706.65

Per SQM : Rs 76.04

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

125.40

954

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-23-a-02

(British) :

100 Sft

Distempering New surface : Two coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand Paper

0.250

Doz

260.00

Doz

65.00

Paint : Distemper

0.697

Ltr

240.00

Ltr

167.28

Brush III

0.030

No

140.00

No

TOTAL

MATERIAL

4.20

29.01

236.48

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

11.25

48.99

386.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

757.26

Per SQM : Rs 81.48

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

134.53

955

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-23-a-03

(British) :

100 Sft

Distempering New surface : Three coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand Paper

0.250

Doz

260.00

Doz

65.00

Paint : Distemper

0.808

Ltr

240.00

Ltr

193.92

Brush III

0.040

No

140.00

No

TOTAL

MATERIAL

5.60

31.02

264.52

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

11.25

46.98

386.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

791.46

Per SQM : Rs 85.16

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

140.69

956

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-23-b-01

(British) :

100 Sft

Distempering Old surface : One coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand Paper

0.250

Doz

260.00

Doz

65.00

Paint : Distemper

0.240

Ltr

240.00

Ltr

57.60

Brush III

0.040

No

140.00

No

5.60

TOTAL

MATERIAL

41.23

128.20

LABOUR
Coolie

0.070

Day

500.00

Day

35.00

Painter / Polisher

0.070

Day

1,000.00

Day

70.00

3.15

36.77

108.15

22

51.30

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

287.65

Per SQM : Rs 30.95

Labour Rates Per

100 Sft

Rs.

131.25

Per SQM : Rs 14.12

957

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-23-b-02

(British) :

100 Sft

Distempering Old surface : Two coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand Paper

0.250

Doz

260.00

Doz

65.00

Paint : Distemper

0.380

Ltr

240.00

Ltr

91.20

Brush III

0.040

No

140.00

No

5.60

TOTAL

MATERIAL

38.92

161.80

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Painter / Polisher

0.100

Day

1,000.00

Day

100.00

4.50

39.08

154.50

22

68.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

384.90

Per SQM : Rs 41.41

Labour Rates Per

100 Sft

Rs.

187.50

Per SQM : Rs 20.18

958

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-24-a-01

(British) :

100 Sft

Colour washing: New surface : One coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.075

Mds

380.00

Mds

28.50

Rice

0.100

Kg

80.00

Kg

8.00

Gum/colour For White Washing

0.100

Pack

80.00

Pack

8.00

TOTAL

MATERIAL

24.81

44.50

Day

90.00

2.70

53.19

92.70

22

LABOUR
Skilled Coolie

0.150

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

166.79

Per SQM : Rs 17.95

Labour Rates Per

100 Sft

Rs.

112.50

Per SQM : Rs 12.11

29.59

959

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-24-a-02

(British) :

100 Sft

Colour washing: New surface : Two coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.120

Mds

380.00

Mds

45.60

Rice

0.180

Kg

80.00

Kg

14.40

Gum/colour For White Washing

0.150

Pack

80.00

Pack

12.00

18.18

72.00

TOTAL

MATERIAL

LABOUR
Coolie

0.150

Day

500.00

Day

75.00

Skilled Coolie

0.250

Day

600.00

Day

150.00

6.75

59.82

231.75

22

65.34

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

369.09

Per SQM : Rs 39.71

Labour Rates Per

100 Sft

Rs.

281.25

Per SQM : Rs 30.26

960

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-24-b-01

(British) :

100 Sft

Colour washing: Old surface : One coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.056

Mds

380.00

Mds

21.28

Rice

0.070

Kg

80.00

Kg

5.60

Gum/colour For White Washing

0.100

Pack

80.00

Pack

8.00

TOTAL

MATERIAL

19.11

34.88

Day

102.00

3.06

58.89

105.06

22

30.11

LABOUR
Skilled Coolie

0.170

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

170.05

Per SQM : Rs 18.30

Labour Rates Per

100 Sft

Rs.

127.50

Per SQM : Rs 13.72

961

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-24-b-02

(British) :

100 Sft

Colour washing: Old surface : Two coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.094

Mds

380.00

Mds

35.72

Rice

0.110

Kg

80.00

Kg

8.80

Gum/colour For White Washing

0.150

Pack

80.00

Pack

12.00

18.55

56.52

TOTAL

MATERIAL

LABOUR
Coolie

0.140

Day

500.00

Day

70.00

Skilled Coolie

0.170

Day

600.00

Day

102.00

5.16

59.45

177.16

22

50.27

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

283.95

Per SQM : Rs 30.55

Labour Rates Per

100 Sft

Rs.

215.00

Per SQM : Rs 23.13

962

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-25-a-01

(British) :

100 Sft

White washing: New surface : One coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.030

Mds

380.00

Mds

11.40

Rice

0.040

Kg

80.00

Kg

3.20

TOTAL

MATERIAL

11.11

14.60

Day

84.00

2.52

66.89

86.52

22

LABOUR
Skilled Coolie

0.140

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

122.81

Per SQM : Rs 13.21

Labour Rates Per

100 Sft

Rs.

105.00

Per SQM : Rs 11.30

21.69

963

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-25-a-02

(British) :

100 Sft

White washing: New surface : Two coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.045

Mds

380.00

Mds

17.10

Rice

0.060

Kg

80.00

Kg

4.80

TOTAL

6.55

MATERIAL

21.90

LABOUR
Coolie

0.170

Day

500.00

Day

85.00

Skilled Coolie

0.240

Day

600.00

Day

144.00

6.87

71.45

235.87

22

55.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

312.97

Per SQM : Rs 33.68

Labour Rates Per

100 Sft

Rs.

286.25

Per SQM : Rs 30.80

964

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-25-a-03

(British) :

100 Sft

White washing: New surface : Three coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.066

Mds

380.00

Mds

25.08

Rice

0.110

Kg

80.00

Kg

8.80

TOTAL

7.73

MATERIAL

33.88

LABOUR
Coolie

0.170

Day

500.00

Day

85.00

Skilled Coolie

0.350

Day

600.00

Day

210.00

8.85

70.27

303.85

22

72.35

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

410.08

Per SQM : Rs 44.12

Labour Rates Per

100 Sft

Rs.

368.75

Per SQM : Rs 39.68

965

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-25-b-01

(British) :

100 Sft

White washing: Old surface : One coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.052

Mds

380.00

Mds

19.76

Rice

0.081

Kg

80.00

Kg

6.48

TOTAL

MATERIAL

15.35

26.24

Day

102.00

3.06

62.65

105.06

22

28.21

LABOUR
Skilled Coolie

0.170

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

159.51

Per SQM : Rs 17.16

Labour Rates Per

100 Sft

Rs.

127.50

Per SQM : Rs 13.72

966

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-25-b-02

(British) :

100 Sft

White washing: Old surface : Two coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lime (unslaked)

0.035

Mds

380.00

Mds

13.30

Rice

0.060

Kg

80.00

Kg

4.80

TOTAL

7.14

MATERIAL

18.10

LABOUR
Coolie

0.140

Day

500.00

Day

70.00

Skilled Coolie

0.170

Day

600.00

Day

102.00

5.16

70.86

177.16

22

41.82

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

237.08

Per SQM : Rs 25.51

Labour Rates Per

100 Sft

Rs.

215.00

Per SQM : Rs 23.13

967

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-26-a

(British) :

100 Sft

Gobri leeping: On walls

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

0.250

Cft

1,400.00

Cow Dung

0.250

Cft

140.00

TOTAL

MATERIAL

100 Cft

3.50

Cft

35.00

16.36

38.50

LABOUR
Mason

0.120

Day

900.00

Day

108.00

Bhishti

0.060

Day

500.00

Day

30.00

4.14

61.64

142.14

22

38.83

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

219.47

Per SQM : Rs 23.61

Labour Rates Per

100 Sft

Rs.

172.50

Per SQM : Rs 18.56

968

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-26-b

(British) :

100 Sft

Gobri leeping: Over roofs

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Mud / Clay

0.550

Cft

1,400.00

Cow Dung

0.550

Cft

140.00

TOTAL

MATERIAL

100 Cft

7.70

Cft

77.00

28.52

84.70

LABOUR
Mason

0.120

Day

900.00

Day

108.00

Bhishti

0.060

Day

500.00

Day

30.00

4.14

49.48

142.14

22

48.99

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

275.83

Per SQM : Rs 29.68

Labour Rates Per

100 Sft

Rs.

172.50

Per SQM : Rs 18.56

969

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-27

(British) :

100 Sft

Striking joints of burnt brick in lime or cement mortar

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.350

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

315.00

9.45

78.00

324.45

22

69.30

Composite Rates Per

100 Sft

Rs.

393.75

Per SQM : Rs 42.37

Labour Rates Per

100 Sft

Rs.

393.75

Per SQM : Rs 42.37

970

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-28

(British) :

100 Sft

Extra for lime, mud or cement plaster & pointing from 20' & above
for each additional 10' height

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.120

Day

900.00

Day

108.00

Coolie

0.250

Day

500.00

Day

125.00

6.99

78.00

239.99

22

51.26

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

291.25

Per SQM : Rs 31.34

Labour Rates Per

100 Sft

Rs.

291.25

Per SQM : Rs 31.34

971

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-29

(British) :

100 Sft

Caulking joints of sleeper wall, with sand and coaltar

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

4.000

Cft

2,200.00

Fuel Wood

0.050

Mds

400.00

Mds

20.00

Coal Tar (in canisters)

4.550

Kg

110.00

Kg

500.50

TOTAL

MATERIAL

100 Cft

88.00

39.39

608.50

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Skilled Coolie

0.500

Day

600.00

Day

300.00

16.50

38.61

566.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,429.87

Per SQM : Rs 153.85

Labour Rates Per

100 Sft

Rs.

687.50

Per SQM : Rs 73.98

254.87

972

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-30

(British) :

100 Sft

Caulking joints of sleepers, with mud and chopped straw

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bhoosa

2.000

Sr

15.00

Clay (fine)

4.000

Cft

1,200.00

Cow Dung

1.000

Cft

140.00

TOTAL

MATERIAL

Sr

100 Cft

30.00
48.00

Cft

140.00

21.29

218.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Skilled Coolie

0.500

Day

600.00

Day

300.00

16.50

56.71

566.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

953.46

Per SQM : Rs 102.59

Labour Rates Per

100 Sft

Rs.

687.50

Per SQM : Rs 73.98

168.96

973

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-31

(British) :

100 Sft

Extra cost of labour & material for red oxide pigment in cement
pointing to match bricks

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Red Oxide Pigment

1.450

70.00

Kg

TOTAL

MATERIAL

Kg

101.50

39.75

101.50

Day

90.00

2.70

38.25

92.70

22

LABOUR
Skilled Coolie

0.150

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

236.33

Per SQM : Rs 25.43

Labour Rates Per

100 Sft

Rs.

112.50

Per SQM : Rs 12.11

42.13

974

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-32-a

(British) :

100 Sft

Provide grooved c/s plaster 1:3 over existing plastered & roughened
surface 3/8" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.700

Bag

490.00

Sand

3.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

343.00

100 Cft

66.00

19.61

409.00

LABOUR
Mason

0.700

Day

900.00

Day

630.00

Coolie

0.700

Day

500.00

Day

350.00

Bhishti

0.350

Day

500.00

Day

175.00

34.65

58.39

1,189.65

22

344.08

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,942.73

Per SQM : Rs 209.04

Labour Rates Per

100 Sft

Rs.

1,443.75

Per SQM : Rs 155.35

975

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-32-b

(British) :

100 Sft

Provide grooved c/s plaster 1:3 over existing plastered & roughened
surface 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.870

Bag

490.00

Sand

4.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

426.30

100 Cft

88.00

23.11

514.30

LABOUR
Mason

0.700

Day

900.00

Day

630.00

Coolie

0.700

Day

500.00

Day

350.00

Bhishti

0.350

Day

500.00

Day

175.00

34.65

54.89

1,189.65

22

367.25

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,071.20

Per SQM : Rs 222.86

Labour Rates Per

100 Sft

Rs.

1,443.75

Per SQM : Rs 155.35

976

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-32-c

(British) :

100 Sft

Providing ornamental plaster 3/4" thick with (1:3) cement sand


mortar on walls, columns chajja and slabs finished smooth including
all charges for Labour and Material.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.340

Bag

490.00

Sand

8.780

Cft

2,200.00

TOTAL

MATERIAL

Bag

1,146.60

100 Cft

193.16

10.40

1,339.76

LABOUR
Mason

7.000

Day

900.00

Day

6,300.00

Coolie

3.500

Day

500.00

Day

1,750.00

Bhishti

0.250

Day

500.00

Day

125.00

Skilled Coolie

0.250

Day

600.00

Day

150.00

249.75

67.60

8,574.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,126.25

Composite Rates Per

100 Sft

Rs.

12,040.76

Per SQM : Rs 1,295.59

Labour Rates Per

100 Sft

Rs.

10,406.25

Per SQM : Rs 1,119.71

977

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-32-d

(British) :

100 Sft

Providing ornamental moulding of approved design in column with


base/top and nosing and shade of lintle or pediments in cement
mortar(1:3) 1-1/8" thick(1 feet under coat x 1/8" finish layer)
including all charges for curing/finishing complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.940

Bag

490.00

Sand

14.770

Cft

2,200.00

Wood Deodar

0.018

Cft

2,600.00

TOTAL

MATERIAL

Bag

1,930.60

100 Cft

324.94

Cft

46.80

17.52

2,302.34

LABOUR
Mason

6.000

Day

900.00

Day

5,400.00

Coolie

3.000

Day

500.00

Day

1,500.00

Bhishti

0.250

Day

500.00

Day

125.00

Carpenter

0.100

Day

800.00

Day

80.00

Skilled Coolie

0.750

Day

600.00

Day

450.00

226.65

60.48

7,781.65

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,168.61

Composite Rates Per

100 Sft

Rs.

12,252.60

Per SQM : Rs 1,318.38

Labour Rates Per

100 Sft

Rs.

9,443.75

Per SQM : Rs 1,016.15

978

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-33

(British) :

Rft

Provide & fit expanded metal edge bead for corners, with nails on
both sides of edges

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

0.098

Kg

140.00

Kg

13.66

Expanded Metal

0.250

Sft

70.00

Sft

17.50

61.52

31.16

TOTAL

MATERIAL

LABOUR
Coolie

0.005

Day

500.00

Day

2.44

Pipe Fitter I

0.005

Day

900.00

Day

4.39

0.20

16.48

7.03

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

46.55

Labour Rates Per

Rft

Rs.

8.54

LABOUR

8.36

Per Meter : Rs 152.68


Per Meter : Rs 28.00

979

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-34-a

(British) :

Each

Petty repairs to Fire Place

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Petty Items of Repair

250.00

LS

TOTAL

MATERIAL

LS

250.00

38.27

250.00

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Skilled Coolie

0.250

Day

600.00

Day

150.00

7.20

39.73

247.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

605.00

Cost Per Each: 605.00

Labour Rates Per

Each

Rs.

300.00

Cost Per Each: 300.00

107.80

980

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-34-b

(British) :

Each

Petty repairs to Verandah

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Repair Items for Floor and Pai

350.00

LS

TOTAL

MATERIAL

LS

350.00

38.60

350.00

LABOUR
Mason

0.200

Day

900.00

Day

180.00

Skilled Coolie

0.250

Day

600.00

Day

150.00

9.90

39.40

339.90

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

839.50

Cost Per Each: 839.50

Labour Rates Per

Each

Rs.

412.50

Cost Per Each: 412.50

149.60

981

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-34-c

(British) :

Each

Petty repairs to Room upto 100 sft area

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Repairing Paint of Joinery an

400.00

LS

TOTAL

MATERIAL

LS

400.00

46.88

400.00

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Skilled Coolie

0.250

Day

600.00

Day

150.00

7.20

31.13

247.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

788.00

Cost Per Each: 788.00

Labour Rates Per

Each

Rs.

300.00

Cost Per Each: 300.00

140.80

982

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-34-d

(British) :

Each

Petty repairs to Room exceeding 100 sft area

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Repairs to Walls and Floors an

400.00

LS

TOTAL

MATERIAL

LS

400.00

38.71

400.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Skilled Coolie

0.250

Day

600.00

Day

150.00

11.25

39.29

386.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

956.75

Cost Per Each: 956.75

Labour Rates Per

Each

Rs.

468.75

Cost Per Each: 468.75

170.50

983

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-35

(British) :

m3 / coat

Extra labour for white washing, priming etc. from 20' height &
above for every extra 10' height

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

0.003

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1.80

0.05

78.00

1.85

22

Composite Rates Per

m3 / coat

Rs.

2.25

Cost Per m3 / coat: 2.25

Labour Rates Per

m3 / coat

Rs.

2.25

Cost Per m3 / coat: 2.25

0.40

984

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-36

(British) :

100 Sft

Providing and fixing of clad stones over 1/2" c/s mortar 1:1 incl
curing etc.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.660

Bag

490.00

Sand

1.131

Cft

2,200.00

Clad Stone

57.000

Sft

120.00

TOTAL

MATERIAL

Bag

1,303.40

100 Cft

24.88

Sft

6,840.00

53.42

8,168.28

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

1.000

Day

500.00

Day

500.00

99.00

24.58

3,399.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,523.02

Composite Rates Per

100 Sft

Rs.

14,090.30

Per SQM : Rs 1,516.12

Labour Rates Per

100 Sft

Rs.

4,125.00

Per SQM : Rs 443.85

985

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-37

(British) :

100 Sft

Supply & apply acrylic wall coating 10 to 12mm thick of approved


quality over plastered surface

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.660

Bag

490.00

Sand

1.131

Cft

2,200.00

Acrylic

24.990

Kg

140.00

TOTAL

MATERIAL

Bag

1,303.40

100 Cft

24.88

Kg

3,498.60

52.83

4,826.88

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.750

Day

500.00

Day

375.00

60.75

25.17

2,085.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,420.05

Per SQM : Rs 906.00

Labour Rates Per

100 Sft

Rs.

2,531.25

Per SQM : Rs 272.36

1,507.41

986

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-38

(British) :

100 Sft

P/F Ceramic Exterior Finish Tiles over 1/2" cement sand mortar 1:1
including curing complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.920

Bag

490.00

Sand

4.000

Cft

2,200.00

Scaffolding

100.000

Sft

15.00

Sft

1,500.00

White Cement

0.250

Bag

700.00

Bag

175.00

Ceramic Tile 12" x 12"

100.000

Sft

70.00

Sft

7,000.00

52.00

9,213.80

TOTAL

MATERIAL

Bag

450.80

100 Cft

88.00

LABOUR
Mason

3.000

Day

900.00

Day

2,700.00

Coolie

2.000

Day

500.00

Day

1,000.00

Bhishti

0.750

Day

500.00

Day

375.00

122.25

26.00

4,197.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,923.54

Composite Rates Per

100 Sft

Rs.

16,334.59

Per SQM : Rs 1,757.60

Labour Rates Per

100 Sft

Rs.

5,093.75

Per SQM : Rs 548.09

987

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-39-a

(British) :

100 Sft

Providing and fixing Chakwal tiles red colour in 1:3 cement mortar
complete.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.500

Bag

490.00

Sand

5.000

Cft

2,200.00

Filler

2.000

Pkt

130.00

Pkt

260.00

Chakwal Tile (Red)

100.000

Sft

19.00

Sft

1,900.00

36.03

3,005.00

TOTAL

MATERIAL

Bag

735.00

100 Cft

110.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

2.000

Day

500.00

Day

1,000.00

97.50

41.97

3,347.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,728.60

Per SQM : Rs 831.60

Labour Rates Per

100 Sft

Rs.

4,062.50

Per SQM : Rs 437.13

1,376.10

988

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 11 , SURFACE RENDERING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

11-39-b

(British) :

100 Sft

Providing and fixing Chakwal tiles white colour in 1:3 cement


mortar complete.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.500

Bag

490.00

Sand

5.000

Cft

2,200.00

Filler

2.000

Pkt

130.00

Pkt

260.00

Chakwal Tile (White)

100.000

Sft

22.00

Sft

2,200.00

37.81

3,305.00

TOTAL

MATERIAL

Bag

735.00

100 Cft

110.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

2.000

Day

500.00

Day

1,000.00

97.50

40.19

3,347.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,094.60

Per SQM : Rs 870.98

Labour Rates Per

100 Sft

Rs.

4,062.50

Per SQM : Rs 437.13

1,442.10

989

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-01-a

(British) :

Cft

Plain wood work sawn, wrought, planed & fixed in position,


including nails & screws : Deodar wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.200

Kg

120.00

Kg

Wood Deodar

1.150

Cft

2,600.00

Cft

2,990.00

Screw

0.100

Pkt

90.00

Pkt

9.00

63.90

3,023.00

TOTAL

MATERIAL

24.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Carpenter

0.500

Day

800.00

Day

400.00

15.75

14.10

540.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

780.56

Composite Rates Per

Cft

Rs.

4,344.31

Per CUM : Rs 153,418.00

Labour Rates Per

Cft

Rs.

656.25

Per CUM : Rs 23,175.27

990

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-01-b

(British) :

Cft

Plain wood work sawn, wrought, planed & fixed in position,


including nails & screws : Shisham wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.200

Kg

120.00

Kg

Wood - Shishim

1.200

Cft

1,800.00

Cft

2,160.00

Screw

0.100

Pkt

90.00

Pkt

9.00

56.37

2,193.00

TOTAL

MATERIAL

24.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Carpenter

0.750

Day

800.00

Day

600.00

21.75

21.63

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

641.96

Composite Rates Per

Cft

Rs.

3,581.71

Per CUM : Rs 126,487.01

Labour Rates Per

Cft

Rs.

906.25

Per CUM : Rs 32,003.95

991

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-02-a

(British) :

Cft

Plain woodwork for regulation karries or needles etc. complete as


per specs : Deodar wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.150

Wood Deodar

2,600.00

Cft

TOTAL

MATERIAL

Cft

2,990.00

66.37

2,990.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Carpenter

0.330

Day

800.00

Day

264.00

11.67

11.63

400.67

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

743.38

Composite Rates Per

Cft

Rs.

4,134.05

Per CUM : Rs 145,992.74

Labour Rates Per

Cft

Rs.

486.25

Per CUM : Rs 17,171.77

992

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-02-b

(British) :

Cft

Plain woodwork for regulation karries or needles etc. complete as


per specs : Shisham wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.200

Wood - Shishim

1,800.00

Cft

TOTAL

MATERIAL

Cft

2,160.00

58.59

2,160.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Carpenter

0.600

Day

800.00

Day

480.00

18.15

19.41

623.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

608.30

Composite Rates Per

Cft

Rs.

3,391.45

Per CUM : Rs 119,768.04

Labour Rates Per

Cft

Rs.

756.25

Per CUM : Rs 26,706.74

993

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-03-a

(British) :

Sft

1st class teak wood wrought joinery in doors & windows, panelled or
glazed complete : 2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.007

Kg

120.00

Kg

Wood - Teak

0.232

Cft

7,600.00

Cft

1,764.29

Screw

0.027

Pkt

90.00

Pkt

2.41

Hinges 5"

0.018

Doz

550.00

Doz

9.82

Tower Bolt 9"

0.107

No

75.00

No

8.02

Handles 6"

0.107

No

50.00

No

5.36

Iron Holdfasts 1-1/2x1/4

0.115

Kg

40.00

Kg

4.61

Hinger Chocks/lock

0.071

No

40.00

No

2.86

Door Stops 6 "

0.071

No

150.00

No

10.71

TOTAL

MATERIAL

0.86

67.90

1,808.94

LABOUR
Coolie

0.036

Day

500.00

Day

17.86

Carpenter

0.214

Day

800.00

Day

171.43

5.68

10.10

194.96

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

2,443.52

Per SQM : Rs 26,292.25

Labour Rates Per

Sft

Rs.

236.61

Per SQM : Rs 2,545.89

439.61

994

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-03-b

(British) :

Sft

1st class teak wood wrought joinery in doors & windows, panelled or
glazed complete : 1.75" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.007

Kg

120.00

Kg

Wood - Teak

0.214

Cft

7,600.00

Cft

1,628.57

Screw

0.027

Pkt

90.00

Pkt

2.41

Hinges 5"

0.018

Doz

550.00

Doz

9.82

Tower Bolt 9"

0.107

No

75.00

No

8.02

Handles 6"

0.107

No

50.00

No

5.36

Iron Holdfasts 1-1/2x1/4

0.115

Kg

40.00

Kg

4.61

Hinger Chocks/lock

0.071

No

40.00

No

2.86

Door Stops 6 "

0.071

No

150.00

No

10.71

TOTAL

MATERIAL

0.86

67.38

1,673.23

LABOUR
Coolie

0.036

Day

500.00

Day

17.86

Carpenter

0.214

Day

800.00

Day

171.43

5.68

10.62

194.96

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

2,277.95

Per SQM : Rs 24,510.70

Labour Rates Per

Sft

Rs.

236.61

Per SQM : Rs 2,545.89

409.75

995

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-03-c

(British) :

Sft

1st class teak wood wrought joinery in doors & windows, panelled or
glazed complete : 1.5" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.007

Kg

120.00

Kg

Wood - Teak

0.196

Cft

7,600.00

Cft

1,492.86

Screw

0.027

Pkt

90.00

Pkt

2.41

Hinges 5"

0.018

Doz

550.00

Doz

9.82

Tower Bolt 9"

0.107

No

75.00

No

8.02

Handles 6"

0.107

No

50.00

No

5.35

Iron Holdfasts 1-1/2x1/4

0.115

Kg

40.00

Kg

4.61

Hinger Chocks/lock

0.071

No

40.00

No

2.86

Door Stops 6 "

0.071

No

150.00

No

10.71

TOTAL

MATERIAL

0.86

66.78

1,537.51

LABOUR
Coolie

0.036

Day

500.00

Day

17.86

Carpenter

0.214

Day

800.00

Day

171.43

5.68

11.22

194.96

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

2,112.37

Per SQM : Rs 22,729.06

Labour Rates Per

Sft

Rs.

236.61

Per SQM : Rs 2,545.89

379.89

996

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-04-a-01

(British) :

Sft

1st class teak wood wrought joinery Teak wood frame 1.75" thick w/o
spring/hinge

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

Kg

120.00

Kg

Wood - Teak

0.112

Cft

7,600.00

Cft

847.93

Screw

0.026

Pkt

90.00

Pkt

2.31

Hinges 5"

0.014

Doz

550.00

Doz

7.50

Tower Bolt 9"

0.083

No

75.00

No

6.20

Handles 6"

0.083

No

50.00

No

4.13

Hinger Chocks/lock

0.083

No

40.00

No

3.31

Door Stops 6 "

0.083

No

150.00

No

12.40

Wire Gauze 12x24

0.579

Sft

35.00

Sft

20.25

66.23

905.01

TOTAL

MATERIAL

0.99

LABOUR
Coolie

0.041

Day

500.00

Day

20.66

Carpenter

0.124

Day

800.00

Day

99.17

3.60

11.77

123.43

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,253.91

Per SQM : Rs 13,492.06

Labour Rates Per

Sft

Rs.

149.79

Per SQM : Rs 1,611.78

225.47

997

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-04-a-02

(British) :

Sft

1st class teak wood wrought joinery Teak wood frame 1.75" thick w/o
spring/hinge

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

Kg

120.00

Kg

Wood - Teak

0.112

Cft

7,600.00

Cft

847.93

Screw

0.026

Pkt

90.00

Pkt

2.31

Hinges 5"

0.014

Doz

550.00

Doz

7.50

Tower Bolt 9"

0.083

No

75.00

No

6.20

Handles 6"

0.083

No

50.00

No

4.13

Hinger Chocks/lock

0.083

No

40.00

No

3.31

Door Stops 6 "

0.083

No

150.00

No

12.40

Spring Hinges

0.083

No

400.00

No

33.06

Wire Gauze 12x24

0.579

Sft

35.00

Sft

20.25

66.50

938.07

TOTAL

MATERIAL

0.99

LABOUR
Coolie

0.041

Day

500.00

Day

20.66

Carpenter

0.124

Day

800.00

Day

99.17

3.60

11.50

123.43

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,294.24

Per SQM : Rs 13,926.01

Labour Rates Per

Sft

Rs.

149.79

Per SQM : Rs 1,611.78

232.74

998

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-04-b-01

(British) :

Sft

1st Class Teak Wood Wrought Joinery : Teak Wood framing 1.5" thick
w/ wire guaze w/o springs

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

Kg

120.00

Kg

Wood - Teak

0.093

Cft

7,600.00

Cft

706.61

Screw

0.026

Pkt

90.00

Pkt

2.31

Hinges 5"

0.014

Doz

550.00

Doz

7.50

Tower Bolt 9"

0.083

No

75.00

No

6.20

Handles 6"

0.083

No

50.00

No

4.15

Hinger Chocks/lock

0.083

No

40.00

No

3.31

Door Stops 6 "

0.083

No

150.00

No

12.40

Wire Gauze 12x24

0.579

Sft

35.00

Sft

20.25

64.83

763.71

TOTAL

MATERIAL

0.99

LABOUR
Coolie

0.041

Day

500.00

Day

20.66

Carpenter

0.124

Day

800.00

Day

99.17

3.60

13.17

123.43

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,081.52

Per SQM : Rs 11,637.12

Labour Rates Per

Sft

Rs.

149.79

Per SQM : Rs 1,611.78

194.38

999

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-04-b-02

(British) :

Sft

1st Class Teak Wood wrought joinery : Teak Wood framing 1.5" thick
w/ wire guaze w/ springs

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

Kg

120.00

Kg

Wood - Teak

0.093

Cft

7,600.00

Cft

706.61

Screw

0.026

Pkt

90.00

Pkt

2.31

Hinges 5"

0.014

Doz

550.00

Doz

7.50

Tower Bolt 9"

0.083

No

75.00

No

6.20

Handles 6"

0.124

No

50.00

No

6.20

Hinger Chocks/lock

0.083

No

40.00

No

3.31

Door Stops 6 "

0.083

No

150.00

No

12.40

Spring Hinges

0.083

No

400.00

No

33.06

Wire Gauze 12x24

0.579

Sft

35.00

Sft

20.25

65.22

798.81

TOTAL

MATERIAL

0.99

LABOUR
Coolie

0.041

Day

500.00

Day

20.66

Carpenter

0.124

Day

800.00

Day

99.17

3.60

12.78

123.43

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,124.35

Per SQM : Rs 12,097.97

Labour Rates Per

Sft

Rs.

149.79

Per SQM : Rs 1,611.78

202.10

1,000

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-04-c

(British) :

Sft

1st class teak wood wrought joinery GI wire guaze 22 SWG, fixed to
chowkat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Teak

0.025

Cft

7,600.00

Cft

190.00

Screw

0.023

Pkt

90.00

Pkt

2.10

Wire Gauze 12x24

1.083

Sft

35.00

Sft

37.92

62.07

230.02

TOTAL

MATERIAL

LABOUR
Mason

0.042

Day

900.00

Day

37.50

Coolie

0.021

Day

500.00

Day

10.42

1.44

15.93

49.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

340.52

Per SQM : Rs 3,663.95

Labour Rates Per

Sft

Rs.

59.90

Per SQM : Rs 644.48

61.15

1,001

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-04-d

(British) :

Sft

1st class teak wood wrought joinery GI wire guaze 22 SWG, fixed on
teak wood frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Teak

0.081

Cft

7,600.00

Cft

617.50

Screw

0.020

Pkt

90.00

Pkt

1.80

Wire Gauze 12x24

1.125

Sft

35.00

Sft

39.38

68.20

658.67

TOTAL

MATERIAL

LABOUR
Coolie

0.031

Day

500.00

Day

15.63

Carpenter

0.063

Day

800.00

Day

50.00

1.97

9.80

67.59

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

885.61

Per SQM : Rs 9,529.21

Labour Rates Per

Sft

Rs.

82.03

Per SQM : Rs 882.66

159.35

1,002

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-05

(British) :

Sft

Provide & fix exp. metal 1/2"-3/4" mesh, 16 guage fixed to chowkat,
with 1" teak wood cover strips

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Teak

0.025

Cft

7,600.00

Cft

190.00

Screw

0.023

Pkt

90.00

Pkt

2.10

Expended Metal 16 Gauge

1.083

Sft

70.00

Sft

75.83

64.47

267.93

TOTAL

MATERIAL

LABOUR
Coolie

0.021

Day

500.00

Day

10.42

Carpenter

0.042

Day

800.00

Day

33.33

1.31

13.53

45.06

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

381.57

Per SQM : Rs 4,105.65

Labour Rates Per

Sft

Rs.

54.69

Per SQM : Rs 588.44

68.57

1,003

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-06

(British) :

Sft

Provide & fix expanded metal 1/2" to 3/4", 16 guage fixed to


chowkat with 1" cover moulding

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Teak

0.025

Cft

7,600.00

Cft

190.00

Screw

0.023

Pkt

90.00

Pkt

2.10

Expended Metal 16 Gauge

1.083

Sft

70.00

Sft

75.83

64.47

267.93

TOTAL

MATERIAL

LABOUR
Coolie

0.021

Day

500.00

Day

10.42

Carpenter

0.042

Day

800.00

Day

33.33

1.31

13.53

45.06

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

381.57

Per SQM : Rs 4,105.65

Labour Rates Per

Sft

Rs.

54.69

Per SQM : Rs 588.44

68.57

1,004

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-07-a

(British) :

Sft

First class deodar wood wrought joinery in doors and windows etc.
complete : 2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.007

Kg

120.00

Kg

Wood Deodar

0.250

Cft

2,600.00

Cft

650.00

Screw

0.027

Pkt

90.00

Pkt

2.41

Hinges 5"

0.018

Doz

550.00

Doz

9.82

Tower Bolt 9"

0.143

No

75.00

No

10.71

Handles 6"

0.107

No

50.00

No

5.36

Iron Holdfasts 1-1/2x1/4

0.115

Kg

40.00

Kg

4.61

Hinger Chocks/lock

0.071

No

40.00

No

2.86

Door Stops 6 "

0.071

No

150.00

No

10.71

Glass 3mm Local

0.357

Sft

38.00

Sft

13.57

64.33

710.92

TOTAL

MATERIAL

0.86

LABOUR
Coolie

0.036

Day

500.00

Day

17.86

Carpenter

0.125

Day

800.00

Day

100.00

3.54

13.67

121.39

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,014.64

Per SQM : Rs 10,917.54

Labour Rates Per

Sft

Rs.

147.32

Per SQM : Rs 1,585.18

182.33

1,005

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-07-b

(British) :

Sft

First class deodar wood wrought joinery in doors and windows etc.
complete : 1-3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.007

Kg

120.00

Kg

Wood Deodar

0.214

Cft

2,600.00

Cft

557.14

Screw

0.027

Pkt

90.00

Pkt

2.41

Hinges 5"

0.018

Doz

550.00

Doz

9.82

Tower Bolt 9"

0.143

No

75.00

No

10.71

Handles 6"

0.107

No

50.00

No

5.36

Iron Holdfasts 1-1/2x1/4

0.115

Kg

40.00

Kg

4.61

Hinger Chocks/lock

0.071

No

40.00

No

2.86

Door Stops 6 "

0.071

No

150.00

No

10.71

Glass 3mm Local

0.357

Sft

38.00

Sft

13.57

62.99

618.06

TOTAL

MATERIAL

0.86

LABOUR
Coolie

0.036

Day

500.00

Day

17.86

Carpenter

0.125

Day

800.00

Day

100.00

3.54

15.01

121.39

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

901.36

Per SQM : Rs 9,698.59

Labour Rates Per

Sft

Rs.

147.32

Per SQM : Rs 1,585.18

161.90

1,006

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-07-c

(British) :

Sft

First class deodar wood wrought joinery in doors and windows etc.
complete : 1.5" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.007

Kg

120.00

Kg

Wood Deodar

0.205

Cft

2,600.00

Cft

533.93

Screw

0.027

Pkt

90.00

Pkt

2.41

Hinges 5"

0.018

Doz

550.00

Doz

9.82

Tower Bolt 9"

0.143

No

75.00

No

10.71

Handles 6"

0.107

No

50.00

No

5.36

Iron Holdfasts 1-1/2x1/4

0.115

Kg

40.00

Kg

4.61

Hinger Chocks/lock

0.071

No

40.00

No

2.86

Door Stops 6 "

0.107

No

150.00

No

16.07

Glass 3mm Local

0.357

Sft

38.00

Sft

13.57

64.62

600.20

TOTAL

MATERIAL

0.86

LABOUR
Coolie

0.036

Day

500.00

Day

17.86

Carpenter

0.098

Day

800.00

Day

78.57

2.89

13.38

99.32

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

852.78

Per SQM : Rs 9,175.96

Labour Rates Per

Sft

Rs.

120.54

Per SQM : Rs 1,296.96

153.26

1,007

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-08-a

(British) :

Sft

Deodar wood framed, braced & battened doors & windows : 2.25"
thick, 1.25" battens & 1" planks

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

kg

120.00

kg

Wood Deodar

0.250

Cft

2,600.00

Cft

650.00

Screw

0.028

Pkt

90.00

Pkt

2.50

Tower Bolt 9"

0.167

No

75.00

No

12.50

Handles 6"

0.111

No

50.00

No

5.56

Iron Holdfasts 1-1/2x1/4

0.179

Kg

40.00

Kg

7.18

Hinger Chocks/lock

0.056

No

40.00

No

2.22

Door Stops 6 "

0.056

No

150.00

No

8.33

T-hinges 10 Inch

0.014

Doz

560.00

Doz

7.78

62.54

697.07

TOTAL

MATERIAL

1.00

LABOUR
Coolie

0.056

Day

500.00

Day

27.78

Carpenter

0.139

Day

800.00

Day

111.11

4.17

15.46

143.06

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,024.03

Per SQM : Rs 11,018.59

Labour Rates Per

Sft

Rs.

173.61

Per SQM : Rs 1,868.06

183.91

1,008

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-08-b

(British) :

Sft

Deodar wood framed, braced & battened doors & windows : 1.75"
thick, 1" battens & 3/4" planks

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

Kg

120.00

Kg

Wood Deodar

0.205

Cft

2,600.00

Cft

533.33

Screw

0.026

Pkt

90.00

Pkt

2.31

Tower Bolt 9"

0.154

No

75.00

No

11.54

Handles 6"

0.103

No

50.00

No

5.13

Iron Holdfasts 1-1/2x1/4

0.166

Kg

40.00

Kg

6.63

Hinger Chocks/lock

0.051

No

40.00

No

2.05

Door Stops 6 "

0.051

No

150.00

No

7.69

T-hinges 10 Inch

0.013

Doz

560.00

Doz

7.18

63.20

576.78

TOTAL

MATERIAL

0.92

LABOUR
Coolie

0.051

Day

500.00

Day

25.64

Carpenter

0.103

Day

800.00

Day

82.05

3.23

14.80

110.92

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

838.29

Per SQM : Rs 9,019.96

Labour Rates Per

Sft

Rs.

134.62

Per SQM : Rs 1,448.46

150.58

1,009

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-09

(British) :

Sft

1" thick battened doors & windows fitted in position, complete with
iron fittings

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

kg

120.00

kg

Wood Deodar

0.154

Cft

2,600.00

Cft

400.00

Screw

0.010

Pkt

90.00

Pkt

0.92

Tower Bolt 9"

0.154

No

75.00

No

11.54

Handles 6"

0.103

No

50.00

No

5.13

Hinger Chocks/lock

0.051

No

40.00

No

2.05

Door Stops 6 "

0.051

No

150.00

No

7.69

T-hinges 10 Inch

0.013

Doz

560.00

Doz

7.18

63.26

435.44

TOTAL

MATERIAL

0.92

LABOUR
Coolie

0.038

Day

500.00

Day

19.23

Carpenter

0.077

Day

800.00

Day

61.54

2.42

14.74

83.19

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

632.19

Per SQM : Rs 6,802.40

Labour Rates Per

Sft

Rs.

100.96

Per SQM : Rs 1,086.35

113.57

1,010

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-10

(British) :

Sft

Deodar wood battened ledged & braced doors & windows 2.25" thick
complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.007

Kg

120.00

Kg

Wood Deodar

0.262

Cft

2,600.00

Cft

680.95

Screw

0.010

Pkt

90.00

Pkt

0.86

Tower Bolt 9"

0.143

No

75.00

No

10.71

Handles 6"

0.095

No

50.00

No

4.76

Hinger Chocks/lock

0.048

No

40.00

No

1.90

Door Stops 6 "

0.048

No

150.00

No

7.14

T-hinges 10 Inch

0.012

Doz

560.00

Doz

6.67

64.28

713.86

TOTAL

MATERIAL

0.86

LABOUR
Coolie

0.048

Day

500.00

Day

23.81

Carpenter

0.119

Day

800.00

Day

95.24

3.57

13.72

122.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,019.72

Per SQM : Rs 10,972.14

Labour Rates Per

Sft

Rs.

148.81

Per SQM : Rs 1,601.19

183.24

1,011

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-11-a

(British) :

Sft

Deodar wood doors framed with braces & 22 SWG GI sheet facing on
one side complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.003

Kg

120.00

Kg

Wood Deodar

0.109

Cft

2,600.00

Cft

284.38

Screw

0.012

Pkt

90.00

Pkt

1.05

Iron Holdfasts 1-1/2x1/4

0.050

Kg

40.00

Kg

2.02

G.I. Plain Sheet 22 SWG

0.058

Kg

130.00

Kg

7.54

Sliding bolt 18 Inch Long

0.016

No

650.00

No

10.16

TOTAL

MATERIAL

0.38

63.48

305.52

LABOUR
Coolie

0.023

Day

500.00

Day

11.72

Carpenter

0.055

Day

800.00

Day

43.75

1.66

14.52

57.13

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

442.07

Per SQM : Rs 4,756.62

Labour Rates Per

Sft

Rs.

69.34

Per SQM : Rs 746.05

79.42

1,012

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-11-b

(British) :

Sft

Deodar wood doors framed with braces & 22 SWG GI sheet facing on
both sides complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.003

Kg

120.00

Kg

Wood Deodar

0.109

Cft

2,600.00

Cft

284.38

Screw

0.012

Pkt

90.00

Pkt

1.05

Iron Holdfasts 1-1/2x1/4

0.050

Kg.

40.00

Kg.

2.02

G.I. Plain Sheet 22 SWG

0.116

Kg

130.00

Kg

15.08

Sliding bolt 18 Inch Long

0.016

No

650.00

No

10.16

TOTAL

MATERIAL

0.38

63.71

313.06

LABOUR
Coolie

0.023

Day

500.00

Day

11.72

Carpenter

0.055

Day

800.00

Day

43.75

1.66

14.29

57.13

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

451.27

Per SQM : Rs 4,855.65

Labour Rates Per

Sft

Rs.

69.34

Per SQM : Rs 746.05

81.08

1,013

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-12-a

(British) :

Sft

Partal wood doors framed with braces & 22 SWG GI sheet facing on
one side complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.004

kg

120.00

kg

0.47

Screw

0.016

Pkt

90.00

Pkt

1.41

Iron Holdfasts 1-1/2x1/4

0.050

Kg

40.00

Kg

2.02

G.I. Plain Sheet 22 SWG

0.580

Kg

130.00

Kg

75.40

Sliding bolt 18 Inch Long

0.116

No

650.00

No

75.40

Wood - Partal

0.109

Cft

1,200.00

Cft

131.25

65.99

285.94

TOTAL

MATERIAL

LABOUR
Coolie

0.016

Day

500.00

Day

7.81

Carpenter

0.039

Day

800.00

Day

31.25

1.17

12.01

40.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

397.68

Per SQM : Rs 4,279.03

Labour Rates Per

Sft

Rs.

48.83

Per SQM : Rs 525.39

71.50

1,014

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-12-b

(British) :

Sft

Partal wood doors framed with braces & 22 SWG GI sheet facing on
both sides complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.004

Kg

120.00

Kg

0.47

Screw

0.016

Pkt

90.00

Pkt

1.41

Iron Holdfasts 1-1/2x1/4

0.050

KG

40.00

KG

2.02

G.I. Plain Sheet 22 SWG

0.116

Kg

130.00

Kg

15.08

Sliding bolt 18 Inch Long

0.016

No

650.00

No

10.16

Wood - Partal

0.109

Cft

1,200.00

Cft

131.25

55.73

160.38

TOTAL

MATERIAL

LABOUR
Coolie

0.023

Day

500.00

Day

11.72

Carpenter

0.055

Day

800.00

Day

43.75

1.66

22.27

57.13

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

265.00

Per SQM : Rs 2,851.40

Labour Rates Per

Sft

Rs.

69.34

Per SQM : Rs 746.05

47.49

1,015

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-13-a-01

(British) :

Sft

First class deodar wood wrought joinery work Deodar wood frame
1-3/4" thick w/o springs

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.020

Kg

120.00

Kg

Wood Deodar

0.088

Cft

2,600.00

Cft

229.55

Screw

0.046

Pkt

90.00

Pkt

4.18

Hinges 5"

0.164

Doz

550.00

Doz

89.96

Handles 6"

0.082

No

50.00

No

4.09

Hinger Chocks/lock

0.082

No

40.00

No

3.27

Wire Gauze 12x24

0.572

Sft

35.00

Sft

20.00

Tower Bolt 10 Inch I

0.082

No

130.00

No

10.63

TOTAL

MATERIAL

2.45

58.56

364.15

LABOUR
Coolie

0.041

Day

500.00

Day

20.45

Carpenter

0.102

Day

800.00

Day

81.78

3.07

19.44

105.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

572.05

Per SQM : Rs 6,155.27

Labour Rates Per

Sft

Rs.

127.79

Per SQM : Rs 1,375.00

102.60

1,016

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-13-a-02

(British) :

Sft

First class deodar wood wrought joinery work Deodar wood frame
13/4" thick with springs

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.020

Kg

120.00

Kg

Wood Deodar

0.088

Cft

2,600.00

Cft

229.55

Screw

0.046

Pkt

90.00

Pkt

4.18

Hinges 5"

0.164

Doz

550.00

Doz

89.96

Handles 6"

0.082

No

50.00

No

4.09

Hinger Chocks/lock

0.082

No

40.00

No

3.27

Wire Gauze 12x24

0.572

sft

35.00

sft

20.00

Tower Bolt 10 Inch I

0.082

No

130.00

No

10.63

Spring Hinges Single

0.082

No

230.00

No

18.81

TOTAL

MATERIAL

2.45

59.20

382.96

LABOUR
Coolie

0.041

Day

500.00

Day

20.45

Carpenter

0.102

Day

800.00

Day

81.78

3.07

18.80

105.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

595.00

Per SQM : Rs 6,402.19

Labour Rates Per

Sft

Rs.

127.79

Per SQM : Rs 1,375.00

106.74

1,017

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-13-b-01

(British) :

Sft

First class deodar wood wrought joinery work Deodar wood frame 1.5"
thick w/o springs

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.020

kg

120.00

kg

Wood Deodar

0.073

Cft

2,600.00

Cft

190.89

Screw

0.046

Pkt

90.00

Pkt

4.18

Hinges 5"

0.164

Doz

550.00

Doz

89.96

Handles 6"

0.082

No

50.00

No

4.09

Hinger Chocks/lock

0.082

No

40.00

No

3.27

Wire Gauze 12x24

0.572

Sft

35.00

Sft

20.00

Tower Bolt 10 Inch I

0.082

No

130.00

No

10.63

TOTAL

MATERIAL

2.45

57.07

325.49

LABOUR
Coolie

0.041

Day

500.00

Day

20.45

Carpenter

0.102

Day

800.00

Day

81.78

3.07

20.93

105.30

22

94.10

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

524.88

Per SQM : Rs 5,647.74

Labour Rates Per

Sft

Rs.

127.79

Per SQM : Rs 1,375.00

1,018

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-13-b-02

(British) :

Sft

First class deodar wood wrought joinery work Deodar wood frame 1"
thick with springs

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.020

Kg

120.00

Kg

Wood Deodar

0.073

Cft

2,600.00

Cft

190.89

Screw

0.046

Pkt

90.00

Pkt

4.18

Hinges 5"

0.164

Doz

550.00

Doz

89.96

Handles 6"

0.082

No

50.00

No

4.09

Hinger Chocks/lock

0.082

No

40.00

No

3.27

Wire Gauze 12x24

0.572

Sft

35.00

Sft

20.00

Tower Bolt 10 Inch I

0.082

No

130.00

No

10.63

Spring Hinges Single

0.082

No

230.00

No

18.81

TOTAL

MATERIAL

2.45

56.53

344.30

LABOUR
Mason

0.102

Day

900.00

Day

92.01

Coolie

0.041

Day

500.00

Day

20.45

3.37

21.47

115.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

560.61

Per SQM : Rs 6,032.17

Labour Rates Per

Sft

Rs.

140.57

Per SQM : Rs 1,512.50

100.49

1,019

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-13-c

(British) :

Sft

First class deodar wood wrought joinery work GI wire guaze fixed to
chowkat with 3/4" strip

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

Kg

120.00

Kg

1.00

Wood Deodar

0.021

Cft

2,600.00

Cft

54.17

Screw

0.021

Pkt

90.00

Pkt

1.88

Wire Gauze 12x24

1.000

Sft

35.00

Sft

35.00

50.84

92.04

TOTAL

MATERIAL

LABOUR
Coolie

0.021

Day

500.00

Day

10.42

Carpenter

0.042

Day

800.00

Day

33.33

1.31

27.16

45.06

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

166.98

Per SQM : Rs 1,796.69

Labour Rates Per

Sft

Rs.

54.69

Per SQM : Rs 588.44

29.87

1,020

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-13-d

(British) :

Sft

First class deodar wood wrought joinery work GI wire guaze fixed to
chowkat with 1/2" strip

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

Kg

120.00

Kg

1.00

Wood Deodar

0.014

Cft

2,600.00

Cft

36.83

Screw

0.021

Pkt

90.00

Pkt

1.88

Wire Gauze 12x24

1.000

Sft

35.00

Sft

35.00

47.30

74.71

TOTAL

MATERIAL

LABOUR
Coolie

0.021

Day

500.00

Day

10.42

Carpenter

0.042

Day

800.00

Day

33.33

1.31

30.70

45.06

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

145.83

Per SQM : Rs 1,569.15

Labour Rates Per

Sft

Rs.

54.69

Per SQM : Rs 588.44

26.06

1,021

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-14

(British) :

Sft

Making and fixing trellis doors & windows of deodar wood complete.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.008

Kg

120.00

Kg

Wood Deodar

0.128

Cft

2,600.00

Cft

333.46

Screw

0.011

Pkt

90.00

Pkt

1.00

Hinges 5"

0.019

Doz

550.00

Doz

10.22

Tower Bolt 10 Inch I

0.111

No

130.00

No

14.44

Hasp & Staple Iron

0.056

No

75.00

No

4.17

TOTAL

MATERIAL

1.00

59.56

364.29

LABOUR
Coolie

0.056

Day

500.00

Day

27.78

Carpenter

0.083

Day

800.00

Day

66.67

2.83

18.44

97.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

562.49

Per SQM : Rs 6,052.40

Labour Rates Per

Sft

Rs.

118.06

Per SQM : Rs 1,270.28

100.92

1,022

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-15-a

(British) :

Sft

Provide & fix MS chowkat of doors, windows etc MS angle iron


1.5"x1.5"x1/4" welded with MS flat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.892

Steel (Struct. Sections)

97.00

Kg

TOTAL

MATERIAL

Kg

86.54

54.16

86.54

LABOUR
Coolie

0.024

Day

500.00

Day

11.90

Black Smith

0.024

Day

900.00

Day

21.41

1.00

23.84

34.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

147.22

Per SQM : Rs 1,584.06

Labour Rates Per

Sft

Rs.

41.64

Per SQM : Rs 448.00

26.37

1,023

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-15-b

(British) :

Sft

Provide & fix MS chowkat of doors, windows etc MS tee iron 1.5"x
1.5"x 1/4" welded with MS flat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.967

Steel (Struct. Sections)

97.00

Kg

TOTAL

MATERIAL

Kg

93.75

55.27

93.75

LABOUR
Coolie

0.024

Day

500.00

Day

11.90

Black Smith

0.024

Day

900.00

Day

21.58

1.00

22.73

34.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

156.23

Per SQM : Rs 1,680.99

Labour Rates Per

Sft

Rs.

41.84

Per SQM : Rs 450.25

27.99

1,024

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-16

Item Name :

(British) :

Sft

Extra for providing & fixing iron double spring hinges with brass
fittings including finger plate etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brass Spring Hinges

0.071

No

330.00

No

23.57

Brass Screws 1 Inch

0.003

Pkt

90.00

Pkt

0.26

Brass Finger Plate

0.095

No

520.00

No

49.52

Brass Tower Bolt 6"

0.048

No

130.00

No

6.19

TOTAL

MATERIAL

53.99

79.54

LABOUR
Coolie

0.024

Day

500.00

Day

11.90

Carpenter

0.024

Day

800.00

Day

19.05

0.93

24.01

31.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

135.73

Per SQM : Rs 1,460.48

Labour Rates Per

Sft

Rs.

38.69

Per SQM : Rs 416.31

24.31

1,025

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-17-a

Item Name :

(British) :

Each

P/F brass spring hinges to wire gauzed door.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brass Spring Hinges

0.500

No

330.00

No

Brass Screws 1 Inch

0.040

Pkt

90.00

Pkt

3.60

54.13

168.60

TOTAL

MATERIAL

165.00

LABOUR
Coolie

0.050

Day

500.00

Day

25.00

Carpenter

0.050

Day

800.00

Day

40.00

1.95

23.87

66.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

286.94

Cost Per Each: 286.94

Labour Rates Per

Each

Rs.

81.25

Cost Per Each: 81.25

51.39

1,026

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-17-b

(British) :

Each

P/F hydraulic Door Closer (Best Quality)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Door Closer Single Action

1,800.00

No

TOTAL

MATERIAL

No

1,800.00

69.59

1,800.00

LABOUR
Carpenter

0.100

Day

800.00

Day

80.00

Skilled Coolie

0.100

Day

600.00

Day

60.00

4.20

8.41

144.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

426.80

Composite Rates Per

Each

Rs.

2,371.00

Cost Per Each: 2,371.00

Labour Rates Per

Each

Rs.

175.00

Cost Per Each: 175.00

1,027

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-18-a-01

(British) :

Each

Providing and fixing sliding bolt to doors Iron sliding bolts : 10"
long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.120

Pkt

90.00

Pkt

10.80

Sliding bolt Iron 10"

1.000

No

150.00

No

150.00

TOTAL

MATERIAL

53.89

160.80

LABOUR
Coolie

0.030

Day

500.00

Day

15.00

Carpenter

0.060

Day

800.00

Day

48.00

1.89

24.11

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

274.93

Cost Per Each: 274.93

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

49.24

1,028

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-18-a-02

(British) :

Each

Providing and fixing sliding bolt to doors Iron sliding bolts : 12"
long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.120

Pkt

90.00

Pkt

10.80

Sliding Bolt 12"

1.000

No

190.00

No

190.00

TOTAL

MATERIAL

57.09

200.80

LABOUR
Coolie

0.030

Day

500.00

Day

15.00

Carpenter

0.060

Day

800.00

Day

48.00

1.89

20.91

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

323.73

Cost Per Each: 323.73

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

58.04

1,029

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-18-b-01

Item Name :

(British) :

Each

Providing and fixing sliding bolt to doors CP sliding bolts : 10"


long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.120

Pkt

90.00

Pkt

10.80

Sliding Bolt CP 10"

1.000

No

350.00

No

350.00

TOTAL

MATERIAL

63.85

360.80

LABOUR
Coolie

0.030

Day

500.00

Day

15.00

Carpenter

0.060

Day

800.00

Day

48.00

1.89

14.15

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

518.93

Cost Per Each: 518.93

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

93.24

1,030

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-18-b-02

Item Name :

(British) :

Each

Providing and fixing sliding bolt to doors CP sliding bolts : 12"


long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.120

Pkt

90.00

Pkt

10.80

Sliding Bolt CP 12"

1.000

No

450.00

No

450.00

TOTAL

MATERIAL

65.98

460.80

LABOUR
Coolie

0.030

Day

500.00

Day

15.00

Carpenter

0.060

Day

800.00

Day

48.00

1.89

12.02

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

640.93

Cost Per Each: 640.93

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

115.24

1,031

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-18-c-01

(British) :

Each

Providing and fixing sliding bolt to doors Brass sliding bolts :


10" long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.120

Pkt

90.00

Pkt

10.80

Sliding Bolt Brass 10"

1.000

No

850.00

No

850.00

TOTAL

MATERIAL

69.89

860.80

LABOUR
Coolie

0.030

Day

500.00

Day

15.00

Carpenter

0.060

Day

800.00

Day

48.00

1.89

8.11

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

203.24

Composite Rates Per

Each

Rs.

1,128.93

Cost Per Each: 1,128.93

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

1,032

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-18-c-02

(British) :

Each

Providing and fixing sliding bolt to doors Brass sliding bolts :


12" long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.120

Pkt

90.00

Pkt

Sliding Bolt Brass 12"

1.000

No

1,100.00

No

TOTAL

MATERIAL

10.80
1,100.00

70.97

1,110.80

LABOUR
Coolie

0.030

Day

500.00

Day

15.00

Carpenter

0.060

Day

800.00

Day

48.00

1.89

7.03

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

258.24

Composite Rates Per

Each

Rs.

1,433.93

Cost Per Each: 1,433.93

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

1,033

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-19-a

(British) :

Sft

Extra for brass fittings to doors & windows Deodar panelled,


panelled+glazed or fully glazed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Handles Brass 4"

0.053

No

120.00

No

6.36

Tower Bolt Brass 9" I

0.018

No

350.00

No

6.18

TOTAL

MATERIAL

67.23

12.54

LABOUR
Coolie

0.001

Day

500.00

Day

0.56

Carpenter

0.001

Day

800.00

Day

0.89

0.04

10.77

1.49

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

17.11

Per SQM : Rs 184.08

Labour Rates Per

Sft

Rs.

1.81

Per SQM : Rs 19.50

3.08

1,034

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-19-b

(British) :

Sft

Extra for brass fittings to doors & windows Deodar wood wire guazed
shutters

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Handles Brass 4"

0.053

No

120.00

No

6.36

Tower Bolt Brass 9" Ii

0.018

No

290.00

No

5.12

TOTAL

MATERIAL

65.97

11.48

LABOUR
Coolie

0.001

Day

500.00

Day

0.60

Carpenter

0.001

Day

800.00

Day

0.97

0.05

12.03

1.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

15.97

Per SQM : Rs 171.79

Labour Rates Per

Sft

Rs.

1.96

Per SQM : Rs 21.13

2.87

1,035

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-20-a-01

Item Name :

(British) :

Each

Extra for providing/fixing approved quality Rim locks : Imported

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Rim Lock complete I

1,200.00

No

TOTAL

MATERIAL

No

1,200.00

60.61

1,200.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Carpenter

0.200

Day

800.00

Day

160.00

8.55

17.39

293.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

326.70

Composite Rates Per

Each

Rs.

1,820.25

Cost Per Each: 1,820.25

Labour Rates Per

Each

Rs.

356.25

Cost Per Each: 356.25

1,036

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-20-a-02

(British) :

Each

Extra for providing/fixing approved quality Rim locks : Local

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Rim Lock complete II

850.00

No

TOTAL

MATERIAL

850.00

No

56.17

850.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Carpenter

0.200

Day

800.00

Day

160.00

8.55

21.83

293.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

249.70

Composite Rates Per

Each

Rs.

1,393.25

Cost Per Each: 1,393.25

Labour Rates Per

Each

Rs.

356.25

Cost Per Each: 356.25

1,037

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-20-b-01

(British) :

Each

Extra for providing/fixing approved quality Rim locks : Imported

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Rim Latches Complete I

1,250.00

No

TOTAL

MATERIAL

No

1,250.00

64.87

1,250.00

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Carpenter

0.166

Day

800.00

Day

132.80

5.86

13.13

201.16

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

317.97

Composite Rates Per

Each

Rs.

1,769.12

Cost Per Each: 1,769.12

Labour Rates Per

Each

Rs.

244.12

Cost Per Each: 244.12

1,038

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-20-b-02

(British) :

Each

Extra for providing/fixing approved quality Rim locks : Local

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Rim Latches Complete II

1,000.00

No

TOTAL

MATERIAL

No

1,000.00

62.75

1,000.00

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Carpenter

0.166

Day

800.00

Day

132.80

5.86

15.25

201.16

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

262.97

Composite Rates Per

Each

Rs.

1,464.12

Cost Per Each: 1,464.12

Labour Rates Per

Each

Rs.

244.12

Cost Per Each: 244.12

1,039

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-21-a

(British) :

Sft

Provide & fix exp. metal 1/2"-3/4"mesh 16 gauge Fixed to chowkat


with 1" deodar wood strip etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.001

Kg

120.00

Kg

Wood Deodar

0.047

Cft

2,600.00

Cft

121.88

Screw

0.016

Pkt

90.00

Pkt

1.41

Exp. Metal 1/2"x3/4"

1.125

Sft

50.00

Sft

56.25

66.86

179.65

TOTAL

MATERIAL

0.12

LABOUR
Coolie

0.010

Day

500.00

Day

5.21

Carpenter

0.021

Day

800.00

Day

16.67

0.66

11.14

22.53

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

246.52

Per SQM : Rs 2,652.54

Labour Rates Per

Sft

Rs.

27.34

Per SQM : Rs 294.22

44.34

1,040

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-21-b

(British) :

Sft

Provide & fix exp. metal 1/2"-3/4"mesh 16 gauge Fixed with 1" cover
mould & screws including frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.071

Cft

2,600.00

Cft

185.25

Screw

0.168

Pkt

90.00

Pkt

15.13

Wooden Plugs

0.500

No

50.00

No

25.00

Exp. Metal 1/2"x3/4"

1.345

Sft

50.00

Sft

67.25

70.06

292.63

TOTAL

MATERIAL

LABOUR
Coolie

0.031

Day

500.00

Day

15.63

Carpenter

0.006

Day

800.00

Day

5.00

0.62

7.94

21.24

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

382.79

Per SQM : Rs 4,118.84

Labour Rates Per

Sft

Rs.

25.78

Per SQM : Rs 277.41

68.92

1,041

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-22-a

(British) :

Sft

Provide & fix deodar wood almirah 9"-12" depth including boxing
with back, shelves, shutters etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Coal Tar (in canisters)

0.300

Kg

110.00

Kg

33.01

Wood Deodar

0.324

Cft

2,600.00

Cft

843.31

Screw

0.080

Pkt

90.00

Pkt

7.20

Tower Bolt 10 Inch I

0.267

No

130.00

No

34.68

TOTAL

MATERIAL

61.95

918.20

LABOUR
Coolie

0.067

Day

500.00

Day

33.35

Carpenter

0.200

Day

800.00

Day

160.06

5.80

16.05

199.21

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,361.96

Per SQM : Rs 14,654.69

Labour Rates Per

Sft

Rs.

241.75

Per SQM : Rs 2,601.27

244.55

1,042

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-22-b

(British) :

Sft

Provide & fix deodar wood almirah 9"-12" depth With shelves,
shutters etc w/o boxing & back

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.121

Cft

2,600.00

Cft

315.64

Screw

0.070

Pkt

90.00

Pkt

6.27

Wooden Plugs

0.400

No

50.00

No

20.01

Tower Bolt 10 Inch I

0.267

No

130.00

No

34.68

Hasp & Staple Iron

0.067

No

75.00

No

5.00

Handle Brass 6"

0.133

No

240.00

No

32.01

Hinges 4"

0.400

Doz

250.00

Doz

100.04

58.93

513.65

TOTAL

MATERIAL

LABOUR
Coolie

0.067

Day

500.00

Day

33.35

Carpenter

0.133

Day

800.00

Day

106.70

4.20

19.07

144.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

801.72

Per SQM : Rs 8,626.46

Labour Rates Per

Sft

Rs.

175.06

Per SQM : Rs 1,883.67

143.81

1,043

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-23-a

(British) :

Sft

Provide & fix wooden box type wardrobe 22" deep Partal wood boxing
& deodar wood shelves etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.115

Cft

2,600.00

Cft

299.00

Shoe Head Offs

0.025

No

1,050.00

No

26.67

Screw

0.070

Pkt

90.00

Pkt

6.27

Wood - Partal

0.046

Cft

1,200.00

Cft

55.76

Hinges 4"

0.250

Doz

250.00

Doz

62.50

Paint : Enamel

0.190

Ltr

495.00

Ltr

94.03

Hard Board

1.500

Sft

12.00

Sft

18.00

Mirror 24"x18" Imported

0.042

No

600.00

No

24.98

TOTAL

MATERIAL

55.36

587.22

LABOUR
Coolie

0.083

Day

500.00

Day

41.68

Carpenter

0.208

Day

800.00

Day

166.69

6.25

22.64

214.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

976.87

Per SQM : Rs 10,511.15

Labour Rates Per

Sft

Rs.

260.47

Per SQM : Rs 2,802.62

175.03

1,044

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-23-b

(British) :

Sft

Provide & fix wooden box type wardrobe 22" deep Deodar wood boxing
& deodar shelves etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.154

Cft

2,600.00

Cft

401.12

Shoe Head Offs

0.025

No

1,050.00

No

26.67

Screw

0.070

Pkt

90.00

Pkt

6.27

Wood - Partal

0.030

Cft

1,200.00

Cft

35.69

Hinges 4"

0.250

Doz

250.00

Doz

62.50

Paint : Enamel

0.190

Ltr

495.00

Ltr

94.03

Hard Board

1.500

Sft

12.00

Sft

18.00

Mirror 24"x18" Imported

0.042

No

600.00

No

24.98

TOTAL

MATERIAL

57.19

669.26

LABOUR
Coolie

0.083

Day

500.00

Day

41.68

Carpenter

0.208

Day

800.00

Day

166.69

6.25

20.81

214.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,076.96

Per SQM : Rs 11,588.12

Labour Rates Per

Sft

Rs.

260.47

Per SQM : Rs 2,802.63

193.08

1,045

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-24-a

(British) :

Sft

Provide & fix chowkat for doors, windows & CS windows, including
holdfast etc : Teak wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Teak

0.063

Cft

7,600.00

Cft

475.00

Screw

0.007

Pkt

90.00

Pkt

0.64

Iron Holdfast

0.115

No

130.00

No

15.00

Nails

0.007

Kg

130.00

Kg

0.93

TOTAL

MATERIAL

69.68

491.57

LABOUR
Coolie

0.018

Day

500.00

Day

8.93

Carpenter

0.036

Day

800.00

Day

28.57

1.13

8.32

38.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

646.59

Per SQM : Rs 6,957.28

Labour Rates Per

Sft

Rs.

46.88

Per SQM : Rs 504.38

116.39

1,046

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-24-b

(British) :

Sft

Provide & fix chowkat for doors, windows & CS windows, including
holdfast etc : Shisham wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Shishim

0.073

Cft

1,800.00

Cft

131.79

Screw

0.007

Pkt

90.00

Pkt

0.64

Iron Holdfast

0.115

No

130.00

No

15.00

Nails

0.007

Kg

130.00

Kg

0.93

TOTAL

MATERIAL

62.26

148.35

LABOUR
Coolie

0.018

Day

500.00

Day

8.93

Carpenter

0.027

Day

800.00

Day

21.43

0.91

15.74

31.27

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

218.94

Per SQM : Rs 2,355.77

Labour Rates Per

Sft

Rs.

37.95

Per SQM : Rs 408.30

39.32

1,047

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-24-c

(British) :

Sft

Provide & fix chowkat for doors, windows & CS windows, including
holdfast etc : Deodar wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.068

Cft

2,600.00

Cft

176.43

Screw

0.007

Pkt

90.00

Pkt

0.64

Iron Holdfast

0.115

No

130.00

No

15.00

Nails

0.007

Kg

130.00

Kg

0.93

TOTAL

MATERIAL

68.36

193.00

LABOUR
Coolie

0.009

Day

500.00

Day

4.46

Carpenter

0.018

Day

800.00

Day

14.29

0.56

9.64

19.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

258.89

Per SQM : Rs 2,785.69

Labour Rates Per

Sft

Rs.

23.44

Per SQM : Rs 252.19

46.58

1,048

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-25-a

(British) :

100 Sft

Make & fix deodar planking in eave boards etc planed on both sides
complete : 1" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

9.500

Cft

2,600.00

Cft

24,700.00

Screw

0.100

Pkt

90.00

Pkt

9.00

Nails

0.108

Kg

130.00

Kg

14.04

L-Iron Bracket I

10.000

No

150.00

No

1,500.00

Nut / Bolt

0.500

Kg

150.00

Kg

75.00

TOTAL

MATERIAL

65.75

26,298.04

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

4.000

Day

800.00

Day

3,200.00

111.00

12.25

3,811.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,599.57

Composite Rates Per

100 Sft

Rs.

36,708.61

Per SQM : Rs 3,949.85

Labour Rates Per

100 Sft

Rs.

4,625.00

Per SQM : Rs 497.65

1,049

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-25-b

(British) :

100 Sft

Make & fix deodar planking in eave boards etc planed on both sides
complete : 3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

7.120

Cft

2,600.00

Cft

18,512.00

Screw

0.100

Pkt

90.00

Pkt

9.00

Nails

0.108

Kg

130.00

Kg

13.99

L-Iron Bracket I

10.000

No

150.00

No

1,500.00

Nut / Bolt

0.500

Kg

150.00

Kg

75.00

TOTAL

MATERIAL

63.35

20,109.99

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

4.000

Day

800.00

Day

3,200.00

111.00

14.65

3,811.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,238.20

Composite Rates Per

100 Sft

Rs.

29,159.19

Per SQM : Rs 3,137.53

Labour Rates Per

100 Sft

Rs.

4,625.00

Per SQM : Rs 497.65

1,050

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-25-c

(British) :

100 Sft

Make & fix deodar planking in eave boards etc planed on both sides
complete : 1/2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

4.750

Cft

2,600.00

Cft

12,350.00

Screw

0.100

Pkt

90.00

Pkt

9.00

Nails

0.108

Kg

130.00

Kg

13.99

L-Iron Bracket I

10.000

No

150.00

No

1,500.00

Nut / Bolt

0.500

Kg

150.00

Kg

75.00

TOTAL

MATERIAL

59.28

13,947.99

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

4.000

Day

800.00

Day

3,200.00

111.00

18.72

3,811.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,882.56

Composite Rates Per

100 Sft

Rs.

21,641.55

Per SQM : Rs 2,328.63

Labour Rates Per

100 Sft

Rs.

4,625.00

Per SQM : Rs 497.65

1,051

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-26-a

(British) :

100 Sft

Make & fix deodar wood shelves, incl brackets 1" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

9.500

Cft

2,600.00

Cft

24,700.00

Screw

0.100

Pkt

90.00

Pkt

9.00

Nails

0.108

Kg

130.00

Kg

13.99

L-Iron Bracket I

10.000

No

150.00

No

1,500.00

TOTAL

MATERIAL

65.73

26,222.99

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

4.000

Day

800.00

Day

3,200.00

111.00

12.27

3,811.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,583.06

Composite Rates Per

100 Sft

Rs.

36,617.05

Per SQM : Rs 3,939.99

Labour Rates Per

100 Sft

Rs.

4,625.00

Per SQM : Rs 497.65

1,052

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-26-b

(British) :

100 Sft

Make & fix deodar wood shelves, incl brackets 1.5" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

14.250

Cft

2,600.00

Cft

37,050.00

Screw

0.100

Pkt

90.00

Pkt

9.00

Nails

0.215

Kg

130.00

Kg

27.99

L-Iron Bracket I

10.000

No

150.00

No

1,500.00

TOTAL

MATERIAL

68.44

38,586.99

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

4.000

Day

800.00

Day

3,200.00

111.00

9.56

3,811.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

9,303.14

Composite Rates Per

100 Sft

Rs.

51,701.12

Per SQM : Rs 5,563.04

Labour Rates Per

100 Sft

Rs.

4,625.00

Per SQM : Rs 497.65

1,053

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-26-c

(British) :

100 Sft

Make & fix deodar wood shelves, incl brackets 2" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

19.000

Cft

2,600.00

Cft

49,400.00

Screw

0.100

Pkt

90.00

Pkt

9.00

Nails

0.323

Kg

130.00

Kg

41.98

L-Iron Bracket I

10.000

No

150.00

No

1,500.00

TOTAL

MATERIAL

69.92

50,950.98

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

4.000

Day

800.00

Day

3,200.00

111.00

8.08

3,811.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

12,023.22

Composite Rates Per

100 Sft

Rs.

66,785.20

Per SQM : Rs 7,186.09

Labour Rates Per

100 Sft

Rs.

4,625.00

Per SQM : Rs 497.65

1,054

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-27-a

(British) :

Each

Make & fix cleats for doors & windows including hinges and screws.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.060

Kg

120.00

Kg

7.20

Wood Deodar

0.010

Cft

2,600.00

Cft

26.00

Hinges 4"

0.084

Doz

250.00

Doz

21.00

38.10

54.20

TOTAL

MATERIAL

LABOUR
Coolie

0.025

Day

500.00

Day

12.50

Carpenter

0.050

Day

800.00

Day

40.00

1.58

39.90

54.08

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

131.75

Cost Per Each: 131.75

Labour Rates Per

Each

Rs.

65.63

Cost Per Each: 65.63

23.47

1,055

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-27-b

(British) :

1 No

Make & fix cleats with brass hooks for roof ventilators

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.020

Kg

120.00

Kg

2.40

Wood Deodar

0.001

Cft

2,600.00

Cft

2.60

Brass Hook

1.000

No

90.00

No

90.00

TOTAL

MATERIAL

48.31

95.00

LABOUR
Coolie

0.025

Day

500.00

Day

12.50

Carpenter

0.050

Day

800.00

Day

40.00

1.58

29.69

54.08

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

1 No

Rs.

181.52

Cost Per no: 181.52

Labour Rates Per

1 No

Rs.

65.63

Cost Per no: 65.63

32.45

1,056

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-27-c

(British) :

Each

Make & fix Door stops of 1.5" dia rubber block

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Magnet Door Stop

130.00

No

TOTAL

MATERIAL

No

130.00

60.00

130.00

LABOUR
Coolie

0.025

Day

500.00

Day

12.50

Carpenter

0.025

Day

800.00

Day

20.00

0.98

18.00

33.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

199.23

Cost Per Each: 199.23

Labour Rates Per

Each

Rs.

40.63

Cost Per Each: 40.63

35.75

1,057

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-27-d

(British) :

Each

Make & fix GI hook with clamps for doors

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Hook With Clamps

50.00

No

TOTAL

MATERIAL

No

50.00

42.13

50.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.00

Carpenter

0.030

Day

800.00

Day

24.00

1.17

35.87

40.17

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

109.75

Cost Per Each: 109.75

Labour Rates Per

Each

Rs.

48.75

Cost Per Each: 48.75

19.58

1,058

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-28-a

(British) :

Rft

Teak wood railing of any shape & design including bends, corners,
polishing etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.040

Kg

120.00

Kg

4.80

Sand Paper

0.025

Doz

260.00

Doz

6.50

Wood - Teak

0.174

Cft

7,600.00

Cft

1,322.40

Spirit

0.083

Ltr

107.00

Ltr

8.92

Shellac

0.042

Kg

1,800.00

Kg

75.60

Whiting

0.042

Ltr

30.00

Ltr

1.26

Rawal Plug Brass

0.104

No

170.00

No

17.71

Rawal Pin

0.104

No

35.00

No

3.65

TOTAL

MATERIAL

66.30

1,440.84

LABOUR
Coolie

0.061

Day

500.00

Day

30.50

Carpenter

0.122

Day

800.00

Day

97.60

Painter / Polisher

0.061

Day

1,000.00

Day

61.00

5.67

11.70

194.77

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,994.21

Labour Rates Per

Rft

Rs.

236.37

358.59

Per Meter : Rs 6,540.99


Per Meter : Rs 775.31

1,059

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-28-b

(British) :

Rft

Shisham wood railing of any shape & design including bends,


corners, polishing etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.040

Kg

120.00

Kg

Wood - Shishim

0.174

Cft

1,800.00

Cft

313.20

Sand Paper

0.125

Doz

260.00

Doz

32.50

Spirit

0.083

Ltr

107.00

Ltr

8.92

Shellac

0.042

Kg

1,800.00

Kg

75.60

Whiting

0.042

Ltr

30.00

Ltr

1.26

Rawal Plug Brass

1.042

No

170.00

No

177.14

Rawal Pin

1.042

No

35.00

No

36.47

TOTAL

MATERIAL

4.80

58.10

649.89

LABOUR
Coolie

0.061

Day

500.00

Day

30.50

Carpenter

0.122

Day

800.00

Day

97.60

Painter / Polisher

0.061

Day

1,000.00

Day

61.00

5.67

19.90

194.77

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,029.25

Labour Rates Per

Rft

Rs.

236.37

184.58

Per Meter : Rs 3,375.93


Per Meter : Rs 775.31

1,060

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-29

(British) :

Rft

Deodar wood dado or picture rail 3"x1.5" as per approved design,


including moulding etc. complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.056

Cft

2,600.00

Cft

145.60

Bolts / Nuts / Screws

0.050

Doz

125.00

Doz

6.25

Sand Paper

0.100

Doz

260.00

Doz

26.00

Spirit

0.200

Ltr

107.00

Ltr

21.40

Shellac

0.050

Kg

1,800.00

Kg

90.00

Whiting

0.100

Ltr

30.00

Ltr

3.00

Rawal Bolts

0.600

No

25.00

No

15.00

TOTAL

MATERIAL

59.82

307.25

LABOUR
Coolie

0.050

Day

500.00

Day

25.00

Carpenter

0.050

Day

800.00

Day

40.00

Painter / Polisher

0.013

Day

1,000.00

Day

13.00

2.34

18.18

80.34

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

472.35

Labour Rates Per

Rft

Rs.

97.50

LABOUR

84.76

Per Meter : Rs 1,549.29


Per Meter : Rs 319.80

1,061

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-30-a

(British) :

100 Sft

Sawing wood by hand : Soft wood (deodar, kail or chir)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Sawman I

1.500

Day

800.00

Day

1,200.00

58.50

78.00

2,008.50

22

429.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,437.50

Per SQM : Rs 262.28

Labour Rates Per

100 Sft

Rs.

2,437.50

Per SQM : Rs 262.28

1,062

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-30-b

(British) :

100 Sft

Sawing wood by hand : Hard wood (shisham, kikar, teak or sahl)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Sawman I

3.000

Day

800.00

Day

2,400.00

117.00

78.00

4,017.00

22

858.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,875.00

Per SQM : Rs 524.55

Labour Rates Per

100 Sft

Rs.

4,875.00

Per SQM : Rs 524.55

1,063

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-31-a

(British) :

100 Sft

Sawing wood by machine : Soft Wood

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.465

Day

500.00

Day

232.50

Machine Man

0.650

Day

800.00

Day

520.00

22.58

78.00

775.08

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

940.63

Per SQM : Rs 101.21

Labour Rates Per

100 Sft

Rs.

940.63

Per SQM : Rs 101.21

165.55

1,064

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-31-b

(British) :

100 Sft

Sawing wood by machine : Hard Wood

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.511

Day

500.00

Day

255.50

Machine Man

0.697

Day

800.00

Day

557.60

24.39

78.00

837.49

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,016.38

Per SQM : Rs 109.36

Labour Rates Per

100 Sft

Rs.

1,016.38

Per SQM : Rs 109.36

178.88

1,065

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-32

(British) :

100 Sft

Making and fixing sun-shade of deodar wood including fixing


brackets

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

11.880

Cft

2,600.00

Cft

30,888.00

Screw

0.100

Pkt

90.00

Pkt

9.00

Nails

0.200

Kg

130.00

Kg

26.00

TOTAL

MATERIAL

65.01

30,923.00

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Carpenter

5.000

Day

800.00

Day

4,000.00

142.50

12.99

4,892.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

7,848.06

Composite Rates Per

100 Sft

Rs.

43,663.56

Per SQM : Rs 4,698.20

Labour Rates Per

100 Sft

Rs.

5,937.50

Per SQM : Rs 638.88

1,066

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-33

(British) :

Sft

Making and fixing 1" thick kail or chir wooden notice board with
frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.006

Kg

90.00

Kg

0.50

Iron Hooks

0.111

No

70.00

No

7.77

Nails

0.011

Kg

130.00

Kg

1.44

Wood Kail

0.091

Cft

1,650.00

Cft

150.33

54.97

160.05

TOTAL

MATERIAL

LABOUR
Coolie

0.028

Day

500.00

Day

13.89

Carpenter

0.056

Day

800.00

Day

44.44

1.75

23.03

60.08

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

268.17

Per SQM : Rs 2,885.56

Labour Rates Per

Sft

Rs.

72.92

Per SQM : Rs 784.58

48.04

1,067

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-34

(British) :

Each

Making deodar punkha pole 10'x6"x6"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

2.020

Cft

2,600.00

Cft

5,252.00

Iron Hooks

27.000

No

70.00

No

1,890.00

TOTAL

MATERIAL

70.80

7,142.00

LABOUR
Coolie

0.047

Day

500.00

Day

23.50

Carpenter

0.500

Day

800.00

Day

400.00

12.71

7.20

436.21

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,664.41

Composite Rates Per

Each

Rs.

9,242.62

Cost Per Each: 9,242.62

Labour Rates Per

Each

Rs.

529.38

Cost Per Each: 529.38

1,068

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-35

(British) :

Rft

Dismantling and refixing eave boards

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.017

Day

500.00

Day

8.33

Carpenter

0.017

Day

800.00

Day

13.33

0.65

78.00

22.32

22

4.77

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

27.08

Labour Rates Per

Rft

Rs.

27.08

LABOUR

Per Meter : Rs 88.83


Per Meter : Rs 88.83

1,069

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-36

Item Name :

Wooden stair-cases complete 2'-3'


deodar wood including hand rails

Detail

Qty

(British) :

Rft

wide frame 1.5" thick planks of

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.700

Cft

2,600.00

Cft

Screw

0.181

Kg

90.00

Kg

16.32

Bolt 1/2" x 3' Long

0.066

Kg

130.00

Kg

8.53

Nails

0.060

Kg

130.00

Kg

7.80

TOTAL

MATERIAL

1,820.00

66.82

1,852.65

LABOUR
Coolie

0.133

Day

500.00

Day

66.67

Carpenter

0.133

Day

800.00

Day

106.67

Black Smith

0.033

Day

900.00

Day

30.00

Hammer Man

0.033

Day

700.00

Day

23.33

6.80

11.18

233.47

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,543.57

Labour Rates Per

Rft

Rs.

283.33

457.45

Per Meter : Rs 8,342.90


Per Meter : Rs 929.33

1,070

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-37-a-01

(British) :

100 Sft

Providing and fixing partition including framework : Sheet on one


side of frame : Hard board

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.500

Kg

90.00

Kg

Wood - Partal

4.680

Cft

1,200.00

Cft

Nails

0.900

Kg

130.00

Kg

Hard Board

110.000

Sft

12.00

Sft

1,320.00

63.39

7,098.00

TOTAL

MATERIAL

45.00
5,616.00
117.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

1.000

Day

800.00

Day

800.00

39.00

14.61

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,847.56

Composite Rates Per

100 Sft

Rs.

10,284.56

Per SQM : Rs 1,106.62

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

1,071

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-37-a-02

(British) :

100 Sft

Providing and fixing partition including framework : Sheet on one


side of frame : Ply wood 1/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.500

Kg

90.00

Kg

Wood - Partal

4.680

Cft

1,200.00

Cft

Nails

0.900

Kg

130.00

Kg

Ply Commercial

110.000

Sft

15.00

Sft

1,650.00

63.83

7,428.00

TOTAL

MATERIAL

45.00
5,616.00
117.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

1.000

Day

800.00

Day

800.00

39.00

14.17

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,920.16

Composite Rates Per

100 Sft

Rs.

10,687.16

Per SQM : Rs 1,149.94

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

1,072

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-37-a-03

(British) :

100 Sft

Providing and fixing partition including framework : Sheet on one


side of frame : Masonite

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

4.680

Cft

1,200.00

Cft

Glue

4.000

Kg

140.00

Kg

Masonite

110.000

Sft

35.00

Sft

3,850.00

66.39

10,026.00

TOTAL

MATERIAL

5,616.00
560.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Carpenter

1.000

Day

800.00

Day

800.00

39.00

11.61

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,491.72

Composite Rates Per

100 Sft

Rs.

13,856.72

Per SQM : Rs 1,490.98

Labour Rates Per

100 Sft

Rs.

1,625.00

Per SQM : Rs 174.85

1,073

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-37-b-01

(British) :

100 Sft

Providing and fixing partition including framework : Sheets on both


sides of frame : Hard board

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

4.680

Cft

1,200.00

Cft

Nails

2.500

Kg

130.00

Kg

Hard Board

220.000

Sft

12.00

Sft

2,640.00

58.88

8,581.00

TOTAL

MATERIAL

5,616.00
325.00

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Carpenter

2.000

Day

800.00

Day

1,600.00

70.50

19.12

2,420.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,404.82

Composite Rates Per

100 Sft

Rs.

13,406.32

Per SQM : Rs 1,442.52

Labour Rates Per

100 Sft

Rs.

2,937.50

Per SQM : Rs 316.08

1,074

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-37-b-02

(British) :

100 Sft

Providing and fixing partition including framework : Sheets on both


sides of frame : Ply wood 1/4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

4.680

Cft

1,200.00

Cft

Nails

2.100

Kg

130.00

Kg

Ply Commercial

220.000

Sft

15.00

Sft

3,300.00

59.73

9,189.00

TOTAL

MATERIAL

5,616.00
273.00

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Carpenter

2.000

Day

800.00

Day

1,600.00

70.50

18.27

2,420.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,538.58

Composite Rates Per

100 Sft

Rs.

14,148.08

Per SQM : Rs 1,522.33

Labour Rates Per

100 Sft

Rs.

2,937.50

Per SQM : Rs 316.08

1,075

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-37-b-03

(British) :

100 Sft

Providing and fixing partition including framework : Sheets on both


sides of frame : Masonite

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

4.680

Cft

1,200.00

Cft

Glue

4.000

Kg

140.00

Kg

Masonite

220.000

Sft

35.00

Sft

7,700.00

64.14

13,876.00

TOTAL

MATERIAL

5,616.00
560.00

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Carpenter

2.000

Day

800.00

Day

1,600.00

70.50

13.86

2,420.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,569.72

Composite Rates Per

100 Sft

Rs.

19,866.22

Per SQM : Rs 2,137.61

Labour Rates Per

100 Sft

Rs.

2,937.50

Per SQM : Rs 316.08

1,076

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-38-a

(British) :

100 Sft

Providing and fixing ceiling, including frame work : Hard board

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.500

Pkt

90.00

Pkt

45.00

Wood - Partal

4.680

Cft

1,200.00

Cft

5,616.00

Nails

0.900

Kg

130.00

Kg

Hard Board

110.000

Sft

12.00

Sft

1,320.00

49.76

7,098.00

TOTAL

MATERIAL

117.00

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Carpenter

2.000

Day

800.00

Day

1,600.00

108.00

28.24

3,708.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,353.56

Composite Rates Per

100 Sft

Rs.

13,159.56

Per SQM : Rs 1,415.97

Labour Rates Per

100 Sft

Rs.

4,500.00

Per SQM : Rs 484.20

1,077

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-38-b

(British) :

100 Sft

Providing and fixing ceiling, including frame work : Chip Board

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

4.680

Cft

1,200.00

Cft

Nails

4.000

Kg

130.00

Kg

Chip Board 1/2" Thick

110.000

Sft

30.00

Sft

3,300.00

54.29

9,436.00

TOTAL

MATERIAL

5,616.00
520.00

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Carpenter

2.000

Day

800.00

Day

1,600.00

108.00

23.71

3,708.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,867.92

Composite Rates Per

100 Sft

Rs.

16,011.92

Per SQM : Rs 1,722.88

Labour Rates Per

100 Sft

Rs.

4,500.00

Per SQM : Rs 484.20

1,078

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-38-c

(British) :

100 Sft

Providing and fixing ceiling, including frame work : Ply wood 1/4"
thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

4.680

Cft

1,200.00

Cft

Nails

0.800

Kg

130.00

Kg

Ply Commercial

110.000

Sft

15.00

Sft

1,650.00

50.39

7,370.00

TOTAL

MATERIAL

5,616.00
104.00

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Carpenter

2.000

Day

800.00

Day

1,600.00

108.00

27.61

3,708.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,413.40

Composite Rates Per

100 Sft

Rs.

13,491.40

Per SQM : Rs 1,451.67

Labour Rates Per

100 Sft

Rs.

4,500.00

Per SQM : Rs 484.20

1,079

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-38-d

(British) :

100 Sft

Providing and fixing ceiling, including frame work : Masonite

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

4.680

Cft

1,200.00

Cft

5,616.00

Glue

9.000

Kg

140.00

Kg

1,260.00

Masonite

110.000

Sft

35.00

Sft

3,850.00

56.15

10,726.00

TOTAL

MATERIAL

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Carpenter

2.000

Day

800.00

Day

1,600.00

108.00

21.85

3,708.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,151.72

Composite Rates Per

100 Sft

Rs.

17,585.72

Per SQM : Rs 1,892.22

Labour Rates Per

100 Sft

Rs.

4,500.00

Per SQM : Rs 484.20

1,080

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-39-a-01

(British) :

100 Sft

Provide & fix, thermorpore false ceiling complete Deodar wood frame
panelling : 3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

2.560

Cft

2,600.00

Cft

Nails

1.000

Kg

130.00

Kg

130.00

Clamps (MS)

6.000

No

90.00

No

540.00

Thermopore Sheet 0.75"

110.000

Sft

16.00

Sft

1,760.00

58.06

9,086.00

TOTAL

MATERIAL

6,656.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

1.500

Day

800.00

Day

1,200.00

79.50

19.94

2,729.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,581.92

Composite Rates Per

100 Sft

Rs.

14,397.42

Per SQM : Rs 1,549.16

Labour Rates Per

100 Sft

Rs.

3,312.50

Per SQM : Rs 356.43

1,081

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-39-a-02

Item Name :

(British) :

100 Sft

Provide & fix, thermorpore false ceiling complete Deodar wood frame
panelling : 1" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

2.820

Cft

2,600.00

Cft

Nails

1.000

Kg

130.00

Kg

130.00

Clamps (MS)

6.000

No

90.00

No

540.00

Thermopore Sheet 1"

110.000

Sft

18.00

Sft

1,980.00

59.27

9,982.00

TOTAL

MATERIAL

7,332.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

1.500

Day

800.00

Day

1,200.00

79.50

18.73

2,729.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,779.04

Composite Rates Per

100 Sft

Rs.

15,490.54

Per SQM : Rs 1,666.78

Labour Rates Per

100 Sft

Rs.

3,312.50

Per SQM : Rs 356.43

1,082

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-39-b-01

(British) :

100 Sft

Provide & fix, thermorpore false ceiling complete Partal wood frame
panelling : 3/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

2.620

Cft

1,200.00

Cft

Nails

1.000

Kg

130.00

Kg

130.00

Clamps (MS)

6.000

No

90.00

No

540.00

Thermopore Sheet 0.75"

110.000

Sft

16.00

Sft

1,760.00

50.83

5,574.00

TOTAL

MATERIAL

3,144.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

1.500

Day

800.00

Day

1,200.00

79.50

27.17

2,729.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,809.28

Composite Rates Per

100 Sft

Rs.

10,112.78

Per SQM : Rs 1,088.14

Labour Rates Per

100 Sft

Rs.

3,312.50

Per SQM : Rs 356.43

1,083

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-39-b-02

(British) :

100 Sft

Provide & fix, thermorpore false ceiling complete Partal wood frame
panelling : 1" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

3.530

Cft

1,200.00

Cft

Nails

1.000

Kg

130.00

Kg

130.00

Clamps (MS)

6.000

No

90.00

No

540.00

Thermopore Sheet 0.75"

110.000

Sft

16.00

Sft

1,760.00

53.67

6,666.00

TOTAL

MATERIAL

4,236.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

1.500

Day

800.00

Day

1,200.00

79.50

24.33

2,729.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,049.52

Composite Rates Per

100 Sft

Rs.

11,445.02

Per SQM : Rs 1,231.48

Labour Rates Per

100 Sft

Rs.

3,312.50

Per SQM : Rs 356.43

1,084

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-40

Item Name :

(British) :

100 Sft

Supply and Fixing accoustic miller fibre tile ceiling fixed with
aluminium tee hung by GI wire fixed in roof

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I wire 8 SWG

9.000

Kg

160.00

Kg

1,440.00

Mineral Fiber Tiles

100.000

Sft

80.00

Sft

8,000.00

Aluminium Tee

150.000

Rft

16.00

Rft

2,400.00

62.71

11,840.00

TOTAL

MATERIAL

LABOUR
Carpenter

1.400

Day

800.00

Day

1,120.00

Skilled Coolie

2.000

Day

600.00

Day

1,200.00

69.60

15.29

2,389.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,115.20

Composite Rates Per

100 Sft

Rs.

17,344.80

Per SQM : Rs 1,866.30

Labour Rates Per

100 Sft

Rs.

2,900.00

Per SQM : Rs 312.04

1,085

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-41-a

(British) :

Each

Fixing Door including chowkats

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Carpenter

0.500

Day

800.00

Day

400.00

15.75

78.00

540.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

656.25

Cost Per Each: 656.25

Labour Rates Per

Each

Rs.

656.25

Cost Per Each: 656.25

115.50

1,086

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-41-b

(British) :

Each

Fixing Windows including chowkats

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Carpenter

0.250

Day

800.00

Day

200.00

7.88

78.00

270.38

22

57.75

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

328.13

Cost Per Each: 328.13

Labour Rates Per

Each

Rs.

328.13

Cost Per Each: 328.13

1,087

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-42-a

(British) :

Sft

Glazing with panes (16-18 oz) including cost of putty

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Glass Pane 10Oz - 19Oz

1.100

Sft

50.00

Sft

55.00

Wire Tacks

0.004

Kg

130.00

Kg

0.46

Putty

0.001

Kg

90.00

Kg

0.10

TOTAL

MATERIAL

54.13

55.57

LABOUR
Coolie

0.018

Day

500.00

Day

8.93

Glazier

0.018

Day

700.00

Day

12.50

0.64

23.87

22.07

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

94.58

Per SQM : Rs 1,017.66

Labour Rates Per

Sft

Rs.

26.79

Per SQM : Rs 288.21

16.94

1,088

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-42-b

(British) :

Sft

Glazing with panes (16-18 oz) using deodar wooden fillets & putty

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.006

Cft

2,600.00

Cft

16.71

Glass Pane 10Oz - 19Oz

1.100

Sft

50.00

Sft

55.00

Wire Tacks

0.004

Kg

130.00

Kg

0.46

Putty

0.001

Kg

90.00

Kg

0.10

TOTAL

MATERIAL

54.72

72.28

LABOUR
Carpenter

0.018

Day

800.00

Day

14.29

Glazier

0.018

Day

700.00

Day

12.50

0.80

23.28

27.59

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

121.67

Per SQM : Rs 1,309.13

Labour Rates Per

Sft

Rs.

33.48

Per SQM : Rs 360.27

21.79

1,089

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-42-c

(British) :

Sft

Glazing with panes (24-26 oz) using putty & deodar wooden fillets

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.006

Cft

2,600.00

Cft

16.71

Glass Pane 10Oz - 19Oz

1.100

Sft

50.00

Sft

55.00

Wire Tacks

0.004

Kg

130.00

Kg

0.46

Putty

0.001

Kg

90.00

Kg

0.10

TOTAL

MATERIAL

54.72

72.28

LABOUR
Carpenter

0.018

Day

800.00

Day

14.29

Glazier

0.018

Day

700.00

Day

12.50

0.80

23.28

27.59

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

121.67

Per SQM : Rs 1,309.13

Labour Rates Per

Sft

Rs.

33.48

Per SQM : Rs 360.27

21.79

1,090

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-43-a

(British) :

100 Sft

Cutting to required size & fixing glass panes with putty.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wire Nails

0.500

Kg

170.00

Kg

85.00

Putty

1.000

Kg

90.00

Kg

90.00

TOTAL

MATERIAL

27.63

175.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Glazier

0.250

Day

700.00

Day

175.00

9.00

50.37

309.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

588.50

Per SQM : Rs 63.32

Labour Rates Per

100 Sft

Rs.

375.00

Per SQM : Rs 40.35

104.50

1,091

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-43-b

(British) :

Sft

Cutting to required size & fixing glass panes Using deodar wood
fillets & putty

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.003

Cft

2,600.00

Cft

8.55

Wire Nails

0.010

Kg

170.00

Kg

1.70

Putty

0.020

Kg

90.00

Kg

1.80

TOTAL

MATERIAL

50.31

12.05

LABOUR
Coolie

0.001

Day

500.00

Day

0.63

Carpenter

0.001

Day

800.00

Day

1.00

Skilled Coolie

0.003

Day

600.00

Day

1.98

Glazier

0.003

Day

700.00

Day

2.31

0.18

27.69

6.09

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

22.10

Per SQM : Rs 237.82

Labour Rates Per

Sft

Rs.

7.40

Per SQM : Rs 79.58

3.95

1,092

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-44-a

(British) :

Sft

Glazing with plate glass 6 mm thick including cost of deodar wood


fillet & putty : Upto 0.75 m2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.002

Cft

2,600.00

Cft

4.28

Wire Nails

0.009

Kg

170.00

Kg

1.59

Putty

0.013

Kg

90.00

Kg

1.13

Plate Glass 1/4"

1.000

Sft

115.00

Sft

115.00

57.55

122.00

TOTAL

MATERIAL

LABOUR
Coolie

0.008

Day

500.00

Day

3.91

Carpenter

0.008

Day

800.00

Day

6.25

Skilled Coolie

0.021

Day

600.00

Day

12.38

Glazier

0.021

Day

700.00

Day

14.44

1.11

20.45

38.09

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

195.06

Per SQM : Rs 2,098.88

Labour Rates Per

Sft

Rs.

46.23

Per SQM : Rs 497.41

34.98

1,093

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-44-b

(British) :

Sft

Glazing with plate glass 6 mm thick including cost of deodar wood


fillet & putty : 0.75m2 to 2.25 m2

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.002

Cft

2,600.00

Cft

4.28

Wire Nails

0.009

Kg

170.00

Kg

1.59

Putty

0.006

Kg

90.00

Kg

0.56

Plate Glass 1/4"

1.000

Sft

115.00

Sft

115.00

57.49

121.43

TOTAL

MATERIAL

LABOUR
Coolie

0.008

Day

500.00

Day

3.91

Carpenter

0.008

Day

800.00

Day

6.25

Skilled Coolie

0.021

Day

600.00

Day

12.38

Glazier

0.021

Day

700.00

Day

14.44

1.11

20.51

38.09

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

194.38

Per SQM : Rs 2,091.48

Labour Rates Per

Sft

Rs.

46.23

Per SQM : Rs 497.40

34.85

1,094

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-45-a

(British) :

Sft

1.5" thick deodar doors & windows, chowkat of MS angle iron


1.5"x1.5"x1/4" welded with MS flat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

1.000

Kg

97.00

Kg

97.00

Wood Deodar

0.126

Cft

2,600.00

Cft

328.62

Hinges 5"

0.321

Doz

550.00

Doz

176.81

Tower Bolt 10 Inch I

0.143

No

130.00

No

18.57

Glass Pane

0.428

Sft

50.00

Sft

21.42

60.12

642.42

TOTAL

MATERIAL

LABOUR
Coolie

0.036

Day

500.00

Day

17.84

Carpenter

0.107

Day

800.00

Day

85.72

Skilled Coolie

0.071

Day

600.00

Day

42.88

Glazier

0.018

Day

700.00

Day

12.49

4.77

17.88

163.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

982.43

Per SQM : Rs 10,570.98

Labour Rates Per

Sft

Rs.

198.68

Per SQM : Rs 2,137.75

176.30

1,095

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-45-b

(British) :

Sft

1.5" thick deodar doors & windows, chowkat of MS tee iron 1.5"x
1.5"x 1/4" welded with MS flat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

1.428

Kg

97.00

Kg

138.56

Wood Deodar

0.099

Cft

2,600.00

Cft

256.13

Hinges 5"

0.322

Doz

550.00

Doz

176.86

Tower Bolt 10 Inch I

0.143

No

130.00

No

18.57

Glass Pane

0.428

Sft

50.00

Sft

21.42

58.05

611.54

TOTAL

MATERIAL

LABOUR
Coolie

0.054

Day

500.00

Day

26.77

Carpenter

0.107

Day

800.00

Day

85.72

Skilled Coolie

0.089

Day

600.00

Day

53.59

Glazier

0.018

Day

700.00

Day

12.50

5.36

19.95

183.92

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

969.29

Per SQM : Rs 10,429.58

Labour Rates Per

Sft

Rs.

223.21

Per SQM : Rs 2,401.74

173.82

1,096

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-46-a

(British) :

Sft

1.5" thick hollow flush door/window, chowkat of MS angle iron


1.5"x1.5"x1/4" welded with MS flat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

1.286

Kg

97.00

Kg

124.71

Wood Deodar

0.075

Cft

2,600.00

Cft

195.72

Wood - Partal

0.054

Cft

1,200.00

Cft

64.68

Glue

0.107

Kg

140.00

Kg

15.00

Glass Pane

0.384

Sft

50.00

Sft

19.21

Ply Commercial

1.785

Sft

15.00

Sft

26.78

57.24

446.11

TOTAL

MATERIAL

LABOUR
Coolie

0.043

Day

500.00

Day

21.38

Carpenter

0.065

Day

800.00

Day

52.04

Black Smith

0.021

Day

900.00

Day

19.24

Fitter II

0.011

Day

600.00

Day

6.69

Skilled Coolie

0.065

Day

600.00

Day

39.03

4.15

20.76

142.53

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

717.24

Per SQM : Rs 7,717.46

Labour Rates Per

Sft

Rs.

172.98

Per SQM : Rs 1,861.25

128.59

1,097

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-46-b

(British) :

Sft

1.5" thick hollow flush door/window, chowkat of MS tee iron 1.5"x


1.5"x 1/4" welded with MS flat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

0.857

Kg

97.00

Kg

83.12

Wood Deodar

0.075

Cft

2,600.00

Cft

195.72

Wood - Partal

0.054

Cft

1,200.00

Cft

64.68

Glue

0.107

Kg

140.00

Kg

15.00

Glass Pane

0.384

Sft

50.00

Sft

19.20

Ply Commercial

1.785

Sft

15.00

Sft

26.78

56.03

404.50

TOTAL

MATERIAL

LABOUR
Coolie

0.043

Day

500.00

Day

21.38

Carpenter

0.064

Day

800.00

Day

51.30

Black Smith

0.021

Day

900.00

Day

19.24

Fitter II

0.011

Day

600.00

Day

6.41

Skilled Coolie

0.064

Day

600.00

Day

38.59

4.11

21.97

141.02

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

664.64

Per SQM : Rs 7,151.50

Labour Rates Per

Sft

Rs.

171.14

Per SQM : Rs 1,841.50

119.11

1,098

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-47

(British) :

Sft

Panelled door of MS sheet with forged door leaves of MS sheet 22


SWG etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.035

Bag

490.00

Bag

17.30

Sand

0.131

Cft

2,200.00

100 Cft

2.88

Crushed Aggregate

0.263

Cft

2,800.00

100 Cft

7.35

M.S Sheet

2.416

Kg

125.00

Kg

Paint : Enamel

0.001

Ltr

495.00

Ltr

0.62

44.31

330.20

TOTAL

MATERIAL

302.04

LABOUR
Coolie

0.071

Day

500.00

Day

35.73

Carpenter

0.107

Day

800.00

Day

85.74

Black Smith

0.036

Day

900.00

Day

32.15

Fitter II

0.018

Day

600.00

Day

10.72

Skilled Coolie

0.107

Day

600.00

Day

64.31

6.86

33.69

235.51

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

688.66

Per SQM : Rs 7,410.02

Labour Rates Per

Sft

Rs.

285.82

Per SQM : Rs 3,075.39

122.95

1,099

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-48

(British) :

Rft

24 SWG aluminium kick plate 4" high, on bottom rail of flush doors
of commercial ply

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.034

Pkt

90.00

Pkt

3.02

Aluminum Plate 4" 24SWG

0.100

RFT

85.00

RFT

8.50

18.53

11.52

TOTAL

MATERIAL

LABOUR
Carpenter

0.028

Day

800.00

Day

22.23

Skilled Coolie

0.021

Day

600.00

Day

12.87

1.05

59.47

36.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

57.92

Labour Rates Per

Rft

Rs.

43.87

LABOUR

10.26

Per Meter : Rs 189.98


Per Meter : Rs 143.89

1,100

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-49

(British) :

Rft

Curtain railing to doors & windows comprising TOSO-elite Japanese


railing or equiv. including paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.002

Cft

2,600.00

Cft

4.20

Paint : Enamel

0.001

Ltr

495.00

Ltr

0.27

Nails

0.022

Kg

130.00

Kg

2.80

Railing TOSO or equiv

1.075

RFT

70.00

RFT

75.27

52.69

82.53

TOTAL

MATERIAL

LABOUR
Carpenter

0.027

Day

800.00

Day

21.51

Skilled Coolie

0.020

Day

600.00

Day

12.26

Painter / Polisher

0.001

Day

1,000.00

Day

1.18

1.05

25.31

36.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

144.38

Labour Rates Per

Rft

Rs.

43.69

LABOUR

25.85

Per Meter : Rs 473.56


Per Meter : Rs 143.30

1,101

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-50

(British) :

Sft

MS flat 1/2"x1/8" grill in windows of approved design including


painting 3 coats, complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Screw

0.013

Pkt

90.00

Pkt

1.15

Paint : Enamel

0.013

Ltr

495.00

Ltr

6.60

MS Flat Grill 1/2" x 1/8"

0.960

Sft

200.00

Sft

192.01

62.58

199.76

TOTAL

MATERIAL

LABOUR
Black Smith

0.020

Day

900.00

Day

17.77

Skilled Coolie

0.032

Day

600.00

Day

19.21

Painter / Polisher

0.003

Day

1,000.00

Day

2.67

1.19

15.42

40.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

293.26

Per SQM : Rs 3,155.51

Labour Rates Per

Sft

Rs.

49.55

Per SQM : Rs 533.16

52.67

1,102

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-51

(British) :

Sft

Provide & fix GI wire gauze 22 SWG, 12x12 mesh per sq. in, fixed to
steel window complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

0.179

Kg

97.00

Kg

17.34

Screw

0.238

Pkt

90.00

Pkt

21.45

Wire Gauze 12x24

1.674

Sft

35.00

Sft

58.58

49.65

97.36

TOTAL

MATERIAL

LABOUR
Coolie

0.046

Day

500.00

Day

23.23

Carpenter

0.028

Day

800.00

Day

22.30

Black Smith

0.005

Day

900.00

Day

4.18

1.49

28.35

51.21

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

180.94

Per SQM : Rs 1,946.87

Labour Rates Per

Sft

Rs.

62.15

Per SQM : Rs 668.75

32.36

1,103

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-52-a

(British) :

Sft

Hollow flush door 1.5"-2" thick including iron mongery excluding


chowkat & lock : Teak veneered

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.075

Cft

2,600.00

Cft

Handles 6"

0.107

No

50.00

No

5.36

Door Stops 6 "

0.071

No

150.00

No

10.72

Tower Bolt 10 Inch I

0.071

No

130.00

No

9.29

Wood - Partal

0.054

Cft

1,200.00

Cft

64.68

Nails

0.071

Kg

130.00

Kg

9.29

Vineer : Teak

2.000

Sft

75.00

Sft

150.00

Hinges 5"

0.143

Doz

550.00

Doz

78.60

71.50

524.22

TOTAL

MATERIAL

196.28

LABOUR
Carpenter

0.024

Day

800.00

Day

19.43

Skilled Coolie

0.010

Day

600.00

Day

6.22

0.77

6.50

26.42

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

671.61

Per SQM : Rs 7,226.55

Labour Rates Per

Sft

Rs.

32.06

Per SQM : Rs 345.01

120.97

1,104

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-52-b

(British) :

Sft

Hollow flush door 1.5"-2" thick including iron mongery excluding


chowkat & lock : Shisham veneered

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.075

Cft

2,600.00

Cft

Handles 6"

0.107

No

50.00

No

5.36

Door Stops 6 "

0.071

No

150.00

No

10.72

Tower Bolt 10 Inch I

0.071

No

130.00

No

9.29

Wood - Partal

0.054

Cft

1,200.00

Cft

64.68

Nails

0.071

Kg

130.00

Kg

9.29

Hinges 5"

0.143

Doz

550.00

Doz

78.60

Vineer : Sheeshem

2.000

Sft

90.00

Sft

180.00

71.68

554.22

TOTAL

MATERIAL

196.28

LABOUR
Carpenter

0.024

Day

800.00

Day

19.43

Skilled Coolie

0.010

Day

600.00

Day

6.22

0.77

6.32

26.42

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

708.21

Per SQM : Rs 7,620.37

Labour Rates Per

Sft

Rs.

32.06

Per SQM : Rs 345.01

127.57

1,105

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-52-c

(British) :

Sft

Hollow flush door 1.5"-2" thick including iron mongery excluding


chowkat & lock : Deodar veneered

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.075

Cft

2,600.00

Cft

Handles 6"

0.107

No

50.00

No

5.36

Door Stops 6 "

0.071

No

150.00

No

10.72

Tower Bolt 10 Inch I

0.071

No

130.00

No

9.29

Wood - Partal

0.054

Cft

1,200.00

Cft

64.68

Nails

0.071

Kg

130.00

Kg

9.29

Hinges 5"

0.143

Doz

550.00

Doz

78.56

Vineer : Deodar

2.000

Sft

60.00

Sft

120.00

71.30

494.19

TOTAL

MATERIAL

196.28

LABOUR
Carpenter

0.024

Day

800.00

Day

19.43

Skilled Coolie

0.010

Day

600.00

Day

6.19

0.77

6.70

26.39

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

634.93

Per SQM : Rs 6,831.84

Labour Rates Per

Sft

Rs.

32.02

Per SQM : Rs 344.55

114.36

1,106

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-52-d

Item Name :

(British) :

Sft

Hollow flush door 1.5"-2" thick including iron mongery excluding


chowkat & lock : Commercial veneered

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

0.075

Cft

2,600.00

Cft

Handles 6"

0.107

No

50.00

No

5.36

Door Stops 6 "

0.071

No

150.00

No

10.72

Tower Bolt 10 Inch I

0.071

No

130.00

No

9.29

Wood - Partal

0.054

Cft

1,200.00

Cft

64.68

Nails

0.071

Kg

130.00

Kg

9.29

Hinges 5"

0.143

Doz

550.00

Doz

78.56

Vineer : Commercial

2.000

Sft

50.00

Sft

100.00

71.15

474.19

TOTAL

MATERIAL

196.28

LABOUR
Carpenter

0.024

Day

800.00

Day

19.44

Skilled Coolie

0.010

Day

600.00

Day

6.22

0.77

6.85

26.42

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

610.57

Per SQM : Rs 6,569.77

Labour Rates Per

Sft

Rs.

32.07

Per SQM : Rs 345.02

109.96

1,107

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-a-01

(British) :

Sft

Supply and Fixing aluminium door/window, Economy model Sliding


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Sliding Window ECO

1.000

Sft

460.00

Sft

460.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

69.39

520.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.61

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

686.92

Per SQM : Rs 7,391.27

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

123.64

1,108

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-a-02

(British) :

Sft

Supply and Fixing aluminium door/window, Economy model Hinges


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Hinged Window ECO

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

69.19

500.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.81

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

662.52

Per SQM : Rs 7,128.73

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

119.24

1,109

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-a-03

(British) :

Sft

Supply and Fixing aluminium door/window, Economy model Fixed louver


in door frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fxd Louver D/Fr ECO

1.000

Sft

520.00

Sft

520.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Short

0.082

Each

400.00

Each

32.65

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.77

703.71

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.23

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

911.04

Per SQM : Rs 9,802.81

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

164.06

1,110

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-a-04

(British) :

Sft

Supply and Fixing aluminium door/window, Economy model Fixed louver


in 2" frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fxd Louver 2" fr ECO

1.000

Sft

320.00

Sft

320.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

67.53

380.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

10.47

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

516.12

Per SQM : Rs 5,553.46

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

92.84

1,111

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-01

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Sliding


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Sliding Window 3"

1.000

Sft

370.00

Sft

370.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.32

430.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.68

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

577.12

Per SQM : Rs 6,209.82

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

103.84

1,112

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-02

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Hinges


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Hinged Window 3"

1.000

Sft

400.00

Sft

400.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.72

460.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.28

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

613.72

Per SQM : Rs 6,603.64

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

110.44

1,113

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-03

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed


glazing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fixed Glazing 3"

1.000

Sft

320.00

Sft

320.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

67.53

380.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

10.47

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

516.12

Per SQM : Rs 5,553.46

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

92.84

1,114

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-04

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed arch

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fixed Arch 3"

1.000

Sft

360.00

Sft

360.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.18

420.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.82

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

564.92

Per SQM : Rs 6,078.55

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

101.64

1,115

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-05

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed


louvers

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fxd Louver 3"

1.000

Sft

430.00

Sft

430.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Short

0.082

Each

400.00

Each

32.66

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.19

613.72

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.81

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

801.26

Per SQM : Rs 8,621.52

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

144.26

1,116

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-06

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Sliding


door

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Sliding Door 3"

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Short

0.082

Each

400.00

Each

32.66

Lock for Aluminum

0.041

Each

430.00

Each

17.56

TOTAL

MATERIAL

69.68

550.22

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.32

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

723.79

Per SQM : Rs 7,788.00

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

130.29

1,117

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-07

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door
single action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 3"

1.000

Sft

420.00

Sft

420.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

71.06

756.93

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.94

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

975.97

Per SQM : Rs 10,501.45

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

175.77

1,118

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-08

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door
single action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 3"

1.000

Sft

420.00

Sft

420.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.074

Each

430.00

Each

31.97

Door Closer Single Action

0.042

Each

1,800.00

Each

75.28

TOTAL

MATERIAL

71.13

773.12

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.87

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

995.73

Per SQM : Rs 10,714.06

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

179.33

1,119

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-09

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door
double action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 3"

1.000

Sft

420.00

Sft

420.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

71.06

756.93

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.94

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

975.97

Per SQM : Rs 10,501.45

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

175.77

1,120

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-b-10

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door
double action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 3"

1.000

Sft

420.00

Sft

420.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Double Action

0.000

Each

3,000.00

Each

0.00

TOTAL

MATERIAL

70.66

683.43

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.34

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

886.31

Per SQM : Rs 9,536.66

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

159.60

1,121

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-c-01

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Sliding


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Sliding Window 3.5"

1.000

Sft

410.00

Sft

410.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.85

470.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.15

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

625.92

Per SQM : Rs 6,734.91

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

112.64

1,122

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-c-02

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Hinges


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Hinged Window 3.5"

1.000

Sft

430.00

Sft

430.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

69.08

490.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.92

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

650.32

Per SQM : Rs 6,997.45

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

117.04

1,123

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-c-03

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Fixed


glazing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fixed Glazing 3.5"

1.000

Sft

340.00

Sft

340.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

67.87

400.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

10.13

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

540.52

Per SQM : Rs 5,816.01

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

97.24

1,124

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-c-04

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Fixed


arch

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fixed Arch 3.5"

1.000

Sft

350.00

Sft

350.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.03

410.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.97

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

552.72

Per SQM : Rs 5,947.28

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

99.44

1,125

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-c-05

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Sliding


door

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Sliding Door 3.5"

1.000

Sft

420.00

Sft

420.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Short

0.082

Each

400.00

Each

32.64

Lock for Aluminum

0.041

Each

430.00

Each

17.54

TOTAL

MATERIAL

69.49

530.18

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.51

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

699.34

Per SQM : Rs 7,524.94

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

125.88

1,126

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-c-06

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Swing


door single action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 3.5"

1.000

Sft

430.00

Sft

430.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Short

0.082

Each

400.00

Each

32.66

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.19

613.72

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.81

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

801.26

Per SQM : Rs 8,621.52

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

144.26

1,127

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-c-07

(British) :

Sft

Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Swing


door single action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 3.5"

1.000

Sft

430.00

Sft

430.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.52

Door Closer Single Action

0.041

Each

1,800.00

Each

73.33

TOTAL

MATERIAL

71.10

766.72

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.90

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

987.92

Per SQM : Rs 10,630.00

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

177.92

1,128

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-01

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Sliding


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Sliding Window 4"

1.160

Sft

460.00

Sft

533.53

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

70.04

593.53

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.96

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

776.63

Per SQM : Rs 8,356.53

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

139.82

1,129

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-02

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Hinges


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Hinged Window 4"

1.140

Sft

450.00

Sft

513.15

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

69.88

573.15

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.12

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

751.76

Per SQM : Rs 8,088.99

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

135.34

1,130

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-03

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Fixed


glazing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fixed Glazing 4"

1.000

Sft

360.00

Sft

360.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.18

420.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.82

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

564.92

Per SQM : Rs 6,078.55

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

101.64

1,131

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-04

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Fixed


arch

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Fixed Arch 4"

1.116

Sft

370.00

Sft

412.92

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.88

472.92

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.12

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

629.48

Per SQM : Rs 6,773.26

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

113.29

1,132

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-05

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Sliding


door

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Sliding Door 4"

1.114

Sft

450.00

Sft

501.44

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Short

0.082

Each

400.00

Each

32.66

Lock for Aluminum

0.041

Each

430.00

Each

17.56

TOTAL

MATERIAL

70.18

611.66

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.82

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

798.75

Per SQM : Rs 8,594.54

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

143.81

1,133

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-06

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Swing


door single action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 4"

1.000

Sft

490.00

Sft

490.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Short

0.082

Each

400.00

Each

32.66

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.60

673.72

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.40

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

874.46

Per SQM : Rs 9,409.15

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

157.46

1,134

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-07

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Swing


door single action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 4"

1.000

Sft

490.00

Sft

490.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

71.37

826.93

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.63

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,061.37

Per SQM : Rs 11,420.35

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

191.17

1,135

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-08

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Swing


door double action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 4"

1.000

Sft

490.00

Sft

490.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Short

0.082

Each

400.00

Each

32.66

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Double Action

0.041

Each

3,000.00

Each

122.49

70.88

722.71

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.12

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

934.23

Per SQM : Rs 10,052.34

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

168.24

1,136

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-d-09

(British) :

Sft

Supply and Fixing aluminium door/window, Premium 4" sect. Swing


door double action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
W.AL Swing Door 4"

1.000

Sft

490.00

Sft

490.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

W.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Double Action

0.041

Each

3,000.00

Each

122.68

71.57

876.11

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.43

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,121.37

Per SQM : Rs 12,065.96

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

201.99

1,137

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-e-01

(British) :

Sft

Supply and Fixing aluminium door/window. Other items : Fly screen


shutter for Deluxe model

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

W.AL Fly Screen Deluxe

180.00

Sft

TOTAL

MATERIAL

Sft

180.00

71.43

180.00

Sft

9.00

0.27

6.57

9.27

22

LABOUR
0.200

Aluminum Fixer

45.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

230.85

Per SQM : Rs 2,483.95

Labour Rates Per

Sft

Rs.

11.25

Per SQM : Rs 121.05

41.58

1,138

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-e-02

(British) :

Sft

Supply and Fixing aluminium door/window. Other items : Fly screen


shutter for Premium model

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

W.AL Fly Screen Premium

160.00

Sft

TOTAL

MATERIAL

Sft

160.00

71.01

160.00

Sft

9.00

0.27

6.99

9.27

22

LABOUR
0.200

Aluminum Fixer

45.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

206.45

Per SQM : Rs 2,221.40

Labour Rates Per

Sft

Rs.

11.25

Per SQM : Rs 121.05

37.18

1,139

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-53-e-03

(British) :

Sft

Supply and Fixing aluminium door/window. Other items : Fly screen


shutter with separate outer frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

W.AL Fly Screen Sep Frame

260.00

Sft

TOTAL

MATERIAL

Sft

260.00

72.49

260.00

Sft

9.00

0.27

5.51

9.27

22

LABOUR
0.200

Aluminum Fixer

45.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

328.45

Per SQM : Rs 3,534.12

Labour Rates Per

Sft

Rs.

11.25

Per SQM : Rs 121.05

59.18

1,140

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-a-01

(British) :

Sft

Supply and Fixing aluminium bronze/black. Economy model Sliding


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Sliding Window ECO

1.000

Sft

460.00

Sft

460.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

69.39

520.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.61

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

686.92

Per SQM : Rs 7,391.27

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

123.64

1,141

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-a-02

(British) :

Sft

Supply and Fixing aluminium bronze/black. Economy model Hinges


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Hinged Window ECO

1.000

Sft

370.00

Sft

370.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.32

430.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.68

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

577.12

Per SQM : Rs 6,209.82

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

103.84

1,142

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-a-03

(British) :

Sft

Supply and Fixing aluminium bronze/black. Economy model Fixed


louver in door frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fxd Louver D/Fr ECO

1.000

Sft

530.00

Sft

530.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.82

711.68

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.18

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

920.77

Per SQM : Rs 9,907.44

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

165.81

1,143

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-a-04

(British) :

Sft

Supply and Fixing aluminium bronze/black. Economy model Fixed


louver in 2" frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fxd Louver 2" fr ECO

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.25

621.68

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.75

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

810.97

Per SQM : Rs 8,725.99

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

146.01

1,144

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-01

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Sliding


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Sliding Window 3"

1.000

Sft

370.00

Sft

370.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.32

430.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.68

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

577.12

Per SQM : Rs 6,209.82

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

103.84

1,145

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-02

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Hinges


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Hinged Window 3"

1.000

Sft

400.00

Sft

400.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.72

460.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.28

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

613.72

Per SQM : Rs 6,603.64

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

110.44

1,146

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-03

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed


glazing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fixed Glazing 3"

1.000

Sft

330.00

Sft

330.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

67.71

390.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

10.29

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

528.32

Per SQM : Rs 5,684.73

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

95.04

1,147

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-04

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed


arch

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fixed Arch 3"

1.000

Sft

410.00

Sft

410.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.85

470.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.15

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

625.92

Per SQM : Rs 6,734.91

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

112.64

1,148

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-05

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed


louvers

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fxd Louver 3"

1.000

Sft

390.00

Sft

390.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

69.87

571.68

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.13

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

749.97

Per SQM : Rs 8,069.63

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

135.01

1,149

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-06

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Sliding


door

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Sliding Door 3"

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

TOTAL

MATERIAL

69.66

548.18

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.34

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

721.30

Per SQM : Rs 7,761.20

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

129.84

1,150

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-07

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing


door single action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 3"

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.25

621.68

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.75

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

810.97

Per SQM : Rs 8,725.99

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

146.01

1,151

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-08

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing


door single action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 3"

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

TOTAL

MATERIAL

70.77

703.43

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.23

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

910.71

Per SQM : Rs 9,799.20

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

164.00

1,152

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-09

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing


door double action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 3"

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Rft

375.00

Rft

30.62

Lock for Aluminum

0.042

Each

430.00

Each

17.98

Door Closer Double Action

0.042

Each

3,000.00

Each

125.46

70.60

674.07

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.40

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

874.89

Per SQM : Rs 9,413.79

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

157.54

1,153

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-b-10

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing


door double action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 3"

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Door Closer Double Action

0.041

Each

3,000.00

Each

122.49

71.29

808.37

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.71

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,038.73

Per SQM : Rs 11,176.71

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

187.08

1,154

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-c-01

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Sliding


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Sliding Window 3.5"

1.000

Sft

410.00

Sft

410.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.85

470.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.15

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

625.92

Per SQM : Rs 6,734.91

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

112.64

1,155

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-c-02

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Hinges


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Hinged Window 3.5"

1.000

Sft

430.00

Sft

430.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

69.08

490.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.92

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

650.32

Per SQM : Rs 6,997.45

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

117.04

1,156

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-c-03

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Fixed


glazing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fixed Glazing 3.5"

1.000

Sft

350.00

Sft

350.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.03

410.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.97

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

552.72

Per SQM : Rs 5,947.28

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

99.44

1,157

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-c-04

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Fixed


arch

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fixed Arch 3.5"

1.000

Sft

360.00

Sft

360.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.18

420.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.82

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

564.92

Per SQM : Rs 6,078.55

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

101.64

1,158

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-c-05

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Sliding


door

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Sliding Door 3.5"

1.000

Sft

450.00

Sft

450.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

TOTAL

MATERIAL

69.75

558.18

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.25

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

733.50

Per SQM : Rs 7,892.47

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

132.04

1,159

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-c-06

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Swing


door single action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 3.5"

1.000

Sft

450.00

Sft

450.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.32

631.68

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.68

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

823.17

Per SQM : Rs 8,857.26

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

148.21

1,160

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-c-07

(British) :

Sft

Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Swing


door single action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 3.5"

1.000

Sft

450.00

Sft

450.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

71.20

786.93

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.80

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,012.57

Per SQM : Rs 10,895.27

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

182.37

1,161

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-01

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Sliding


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Sliding Window 4"

1.000

Sft

460.00

Sft

460.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

69.39

520.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.61

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

686.92

Per SQM : Rs 7,391.27

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

123.64

1,162

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-02

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Hinges


window

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Hinged Window 4"

1.000

Sft

440.00

Sft

440.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

69.19

500.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.81

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

662.52

Per SQM : Rs 7,128.73

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

119.24

1,163

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-03

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Fixed


glazing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fixed Glazing 4"

1.000

Sft

370.00

Sft

370.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.32

430.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.68

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

577.12

Per SQM : Rs 6,209.82

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

103.84

1,164

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-04

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Fixed


arch

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Fixed Arch 4"

1.000

Sft

390.00

Sft

390.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

68.60

450.00

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

9.40

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

601.52

Per SQM : Rs 6,472.37

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

108.24

1,165

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-05

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Sliding


door

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Sliding Door 4"

1.000

Sft

450.00

Sft

450.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

TOTAL

MATERIAL

69.75

558.18

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

8.25

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

733.50

Per SQM : Rs 7,892.47

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

132.04

1,166

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-06

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing


door single action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 4"

1.000

Sft

490.00

Sft

490.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

70.58

671.68

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.42

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

871.97

Per SQM : Rs 9,382.35

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

157.01

1,167

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-07

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing


door single action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 4"

1.000

Sft

490.00

Sft

490.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Single Action

0.041

Each

1,800.00

Each

73.50

TOTAL

MATERIAL

71.37

826.93

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.63

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,061.37

Per SQM : Rs 11,420.35

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

191.17

1,168

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-08

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing


door double action (short handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 4"

1.000

Sft

490.00

Sft

490.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Short

0.082

Each

375.00

Each

30.62

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Double Action

0.041

Each

3,000.00

Each

122.49

70.87

720.67

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

7.13

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

931.74

Per SQM : Rs 10,025.54

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

167.79

1,169

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-d-09

(British) :

Sft

Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing


door double action (long handle)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
B.AL Swing Door 4"

1.000

Sft

490.00

Sft

490.00

Glass Pane 5mm thick

1.000

Sft

60.00

Sft

60.00

B.AL Handle Long

0.232

Rft

800.00

Rft

185.87

Lock for Aluminum

0.041

Each

430.00

Each

17.56

Door Closer Double Action

0.041

Each

3,000.00

Each

122.49

71.57

875.92

TOTAL

MATERIAL

LABOUR
Glazier

0.028

Day

700.00

Day

19.52

Aluminum Fixer

0.500

Sft

45.00

Sft

22.50

1.26

6.43

43.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,121.15

Per SQM : Rs 12,063.55

Labour Rates Per

Sft

Rs.

52.52

Per SQM : Rs 565.13

201.95

1,170

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-e-01

(British) :

Sft

Supply and Fixing aluminium bronze/black. Other items : Fly screen


shutter for Deluxe model

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

B.AL Fly Screen Deluxe

210.00

Sft

TOTAL

MATERIAL

Sft

210.00

71.92

210.00

Sft

9.00

0.27

6.08

9.27

22

LABOUR
0.200

Aluminum Fixer

45.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

267.45

Per SQM : Rs 2,877.76

Labour Rates Per

Sft

Rs.

11.25

Per SQM : Rs 121.05

48.18

1,171

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-e-02

(British) :

Sft

Supply and Fixing aluminium bronze/black. Other items : Fly screen


shutter for Premium model

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

B.AL Fly Screen Premium

180.00

Sft

TOTAL

MATERIAL

Sft

180.00

71.43

180.00

Sft

9.00

0.27

6.57

9.27

22

LABOUR
0.200

Aluminum Fixer

45.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

230.85

Per SQM : Rs 2,483.95

Labour Rates Per

Sft

Rs.

11.25

Per SQM : Rs 121.05

41.58

1,172

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-54-e-03

(British) :

Sft

Supply and Fixing aluminium bronze/black. Other items : Fly screen


shutter with separate outer frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

B.AL Fly Screen Sep Frame

270.00

Sft

TOTAL

MATERIAL

Sft

270.00

72.58

270.00

Sft

9.00

0.27

5.42

9.27

22

LABOUR
0.200

Aluminum Fixer

45.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

340.65

Per SQM : Rs 3,665.39

Labour Rates Per

Sft

Rs.

11.25

Per SQM : Rs 121.05

61.38

1,173

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-55-a

(British) :

Sft

Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75")
2'x2' grid : Sheesham Ply

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.010

Kg

120.00

Kg

1.20

Wood - Partal

0.015

Cft

1,200.00

Cft

17.89

Glue

0.010

Kg

140.00

Kg

1.40

Chip Board 1/2" Thick

1.000

Sft

30.00

Sft

30.00

Ply Sheesham

1.000

Sft

35.00

Sft

35.00

41.76

85.49

TOTAL

MATERIAL

LABOUR
Coolie

0.040

Day

500.00

Day

20.03

Carpenter

0.060

Day

800.00

Day

48.00

2.04

36.24

70.07

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

189.34

Per SQM : Rs 2,037.26

Labour Rates Per

Sft

Rs.

85.04

Per SQM : Rs 915.03

33.77

1,174

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-55-b

(British) :

Sft

Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75")
2'x2'grid : Lamination Sheet

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.010

Kg

120.00

Kg

1.20

Wood - Partal

0.015

Cft

1,200.00

Cft

17.89

Glue

0.005

Kg

140.00

Kg

0.70

Chip Board 1/2" Thick

1.000

Sft

30.00

Sft

30.00

Lamination Board

1.000

Sft

60.00

Sft

60.00

50.82

109.79

TOTAL

MATERIAL

LABOUR
Coolie

0.040

Day

500.00

Day

20.24

Carpenter

0.040

Day

800.00

Day

32.00

1.57

27.18

53.81

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

199.25

Per SQM : Rs 2,143.91

Labour Rates Per

Sft

Rs.

65.31

Per SQM : Rs 702.69

35.65

1,175

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-55-c

(British) :

Sft

Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75")
2'x2' grid : Commercial Ply

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.010

Kg

120.00

Kg

1.23

Wood - Partal

0.015

Cft

1,200.00

Cft

17.89

Glue

0.010

Kg

140.00

Kg

1.43

Chip Board 1/2" Thick

1.000

Sft

30.00

Sft

30.00

Ply Commercial

1.000

Sft

15.00

Sft

15.00

36.81

65.55

TOTAL

MATERIAL

LABOUR
Coolie

0.040

Day

500.00

Day

20.01

Carpenter

0.060

Day

800.00

Day

48.00

2.04

41.19

70.05

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

164.98

Per SQM : Rs 1,775.20

Labour Rates Per

Sft

Rs.

85.01

Per SQM : Rs 914.76

29.38

1,176

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-56-a

(British) :

Rft

Supply and Fixing MS Sheet 16 guage(10x20 feet) box type chowkats


including fixing in position with all charges for Hold fast, Hinges
and Painting etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.021

Bag

490.00

Sand

0.931

Cft

2,200.00

Iron Holdfast

0.138

No

130.00

No

17.93

Paint : Enamel

0.017

Ltr

495.00

Ltr

8.53

Hinges 5"

0.012

Doz

550.00

Doz

6.45

Welding Rod

0.004

Pack

400.00

Pack

1.66

MS Sheet (moulded)

1.276

Kg

140.00

Kg

TOTAL

MATERIAL

Bag

10.14

100 Cft

20.48

178.62

62.13

243.81

LABOUR
Mason

0.009

Day

900.00

Day

7.76

Coolie

0.034

Day

500.00

Day

17.24

Black Smith

0.021

Day

900.00

Day

18.62

Painter / Polisher

0.007

Day

1,000.00

Day

6.90

1.52

15.87

52.03

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

360.60

Labour Rates Per

Rft

Rs.

63.15

LABOUR

64.75

Per Meter : Rs 1,182.75


Per Meter : Rs 207.12

1,177

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-56-b

Item Name :

(British) :

Rft

Wood plastic composite door patio door leap delux (laker coated)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.952

Rft

180.00

Rft

171.43

Rubber Channels

0.952

Rft

10.00

Rft

9.52

Glass Plans (Plain)

0.952

Sft

50.00

Sft

47.62

Panels

0.952

Rft

245.00

Rft

233.33

66.14

461.90

TOTAL

MATERIAL

LABOUR
Coolie

0.048

Day

500.00

Day

23.81

Carpenter

0.048

Day

800.00

Day

38.10

1.86

11.86

63.76

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

640.90

Per SQM : Rs 6,896.14

Labour Rates Per

Rft

Rs.

77.38

Per SQM : Rs 832.62

115.24

1,178

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-56-c

(British) :

Rft

Wood plastic composite door patio door leap premium grade ( UV


coated )

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.952

Rft

180.00

Rft

171.43

Rubber Channels

0.952

Rft

10.00

Rft

9.52

Glass Pans Tinted

0.952

Sft

90.00

Sft

85.71

Panels

0.952

Rft

245.00

Rft

233.33

66.74

500.00

TOTAL

MATERIAL

LABOUR
Coolie

0.048

Day

500.00

Day

23.81

Carpenter

0.048

Day

800.00

Day

38.10

1.86

11.26

63.76

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

687.38

Per SQM : Rs 7,396.22

Labour Rates Per

Rft

Rs.

77.38

Per SQM : Rs 832.62

123.62

1,179

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-56-d

Item Name :

(British) :

Sft

Wood plastic composite door patio door with frame and beading
deluxe grade (laker coated)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.741

Rft

180.00

Rft

133.42

Rubber Channels

0.824

Rft

10.00

Rft

8.24

Glass Plans (Plain)

0.824

Sft

50.00

Sft

41.18

Frame

0.741

Rft

200.00

Rft

148.24

Beading

1.486

Rft

80.00

Rft

118.86

G.I Corner Plate

0.082

No

340.00

No

28.00

G.I Reinforcement (For Panel)

0.824

Rft

50.00

Rft

41.18

Panels

0.824

Rft

245.00

Rft

201.77

69.82

720.87

TOTAL

MATERIAL

LABOUR
Coolie

0.041

Day

500.00

Day

20.59

Carpenter

0.041

Day

800.00

Day

32.94

1.61

8.18

55.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

946.38

Per SQM : Rs 10,183.04

Labour Rates Per

Sft

Rs.

66.91

Per SQM : Rs 719.99

170.37

1,180

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-56-e

Item Name :

(British) :

Sft

Wood plastic composite patio door with frame and beading premium
grade(UV coated)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.741

Rft

180.00

Rft

133.42

Rubber Channels

0.824

Rft

10.00

Rft

8.24

Glass Plans (Plain)

0.824

Sft

50.00

Sft

41.18

Frame

0.741

Rft

200.00

Rft

148.24

Beading

1.486

Rft

80.00

Rft

118.86

G.I Corner Plate

0.082

No

340.00

No

28.00

G.I Reinforcement (For Panel)

0.824

Rft

50.00

Rft

41.18

Panels

0.824

Rft

245.00

Rft

201.77

69.82

720.87

TOTAL

MATERIAL

LABOUR
Coolie

0.041

Day

500.00

Day

20.59

Carpenter

0.041

Day

800.00

Day

32.94

1.61

8.18

55.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

946.38

Per SQM : Rs 10,183.04

Labour Rates Per

Sft

Rs.

66.91

Per SQM : Rs 719.99

170.37

1,181

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-57-a
Wood plastic composite door Leaf only
type

Detail

Qty

Unit

(British) :

Sft

bukhara, flush or steppe

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.741

Rft

180.00

Rft

133.42

Frame

0.741

Rft

200.00

Rft

148.24

Beading

1.486

Rft

80.00

Rft

118.86

G.I Corner Plate

0.082

No

340.00

No

28.00

Door Leaf

0.865

Sft

650.00

Sft

562.08

71.15

990.59

TOTAL

MATERIAL

LABOUR
Coolie

0.041

Day

500.00

Day

20.59

Carpenter

0.041

Day

800.00

Day

32.94

1.61

6.85

55.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,275.43

Per SQM : Rs 13,723.62

Labour Rates Per

Sft

Rs.

66.91

Per SQM : Rs 719.99

229.71

1,182

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-57-b

(British) :

Sft

Wood plastic composite door Leaf rock type single side

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.741

Rft

180.00

Rft

133.42

Frame

0.741

Rft

200.00

Rft

148.24

Beading

1.486

Rft

80.00

Rft

118.86

G.I Corner Plate

0.082

No

340.00

No

28.00

Door Leaf

0.865

Sft

650.00

Sft

562.08

71.15

990.59

TOTAL

MATERIAL

LABOUR
Coolie

0.041

Day

500.00

Day

20.59

Carpenter

0.041

Day

800.00

Day

32.94

1.61

6.85

55.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,275.43

Per SQM : Rs 13,723.62

Labour Rates Per

Sft

Rs.

66.91

Per SQM : Rs 719.99

229.71

1,183

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-57-c

(British) :

Sft

Wood plastic composite door rock type single type with frame and
beading

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.741

Rft

180.00

Rft

133.42

Frame

0.741

Rft

200.00

Rft

148.24

Beading

1.486

Rft

80.00

Rft

118.86

G.I Corner Plate

0.082

No

340.00

No

28.00

Door Leaf

0.865

Sft

650.00

Sft

562.08

71.15

990.59

TOTAL

MATERIAL

LABOUR
Coolie

0.041

Day

500.00

Day

20.59

Carpenter

0.041

Day

800.00

Day

32.94

1.61

6.85

55.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,275.43

Per SQM : Rs 13,723.62

Labour Rates Per

Sft

Rs.

66.91

Per SQM : Rs 719.99

229.71

1,184

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-58

(British) :

Sft

Wood plastic composite door image type single side with frame and
beading

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.741

Rft

180.00

Rft

133.42

Frame

0.741

Rft

200.00

Rft

148.24

Beading

1.486

Rft

80.00

Rft

118.86

G.I Corner Plate

0.082

No

340.00

No

28.00

Door Leaf

0.865

Sft

650.00

Sft

562.08

71.15

990.59

TOTAL

MATERIAL

LABOUR
Coolie

0.041

Day

500.00

Day

20.59

Carpenter

0.041

Day

800.00

Day

32.94

1.61

6.85

55.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,275.43

Per SQM : Rs 13,723.62

Labour Rates Per

Sft

Rs.

66.91

Per SQM : Rs 719.99

229.71

1,185

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-59

(British) :

Sft

Wood plastic composite door carving type single side with frame and
beading

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Reinforcement (Chowkat)

0.741

Rft

180.00

Rft

133.42

Frame

0.741

Rft

200.00

Rft

148.24

Beading

1.486

Rft

80.00

Rft

118.86

G.I Corner Plate

0.082

No

340.00

No

28.00

Door Leaf

0.865

Sft

650.00

Sft

562.08

71.15

990.59

TOTAL

MATERIAL

LABOUR
Coolie

0.041

Day

500.00

Day

20.59

Carpenter

0.041

Day

800.00

Day

32.94

1.61

6.85

55.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,275.43

Per SQM : Rs 13,723.62

Labour Rates Per

Sft

Rs.

66.91

Per SQM : Rs 719.99

229.71

1,186

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

12-60-a

Item Name :

(British) :

Sft

Composite windows deluxe grade (laker coated)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Glass Plans (Plain)

1.000

Sft

50.00

Sft

50.00

Frame

0.723

Rft

200.00

Rft

144.57

Beading

1.120

Rft

80.00

Rft

89.58

G.I Corner Plate

0.036

No

340.00

No

12.28

G.I Reinforcement (For Frame)

0.711

Rft

110.00

Rft

78.21

G.I Reinforcement (For Panel)

0.711

Rft

50.00

Rft

35.55

Panels

0.829

Rft

245.00

Rft

203.22

72.23

613.41

TOTAL

MATERIAL

LABOUR
Coolie

0.018

Day

500.00

Day

9.03

Carpenter

0.018

Day

800.00

Day

14.45

0.70

5.77

24.19

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

777.71

Per SQM : Rs 8,368.20

Labour Rates Per

Sft

Rs.

29.35

Per SQM : Rs 315.84

140.12

1,187

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-60-b

(British) :

Sft

Composite windows premium grade (UV coated)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Glass Pans Tinted

1.000

Sft

90.00

Sft

90.00

Frame

0.723

Rft

200.00

Rft

144.60

Beading

1.120

Rft

80.00

Rft

89.60

G.I Corner Plate

0.036

No

340.00

No

12.24

G.I Reinforcement (For Frame)

0.711

Rft

110.00

Rft

78.21

G.I Reinforcement (For Panel)

0.711

Rft

50.00

Rft

35.55

Panels

0.829

Rft

245.00

Rft

203.10

72.41

653.30

TOTAL

MATERIAL

LABOUR
Coolie

0.018

Day

500.00

Day

9.00

Carpenter

0.018

Day

800.00

Day

14.40

0.70

5.59

24.10

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

826.28

Per SQM : Rs 8,890.80

Labour Rates Per

Sft

Rs.

29.25

Per SQM : Rs 314.73

148.88

1,188

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-61-a

(British) :

Sft

Wood Plastic Fly Screen Delux Grade

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Wood Plastic Fly Screen Delus


Grade

310.00

Sft

TOTAL

MATERIAL

Sft

310.00

67.98

310.00

Sft

32.00

0.96

10.02

32.96

22

LABOUR
0.040

Carpenter

800.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

418.20

Per SQM : Rs 4,499.83

Labour Rates Per

Sft

Rs.

40.00

Per SQM : Rs 430.40

75.24

1,189

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-61-b
Wood Plastic Screen Premium

Detail

Qty

(British) :

Sft

Grade

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Wood Plastic Fly Screen


Premium

365.00

Sft

TOTAL

MATERIAL

Sft

365.00

68.95

365.00

Sft

32.00

0.96

9.05

32.96

22

LABOUR
0.040

Carpenter

800.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

485.30

Per SQM : Rs 5,221.83

Labour Rates Per

Sft

Rs.

40.00

Per SQM : Rs 430.40

87.34

1,190

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-61-c

(British) :

Rft

Wood Plastic Screen Door Frame Only

Detail

Qty

Unit

Rate (Rs)

1 Rft

350.00

Amount

MATERIAL
1.000

Wood Plastic Door Frame Only


Grade

TOTAL

MATERIAL

1 Rft

350.00

65.95

350.00

Sft

48.00

1.44

12.05

49.44

22

LABOUR
0.060

Carpenter

800.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

487.00

Labour Rates Per

Rft

Rs.

60.00

LABOUR

87.56

Per Meter : Rs 1,597.36


Per Meter : Rs 196.80

1,191

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-61-d

(British) :

Sft

Wood Plastic Screen Beading Smaller

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Wood Plastic Beading Smaller


Grade

45.00

1 Rft

TOTAL

1 Rft

45.00

36.29

45.00

Sft

48.00

1.44

41.71

49.44

22

MATERIAL

LABOUR
0.060

Carpenter

800.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Sft

Rs.

114.90

Labour Rates Per

Sft

Rs.

60.00

LABOUR

20.46

Per Meter : Rs 376.87


Per Meter : Rs 196.80

1,192

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-61-e

(British) :

Sft

Wood Plastic Screen Beading larger

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Wood Plastic Beading Larger


Grade

80.00

1 Rft

TOTAL

1 Rft

80.00

46.88

80.00

Sft

48.00

1.44

31.13

49.44

22

MATERIAL

LABOUR
0.060

Carpenter

800.00

Sft

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Sft

Rs.

157.60

Labour Rates Per

Sft

Rs.

60.00

LABOUR

28.16

Per Meter : Rs 516.93


Per Meter : Rs 196.80

1,193

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-62-a

(British) :

Sft

Kitchen Floor Cabinet as per MES Design/Specification..

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails / Screws / Clamps

0.042

Kg

140.00

Kg

Wood - Partal

0.125

Cft

1,200.00

Cft

150.00

Spring Hinges Single

0.250

No

230.00

No

57.50

Handle Brass 6"

0.500

No

240.00

No

120.00

Hard Board

0.833

Sft

12.00

Sft

10.00

Chip Board 1/2" Thick

3.333

Sft

30.00

Sft

100.00

Lamination Board

3.333

Sft

60.00

Sft

200.00

Aluminium legs 1"x1"x6"

0.250

No

290.00

No

72.50

Aluminium Strip

0.500

Ft

18.00

Ft

9.00

PVC Strip

0.500

Ft

16.00

Ft

8.00

TOTAL

MATERIAL

5.83

61.39

732.83

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Carpenter

0.125

Day

800.00

Day

100.00

4.88

16.61

167.38

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,097.18

Per SQM : Rs 11,805.67

Labour Rates Per

Sft

Rs.

203.13

Per SQM : Rs 2,185.63

196.97

1,194

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-62-b

(British) :

Sft

Kitchen Wall Cabinet as per MES Design/Specification.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Spring Hinges Single

0.500

No

230.00

No

115.00

Handle Brass 6"

0.250

No

240.00

No

60.00

Chip Board 1/2" Thick

2.500

Sft

30.00

Sft

75.00

Lamination Board

3.000

Sft

60.00

Sft

180.00

PVC Strip

1.000

Ft

16.00

Ft

16.00

Farmica

2.000

Sft

30.00

Sft

60.00

59.67

506.00

TOTAL

MATERIAL

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Carpenter

0.100

Day

800.00

Day

80.00

3.90

18.33

133.90

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

779.82

Per SQM : Rs 8,390.86

Labour Rates Per

Sft

Rs.

162.50

Per SQM : Rs 1,748.50

139.92

1,195

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-62-c

(British) :

Each

Providing and Fixing Sink Cabinet as per MES Design/Specification.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Partal

1.500

Cft

1,200.00

Cft

1,800.00

Spring Hinges Single

6.000

No

230.00

No

1,380.00

Chip Board 1/2" Thick

20.000

Sft

30.00

Sft

600.00

Ply Commercial

2.500

Sft

15.00

Sft

37.50

Lamination Board

10.000

Sft

60.00

Sft

600.00

Aluminium legs 1"x1"x6"

4.000

No

290.00

No

Farmica

30.000

Sft

30.00

Sft

900.00

57.65

6,477.50

TOTAL

MATERIAL

1,160.00

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Carpenter

1.500

Day

800.00

Day

1,200.00

58.50

20.35

2,008.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,854.05

Composite Rates Per

Each

Rs.

10,340.05

Cost Per Each: 10,340.05

Labour Rates Per

Each

Rs.

2,437.50

Cost Per Each: 2,437.50

1,196

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-63

(British) :

Sft

Supply and fixing UPVC Flush doors with 60mm wide frame 2-2.5mm
wall thickness inclusive of all accessories and galvanized iron
support in any available Plain colour

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Flush doors with 60mm wid

850.00

Sft

TOTAL

MATERIAL

Sft

850.00

65.61

850.00

Day

121.60

3.65

12.39

125.25

22

LABOUR
0.152

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,189.00

Per SQM : Rs 12,793.64

Labour Rates Per

Sft

Rs.

152.00

Per SQM : Rs 1,635.52

213.75

1,197

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-64

(British) :

Sft

Supply and fixing UPVC Fancy doors with 60mm wide frame 2-2.5mm
wall thickness inclusive of all accessories and galvanized iron
support in any available Plain colour

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Fancy doors with 60mm wid

950.00

Sft

TOTAL

MATERIAL

Sft

950.00

65.03

950.00

Day

145.60

4.37

12.97

149.97

22

LABOUR
0.182

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,341.00

Per SQM : Rs 14,429.16

Labour Rates Per

Sft

Rs.

182.00

Per SQM : Rs 1,958.32

241.03

1,198

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-65

(British) :

Sft

Supply and fixing UPVC Fancy doors with 60mm wide frame 2-2.5mm
wall thickness inclusive of all accessories and galvanized iron
support in Wood texture.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Flush doors with 60mm wid

1,450.00

Sft

TOTAL

MATERIAL

Sft

1,450.00

68.16

1,450.00

Day

145.60

4.37

9.84

149.97

22

LABOUR
0.182

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,951.00

Per SQM : Rs 20,992.76

Labour Rates Per

Sft

Rs.

182.00

Per SQM : Rs 1,958.32

351.03

1,199

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-66

(British) :

Sft

Supply and fixing UPVC Partially glazed doors with 60mm wide frame
2-2.5mm wall thickness inclusive of all accessories and galvanized
iron support in any available Plain colour

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Partialy glazed doors wit

1,070.00

Sft

TOTAL

MATERIAL

Sft

1,070.00

66.19

1,070.00

Day

142.40

4.27

11.81

146.67

22

LABOUR
0.178

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,483.40

Per SQM : Rs 15,961.38

Labour Rates Per

Sft

Rs.

178.00

Per SQM : Rs 1,915.28

266.73

1,200

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-67

(British) :

Sft

Supply and fixing UPVC Full glazed doors with 60mm wide frame
2-2.5mm wall thickness inclusive of all accessories and galvanized
iron support in any available Plain colour

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed doors with 60

1,130.00

Sft

TOTAL

MATERIAL

Sft

1,130.00

66.61

1,130.00

Day

142.40

4.27

11.39

146.67

22

LABOUR
0.178

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,556.60

Per SQM : Rs 16,749.02

Labour Rates Per

Sft

Rs.

178.00

Per SQM : Rs 1,915.28

279.93

1,201

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-68

(British) :

Sft

Supply and fixing UPVC full glazed sliding windows with 80mm wide
frame 2-2.2mm wall thicknesses inclusive of all accessories and
galvanized iron support in any available plain colour I/c fly
screen shutter without glass pan.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed sliding windo

700.00

Sft

TOTAL

MATERIAL

Sft

700.00

66.90

700.00

Day

84.80

2.54

11.10

87.34

22

LABOUR
0.106

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

960.00

Per SQM : Rs 10,329.60

Labour Rates Per

Sft

Rs.

106.00

Per SQM : Rs 1,140.56

172.66

1,202

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-69

(British) :

Sft

Supply and fixing UPVC full glazed sliding windows with 80mm wide
frame 2-2.2mm wall thicknesses inclusive of all accessories and
galvanized iron support in any available plain colour without fly
screen shutter and without glazing.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed sliding windo

600.00

Sft

TOTAL

MATERIAL

Sft

600.00

65.71

600.00

Day

84.80

2.54

12.29

87.34

22

LABOUR
0.106

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

838.00

Per SQM : Rs 9,016.88

Labour Rates Per

Sft

Rs.

106.00

Per SQM : Rs 1,140.56

150.66

1,203

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-70

(British) :

Sft

Supply and fixing UPVC full glazed openable windows with 60mm wide
frame 2-2.2mm wall thicknesses inclusive of all accessories and
galvanized iron support in any available plain colour without glass
pans.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed openable wind

800.00

Sft

TOTAL

MATERIAL

Sft

800.00

65.91

800.00

Day

110.40

3.31

12.09

113.71

22

LABOUR
0.138

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,114.00

Per SQM : Rs 11,986.64

Labour Rates Per

Sft

Rs.

138.00

Per SQM : Rs 1,484.88

200.29

1,204

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-71

(British) :

Sft

Supply and fixing UPVC full glazed Fixed windows with 80mm wide
frame 2-2.2mm wall thicknesses inclusive of all accessories and
galvanized iron support in any available plain colour without
glass pans.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed fixed window

640.00

Sft

TOTAL

MATERIAL

Sft

640.00

67.72

640.00

Day

68.80

2.06

10.28

70.86

22

LABOUR
0.086

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

866.80

Per SQM : Rs 9,326.77

Labour Rates Per

Sft

Rs.

86.00

Per SQM : Rs 925.36

155.94

1,205

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-72

(British) :

Sft

Supply and fixing UPVC full glazed sliding windows with 80mm wide
frame 2-2.2mm wall thicknesses inclusive of all accessories and
galvanized iron support in wooden texture I/c fly screen shutter
without glass pan.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed sliding windo

1,250.00

Sft

TOTAL

MATERIAL

Sft

1,250.00

70.15

1,250.00

Day

86.40

2.59

7.85

88.99

22

LABOUR
0.108

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,633.00

Per SQM : Rs 17,571.08

Labour Rates Per

Sft

Rs.

108.00

Per SQM : Rs 1,162.08

294.01

1,206

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-73

(British) :

Sft

Supply and fixing UPVC full glazed sliding windows with 80mm wide
frame 2-2.2mm wall thicknesses inclusive of all accessories and
galvanized iron support in wooden texture without fly screen
shutter without glazing.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed sliding windo

1,150.00

Sft

TOTAL

MATERIAL

Sft

1,150.00

69.76

1,150.00

Day

86.40

2.59

8.24

88.99

22

LABOUR
0.108

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,511.00

Per SQM : Rs 16,258.36

Labour Rates Per

Sft

Rs.

108.00

Per SQM : Rs 1,162.08

272.01

1,207

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-74

(British) :

Sft

Supply and fixing UPVC full glazed openable windows with 60mm wide
frame 2-2.2mm wall thicknesses inclusive of all accessories and
galvanized iron support in wooden texture without glass panes

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed openable wind

1,350.00

Sft

TOTAL

MATERIAL

Sft

1,350.00

69.33

1,350.00

Day

110.40

3.31

8.67

113.71

22

LABOUR
0.138

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,785.00

Per SQM : Rs 19,206.60

Labour Rates Per

Sft

Rs.

138.00

Per SQM : Rs 1,484.88

321.29

1,208

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-75

(British) :

Sft

Supply and fixing UPVC full glazed fixed windows with 80mm wide
frame 2-2.2mm wall thicknesses inclusive of all accessories and
galvanized iron support in wooden texture without glass panes

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed fixed window

1,190.00

Sft

TOTAL

MATERIAL

Sft

1,190.00

70.90

1,190.00

Day

68.80

2.06

7.10

70.86

22

LABOUR
0.086

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,537.80

Per SQM : Rs 16,546.73

Labour Rates Per

Sft

Rs.

86.00

Per SQM : Rs 925.36

276.94

1,209

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 12 , WOOD WORK, WOODEN/ALUMINIUM JOINERY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

12-76

(British) :

Sft

Supply and fixing UPVC full glazed fixed lowvers windows with 80mm
wide frame 2-2.2mm wall thicknesses inclusive of all accessories
and galvanized iron support in any available plain colours without
glass panes

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

UPVC Full glazed fixed lower w

1,190.00

Sft

TOTAL

MATERIAL

Sft

1,190.00

66.70

1,190.00

Day

148.00

4.44

11.30

152.44

22

LABOUR
0.185

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

1,636.80

Per SQM : Rs 17,611.97

Labour Rates Per

Sft

Rs.

185.00

Per SQM : Rs 1,990.60

294.36

1,210

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-01

(British) :

100 Sft

Cleaning painted woodwork with oil & water

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Linseed Oil

0.050

Ltr

300.00

Ltr

15.00

25.00

60.00

Day

120.00

3.60

53.00

123.60

22

39.60

TOTAL

MATERIAL

LABOUR
Skilled Coolie

0.200

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

223.20

Per SQM : Rs 24.02

Labour Rates Per

100 Sft

Rs.

150.00

Per SQM : Rs 16.14

1,211

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-02

(British) :

100 Sft

Oiling woodwork with boiled linseed oil

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Linseed Oil

0.100

Ltr

300.00

Ltr

30.00

28.85

75.00

Day

120.00

3.60

49.15

123.60

22

42.90

TOTAL

MATERIAL

LABOUR
Skilled Coolie

0.200

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

241.50

Per SQM : Rs 25.99

Labour Rates Per

100 Sft

Rs.

150.00

Per SQM : Rs 16.14

1,212

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-03

(British) :

100 Sft

Brushing & scraping blisters of old paints from woodwork

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Composite Rates Per

100 Sft

Rs.

312.50

Per SQM : Rs 33.63

Labour Rates Per

100 Sft

Rs.

312.50

Per SQM : Rs 33.63

1,213

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-04

(British) :

100 Sft

Scraping, brushing and removing old paint, from metal surface

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

Labour Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

1,214

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-a-01

(British) :

100 Sft

Painting old corrugated surfaces, pent roofing etc. with oil paint
: First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.900

Ltr

495.00

Ltr

445.50

37.33

490.50

TOTAL

MATERIAL

LABOUR
Coolie

0.330

Day

500.00

Day

165.00

Painter / Polisher

0.330

Day

1,000.00

Day

330.00

14.85

40.67

509.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,217.16

Per SQM : Rs 130.97

Labour Rates Per

100 Sft

Rs.

618.75

Per SQM : Rs 66.58

216.81

1,215

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-a-02

(British) :

100 Sft

Painting old corrugated surfaces, pent roofing etc. with oil paint
: Each subsequent coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.680

Ltr

495.00

Ltr

336.60

37.83

381.60

TOTAL

MATERIAL

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

11.25

40.17

386.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

934.30

Per SQM : Rs 100.53

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

166.45

1,216

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-b-01

(British) :

100 Sft

Painting old surfaces : Sashes, fanlights, doors or windows : First


coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.450

Ltr

495.00

Ltr

222.75

35.37

267.75

TOTAL

MATERIAL

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Painter / Polisher

0.200

Day

1,000.00

Day

200.00

9.00

42.63

309.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

701.66

Per SQM : Rs 75.50

Labour Rates Per

100 Sft

Rs.

375.00

Per SQM : Rs 40.35

124.91

1,217

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-b-02

(British) :

100 Sft

Painting old surfaces : Sashes, fanlights, doors or windows : Each


subsequent coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.340

Ltr

495.00

Ltr

168.30

34.16

213.30

TOTAL

MATERIAL

LABOUR
Coolie

0.170

Day

500.00

Day

85.00

Painter / Polisher

0.170

Day

1,000.00

Day

170.00

7.65

43.84

262.65

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

578.98

Per SQM : Rs 62.30

Labour Rates Per

100 Sft

Rs.

318.75

Per SQM : Rs 34.30

103.03

1,218

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-c-01

(British) :

100 Sft

Painting old surfaces : Doors / windows any type First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.900

Ltr

495.00

Ltr

445.50

37.33

490.50

TOTAL

MATERIAL

LABOUR
Coolie

0.330

Day

500.00

Day

165.00

Painter / Polisher

0.330

Day

1,000.00

Day

330.00

14.85

40.67

509.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,217.16

Per SQM : Rs 130.97

Labour Rates Per

100 Sft

Rs.

618.75

Per SQM : Rs 66.58

216.81

1,219

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-c-02

(British) :

100 Sft

Painting old surfaces : Doors / windows any type Each subsequent


coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.680

Ltr

495.00

Ltr

336.60

37.83

381.60

TOTAL

MATERIAL

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

11.25

40.17

386.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

934.30

Per SQM : Rs 100.53

Labour Rates Per

100 Sft

Rs.

468.75

Per SQM : Rs 50.44

166.45

1,220

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-d-01

(British) :

100 Sft

Painting old surfaces : Guard bars, gratings, railing & similar


open work : First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.450

Ltr

495.00

Ltr

222.75

35.37

267.75

TOTAL

MATERIAL

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Painter / Polisher

0.200

Day

1,000.00

Day

200.00

9.00

42.63

309.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

701.66

Per SQM : Rs 75.50

Labour Rates Per

100 Sft

Rs.

375.00

Per SQM : Rs 40.35

124.91

1,221

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-d-02

(British) :

100 Sft

Painting old surfaces : Guard bars, gratings, railing & similar


work : Each subsequent coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.340

Ltr

495.00

Ltr

168.30

34.16

213.30

TOTAL

MATERIAL

LABOUR
Coolie

0.170

Day

500.00

Day

85.00

Painter / Polisher

0.170

Day

1,000.00

Day

170.00

7.65

43.84

262.65

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

578.98

Per SQM : Rs 62.30

Labour Rates Per

100 Sft

Rs.

318.75

Per SQM : Rs 34.30

103.03

1,222

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-e-01

(British) :

100 Rft

Painting old surfaces : Fillets, framing, skirting pipes, etc. less


than 6" girth : First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.130

No

180.00

No

23.40

Paint : Enamel

0.450

Ltr

495.00

Ltr

222.75

36.84

246.15

TOTAL

MATERIAL

LABOUR
Coolie

0.170

Day

500.00

Day

85.00

Painter / Polisher

0.170

Day

1,000.00

Day

170.00

7.65

41.16

262.65

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 Rft

Rs.

619.05

Labour Rates Per

100 Rft

Rs.

318.75

LABOUR

110.25

Per Meter : Rs 20.30


Per Meter : Rs 10.46

1,223

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-e-02

(British) :

100 Rft

Painting old surfaces : Fillets, framing, skirting pipes, etc. less


than 6" girth : Each subseq. coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.130

No

180.00

No

23.40

Paint : Enamel

0.340

Ltr

495.00

Ltr

168.30

38.68

191.70

TOTAL

MATERIAL

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Painter / Polisher

0.120

Day

1,000.00

Day

120.00

5.40

39.32

185.40

22

81.77

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 Rft

Rs.

458.87

Labour Rates Per

100 Rft

Rs.

225.00

LABOUR

Per Meter : Rs 15.05


Per Meter : Rs 7.38

1,224

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-f-01

(British) :

100 No.

Painting old surfaces : Small detached articles Not exceeding 1 sft


: First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

1.800

Ltr

495.00

Ltr

891.00

34.06

936.00

TOTAL

MATERIAL

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

1.000

Day

1,000.00

Day

1,000.00

33.75

43.94

1,158.75

22

453.42

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

2,548.17

Cost Per 100 No.: 2,548.17

Labour Rates Per

100 No.

Rs.

1,406.25

Cost Per 100 No.: 1,406.25

1,225

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-f-02

(British) :

100 No.

Painting old surfaces : Small detached articles Not exceeding 1 sft


: Each subsequent coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

1.120

Ltr

495.00

Ltr

554.40

30.49

599.40

TOTAL

MATERIAL

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.750

Day

1,000.00

Day

750.00

26.25

47.51

901.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

324.37

Composite Rates Per

100 No.

Rs.

1,825.02

Cost Per 100 No.: 1,825.02

Labour Rates Per

100 No.

Rs.

1,093.75

Cost Per 100 No.: 1,093.75

1,226

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-g-01

(British) :

100 No.

Painting old surfaces : Small detached articles 1sft-3sft area :


First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.400

No

180.00

No

Paint : Enamel

3.500

Ltr

495.00

Ltr

1,732.50

33.38

1,804.50

TOTAL

MATERIAL

72.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Painter / Polisher

2.000

Day

1,000.00

Day

2,000.00

67.50

44.62

2,317.50

22

891.99

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

5,013.99

Cost Per 100 No.: 5,013.99

Labour Rates Per

100 No.

Rs.

2,812.50

Cost Per 100 No.: 2,812.50

1,227

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-05-g-02

(British) :

100 No.

Painting old surfaces : Small detached articles 1sft-3sft area :


Each subsequent coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.400

No

180.00

No

72.00

Paint : Enamel

2.000

Ltr

495.00

Ltr

990.00

34.45

1,062.00

TOTAL

MATERIAL

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Painter / Polisher

1.000

Day

1,000.00

Day

1,000.00

37.50

43.55

1,287.50

22

508.64

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

2,858.14

Cost Per 100 No.: 2,858.14

Labour Rates Per

100 No.

Rs.

1,562.50

Cost Per 100 No.: 1,562.50

1,228

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-a-01

(British) :

100 Sft

Prepare & Paint new corrugated surface, pent roofing etc : Priming
coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

1.350

Ltr

495.00

Ltr

668.25

42.01

713.25

TOTAL

MATERIAL

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Painter / Polisher

0.500

Day

1,000.00

Day

500.00

16.80

35.99

576.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,570.17

Per SQM : Rs 168.95

Labour Rates Per

100 Sft

Rs.

700.00

Per SQM : Rs 75.32

280.12

1,229

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-a-02

(British) :

100 Sft

Prepare & Paint new corrugated surface, pent roofing etc : Each
subsequent coat of paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

1.130

Ltr

495.00

Ltr

559.35

50.68

604.35

TOTAL

MATERIAL

LABOUR
Coolie

0.080

Day

500.00

Day

40.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

8.70

27.32

298.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,099.81

Per SQM : Rs 118.34

Labour Rates Per

100 Sft

Rs.

362.50

Per SQM : Rs 39.01

196.76

1,230

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-b-01

(British) :

100 Sft

Prepare & Paint new surface, sashes, doors & windows etc : Priming
coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.790

Ltr

495.00

Ltr

391.05

42.41

436.05

TOTAL

MATERIAL

LABOUR
Coolie

0.170

Day

500.00

Day

85.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

10.05

35.59

345.05

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

950.73

Per SQM : Rs 102.30

Labour Rates Per

100 Sft

Rs.

418.75

Per SQM : Rs 45.06

169.63

1,231

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-b-02

(British) :

100 Sft

Prepare & Paint new surface, sashes, doors & windows etc : Each
subsequent coat of paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

0.630

Ltr

495.00

Ltr

311.85

49.85

356.85

TOTAL

MATERIAL

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Painter / Polisher

0.120

Day

1,000.00

Day

120.00

5.40

28.15

185.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

660.36

Per SQM : Rs 71.05

Labour Rates Per

100 Sft

Rs.

225.00

Per SQM : Rs 24.21

118.11

1,232

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-c-01

(British) :

100 Sft

Prepare & Paint new surface, doors & windows Priming coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

1.350

Ltr

495.00

Ltr

668.25

42.01

713.25

TOTAL

MATERIAL

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Painter / Polisher

0.500

Day

1,000.00

Day

500.00

16.80

35.99

576.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,570.17

Per SQM : Rs 168.95

Labour Rates Per

100 Sft

Rs.

700.00

Per SQM : Rs 75.32

280.12

1,233

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-c-02

(British) :

100 Sft

Prepare & Paint new surface, doors & windows Each subsequent coat
of paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Enamel

1.130

Ltr

495.00

Ltr

559.35

50.68

604.35

TOTAL

MATERIAL

LABOUR
Coolie

0.080

Day

500.00

Day

40.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

8.70

27.32

298.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,099.81

Per SQM : Rs 118.34

Labour Rates Per

100 Sft

Rs.

362.50

Per SQM : Rs 39.01

196.76

1,234

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-d-01

(British) :

100 Sft

Prepare & Paint new surfaces of guard bars, railing & similar open
work : Priming coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.100

No

180.00

No

18.00

Paint : Enamel

0.790

Ltr

495.00

Ltr

391.05

41.23

409.05

TOTAL

MATERIAL

LABOUR
Coolie

0.170

Day

500.00

Day

85.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

10.05

36.77

345.05

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

917.79

Per SQM : Rs 98.75

Labour Rates Per

100 Sft

Rs.

418.75

Per SQM : Rs 45.06

163.69

1,235

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-d-02

(British) :

100 Sft

Prepare & Paint new surfaces of guard bars, railing & similar work
: Each subsequent coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.100

No

180.00

No

18.00

Paint : Enamel

0.630

Ltr

495.00

Ltr

311.85

48.52

329.85

TOTAL

MATERIAL

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Painter / Polisher

0.120

Day

1,000.00

Day

120.00

5.40

29.48

185.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

627.42

Per SQM : Rs 67.51

Labour Rates Per

100 Sft

Rs.

225.00

Per SQM : Rs 24.21

112.17

1,236

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-e-01

(British) :

100 Rft

Prepare & Paint new surface of fillets, framing, skirtings etc :


Priming coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.120

No

180.00

No

21.60

Paint : Enamel

0.630

Ltr

495.00

Ltr

311.85

42.50

333.45

TOTAL

MATERIAL

LABOUR
Coolie

0.170

Day

500.00

Day

85.00

Painter / Polisher

0.170

Day

1,000.00

Day

170.00

7.65

35.50

262.65

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 Rft

Rs.

725.56

Labour Rates Per

100 Rft

Rs.

318.75

LABOUR

129.46

Per Meter : Rs 23.80


Per Meter : Rs 10.46

1,237

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-e-02

(British) :

100 Rft

Prepare & Paint new surface of fillets, framing, skirtings etc :


Each subsequent coat of paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.120

No

180.00

No

21.60

Paint : Enamel

0.500

Ltr

495.00

Ltr

247.50

51.87

269.10

TOTAL

MATERIAL

LABOUR
Coolie

0.080

Day

500.00

Day

40.00

Painter / Polisher

0.080

Day

1,000.00

Day

80.00

3.60

26.13

123.60

22

85.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 Rft

Rs.

478.30

Labour Rates Per

100 Rft

Rs.

150.00

LABOUR

Per Meter : Rs 15.69


Per Meter : Rs 4.92

1,238

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-f-01

(British) :

100 No.

Prepare & Paint new surface of small detached articles upto 1 sft :
Priming coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.100

No

180.00

No

Paint : Enamel

2.800

Ltr

495.00

Ltr

1,386.00

41.64

1,404.00

TOTAL

MATERIAL

18.00

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Painter / Polisher

0.750

Day

1,000.00

Day

750.00

33.75

36.36

1,158.75

22

556.38

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

3,119.13

Cost Per 100 No.: 3,119.13

Labour Rates Per

100 No.

Rs.

1,406.25

Cost Per 100 No.: 1,406.25

1,239

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-f-02

(British) :

100 No.

Prepare & Paint new surface of small detached articles upto 1 sft :
Each subsequent coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.100

No

180.00

No

Paint : Enamel

2.250

Ltr

495.00

Ltr

1,113.75

50.03

1,131.75

TOTAL

MATERIAL

18.00

LABOUR
Coolie

0.330

Day

500.00

Day

165.00

Painter / Polisher

0.400

Day

1,000.00

Day

400.00

16.95

27.97

581.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

373.29

Composite Rates Per

100 No.

Rs.

2,086.99

Cost Per 100 No.: 2,086.99

Labour Rates Per

100 No.

Rs.

706.25

Cost Per 100 No.: 706.25

1,240

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-g-01

(British) :

100 No.

Prepare & paint surf. of small detached articles 1sft - 3sft area :
Priming coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

Paint : Enamel

5.400

Ltr

495.00

Ltr

2,673.00

41.03

2,718.00

TOTAL

MATERIAL

45.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Painter / Polisher

1.750

Day

1,000.00

Day

1,750.00

67.50

36.97

2,317.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,092.96

Composite Rates Per

100 No.

Rs.

6,128.46

Cost Per 100 No.: 6,128.46

Labour Rates Per

100 No.

Rs.

2,812.50

Cost Per 100 No.: 2,812.50

1,241

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-g-02

(British) :

100 No.

Prepare & paint surf. of small detached articles 1sft - 3sft area :
Subsequent coat of paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

Paint : Enamel

4.000

Ltr

495.00

Ltr

1,980.00

50.21

2,025.00

TOTAL

MATERIAL

45.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Painter / Polisher

0.750

Day

1,000.00

Day

750.00

30.00

27.79

1,030.00

22

665.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

3,720.50

Cost Per 100 No.: 3,720.50

Labour Rates Per

100 No.

Rs.

1,250.00

Cost Per 100 No.: 1,250.00

1,242

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-h

(British) :

100 Sft

Extra for knotting & stopping to prime coat on new surface of wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.120

No

180.00

No

21.60

Paint : Enamel

0.220

Ltr

495.00

Ltr

108.90

51.38

130.50

Day

60.00

1.80

26.62

61.80

22

TOTAL

MATERIAL

LABOUR
Painter / Polisher

0.060

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

234.21

Per SQM : Rs 25.20

Labour Rates Per

100 Sft

Rs.

75.00

Per SQM : Rs 8.07

41.91

1,243

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-06-i

(British) :

100 Sft

Providing and applying 3 coats of approved type of Plastic emulsion


paint to Plastic surface as per manufucture specification.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand Paper

6.000

Doz

260.00

Doz

Brush II

0.750

No

180.00

No

135.00

Chalk

0.500

Kg

20.00

Kg

10.00

Varnish

1.000

Ltr

330.00

Ltr

330.00

Linseed Oil

0.130

Ltr

300.00

Ltr

39.00

Plastic emulsion Paint

1.650

Ltr

540.00

Ltr

891.00

Zinc

0.250

Kg

50.00

Kg

12.50

TOTAL

MATERIAL

1,560.00

49.87

2,977.50

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Painter / Polisher

1.000

Day

1,000.00

Day

1,000.00

45.00

28.13

1,545.00

22

985.05

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,507.55

Per SQM : Rs 592.61

Labour Rates Per

100 Sft

Rs.

1,875.00

Per SQM : Rs 201.75

1,244

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-07-a

(British) :

2000 Sft

Khanki mixture, applied hot to barrage gates First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

1.500

Mds

400.00

Mds

Coal Tar (in canisters)

38.000

Kg

110.00

Kg

Kerosene Oil

4.500

Ltr

120.00

Ltr

540.00

Brush II

5.000

No

180.00

No

900.00

Mineral Pich

4.500

Kg

250.00

Kg

1,125.00

Slaked Lime

0.100

Mds

380.00

Mds

38.00

37.21

7,383.00

TOTAL

MATERIAL

600.00
4,180.00

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Painter / Polisher

5.000

Day

1,000.00

Day

5,000.00

225.00

40.79

7,725.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

2000 Sft

Rs.

18,382.26

Per SQM : Rs 98.90

Labour Rates Per

2000 Sft

Rs.

9,375.00

Per SQM : Rs 50.44

3,274.26

1,245

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-07-b

(British) :

2000 Sft

Khanki mixture, applied hot to barrage gates Second coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.930

Mds

400.00

Mds

Coal Tar (in canisters)

23.600

Kg

110.00

Kg

Kerosene Oil

2.700

Ltr

120.00

Ltr

324.00

Brush II

5.000

No

180.00

No

900.00

Mineral Pich

2.800

Kg

250.00

Kg

700.00

Slaked Lime

0.625

Mds

380.00

Mds

237.50

35.52

5,129.50

TOTAL

MATERIAL

372.00
2,596.00

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Painter / Polisher

3.200

Day

1,000.00

Day

3,200.00

171.00

42.48

5,871.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

2000 Sft

Rs.

13,382.99

Per SQM : Rs 72.00

Labour Rates Per

2000 Sft

Rs.

7,125.00

Per SQM : Rs 38.33

2,382.49

1,246

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-08-a

(British) :

100 Sft

French polishing complete: On new work

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.120

No

180.00

No

French Polish

2.250

Ltr

450.00

Ltr

1,012.50

13.89

1,034.10

TOTAL

MATERIAL

21.60

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Polisher

4.500

Day

900.00

Day

4,050.00

136.50

64.11

4,686.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,949.10

Per SQM : Rs 747.72

Labour Rates Per

100 Sft

Rs.

5,687.50

Per SQM : Rs 611.98

1,228.50

1,247

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-08-b

(British) :

100 Sft

French polishing complete: On old work

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.120

No

180.00

No

21.60

French Polish

1.130

Ltr

450.00

Ltr

508.50

14.05

530.10

TOTAL

MATERIAL

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Polisher

2.000

Day

900.00

Day

1,800.00

69.00

63.95

2,369.00

22

622.62

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,521.72

Per SQM : Rs 378.94

Labour Rates Per

100 Sft

Rs.

2,875.00

Per SQM : Rs 309.35

1,248

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-09-a

(British) :

100 Sft

Varnishing wood work, including cleaning & preparing surface :


First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.120

No

180.00

No

21.60

Varnish

1.500

Ltr

330.00

Ltr

495.00

47.45

516.60

TOTAL

MATERIAL

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Painter / Polisher

0.200

Day

1,000.00

Day

200.00

9.00

30.55

309.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,005.25

Per SQM : Rs 108.17

Labour Rates Per

100 Sft

Rs.

375.00

Per SQM : Rs 40.35

179.65

1,249

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-09-b

(British) :

100 Sft

Varnishing wood work, including cleaning & preparing surface :


Second coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.120

No

180.00

No

21.60

Varnish

1.120

Ltr

330.00

Ltr

369.60

54.21

391.20

TOTAL

MATERIAL

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Painter / Polisher

0.100

Day

1,000.00

Day

100.00

4.50

23.79

154.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

664.76

Per SQM : Rs 71.53

Labour Rates Per

100 Sft

Rs.

187.50

Per SQM : Rs 20.18

119.06

1,250

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-09-c

(British) :

100 Sft

Varnishing wood work, including cleaning & preparing surface :


Third coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.120

No

180.00

No

21.60

Varnish

0.900

Ltr

330.00

Ltr

297.00

50.99

318.60

TOTAL

MATERIAL

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Painter / Polisher

0.100

Day

1,000.00

Day

100.00

4.50

27.01

154.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

576.19

Per SQM : Rs 62.00

Labour Rates Per

100 Sft

Rs.

187.50

Per SQM : Rs 20.18

103.09

1,251

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-10-a

(British) :

100 Sft

Bitumen coating to plastered / cement concrete surface : 20 Ibs.


per 100 sft.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.148

Mds

400.00

Mds

59.20

Coal Tar (in canisters)

9.070

Kg

110.00

Kg

997.70

Brush II

0.400

No

180.00

No

72.00

TOTAL

MATERIAL

66.20

1,128.90

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Painter / Polisher

0.100

Day

1,000.00

Day

100.00

4.50

11.80

154.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,564.76

Per SQM : Rs 168.37

Labour Rates Per

100 Sft

Rs.

187.50

Per SQM : Rs 20.18

281.36

1,252

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-10-b

(British) :

100 Sft

Bitumen coating to plastered / cement concrete surface : 14 Ibs.


per 100 sft.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.103

Mds

400.00

Mds

41.20

Coal Tar (in canisters)

6.350

Kg

110.00

Kg

698.50

Brush II

0.400

No

180.00

No

72.00

TOTAL

MATERIAL

35.57

811.70

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Painter / Polisher

0.600

Day

1,000.00

Day

600.00

27.00

42.43

927.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,115.27

Per SQM : Rs 227.60

Labour Rates Per

100 Sft

Rs.

1,125.00

Per SQM : Rs 121.05

376.57

1,253

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-10-c

(British) :

100 Sft

Bitumen coating to plastered / cement concrete surface : 10 Ibs.


per 100 sft.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.074

Mds

400.00

Mds

29.60

Coal Tar (in canisters)

4.530

Kg

110.00

Kg

498.30

Brush II

0.400

No

180.00

No

72.00

TOTAL

MATERIAL

37.50

599.90

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Painter / Polisher

0.400

Day

1,000.00

Day

400.00

18.00

40.50

618.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,481.88

Per SQM : Rs 159.45

Labour Rates Per

100 Sft

Rs.

750.00

Per SQM : Rs 80.70

263.98

1,254

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-11

(British) :

Each

Writing letters or figures

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.001

No

180.00

No

0.23

Paint : Enamel

0.003

Ltr

495.00

Ltr

1.49

12.03

1.72

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Painter / Polisher

0.004

Day

1,000.00

Day

4.00

0.27

65.97

9.27

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

13.35

Cost Per Each: 13.35

Labour Rates Per

Each

Rs.

11.25

Cost Per Each: 11.25

2.36

1,255

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-12-a

(British) :

100 Sft

Coaltar paint applied hot: First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.100

Mds

400.00

Mds

40.00

Brush II

0.400

No

180.00

No

72.00

Paint : Bituminous

7.265

Kg

40.00

Kg

290.60

TOTAL

MATERIAL

50.27

402.60

Day

198.00

5.94

27.73

203.94

22

LABOUR
Skilled Coolie

0.330

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

738.67

Per SQM : Rs 79.48

Labour Rates Per

100 Sft

Rs.

247.50

Per SQM : Rs 26.63

132.13

1,256

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-12-b

(British) :

100 Sft

Coaltar paint applied hot: Second coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.120

Mds

400.00

Mds

48.00

Coal Tar (in canisters)

4.500

Kg

110.00

Kg

495.00

Brush II

0.400

No

180.00

No

72.00

TOTAL

MATERIAL

62.76

615.00

Day

120.00

3.60

15.24

123.60

22

LABOUR
Skilled Coolie

0.200

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

900.30

Per SQM : Rs 96.87

Labour Rates Per

100 Sft

Rs.

150.00

Per SQM : Rs 16.14

161.70

1,257

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-13-a

(British) :

100 Sft

Solignum paint applied hot: First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Solignum

0.900

Ltr

375.00

Ltr

337.50

40.26

382.50

Day

330.00

9.90

37.74

339.90

22

TOTAL

MATERIAL

LABOUR
Painter / Polisher

0.330

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

879.15

Per SQM : Rs 94.60

Labour Rates Per

100 Sft

Rs.

412.50

Per SQM : Rs 44.39

156.75

1,258

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-13-b

(British) :

100 Sft

Solignum paint applied hot: Second coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.250

No

180.00

No

45.00

Paint : Solignum

1.530

Ltr

375.00

Ltr

573.75

58.84

618.75

Day

170.00

5.10

19.16

175.10

22

TOTAL

MATERIAL

LABOUR
Painter / Polisher

0.170

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

967.38

Per SQM : Rs 104.09

Labour Rates Per

100 Sft

Rs.

212.50

Per SQM : Rs 22.87

173.53

1,259

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-14-a

(British) :

100 Sft

Creosote paint applied hot: First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.170

No

180.00

No

30.60

Paint : Creosote

0.910

Ltr

300.00

Ltr

273.00

35.94

303.60

Day

330.00

9.90

42.06

339.90

22

TOTAL

MATERIAL

LABOUR
Painter / Polisher

0.330

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

782.89

Per SQM : Rs 84.24

Labour Rates Per

100 Sft

Rs.

412.50

Per SQM : Rs 44.39

139.39

1,260

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-14-b

(British) :

100 Sft

Creosote paint applied hot: Second coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.075

No

180.00

No

13.50

Paint : Creosote

0.640

Ltr

300.00

Ltr

192.00

41.05

205.50

Day

170.00

5.10

36.95

175.10

22

82.61

TOTAL

MATERIAL

LABOUR
Painter / Polisher

0.170

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

463.21

Per SQM : Rs 49.84

Labour Rates Per

100 Sft

Rs.

212.50

Per SQM : Rs 22.87

1,261

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-15

(British) :

100 Sft

Burning off or rubbing down with pumice stone, old paint from wood
work

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Kerosene Oil

3.400

120.00

Ltr

TOTAL

MATERIAL

Ltr

408.00

28.92

408.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Skilled Coolie

0.250

Day

600.00

Day

150.00

19.50

49.08

669.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,310.26

Per SQM : Rs 140.98

Labour Rates Per

100 Sft

Rs.

812.50

Per SQM : Rs 87.43

232.76

1,262

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-16

(British) :

100 Sft

Removing with caustic soda,old paint from wood work

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Caustic Soda

0.500

140.00

Kg

TOTAL

MATERIAL

Kg

70.00

16.41

70.00

Day

250.00

7.50

61.59

257.50

22

70.40

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

397.90

Per SQM : Rs 42.81

Labour Rates Per

100 Sft

Rs.

312.50

Per SQM : Rs 33.63

1,263

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-17

(British) :

Each

Painting distance marks with white ground and black letterin on


both faces

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.025

No

180.00

No

4.50

Paint : Enamel

0.135

Ltr

495.00

Ltr

66.83

45.99

71.33

Day

45.00

1.35

32.01

46.35

22

TOTAL

MATERIAL

LABOUR
0.045

Painter / Polisher

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

143.27

Cost Per Each: 143.27

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

25.59

1,264

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-18

(British) :

100 RFT

Painting two feet wide gauges, reading to 1/10th of a foot.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.884

No

180.00

No

Paint : Enamel

3.506

Ltr

495.00

Ltr

1,735.52

11.89

1,894.66

TOTAL

MATERIAL

159.15

LABOUR
Coolie

6.707

Day

500.00

Day

3,353.66

Painter / Polisher

6.707

Day

1,000.00

Day

6,707.32

301.83

66.11

10,362.80

22

2,630.24

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 RFT

Rs.

14,887.71

Labour Rates Per

100 RFT

Rs.

12,576.22

Per Meter : Rs 488.32


Per Meter : Rs 412.50

1,265

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-19

(British) :

100 RFT

Painting sounding rods and other guages, reading to 1/10th of a


foot

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.884

No

180.00

No

159.15

Paint : Enamel

0.878

Ltr

495.00

Ltr

434.63

593.78

TOTAL

7.92

MATERIAL

LABOUR
Coolie

3.354

Day

500.00

Day

1,676.83

Painter / Polisher

3.354

Day

1,000.00

Day

3,353.66

150.91

70.08

5,181.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 RFT

Rs.

7,012.52

Labour Rates Per

100 RFT

Rs.

6,288.11

1,237.34

Per Meter : Rs 230.01


Per Meter : Rs 206.25

1,266

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-20

(British) :

100 RFT

Painting levelling staves

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.750

No

180.00

No

135.00

Paint : Enamel

1.500

Ltr

495.00

Ltr

742.50

877.50

TOTAL

4.16

MATERIAL

LABOUR
Coolie

6.098

Day

500.00

Day

3,048.78

Painter / Polisher

11.890

Day

1,000.00

Day

11,890.24

448.17

73.84

15,387.19

22

3,479.64

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 RFT

Rs.

19,744.33

Labour Rates Per

100 RFT

Rs.

18,673.78

Per Meter : Rs 647.61


Per Meter : Rs 612.50

1,267

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-21-a

(British) :

Each

Painting & lettering (2 coats) on both sides with syn. enamel paint
: Mile/km posts

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.125

No

180.00

No

22.50

Paint : Enamel

0.300

Ltr

495.00

Ltr

148.50

23.49

171.00

TOTAL

MATERIAL

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

11.25

54.51

386.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

677.37

Cost Per Each: 677.37

Labour Rates Per

Each

Rs.

468.75

Cost Per Each: 468.75

120.12

1,268

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-21-b

(British) :

Each

Painting & lettering (2 coats) on both sides with syn. enamel paint
: Furlong or 1/10 km posts

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.016

No

180.00

No

2.84

Paint : Enamel

0.038

Ltr

495.00

Ltr

18.56

23.49

21.41

TOTAL

MATERIAL

LABOUR
Coolie

0.031

Day

500.00

Day

15.65

Painter / Polisher

0.031

Day

1,000.00

Day

31.30

1.41

54.51

48.36

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

84.80

Cost Per Each: 84.80

Labour Rates Per

Each

Rs.

58.69

Cost Per Each: 58.69

15.04

1,269

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-21-c

(British) :

Each

Painting & lettering (2 coats) on both sides with syn. enamel paint
: Sign posts

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.125

No

180.00

No

22.50

Paint : Enamel

0.300

Ltr

495.00

Ltr

148.50

19.26

171.00

TOTAL

MATERIAL

LABOUR
Coolie

0.330

Day

500.00

Day

165.00

Painter / Polisher

0.330

Day

1,000.00

Day

330.00

14.85

58.74

509.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

827.37

Cost Per Each: 827.37

Labour Rates Per

Each

Rs.

618.75

Cost Per Each: 618.75

146.52

1,270

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-22

(British) :

100 Sft

Removing paint or varnish from wall

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

100 Sft

Rs.

625.00

Per SQM : Rs 67.25

Labour Rates Per

100 Sft

Rs.

625.00

Per SQM : Rs 67.25

110.00

1,271

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-23-a

(British) :

100 Sft

Scraing of Khanki paint from barrage gates

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scraping Material( including S

0.500

275.00

Doz

TOTAL

MATERIAL

Doz

137.50

71.74

137.50

Day

6.25

0.19

6.26

6.44

22

LABOUR
Coolie

0.013

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

175.56

Per SQM : Rs 18.89

Labour Rates Per

100 Sft

Rs.

7.81

Per SQM : Rs 0.84

31.63

1,272

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-23-b

(British) :

100 Sft

Scraping of Aluminium paint from barrage headworks

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scraping Material( including S

0.500

275.00

Doz

TOTAL

MATERIAL

Doz

137.50

39.29

137.50

Day

125.00

3.75

38.71

128.75

22

57.75

LABOUR
Coolie

0.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

324.00

Per SQM : Rs 34.86

Labour Rates Per

100 Sft

Rs.

156.25

Per SQM : Rs 16.81

1,273

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-24

(British) :

letter

Painting letters with shade

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.001

No

180.00

No

0.09

Paint : Enamel

0.020

Ltr

495.00

Ltr

9.90

22.04

9.99

TOTAL

MATERIAL

LABOUR
Coolie

0.016

Day

500.00

Day

8.00

Painter / Polisher

0.016

Day

1,000.00

Day

16.00

0.72

55.96

24.72

22

7.48

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

letter

Rs.

42.19

Cost Per letter: 42.19

Labour Rates Per

letter

Rs.

30.00

Cost Per letter: 30.00

1,274

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-25

(British) :

100 Sft

Scraping rust from old rails or girders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scraping Material( including S

0.500

275.00

Doz

TOTAL

MATERIAL

Doz

137.50

11.62

137.50

Day

750.00

22.50

66.38

772.50

22

LABOUR
Coolie

1.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,105.25

Per SQM : Rs 118.92

Labour Rates Per

100 Sft

Rs.

937.50

Per SQM : Rs 100.88

195.25

1,275

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-26

(British) :

100 Sft

Chiselling old paint from brick work

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scraping Material( including S

0.500

275.00

Doz

TOTAL

Doz

137.50

137.50

Day

1,000.00

30.00

68.93

1,030.00

22

250.25

9.07

MATERIAL

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,417.75

Per SQM : Rs 152.55

Labour Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

1,276

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-27

(British) :

100 Sft

Cleaning glasses with chalk and spirit etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Scraping Material( including S

0.500

275.00

Doz

TOTAL

MATERIAL

Doz

137.50

16.18

137.50

Day

500.00

15.00

61.82

515.00

22

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

792.75

Per SQM : Rs 85.30

Labour Rates Per

100 Sft

Rs.

625.00

Per SQM : Rs 67.25

140.25

1,277

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-28

(British) :

100 Sft

Cleaning and oiling rafter or rolled steel beams

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Diesel Oil

0.110

85.00

Ltr

TOTAL

Ltr

9.35

9.35

Day

250.00

7.50

75.30

257.50

22

57.06

2.70

MATERIAL

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

323.91

Per SQM : Rs 34.85

Labour Rates Per

100 Sft

Rs.

312.50

Per SQM : Rs 33.63

1,278

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-29

(British) :

Each

Cleaning and painting punkha poles, including fixing hooks

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.025

No

180.00

No

4.50

Paint : Enamel

0.065

Ltr

495.00

Ltr

32.17

36.67

Day

500.00

15.00

72.87

515.00

22

TOTAL

5.13

MATERIAL

LABOUR
1.000

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

669.74

Cost Per Each: 669.74

Labour Rates Per

Each

Rs.

625.00

Cost Per Each: 625.00

118.07

1,279

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-30-a

(British) :

100 Sft

Preparing surface and painting with emulsion paint : First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.100

No

180.00

No

18.00

Paint : Enamel

0.740

Ltr

495.00

Ltr

366.30

Miscellaneouse Painting Access

1.000

Ls

350.00

Ls

350.00

TOTAL

MATERIAL

41.27

734.30

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Painter / Polisher

0.400

Day

1,000.00

Day

400.00

18.00

36.73

618.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,645.85

Per SQM : Rs 177.09

Labour Rates Per

100 Sft

Rs.

750.00

Per SQM : Rs 80.70

293.55

1,280

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-30-b

(British) :

100 Sft

Preparing surface and painting with emulsion paint : 2nd & each
subsequent coat.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.070

No

180.00

No

12.60

Paint : Enamel

0.600

Ltr

495.00

Ltr

297.00

38.09

309.60

TOTAL

MATERIAL

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Painter / Polisher

0.200

Day

1,000.00

Day

200.00

9.00

39.91

309.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

752.71

Per SQM : Rs 80.99

Labour Rates Per

100 Sft

Rs.

375.00

Per SQM : Rs 40.35

134.11

1,281

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-31

(British) :

100 Sft

Pavement Marking using Reflective Chlorinated Rubber Paint with


Glass Beads as per specification

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Glass Beads

1.860

Kg

240.00

Kg

446.40

Chlorinated Rubber Paint

4.650

Kg

565.00

Kg

2,627.25

TOTAL

MATERIAL

56.59

3,073.65

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Painter / Polisher

0.500

Day

1,000.00

Day

500.00

30.00

21.41

1,030.00

22

896.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,999.85

Per SQM : Rs 537.98

Labour Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

1,282

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-33

(British) :

Job

Repainting of ceiling fan (all sizes & types) incl painting of


blades, canopy etc with syn. enamel

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.033

No

180.00

No

Paint : Enamel

0.330

Ltr

495.00

Ltr

163.35

53.06

169.29

Day

70.00

2.10

24.94

72.10

22

TOTAL

MATERIAL

5.94

LABOUR
0.070

Painter / Polisher

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Job

Rs.

294.03

Cost Per Job: 294.03

Labour Rates Per

Job

Rs.

87.50

Cost Per Job: 87.50

52.64

1,283

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-34

(British) :

Job

Repainting of iron poles with cross arms, with bitumen or other


approved paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.100

No

180.00

No

18.00

Paint : Enamel

0.165

Ltr

495.00

Ltr

81.68

12.47

99.68

TOTAL

MATERIAL

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

15.00

65.53

515.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Job

Rs.

746.60

Cost Per Job: 746.60

Labour Rates Per

Job

Rs.

625.00

Cost Per Job: 625.00

131.93

1,284

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-35-a

(British) :

100 RFT

Repainting of pipes and specials of GI, MS or PVC conduit etc :


Upto 1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.009

No

180.00

No

Paint : Enamel

0.762

Ltr

495.00

Ltr

377.19

41.56

378.84

Day

304.88

9.15

36.44

314.02

22

TOTAL

MATERIAL

1.65

LABOUR
Painter / Polisher

0.305

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

100 RFT

Rs.

843.28

Labour Rates Per

100 RFT

Rs.

381.10

LABOUR

150.42

Per Meter : Rs 27.66


Per Meter : Rs 12.50

1,285

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-35-b

(British) :

100 RFT

Repainting of pipes and specials of GI, MS or PVC conduit etc :


From 1.5" to 2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.381

No

180.00

No

68.60

Paint : Enamel

1.143

Ltr

495.00

Ltr

565.93

43.59

634.53

Day

457.32

13.72

34.41

471.04

22

TOTAL

MATERIAL

LABOUR
Painter / Polisher

0.457

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 RFT

Rs.

1,345.77

Labour Rates Per

100 RFT

Rs.

571.65

240.21

Per Meter : Rs 44.14


Per Meter : Rs 18.75

1,286

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-35-c

(British) :

100 RFT

Repainting of pipes and specials of GI, MS or PVC conduit etc :


From 2" to 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.195

No

180.00

No

35.12

Paint : Enamel

1.524

Ltr

495.00

Ltr

754.57

42.32

789.69

Day

609.76

18.29

35.68

628.05

22

TOTAL

MATERIAL

LABOUR
Painter / Polisher

0.610

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 RFT

Rs.

1,725.62

Labour Rates Per

100 RFT

Rs.

762.20

307.88

Per Meter : Rs 56.60


Per Meter : Rs 25.00

1,287

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-36

(British) :

Job

Repainting main switches & branch distribution boards of all sizes


& types with approved paint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.063

No

180.00

No

11.25

Paint : Enamel

0.125

Ltr

495.00

Ltr

61.88

37.03

73.13

Day

75.00

2.25

40.97

77.25

22

TOTAL

MATERIAL

LABOUR
0.075

Painter / Polisher

1,000.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Job

Rs.

182.96

Cost Per Job: 182.96

Labour Rates Per

Job

Rs.

93.75

Cost Per Job: 93.75

32.59

1,288

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-37

(British) :

100/coat

Extra labour for painting, varnishing etc from 20' height & above,
for every additional 10'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.180

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

90.00

2.70

78.00

92.70

22

Composite Rates Per

100/coat

Rs.

112.50

Per SQM : Rs 12.11

Labour Rates Per

100/coat

Rs.

112.50

Per SQM : Rs 12.11

19.80

1,289

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-38-a

(British) :

100/coat

Preparing surface & painting with snowcem / weathershield paint :


First coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.200

No

180.00

No

36.00

Paint : Weather shield

0.740

Ltr

540.00

Ltr

399.60

Miscellaneouse Items

1.000

LS

200.00

LS

200.00

TOTAL

MATERIAL

34.40

635.60

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Painter / Polisher

0.500

Day

1,000.00

Day

500.00

22.50

43.60

772.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100/coat

Rs.

1,712.93

Per SQM : Rs 184.31

Labour Rates Per

100/coat

Rs.

937.50

Per SQM : Rs 100.88

304.83

1,290

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 13 , PAINTING AND VARNISHING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

13-38-b

(British) :

100/coat

Preparing surface & painting with snowcem / weathershield paint :


2nd & subsequent coats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brush II

0.150

No

180.00

No

27.00

Paint : Weather shield

0.600

Ltr

540.00

Ltr

324.00

36.26

351.00

TOTAL

MATERIAL

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

11.25

41.74

386.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100/coat

Rs.

896.97

Per SQM : Rs 96.51

Labour Rates Per

100/coat

Rs.

468.75

Per SQM : Rs 50.44

159.72

1,291

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-01-a

(British) :

Each

Providing and Fixing glazed earthen ware WC European type excluding


cost of seat & cover : White

Detail

Qty

Unit

Rate (Rs)

Each

3,700.00

Amount

MATERIAL
1.000

WC European (W) ICL or eq

TOTAL

MATERIAL

Each

3,700.00

67.21

3,700.00

LABOUR
Skilled Coolie

0.330

Day

600.00

Day

198.00

Plumber II

0.330

Day

700.00

Day

231.00

12.87

10.79

441.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

908.38

Composite Rates Per

Each

Rs.

5,050.25

Cost Per Each: 5,050.25

Labour Rates Per

Each

Rs.

536.25

Cost Per Each: 536.25

1,292

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-01-b

(British) :

Each

Providing and Fixing glazed earthen ware WC European type excluding


cost of seat & cover : Coloured

Detail

Qty

Unit

Rate (Rs)

Each

3,800.00

Amount

MATERIAL
1.000

WC European (C) ICL or eq

TOTAL

MATERIAL

Each

3,800.00

67.39

3,800.00

LABOUR
Skilled Coolie

0.330

Day

600.00

Day

198.00

Plumber II

0.330

Day

700.00

Day

231.00

12.87

10.61

441.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

930.38

Composite Rates Per

Each

Rs.

5,172.25

Cost Per Each: 5,172.25

Labour Rates Per

Each

Rs.

536.25

Cost Per Each: 536.25

1,293

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-02-a

(British) :

Each

Providing and Fixing double seat & cover only : Bakelite

Detail

Qty

Unit

Rate (Rs)

Each

400.00

Amount

MATERIAL
1.000

Seat & Cover (Bakelite)

TOTAL

MATERIAL

Each

400.00

73.71

400.00

Day

7.00

0.21

4.29

7.21

22

LABOUR
0.010

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

496.75

Cost Per Each: 496.75

Labour Rates Per

Each

Rs.

8.75

Cost Per Each: 8.75

89.54

1,294

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-02-b

(British) :

Each

Providing and Fixing double seat & cover only : Plastic

Detail

Qty

Unit

Rate (Rs)

Each

360.00

Amount

MATERIAL
1.000

Seat & Cover (plastic)

TOTAL

MATERIAL

Each

360.00

73.57

360.00

Day

7.00

0.21

4.43

7.21

22

LABOUR
0.010

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

447.95

Cost Per Each: 447.95

Labour Rates Per

Each

Rs.

8.75

Cost Per Each: 8.75

80.74

1,295

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-03-a

(British) :

Each

Providing and Fixing glazed earthen ware WC squatting type with


built-in foot rests : White

Detail

Qty

Unit

Rate (Rs)

Each

975.00

Amount

MATERIAL
1.000

WC Orissa (W) ICL or eq

TOTAL

MATERIAL

Each

975.00

53.57

975.00

LABOUR
Skilled Coolie

0.300

Day

600.00

Day

180.00

Plumber II

0.300

Day

700.00

Day

210.00

11.70

24.43

401.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

300.30

Composite Rates Per

Each

Rs.

1,677.00

Cost Per Each: 1,677.00

Labour Rates Per

Each

Rs.

487.50

Cost Per Each: 487.50

1,296

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-03-b

(British) :

Each

Providing and Fixing glazed earthen ware WC squatting type with


built-in foot rests : Coloured

Detail

Qty

Unit

Rate (Rs)

Each

1,050.00

Amount

MATERIAL
1.000

WC Orissa (C) ICL or eq

TOTAL

MATERIAL

Each

1,050.00

54.69

1,050.00

LABOUR
Skilled Coolie

0.300

Day

600.00

Day

180.00

Plumber II

0.300

Day

700.00

Day

210.00

11.70

23.31

401.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

316.80

Composite Rates Per

Each

Rs.

1,768.50

Cost Per Each: 1,768.50

Labour Rates Per

Each

Rs.

487.50

Cost Per Each: 487.50

1,297

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-04

(British) :

Each

Providing and Fixing white glazed earthernware WC squatting type


with separate foot rests

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
WC Orissa w/o foot rest

1.000

Each

525.00

Each

525.00

Foot Rest for Orissa WC

1.000

Pair

340.00

Pair

340.00

51.69

865.00

TOTAL

MATERIAL

LABOUR
Skilled Coolie

0.300

Day

600.00

Day

180.00

Plumber II

0.300

Day

700.00

Day

210.00

11.70

26.31

401.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

276.10

Composite Rates Per

Each

Rs.

1,542.80

Cost Per Each: 1,542.80

Labour Rates Per

Each

Rs.

487.50

Cost Per Each: 487.50

1,298

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-05-a-01

(British) :

Each

Providing and Fixing glazed earthen ware WHB complete Size 22"x16"
: White with pedestal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
WHB 1 (W) w/ Pedestal ICL

1.000

Each

1,850.00

Each

Plastic Connection 13mm

1.000

No

90.00

No

TOTAL

MATERIAL

1,850.00
90.00

59.15

1,940.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

18.85

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

541.20

Composite Rates Per

Each

Rs.

3,016.80

Cost Per Each: 3,016.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,299

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-05-a-02

(British) :

Each

Providing and Fixing glazed earthen ware WHB complete Size 22"x16"
: Coloured with pedestal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
WHB 1 (C) w/ pedestal ICL

1.000

Each

1,900.00

Each

Plastic Connection 13mm

1.000

No

90.00

No

TOTAL

MATERIAL

1,900.00
90.00

59.46

1,990.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

18.54

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

552.20

Composite Rates Per

Each

Rs.

3,077.80

Cost Per Each: 3,077.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,300

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-05-a-03

(British) :

Each

Providing and Fixing glazed earthen ware WHB complete Size 22"x16"
: White without pedestal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

WHB 1(W) w/o Pedestal ICL

1.000

Each

1,450.00

Each

1,450.00

59.84

1,540.00

TOTAL

MATERIAL

90.00

LABOUR
Skilled Coolie

0.300

Day

600.00

Day

180.00

Plumber II

0.300

Day

700.00

Day

210.00

11.70

18.16

401.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

424.60

Composite Rates Per

Each

Rs.

2,366.30

Cost Per Each: 2,366.30

Labour Rates Per

Each

Rs.

487.50

Cost Per Each: 487.50

1,301

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-05-a-04

(British) :

Each

Providing and Fixing glazed earthen ware WHB complete Size 22"x16'
: Coloured without pedestal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

WHB 1(C) w/o Pedestal ICL

1.000

Each

1,600.00

Each

1,600.00

60.94

1,690.00

TOTAL

MATERIAL

90.00

LABOUR
Skilled Coolie

0.300

Day

600.00

Day

180.00

Plumber II

0.300

Day

700.00

Day

210.00

11.70

17.06

401.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

457.60

Composite Rates Per

Each

Rs.

2,549.30

Cost Per Each: 2,549.30

Labour Rates Per

Each

Rs.

487.50

Cost Per Each: 487.50

1,302

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-05-b-01

(British) :

Each

Providing and Fixing glazed earthen ware WHB complete Size 25"x18"
: White with pedestal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

WHB 2 (W) w/ Pedestal ICL

1.000

Each

2,100.00

Each

2,100.00

60.61

2,190.00

TOTAL

MATERIAL

90.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

17.39

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

596.20

Composite Rates Per

Each

Rs.

3,321.80

Cost Per Each: 3,321.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,303

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-05-b-02

(British) :

Each

Providing and Fixing glazed earthen ware WHB complete Size 25"x18"
: Coloured with pedestal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

WHB 2 (C) w/ Pedestal ICL

1.000

Each

2,200.00

Each

2,200.00

61.12

2,290.00

TOTAL

MATERIAL

90.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

16.88

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

618.20

Composite Rates Per

Each

Rs.

3,443.80

Cost Per Each: 3,443.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,304

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-05-b-03

(British) :

Each

Providing and Fixing glazed earthen ware WHB complete Size 25"x18"
: White without pedestal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

WHB 2(W) w/o Pedestal ICL

1.000

Each

1,600.00

Each

1,600.00

60.94

1,690.00

TOTAL

MATERIAL

90.00

LABOUR
Skilled Coolie

0.300

Day

600.00

Day

180.00

Plumber II

0.300

Day

700.00

Day

210.00

11.70

17.06

401.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

457.60

Composite Rates Per

Each

Rs.

2,549.30

Cost Per Each: 2,549.30

Labour Rates Per

Each

Rs.

487.50

Cost Per Each: 487.50

1,305

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-05-b-04

(British) :

Each

Providing and Fixing glazed earthen ware WHB complete Size 25"x18"
: Coloured without pedestal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

WHB 2(C) w/o Pedestal ICL

1.000

Each

1,750.00

Each

1,750.00

61.88

1,840.00

TOTAL

MATERIAL

90.00

LABOUR
Skilled Coolie

0.300

Day

600.00

Day

180.00

Plumber II

0.300

Day

700.00

Day

210.00

11.70

16.12

401.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

490.60

Composite Rates Per

Each

Rs.

2,732.30

Cost Per Each: 2,732.30

Labour Rates Per

Each

Rs.

487.50

Cost Per Each: 487.50

1,306

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-06-a

(British) :

Each

Providing and Fixing stainless steel sink with drain board size
48"x24", including set of brackets, waste pipe etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Steel Sink 24"x48" ASIA

1.000

No

2,500.00

No

2,500.00

TOTAL

MATERIAL

62.46

2,590.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

15.54

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

684.20

Composite Rates Per

Each

Rs.

3,809.80

Cost Per Each: 3,809.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,307

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-06-b

(British) :

Each

Providing and fixing stainless steel sink with drain board size
18"x36" including set of brackets, waste pipe etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Stainless Steel Sink


18"x36"(single)

1.000

No

1,600.00

No

1,600.00

TOTAL

MATERIAL

57.35

1,690.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

20.65

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

486.20

Composite Rates Per

Each

Rs.

2,711.80

Cost Per Each: 2,711.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,308

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-06-c

(British) :

Each

Providing and fixing stainless steel sink with drain board size
18"x48" including set of brackets, waste pipe etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Stainless Steel Sink


18"x48"(single)

1.000

No

2,600.00

No

2,600.00

TOTAL

MATERIAL

62.85

2,690.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

15.15

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

706.20

Composite Rates Per

Each

Rs.

3,931.80

Cost Per Each: 3,931.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,309

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-06-d

(British) :

Each

Providing and fixing stainless steel sink with drain board size
20"x60" including set of brackets, waste pipe etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Stainless Steel Sink 20"x60"(D

1.000

No

6,300.00

No

6,300.00

TOTAL

MATERIAL

69.36

6,390.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

8.64

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,520.20

Composite Rates Per

Each

Rs.

8,445.80

Cost Per Each: 8,445.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,310

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-06-e

(British) :

Each

Providing and fixing stainless steel sink with drain board size
20"x72" including set of brackets, waste pipe etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Stainless Steel Sink 20"x72"(D

1.000

No

6,800.00

No

6,800.00

TOTAL

MATERIAL

69.74

6,890.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

8.26

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,630.20

Composite Rates Per

Each

Rs.

9,055.80

Cost Per Each: 9,055.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,311

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-07

(British) :

Each

Providing and Fixing terrazzo concrete sink 25"x18", with drain


board of mosaic, including set of brackets etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Concrete Sink 25"x18"

1.000

No

1,850.00

No

1,850.00

TOTAL

MATERIAL

57.51

1,940.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.500

Day

700.00

Day

350.00

17.70

20.49

607.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

556.60

Composite Rates Per

Each

Rs.

3,104.30

Cost Per Each: 3,104.30

Labour Rates Per

Each

Rs.

737.50

Cost Per Each: 737.50

1,312

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-08-a

(British) :

Each

Providing and Fixing glazed earthen ware sink including set of


brackets, waste pipe etc : 25"x18"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Earthware Sink 25"x18"

1.000

No

1,450.00

No

1,450.00

TOTAL

MATERIAL

56.07

1,540.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

21.93

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

453.20

Composite Rates Per

Each

Rs.

2,528.80

Cost Per Each: 2,528.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,313

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-08-b

(British) :

Each

Providing and Fixing glazed earthen ware sink including set of


brackets, waste pipe etc : 25"x18"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Earthware Sink 15"x18"

1.000

No

1,250.00

No

1,250.00

TOTAL

MATERIAL

54.03

1,340.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

23.97

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

409.20

Composite Rates Per

Each

Rs.

2,284.80

Cost Per Each: 2,284.80

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,314

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-09

(British) :

Each

Providing and Fixing white glazed earthernware flat back urinal

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flat Back Urinal

1,200.00

No

TOTAL

MATERIAL

No

1,200.00

52.33

1,200.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

25.67

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

378.40

Composite Rates Per

Each

Rs.

2,114.00

Cost Per Each: 2,114.00

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,315

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-10-a

Item Name :

(British) :

Each

Providing and Fixing glazed earthen ware low down flushing cistern
3 gallons capacity : White

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Waste Pipe (PVC) 32mm

1.000

No

60.00

No

60.00

Cistern White 3 gal

1.000

No

1,400.00

No

1,400.00

TOTAL

MATERIAL

56.16

1,550.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

21.84

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

455.40

Composite Rates Per

Each

Rs.

2,541.00

Cost Per Each: 2,541.00

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,316

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-10-b

(British) :

Each

Providing and Fixing glazed earthen ware low down flushing cistern
3 gallons capacity : Coloured

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plastic Connection 13mm

1.000

No

90.00

No

90.00

Waste Pipe (PVC) 32mm

1.000

No

60.00

No

60.00

Cistern Colour 3 gal

1.000

No

2,400.00

No

2,400.00

TOTAL

MATERIAL

62.30

2,550.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

15.70

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

675.40

Composite Rates Per

Each

Rs.

3,761.00

Cost Per Each: 3,761.00

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,317

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-11

(British) :

Each

Providing and Fixing white enamelled CI low down flushing cistern


(3 gallons capacity) including CP water connection

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Enameled CI Cistern 3gal

1.000

No

2,200.00

No

2,200.00

Waste Pipe (PVC) 32mm

1.000

No

60.00

No

60.00

TOTAL

MATERIAL

60.97

2,260.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

17.03

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

611.60

Composite Rates Per

Each

Rs.

3,407.20

Cost Per Each: 3,407.20

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,318

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-12-a

(British) :

Each

Providing and Fixing cast iron high level flushing cistern,


including high level flushing cistern including CP : 3 gallons

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
C.I Cistern 3 gallon

1.000

No

1,850.00

No

1,850.00

Waste Pipe (PVC) 32mm

1.000

No

60.00

No

60.00

TOTAL

MATERIAL

58.95

1,910.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

19.05

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

534.60

Composite Rates Per

Each

Rs.

2,980.20

Cost Per Each: 2,980.20

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,319

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-12-b

(British) :

Each

Providing and Fixing cast iron high level flushing cistern,


including high level flushing cistern including CP : 1 gallon

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
C.I. Cistern 1 gal

1.000

No

800.00

No

800.00

Waste Pipe (PVC) 32mm

1.000

No

60.00

No

60.00

TOTAL

MATERIAL

46.74

860.00

LABOUR
Skilled Coolie

0.400

Day

600.00

Day

240.00

Plumber II

0.400

Day

700.00

Day

280.00

15.60

31.26

535.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

303.60

Composite Rates Per

Each

Rs.

1,699.20

Cost Per Each: 1,699.20

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,320

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-13

(British) :

Each

Providing and Fixing CP soap dish.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Chromium Plated Soap Dish

450.00

No

TOTAL

MATERIAL

No

450.00

67.64

450.00

Day

49.00

1.47

10.36

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

610.25

Cost Per Each: 610.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

109.78

1,321

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-14-a

(British) :

Each

Providing and Fixing glazed earthen ware soap dish White

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Earthware soap Dish (W)

325.00

No

TOTAL

MATERIAL

No

325.00

65.17

325.00

Day

49.00

1.47

12.83

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

457.75

Cost Per Each: 457.75

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

82.28

1,322

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-14-b

(British) :

Each

Providing and Fixing glazed earthen ware soap dish Coloured

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Glazed EWare Soap Dish W

325.00

No

TOTAL

MATERIAL

No

325.00

65.17

325.00

Day

49.00

1.47

12.83

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

457.75

Cost Per Each: 457.75

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

82.28

1,323

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-15

Item Name :

(British) :

Each

Providing and Fixing CP toilet paper holder

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Toilet Paper Holder

190.00

No

TOTAL

MATERIAL

No

190.00

59.62

190.00

Day

49.00

1.47

18.38

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

293.05

Cost Per Each: 293.05

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

52.58

1,324

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-16-a

(British) :

Each

Providing and Fixing CP towel rail : 24" long, 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Towel Rail 600 x 20mm Dia

600.00

No

TOTAL

MATERIAL

No

600.00

69.34

600.00

Day

49.00

1.47

8.66

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

793.25

Cost Per Each: 793.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

142.78

1,325

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-16-b

(British) :

Each

Providing and Fixing CP towel rail : 20" long, 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Towel Rail 500x13mm Dia

180.00

No

TOTAL

MATERIAL

No

180.00

58.95

180.00

Day

49.00

1.47

19.05

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

280.85

Cost Per Each: 280.85

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

50.38

1,326

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-17

(British) :

Each

Providing and Fixing best quality 5mm mirror 22"x16" size

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Mirror 24"x18" Imported

600.00

No

TOTAL

MATERIAL

No

600.00

59.02

600.00

LABOUR
Skilled Coolie

0.125

Day

600.00

Day

75.00

Welder II

0.125

Day

700.00

Day

87.50

4.88

18.98

167.38

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

935.13

Cost Per Each: 935.13

Labour Rates Per

Each

Rs.

203.13

Cost Per Each: 203.13

167.75

1,327

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-18-a

(British) :

Each

Providing and Fixing best quality 5mm glass shelf 24"x5" With
chromium plated brackets & railing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Glass Shelf 60x13 & 5mm I

450.00

No

TOTAL

MATERIAL

No

450.00

66.70

450.00

Day

56.00

1.68

11.30

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

619.00

Cost Per Each: 619.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

111.32

1,328

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-18-b

(British) :

Each

Providing and Fixing best quality 5mm glass shelf 24"x5" Glass
shelf only, w/o chromium plated brackets

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Glass Shelf 60x13cm 5mm 2

450.00

No

TOTAL

MATERIAL

No

450.00

71.66

450.00

Day

21.00

0.63

6.34

21.63

22

LABOUR
0.030

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

575.25

Cost Per Each: 575.25

Labour Rates Per

Each

Rs.

26.25

Cost Per Each: 26.25

103.62

1,329

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-19-a

(British) :

Each

Providing and Fixing glazed earthen ware shelf 24"x5" with CP


brackets & railing of : 24" length, 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Earthen ware Shelf W

200.00

No

TOTAL

MATERIAL

No

200.00

58.59

200.00

Day

56.00

1.68

19.41

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

314.00

Cost Per Each: 314.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

56.32

1,330

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-19-b

(British) :

Each

Providing and Fixing glazed earthen ware shelf 24"x5" with CP


brackets & railing of : 20" length, 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Glass / Earthware Shelf

450.00

No

TOTAL

MATERIAL

No

450.00

66.70

450.00

Day

56.00

1.68

11.30

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

619.00

Cost Per Each: 619.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

111.32

1,331

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-20-a

(British) :

Each

Providing and Fixing Plastic soap dish.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plastic Soap Dish

180.00

No

TOTAL

MATERIAL

No

180.00

58.95

180.00

Day

49.00

1.47

19.05

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

280.85

Cost Per Each: 280.85

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

50.38

1,332

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-20-b

(British) :

Each

Providing and Fixing Plastic toilet paper holder.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plastic Toilet Paper Hold

180.00

No

TOTAL

MATERIAL

No

180.00

58.95

180.00

Day

49.00

1.47

19.05

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

280.85

Cost Per Each: 280.85

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

50.38

1,333

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-20-c

(British) :

Each

Providing and Fixing Plastic towel rail.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plastic Tower Rail

200.00

No

TOTAL

MATERIAL

No

200.00

60.24

200.00

Day

49.00

1.47

17.76

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

305.25

Cost Per Each: 305.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

54.78

1,334

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-20-d

(British) :

Each

Providing and Fixing Plastic shelf 24"x5" with

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plastic Shelf 30x13 Cm

220.00

No

TOTAL

MATERIAL

No

220.00

61.34

220.00

Day

49.00

1.47

16.66

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

329.65

Cost Per Each: 329.65

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

59.18

1,335

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-21-a

(British) :

Each

Providing and Fixing CP pillar-cock, heavy type : 3/4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pillar/bib/stop Cock 20mm

750.00

No

TOTAL

MATERIAL

No

750.00

70.40

750.00

Day

49.00

1.47

7.60

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

976.25

Cost Per Each: 976.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

175.78

1,336

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-21-b

(British) :

Each

Providing and Fixing CP pillar-cock, heavy type : 1/2"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pillar/bib/stop Cock 13mm

750.00

No

TOTAL

MATERIAL

No

750.00

70.40

750.00

Day

49.00

1.47

7.60

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

976.25

Cost Per Each: 976.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

175.78

1,337

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-22-a

(British) :

Each

Providing and Fixing CP stop-cock, heavy type : 3/4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

CP Stop Cock Heavy 20mm

420.00

No

TOTAL

MATERIAL

No

420.00

67.16

420.00

Day

49.00

1.47

10.84

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

573.65

Cost Per Each: 573.65

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

103.18

1,338

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-22-b

(British) :

Each

Providing and Fixing CP stop-cock, heavy type : 1/2"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

CP Stop Cock Heavy 13mm

420.00

No

TOTAL

MATERIAL

No

420.00

67.16

420.00

Day

49.00

1.47

10.84

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

573.65

Cost Per Each: 573.65

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

103.18

1,339

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-23

(British) :

Each

Providing and Fixing underground stop-cock 1/2" with CP cover

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CP Stop Cock Heavy 13mm

420.00

No

TOTAL

MATERIAL

No

462.00

66.89

462.00

Day

56.00

1.68

11.11

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

633.64

Cost Per Each: 633.64

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

113.96

1,340

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-24-a

(British) :

Each

Providing and Fixing CP bib-cock, heavy type : 3/4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plated Bib Cock 200mm Dia

420.00

No

TOTAL

MATERIAL

No

420.00

67.16

420.00

Day

49.00

1.47

10.84

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

573.65

Cost Per Each: 573.65

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

103.18

1,341

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-24-b

(British) :

Each

Providing and Fixing CP bib-cock, heavy type : 1/2"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plated Bib Cock 13 Mm Dia

420.00

No

TOTAL

MATERIAL

No

420.00

67.16

420.00

Day

49.00

1.47

10.84

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

573.65

Cost Per Each: 573.65

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

103.18

1,342

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-25

(British) :

Each

Providing and Fixing 1/2" CP tee stop cock

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Stop Cock With CP Cover

420.00

No

TOTAL

MATERIAL

No

420.00

67.16

420.00

Day

49.00

1.47

10.84

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

573.65

Cost Per Each: 573.65

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

103.18

1,343

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-26-a

(British) :

Each

Providing and Fixing CP shower rose : 1/2"x4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Shower Rose 13x100 MM

960.00

No

TOTAL

MATERIAL

960.00

No

71.36

960.00

Day

49.00

1.47

6.64

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

221.98

Composite Rates Per

Each

Rs.

1,232.45

Cost Per Each: 1,232.45

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

1,344

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-26-b

(British) :

Each

Providing and Fixing CP shower rose : 3/4"x6"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Shower Rose 20x150 MM

500.00

No

TOTAL

MATERIAL

No

500.00

68.31

500.00

Day

49.00

1.47

9.69

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

671.25

Cost Per Each: 671.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

120.78

1,345

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-27

(British) :

Each

Providing and Fixing CP mixing valve for WHB, sink or shower

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Mixing Valve

1,700.00

No

TOTAL

MATERIAL

No

1,700.00

72.90

1,700.00

Day

49.00

1.47

5.10

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

384.78

Composite Rates Per

Each

Rs.

2,135.25

Cost Per Each: 2,135.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

1,346

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-28-a

(British) :

Each

Providing and Fixing gun metal peet / gate valve (screwed) 1" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Peet/gate Vlave 32 MM

1,200.00

No

TOTAL

MATERIAL

No

1,200.00

71.66

1,200.00

Day

56.00

1.68

6.34

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

276.32

Composite Rates Per

Each

Rs.

1,534.00

Cost Per Each: 1,534.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

1,347

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-28-b

(British) :

Each

Providing and Fixing gun metal peet / gate valve (screwed) 1.25"
dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Peet/gate Vlave 40 MM

1,450.00

No

TOTAL

MATERIAL

No

1,450.00

72.21

1,450.00

Day

56.00

1.68

5.79

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

331.32

Composite Rates Per

Each

Rs.

1,839.00

Cost Per Each: 1,839.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

1,348

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-28-c

(British) :

Each

Providing and Fixing gun metal peet / gate valve (screwed) 1.75"
dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Peet/gate Valve 50 MM

1,550.00

No

TOTAL

MATERIAL

No

1,550.00

72.38

1,550.00

Day

56.00

1.68

5.62

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

353.32

Composite Rates Per

Each

Rs.

1,961.00

Cost Per Each: 1,961.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

1,349

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-28-d

(British) :

Each

Providing and Fixing gun metal peet / gate valve (screwed) 2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Peet/gate Valve 50 MM

1.000

No

1,550.00

No

1,550.00

Peet/gate Valve 63 MM

1.000

No

3,200.00

No

3,200.00

TOTAL

MATERIAL

74.13

4,750.00

Day

56.00

1.68

3.87

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,057.32

Composite Rates Per

Each

Rs.

5,865.00

Cost Per Each: 5,865.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

1,350

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-28-e

(British) :

Each

Providing and Fixing gun metal peet / gate valve (screwed) 3" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Peet/gate Valve 75 MM

5,200.00

No

TOTAL

MATERIAL

No

5,200.00

74.20

5,200.00

Day

56.00

1.68

3.80

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,156.32

Composite Rates Per

Each

Rs.

6,414.00

Cost Per Each: 6,414.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

1,351

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-29-a

(British) :

Each

Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia :


Single way

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Swan Neck Cock 13mm Sing

700.00

No

TOTAL

MATERIAL

No

700.00

70.09

700.00

Day

49.00

1.47

7.91

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

915.25

Cost Per Each: 915.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

164.78

1,352

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-29-b

(British) :

Each

Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia :


Double way

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Swan Neck Cock 13mm Doub

1,850.00

No

TOTAL

MATERIAL

No

1,850.00

72.80

1,850.00

Day

56.00

1.68

5.20

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

419.32

Composite Rates Per

Each

Rs.

2,327.00

Cost Per Each: 2,327.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

1,353

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-29-c

(British) :

Each

Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia :


Three way

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Swan Neck Cock 13mm Trip

100.00

No

TOTAL

MATERIAL

No

100.00

44.12

100.00

Day

70.00

2.10

33.88

72.10

22

LABOUR
0.100

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

209.50

Cost Per Each: 209.50

Labour Rates Per

Each

Rs.

87.50

Cost Per Each: 87.50

37.40

1,354

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-30-a

(British) :

Each

Providing and Fixing brass union 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Union Brass Cock 13 MM

250.00

No

TOTAL

MATERIAL

No

250.00

62.71

250.00

Day

49.00

1.47

15.29

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

366.25

Cost Per Each: 366.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

65.78

1,355

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-30-b

(British) :

Each

Providing and Fixing brass union 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Union Brass Cock 20mm

350.00

No

TOTAL

MATERIAL

No

350.00

65.79

350.00

Day

49.00

1.47

12.21

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

488.25

Cost Per Each: 488.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

87.78

1,356

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-31-a

(British) :

Each

Providing and Fixing CI floor trap including CI grating & concrete


chamber all round : 4"x2"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Floor Trap 100x50

250.00

No

TOTAL

MATERIAL

No

250.00

50.68

250.00

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Plumber II

0.100

Day

700.00

Day

70.00

3.60

27.32

123.60

22

81.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

455.00

Cost Per Each: 455.00

Labour Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

1,357

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-31-b

(British) :

Each

Providing and Fixing CI floor trap including CI grating & concrete


chamber all round : 4"x3"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Floor Trap 100x75

540.00

No

TOTAL

61.36

MATERIAL

No

540.00

540.00

LABOUR
Coolie

0.100

Day.

500.00

Day.

50.00

Plumber II

0.100

Day

700.00

Day

70.00

3.60

16.64

123.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

808.80

Cost Per Each: 808.80

Labour Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

145.20

1,358

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-32-a

(British) :

Each

Providing and Fixing 'P' trap including GI grating & PCC chamber 4"
of cast iron

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cast Iron P Trap 100 mm

650.00

No

TOTAL

MATERIAL

No

650.00

64.31

650.00

LABOUR
Coolie

0.090

Day

500.00

Day

45.00

Plumber II

0.090

Day

700.00

Day

63.00

3.24

13.69

111.24

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

928.00

Cost Per Each: 928.00

Labour Rates Per

Each

Rs.

135.00

Cost Per Each: 135.00

166.76

1,359

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-32-b

(British) :

Each

Providing and Fixing 'P' trap including GI grating & PCC chamber 4"
glazed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Glazed P Trap 100 mm

200.00

No

TOTAL

MATERIAL

No

200.00

48.70

200.00

LABOUR
Coolie

0.090

Day

500.00

Day

45.00

Plumber II

0.090

Day

700.00

Day

63.00

3.24

29.30

111.24

22

67.76

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

379.00

Cost Per Each: 379.00

Labour Rates Per

Each

Rs.

135.00

Cost Per Each: 135.00

1,360

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-33

(British) :

Each

Providing and Fixing 4" gully trap with PCC, including masonry
chamber 1'x1' and PVC grating 6"x6"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Masonry Chamber 3050x254

1.000

No

300.00

No

300.00

Gully TP

1.000

No

325.00

No

325.00

TOTAL

MATERIAL

58.23

625.00

LABOUR
Coolie

0.150

Day

500.00

Day

75.00

Plumber II

0.150

Day

700.00

Day

105.00

5.40

19.77

185.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

987.50

Cost Per Each: 987.50

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

177.10

1,361

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-34-a-01

(British) :

Rft

Providing and fitting CI soil pipe with : Lead & yarn caulked joint
: 4" dia.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
C.I. Soil pipe 100mm Dia

1.000

RFT

550.00

RFT

550.00

Lead Caulked Joint II

1.000

RFT

110.00

RFT

110.00

71.06

660.00

TOTAL

MATERIAL

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Plumber II

0.030

Day

700.00

Day

21.34

1.10

6.94

37.68

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

850.93

Labour Rates Per

Rft

Rs.

45.73

LABOUR

153.25

Per Meter : Rs 2,791.06


Per Meter : Rs 150.00

1,362

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-34-a-02

(British) :

Rft

Providing and fitting CI soil pipe with : Lead & yarn caulked joint
: 2" dia.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lead Caulked Joint I

1.000

RFT

100.00

RFT

100.00

C.I. Soil Pipe 50 MM Dia

1.000

RFT

240.00

RFT

240.00

71.17

340.00

TOTAL

MATERIAL

LABOUR
Coolie

0.015

Day

500.00

Day

7.62

Plumber II

0.015

Day

700.00

Day

10.67

0.55

6.83

18.84

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

437.67

Labour Rates Per

Rft

Rs.

22.87

LABOUR

78.82

Per Meter : Rs 1,435.54


Per Meter : Rs 75.00

1,363

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-34-b-01

(British) :

Rft

Providing and fitting CI soil pipe with : Cement caulked joint : 4"
dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
C.I. Soil pipe 100mm Dia

1.000

RFT

550.00

RFT

550.00

Cement Caulked Joint I

1.000

RFT

90.00

RFT

90.00

70.94

640.00

TOTAL

MATERIAL

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Plumber II

0.030

Day

700.00

Day

21.34

1.10

7.06

37.68

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

826.53

Labour Rates Per

Rft

Rs.

45.73

LABOUR

148.85

Per Meter : Rs 2,711.02


Per Meter : Rs 150.00

1,364

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-34-b-02

(British) :

Rft

Providing and fitting CI soil pipe with : Cement caulked joint : 2"
dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
C.I. Soil Pipe 50 MM Dia

1.000

RFT

240.00

RFT

240.00

Cement Caulked Joint II

1.000

RFT

50.00

RFT

50.00

70.55

290.00

TOTAL

MATERIAL

LABOUR
Coolie

0.015

Day

500.00

Day

7.62

Plumber II

0.015

Day

700.00

Day

10.67

0.55

7.45

18.84

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

376.67

Labour Rates Per

Rft

Rs.

22.87

LABOUR

67.82

Per Meter : Rs 1,235.46


Per Meter : Rs 75.00

1,365

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-35-a

Item Name :

(British) :

Rft

Providing and Fixing AC soil pipe with cement caulked joint


including all specials : 1" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
A.C. Pipe 32 MM Dia

1.000

RFT

75.00

RFT

75.00

Cement Caulked Joint III

0.305

No

120.00

No

36.59

TOTAL

MATERIAL

69.32

111.59

LABOUR
Coolie

0.008

Day

500.00

Day

3.81

Plumber II

0.008

Day

700.00

Day

5.34

0.27

8.68

9.42

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

147.57

Labour Rates Per

Rft

Rs.

11.43

LABOUR

26.56

Per Meter : Rs 484.02


Per Meter : Rs 37.50

1,366

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-35-b

(British) :

Rft

Providing and Fixing AC soil pipe with cement caulked joint


including all specials : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cement Caulked Joint IV

0.305

No

130.00

No

39.63

A.C.pipe (b) 3"

1.000

RFT

150.00

RFT

150.00

70.90

189.63

TOTAL

MATERIAL

LABOUR
Coolie

0.009

Day

500.00

Day

4.57

Plumber II

0.009

Day

700.00

Day

6.40

0.33

7.10

11.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

245.07

Labour Rates Per

Rft

Rs.

13.72

LABOUR

44.13

Per Meter : Rs 803.84


Per Meter : Rs 45.00

1,367

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-35-c

(British) :

Rft

Providing and Fixing AC soil pipe with cement caulked joint


including all specials : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cement Caulked Joint V

0.305

No

140.00

No

42.68

A.C.pipe (b) 4"

1.000

RFT

190.00

RFT

190.00

69.53

232.68

TOTAL

MATERIAL

LABOUR
Coolie

0.015

Day

500.00

Day

7.62

Plumber II

0.015

Day

700.00

Day

10.67

0.55

8.47

18.84

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

306.74

Labour Rates Per

Rft

Rs.

22.87

LABOUR

55.21

Per Meter : Rs 1,006.10


Per Meter : Rs 75.00

1,368

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-35-d

(British) :

Rft

Providing and Fixing AC soil pipe with cement caulked joint


including all specials : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cement Caulked Joint V

0.305

No

140.00

No

42.68

A.C.pipe (b) 6"

1.000

Rft

300.00

Rft

300.00

69.10

342.68

TOTAL

MATERIAL

LABOUR
Coolie

0.024

Day

500.00

Day

12.20

Plumber II

0.024

Day

700.00

Day

17.07

0.88

8.90

30.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

454.66

Labour Rates Per

Rft

Rs.

36.59

LABOUR

81.83

Per Meter : Rs 1,491.28


Per Meter : Rs 120.00

1,369

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-36-a

(British) :

Each

Providing and Fixing CI specials, such as tees, bends etc Lead


caulked joint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lead Caulked Joint I

3.280

RFT

100.00

RFT

328.00

C.I. Tee/Bend/Collar etc

1.000

No

320.00

No

320.00

TOTAL

MATERIAL

60.90

648.00

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Plumber II

0.125

Day

700.00

Day

87.50

4.50

17.10

154.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

978.06

Cost Per Each: 978.06

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

175.56

1,370

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-36-b

(British) :

Each

Providing and Fixing CI specials, such as tees, bends etc Cement


caulked joint

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cement Caulked Joint V

1.000

No

140.00

No

140.00

C.I. Tee/Bend/Collar etc

1.000

No

320.00

No

320.00

TOTAL

MATERIAL

56.56

460.00

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Plumber II

0.125

Day

700.00

Day

87.50

4.50

21.44

154.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

748.70

Cost Per Each: 748.70

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

134.20

1,371

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-37-a

(British) :

Each

Supply and Fixing CI manhole cover with frame etc complete 12" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Manhole Cover CI 300mm

1,000.00

No

TOTAL

MATERIAL

No

1,000.00

69.67

1,000.00

Day

76.50

2.30

8.33

78.80

22

LABOUR
0.085

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

236.83

Composite Rates Per

Each

Rs.

1,315.63

Cost Per Each: 1,315.63

Labour Rates Per

Each

Rs.

95.63

Cost Per Each: 95.63

1,372

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-37-b

(British) :

Each

Supply and Fixing CI manhole cover with frame etc complete 18" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Manhole Cover CI 455mm

1,800.00

No

TOTAL

MATERIAL

No

1,800.00

71.94

1,800.00

Day

76.50

2.30

6.06

78.80

22

LABOUR
0.085

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

412.83

Composite Rates Per

Each

Rs.

2,291.63

Cost Per Each: 2,291.63

Labour Rates Per

Each

Rs.

95.63

Cost Per Each: 95.63

1,373

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-37-c

(British) :

Each

Supply and Fixing CI manhole cover with frame etc complete 24" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Manhole Cover CI 600mm

3,000.00

No

TOTAL

MATERIAL

No

3,000.00

73.14

3,000.00

Day

76.50

2.30

4.86

78.80

22

LABOUR
0.085

Mason

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

676.83

Composite Rates Per

Each

Rs.

3,755.63

Cost Per Each: 3,755.63

Labour Rates Per

Each

Rs.

95.63

Cost Per Each: 95.63

1,374

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-37-d

(British) :

Each

Providing & Fixing Steel manhole cover with frame 18"x18" full
heavy duty

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Manhole cover with frame


18"x18" full heavy duty

2,500.00

No

TOTAL

MATERIAL

No

2,500.00

65.79

2,500.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

0.250

Day

500.00

Day

125.00

10.50

12.21

360.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

627.00

Composite Rates Per

Each

Rs.

3,487.50

Cost Per Each: 3,487.50

Labour Rates Per

Each

Rs.

437.50

Cost Per Each: 437.50

1,375

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-38

(British) :

Rft

Providing and Fixing RCC pipe 4" dia, including laying & jointing
in trenches

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.046

Bag

490.00

Bag

22.41

Sand

0.162

Cft

2,200.00

100 Cft

3.56

Crushed Aggregate

0.323

Cft

2,800.00

100 Cft

9.04

Pipe RCC 4" BS-5911 "L"

1.000

RFT

85.00

RFT

85.00

Collar

0.305

No

120.00

No

36.59

TOTAL

MATERIAL

42.07

156.60

LABOUR
Mason

0.009

Day

900.00

Day

8.23

Coolie

0.229

Day

500.00

Day

114.33

3.68

35.93

126.24

22

61.42

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

344.25

Labour Rates Per

Rft

Rs.

153.20

LABOUR

Per Meter : Rs 1,129.15


Per Meter : Rs 502.50

1,376

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-39-a

(British) :

Each

Providing and Fixing brass stop/bib cock : 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass/stop/bib Cock 13mm

120.00

No

TOTAL

MATERIAL

No

120.00

53.25

120.00

Day

49.00

1.47

24.75

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

207.65

Cost Per Each: 207.65

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

37.18

1,377

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-39-b

(British) :

Each

Providing and Fixing brass stop/bib cock : 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass/stop/bib Cock 20mm

200.00

No

TOTAL

MATERIAL

No

200.00

60.24

200.00

Day

49.00

1.47

17.76

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

305.25

Cost Per Each: 305.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

54.78

1,378

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-40

(British) :

Each

Hoisting & Placing in position precast RC latrine seat

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.750

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

375.00

11.25

78.00

386.25

22

82.50

Composite Rates Per

Each

Rs.

468.75

Cost Per Each: 468.75

Labour Rates Per

Each

Rs.

468.75

Cost Per Each: 468.75

1,379

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-41-a

Item Name :

(British) :

Each

Providing and Fixing CP waste coupling : 1.25"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Waste Coupling 32mm

220.00

No

TOTAL

MATERIAL

No

220.00

59.78

220.00

Day

56.00

1.68

18.22

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

338.40

Cost Per Each: 338.40

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

60.72

1,380

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-41-b

(British) :

Each

Providing and Fixing CP waste coupling : 1.5"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Waste Coupling 40 MM

350.00

No

TOTAL

MATERIAL

No

350.00

64.66

350.00

Day

56.00

1.68

13.34

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

497.00

Cost Per Each: 497.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

89.32

1,381

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-42-a

(British) :

Each

Providing and Fixing rubber plug with chain : 1.25"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Rubber Plug 32mm

20.00

No

TOTAL

MATERIAL

No

20.00

67.87

20.00

Day

2.10

0.06

10.13

2.16

22

LABOUR
0.003

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

27.02

Cost Per Each: 27.02

Labour Rates Per

Each

Rs.

2.62

Cost Per Each: 2.62

4.86

1,382

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-42-b

(British) :

Each

Providing and Fixing rubber plug with chain : 1.5"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Rubber Plug 40 mm

30.00

No

TOTAL

MATERIAL

No

30.00

70.09

30.00

Day

2.10

0.06

7.91

2.16

22

LABOUR
0.003

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

39.22

Cost Per Each: 39.22

Labour Rates Per

Each

Rs.

2.62

Cost Per Each: 2.62

7.06

1,383

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-43-a

(British) :

Each

Providing and Fixing waste pipe of PVC : 1.25"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Waste Pipe (PVC) 32mm

60.00

No

TOTAL

MATERIAL

No

60.00

41.28

60.00

Day

49.00

1.47

36.72

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

134.45

Cost Per Each: 134.45

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

23.98

1,384

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-43-b

(British) :

Each

Providing and Fixing waste pipe of PVC : 1.5"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Waste Pipe (PVC) 40mm

90.00

No

TOTAL

MATERIAL

No

90.00

48.56

90.00

Day

49.00

1.47

29.44

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

171.05

Cost Per Each: 171.05

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

30.58

1,385

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-44-a

(British) :

Each

Providing and Fixing flushing bend of PVC : 1.25"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flushing Bend (PVC) 32mm

60.00

No

TOTAL

MATERIAL

No

60.00

47.37

60.00

Day

35.00

1.05

30.63

36.05

22

LABOUR
0.050

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

116.95

Cost Per Each: 116.95

Labour Rates Per

Each

Rs.

43.75

Cost Per Each: 43.75

20.90

1,386

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-44-b

(British) :

Each

Providing and Fixing flushing bend of PVC : 1.5"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flushing Bend (PVC) 40mm

80.00

No

TOTAL

MATERIAL

No

80.00

52.17

80.00

Day

35.00

1.05

25.83

36.05

22

LABOUR
0.050

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

141.35

Cost Per Each: 141.35

Labour Rates Per

Each

Rs.

43.75

Cost Per Each: 43.75

25.30

1,387

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-45-a

(British) :

Each

Providing and Fixing CP bottle trough with waste pipe : 1.25" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Bottle Trough 32mm

1,000.00

No

TOTAL

MATERIAL

No

1,000.00

71.02

1,000.00

Day

56.00

1.68

6.98

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

232.32

Composite Rates Per

Each

Rs.

1,290.00

Cost Per Each: 1,290.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

1,388

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-45-b

(British) :

Each

Providing and Fixing CP bottle trough with waste pipe : 1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Bottle Trough 40mm

1,250.00

No

TOTAL

MATERIAL

No

1,250.00

71.78

1,250.00

Day

56.00

1.68

6.22

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

287.32

Composite Rates Per

Each

Rs.

1,595.00

Cost Per Each: 1,595.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

1,389

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-46-a

(British) :

Each

Providing and Fixing angle iron brackets for : WHB and cistern

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

L-Iron Bracket I

150.00

No

TOTAL

MATERIAL

No

150.00

54.61

150.00

Day

56.00

1.68

23.39

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

253.00

Cost Per Each: 253.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

45.32

1,390

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-46-b

(British) :

Each

Providing and Fixing angle iron brackets for : Sink

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

L-Iron Bracket II

140.00

No

TOTAL

MATERIAL

No

140.00

53.57

140.00

Day

56.00

1.68

24.43

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

240.80

Cost Per Each: 240.80

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

43.12

1,391

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-47-a

(British) :

Each

Providing and Fixing 1/2" dia connection including check nuts etc
Plastic rubber connection

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plastic Rubber Connection

120.00

No

TOTAL

MATERIAL

No

120.00

63.83

120.00

Day

21.00

0.63

14.17

21.63

22

LABOUR
0.030

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

172.65

Cost Per Each: 172.65

Labour Rates Per

Each

Rs.

26.25

Cost Per Each: 26.25

31.02

1,392

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-47-b

(British) :

Each

Providing and Fixing 1/2" dia connection including check nuts etc
Copper connection

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Copper Connection

150.00

No

TOTAL

MATERIAL

No

150.00

65.79

150.00

Day

21.00

0.63

12.21

21.63

22

LABOUR
0.030

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

209.25

Cost Per Each: 209.25

Labour Rates Per

Each

Rs.

26.25

Cost Per Each: 26.25

37.62

1,393

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-47-c

(British) :

Each

Providing and Fixing 1/2" dia connection including check nuts etc
CP connection

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.P. Connection

140.00

No

TOTAL

MATERIAL

No

140.00

65.22

140.00

Day

21.00

0.63

12.78

21.63

22

LABOUR
0.030

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

197.05

Cost Per Each: 197.05

Labour Rates Per

Each

Rs.

26.25

Cost Per Each: 26.25

35.42

1,394

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-48-a

(British) :

Each

Providing and Fixing brass ball float valve 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Ball Valve 13 Mm

175.00

No

TOTAL

MATERIAL

No

175.00

58.59

175.00

Day

49.00

1.47

19.41

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

274.75

Cost Per Each: 274.75

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

49.28

1,395

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-48-b

(British) :

Each

Providing and Fixing brass ball float valve 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Ball Valve 20 Mm Dia

250.00

No

TOTAL

MATERIAL

No

250.00

62.71

250.00

Day

49.00

1.47

15.29

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

366.25

Cost Per Each: 366.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

65.78

1,396

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-48-c

Item Name :

(British) :

Each

Providing and Fixing brass ball float valve 1" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Ball Valve 25mm Dia

310.00

No

TOTAL

MATERIAL

No

310.00

64.76

310.00

Day

49.00

1.47

13.24

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

439.45

Cost Per Each: 439.45

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

78.98

1,397

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-48-d

Item Name :

(British) :

Each

Providing and Fixing brass ball float valve 1.25" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Ball Valve 32mm Dia

500.00

No

TOTAL

MATERIAL

No

500.00

68.31

500.00

Day

49.00

1.47

9.69

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

671.25

Cost Per Each: 671.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

120.78

1,398

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-48-e

Item Name :

(British) :

Each

Providing and Fixing brass ball float valve 1.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Ball Valve 40MM Dia

900.00

No

TOTAL

MATERIAL

900.00

No

71.13

900.00

Day

49.00

1.47

6.87

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

208.78

Composite Rates Per

Each

Rs.

1,159.25

Cost Per Each: 1,159.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

1,399

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-48-f

(British) :

Each

Providing and Fixing brass ball float valve 2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Ball Valve 50 MM Dia

950.00

No

TOTAL

MATERIAL

950.00

No

71.32

950.00

Day

49.00

1.47

6.68

50.47

22

LABOUR
0.070

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

219.78

Composite Rates Per

Each

Rs.

1,220.25

Cost Per Each: 1,220.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

1,400

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-49-a

(British) :

Rft

Providing and Fixing 4" dia MS high pressure seamwelded pipe &
specials complete : 2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

High Pr Steel Welded I

230.00

RFT

TOTAL

MATERIAL

RFT

230.00

46.93

230.00

LABOUR
Coolie

0.125

Day

500.00

Day

62.52

Fitter II

0.125

Day

600.00

Day

75.02

4.13

31.07

141.67

22

80.86

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

452.53

Labour Rates Per

Rft

Rs.

171.93

LABOUR

Per Meter : Rs 1,484.28


Per Meter : Rs 563.91

1,401

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-49-b

(British) :

Rft

Providing and Fixing 4" dia MS high pressure seamwelded pipe &
specials complete : 1" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

High Pr. Steel Welded II

200.00

RFT

TOTAL

MATERIAL

RFT

200.00

48.38

200.00

LABOUR
Coolie

0.100

Day

500.00

Day

50.02

Fitter II

0.100

Day

600.00

Day

60.02

3.30

29.62

113.33

22

68.21

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

381.54

Labour Rates Per

Rft

Rs.

137.54

LABOUR

Per Meter : Rs 1,251.46


Per Meter : Rs 451.14

1,402

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-50-a

(British) :

Each

Providing and Fixing Audco type valve : 4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Audco Valve 100 Mm Dia

1,100.00

No

TOTAL

MATERIAL

No

1,100.00

50.00

1,100.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Fitter II

0.500

Day

600.00

Day

300.00

16.50

28.00

566.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

363.00

Composite Rates Per

Each

Rs.

2,029.50

Cost Per Each: 2,029.50

Labour Rates Per

Each

Rs.

687.50

Cost Per Each: 687.50

1,403

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-50-b

(British) :

Each

Providing and Fixing Audco type valve : 2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Audco Valve 50mm Dia

4,000.00

No

TOTAL

MATERIAL

No

4,000.00

71.09

4,000.00

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Fitter II

0.200

Day

600.00

Day

120.00

6.60

6.91

226.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

928.40

Composite Rates Per

Each

Rs.

5,155.00

Cost Per Each: 5,155.00

Labour Rates Per

Each

Rs.

275.00

Cost Per Each: 275.00

1,404

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-50-c

(British) :

Each

Providing and Fixing Audco type valve : 1" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Audco Valve 25mm Dia

2,500.00

No

TOTAL

MATERIAL

No

2,500.00

70.36

2,500.00

LABOUR
Coolie

0.150

Day

500.00

Day

75.00

Fitter II

0.150

Day

600.00

Day

90.00

4.95

7.64

169.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

586.30

Composite Rates Per

Each

Rs.

3,256.25

Cost Per Each: 3,256.25

Labour Rates Per

Each

Rs.

206.25

Cost Per Each: 206.25

1,405

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-51-a

(British) :

Each

Providing and Fixing pressure regulator : No. 103

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pressure Regulator I

2,800.00

No

TOTAL

MATERIAL

No

2,800.00

71.19

2,800.00

Day

150.00

4.50

6.81

154.50

22

LABOUR
0.250

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

649.00

Composite Rates Per

Each

Rs.

3,603.50

Cost Per Each: 3,603.50

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

1,406

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-51-b

(British) :

Each

Providing and Fixing pressure regulator : No. 043

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pressure Regulator II

1,000.00

No

TOTAL

MATERIAL

No

1,000.00

65.22

1,000.00

Day

150.00

4.50

12.78

154.50

22

LABOUR
0.250

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

253.00

Composite Rates Per

Each

Rs.

1,407.50

Cost Per Each: 1,407.50

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

1,407

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-51-c

(British) :

Each

Providing and Fixing pressure regulator : People type

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pressure Regulator III

700.00

No

TOTAL

MATERIAL

700.00

No

61.76

700.00

Day

150.00

4.50

16.24

154.50

22

LABOUR
0.250

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

187.00

Composite Rates Per

Each

Rs.

1,041.50

Cost Per Each: 1,041.50

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

1,408

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-52-a

(British) :

Each

Providing and Fixing high pressure flange type valve : 4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pressure Flanged 100mm

12,500.00

No

TOTAL

MATERIAL

12,500.00

No

71.84

12,500.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Fitter II

0.500

Day

600.00

Day

300.00

16.50

6.16

566.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,871.00

Composite Rates Per

Each

Rs.

15,937.50

Cost Per Each: 15,937.50

Labour Rates Per

Each

Rs.

687.50

Cost Per Each: 687.50

1,409

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-52-b

(British) :

Each

Providing and Fixing high pressure flange type valve : 2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pressure Flanged 50mm

6,500.00

No

TOTAL

MATERIAL

6,500.00

No

72.54

6,500.00

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Fitter II

0.200

Day

600.00

Day

120.00

6.60

5.46

226.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,478.40

Composite Rates Per

Each

Rs.

8,205.00

Cost Per Each: 8,205.00

Labour Rates Per

Each

Rs.

275.00

Cost Per Each: 275.00

1,410

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-52-c

(British) :

Each

Providing and Fixing high pressure flange type valve : 1" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pressure Flanged 25mm

3,200.00

No

TOTAL

MATERIAL

No

3,200.00

72.51

3,200.00

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Fitter II

0.100

Day

600.00

Day

60.00

3.30

5.49

113.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

728.20

Composite Rates Per

Each

Rs.

4,041.50

Cost Per Each: 4,041.50

Labour Rates Per

Each

Rs.

137.50

Cost Per Each: 137.50

1,411

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-53

(British) :

Each

Providing and Fixing nipple or bush 1/4" to 3/8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Nipple Or Bush 6-10mm

20.00

No

TOTAL

MATERIAL

No

20.00

36.59

20.00

Day

21.00

0.63

41.41

21.63

22

9.02

LABOUR
0.030

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

50.65

Cost Per Each: 50.65

Labour Rates Per

Each

Rs.

26.25

Cost Per Each: 26.25

1,412

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-54-a

(British) :

Each

Providing and Fixing eclipse cock : 1" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Eclipse Cock 25mm Dia

850.00

No

TOTAL

MATERIAL

850.00

No

66.41

850.00

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Fitter II

0.100

Day

600.00

Day

60.00

3.30

11.59

113.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

211.20

Composite Rates Per

Each

Rs.

1,174.50

Cost Per Each: 1,174.50

Labour Rates Per

Each

Rs.

137.50

Cost Per Each: 137.50

1,413

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-54-b

(British) :

Each

Providing and Fixing eclipse cock : 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Eclipse Cock 20mm Dia

800.00

No

TOTAL

MATERIAL

800.00

No

65.93

800.00

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Fitter II

0.100

Day

600.00

Day

60.00

3.30

12.07

113.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

200.20

Composite Rates Per

Each

Rs.

1,113.50

Cost Per Each: 1,113.50

Labour Rates Per

Each

Rs.

137.50

Cost Per Each: 137.50

1,414

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-55-a

Item Name :

(British) :

Rft

Providing and Fixing GI pipe & including specials complete 2" dia
(light)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 2"

210.00

RFT

TOTAL

MATERIAL

RFT

210.00

60.17

210.00

LABOUR
Coolie

0.076

Day

500.00

Day

38.11

Plumber II

0.020

Day

700.00

Day

13.66

1.55

17.83

53.32

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

320.91

Labour Rates Per

Rft

Rs.

64.71

LABOUR

57.59

Per Meter : Rs 1,052.59


Per Meter : Rs 212.25

1,415

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-55-b

(British) :

Rft

Providing and Fixing GI pipe & including specials complete 1.5"


dia (light)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 1.5"

160.00

RFT

TOTAL

MATERIAL

RFT

160.00

56.67

160.00

LABOUR
Coolie

0.076

Day

500.00

Day

38.11

Plumber II

0.020

Day

700.00

Day

13.66

1.55

21.33

53.32

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

259.91

Labour Rates Per

Rft

Rs.

64.71

LABOUR

46.59

Per Meter : Rs 852.51


Per Meter : Rs 212.25

1,416

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-55-c

(British) :

Rft

Providing and Fixing GI pipe & including specials complete 1.25"


dia (light)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 1.25"

125.00

RFT

TOTAL

MATERIAL

RFT

125.00

53.04

125.00

LABOUR
Coolie

0.076

Day

500.00

Day

38.11

Plumber II

0.020

Day

700.00

Day

13.66

1.55

24.96

53.32

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

217.21

Labour Rates Per

Rft

Rs.

64.71

LABOUR

38.89

Per Meter : Rs 712.45


Per Meter : Rs 212.25

1,417

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-55-d

Item Name :

(British) :

Rft

Providing and Fixing GI pipe & including specials complete 1"


(light)

Detail

Qty

Unit

dia

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 1"

95.00

RFT

TOTAL

MATERIAL

RFT

95.00

57.25

95.00

LABOUR
Coolie

0.038

Day

500.00

Day

19.21

Plumber II

0.015

Day

700.00

Day

10.24

0.88

20.75

30.33

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

152.71

Labour Rates Per

Rft

Rs.

36.81

LABOUR

27.38

Per Meter : Rs 500.90


Per Meter : Rs 120.75

1,418

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-55-e

(British) :

Rft

Providing and Fixing GI pipe & including specials complete 3/4" dia
(light)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 0.75"

75.00

RFT

TOTAL

MATERIAL

RFT

75.00

53.93

75.00

LABOUR
Coolie

0.038

Day

500.00

Day

19.05

Plumber II

0.015

Day

700.00

Day

10.24

0.88

24.07

30.18

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

128.12

Labour Rates Per

Rft

Rs.

36.62

LABOUR

22.95

Per Meter : Rs 420.25


Per Meter : Rs 120.13

1,419

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-55-f

(British) :

Rft

Providing and Fixing GI pipe & including specials complete 1/2" dia
(light)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 0.5"

50.00

RFT

TOTAL

MATERIAL

RFT

50.00

49.42

50.00

LABOUR
Coolie

0.038

Day

500.00

Day

19.05

Plumber II

0.010

Day

700.00

Day

6.83

0.78

28.58

26.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

93.36

Labour Rates Per

Rft

Rs.

32.36

LABOUR

16.69

Per Meter : Rs 306.21


Per Meter : Rs 106.13

1,420

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-56-a

(British) :

Each

Providing and Fixing oxidized gas cock : 1" dia.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Cock 25mm Dia

500.00

No

TOTAL

MATERIAL

No

500.00

72.82

500.00

Day

15.00

0.45

5.18

15.45

22

LABOUR
0.025

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

628.75

Cost Per Each: 628.75

Labour Rates Per

Each

Rs.

18.75

Cost Per Each: 18.75

113.30

1,421

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-56-b

(British) :

Each

Providing and Fixing oxidized gas cock : 3/4" dia.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Cock 20mm Dia

350.00

No

TOTAL

MATERIAL

No

350.00

71.92

350.00

Day

15.00

0.45

6.08

15.45

22

LABOUR
0.025

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

445.75

Cost Per Each: 445.75

Labour Rates Per

Each

Rs.

18.75

Cost Per Each: 18.75

80.30

1,422

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-56-c

(British) :

Each

Providing and Fixing oxidized gas cock : 1/2" dia.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Cock 13mm Dia

300.00

No

TOTAL

MATERIAL

No

300.00

71.43

300.00

Day

15.00

0.45

6.57

15.45

22

LABOUR
0.025

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

384.75

Cost Per Each: 384.75

Labour Rates Per

Each

Rs.

18.75

Cost Per Each: 18.75

69.30

1,423

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-57-a

(British) :

Each

Providing and Fixing brass gas cock : 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass Gas Cock 13mm Dia

240.00

No

TOTAL

MATERIAL

No

240.00

74.07

240.00

Day

3.00

0.09

3.93

3.09

22

LABOUR
0.005

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

296.55

Cost Per Each: 296.55

Labour Rates Per

Each

Rs.

3.75

Cost Per Each: 3.75

53.46

1,424

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-57-b

(British) :

Each

Providing and Fixing brass gas cock : 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass Gas Cock 20mm Dia

350.00

No

TOTAL

MATERIAL

No

350.00

74.36

350.00

Day

3.00

0.09

3.64

3.09

22

LABOUR
0.005

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

430.75

Cost Per Each: 430.75

Labour Rates Per

Each

Rs.

3.75

Cost Per Each: 3.75

77.66

1,425

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-58-a

(British) :

Each

Providing and Fixing 1/4" CP or oxidized gas cock Single way

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Cock Single Way 6mm

70.00

No

TOTAL

MATERIAL

No

70.00

59.66

70.00

Day

18.00

0.54

18.34

18.54

22

LABOUR
0.030

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

107.90

Cost Per Each: 107.90

Labour Rates Per

Each

Rs.

22.50

Cost Per Each: 22.50

19.36

1,426

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-58-b

(British) :

Each

Providing and Fixing 1/4" CP or oxidized gas cock Two way

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Cock Two Way 6mm

125.00

No

TOTAL

MATERIAL

No

125.00

60.48

125.00

Day

30.00

0.90

17.52

30.90

22

LABOUR
0.050

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

190.00

Cost Per Each: 190.00

Labour Rates Per

Each

Rs.

37.50

Cost Per Each: 37.50

34.10

1,427

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-58-c

(British) :

Each

Providing and Fixing 1/4" CP or oxidized gas cock Three way

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Cock Triple Way 6mm

155.00

No

TOTAL

MATERIAL

No

155.00

57.27

155.00

Day

48.00

1.44

20.73

49.44

22

LABOUR
0.080

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

249.10

Cost Per Each: 249.10

Labour Rates Per

Each

Rs.

60.00

Cost Per Each: 60.00

44.66

1,428

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-59-a

(British) :

Each

Providing and Fixing approved best quality light burners Single

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Sui Gas Single Burner

400.00

No

TOTAL

MATERIAL

400.00

No

30.00

400.00

Day

600.00

18.00

48.00

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

220.00

Composite Rates Per

Each

Rs.

1,238.00

Cost Per Each: 1,238.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,429

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-59-b

(British) :

Each

Providing and Fixing approved best quality light burners Double

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Sui Gas Double Burner

1,000.00

No

TOTAL

MATERIAL

No

1,000.00

46.88

1,000.00

Day

600.00

18.00

31.13

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

352.00

Composite Rates Per

Each

Rs.

1,970.00

Cost Per Each: 1,970.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,430

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-60-a

(British) :

Each

Providing and Fixing approved best quality gas room heaters Single
pannel

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Room Heater Single Panel

850.00

No

TOTAL

43.97

MATERIAL

850.00

No

850.00

Day.

600.00

18.00

34.03

618.00

22

LABOUR
1.000

Fitter II

600.00

Day.

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

319.00

Composite Rates Per

Each

Rs.

1,787.00

Cost Per Each: 1,787.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,431

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-60-b

(British) :

Each

Providing and Fixing approved best quality gas room heaters Double
pannel

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Room Heater Double Panel

1,800.00

No

TOTAL

MATERIAL

No

1,800.00

56.25

1,800.00

Day

600.00

18.00

21.75

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

528.00

Composite Rates Per

Each

Rs.

2,946.00

Cost Per Each: 2,946.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,432

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-61-a

(British) :

Each

Providing and Fixing approved best quality cooking range with 2


burners & oven

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

2 Burner & Oven

12,000.00

No

TOTAL

MATERIAL

12,000.00

No

71.43

12,000.00

Day

600.00

18.00

6.57

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,772.00

Composite Rates Per

Each

Rs.

15,390.00

Cost Per Each: 15,390.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,433

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-61-b

(British) :

Each

Providing and Fixing approved best quality cooking range with 2


burners, oven & rostary

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

2 Burner & Oven Rostary

14,000.00

No

TOTAL

MATERIAL

14,000.00

No

71.92

14,000.00

Day

600.00

18.00

6.08

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,212.00

Composite Rates Per

Each

Rs.

17,830.00

Cost Per Each: 17,830.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,434

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-61-c

(British) :

Each

Providing and Fixing approved best quality cooking range with 3


burners, oven & hot case

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

3 Burner Oven w/ hot case

9,500.00

No

TOTAL

MATERIAL

9,500.00

No

70.54

9,500.00

Day

600.00

18.00

7.46

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,222.00

Composite Rates Per

Each

Rs.

12,340.00

Cost Per Each: 12,340.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,435

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-61-d

(British) :

Each

Providing and Fixing approved best quality cooking range with 3


burners, oven, hot case & roastary

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

3 Burner Oven HCase Roast

12,000.00

No

TOTAL

MATERIAL

12,000.00

No

71.43

12,000.00

Day

600.00

18.00

6.57

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,772.00

Composite Rates Per

Each

Rs.

15,390.00

Cost Per Each: 15,390.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,436

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-61-e

(British) :

Each

Providing and Fixing approved best quality cooking range with 5


burners, oven, hot case & roastary

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

5 Burner Oven HCase Roast

18,000.00

No

TOTAL

MATERIAL

18,000.00

No

72.58

18,000.00

Day

600.00

18.00

5.42

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,092.00

Composite Rates Per

Each

Rs.

22,710.00

Cost Per Each: 22,710.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,437

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-62-a

(British) :

Each

Providing and Fixing approved best quality gas water heaters 20


gallons capacity

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Water Heater 20 gal

12,000.00

No

TOTAL

MATERIAL

12,000.00

No

71.43

12,000.00

Day

600.00

18.00

6.57

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,772.00

Composite Rates Per

Each

Rs.

15,390.00

Cost Per Each: 15,390.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,438

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-62-b

(British) :

Each

Providing and Fixing approved best quality gas water heaters 30


gallons capacity

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Water Heater 30 Gal

15,000.00

No

TOTAL

MATERIAL

15,000.00

No

72.12

15,000.00

Day

600.00

18.00

5.88

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,432.00

Composite Rates Per

Each

Rs.

19,050.00

Cost Per Each: 19,050.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,439

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-62-c

(British) :

Each

Providing and Fixing approved best quality gas water heaters 50


gallons capacity

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Water Heater 50 Gal

20,000.00

No

TOTAL

MATERIAL

20,000.00

No

72.82

20,000.00

Day

600.00

18.00

5.18

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,532.00

Composite Rates Per

Each

Rs.

25,150.00

Cost Per Each: 25,150.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,440

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-63-a

(British) :

Each

Providing and Fixing gas cross burners : 6" Size

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cross Burner 150mm

450.00

No

TOTAL

MATERIAL

No

450.00

64.29

450.00

Day

75.00

2.25

13.71

77.25

22

LABOUR
0.125

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

642.75

Cost Per Each: 642.75

Labour Rates Per

Each

Rs.

93.75

Cost Per Each: 93.75

115.50

1,441

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-63-b

(British) :

Each

Providing and Fixing gas cross burners : 9" Size

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cross Burner 225mm

750.00

No

TOTAL

MATERIAL

750.00

No

68.18

750.00

Day

75.00

2.25

9.82

77.25

22

LABOUR
0.125

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

181.50

Composite Rates Per

Each

Rs.

1,008.75

Cost Per Each: 1,008.75

Labour Rates Per

Each

Rs.

93.75

Cost Per Each: 93.75

1,442

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-63-c

(British) :

Each

Providing and Fixing gas cross burners : 12" Size

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cross Burner 300mm

900.00

No

TOTAL

MATERIAL

900.00

No

69.23

900.00

Day

75.00

2.25

8.77

77.25

22

LABOUR
0.125

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

214.50

Composite Rates Per

Each

Rs.

1,191.75

Cost Per Each: 1,191.75

Labour Rates Per

Each

Rs.

93.75

Cost Per Each: 93.75

1,443

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-64-a

(British) :

Each

Providing and Fixing gas nozzle star burner with injector 12"
nozzle

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Star Burner 300mm

550.00

No

TOTAL

MATERIAL

No

550.00

56.51

550.00

Day

180.00

5.40

21.49

185.40

22

LABOUR
0.300

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

896.00

Cost Per Each: 896.00

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

160.60

1,444

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-64-b

(British) :

Each

Providing and Fixing gas nozzle star burner with injector 18"
nozzle

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Star Burner 450mm

1,120.00

No

TOTAL

MATERIAL

No

1,120.00

64.62

1,120.00

Day

180.00

5.40

13.38

185.40

22

LABOUR
0.300

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

286.00

Composite Rates Per

Each

Rs.

1,591.40

Cost Per Each: 1,591.40

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

1,445

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-64-c

(British) :

Each

Providing and Fixing gas nozzle star burner with injector 24"
nozzle

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Star Burner 600mm

1,450.00

No

TOTAL

MATERIAL

No

1,450.00

66.72

1,450.00

Day

180.00

5.40

11.28

185.40

22

LABOUR
0.300

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

358.60

Composite Rates Per

Each

Rs.

1,994.00

Cost Per Each: 1,994.00

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

1,446

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-64-d

(British) :

Each

Providing and Fixing gas nozzle star burner with injector 32"
nozzle

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Star Burner 900mm

1,700.00

No

TOTAL

MATERIAL

No

1,700.00

67.82

1,700.00

Day

180.00

5.40

10.18

185.40

22

LABOUR
0.300

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

413.60

Composite Rates Per

Each

Rs.

2,299.00

Cost Per Each: 2,299.00

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

1,447

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-65

(British) :

Each

Providing and Fixing flue pipe for gas room heater any type/make

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flue Pipe

40.00

No

TOTAL

MATERIAL

No

40.00

30.00

40.00

Day

60.00

1.80

48.00

61.80

22

LABOUR
0.100

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

123.80

Cost Per Each: 123.80

Labour Rates Per

Each

Rs.

75.00

Cost Per Each: 75.00

22.00

1,448

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-66

(British) :

Each

Providing and Fixing gas twin burners with stand complete Imperial
make

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Twin Burner

1,510.00

No

TOTAL

MATERIAL

No

1,510.00

67.01

1,510.00

Day

180.00

5.40

10.99

185.40

22

LABOUR
0.300

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

371.80

Composite Rates Per

Each

Rs.

2,067.20

Cost Per Each: 2,067.20

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

1,449

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-67

(British) :

Pair

Providing and Fixing angle iron frame wall type brackets for gas
room heater

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

L-iron Frame

235.00

No

TOTAL

MATERIAL

No

235.00

56.85

235.00

Day

75.00

2.25

21.15

77.25

22

LABOUR
0.125

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Pair

Rs.

380.45

Cost Per Pair: 380.45

Labour Rates Per

Pair

Rs.

93.75

Cost Per Pair: 93.75

68.20

1,450

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-68-a

(British) :

Each

Providing and Fixing gas tandoor complete : 24" nozzle

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Burner W Inject 600mm

1,200.00

No

TOTAL

MATERIAL

No

1,200.00

51.43

1,200.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Fitter II

0.500

Day

600.00

Day

300.00

16.50

26.57

566.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

385.00

Composite Rates Per

Each

Rs.

2,151.50

Cost Per Each: 2,151.50

Labour Rates Per

Each

Rs.

687.50

Cost Per Each: 687.50

1,451

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-68-b

(British) :

Each

Providing and Fixing gas tandoor complete : 32" nozzle

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas Burner W Inject 900mm

2,500.00

No

TOTAL

MATERIAL

No

2,500.00

56.39

2,500.00

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Fitter II

0.750

Day

600.00

Day

450.00

24.75

21.61

849.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

731.50

Composite Rates Per

Each

Rs.

4,081.25

Cost Per Each: 4,081.25

Labour Rates Per

Each

Rs.

1,031.25

Cost Per Each: 1,031.25

1,452

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-68-c

(British) :

Each

Providing and Fixing gas tandoor complete : 48" nozzle

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas burner with inject 1200 mm

1,950.00

No

TOTAL

MATERIAL

No

1,950.00

52.70

1,950.00

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Fitter II

0.750

Day

600.00

Day

450.00

24.75

25.30

849.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

610.50

Composite Rates Per

Each

Rs.

3,410.25

Cost Per Each: 3,410.25

Labour Rates Per

Each

Rs.

1,031.25

Cost Per Each: 1,031.25

1,453

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-69-a-01

(British) :

Each

P/F Fibre Glass Water Tank 300 gallons

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 0.75"

9.840

RFT

75.00

RFT

F-Glass Water Tank 300G

1.000

Each

14,000.00

Each

14,000.00

69.35

14,738.00

TOTAL

MATERIAL

738.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Plumber II

1.000

Day

700.00

Day

700.00

36.00

8.65

1,236.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,506.36

Composite Rates Per

Each

Rs.

19,480.36

Cost Per Each: 19,480.36

Labour Rates Per

Each

Rs.

1,500.00

Cost Per Each: 1,500.00

1,454

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-69-a-02

Item Name :

(British) :

Each

P/F Fibre Glass Water Tank 400 gallons

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 1"

9.840

RFT

95.00

RFT

F-Glass Water Tank 400G

1.000

Each

18,000.00

Each

18,000.00

70.53

18,934.80

TOTAL

MATERIAL

934.80

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Plumber II

1.000

Day

700.00

Day

700.00

36.00

7.47

1,236.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,429.66

Composite Rates Per

Each

Rs.

24,600.46

Cost Per Each: 24,600.46

Labour Rates Per

Each

Rs.

1,500.00

Cost Per Each: 1,500.00

1,455

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-69-b-01

(British) :

Each

P/F Polyethylene Water Tank 200 gallons (Horizontal)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 0.75"

9.840

RFT

75.00

RFT

Polyethylene W.Tank 200G

1.000

Each

10,000.00

Each

10,000.00

67.46

10,738.00

TOTAL

MATERIAL

738.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Plumber II

1.000

Day

700.00

Day

700.00

36.00

10.54

1,236.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,626.36

Composite Rates Per

Each

Rs.

14,600.36

Cost Per Each: 14,600.36

Labour Rates Per

Each

Rs.

1,500.00

Cost Per Each: 1,500.00

1,456

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-69-b-02
Supplying and Fixing
(Vertical)

Detail

(British) :

Each

Polyethylene Water Tank 400 gallons

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 0.75"

16.400

RFT

75.00

RFT

1,230.00

Polyethylene W.Tank 400G

1.000

Each

18,000.00

Each

18,000.00

66.22

19,230.00

TOTAL

MATERIAL

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Plumber II

1.500

Day

700.00

Day

1,050.00

76.50

11.78

2,626.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,791.60

Composite Rates Per

Each

Rs.

26,648.10

Cost Per Each: 26,648.10

Labour Rates Per

Each

Rs.

3,187.50

Cost Per Each: 3,187.50

1,457

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-69-b-03

Item Name :

(British) :

Each

P/F Polyethylene Water Tank 500 gallons (Vertical)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 1"

16.400

RFT

95.00

RFT

1,558.00

Polyethylene W.Tank 500G

1.000

Each

22,000.00

Each

22,000.00

67.67

23,558.00

TOTAL

MATERIAL

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Plumber II

1.500

Day

700.00

Day

1,050.00

76.50

10.33

2,626.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,743.76

Composite Rates Per

Each

Rs.

31,928.26

Cost Per Each: 31,928.26

Labour Rates Per

Each

Rs.

3,187.50

Cost Per Each: 3,187.50

1,458

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-69-b-04

Item Name :

(British) :

Each

P/F Polyethylene Water Tank 1000 gallons (Vertical)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 1"

22.960

RFT

95.00

RFT

2,181.20

Polyethylene W.Tank 1000G

1.000

Each

47,000.00

Each

47,000.00

70.15

49,181.20

TOTAL

MATERIAL

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Plumber II

2.000

Day

700.00

Day

1,400.00

102.00

7.85

3,502.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,567.86

Composite Rates Per

Each

Rs.

64,251.06

Cost Per Each: 64,251.06

Labour Rates Per

Each

Rs.

4,250.00

Cost Per Each: 4,250.00

1,459

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-69-b-05

Item Name :

(British) :

Each

P/F Polyethylene Water Tank 1500 gallons (Vertical)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 1"

29.520

RFT

95.00

RFT

2,804.40

Polyethylene W.Tank 1500G

1.000

Each

67,500.00

Each

67,500.00

69.93

70,304.40

TOTAL

MATERIAL

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.00

Plumber II

3.000

Day

700.00

Day

2,100.00

153.00

8.07

5,253.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

16,588.97

Composite Rates Per

Each

Rs.

92,146.37

Cost Per Each: 92,146.37

Labour Rates Per

Each

Rs.

6,375.00

Cost Per Each: 6,375.00

1,460

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-70-a

(British) :

Rft

Providing and Fixing of pipe type B nikasi system including testing


in all respect 110 mm (using dadex, or eq)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
PVC Pipe 110mm

(dadex)

Tee/Reducer etc

1.000

Rft

150.00

Rft

150.00

0.305

No

350.00

No

106.71

TOTAL

MATERIAL

65.64

256.71

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Plumber II

0.030

Day

700.00

Day

21.34

1.10

12.36

37.68

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

358.91

Labour Rates Per

Rft

Rs.

45.73

LABOUR

64.52

Per Meter : Rs 1,177.24


Per Meter : Rs 150.00

1,461

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-70-b

(British) :

Rft

Providing and Fixing of pipe type B nikasi system including testing


in all respect 75 mm (using dadex, or eq)

Item Name :

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Tee Elbow Reducer

0.305

No

300.00

No

91.46

PVC Pipe 75mm

1.000

Rft

95.00

Rft

95.00

62.70

186.46

(dadex)

TOTAL

MATERIAL

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Plumber II

0.030

Day

700.00

Day

21.34

1.10

15.30

37.68

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

273.22

Labour Rates Per

Rft

Rs.

45.73

LABOUR

49.07

Per Meter : Rs 896.15


Per Meter : Rs 150.00

1,462

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-71-a

(British) :

Rft

Providing and Fixing of poly dex high pressure PPR(green including


testing ect complete 25 mm(including all special etc)

Item Name :

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Tee Elbow Union etc

0.305

Ls

200.00

Ls

60.98

PVC Pipe 25mm

1.000

Rft

25.00

Rft

25.00

57.65

85.98

(dadex)

TOTAL

MATERIAL

LABOUR
Coolie

0.038

Day

500.00

Day

19.05

Plumber II

0.010

Day

700.00

Day

6.83

0.78

20.35

26.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

137.25

Labour Rates Per

Rft

Rs.

32.36

LABOUR

24.61

Per Meter : Rs 450.17


Per Meter : Rs 106.13

1,463

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-71-b

(British) :

Rft

Providing and Fixing of poly dex high pressure PPR(green including


testing ect complete 20 mm(including all special etc)

Item Name :

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Tee Elbow Union etc

0.305

Ls

200.00

Ls

60.98

PVC Pipe 20mm

1.000

Rft

15.00

Rft

15.00

55.94

75.98

(dadex)

TOTAL

MATERIAL

LABOUR
Coolie

0.038

Day

500.00

Day

19.05

Plumber II

0.010

Day

700.00

Day

6.83

0.78

22.06

26.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

125.05

Labour Rates Per

Rft

Rs.

32.36

LABOUR

22.41

Per Meter : Rs 410.15


Per Meter : Rs 106.13

1,464

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-72-a

(British) :

20 Rft

Providing of plumbing tape insulation on G.I pipe complete 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plumbing insulation tape

0.305

35.00

No

TOTAL

MATERIAL

No

10.67

23.86

10.67

Day

22.87

0.69

54.14

23.55

22

7.38

LABOUR
Skilled Coolie

0.038

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

41.60

Labour Rates Per

20 Rft

Rs.

28.58

LABOUR

Per Meter : Rs 6.82


Per Meter : Rs 4.69

1,465

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-72-b

(British) :

20 Rft

Providing of plumbing tape insulation on G.I pipe complete 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plumbing insulation tape

0.457

35.00

No

TOTAL

MATERIAL

No

16.01

30.88

16.01

Day

22.87

0.69

47.12

23.55

22

8.55

LABOUR
Skilled Coolie

0.038

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

48.11

Labour Rates Per

20 Rft

Rs.

28.58

LABOUR

Per Meter : Rs 7.89


Per Meter : Rs 4.69

1,466

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-72-c

(British) :

20 Rft

Providing of plumbing tape insulation on G.I pipe complete 1" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plumbing insulation tape

0.610

35.00

No

TOTAL

MATERIAL

No

21.34

36.21

21.34

Day

22.87

0.69

41.79

23.55

22

9.73

LABOUR
Skilled Coolie

0.038

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

54.62

Labour Rates Per

20 Rft

Rs.

28.58

LABOUR

Per Meter : Rs 8.96


Per Meter : Rs 4.69

1,467

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-72-d

(British) :

20 Rft

Providing of plumbing tape insulation on G.I pipe complete 1.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plumbing insulation tape

0.762

35.00

No

TOTAL

MATERIAL

No

26.68

40.38

26.68

Day

22.87

0.69

37.62

23.55

22

LABOUR
Skilled Coolie

0.038

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

61.13

Labour Rates Per

20 Rft

Rs.

28.58

LABOUR

10.90

Per Meter : Rs 10.02


Per Meter : Rs 4.69

1,468

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-72-e

(British) :

20 Rft

Providing of plumbing tape insulation on G.I pipe complete 2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plumbing insulation tape

0.915

35.00

No

TOTAL

MATERIAL

No

32.01

43.75

32.01

Day

22.87

0.69

34.25

23.55

22

LABOUR
Skilled Coolie

0.038

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

67.64

Labour Rates Per

20 Rft

Rs.

28.58

LABOUR

12.07

Per Meter : Rs 11.09


Per Meter : Rs 4.69

1,469

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-72-f

(British) :

20 Rft

Providing of plumbing tape insulation on G.I pipe complete 2.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Plumbing insulation tape

1.067

35.00

No

TOTAL

MATERIAL

No

37.35

46.52

37.35

Day

22.87

0.69

31.48

23.55

22

LABOUR
Skilled Coolie

0.038

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

74.15

Labour Rates Per

20 Rft

Rs.

28.58

LABOUR

13.25

Per Meter : Rs 12.16


Per Meter : Rs 4.69

1,470

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-73-a

(British) :

20 Rft

Providing of thermal insulation of high density (64kg/m3) fiber


glass pipe insulation faced with aluminium foil for chilled/hot
water piping complete 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Thermal Insulation tape

1.000

50.00

No

TOTAL

34.09

MATERIAL

No

50.00

50.00

LABOUR
Skilled Coolie

0.100

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

136.00

Labour Rates Per

20 Rft

Rs.

75.00

LABOUR

No

60.00

1.80

43.91

61.80

22

24.20

Per Meter : Rs 22.30


Per Meter : Rs 12.30

1,471

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-73-b

(British) :

20 Rft

Providing of thermal insulation of high density (64kg/m3) fiber


glass pipe insulation faced with aluminium foil for chilled/hot
water piping complete 3/4" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Thermal Insulation tape

1.070

50.00

No

TOTAL

35.35

MATERIAL

No

53.50

53.50

LABOUR
Skilled Coolie

0.100

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

140.27

Labour Rates Per

20 Rft

Rs.

75.00

LABOUR

No

60.00

1.80

42.65

61.80

22

24.97

Per Meter : Rs 23.00


Per Meter : Rs 12.30

1,472

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-73-c

(British) :

20 Rft

Providing of thermal insulation of high density (64kg/m3) fiber


glass pipe insulation faced with aluminium foil for chilled/hot
water piping complete 1" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Thermal Insulation tape

1.300

50.00

No

TOTAL

39.00

MATERIAL

No

65.00

65.00

LABOUR
Skilled Coolie

0.100

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

154.30

Labour Rates Per

20 Rft

Rs.

75.00

LABOUR

No

60.00

1.80

39.00

61.80

22

27.50

Per Meter : Rs 25.31


Per Meter : Rs 12.30

1,473

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-73-d

(British) :

20 Rft

Providing of thermal insulation of high density (64kg/m3) fiber


glass pipe insulation faced with aluminium foil for chilled/hot
water piping complete 1.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Thermal Insulation tape

1.430

50.00

No

TOTAL

40.78

MATERIAL

No

71.50

71.50

LABOUR
Skilled Coolie

0.100

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

162.23

Labour Rates Per

20 Rft

Rs.

75.00

LABOUR

No

60.00

1.80

37.22

61.80

22

28.93

Per Meter : Rs 26.61


Per Meter : Rs 12.30

1,474

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-73-e

(British) :

20 Rft

Providing of thermal insulation of high density (64kg/m3) fiber


glass pipe insulation faced with aluminium foil for chilled/hot
water piping complete 2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Thermal Insulation tape

1.480

50.00

No

TOTAL

41.42

MATERIAL

No

74.00

74.00

LABOUR
Skilled Coolie

0.100

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

165.28

Labour Rates Per

20 Rft

Rs.

75.00

LABOUR

No

60.00

1.80

36.58

61.80

22

29.48

Per Meter : Rs 27.11


Per Meter : Rs 12.30

1,475

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-73-f

(British) :

20 Rft

Providing of thermal insulation of high density (64kg/m3) fiber


glass pipe insulation faced with aluminium foil for chilled/hot
water piping complete 2.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Thermal Insulation tape

1.720

50.00

No

TOTAL

44.18

MATERIAL

No

86.00

86.00

LABOUR
Skilled Coolie

0.100

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

179.92

Labour Rates Per

20 Rft

Rs.

75.00

LABOUR

No

60.00

1.80

33.82

61.80

22

32.12

Per Meter : Rs 29.51


Per Meter : Rs 12.30

1,476

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-73-g

(British) :

20 Rft

Providing of thermal insulation of high density (64kg/m3) fiber


glass pipe insulation faced with aluminium foil for chilled/hot
water piping complete 3" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Thermal Insulation tape

1.980

50.00

No

TOTAL

46.70

MATERIAL

No

99.00

99.00

LABOUR
Skilled Coolie

0.100

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

20 Rft

Rs.

195.78

Labour Rates Per

20 Rft

Rs.

75.00

LABOUR

No

60.00

1.80

31.30

61.80

22

34.98

Per Meter : Rs 32.11


Per Meter : Rs 12.30

1,477

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-74-a

(British) :

Each

Providing and Fixing Gas water Geyser 30 gallons SG 35 DLX with


imported Thermostat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas water Geyser 30 gallons


"Singer" SG 35 DLX

22,900.00

No

TOTAL

MATERIAL

22,900.00

No

73.09

22,900.00

Day

600.00

18.00

4.91

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,170.00

Composite Rates Per

Each

Rs.

28,688.00

Cost Per Each: 28,688.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,478

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-74-b

(British) :

Each

Providing and Fixing Gas water Geyser 35 gallons SG 35 DLX with


imported Thermostat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Gas water Geyser 35 gallons


"Singer" SG 35 DLX

25,050.00

No

TOTAL

MATERIAL

25,050.00

No

73.25

25,050.00

Day

600.00

18.00

4.75

618.00

22

LABOUR
1.000

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,643.00

Composite Rates Per

Each

Rs.

31,311.00

Cost Per Each: 31,311.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

1,479

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-75-a

(British) :

Each

Providing & Fixing "Singer" Cooking Range Model 307 (3 Burners


Black), Bigger size

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

"Singer" Cooking Range Model


307 (3 Burners Black), Bigger

20,900.00

No

TOTAL

MATERIAL

20,900.00

No

74.47

20,900.00

Day

150.00

4.50

3.53

154.50

22

LABOUR
0.250

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,631.00

Composite Rates Per

Each

Rs.

25,685.50

Cost Per Each: 25,685.50

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

1,480

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-75-b

(British) :

Each

Providing & Fixing "Singer" Cooking Range Model 308 (3 Burners


Black), Smaller size

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

"Singer" Cooking Range Model


308 (3 Burners Black),

20,000.00

No

TOTAL

MATERIAL

20,000.00

No

74.44

20,000.00

Day

150.00

4.50

3.56

154.50

22

LABOUR
0.250

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,433.00

Composite Rates Per

Each

Rs.

24,587.50

Cost Per Each: 24,587.50

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

1,481

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-76

(British) :

Each

Providing & Fixing "Singer" Cooking Range Model 310 (3 Burners


White)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

"Singer" Cooking Range Model


310 (3 Burners White)

21,500.00

No

TOTAL

MATERIAL

21,500.00

No

74.48

21,500.00

Day

150.00

4.50

3.52

154.50

22

LABOUR
0.250

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,763.00

Composite Rates Per

Each

Rs.

26,417.50

Cost Per Each: 26,417.50

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

1,482

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-77

(British) :

Each

Providing & Fixing "Singer" Cooking Range Model 312 (5 Burners),


(Automatic)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

"Singer" Cooking Range Model 3

22,500.00

No

TOTAL

MATERIAL

22,500.00

No

74.50

22,500.00

Day

150.00

4.50

3.50

154.50

22

LABOUR
0.250

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,983.00

Composite Rates Per

Each

Rs.

27,637.50

Cost Per Each: 27,637.50

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

1,483

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-78

(British) :

Each

Supply and Fixing low level plastic flushing cistern.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Rawal Plug Brass

2.000

No

170.00

No

340.00

Rawal Pin

2.000

No

35.00

No

70.00

Plastic Connection 13mm

1.000

No

90.00

No

90.00

Flushing Bend (PVC) 32mm

1.000

No

60.00

No

60.00

Plastic Cistern

1.000

No

150.00

No

150.00

TOTAL

MATERIAL

64.16

710.00

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Plumber II

0.100

Day

700.00

Day

70.00

3.60

13.84

123.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

182.60

Composite Rates Per

Each

Rs.

1,016.20

Cost Per Each: 1,016.20

Labour Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

1,484

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-79-a

Item Name :

(British) :

Each

Supply and fixing of 0.5 HP Monoblock water pump 1.25"x1" single


phase upto 72 ft head (Type SE) i/c all accessories.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

G.I pipe (light) 1.25"

15.000

Rft

125.00

Rft

G.I Bend 1.25" Dia

1.000

No

276.00

No

276.00

G.I Union 1.25" Dia

1.000

No

272.00

No

272.00

G.I Socket 1.25" Dia

2.000

No

104.00

No

208.00

G.I Nipple 1.25" Dia

2.000

No

92.00

No

184.00

G.I Foot Valve 1.25" Dia

1.000

No

650.00

No

650.00

G.I Bend 1" Dia

1.000

No

166.00

No

166.00

G.I Socket 1" Dia

1.000

No

72.00

No

72.00

Pumping set SE 0.5 HP 72 ft he

1.000

No

7,800.00

No

7,800.00

TOTAL

MATERIAL

310.00
1,875.00

72.31

11,813.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

5.69

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,695.66

Composite Rates Per

Each

Rs.

14,961.86

Cost Per Each: 14,961.86

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,485

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-79-b

Item Name :

(British) :

Each

Supply and fixing of 1.0 HP Monoblock water pump 1.25"x1" single


phase upto 90 ft head (Type SE) i/c all accessories.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

G.I pipe (light) 1.25"

15.000

Rft

125.00

Rft

G.I Bend 1.25" Dia

1.000

No

276.00

No

276.00

G.I Union 1.25" Dia

1.000

No

272.00

No

272.00

G.I Socket 1.25" Dia

2.000

No

104.00

No

208.00

G.I Nipple 1.25" Dia

2.000

No

92.00

No

184.00

G.I Foot Valve 1.25" Dia

1.000

No

650.00

No

650.00

G.I Bend 1" Dia

1.000

No

166.00

No

166.00

G.I Socket 1" Dia

1.000

No

72.00

No

72.00

Pumping set SE 1.0 HP 90 ft he

1.000

No

9,500.00

No

9,500.00

TOTAL

MATERIAL

310.00
1,875.00

72.63

13,513.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

5.37

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,069.66

Composite Rates Per

Each

Rs.

17,035.86

Cost Per Each: 17,035.86

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,486

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-79-c

Item Name :

(British) :

Each

Supply and fixing of 1.0 HP Monoblock water pump 1.25"x1" single


phase upto 88 ft head (Type DE-S2) i/c all accessories.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

G.I pipe (light) 1.25"

15.000

Rft

125.00

Rft

G.I Bend 1.25" Dia

1.000

No

276.00

No

276.00

G.I Union 1.25" Dia

1.000

No

272.00

No

272.00

G.I Socket 1.25" Dia

2.000

No

104.00

No

208.00

G.I Nipple 1.25" Dia

2.000

No

92.00

No

184.00

G.I Foot Valve 1.25" Dia

1.000

No

650.00

No

650.00

G.I Bend 1" Dia

1.000

No

166.00

No

166.00

G.I Socket 1" Dia

1.000

No

72.00

No

72.00

Pumping set DE-S2 1.0 HP 88 f

1.000

Day

9,500.00

Day

9,500.00

72.63

13,513.00

TOTAL

MATERIAL

310.00
1,875.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

5.37

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,069.66

Composite Rates Per

Each

Rs.

17,035.86

Cost Per Each: 17,035.86

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,487

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-79-d

Item Name :

(British) :

Each

Supply and fixing of 1.5 HP Monoblock water pump 1.25"x1" single


phase upto 130 ft head (Type DE-S2) i/c all accessories.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

G.I pipe (light) 1.25"

15.000

Rft

125.00

Rft

G.I Bend 1.25" Dia

1.000

No

276.00

No

276.00

G.I Union 1.25" Dia

1.000

No

272.00

No

272.00

G.I Socket 1.25" Dia

2.000

No

104.00

No

208.00

G.I Nipple 1.25" Dia

2.000

No

92.00

No

184.00

G.I Foot Valve 1.25" Dia

1.000

No

650.00

No

650.00

G.I Bend 1" Dia

1.000

No

166.00

No

166.00

G.I Socket 1" Dia

1.000

No

72.00

No

72.00

Pumping set DE-S2 1.5 HP 130 f

1.000

Day

10,500.00

Day

10,500.00

72.79

14,513.00

TOTAL

MATERIAL

310.00
1,875.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

5.21

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,289.66

Composite Rates Per

Each

Rs.

18,255.86

Cost Per Each: 18,255.86

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,488

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-80-a

Item Name :

(British) :

Each

Supply and fixing of 2.0 HP Monoblock water pump 1.5"x1.25" 3


stage model DE-S3 (Deen Pump) single phase for 150 ft head with all
accessories.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 32mm Dia

1.000

No

500.00

No

G.I pipe (light) 1.25"

10.000

Rft

125.00

Rft

1,250.00

G.I pipe (light) 1.5"

15.000

Rft

160.00

Rft

2,400.00

G.I Bend 1.25" Dia

1.000

No

276.00

No

276.00

G.I Socket 1.25" Dia

1.000

No

104.00

No

104.00

G.I Bend 1.5" Dia

1.000

No

369.00

No

369.00

G.I Union 1.5" Dia

1.000

No

369.00

No

369.00

G.I Socket 1.5" Dia

2.000

No

122.00

No

244.00

G.I Nipple 1.5" Dia

2.000

No

129.00

No

258.00

G.I Foot valve 1.5" Dia

1.000

No

650.00

No

650.00

Pumping set SE 2.0 HP 150 ft h

1.000

No

12,500.00

No

12,500.00

TOTAL

MATERIAL

500.00

73.30

18,920.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

4.70

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,259.20

Composite Rates Per

Each

Rs.

23,632.40

Cost Per Each: 23,632.40

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,489

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-80-b

Item Name :

(British) :

Each

Supply and fixing of 2.0 HP Monoblock water pump 1.5"x1.5"


stage model DE-S4 single phase for 190 ft head with all
accessories.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 32mm Dia

1.000

No

500.00

No

G.I pipe (light) 1.25"

10.000

Rft

125.00

Rft

1,250.00

G.I pipe (light) 1.5"

15.000

Rft

160.00

Rft

2,400.00

G.I Bend 1.25" Dia

1.000

No

276.00

No

276.00

G.I Socket 1.25" Dia

1.000

No

104.00

No

104.00

G.I Bend 1.5" Dia

1.000

No

369.00

No

369.00

G.I Union 1.5" Dia

1.000

No

369.00

No

369.00

G.I Socket 1.5" Dia

2.000

No

122.00

No

244.00

G.I Nipple 1.5" Dia

2.000

No

129.00

No

258.00

G.I Foot valve 1.5" Dia

1.000

No

650.00

No

650.00

Pumping set SE 2.0 HP 190 ft h

1.000

No

12,500.00

No

12,500.00

TOTAL

MATERIAL

500.00

73.30

18,920.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

4.70

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,259.20

Composite Rates Per

Each

Rs.

23,632.40

Cost Per Each: 23,632.40

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,490

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-80-c

Item Name :

(British) :

Each

Supply and fixing of 2.0 HP Monoblock water pump 2"x2" size 1


stage SE model single phase for 65 ft head with all accessories and
fittings.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 50 MM Dia

1.000

No

950.00

No

G.I pipe (light) 2"

25.000

Rft

210.00

Rft

5,250.00

G.I Bend 2" Dia

2.000

No

632.00

No

1,264.00

G.I Union 2" Dia

1.000

No

530.00

No

530.00

G.I Socket 2" Dia

3.000

No

203.00

No

609.00

G.I Nipple 2" Dia

2.000

No

203.00

No

406.00

G.I Foot valve 2" Dia

1.000

No

1,850.00

No

1,850.00

Pumping set SE 2.0 HP 65 ft he

1.000

No

12,500.00

No

12,500.00

TOTAL

MATERIAL

950.00

73.61

23,359.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

4.39

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,235.78

Composite Rates Per

Each

Rs.

29,047.98

Cost Per Each: 29,047.98

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,491

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-81-a

Item Name :

(British) :

Each

Supply and fixing of 3.0 HP Monoblock water pump 1.5"x1.5" size 5


stage DE-S5 model single phase for 220 ft head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 32mm Dia

1.000

No

500.00

No

500.00

G.I pipe (light) 1.5"

25.000

Ft

160.00

Ft

4,000.00

G.I Bend 1.5" Dia

2.000

No

369.00

No

738.00

G.I Union 1.5" Dia

1.000

No

369.00

No

369.00

G.I Socket 1.5" Dia

3.000

No

122.00

No

366.00

G.I Nipple 1.5" Dia

2.000

No

129.00

No

258.00

G.I Foot valve 1.5" Dia

1.000

No

650.00

No

650.00

Pumping set SE 3.0 HP 220 ft h

1.000

No

15,500.00

No

15,500.00

TOTAL

MATERIAL

73.55

22,381.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

4.45

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,020.62

Composite Rates Per

Each

Rs.

27,854.82

Cost Per Each: 27,854.82

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,492

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-81-b

Item Name :

(British) :

Each

Supply and fixing of 3.0 HP Monoblock water pump 1.5"x1.25" size


6 stage DE-S6 model single phase for 260 ft head with all
accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

310.00

G.I pipe (light) 1.25"

10.000

Ft

125.00

Ft

1,250.00

G.I pipe (light) 1.5"

15.000

Ft

160.00

Ft

2,400.00

G.I Socket 1.25" Dia

1.000

No

104.00

No

104.00

G.I Bend 1.5" Dia

2.000

No

369.00

No

738.00

G.I Union 1.5" Dia

1.000

No

369.00

No

369.00

G.I Socket 1.5" Dia

2.000

No

122.00

No

244.00

G.I Nipple 1.5" Dia

2.000

No

129.00

No

258.00

G.I Foot valve 1.5" Dia

1.000

No

650.00

No

650.00

Pumping set DE-S6 3.0 HP 260 f

1.000

No

15,500.00

No

15,500.00

TOTAL

MATERIAL

73.52

21,823.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

4.48

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,897.86

Composite Rates Per

Each

Rs.

27,174.06

Cost Per Each: 27,174.06

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,493

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-81-c

Item Name :

(British) :

Each

Supply and fixing of 4.0 HP Monoblock water pump 1.5"x1.25" size


7 stage DN-S7 model single phase for 300 ft head with all
accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

310.00

Ball Valve 32mm Dia

1.000

No

500.00

No

500.00

G.I pipe (light) 1.25"

10.000

Ft

125.00

Ft

1,250.00

G.I pipe (light) 1.5"

15.000

Ft

160.00

Ft

2,400.00

G.I Bend 1.25" Dia

1.000

No

276.00

No

276.00

G.I Socket 1.25" Dia

1.000

No

104.00

No

104.00

G.I Bend 1.5" Dia

1.000

No

369.00

No

369.00

G.I Union 1.5" Dia

1.000

No

369.00

No

369.00

G.I Socket 1.5" Dia

2.000

No

122.00

No

244.00

G.I Nipple 1.5" Dia

2.000

No

129.00

No

258.00

G.I Foot valve 1.5" Dia

1.000

No

650.00

No

650.00

Pumping set DN-S7 4.0 HP 300 f

1.000

No

21,500.00

No

21,500.00

TOTAL

MATERIAL

73.85

28,230.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

4.15

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,307.40

Composite Rates Per

Each

Rs.

34,990.60

Cost Per Each: 34,990.60

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,494

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-81-d

Item Name :

(British) :

Each

Supply and fixing of 3.0 HP Monoblock water pump 2.5"x2" size 2


stage DE-S2 model single phase for 100 ft head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 50 MM Dia

1.000

No

950.00

No

950.00

G.I pipe (light) 2"

10.000

Ft

210.00

Ft

2,100.00

G.I pipe (light) 2.5"

15.000

Ft

275.00

Ft

4,125.00

G.I Socket 2" Dia

1.000

No

203.00

No

203.00

G.I Bend (Delivery) 2" Dia

1.000

No

632.00

No

632.00

G.I Bend 2.5" Dia

1.000

No

1,216.00

No

1,216.00

G.I Union 2.5" Dia

1.000

No

1,136.00

No

1,136.00

G.I Socket 2.5" Dia

2.000

No

389.00

No

778.00

G.I Nipple 2.5" Dia

2.000

No

321.00

No

642.00

G.I Foot Valve 2.5" Dia

1.000

No

2,300.00

No

2,300.00

Pumping set DN-S2 3.0 HP 100 f

1.000

No

16,500.00

No

16,500.00

TOTAL

MATERIAL

73.09

30,582.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.500

Day

900.00

Day

450.00

24.00

4.91

824.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,904.04

Composite Rates Per

Each

Rs.

38,310.04

Cost Per Each: 38,310.04

Labour Rates Per

Each

Rs.

1,000.00

Cost Per Each: 1,000.00

1,495

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-81-e

Item Name :

(British) :

Each

Supply and fixing of 4.0 HP Monoblock water pump 1.5"x2" size 3


stage DN-S3 model single phase for 130 ft head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 50 MM Dia

1.000

No

950.00

No

950.00

G.I pipe (light) 1.5"

15.000

FT

160.00

FT

2,400.00

G.I pipe (light) 2"

10.000

Ft

210.00

Ft

2,100.00

G.I Bend 1.5" Dia

1.000

No

369.00

No

369.00

G.I Union 1.5" Dia

1.000

No

369.00

No

369.00

G.I Socket 1.5" Dia

2.000

No

122.00

No

244.00

G.I Nipple 1.5" Dia

2.000

No

129.00

No

258.00

G.I Foot valve 1.5" Dia

1.000

No

650.00

No

650.00

G.I Bend 2" Dia

1.000

No

632.00

No

632.00

G.I Socket 2" Dia

1.000

No

203.00

No

203.00

Pumping set DN-S3 4.0 HP 130 f

1.000

No

21,500.00

No

21,500.00

TOTAL

MATERIAL

73.90

29,675.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

4.10

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,625.30

Composite Rates Per

Each

Rs.

36,753.50

Cost Per Each: 36,753.50

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,496

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-81-f

Item Name :

(British) :

Each

Supply and fixing of 4.0 HP Monoblock water pump 1.5"x2" size 4


stage DN-S4 model single phase for 160 ft head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 50 MM Dia

1.000

No

950.00

No

950.00

G.I pipe (light) 1.5"

15.000

FT

160.00

FT

2,400.00

G.I pipe (light) 2"

10.000

Ft

210.00

Ft

2,100.00

G.I Bend 1.5" Dia

1.000

No

369.00

No

369.00

G.I Union 1.5" Dia

1.000

No

369.00

No

369.00

G.I Socket 1.5" Dia

2.000

No

122.00

No

244.00

G.I Nipple 1.5" Dia

2.000

No

129.00

No

258.00

G.I Foot valve 1.5" Dia

1.000

No

650.00

No

650.00

G.I Bend 2" Dia

1.000

No

632.00

No

632.00

G.I Socket 2" Dia

1.000

No

203.00

No

203.00

Pumping set DN-S4 4.0 HP 150 f

1.000

No

21,500.00

No

21,500.00

TOTAL

MATERIAL

73.03

29,675.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.500

Day

900.00

Day

450.00

24.00

4.97

824.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,704.50

Composite Rates Per

Each

Rs.

37,203.50

Cost Per Each: 37,203.50

Labour Rates Per

Each

Rs.

1,000.00

Cost Per Each: 1,000.00

1,497

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-81-g

Item Name :

(British) :

Each

Supply and fixing of 3.0 HP Monoblock water pump 3"x3" size 1


stage P.P model single phase for 60 ft head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 50 MM Dia

1.000

No

950.00

No

950.00

G.I pipe (light) 2.5"

10.000

Ft

275.00

Ft

2,750.00

G.I pipe (light) 3"

10.000

Ft

325.00

Ft

3,250.00

G.I Bend 3" Dia

1.000

No

1,701.00

No

1,701.00

G.I Union 3" Dia

1.000

No

1,509.00

No

1,509.00

G.I Socket 3" Dia

2.000

No

646.00

No

1,292.00

G.I Nipple 3" Dia

2.000

No

591.00

No

1,182.00

G.I Foot Valve 3" Dia

1.000

No

3,300.00

No

3,300.00

G.I Bend (delivery) 3" Dia

1.000

No

1,701.00

No

1,701.00

Socket (delivery) 3" Dia G.I

1.000

No

646.00

No

646.00

Pumping set P.P 3.0 HP 60 ft h

1.000

No

16,500.00

No

16,500.00

TOTAL

MATERIAL

74.06

34,781.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

3.94

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

7,748.62

Composite Rates Per

Each

Rs.

42,982.82

Cost Per Each: 42,982.82

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,498

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-81-h

Item Name :

(British) :

Each

Supply and fixing of 4.0 HP Monoblock water pump 3"x2.5" size


1stage P.P model single phase for 60 ft head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 50 MM Dia

1.000

No

950.00

No

950.00

G.I pipe (light) 2.5"

10.000

Ft

275.00

Ft

2,750.00

G.I pipe (light) 3"

15.000

Ft

325.00

Ft

4,875.00

G.I Socket 2" Dia

1.000

No

203.00

No

203.00

G.I Bend (Delivery) 2" Dia

1.000

No

632.00

No

632.00

G.I Bend 3" Dia

1.000

No

1,701.00

No

1,701.00

G.I Union 3" Dia

1.000

No

1,509.00

No

1,509.00

G.I Socket 3" Dia

2.000

No

646.00

No

1,292.00

G.I Nipple 3" Dia

2.000

No

591.00

No

1,182.00

G.I Foot Valve 3" Dia

1.000

No

3,300.00

No

3,300.00

Pumping set P.P 4.0 HP 60 ft h

1.000

No

16,500.00

No

16,500.00

TOTAL

MATERIAL

74.07

34,894.00

LABOUR
Plumber II

0.500

Day

700.00

Day

350.00

Electrician I

0.100

Day

900.00

Day

90.00

13.20

3.93

453.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

7,773.48

Composite Rates Per

Each

Rs.

43,120.68

Cost Per Each: 43,120.68

Labour Rates Per

Each

Rs.

550.00

Cost Per Each: 550.00

1,499

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-82-a

Item Name :

(British) :

Each

Supply and fixing of 1.0 HP Deep well water pump 1"x1" size 1stage
Jet S-1 model single phase for 60 ft suction and upto 60 ft head
with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

G.I pipe (light) 1"

25.000

Rft

95.00

Rft

G.I Bend 1" Dia

2.000

No

166.00

No

332.00

G.I Socket 1" Dia

5.000

No

72.00

No

360.00

1.000

No

8,500.00

No

8,500.00

G.I Union 1" Dia

2.000

No

190.00

No

380.00

G.I Nipple

2.000

No

70.00

No

140.00

1.000

No

450.00

No

450.00

Pumping set 1.0 HP Jet S-1

1" Dia

G.I Foot Valve 1" Dia

TOTAL

MATERIAL

310.00
2,375.00

66.01

12,847.00

LABOUR
Skilled Coolie

1.000

Day

600.00

Day

600.00

Plumber II

1.000

Day

700.00

Day

700.00

Electrician I

0.500

Day

900.00

Day

450.00

52.50

11.99

1,802.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,211.34

Composite Rates Per

Each

Rs.

17,860.84

Cost Per Each: 17,860.84

Labour Rates Per

Each

Rs.

2,187.50

Cost Per Each: 2,187.50

1,500

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-82-b

Item Name :

(British) :

Each

Supply and fixing of 2.0 HP Deep well water pump 1"x1" size 2
stage Jet S-2 model single phase for 80 ft suction and upto 80 ft
head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

G.I pipe (light) 1"

25.000

Rft

95.00

Rft

G.I Bend 1" Dia

2.000

No

166.00

No

332.00

G.I Socket 1" Dia

5.000

No

72.00

No

360.00

1.000

No

14,000.00

No

14,000.00

G.I Union 1" Dia

2.000

No

190.00

No

380.00

G.I Nipple

2.000

No

70.00

No

140.00

1.000

No

450.00

No

450.00

Pumping set 2.0 HP Jet S-2

1" Dia

G.I Foot Valve 1" Dia

TOTAL

MATERIAL

310.00
2,375.00

68.47

18,347.00

LABOUR
Skilled Coolie

1.000

Day

600.00

Day

600.00

Plumber II

1.000

Day

700.00

Day

700.00

Electrician I

0.500

Day

900.00

Day

450.00

52.50

9.53

1,802.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,421.34

Composite Rates Per

Each

Rs.

24,570.84

Cost Per Each: 24,570.84

Labour Rates Per

Each

Rs.

2,187.50

Cost Per Each: 2,187.50

1,501

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-82-c

Item Name :

(British) :

Each

Supply and fixing of 3.0 HP Deep well water pump 1"x1" size 3
stage Jet S-3 model single phase for 120 ft suction and upto 120 ft
head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

G.I pipe (light) 1"

25.000

Rft

95.00

Rft

G.I Bend 1" Dia

2.000

No

166.00

No

332.00

G.I Socket 1" Dia

5.000

No

72.00

No

360.00

1.000

No

18,000.00

No

18,000.00

G.I Union 1" Dia

2.000

No

190.00

No

380.00

G.I Nipple

2.000

No

70.00

No

140.00

1.000

No

450.00

No

450.00

Pumping set 3.0 HP Jet S-3

12

1" Dia

G.I Foot Valve 1" Dia

TOTAL

MATERIAL

310.00
2,375.00

69.55

22,347.00

LABOUR
Skilled Coolie

1.000

Day

600.00

Day

600.00

Plumber II

1.000

Day

700.00

Day

700.00

Electrician I

0.500

Day

900.00

Day

450.00

52.50

8.45

1,802.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,301.34

Composite Rates Per

Each

Rs.

29,450.84

Cost Per Each: 29,450.84

Labour Rates Per

Each

Rs.

2,187.50

Cost Per Each: 2,187.50

1,502

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

14-82-d

Item Name :

(British) :

Each

Supply and fixing of 4.0 HP Deep well water pump 1"x1" size 4
stage Jet S-4 model single phase for 160 ft suction and upto 160 ft
head with all accessories

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ball Valve 25mm Dia

1.000

No

310.00

No

G.I pipe (light) 1"

25.000

Rft

95.00

Rft

G.I Bend 1" Dia

2.000

No

166.00

No

332.00

G.I Socket 1" Dia

5.000

No

72.00

No

360.00

1.000

No

17,000.00

No

17,000.00

G.I Union 1" Dia

2.000

No

190.00

No

380.00

G.I Nipple

2.000

No

70.00

No

140.00

1.000

No

450.00

No

450.00

Pumping set 4.0 HP Jet S-4

16

1" Dia

G.I Foot Valve 1" Dia

TOTAL

MATERIAL

310.00
2,375.00

69.32

21,347.00

LABOUR
Skilled Coolie

1.000

Day

600.00

Day

600.00

Plumber II

1.000

Day

700.00

Day

700.00

Electrician I

0.500

Day

900.00

Day

450.00

52.50

8.68

1,802.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,081.34

Composite Rates Per

Each

Rs.

28,230.84

Cost Per Each: 28,230.84

Labour Rates Per

Each

Rs.

2,187.50

Cost Per Each: 2,187.50

1,503

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 14 , PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

14-83

(British) :

Each

Providing & Fixing Solar Geysers 35 gallons capacity (a product of


Enercon, National Energy Conservation Centre Islamabad)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Solar Geyser 35 gallson capaci

1.000

No

25,000.00

No

25,000.00

Additional accessories

1.000

No

3,000.00

No

3,000.00

TOTAL

MATERIAL

71.67

28,000.00

LABOUR
Skilled Coolie

1.000

Day

600.00

Day

600.00

Plumber II

1.000

Day

700.00

Day

700.00

39.00

6.33

1,339.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,446.00

Composite Rates Per

Each

Rs.

35,785.00

Cost Per Each: 35,785.00

Labour Rates Per

Each

Rs.

1,625.00

Cost Per Each: 1,625.00

1,504

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-a-01

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp. On


surface including clamps etc: 1/2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
MS Conduit I

1.000

RFT

20.00

RFT

20.00

Inspection Box

0.030

No

30.00

No

0.91

Clamp For Pipe

0.305

No

7.00

No

2.13

MATERIAL

50.81

23.05

Day

10.98

0.33

27.19

11.30

22

7.49

TOTAL

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

41.84

Labour Rates Per

Rft

Rs.

13.72

LABOUR

Per Meter : Rs 137.23


Per Meter : Rs 45.00

1,505

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-a-02

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp. On


surface including clamps etc: 3/4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clamp For Pipe

0.305

No

7.00

No

2.13

MS Conduit II

1.000

RFT

25.00

RFT

25.00

Inspection Box

0.030

No

60.00

No

1.83

TOTAL

MATERIAL

54.39

28.96

Day

10.98

0.33

23.61

11.30

22

8.79

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

49.05

Labour Rates Per

Rft

Rs.

13.72

LABOUR

Per Meter : Rs 160.90


Per Meter : Rs 45.00

1,506

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-a-03

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp. On


surface including clamps etc: 1" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clamp For Pipe

0.305

No

7.00

No

2.13

MS Conduit III

1.000

RFT

35.00

RFT

35.00

Inspection Box

0.030

No

60.00

No

1.83

TOTAL

MATERIAL

58.52

38.96

Day

10.98

0.33

19.48

11.30

22

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

61.25

Labour Rates Per

Rft

Rs.

13.72

LABOUR

10.99

Per Meter : Rs 200.92


Per Meter : Rs 45.00

1,507

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-a-04

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp. On


surface including clamps etc: 1.25" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clamp For Pipe

0.305

No

7.00

No

2.13

MS Conduit IV

1.000

RFT

40.00

RFT

40.00

Inspection Box

0.030

No

60.00

No

1.83

TOTAL

60.02

MATERIAL

43.96

LABOUR
0.012

Electrician I

900.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

67.35

Labour Rates Per

Rft

Rs.

13.72

LABOUR

No

10.98

0.33

17.98

11.30

22

12.09

Per Meter : Rs 220.92


Per Meter : Rs 45.00

1,508

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-a-05

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp. On


surface including clamps etc: 1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clamp For Pipe

0.305

No

7.00

No

2.13

Inspection Box

0.030

No

60.00

No

1.83

MS Conduit V

1.000

RFT

45.00

RFT

45.00

61.27

48.96

Day

10.98

0.33

16.73

11.30

22

TOTAL

MATERIAL

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

73.45

Labour Rates Per

Rft

Rs.

13.72

LABOUR

13.19

Per Meter : Rs 240.93


Per Meter : Rs 45.00

1,509

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-a-06

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp. On


surface including clamps etc: 2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Inspection Box

0.030

No

75.00

No

2.29

MS Conduit VI

1.000

RFT

60.00

RFT

60.00

PVC Conduit II

0.305

No

15.00

No

4.57

TOTAL

MATERIAL

64.42

66.86

Day

10.98

0.33

13.58

11.30

22

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

95.29

Labour Rates Per

Rft

Rs.

13.72

LABOUR

17.12

Per Meter : Rs 312.55


Per Meter : Rs 45.00

1,510

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-b-01

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp.


Recessed in walls including chase etc : 1/2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

MS Conduit I

1.000

RFT

20.00

RFT

20.00

Inspection Box

0.030

No

30.00

No

0.91

Clamp For Pipe

0.305

No

7.00

No

2.13

MATERIAL

52.91

65.73

Day

27.44

0.82

25.09

28.26

22

TOTAL

LABOUR
0.030

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

114.49

Labour Rates Per

Rft

Rs.

34.30

LABOUR

20.50

Per Meter : Rs 375.53


Per Meter : Rs 112.50

1,511

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-b-02

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp.


Recessed in walls including chase etc : 3/4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamp For Pipe

0.305

No

7.00

No

2.13

MS Conduit II

1.000

RFT

25.00

RFT

25.00

Inspection Box

0.030

No

60.00

No

1.83

TOTAL

MATERIAL

54.23

71.65

Day

27.44

0.82

23.77

28.26

22

LABOUR
0.030

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

121.71

Labour Rates Per

Rft

Rs.

34.30

LABOUR

21.80

Per Meter : Rs 399.20


Per Meter : Rs 112.50

1,512

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-b-03

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp.


Recessed in walls including chase etc : 1" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamp For Pipe

0.305

No

7.00

No

2.13

MS Conduit III

1.000

RFT

35.00

RFT

35.00

Inspection Box

0.030

No

60.00

No

1.83

TOTAL

MATERIAL

56.13

81.65

Day

27.44

0.82

21.87

28.26

22

LABOUR
0.030

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

133.91

Labour Rates Per

Rft

Rs.

34.30

LABOUR

24.00

Per Meter : Rs 439.22


Per Meter : Rs 112.50

1,513

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-b-04

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp.


Recessed in walls including chase etc : 1.25" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamp For Pipe

0.305

No

7.00

No

2.13

MS Conduit IV

1.000

RFT

40.00

RFT

40.00

Inspection Box

0.030

No

60.00

No

1.83

TOTAL

MATERIAL

56.96

86.65

Day

27.44

0.82

21.04

28.26

22

LABOUR
0.030

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

140.01

Labour Rates Per

Rft

Rs.

34.30

LABOUR

25.10

Per Meter : Rs 459.22


Per Meter : Rs 112.50

1,514

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-b-05

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp.


Recessed in walls including chase etc : 1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamp For Pipe

0.305

No

7.00

No

2.13

Inspection Box

0.030

No

60.00

No

1.83

MS Conduit V

1.000

RFT

45.00

RFT

45.00

57.72

91.65

Day

27.44

0.82

20.28

28.26

22

TOTAL

MATERIAL

LABOUR
0.030

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

146.11

Labour Rates Per

Rft

Rs.

34.30

LABOUR

26.20

Per Meter : Rs 479.23


Per Meter : Rs 112.50

1,515

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-01-b-06

(British) :

Rft

Supply and Erection MS conduit pipe for wiring purpose comp.


Recessed in walls including chase etc : 2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamp For Pipe

0.305

No

7.00

No

2.13

MS Conduit VI

1.000

RFT

60.00

RFT

60.00

Inspection Box

0.030

No

45.00

No

1.37

TOTAL

MATERIAL

59.60

106.19

Day

27.44

0.82

18.40

28.26

22

LABOUR
0.030

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

163.85

Labour Rates Per

Rft

Rs.

34.30

LABOUR

29.40

Per Meter : Rs 537.43


Per Meter : Rs 112.50

1,516

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-a-01

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1/2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
PVC Conduit I

1.000

RFT

15.00

RFT

15.00

Inspection Box

0.030

No

12.00

No

0.37

Clamp For Pipe

0.305

No

10.00

No

3.05

TOTAL

MATERIAL

57.78

18.41

Day

5.49

0.16

20.22

5.65

22

LABOUR
0.006

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

29.33

Labour Rates Per

Rft

Rs.

6.86

LABOUR

5.26

Per Meter : Rs 96.19


Per Meter : Rs 22.50

1,517

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-a-02

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 3/4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clamp For Pipe

0.305

No

7.00

No

2.13

PVC Conduit II

1.000

No

15.00

No

15.00

Inspection Box

0.030

No

15.00

No

0.46

TOTAL

MATERIAL

57.17

17.59

Day

5.49

0.16

20.83

5.65

22

LABOUR
0.006

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

28.32

Labour Rates Per

Rft

Rs.

6.86

LABOUR

5.08

Per Meter : Rs 92.89


Per Meter : Rs 22.50

1,518

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-a-03

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clamp For Pipe

0.305

No

7.00

No

2.13

Inspection Box

0.030

No

15.00

No

0.46

PVC Conduit III

1.000

RFT

20.00

RFT

20.00

60.34

22.59

Day

5.49

0.16

17.66

5.65

22

TOTAL

MATERIAL

LABOUR
0.006

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

34.42

Labour Rates Per

Rft

Rs.

6.86

LABOUR

6.18

Per Meter : Rs 112.90


Per Meter : Rs 22.50

1,519

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-a-04

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1.25" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Inspection Box

0.030

No

30.00

No

0.91

Clamp For Pipe

0.305

No

7.00

No

2.13

PVC Conduit IV

1.000

RFT

22.00

RFT

22.00

56.67

25.05

Day

8.10

0.24

21.33

8.34

22

TOTAL

MATERIAL

LABOUR
0.009

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

40.68

Labour Rates Per

Rft

Rs.

10.12

LABOUR

7.29

Per Meter : Rs 133.45


Per Meter : Rs 33.21

1,520

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-a-05

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clamp For Pipe

0.305

No

7.00

No

2.13

Inspection Box

0.030

No

32.00

No

0.98

PVC Conduit V

1.000

RFT

30.00

RFT

30.00

56.33

33.11

Day

10.98

0.33

21.67

11.30

22

9.70

TOTAL

MATERIAL

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

54.11

Labour Rates Per

Rft

Rs.

13.72

LABOUR

Per Meter : Rs 177.49


Per Meter : Rs 45.00

1,521

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-a-06

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
MS Conduit VI

1.000

RFT

25.00

RFT

25.00

Inspection Box

0.030

No

8.00

No

0.24

Clamp For Pipe

0.305

No

10.00

No

3.05

TOTAL

MATERIAL

60.13

28.29

Day

7.00

0.21

17.87

7.21

22

LABOUR
0.008

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

43.26

Labour Rates Per

Rft

Rs.

8.75

LABOUR

7.76

Per Meter : Rs 141.90


Per Meter : Rs 28.69

1,522

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-a-07

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Inspection Box

0.030

No

60.00

No

1.83

Clamps For Pipe

0.305

No

11.00

No

3.35

PVC Conduit VII

1.000

RFT

45.00

RFT

45.00

64.28

50.18

Day

8.37

0.25

13.72

8.62

22

TOTAL

MATERIAL

LABOUR
0.009

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

71.68

Labour Rates Per

Rft

Rs.

10.46

LABOUR

12.88

Per Meter : Rs 235.12


Per Meter : Rs 34.31

1,523

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-a-08

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete On surface
including clamps etc: 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
PVC Conduit VIII

1.000

RFT

55.00

RFT

55.00

Inspection Box

0.030

No

60.00

No

1.83

Clamp For Pipe

0.305

NO

10.00

NO

3.05

TOTAL

MATERIAL

63.54

59.88

Day

10.80

0.32

14.46

11.12

22

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

86.55

Labour Rates Per

Rft

Rs.

13.50

LABOUR

15.55

Per Meter : Rs 283.89


Per Meter : Rs 44.28

1,524

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-b-01

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete Recessed
in walls including chase etc : 1/2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
PVC Conduit I

1.000

RFT

15.00

RFT

15.00

Inspection Box

0.030

No

12.00

No

0.37

Clamp For Pipe

0.305

NO

10.00

NO

3.05

TOTAL

MATERIAL

39.60

18.41

Day

16.46

0.49

38.40

16.96

22

7.67

LABOUR
0.018

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

43.05

Labour Rates Per

Rft

Rs.

20.58

LABOUR

Per Meter : Rs 141.19


Per Meter : Rs 67.50

1,525

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-b-02

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete Recessed
in walls including chase etc : 3/4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamp For Pipe

0.305

NO

7.00

NO

2.13

PVC Conduit II

1.000

RFT

15.00

RFT

15.00

Inspection Pipe

0.030

No

15.00

No

0.46

TOTAL

MATERIAL

58.91

60.27

Day

16.46

0.49

19.09

16.96

22

LABOUR
0.018

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

94.11

Labour Rates Per

Rft

Rs.

20.58

LABOUR

16.88

Per Meter : Rs 308.69


Per Meter : Rs 67.50

1,526

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-b-03

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete Recessed
in walls including chase etc : 1" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Inspection Box

0.030

NO

30.00

NO

0.91

Clamp For Pipe

0.305

NO

7.00

NO

2.13

PVC Conduit III

1.000

RFT

20.00

RFT

20.00

59.98

65.73

Day

16.46

0.49

18.02

16.96

22

TOTAL

MATERIAL

LABOUR
0.018

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

100.77

Labour Rates Per

Rft

Rs.

20.58

LABOUR

18.08

Per Meter : Rs 330.53


Per Meter : Rs 67.50

1,527

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-b-04

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete Recessed
in walls including chase etc : 1.25" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.70

Clamp For Pipe

0.305

No

7.00

No

2.13

Inspection Box

0.030

No

45.00

No

1.35

PVC Conduit IV

1.000

RFT

22.00

RFT

22.00

60.41

68.18

Day

16.46

0.49

17.59

16.96

22

TOTAL

MATERIAL

LABOUR
0.018

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

103.76

Labour Rates Per

Rft

Rs.

20.58

LABOUR

18.62

Per Meter : Rs 340.35


Per Meter : Rs 67.50

1,528

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-b-05

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete Recessed
in walls including chase etc : 1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamp For Pipe

0.305

No

7.00

No

2.13

Inspection Box

0.030

No

60.00

No

1.83

PVC Conduit V

1.000

RFT

30.00

RFT

30.00

58.30

76.65

Day

21.95

0.66

19.70

22.61

22

TOTAL

MATERIAL

LABOUR
0.024

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

120.95

Labour Rates Per

Rft

Rs.

27.44

LABOUR

21.69

Per Meter : Rs 396.71


Per Meter : Rs 90.00

1,529

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-b-06

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete Recessed
in walls including chase etc : 2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamp For Pipe

0.305

No

7.00

No

2.13

Inspection Box

0.030

No

60.00

No

1.83

MS Conduit VI

1.000

RFT

25.00

RFT

25.00

54.23

71.65

Day.

27.44

0.82

23.77

28.26

22

TOTAL

MATERIAL

LABOUR
0.030

Electrician I

900.00

Day.

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

121.71

Labour Rates Per

Rft

Rs.

34.30

LABOUR

21.80

Per Meter : Rs 399.20


Per Meter : Rs 112.50

1,530

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-b-07

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete Recessed
in walls including chase etc : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Inspection Box

0.030

No

60.00

No

1.83

PVC Conduit VII

1.000

RFT

45.00

RFT

45.00

Clamp For Pipe

0.305

No

12.00

No

3.66

TOTAL

MATERIAL

55.42

93.17

Day

32.93

0.99

22.58

33.91

22

LABOUR
0.037

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

154.83

Labour Rates Per

Rft

Rs.

41.16

LABOUR

27.74

Per Meter : Rs 507.83


Per Meter : Rs 135.00

1,531

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-02-b-08

(British) :

Rft

Supply and Erection PVC pipe for wiring purpose complete Recessed
in walls including chase etc : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous I

0.305

LS

140.00

LS

42.68

Clamps For Pipe

0.305

No

11.00

No

3.35

PVC Conduit VIII

1.000

RFT

55.00

RFT

55.00

Inspection Box

0.030

No

60.00

No

1.83

TOTAL

MATERIAL

53.57

102.87

Day

41.16

1.23

24.43

42.39

22

LABOUR
0.046

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

176.94

Labour Rates Per

Rft

Rs.

51.45

LABOUR

31.69

Per Meter : Rs 580.38


Per Meter : Rs 168.75

1,532

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-03-a

(British) :

Rft

Supply and Erection GI flexible pipe for wiring purpose complete


1/2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Flexible Pipe 1/2"

25.00

RFT

TOTAL

MATERIAL

RFT

25.00

59.55

25.00

LABOUR
Electrician I

0.006

Day

900.00

Day

5.49

Welder I

0.001

Day

1,000.00

Day

1.00

0.19

18.45

6.68

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

38.61

Labour Rates Per

Rft

Rs.

8.11

LABOUR

6.93

Per Meter : Rs 126.64


Per Meter : Rs 26.60

1,533

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-03-b

(British) :

Rft

Supply and Erection GI flexible pipe for wiring purpose complete


3/4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Flexible Pipe 3/4"

35.00

RFT

TOTAL

MATERIAL

RFT

35.00

63.41

35.00

LABOUR
Electrician I

0.006

Day

900.00

Day

5.40

Welder I

0.001

Day

1,000.00

Day

1.00

0.19

14.59

6.59

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

50.70

Labour Rates Per

Rft

Rs.

8.00

LABOUR

9.11

Per Meter : Rs 166.30


Per Meter : Rs 26.24

1,534

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-03-c

(British) :

Rft

Supply and Erection GI flexible pipe for wiring purpose complete 1"
i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Flexible Pipe 1"

30.00

RFT

TOTAL

MATERIAL

RFT

30.00

54.88

30.00

LABOUR
Electrician I

0.010

Day

900.00

Day

9.00

Welder I

0.002

Day

1,000.00

Day

2.00

0.33

23.12

11.33

22

9.02

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

50.35

Labour Rates Per

Rft

Rs.

13.75

LABOUR

Per Meter : Rs 165.15


Per Meter : Rs 45.10

1,535

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-03-d

(British) :

Rft

Supply and Erection GI flexible pipe for wiring purpose complete


1.25" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Flexible Pipe 1.25"

45.00

RFT

TOTAL

MATERIAL

RFT

45.00

59.31

45.00

LABOUR
Electrician I

0.011

Day

900.00

Day

9.90

Welder I

0.002

Day

1,000.00

Day

2.00

0.36

18.69

12.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

69.77

Labour Rates Per

Rft

Rs.

14.87

LABOUR

12.52

Per Meter : Rs 228.86


Per Meter : Rs 48.79

1,536

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-03-e

(British) :

Rft

Supply and Erection GI flexible pipe for wiring purpose complete


1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Flexible Pipe 1.5"

50.00

RFT

TOTAL

MATERIAL

RFT

50.00

60.58

50.00

LABOUR
Electrician I

0.011

Day

900.00

Day

9.90

Welder I

0.002

Day

1,000.00

Day

2.00

0.36

17.42

12.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

75.87

Labour Rates Per

Rft

Rs.

14.87

LABOUR

13.62

Per Meter : Rs 248.87


Per Meter : Rs 48.79

1,537

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-03-f

(British) :

Rft

Supply and Erection GI flexible pipe for wiring purpose complete 2"
i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Flexible Pipe 2"

65.00

RFT

TOTAL

MATERIAL

RFT

65.00

57.60

65.00

LABOUR
Electrician I

0.017

Day

900.00

Day

15.37

Welder I

0.004

Day

1,000.00

Day

4.27

0.59

20.40

20.22

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

103.84

Labour Rates Per

Rft

Rs.

24.54

LABOUR

18.62

Per Meter : Rs 340.60


Per Meter : Rs 80.50

1,538

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-03-g

(British) :

Rft

Supply and Erection GI flexible pipe for wiring purpose complete 3"
i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Flexible Pipe 3"

30.00

RFT

TOTAL

MATERIAL

RFT

30.00

44.82

30.00

LABOUR
Electrician I

0.018

Day

900.00

Day

16.20

Welder I

0.004

Day

1,000.00

Day

4.00

0.61

33.18

20.81

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

61.85

Labour Rates Per

Rft

Rs.

25.25

LABOUR

11.04

Per Meter : Rs 202.87


Per Meter : Rs 82.82

1,539

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-04-a

(British) :

Rft

Supply and Erection Sahl wood strip batten for wiring complete 1/2"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Batten 1/2"

1.000

RFT

5.00

RFT

5.00

Clips

0.015

Pkt

7.00

Pkt

0.11

Nails

0.002

Kg

150.00

Kg

0.31

TOTAL

MATERIAL

51.18

5.41

Day

2.52

0.08

26.82

2.60

22

LABOUR
0.003

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

9.75

Labour Rates Per

Rft

Rs.

3.15

LABOUR

1.75

Per Meter : Rs 31.99


Per Meter : Rs 10.33

1,540

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-04-b

(British) :

Rft

Supply and Erection Sahl wood strip batten for wiring complete 3/4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.002

Kg

150.00

Kg

0.28

Sahl Wood Batten 3/4"

1.000

RFT

7.00

RFT

7.00

Clips

0.015

Pkt

7.00

Pkt

0.11

MATERIAL

55.92

7.39

Day

2.52

0.08

22.08

2.60

22

TOTAL

LABOUR
0.003

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

12.16

Labour Rates Per

Rft

Rs.

3.15

LABOUR

2.18

Per Meter : Rs 39.88


Per Meter : Rs 10.33

1,541

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-04-c

Item Name :

(British) :

Rft

Supply and Erection Sahl wood strip batten for wiring complete 1"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Nails

0.002

Kg

150.00

Kg

0.31

Sahl Wood Batten 1"

1.000

RFT

15.00

RFT

15.00

Clips

0.015

Pkt

5.00

Pkt

0.08

MATERIAL

64.44

15.38

Day

2.52

0.08

13.56

2.60

22

TOTAL

LABOUR
0.003

Carpenter

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

21.92

Labour Rates Per

Rft

Rs.

3.15

LABOUR

3.94

Per Meter : Rs 71.89


Per Meter : Rs 10.33

1,542

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-05-a

(British) :

Rft

Supply and Erection single core PVC insulated copper conductor


250/440 V grade cable : 3/0.029"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 250V 3/0.029

7.00

RFT

7.00

MATERIAL

48.50

7.00

Day

3.82

0.11

29.50

3.94

22

RFT

TOTAL

LABOUR
0.004

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

13.32

Labour Rates Per

Rft

Rs.

4.78

LABOUR

2.38

Per Meter : Rs 43.69


Per Meter : Rs 15.68

1,543

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-05-b

(British) :

Rft

Supply and Erection single core PVC insulated copper conductor


250/440 V grade cable : 3/0.036"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 250V 3/0.036

11.00

RFT

TOTAL

MATERIAL

RFT

11.00

55.59

11.00

Day

3.84

0.12

22.41

3.96

22

LABOUR
0.004

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

18.22

Labour Rates Per

Rft

Rs.

4.80

LABOUR

3.27

Per Meter : Rs 59.77


Per Meter : Rs 15.75

1,544

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-05-c

(British) :

Rft

Supply and Erection single core PVC insulated copper conductor


250/440 V grade cable : 7/0.029"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 250V 7/0.029

15.00

RFT

TOTAL

MATERIAL

RFT

15.00

60.48

15.00

Day

3.60

0.11

17.52

3.71

22

LABOUR
0.004

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

22.80

Labour Rates Per

Rft

Rs.

4.50

LABOUR

4.09

Per Meter : Rs 74.78


Per Meter : Rs 14.76

1,545

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-05-d

(British) :

Rft

Supply and Erection single core PVC insulated copper conductor


250/440 V grade cable : 7/0.036"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 250V 7/0.036

24.00

RFT

TOTAL

MATERIAL

RFT

24.00

65.22

24.00

Day

3.60

0.11

12.78

3.71

22

LABOUR
0.004

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

33.78

Labour Rates Per

Rft

Rs.

4.50

LABOUR

6.07

Per Meter : Rs 110.80


Per Meter : Rs 14.76

1,546

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-05-e

(British) :

Rft

Supply and Erection single core PVC insulated copper conductor


250/440 V grade cable : 7/0.044"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 250V 7/0.044

35.00

RFT

TOTAL

MATERIAL

RFT

35.00

59.66

35.00

Day

9.00

0.27

18.34

9.27

22

LABOUR
0.010

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

53.95

Labour Rates Per

Rft

Rs.

11.25

LABOUR

9.68

Per Meter : Rs 176.97


Per Meter : Rs 36.91

1,547

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-05-f

(British) :

Rft

Supply and Erection single core PVC insulated copper conductor


250/440 V grade cable : 7/0.064"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 250V 7/0.064

74.00

RFT

TOTAL

MATERIAL

RFT

74.00

63.43

74.00

Day

13.50

0.41

14.57

13.91

22

LABOUR
0.015

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

107.16

Labour Rates Per

Rft

Rs.

16.88

LABOUR

19.25

Per Meter : Rs 351.47


Per Meter : Rs 55.35

1,548

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-05-g

(British) :

Rft

Supply and Erection single core PVC insulated copper conductor


250/440 V grade cable : 19/0.064"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 250V 19/0.064

135.00

RFT

TOTAL

MATERIAL

RFT

135.00

64.28

135.00

Day

22.51

0.68

13.72

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

192.83

Labour Rates Per

Rft

Rs.

28.13

LABOUR

34.65

Per Meter : Rs 632.49


Per Meter : Rs 92.27

1,549

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-06-a

(British) :

Rft

Supply and Erection single core PVC insulated+sheathed copper


conductor 250/440 V grade cable : 3/0.029"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C SH 250V 3/0.029

7.00

RFT

7.00

MATERIAL

39.47

7.00

Day

6.30

0.19

38.53

6.49

22

RFT

TOTAL

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

16.42

Labour Rates Per

Rft

Rs.

7.88

LABOUR

2.93

Per Meter : Rs 53.84


Per Meter : Rs 25.83

1,550

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-06-b

(British) :

Rft

Supply and Erection single core PVC insulated+sheathed copper


conductor 250/440 V grade cable : 3/0.036"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C SH 250V 3/0.036

11.00

RFT

TOTAL

MATERIAL

RFT

11.00

47.69

11.00

Day

6.30

0.19

30.31

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

21.30

Labour Rates Per

Rft

Rs.

7.88

LABOUR

3.81

Per Meter : Rs 69.85


Per Meter : Rs 25.83

1,551

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-06-c

(British) :

Rft

Supply and Erection single core PVC insulated+sheathed copper


conductor 250/440 V grade cable : 7/0.029"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C SH 250V 7/0.029

15.00

RFT

TOTAL

MATERIAL

RFT

15.00

50.68

15.00

Day

7.20

0.22

27.32

7.42

22

LABOUR
0.008

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

27.30

Labour Rates Per

Rft

Rs.

9.00

LABOUR

4.88

Per Meter : Rs 89.54


Per Meter : Rs 29.52

1,552

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-06-d

(British) :

Rft

Supply and Erection single core PVC insulated+sheathed copper


conductor 250/440 V grade cable : 7/0.036"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C SH 250V 7/0.036

24.00

RFT

TOTAL

MATERIAL

RFT

24.00

57.69

24.00

Day

7.20

0.22

20.31

7.42

22

LABOUR
0.008

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

38.28

Labour Rates Per

Rft

Rs.

9.00

LABOUR

6.86

Per Meter : Rs 125.56


Per Meter : Rs 29.52

1,553

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-06-e

(British) :

Rft

Supply and Erection single core PVC insulated+sheathed copper


conductor 250/440 V grade cable : 7/0.044"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C SH 250V 7/0.044

35.00

RFT

TOTAL

MATERIAL

RFT

35.00

56.21

35.00

Day

11.70

0.35

21.79

12.05

22

LABOUR
0.013

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

57.32

Labour Rates Per

Rft

Rs.

14.62

LABOUR

10.27

Per Meter : Rs 188.03


Per Meter : Rs 47.97

1,554

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-06-f

(British) :

Rft

Supply and Erection single core PVC insulated+sheathed copper


conductor 250/440 V grade cable : 7/0.064"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C SH 250V 7/0.064

74.00

RFT

TOTAL

MATERIAL

RFT

74.00

60.32

74.00

Day

18.01

0.54

17.68

18.55

22

LABOUR
0.020

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

112.79

Labour Rates Per

Rft

Rs.

22.51

LABOUR

20.24

Per Meter : Rs 369.94


Per Meter : Rs 73.82

1,555

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-07-a

(British) :

Rft

Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 7/0.064"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 660V 7/0.064

74.00

RFT

TOTAL

MATERIAL

RFT

74.00

60.32

74.00

Day

18.01

0.54

17.68

18.55

22

LABOUR
0.020

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

112.79

Labour Rates Per

Rft

Rs.

22.51

LABOUR

20.24

Per Meter : Rs 369.94


Per Meter : Rs 73.82

1,556

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-07-b

(British) :

Rft

Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.052"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 660V 19/0.052

100.00

RFT

TOTAL

MATERIAL

RFT

100.00

57.43

100.00

Day

30.60

0.92

20.57

31.52

22

LABOUR
0.034

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

160.25

Labour Rates Per

Rft

Rs.

38.25

LABOUR

28.73

Per Meter : Rs 525.62


Per Meter : Rs 125.46

1,557

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-07-c

(British) :

Rft

Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.064"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 660V 19/0.64

135.00

RFT

TOTAL

MATERIAL

RFT

135.00

61.14

135.00

Day

30.60

0.92

16.86

31.52

22

LABOUR
0.034

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

202.95

Labour Rates Per

Rft

Rs.

38.25

LABOUR

36.43

Per Meter : Rs 665.68


Per Meter : Rs 125.46

1,558

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-07-d

(British) :

Rft

Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 19/0.083"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 660V 19/0.083

263.00

RFT

TOTAL

MATERIAL

RFT

263.00

64.04

263.00

Day

45.01

1.35

13.96

46.36

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

377.13

Labour Rates Per

Rft

Rs.

56.27

LABOUR

67.76

Per Meter : Rs 1,236.98


Per Meter : Rs 184.56

1,559

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-07-e

(British) :

Rft

Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.072"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 660V 37/0.072

365.00

RFT

TOTAL

MATERIAL

RFT

365.00

57.33

365.00

Day

112.54

3.38

20.67

115.91

22

LABOUR
0.125

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

585.97

Labour Rates Per

Rft

Rs.

140.67

LABOUR

105.06

Per Meter : Rs 1,921.98


Per Meter : Rs 461.40

1,560

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-07-f

(British) :

Rft

Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.083"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 660V 37/0.083

459.00

RFT

TOTAL

MATERIAL

RFT

459.00

60.23

459.00

Day

112.54

3.38

17.77

115.91

22

LABOUR
0.125

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

700.65

Labour Rates Per

Rft

Rs.

140.67

LABOUR

125.74

Per Meter : Rs 2,298.13


Per Meter : Rs 461.40

1,561

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-07-g

(British) :

Rft

Supply and Erection single core PVC insulated & sheathed copper
conductor, 660/1100V cable : 37/0.103"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable S/C 660V 37/0.103

706.00

RFT

TOTAL

MATERIAL

RFT

706.00

64.69

706.00

Day

112.54

3.38

13.31

115.91

22

LABOUR
0.125

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,001.99

Labour Rates Per

Rft

Rs.

140.67

180.08

Per Meter : Rs 3,286.53


Per Meter : Rs 461.40

1,562

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-08-a

(British) :

Rft

Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 3/0.029"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable 2/C 250V 3/0.029

22.00

RFT

TOTAL

MATERIAL

RFT

22.00

62.26

22.00

Day

4.50

0.14

15.74

4.64

22

LABOUR
0.005

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

32.47

Labour Rates Per

Rft

Rs.

5.63

LABOUR

5.83

Per Meter : Rs 106.49


Per Meter : Rs 18.45

1,563

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-08-b

(British) :

Rft

Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 3/0.036"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable 2/C 250V 3/0.036

22.00

RFT

TOTAL

MATERIAL

RFT

22.00

62.26

22.00

Day

4.50

0.14

15.74

4.64

22

LABOUR
0.005

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

32.47

Labour Rates Per

Rft

Rs.

5.63

LABOUR

5.83

Per Meter : Rs 106.49


Per Meter : Rs 18.45

1,564

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-08-c

(British) :

Rft

Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.029"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable 2/C 250V 7/0.029

29.00

RFT

TOTAL

MATERIAL

RFT

29.00

61.61

29.00

Day

6.30

0.19

16.39

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

43.26

Labour Rates Per

Rft

Rs.

7.88

LABOUR

7.77

Per Meter : Rs 141.88


Per Meter : Rs 25.83

1,565

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-08-d

(British) :

Rft

Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.036"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable 2/C 250V 7/0.036

46.00

RFT

TOTAL

MATERIAL

RFT

46.00

65.97

46.00

Day

6.30

0.19

12.03

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

64.00

Labour Rates Per

Rft

Rs.

7.88

LABOUR

11.51

Per Meter : Rs 209.90


Per Meter : Rs 25.83

1,566

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-08-e

(British) :

Rft

Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.044"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable 2/C 250V 7/0.044

66.00

RFt

TOTAL

MATERIAL

RFt

66.00

68.46

66.00

Day

6.30

0.19

9.54

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

88.40

Labour Rates Per

Rft

Rs.

7.88

LABOUR

15.91

Per Meter : Rs 289.94


Per Meter : Rs 25.83

1,567

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-08-f

(British) :

Rft

Supply and Erection twin core PVC insulated & sheathed copper
conductor 250/440 V grade cable : 7/0.064"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cable 2/C 250V 7/0.64

173.00

RFT

TOTAL

MATERIAL

RFT

173.00

72.36

173.00

Day

6.30

0.19

5.64

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

218.94

Labour Rates Per

Rft

Rs.

7.88

LABOUR

39.45

Per Meter : Rs 718.11


Per Meter : Rs 25.83

1,568

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-09-a

(British) :

Each

Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 4"x4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Box 4"x4"

50.00

No

TOTAL

MATERIAL

No

50.00

31.91

50.00

Day

67.50

2.03

46.09

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

145.38

Cost Per Each: 145.38

Labour Rates Per

Each

Rs.

84.38

Cost Per Each: 84.38

25.85

1,569

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-09-b

(British) :

Each

Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 7"x4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Box 7"x4"

65.00

No

TOTAL

MATERIAL

No

65.00

31.45

65.00

Day

90.00

2.70

46.55

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

191.80

Cost Per Each: 191.80

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

34.10

1,570

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-09-c

(British) :

Each

Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 9"x4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Box 9"x4"

90.00

No

TOTAL

MATERIAL

No

90.00

33.33

90.00

Day

112.50

3.38

44.67

115.88

22

44.55

LABOUR
0.125

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

250.43

Cost Per Each: 250.43

Labour Rates Per

Each

Rs.

140.63

Cost Per Each: 140.63

1,571

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-09-d

(British) :

Each

Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 8"x10"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Box 8"x10"

130.00

No

TOTAL

MATERIAL

No

130.00

36.79

130.00

Day

135.00

4.05

41.21

139.05

22

58.30

LABOUR
0.150

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

327.35

Cost Per Each: 327.35

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,572

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-09-e

(British) :

Each

Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 10"x12"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Box 10"x12"

150.00

No

TOTAL

MATERIAL

No

150.00

36.06

150.00

Day

162.00

4.86

41.94

166.86

22

68.64

LABOUR
0.180

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

385.50

Cost Per Each: 385.50

Labour Rates Per

Each

Rs.

202.50

Cost Per Each: 202.50

1,573

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-09-f

(British) :

Each

Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick
bakelite sheet top etc. complete : 12"x14"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Box 12"x14"

150.00

No

TOTAL

MATERIAL

No

150.00

33.19

150.00

Day

189.00

5.67

44.81

194.67

22

74.58

LABOUR
0.210

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

419.25

Cost Per Each: 419.25

Labour Rates Per

Each

Rs.

236.25

Cost Per Each: 236.25

1,574

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-10-a

(British) :

Each

Supply and Erection Sahl wood board, 1.75" deep : 3"x3" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Sahl Wood Box 3" Dia

12.00

No

TOTAL

MATERIAL

No

12.00

35.29

12.00

Day

13.50

0.41

42.71

13.91

22

5.61

LABOUR
0.015

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

31.52

Cost Per Each: 31.52

Labour Rates Per

Each

Rs.

16.88

Cost Per Each: 16.88

1,575

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-10-b

Item Name :

(British) :

Each

Supply and Erection Sahl wood board, 1.75" deep : 4"x4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Sahl Wood Box 4"x4"

50.00

No

TOTAL

MATERIAL

No

50.00

41.44

50.00

Day

40.50

1.22

36.56

41.72

22

LABOUR
0.045

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

111.63

Cost Per Each: 111.63

Labour Rates Per

Each

Rs.

50.63

Cost Per Each: 50.63

19.91

1,576

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-10-c

Item Name :

(British) :

Each

Supply and Erection Sahl wood board, 1.75" deep : 7"x4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Sahl Wood Box 7"x4"

65.00

No

TOTAL

MATERIAL

No

65.00

46.21

65.00

Day

40.50

1.22

31.79

41.72

22

LABOUR
0.045

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

129.93

Cost Per Each: 129.93

Labour Rates Per

Each

Rs.

50.63

Cost Per Each: 50.63

23.21

1,577

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-10-d

(British) :

Each

Supply and Erection Sahl wood board, 1.75" deep : 8"x10"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Sahl Wood Box 8"x10"

90.00

No

TOTAL

MATERIAL

No

90.00

51.72

90.00

Day

40.50

1.22

26.28

41.72

22

LABOUR
0.045

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

160.43

Cost Per Each: 160.43

Labour Rates Per

Each

Rs.

50.63

Cost Per Each: 50.63

28.71

1,578

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-10-e

(British) :

Each

Supply and Erection Sahl wood board, 1.75" deep : 10"x12"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Sahl Wood Box 10"x12"

150.00

No

TOTAL

MATERIAL

No

150.00

57.69

150.00

Day

45.00

1.35

20.31

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

239.25

Cost Per Each: 239.25

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

42.90

1,579

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-10-f

(British) :

Each

Supply and Erection Sahl wood board, 1.75" deep : 12"x14"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Sahl Wood Box 12"x14"

150.00

No

TOTAL

MATERIAL

No

150.00

57.69

150.00

Day

45.00

1.35

20.31

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

239.25

Cost Per Each: 239.25

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

42.90

1,580

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-11-a-01

(British) :

Each

Supply and Erection of iron/aluminium clad, 500V main switch Double


pole : 15/20 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Main Switch D.Pole 15/20A

220.00

No

TOTAL

MATERIAL

No

220.00

26.40

220.00

Day

405.00

12.15

51.60

417.15

22

LABOUR
0.450

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

774.65

Cost Per Each: 774.65

Labour Rates Per

Each

Rs.

506.25

Cost Per Each: 506.25

137.50

1,581

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-11-a-02

(British) :

Each

Supply and Erection of iron/aluminium clad, 500V main switch Double


pole : 30/35 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Main Switch D.Pole 30/35A

550.00

No

TOTAL

MATERIAL

550.00

No

43.19

550.00

Day

405.00

12.15

34.81

417.15

22

LABOUR
0.450

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

210.10

Composite Rates Per

Each

Rs.

1,177.25

Cost Per Each: 1,177.25

Labour Rates Per

Each

Rs.

506.25

Cost Per Each: 506.25

1,582

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-11-a-03

(British) :

Each

Supply and Erection iron/aluminium clad 500 volts main switch


Double Pole : 60/65 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Main Switch D.Pole 60/65A

1,100.00

No

TOTAL

MATERIAL

No

1,100.00

54.82

1,100.00

Day

405.00

12.15

23.18

417.15

22

LABOUR
0.450

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

331.10

Composite Rates Per

Each

Rs.

1,848.25

Cost Per Each: 1,848.25

Labour Rates Per

Each

Rs.

506.25

Cost Per Each: 506.25

1,583

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-11-a-04

(British) :

Each

Supply and Erection iron/aluminium clad 500 volts main switch


Double Pole : 100 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Main Switch D.Pole 100A

1,850.00

No

TOTAL

MATERIAL

No

1,850.00

61.53

1,850.00

Day

405.00

12.15

16.47

417.15

22

LABOUR
0.450

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

496.10

Composite Rates Per

Each

Rs.

2,763.25

Cost Per Each: 2,763.25

Labour Rates Per

Each

Rs.

506.25

Cost Per Each: 506.25

1,584

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-11-b-01

(British) :

Each

Supply and Erection of iron/aluminium clad, 500V main switch Triple


pole with neutral link : 15/20 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Main Switch D.Pole 30/35A

550.00

No

TOTAL

MATERIAL

550.00

No

43.19

550.00

Day

405.00

12.15

34.81

417.15

22

LABOUR
0.450

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

210.10

Composite Rates Per

Each

Rs.

1,177.25

Cost Per Each: 1,177.25

Labour Rates Per

Each

Rs.

506.25

Cost Per Each: 506.25

1,585

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-11-b-02

(British) :

Each

Supply and Erection of iron/aluminium clad, 500V main switch Triple


pole with neutral link : 30/35 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Main Switch T.Pole 30/35A

750.00

No

TOTAL

MATERIAL

750.00

No

48.70

750.00

Day

405.00

12.15

29.30

417.15

22

LABOUR
0.450

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

254.10

Composite Rates Per

Each

Rs.

1,421.25

Cost Per Each: 1,421.25

Labour Rates Per

Each

Rs.

506.25

Cost Per Each: 506.25

1,586

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-11-b-03

(British) :

Each

Supply and Erection of iron/aluminium clad, 500V main switch Triple


pole with neutral link : 60/65 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Main Switch T.Pole 60x65A

2,850.00

No

TOTAL

MATERIAL

No

2,850.00

63.05

2,850.00

Day

540.00

16.20

14.95

556.20

22

LABOUR
0.600

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

745.80

Composite Rates Per

Each

Rs.

4,152.00

Cost Per Each: 4,152.00

Labour Rates Per

Each

Rs.

675.00

Cost Per Each: 675.00

1,587

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-11-b-04

(British) :

Each

Supply and Erection of iron/aluminium clad, 500V main switch Triple


pole with neutral link : 100 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Main Switch T.Pole 100Amp

2,350.00

No

TOTAL

MATERIAL

No

2,350.00

58.26

2,350.00

Day

675.00

20.25

19.74

695.25

22

LABOUR
0.750

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

665.50

Composite Rates Per

Each

Rs.

3,710.75

Cost Per Each: 3,710.75

Labour Rates Per

Each

Rs.

843.75

Cost Per Each: 843.75

1,588

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-12-a

(British) :

Each

Supply and Erection or iron/aluminium clad, 500V main switch with


triple pole, complete : 60 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Bars 60 Amp W.4 Copper Bar

3,100.00

No

TOTAL

MATERIAL

No

3,100.00

69.92

3,100.00

Day

225.00

6.75

8.08

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

731.50

Composite Rates Per

Each

Rs.

4,063.25

Cost Per Each: 4,063.25

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,589

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-12-b

(British) :

Each

Supply and Erection or iron/aluminium clad, 500V main switch with


triple pole, complete : 100 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Bars 100 Amp 4 Copper Bar

3,400.00

No

TOTAL

MATERIAL

No

3,400.00

70.34

3,400.00

Day

225.00

6.75

7.66

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

797.50

Composite Rates Per

Each

Rs.

4,429.25

Cost Per Each: 4,429.25

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,590

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-12-c

(British) :

Each

Supply and Erection or iron/aluminium clad, 500V main switch with


triple pole, complete : 200 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Bars 200 Amp 4 Copper Bar

4,600.00

No

TOTAL

MATERIAL

4,600.00

No

69.56

4,600.00

Day

360.00

10.80

8.44

370.80

22

LABOUR
0.400

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,091.20

Composite Rates Per

Each

Rs.

6,062.00

Cost Per Each: 6,062.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,591

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-12-d

(British) :

Each

Supply and Erection or iron/aluminium clad, 500V main switch with


triple pole, complete : 300 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Bars 300 Amp 4 Copper Bar

7,500.00

No

TOTAL

MATERIAL

7,500.00

No

71.56

7,500.00

Day

360.00

10.80

6.44

370.80

22

LABOUR
0.400

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,729.20

Composite Rates Per

Each

Rs.

9,600.00

Cost Per Each: 9,600.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,592

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-12-e

(British) :

Each

Supply and Erection or iron/aluminium clad, 500V main switch with


triple pole, complete : 500 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Bars 500 Amp 4 Copper Bar

10,000.00

No

TOTAL

MATERIAL

10,000.00

No

72.39

10,000.00

Day

360.00

10.80

5.61

370.80

22

LABOUR
0.400

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,279.20

Composite Rates Per

Each

Rs.

12,650.00

Cost Per Each: 12,650.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,593

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-13

(British) :

Each

Supply and Erection plain pendent lamp holder, complete with


bakelite lamp holder & flexible twin wire of 2m

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lamp Holder

1.000

No

30.00

No

30.00

Cable 23/0.0076 2m length

6.560

RFT

21.00

RFT

137.76

71.18

167.76

Day

9.00

0.27

6.82

9.27

22

TOTAL

MATERIAL

LABOUR
0.010

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

215.92

Cost Per Each: 215.92

Labour Rates Per

Each

Rs.

11.25

Cost Per Each: 11.25

38.89

1,594

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-14

(British) :

Each

Supply and Erection 9" long swan neck plain brass/steel/brass


oxidised bracket lamp holder, complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Swan Neck Holder

40.00

No

TOTAL

MATERIAL

No

40.00

52.75

40.00

Day

16.88

0.51

25.25

17.38

22

LABOUR
0.019

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

69.89

Cost Per Each: 69.89

Labour Rates Per

Each

Rs.

21.09

Cost Per Each: 21.09

12.51

1,595

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-15

(British) :

Each

Supply and Erection wall/pole type bracket with double cover water
tight reflector, flexible wire & brass holder

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flexible Brass Holder

40.00

No

TOTAL

MATERIAL

No

40.00

39.47

40.00

Day

36.00

1.08

38.53

37.08

22

LABOUR
0.040

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

93.80

Cost Per Each: 93.80

Labour Rates Per

Each

Rs.

45.00

Cost Per Each: 45.00

16.72

1,596

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-16

Item Name :

(British) :

Each

Supply and Erection call bell 220/250V, fixed on Sahl wood board
7"x4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Box 7"x4"

1.000

No

65.00

No

65.00

Push bell

1.000

No

30.00

No

30.00

TOTAL

MATERIAL

60.64

95.00

Day

22.50

0.68

17.36

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

144.03

Cost Per Each: 144.03

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

25.85

1,597

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-17

(British) :

Each

Supply and Erection bell push or bed switch, with 5m. twin flexible
wire 23/0.0076"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Push bell

1.000

No

30.00

No

30.00

F/wire (23/0.0076)

16.400

RFT

3.00

RFT

49.20

MATERIAL

69.11

79.20

Day

6.75

0.20

8.89

6.95

22

TOTAL

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

105.06

Cost Per Each: 105.06

Labour Rates Per

Each

Rs.

8.44

Cost Per Each: 8.44

18.91

1,598

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-18-a

(British) :

Each

Supply and Erection switches 10/15 Amp : Open type

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Switch (Open) 10/15 Amp

20.00

No

TOTAL

MATERIAL

No

20.00

44.78

20.00

Day

13.50

0.41

33.22

13.91

22

7.37

LABOUR
0.015

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

41.28

Cost Per Each: 41.28

Labour Rates Per

Each

Rs.

16.88

Cost Per Each: 16.88

1,599

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-18-b

(British) :

Each

Supply and Erection switches 10/15 Amp : Recessed type

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Switch (Recessed) 10/15

20.00

No

TOTAL

MATERIAL

No

20.00

44.78

20.00

Day

13.50

0.41

33.22

13.91

22

7.37

LABOUR
0.015

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

41.28

Cost Per Each: 41.28

Labour Rates Per

Each

Rs.

16.88

Cost Per Each: 16.88

1,600

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-19-a

(British) :

Each

Supply and Erection 3 pin 10/15 Amp. wall socket : Open type

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Wall Socket (Open) 10/15

20.00

No

TOTAL

MATERIAL

No

20.00

35.29

20.00

Day

22.50

0.68

42.71

23.18

22

9.35

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

52.53

Cost Per Each: 52.53

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

1,601

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-19-b

(British) :

Each

Supply and Erection 3 pin 10/15 Amp. wall socket : Recessed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Wall Socket Recess 10/15A

20.00

No

TOTAL

MATERIAL

No

20.00

35.29

20.00

Day

22.50

0.68

42.71

23.18

22

9.35

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

52.53

Cost Per Each: 52.53

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

1,602

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-20-a

Item Name :

(British) :

Each

Supply and Erection 3 pin switch & plug combined recessed type : 5
Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Switch & Plug 5 Amp

20.00

No

TOTAL

MATERIAL

No

20.00

35.29

20.00

Day

22.50

0.68

42.71

23.18

22

9.35

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

52.53

Cost Per Each: 52.53

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

1,603

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-20-b

(British) :

Each

Supply and Erection 3 pin switch & plug combined recessed type :
10/15 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Switch & Plug 10/15 Amp

20.00

No

TOTAL

MATERIAL

No

20.00

35.29

20.00

Day

22.50

0.68

42.71

23.18

22

9.35

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

52.53

Cost Per Each: 52.53

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

1,604

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-21

(British) :

Each

Supply and Erection 3 pin 10/15 Amp. wall socket with shoe open
type

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Socket & Shoe 3 pin 10/15

40.00

No

TOTAL

MATERIAL

No

40.00

48.00

40.00

Day

22.50

0.68

30.00

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

76.93

Cost Per Each: 76.93

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

13.75

1,605

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-22-a

(British) :

Each

Supply and Erection button holder/angle holder Bakelite large size

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Button Holder Bakelite

20.00

No

TOTAL

MATERIAL

No

20.00

48.00

20.00

Day

11.25

0.34

30.00

11.59

22

6.88

LABOUR
0.013

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

38.46

Cost Per Each: 38.46

Labour Rates Per

Each

Rs.

14.06

Cost Per Each: 14.06

1,606

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-22-b

Item Name :

(British) :

Each

Supply and Erection button holder/angle holder Brass

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Button Holder Brass

40.00

No

TOTAL

MATERIAL

No

40.00

58.54

40.00

Day

11.25

0.34

19.46

11.59

22

LABOUR
0.013

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

62.86

Cost Per Each: 62.86

Labour Rates Per

Each

Rs.

14.06

Cost Per Each: 14.06

11.28

1,607

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-23-a

(British) :

Each

Supply and Erection porcelain fuses (china made) with plastic sheet
base on angle iron board : 10/15 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fuse Porcelain 10/15 Amp

80.00

No

TOTAL

MATERIAL

No

80.00

58.54

80.00

Day

22.50

0.68

19.46

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

125.73

Cost Per Each: 125.73

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

22.55

1,608

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-23-b

(British) :

Each

Supply and Erection porcelain fuses (china made) with plastic sheet
base on angle iron board : 30 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fuse Porcelain 30 Amp

130.00

No

TOTAL

MATERIAL

No

130.00

63.93

130.00

Day

22.50

0.68

14.07

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

186.73

Cost Per Each: 186.73

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

33.55

1,609

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-23-c

(British) :

Each

Supply and Erection porcelain fuses (china made) with plastic sheet
base on angle iron board : 60 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fuse Porcelain 60 Amp

240.00

No

TOTAL

MATERIAL

No

240.00

68.57

240.00

Day

22.50

0.68

9.43

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

320.93

Cost Per Each: 320.93

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

57.75

1,610

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-23-d

(British) :

Each

Supply and Erection porcelain fuses (china made) with plastic sheet
base on angle iron baord : 100 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fuse Porcelain 100 Amp

480.00

No

TOTAL

MATERIAL

No

480.00

71.64

480.00

Day

22.50

0.68

6.36

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

613.73

Cost Per Each: 613.73

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

110.55

1,611

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-23-e

(British) :

Each

Supply and Erection porcelain fuses (china made) with plastic sheet
base on angle iron board : 200 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fuse Porcelain 200 Amp

540.00

No

TOTAL

MATERIAL

No

540.00

72.00

540.00

Day

22.50

0.68

6.00

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

686.93

Cost Per Each: 686.93

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

123.75

1,612

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-24-a

(British) :

Set

Supply and Erection tube light, including rod, choke etc complete
Double rod (2x40 watts) with 2 chokes & 2 starters

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Tube Light (2 rod)

750.00

Set

TOTAL

MATERIAL

Set

750.00

66.96

750.00

Day

90.00

2.70

11.04

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Set

Rs.

1,027.50

Cost Per Set: 1,027.50

Labour Rates Per

Set

Rs.

112.50

Cost Per Set: 112.50

184.80

1,613

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-24-b

(British) :

Set

Supply and Erection tube light, including rod, choke etc complete
Single rod (40 watts) with 1 choke & 1 starter

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Tube Light (1 rod)

310.00

Set

TOTAL

MATERIAL

Set

310.00

61.59

310.00

Day

67.50

2.03

16.41

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Set

Rs.

462.58

Cost Per Set: 462.58

Labour Rates Per

Set

Rs.

84.38

Cost Per Set: 84.38

83.05

1,614

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-24-c

(British) :

Each

Supply and Erection tube light, including rod, choke etc complete
Round tube (10 watt) 1 choke + 1 starter w/o cover

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Tube Light (Round)

450.00

Set

TOTAL

MATERIAL

Set

450.00

67.57

450.00

Day

49.50

1.49

10.43

50.99

22

LABOUR
0.055

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

610.88

Cost Per Each: 610.88

Labour Rates Per

Each

Rs.

61.88

Cost Per Each: 61.88

109.89

1,615

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-25

(British) :

Each

Supply and Erection girder clamp hook, 5/8" dia.for hanging ceiling
fans

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Girder Clamp Hook

250.00

No

TOTAL

MATERIAL

No

250.00

68.81

250.00

Day

22.50

0.68

9.19

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

333.13

Cost Per Each: 333.13

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

59.95

1,616

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-26-a

(British) :

Each

Supply and Erection circuit breaker (imported) on sahl wood board


complete : 2/5/15 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
MS Conduit VI

3.280

RFT

25.00

RFT

82.00

Circuit Breaker I

1.000

No

110.00

No

110.00

TOTAL

MATERIAL

55.49

192.00

Day

67.50

2.03

22.51

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

318.62

Cost Per Each: 318.62

Labour Rates Per

Each

Rs.

84.38

Cost Per Each: 84.38

57.09

1,617

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-26-b

(British) :

Each

Supply and Erection circuit breaker (imported) on sahl wood board


complete : 20/25/30 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Circuit Breaker II

1.000

No

110.00

No

110.00

Board

1.000

No

40.00

No

40.00

TOTAL

MATERIAL

51.72

150.00

Day

67.50

2.03

26.28

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

267.38

Cost Per Each: 267.38

Labour Rates Per

Each

Rs.

84.38

Cost Per Each: 84.38

47.85

1,618

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-27

(British) :

Rft

Supply and Erection stay for house service pipe, erected with
straining screws and 7/14 SWG stay wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Straining Screws

0.150

Pkt

70.00

Pkt

10.50

Stay Wire 7/14 SWG

1.000

RFT

300.00

RFT

300.00

73.09

310.50

Day

8.10

0.24

4.91

8.34

22

TOTAL

MATERIAL

LABOUR
0.009

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

388.94

Labour Rates Per

Rft

Rs.

10.12

LABOUR

70.09

Per Meter : Rs 1,275.72


Per Meter : Rs 33.21

1,619

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-28

Item Name :

(British) :

Rft

Supply and Erection of house service pipe Henley or pole, type 2"
dia. erected to install insulated wire etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 2"

1.000

RFT

210.00

RFT

210.00

Shackle Insulator

0.063

No

550.00

No

34.39

Straining Device

0.006

No

1,000.00

No

6.25

TOTAL

MATERIAL

71.90

250.64

Day

10.80

0.32

6.10

11.12

22

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

319.28

Labour Rates Per

Rft

Rs.

13.50

LABOUR

57.52

Per Meter : Rs 1,047.23


Per Meter : Rs 44.28

1,620

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-29

(British) :

Each

Supply and Erection shackle/pin insulator, medium size

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Shackle/Pin Insulator

1.000

No

700.00

No

700.00

Nut / Bolt

1.000

Kg

150.00

Kg

150.00

TOTAL

MATERIAL

73.07

850.00

Day

22.50

0.68

4.93

23.18

22

LABOUR
0.025

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

191.95

Composite Rates Per

Each

Rs.

1,065.13

Cost Per Each: 1,065.13

Labour Rates Per

Each

Rs.

28.13

Cost Per Each: 28.13

1,621

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-30

(British) :

kg

Supply and Erection bare copper conductor wire, No. 2 to 16 SWG,


including GI binding wire No. 16 SWG

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Binding Wire

0.333

Kg

122.00

Kg

40.67

Copper Conductor

1.000

Kg

750.00

Kg

750.00

TOTAL

MATERIAL

73.95

790.67

Day

11.25

0.34

4.05

11.59

22

LABOUR
0.013

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

978.68

Cost Per kg: 978.68

Labour Rates Per

kg

Rs.

14.06

Cost Per kg: 14.06

176.42

1,622

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-31

(British) :

kg

Supply and Erection GI wire of sizes, including binding wire No. 16


SWG for support of rubber wire, pole to pole

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Wire 16 SWG

150.00

Kg

TOTAL

MATERIAL

Kg

150.00

69.77

150.00

Day

11.25

0.34

8.23

11.59

22

LABOUR
0.013

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

197.06

Cost Per kg: 197.06

Labour Rates Per

kg

Rs.

14.06

Cost Per kg: 14.06

35.48

1,623

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-32-a

(British) :

Rft

Wiring overhead line in 2 single core, PVC insulated cable with GI


wire #8 SWG : 3/0.029"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cable S/C 250V 3/0.029

2.000

RFT

7.00

RFT

14.00

G.I Wire #8

0.305

Kg

130.00

Kg

39.63

TOTAL

MATERIAL

67.12

53.63

Day

6.30

0.19

10.88

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

73.31

Labour Rates Per

Rft

Rs.

7.88

LABOUR

13.19

Per Meter : Rs 240.45


Per Meter : Rs 25.83

1,624

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-32-b

(British) :

Rft

Wiring overhead line in 2 single core, PVC insulated cable with GI


wire #8 SWG : 7/0.029"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cable S/C 250V 7/0.029

2.000

RFT

15.00

RFT

30.00

G.I Wire #8

0.305

Kg

130.00

Kg

39.63

TOTAL

MATERIAL

68.78

69.63

Day

6.30

0.19

9.22

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

92.83

Labour Rates Per

Rft

Rs.

7.88

LABOUR

16.71

Per Meter : Rs 304.48


Per Meter : Rs 25.83

1,625

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-32-c

(British) :

Rft

Wiring overhead line in 2 single core, PVC insulated cable with GI


wire #8 SWG : 7/0.036"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cable S/C 250V 7/0.036

2.000

RFT

24.00

RFT

48.00

G.I Wire #8

0.305

Kg

130.00

Kg

39.63

TOTAL

MATERIAL

69.97

87.63

Day

6.30

0.19

8.03

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

114.79

Labour Rates Per

Rft

Rs.

7.88

LABOUR

20.67

Per Meter : Rs 376.51


Per Meter : Rs 25.83

1,626

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-32-d

(British) :

Rft

Wiring overhead line in 2 single core, PVC insulated cable with GI


wire #8 SWG : 7/0.044"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cable S/C 250V 7/0.044

2.000

RFT

35.00

RFT

70.00

G.I Wire #8

0.305

Kg

130.00

Kg

39.63

TOTAL

MATERIAL

68.27

109.63

Day

10.80

0.32

9.73

11.12

22

LABOUR
0.012

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

147.25

Labour Rates Per

Rft

Rs.

13.50

LABOUR

26.50

Per Meter : Rs 482.99


Per Meter : Rs 44.28

1,627

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-33

(British) :

Each

Supply and Erection street light pole bracket 1.25" GI pipe 2m.
long, complete with 2 pole clamps

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Street Light Pole Bracket

1.000

No

550.00

No

550.00

Clamp

2.000

No

80.00

No

160.00

TOTAL

MATERIAL

58.36

710.00

Day

202.50

6.08

19.64

208.58

22

LABOUR
0.225

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

200.75

Composite Rates Per

Each

Rs.

1,119.33

Cost Per Each: 1,119.33

Labour Rates Per

Each

Rs.

253.13

Cost Per Each: 253.13

1,628

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-34

(British) :

Each

Supply and Fixing dust & weather proof street light fitting with
reflector, 400W mercury vapour lamp etc comp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Street Light Fitting

1,600.00

No

TOTAL

MATERIAL

No

1,600.00

61.22

1,600.00

Day

360.00

10.80

16.78

370.80

22

LABOUR
0.400

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

431.20

Composite Rates Per

Each

Rs.

2,402.00

Cost Per Each: 2,402.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,629

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-35-a

(British) :

Each

Supply and Erection pole mounted street light complete for fitting
125/250 W mercury lamp : GEC make

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pole Street Light GEC

1,600.00

No

TOTAL

MATERIAL

No

1,600.00

61.22

1,600.00

Day

360.00

10.80

16.78

370.80

22

LABOUR
0.400

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

431.20

Composite Rates Per

Each

Rs.

2,402.00

Cost Per Each: 2,402.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,630

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-35-b

(British) :

Each

Supply and Erection pole mounted street light complete for fitting
125/250 W mercury lamp : Philips make

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pole Street Light Philips

3,200.00

No

TOTAL

MATERIAL

No

3,200.00

67.42

3,200.00

Day

360.00

10.80

10.58

370.80

22

LABOUR
0.400

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

783.20

Composite Rates Per

Each

Rs.

4,354.00

Cost Per Each: 4,354.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,631

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-36-a

(British) :

Each

Supply and Fixing 125 W mercury vapour lamp with choke

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lamp Mercury Vapour 125W

1.000

No

550.00

No

550.00

Choke I

1.000

No

300.00

No

300.00

TOTAL

MATERIAL

67.82

850.00

Day

90.00

2.70

10.18

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

206.80

Composite Rates Per

Each

Rs.

1,149.50

Cost Per Each: 1,149.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,632

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-36-b

(British) :

Each

Supply and Fixing 250 W mercury vapour lamp with choke

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lamp Mercury Vapour 250W

1.000

No

1,000.00

No

1,000.00

Choke II

1.000

No

1,000.00

No

1,000.00

TOTAL

MATERIAL

71.77

2,000.00

Day

90.00

2.70

6.23

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

459.80

Composite Rates Per

Each

Rs.

2,552.50

Cost Per Each: 2,552.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,633

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-36-c

(British) :

Each

Supply and Fixing 400 W mercury vapour lamp with choke

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Lamp Mercury Vapour 400W

1.000

No

1,200.00

No

1,200.00

Choke III

1.000

No

3,000.00

No

3,000.00

TOTAL

MATERIAL

73.43

4,200.00

Day

90.00

2.70

4.57

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

943.80

Composite Rates Per

Each

Rs.

5,236.50

Cost Per Each: 5,236.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,634

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-37

(British) :

Each

Supply and Fixing mercury sodium lamp 360 Sunlux 400 W complete
with choke

Detail

Qty

Unit

Rate (Rs)

Each

1,600.00

Amount

MATERIAL
1.000

Lamp Merc Sodium Sunlex

TOTAL

MATERIAL

Each

1,600.00

71.01

1,600.00

Day

90.00

2.70

6.99

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

371.80

Composite Rates Per

Each

Rs.

2,064.50

Cost Per Each: 2,064.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,635

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-38

(British) :

Each

Supply and Fixing mercury blended lamp 160 W

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Lamp Mercury Blended 160W

300.00

No

TOTAL

MATERIAL

No

300.00

57.69

300.00

Day

90.00

2.70

20.31

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

478.50

Cost Per Each: 478.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

85.80

1,636

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-39

(British) :

Each

Supply and Erection MS angle lattice structure pole 36' long 14"sq
at base & 8"sq. at top for elec. distribution

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pole MS 36'

20,000.00

No

TOTAL

MATERIAL

No

20,000.00

59.06

20,000.00

Day

5,400.00

162.00

18.94

5,562.00

22

LABOUR
6.000

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,588.00

Composite Rates Per

Each

Rs.

31,150.00

Cost Per Each: 31,150.00

Labour Rates Per

Each

Rs.

6,750.00

Cost Per Each: 6,750.00

1,637

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-40-a-01

(British) :

Each

Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4"
dia, 5' of 3" dia, Single arm of 5' of 1.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pole GI Tubular I

1.000

No

30,000.00

No

30,000.00

Miscellaneous III

1.000

LS

300.00

LS

300.00

TOTAL

MATERIAL

71.80

30,300.00

Day

1,350.00

40.50

6.20

1,390.50

22

LABOUR
1.500

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,963.00

Composite Rates Per

Each

Rs.

38,653.50

Cost Per Each: 38,653.50

Labour Rates Per

Each

Rs.

1,687.50

Cost Per Each: 1,687.50

1,638

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-40-a-02

(British) :

Each

Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4"
dia, 5' of 3" dia, Double arm of 5' of 1.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pole GI Tubular II

1.000

No

36,000.00

No

36,000.00

Miscellaneous III

1.000

LS

300.00

LS

300.00

TOTAL

MATERIAL

72.31

36,300.00

Day

1,350.00

40.50

5.69

1,390.50

22

LABOUR
1.500

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

8,283.00

Composite Rates Per

Each

Rs.

45,973.50

Cost Per Each: 45,973.50

Labour Rates Per

Each

Rs.

1,687.50

Cost Per Each: 1,687.50

1,639

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-40-b-01

Item Name :

(British) :

Each

Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3"
dia, 5' of 2" dia, Single arm of 5' of 1.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pole Gi Tubular III

1.000

No

35,000.00

No

35,000.00

Miscellaneous III

1.000

LS

300.00

LS

300.00

TOTAL

MATERIAL

72.24

35,300.00

Day

1,350.00

40.50

5.76

1,390.50

22

LABOUR
1.500

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

8,063.00

Composite Rates Per

Each

Rs.

44,753.50

Cost Per Each: 44,753.50

Labour Rates Per

Each

Rs.

1,687.50

Cost Per Each: 1,687.50

1,640

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-40-b-02

(British) :

Each

Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3"
dia, 5' of 2" dia, Double arm of 5' of 1.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pole GI Tubular IV

1.000

No

18,000.00

No

18,000.00

Miscellaneous III

1.000

LS

300.00

LS

300.00

TOTAL

MATERIAL

69.85

18,300.00

Day

1,350.00

40.50

8.15

1,390.50

22

LABOUR
1.500

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,323.00

Composite Rates Per

Each

Rs.

24,013.50

Cost Per Each: 24,013.50

Labour Rates Per

Each

Rs.

1,687.50

Cost Per Each: 1,687.50

1,641

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-40-b-03

(British) :

Each

Providing street light poles of 40 ft height without arms including


fixing complete.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clamps (MS)

2.000

No

90.00

No

180.00

Tubler Pole 40 ft with iron


plate 12x12x3/4
Steel Jointing box 6"x9"

1.000

No

25,000.00

No

25,000.00

1.000

No

120.00

No

120.00

Pre-cast concrete block 2x2x4


with four number bolts

1.000

No

2,500.00

No

2,500.00

TOTAL

MATERIAL

73.54

27,800.00

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Skilled Coolie

0.250

Day

600.00

Day

150.00

7.20

3.63

247.20

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Dump Truck (10 m3 cap)

0.010

Day

1,050.00

Day

10.50

Excavator

0.100

Hour

3,000.00

Hour

300.00

0.82

310.50

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

6,237.11

Composite Rates Per

Each

Rs.

34,594.81

Cost Per each: 34,594.81

Labour Rates Per

Each

Rs.

300.00

Cost Per each: 300.00

1,642

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-41

Item Name :

(British) :

Job

Earthing of iron clad/aluminium switches etc with GI wire #8 SWG in


GI pipe 0.5" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 0.5"

27.991

RFT

50.00

RFT

1,399.57

G.I pipe (light) 2"

5.248

RFT

210.00

RFT

1,102.16

G.I Wire #8

9.144

Kg

130.00

Kg

1,188.66

TOTAL

MATERIAL

50.41

3,690.40

Day

1,800.00

54.00

27.59

1,854.00

22

LABOUR
2.000

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,207.89

Composite Rates Per

Job

Rs.

6,752.28

Cost Per Job: 6,752.28

Labour Rates Per

Job

Rs.

2,250.00

Cost Per Job: 2,250.00

1,643

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-42

(British) :

Each

Supply and Erection 2'x2'x1/8" copper plate including rivetting to


copper tape & placing in mixture of salt and charcol etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Copper Plate 24"x24"x1/4"

1.000

No

7,000.00

No

Salt & Charcoal

1.000

Each

120.00

Each

120.00

Copper Bolt

2.000

Each

16.00

Each

32.00

TOTAL

MATERIAL

7,000.00

70.56

7,152.00

Day

450.00

13.50

7.44

463.50

22

LABOUR
0.500

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,672.44

Composite Rates Per

Each

Rs.

9,287.94

Cost Per Each: 9,287.94

Labour Rates Per

Each

Rs.

562.50

Cost Per Each: 562.50

1,644

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-43-a

(British) :

Rft

Supply and Erection copper tape, including copper stapple & copper
nails/Screw etc : Size 1.5"x1/8"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Copper Tape 1.5"x1/8"

1.000

RFT

200.00

RFT

200.00

Staple & Nails

5.002

No

50.00

No

250.08

TOTAL

MATERIAL

73.96

450.08

Day

6.30

0.19

4.04

6.49

22

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

556.97

Labour Rates Per

Rft

Rs.

7.88

LABOUR

100.40

Per Meter : Rs 1,826.85


Per Meter : Rs 25.83

1,645

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-43-b

Item Name :

(British) :

Rft

Supply and Erection copper tape, including copper stapple & copper
nails etc : Size 2"x1/8"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Staple & Nails

6.503

No

50.00

No

325.15

Copper Tape 2"x1/8"

1.000

RFT

150.00

RFT

150.00

74.02

475.15

Day

6.30

0.19

3.98

6.49

22

TOTAL

MATERIAL

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

587.56

Labour Rates Per

Rft

Rs.

7.88

LABOUR

105.92

Per Meter : Rs 1,927.20


Per Meter : Rs 25.83

1,646

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-44

Item Name :

(British) :

Job

Supply and Erection 1" dia & 1m long lightening conductor copper
rod with 5 spikes ball & base etc.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Lightning Conductor

2,500.00

No

TOTAL

MATERIAL

No

2,500.00

51.72

2,500.00

Day

1,125.00

33.75

26.28

1,158.75

22

797.50

LABOUR
1.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Job

Rs.

4,456.25

Cost Per Job: 4,456.25

Labour Rates Per

Job

Rs.

1,406.25

Cost Per Job: 1,406.25

1,647

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-45

(British) :

Each

Wiring of light/fan/call-bell point in 3/0.029 PVC insulated &


sheathed cable on sahl wood strip

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Batten 1/2"

29.991

RFT

5.00

RFT

149.95

Cable S/C 250V 3/0.029

59.982

RFT

7.00

RFT

419.87

Wire Clips & Nails

2.000

Pkt

60.00

Pkt

120.00

T-switch

1.000

No

60.00

No

60.00

Round Block

1.000

No

25.00

No

25.00

TOTAL

MATERIAL

72.47

774.83

Day

27.00

0.81

5.53

27.81

22

LABOUR
0.030

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

979.04

Cost Per Each: 979.04

Labour Rates Per

Each

Rs.

33.75

Cost Per Each: 33.75

176.40

1,648

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-46

Item Name :

(British) :

Each

Wiring of 2/3-pin 5-Amp plug point in 3/0.029 PVC insulated &


sheathed cable on sahl wood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Batten 1/2"

19.994

RFT

5.00

RFT

99.97

Cable S/C SH 250V 3/0.029

32.800

RFT

7.00

RFT

229.60

Sahl Wood Box 7"x4"

1.000

No

65.00

No

65.00

Wire Clips & Nails

1.000

Pkt

60.00

Pkt

60.00

T-switch

1.000

No

60.00

No

60.00

Pin 2/3 5 Amp Wall Socket

1.000

No

110.00

No

110.00

TOTAL

MATERIAL

71.89

624.57

Day

27.00

0.81

6.11

27.81

22

LABOUR
0.030

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

795.72

Cost Per Each: 795.72

Labour Rates Per

Each

Rs.

33.75

Cost Per Each: 33.75

143.35

1,649

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-47-a

(British) :

Rft

Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 3/0.029

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Batten 1/2"

1.000

RFT

5.00

RFT

5.00

Clips

0.015

Pkt

7.00

Pkt

0.11

Cable 2/C 250V 3/0.029

2.000

RFT

22.00

RFT

44.00

67.29

49.11

Day

5.63

0.17

10.71

5.80

22

TOTAL

MATERIAL

LABOUR
0.006

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

66.94

Labour Rates Per

Rft

Rs.

7.03

LABOUR

12.04

Per Meter : Rs 219.58


Per Meter : Rs 23.07

1,650

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-47-b

(British) :

Rft

Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.029

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Batten 1/2"

1.000

RFT

5.00

RFT

5.00

Clips

0.015

Pkt

7.00

Pkt

0.11

Cable 2/C 250V 7/0.029

2.000

RFT

29.00

RFT

58.00

68.86

63.11

Day

5.63

0.17

9.14

5.80

22

TOTAL

MATERIAL

LABOUR
0.006

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

84.02

Labour Rates Per

Rft

Rs.

7.03

LABOUR

15.12

Per Meter : Rs 275.60


Per Meter : Rs 23.07

1,651

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-47-c

(British) :

Rft

Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.044

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clips

0.030

Pkt

7.00

Pkt

0.21

Sahl Wood Batten 3/4"

1.000

RFT

7.00

RFT

7.00

Cable 2/C 250V 7/0.044

2.000

RFT

66.00

RFT

132.00

70.45

139.21

Day

9.00

0.27

7.55

9.27

22

TOTAL

MATERIAL

LABOUR
0.010

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

181.09

Labour Rates Per

Rft

Rs.

11.25

LABOUR

32.61

Per Meter : Rs 593.98


Per Meter : Rs 36.90

1,652

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-47-d

(British) :

Rft

Wiring of main & sub-main in 2 single core PVC insulated & sheathed
cable : 7/0.064

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clips

0.030

Pkt

7.00

Pkt

0.21

Sahl Wood Batten 3/4"

1.000

RFT

7.00

RFT

7.00

Cable 2/C 250V 7/0.64

2.000

RFT

173.00

RFT

346.00

71.71

353.21

Day

16.20

0.49

6.29

16.69

22

TOTAL

MATERIAL

LABOUR
0.018

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

451.17

Labour Rates Per

Rft

Rs.

20.25

LABOUR

81.27

Per Meter : Rs 1,479.84


Per Meter : Rs 66.42

1,653

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-48-a

(British) :

Rft

Wiring of sub main/earthing in 1 single core PVC insulated &


sheathed cable : 3/0.029

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Batten 1/2"

1.000

RFT

5.00

RFT

5.00

Clips

0.030

Pkt

7.00

Pkt

0.21

Cable S/C 250V 3/0.029

1.000

RFT

7.00

RFT

7.00

MATERIAL

57.11

12.21

Day

3.82

0.11

20.89

3.94

22

TOTAL

LABOUR
0.004

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

19.68

Labour Rates Per

Rft

Rs.

4.78

LABOUR

3.53

Per Meter : Rs 64.56


Per Meter : Rs 15.68

1,654

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-48-b

(British) :

Rft

Wiring of sub main/earthing in 1 single core PVC insulated &


sheathed cable : 7/0.029

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Batten 1/2"

1.000

RFT

5.00

RFT

5.00

Clips

0.030

Pkt

7.00

Pkt

0.21

Cable S/C 250V 7/0.029

1.000

RFT

15.00

RFT

15.00

63.66

20.21

Day

3.60

0.11

14.34

3.71

22

TOTAL

MATERIAL

LABOUR
0.004

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

29.16

Labour Rates Per

Rft

Rs.

4.50

LABOUR

5.24

Per Meter : Rs 95.65


Per Meter : Rs 14.76

1,655

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-48-c

(British) :

Rft

Wiring of sub main/earthing in 1 single core PVC insulated &


sheathed cable : 7/0.044

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clips

0.030

Pkt

7.00

Pkt

0.21

Sahl Wood Batten 3/4"

1.000

RFT

7.00

RFT

7.00

Cable S/C 250V 7/0.044

1.000

RFT

35.00

RFT

35.00

69.11

42.21

Day

3.60

0.11

8.89

3.71

22

TOTAL

MATERIAL

LABOUR
0.004

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

56.00

Labour Rates Per

Rft

Rs.

4.50

LABOUR

10.08

Per Meter : Rs 183.68


Per Meter : Rs 14.76

1,656

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-48-d

(British) :

Rft

Wiring of sub main/earthing in 1 single core PVC insulated &


sheathed cable : 7/0.064

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Clips

0.030

Pkt

7.00

Pkt

0.21

Sahl Wood Batten 3/4"

1.000

RFT

7.00

RFT

7.00

Cable S/C 250V 7/0.064

1.000

RFT

74.00

RFT

74.00

69.60

81.21

Day

6.30

0.19

8.40

6.49

22

TOTAL

MATERIAL

LABOUR
0.007

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

106.96

Labour Rates Per

Rft

Rs.

7.88

LABOUR

19.25

Per Meter : Rs 350.81


Per Meter : Rs 25.83

1,657

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-49

(British) :

Each

Wiring of light point in 3/0.029 PVC insulated sheathed cable on


sahl wood strip batten

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sahl Wood Batten 1/2"

44.986

RFT

5.00

RFT

224.93

Clips

2.000

Pkt

7.00

Pkt

14.00

Cable S/C 250V 3/0.029

134.959

RFT

7.00

RFT

944.71

Round Block

2.000

No

25.00

No

50.00

Two Way Switch

2.000

No

50.00

No

100.00

TOTAL

MATERIAL

72.65

1,333.64

Day

43.20

1.30

5.35

44.50

22

LABOUR
0.048

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

302.91

Composite Rates Per

Each

Rs.

1,681.04

Cost Per Each: 1,681.04

Labour Rates Per

Each

Rs.

54.00

Cost Per Each: 54.00

1,658

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-50

(British) :

Each

Wiring of light/fan/call-bell point in 3/0.029 PVC insulated bare


cable in PVC pipe recessed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
PVC Conduit I

29.989

RFT

15.00

RFT

449.84

Cable S/C 250V 3/0.029

59.981

RFT

7.00

RFT

419.87

Piano Switch

1.000

No

80.00

No

80.00

Insulation Tape

3.000

No

20.00

No

60.00

Concealed Wooden Box

1.000

No

60.00

No

60.00

TOTAL

MATERIAL

72.26

1,069.71

Day

40.50

1.22

5.74

41.72

22

LABOUR
0.045

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

244.25

Composite Rates Per

Each

Rs.

1,355.67

Cost Per Each: 1,355.67

Labour Rates Per

Each

Rs.

50.63

Cost Per Each: 50.63

1,659

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-51

(British) :

Each

Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC insulated bare


cable in PVC pipe recessed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
PVC Conduit I

19.994

RFT

15.00

RFT

299.91

Cable S/C 250V 3/0.029

7.188

RFT

7.00

RFT

50.31

Piano Switch

1.000

No

80.00

No

80.00

Insulation Tape

3.000

No

20.00

No

60.00

Wall Socket

1.000

No

30.00

No

30.00

Concealed Wooden Box

1.000

No

60.00

No

60.00

TOTAL

MATERIAL

72.53

580.22

Day

19.80

0.59

5.47

20.39

22

LABOUR
0.022

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

732.62

Cost Per Each: 732.62

Labour Rates Per

Each

Rs.

24.75

Cost Per Each: 24.75

132.01

1,660

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-52

(British) :

Each

Wiring of light point in 3/0.029 PVC insulated bare cable in PVC


pipe recessed in wall comp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
PVC Conduit I

44.985

RFT

15.00

RFT

674.78

Cable S/C 250V 3/0.029

134.959

RFT

7.00

RFT

944.71

Insulation Tape

3.000

No

20.00

No

60.00

Concealed Wooden Box

2.000

No

60.00

No

120.00

Piano Switch 2 Way

2.000

No

120.00

No

240.00

TOTAL

MATERIAL

72.82

2,039.49

Day

61.20

1.84

5.18

63.04

22

LABOUR
0.068

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

462.15

Composite Rates Per

Each

Rs.

2,564.68

Cost Per Each: 2,564.68

Labour Rates Per

Each

Rs.

76.50

Cost Per Each: 76.50

1,661

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-53

(British) :

Each

Special earthing of iron/metal clad switches etc with copper wire


No. 8 SWG in GI pipe 1/2" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I pipe (light) 0.5"

31.990

RFT

50.00

RFT

1,599.51

Copper Plate 24"x24"x1/4"

1.000

No

7,000.00

No

7,000.00

Salt & Charcoal

0.500

Each

120.00

Each

Copper Wire 8 swg

4.250

Kg

900.00

Kg

TOTAL

MATERIAL

60.00
3,825.00

70.91

12,484.51

Day

720.00

21.60

7.09

741.60

22

LABOUR
0.800

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,904.99

Composite Rates Per

Each

Rs.

16,131.10

Cost Per Each: 16,131.10

Labour Rates Per

Each

Rs.

900.00

Cost Per Each: 900.00

1,662

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-54

(British) :

Each

Supply and Erection enclosed switch of bakelite DP (China) 15/30


Amp. fixed on wooden board complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Switch China Made

1.000

No

110.00

No

110.00

Wooden Board Box

1.000

No

250.00

No

250.00

Plastic Sheet

0.670

Kg

400.00

Kg

268.00

TOTAL

MATERIAL

69.99

628.00

Day

45.00

1.35

8.01

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

822.41

Cost Per Each: 822.41

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

148.06

1,663

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-55-a

(British) :

Each

Supply and erection of fancy wall type bracket with brass holder &
fancy shade : Single

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fancy Wall Bracket Single

150.00

No

TOTAL

MATERIAL

No

150.00

60.48

150.00

Day

36.00

1.08

17.52

37.08

22

LABOUR
0.040

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

228.00

Cost Per Each: 228.00

Labour Rates Per

Each

Rs.

45.00

Cost Per Each: 45.00

40.92

1,664

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-55-b

(British) :

Each

Supply and erection of fancy wall type bracket with brass holder &
fancy shade : Double

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fancy Wall Bracket Double

240.00

No

TOTAL

MATERIAL

No

240.00

65.22

240.00

Day

36.00

1.08

12.78

37.08

22

LABOUR
0.040

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

337.80

Cost Per Each: 337.80

Labour Rates Per

Each

Rs.

45.00

Cost Per Each: 45.00

60.72

1,665

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-56-a

(British) :

Each

Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 6" dia.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Globe 6"

1.000

No

80.00

No

80.00

Bulb I

1.000

No

20.00

No

20.00

TOTAL

MATERIAL

51.72

100.00

Day

45.00

1.35

26.28

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

178.25

Cost Per Each: 178.25

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

31.90

1,666

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-56-b

(British) :

Each

Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 8" dia.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb I

1.000

No

20.00

No

20.00

Globe 8"

1.000

No

100.00

No

100.00

TOTAL

MATERIAL

54.55

120.00

Day

45.00

1.35

23.45

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

202.65

Cost Per Each: 202.65

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

36.30

1,667

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-56-c

(British) :

Each

Supply and Erection white round globe with holder, gallery & 100
Watt bulb complete : 10" dia.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb I

1.000

No

20.00

No

20.00

Globe 10"

1.000

No

120.00

No

120.00

TOTAL

MATERIAL

56.76

140.00

Day

45.00

1.35

21.24

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

227.05

Cost Per Each: 227.05

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

40.70

1,668

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-57-a

(British) :

Each

Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 8" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb I

1.000

No

20.00

No

20.00

Globe 8"

1.000

No

100.00

No

100.00

TOTAL

MATERIAL

54.55

120.00

Day

45.00

1.35

23.45

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

202.65

Cost Per Each: 202.65

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

36.30

1,669

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-57-b

(British) :

Each

Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 10" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb I

1.000

No

20.00

No

20.00

Globe 10"

1.000

No

120.00

No

120.00

TOTAL

MATERIAL

56.76

140.00

Day

45.00

1.35

21.24

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

227.05

Cost Per Each: 227.05

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

40.70

1,670

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-57-c

(British) :

Each

Supply and Erection white flat globe with holder, gallery & 100 W
bulb complete : 12" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb I

1.000

No

20.00

No

20.00

Globe 12"

1.000

No

140.00

No

140.00

TOTAL

MATERIAL

58.54

160.00

Day

45.00

1.35

19.46

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

251.45

Cost Per Each: 251.45

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

45.10

1,671

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-58

(British) :

Each

Supply and Erection white round globe 6" dia with angle type
bakelite gallery, holder & 60-W bulb complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Globe 6"

1.000

No

80.00

No

80.00

Globe 12"

1.000

No

140.00

No

140.00

TOTAL

MATERIAL

62.26

220.00

Day

45.00

1.35

15.74

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

324.65

Cost Per Each: 324.65

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

58.30

1,672

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-59

Item Name :

(British) :

Each

Supply and Erection 1' long strip light fitting comp. with cover of
opalescent perspex in plain finish 10-Watt

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Strip Light Fitting

250.00

No

TOTAL

MATERIAL

No

250.00

55.15

250.00

Day

90.00

2.70

22.85

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

417.50

Cost Per Each: 417.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

74.80

1,673

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-60

Item Name :

(British) :

Each

Supply and Erection double fluorescent tube light fitting 2 No. 4'
long, 40-W with 2 chokes & starters complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Tube Light Phillips

500.00

Set

TOTAL

MATERIAL

Set

500.00

61.22

500.00

Day

112.50

3.38

16.78

115.88

22

LABOUR
0.125

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

750.63

Cost Per Each: 750.63

Labour Rates Per

Each

Rs.

140.63

Cost Per Each: 140.63

134.75

1,674

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-61-a

(British) :

Each

Supply and Erection fluorescent tube light fitting including 4'


rod, choke, starter, flexible wire etc : Single

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Single Light Phillips

90.00

No

TOTAL

MATERIAL

No

90.00

37.50

90.00

Day

90.00

2.70

40.50

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

222.30

Cost Per Each: 222.30

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

39.60

1,675

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-61-b

(British) :

Each

Supply and Erection fluorescent tube light fitting including 4'


rod, choke, starter, flexible wire etc : Double

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Double Light Phillips

1,000.00

No

TOTAL

MATERIAL

No

1,000.00

68.81

1,000.00

Day

90.00

2.70

9.19

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

239.80

Composite Rates Per

Each

Rs.

1,332.50

Cost Per Each: 1,332.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,676

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-62

(British) :

Each

Supply and Erection porch-light fitting round/square type with


gallery, holder & 40 W bulb

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Porch Light Complete

750.00

No

TOTAL

MATERIAL

No

750.00

68.81

750.00

Day

67.50

2.03

9.19

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

999.38

Cost Per Each: 999.38

Labour Rates Per

Each

Rs.

84.38

Cost Per Each: 84.38

179.85

1,677

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-63-a

(British) :

Each

Supply and Erection gate-light fitting complete with holder &


160-Watt mercury blended lamp: Small

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Gate Light (Small)

1.000

No

550.00

No

550.00

Bulb II

1.000

No

20.00

No

20.00

TOTAL

MATERIAL

64.77

570.00

Day

90.00

2.70

13.23

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

807.90

Cost Per Each: 807.90

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

145.20

1,678

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-63-b

Item Name :

(British) :

Each

Supply and Erection gate-light fitting complete with holder &


160-Watt mercury blended lamp: Medium

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Gate Light (Medium)

1.000

No

900.00

No

900.00

Bulb II

1.000

No

20.00

No

20.00

TOTAL

MATERIAL

68.32

920.00

Day

90.00

2.70

9.68

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

222.20

Composite Rates Per

Each

Rs.

1,234.90

Cost Per Each: 1,234.90

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,679

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-63-c

(British) :

Each

Supply and Erection gate-light fitting complete with holder &


160-Watt mercury blended lamp: Large

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb II

1.000

No

20.00

No

20.00

Gate Light (Large)

1.000

No

550.00

No

550.00

TOTAL

MATERIAL

64.77

570.00

Day

90.00

2.70

13.23

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

807.90

Cost Per Each: 807.90

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

145.20

1,680

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-64-a

(British) :

Each

Supply and Erection garden-light fitting with holder and 160 W


mercury blended lamp & choke : 18" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Garden Light 18"

1.000

No

1,500.00

No

1,500.00

Bulb III

1.000

No

20.00

No

20.00

TOTAL

MATERIAL

65.33

1,520.00

Day

225.00

6.75

12.67

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

383.90

Composite Rates Per

Each

Rs.

2,135.65

Cost Per Each: 2,135.65

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,681

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-64-b

(British) :

Each

Supply and Erection garden-light fitting with holder and 160 W


mercury blended lamp & choke : 19" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb III

1.000

No

20.00

No

20.00

Garden Light 19"

1.000

No

1,500.00

No

1,500.00

TOTAL

MATERIAL

65.33

1,520.00

Day

225.00

6.75

12.67

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

383.90

Composite Rates Per

Each

Rs.

2,135.65

Cost Per Each: 2,135.65

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,682

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-64-c

(British) :

Each

Supply and Erection garden-light fitting with holder and 160 W


mercury blended lamp & choke : 22" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb III

1.000

No

20.00

No

20.00

Garden Light 22"

1.000

No

1,500.00

No

1,500.00

TOTAL

MATERIAL

65.33

1,520.00

Day

225.00

6.75

12.67

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

383.90

Composite Rates Per

Each

Rs.

2,135.65

Cost Per Each: 2,135.65

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,683

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-65-a

(British) :

Each

Supply and Erection garden-light fitting with porcelain holder 125


W mercury vapour lamp & choke : 18" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Garden Light Pore 18"

1.000

No

1,000.00

No

1,000.00

Choke

1.000

No

800.00

No

800.00

Bulb IV

1.000

No

80.00

No

80.00

TOTAL

MATERIAL

66.98

1,880.00

Day

225.00

6.75

11.02

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

463.10

Composite Rates Per

Each

Rs.

2,574.85

Cost Per Each: 2,574.85

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,684

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-65-b

(British) :

Each

Supply and Erection garden-light fitting with porcelain holder 125


W mercury vapour lamp & choke : 19" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Choke

1.000

No

800.00

No

800.00

Bulb IV

1.000

No

80.00

No

80.00

Garden Light Pore 19"

1.000

No

3,000.00

No

3,000.00

TOTAL

MATERIAL

70.89

3,880.00

Day

225.00

6.75

7.11

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

903.10

Composite Rates Per

Each

Rs.

5,014.85

Cost Per Each: 5,014.85

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,685

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-65-c

(British) :

Each

Supply and Erection garden-light fitting with porcelain holder 125


W mercury vapour lamp & choke : 22" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Choke

1.000

No

800.00

No

800.00

Bulb IV

1.000

No

80.00

No

80.00

Garden Light Pore 22"

1.000

No

3,000.00

No

3,000.00

TOTAL

MATERIAL

70.89

3,880.00

Day

225.00

6.75

7.11

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

903.10

Composite Rates Per

Each

Rs.

5,014.85

Cost Per Each: 5,014.85

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,686

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-66-a

(British) :

Each

Supply and Erection flood-light fitting with holder, complete 14"


dia with 500-W lamp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flood Light 500 W

2,500.00

No

TOTAL

MATERIAL

No

2,500.00

68.81

2,500.00

Day

225.00

6.75

9.19

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

599.50

Composite Rates Per

Each

Rs.

3,331.25

Cost Per Each: 3,331.25

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,687

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-66-b

(British) :

Each

Supply and Erection flood-light fitting with holder, complete 19"


dia with 1000-W lamp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bulb V

1.000

No

200.00

No

200.00

Flood Light 1000 W

1.000

No

5,000.00

No

5,000.00

TOTAL

MATERIAL

71.89

5,200.00

Day

225.00

6.75

6.11

231.75

22

LABOUR
0.250

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,193.50

Composite Rates Per

Each

Rs.

6,625.25

Cost Per Each: 6,625.25

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

1,688

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-67

(British) :

Each

Making hole in wall with necessary masonry work for exhaust fan any
size complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
3.000

Insulation Tape

20.00

No

TOTAL

MATERIAL

No

60.00

23.08

60.00

Day

135.00

4.05

54.92

139.05

22

42.90

LABOUR
0.150

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

241.95

Cost Per Each: 241.95

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,689

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-68-a

(British) :

Each

Supply and Erection best quality AC ceiling fan complete with GI


rod, canopy, blades & regulator : 36" sweep

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fan Ceiling 36"

2,800.00

No

TOTAL

MATERIAL

No

2,800.00

72.10

2,800.00

Day

112.50

3.38

5.90

115.88

22

LABOUR
0.125

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

640.75

Composite Rates Per

Each

Rs.

3,556.63

Cost Per Each: 3,556.63

Labour Rates Per

Each

Rs.

140.63

Cost Per Each: 140.63

1,690

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-68-b

(British) :

Each

Supply and Erection best quality AC ceiling fan complete with GI


rod, canopy, blades & regulator : 48" sweep

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fan Ceiling 48"

3,000.00

No

TOTAL

MATERIAL

No

3,000.00

72.29

3,000.00

Day

112.50

3.38

5.71

115.88

22

LABOUR
0.125

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

684.75

Composite Rates Per

Each

Rs.

3,800.63

Cost Per Each: 3,800.63

Labour Rates Per

Each

Rs.

140.63

Cost Per Each: 140.63

1,691

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-68-c

(British) :

Each

Supply and Erection best quality AC ceiling fan complete with GI


rod, canopy, blades & regulator : 56" sweep

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fan Ceiling 56"

3,500.00

No

TOTAL

MATERIAL

No

3,500.00

72.66

3,500.00

Day

112.50

3.38

5.34

115.88

22

LABOUR
0.125

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

794.75

Composite Rates Per

Each

Rs.

4,410.63

Cost Per Each: 4,410.63

Labour Rates Per

Each

Rs.

140.63

Cost Per Each: 140.63

1,692

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-69-a

(British) :

Each

Supply and Erection best quality exhaust fan complete with shutter
& regulator : 12"sweep

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fan Exhaust 12"

2,500.00

No

TOTAL

MATERIAL

No

2,500.00

72.39

2,500.00

Day

90.00

2.70

5.61

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

569.80

Composite Rates Per

Each

Rs.

3,162.50

Cost Per Each: 3,162.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,693

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-69-b

(British) :

Each

Supply and Erection best quality exhaust fan complete with shutter
& regulator : 16"sweep

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fan Exhaust 16"

2,800.00

No

TOTAL

MATERIAL

No

2,800.00

72.66

2,800.00

Day

90.00

2.70

5.34

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

635.80

Composite Rates Per

Each

Rs.

3,528.50

Cost Per Each: 3,528.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,694

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-69-c

(British) :

Each

Supply and Erection best quality exhaust fan complete with shutter
& regulator : 18"sweep

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fan Exhaust 18"

3,000.00

No

TOTAL

MATERIAL

No

3,000.00

72.82

3,000.00

Day

90.00

2.70

5.18

92.70

22

LABOUR
0.100

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

679.80

Composite Rates Per

Each

Rs.

3,772.50

Cost Per Each: 3,772.50

Labour Rates Per

Each

Rs.

112.50

Cost Per Each: 112.50

1,695

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-70-a

(British) :

Each

Supply and Erection transpower auto circuit breaker 3-phase, 400V


fungus moisture proofing : 30 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Auto C.Breaker 3P 30Amp

3,000.00

No

TOTAL

MATERIAL

No

3,000.00

66.96

3,000.00

Day

360.00

10.80

11.04

370.80

22

LABOUR
0.400

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

739.20

Composite Rates Per

Each

Rs.

4,110.00

Cost Per Each: 4,110.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,696

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-70-b

(British) :

Each

Supply and Erection transpower auto circuit breaker 3-phase, 400V


fungus moisture proofing : 60 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Auto C.Breaker 3P 60Amp

4,000.00

No

TOTAL

MATERIAL

No

4,000.00

68.81

4,000.00

Day

360.00

10.80

9.19

370.80

22

LABOUR
0.400

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

959.20

Composite Rates Per

Each

Rs.

5,330.00

Cost Per Each: 5,330.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,697

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-70-c

(British) :

Each

Supply and Erection transpower auto circuit breaker 3-phase, 400V


fungus moisture proofing : 100 Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Auto C.Breaker 3P 100Amp

5,500.00

No

TOTAL

MATERIAL

5,500.00

No

69.59

5,500.00

Day

427.50

12.83

8.41

440.33

22

LABOUR
0.475

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,304.05

Composite Rates Per

Each

Rs.

7,244.38

Cost Per Each: 7,244.38

Labour Rates Per

Each

Rs.

534.38

Cost Per Each: 534.38

1,698

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-71-a

(British) :

Each

Supply and Erection single phase imported auto circuit breaker 6


Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Auto C.Breaker 1P 6 Amp

400.00

No

TOTAL

MATERIAL

No

400.00

64.17

400.00

Day

67.50

2.03

13.83

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

572.38

Cost Per Each: 572.38

Labour Rates Per

Each

Rs.

84.38

Cost Per Each: 84.38

102.85

1,699

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-71-b

(British) :

Each

Supply and Erection single phase imported auto circuit breaker 15


Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Auto C.Breaker 1P 15 Amp

325.00

No

TOTAL

MATERIAL

No

325.00

62.10

325.00

Day

67.50

2.03

15.90

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

480.88

Cost Per Each: 480.88

Labour Rates Per

Each

Rs.

84.38

Cost Per Each: 84.38

86.35

1,700

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-71-c

(British) :

Each

Supply and Erection single phase imported auto circuit breaker 20


Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Auto C.Breaker 1P 20 Amp

325.00

No

TOTAL

MATERIAL

No

325.00

62.10

325.00

Day

67.50

2.03

15.90

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

480.88

Cost Per Each: 480.88

Labour Rates Per

Each

Rs.

84.38

Cost Per Each: 84.38

86.35

1,701

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-71-d

(British) :

Each

Supply and Erection single phase imported auto circuit breaker 30


Amp.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Auto C.Breaker 1P 30 Amp

450.00

No

TOTAL

MATERIAL

No

450.00

65.22

450.00

Day

67.50

2.03

12.78

69.53

22

LABOUR
0.075

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

633.38

Cost Per Each: 633.38

Labour Rates Per

Each

Rs.

84.38

Cost Per Each: 84.38

113.85

1,702

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-72-a

(British) :

Each

Supply and Erection of bus bars for 500 volts 3 phase AC S/W 4
copper bars 40 Amp with bar size 1 1/2" X 1/8"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Porcelain Bridge

8.000

No

75.00

No

600.00

Copper strip 350x40x3mm

4.000

No

850.00

No

3,400.00

Box 450x300x40 mm

1.000

No

1,450.00

No

1,450.00

L-iron II

1.000

No

400.00

No

400.00

Rag bolt 225x16mm

4.000

No

50.00

No

200.00

Miscellaneous II

1.000

LS

50.00

LS

50.00

TOTAL

MATERIAL

67.28

6,100.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Electrician II

0.750

Day

600.00

Day

450.00

21.00

10.72

721.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,496.00

Composite Rates Per

Each

Rs.

8,317.00

Cost Per Each: 8,317.00

Labour Rates Per

Each

Rs.

875.00

Cost Per Each: 875.00

1,703

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-72-b

(British) :

Each

Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 100 Amp with bar size1 1 1/2" X 1/8"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Porcelain Bridge

8.000

No

75.00

No

600.00

Copper strip 350x40x3mm

4.000

No

850.00

No

3,400.00

Box 450x300x40 mm

1.000

No

1,450.00

No

1,450.00

L-iron II

1.000

No

400.00

No

400.00

Rag bolt 225x16mm

4.000

No

50.00

No

200.00

Miscellaneous II

1.500

LS

50.00

LS

75.00

TOTAL

MATERIAL

67.31

6,125.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Electrician II

0.750

Day

600.00

Day

450.00

21.00

10.69

721.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,501.50

Composite Rates Per

Each

Rs.

8,347.50

Cost Per Each: 8,347.50

Labour Rates Per

Each

Rs.

875.00

Cost Per Each: 875.00

1,704

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-72-c

(British) :

Each

Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 200 Amp with bar size 2"X 1/8"

Item Name :

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Porcelain Bridge

8.000

No

75.00

No

600.00

Box 450x300x40 mm

1.000

No

1,450.00

No

1,450.00

L-iron II

1.000

No

400.00

No

400.00

Rag bolt 225x16mm

4.000

No

50.00

No

200.00

Miscellaneous II

2.000

LS

50.00

LS

100.00

Copper strip

4.000

No

850.00

No

3,400.00

350x50x4mm

TOTAL

MATERIAL

62.33

6,150.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Electrician II

1.250

Day

600.00

Day

750.00

37.50

15.67

1,287.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,628.00

Composite Rates Per

Each

Rs.

9,065.50

Cost Per Each: 9,065.50

Labour Rates Per

Each

Rs.

1,562.50

Cost Per Each: 1,562.50

1,705

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-72-d

(British) :

Each

Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 300 Amp with bar zise 2" X 3/16"

Item Name :

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Porcelain Bridge

8.000

No

75.00

No

600.00

Box 450x300x40 mm

1.000

No

1,450.00

No

1,450.00

L-iron II

1.000

No

400.00

No

400.00

Rag bolt 225x16mm

4.000

No

50.00

No

200.00

Miscellaneous II

2.500

LS

50.00

LS

125.00

Copper strip

4.000

No

850.00

No

3,400.00

350x50x4mm

TOTAL

MATERIAL

60.15

6,175.00

LABOUR
Coolie

1.250

Day

500.00

Day

625.00

Electrician II

1.500

Day

600.00

Day

900.00

45.75

17.85

1,570.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,694.00

Composite Rates Per

Each

Rs.

9,439.75

Cost Per Each: 9,439.75

Labour Rates Per

Each

Rs.

1,906.25

Cost Per Each: 1,906.25

1,706

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-72-e

(British) :

Each

Supply and Erection of bus bars 500 volts 3 phase AC supply with 4
copper bars - 500 Amp with zise 2" X 1/4"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Porcelain Bridge

8.000

No

75.00

No

600.00

Box 450x300x40 mm

1.000

No

1,450.00

No

1,450.00

L-iron II

1.000

No

400.00

No

400.00

Rag bolt 225x16mm

4.000

No

50.00

No

200.00

Miscellaneous II

3.000

LS

50.00

LS

150.00

Copper strip 350x50x6mm

4.000

No

1,000.00

No

4,000.00

TOTAL

MATERIAL

60.00

6,800.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Electrician II

2.000

Day

600.00

Day

1,200.00

51.00

18.00

1,751.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,870.00

Composite Rates Per

Each

Rs.

10,421.00

Cost Per Each: 10,421.00

Labour Rates Per

Each

Rs.

2,125.00

Cost Per Each: 2,125.00

1,707

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-73-a

(British) :

Each

Supply and Erection of bracket of channel 3" X 1 1/2" X 1/4"


section 2' long for 2 lines

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
MS Channel 3x1.5x1/4

3.500

Kg

50.00

Kg

175.00

Steel plate 2 x 3/4 x 1/4

0.900

Kg

55.00

Kg

49.50

Nut & bolt 5/8"

2.000

No

15.00

No

30.00

TOTAL

MATERIAL

44.86

254.50

LABOUR
Black Smith

0.150

Day

900.00

Day

135.00

Electrician I

0.040

Day

900.00

Day

36.00

5.13

33.14

176.13

22

93.61

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

524.24

Cost Per Each: 524.24

Labour Rates Per

Each

Rs.

213.75

Cost Per Each: 213.75

1,708

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-73-b

(British) :

Each

Supply and Erection of bracket of MS channel 3" X 1 1/2" X 1/4"


Section:- 4' long for 4 lines

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel plate 2 x 3/4 x 1/4

0.900

Kg

55.00

Kg

49.50

Nut & bolt 5/8"

4.000

No

15.00

No

60.00

MS Channel 3 x 1.5 x 1/4

7.000

Kg

60.00

Kg

420.00

TOTAL

MATERIAL

53.27

529.50

LABOUR
Black Smith

0.200

Day

900.00

Day

180.00

Electrician I

0.040

Day

900.00

Day

36.00

6.48

24.73

222.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

915.99

Cost Per Each: 915.99

Labour Rates Per

Each

Rs.

270.00

Cost Per Each: 270.00

164.01

1,709

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-74

(British) :

Rft

Supply and Erection of anchor rod honley type for poles i/e clamps
& 7/13 SWG stay wire straning screws PCC 1:3:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Miscellaneous II

0.046

Ls

50.00

Ls

2.29

Stay Wire 7/12 SWG

1.000

RFT

75.00

RFT

75.00

Double clamp 8"

0.030

No

250.00

No

7.62

Straining

0.030

No

110.00

No

3.35

Eye batts

0.030

No

50.00

No

1.52

TOTAL

MATERIAL

69.35

89.79

LABOUR
Coolie

0.009

Day

500.00

Day

4.57

Electrician I

0.003

Day

900.00

Day

2.74

0.22

8.65

7.54

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

118.69

Labour Rates Per

Rft

Rs.

9.15

LABOUR

21.36

Per Meter : Rs 389.29


Per Meter : Rs 30.00

1,710

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-75-a

(British) :

SFT

Supply and Erection cubical type factory fabricated floor/wall


mounting steel main board comp. : On surface

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Steel Main Electric Board

500.00

Sft

TOTAL

MATERIAL

Sft

500.00

13.64

500.00

Day

2,250.00

67.50

64.36

2,317.50

22

605.00

LABOUR
2.500

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

SFT

Rs.

3,422.50

Per SQM : Rs 36,826.10

Labour Rates Per

SFT

Rs.

2,812.50

Per SQM : Rs 30,262.50

1,711

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-75-b

(British) :

SFT

Supply and Erection cubical type factory fabricated floor/wall


mounting steel main board comp. : Recessed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Steel Main Electric Board

500.00

Sft

TOTAL

MATERIAL

Sft

500.00

12.06

500.00

Day

2,610.00

78.30

65.94

2,688.30

22

684.20

LABOUR
2.900

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

SFT

Rs.

3,872.50

Per SQM : Rs 41,668.10

Labour Rates Per

SFT

Rs.

3,262.50

Per SQM : Rs 35,104.50

1,712

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-76-a

(British) :

Each

Flouresent tube lights fitting 2.5x2.5 feet square type suitable


for fixing in recess or direct on complete with 4 Nos 2 ft 20 watts
tubes, chokes, starters, holders complete in all respect in steel
body.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fluoresent tube light 2x2" com

3,500.00

No

TOTAL

MATERIAL

No

3,500.00

71.92

3,500.00

Day

150.00

4.50

6.08

154.50

22

LABOUR
0.250

Electrician II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

803.00

Composite Rates Per

Each

Rs.

4,457.50

Cost Per Each: 4,457.50

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

1,713

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-76-b

(British) :

each

Supply and Fixing of fluoresent tube fitting rectanglular box types


housing made of 22 SWG stave enamelled steel sheet having spring
load inner frame attachement with acrylic or polythene complete
with 2 No 4 ft 40 watts

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fluoresent tube fitting rectan

2,000.00

No

TOTAL

MATERIAL

No

2,000.00

69.77

2,000.00

Day

150.00

4.50

8.23

154.50

22

LABOUR
0.250

Electrician II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

473.00

Composite Rates Per

each

Rs.

2,627.50

Cost Per Each: 2,627.50

Labour Rates Per

each

Rs.

187.50

Cost Per Each: 187.50

1,714

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-77-a

(British) :

each

Supply and Fixing electric AC exhuast/fresh air circulation(double


way) 220/230 single phase plastic frame body and blade complete
8"x8"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Exhaust Fan 8"x8"

1.000

No

1,600.00

No

Beading 2'

3.500

Rft

80.00

Rft

280.00

Lasani 1/2" Thick

2.770

Sft

45.00

Sft

124.65

66.39

2,004.65

TOTAL

MATERIAL

1,600.00

LABOUR
Carpenter

0.250

No

800.00

No

200.00

Electrician II

0.100

Day

600.00

Day

60.00

7.80

11.61

267.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

498.22

Composite Rates Per

each

Rs.

2,770.67

Cost Per Each: 2,770.67

Labour Rates Per

each

Rs.

325.00

Cost Per Each: 325.00

1,715

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-77-b

Item Name :

(British) :

each

Supply and Fixing electric AC exhuast/fresh air circulation(double


way) 220/230 single phase plastic frame body and blade complete
10"x10"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Exhaust Fan 10"x10"

1.000

Day

2,000.00

Day

2,000.00

Beading 2'

4.000

Rft

80.00

Rft

320.00

Lasani 1/2" Thick

3.330

Sft

45.00

Sft

149.85

67.86

2,469.85

TOTAL

MATERIAL

LABOUR
Carpenter

0.250

Day

800.00

Day

200.00

Electrician II

0.100

Day

600.00

Day

60.00

7.80

10.14

267.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

600.57

Composite Rates Per

each

Rs.

3,338.22

Cost Per Each: 3,338.22

Labour Rates Per

each

Rs.

325.00

Cost Per Each: 325.00

1,716

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

15-77-c

Item Name :

(British) :

each

Supply and fixing electric AC exhaust/fresh air circulation(Double


way) 220/230 single phase plastic frame body and blade complete
12"x12"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Exhaust Fan 12"x12"

1.000

No

2,800.00

No

Beading 2'

4.670

Rft

80.00

Rft

373.60

Lasani 1/2" Thick

3.890

Sft

45.00

Sft

175.05

72.87

3,348.65

TOTAL

MATERIAL

2,800.00

LABOUR
Carpenter

0.100

Day

800.00

Day

80.00

Electrician II

0.030

Day

600.00

Day

18.00

2.94

5.13

100.94

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

758.26

Composite Rates Per

each

Rs.

4,207.85

Cost Per Each: 4,207.85

Labour Rates Per

each

Rs.

122.50

Cost Per Each: 122.50

1,717

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-78

(British) :

each

Supply and Fixing bracket fan pak made complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Bracket Fan complete set

3,800.00

No

TOTAL

MATERIAL

No

3,800.00

72.70

3,800.00

Day

120.00

3.60

5.30

123.60

22

LABOUR
0.200

Electrician II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

862.40

Composite Rates Per

each

Rs.

4,786.00

Cost Per Each: 4,786.00

Labour Rates Per

each

Rs.

150.00

Cost Per Each: 150.00

1,718

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-79-a

(British) :

Rft

Supply and Fixing PVC conduit for surface wiring (dura duct) 1/2"
including all charges for nail screws etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

PVC Conduit 1/2"

8.00

Rft

8.00

MATERIAL

44.48

8.00

Day

5.49

0.16

33.52

5.65

22

Rft

TOTAL

LABOUR
0.009

Electrician II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

16.62

Labour Rates Per

Rft

Rs.

6.86

LABOUR

2.97

Per Meter : Rs 54.51


Per Meter : Rs 22.50

1,719

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-79-b

(British) :

Rft

PVC conduit for surface wiring (dura duct) 1" including all charges
for nail screws etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

PVC Conduit 1"

12.00

Rft

TOTAL

MATERIAL

Rft

12.00

51.46

12.00

LABOUR
0.009

Electrician II

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

21.50

Labour Rates Per

Rft

Rs.

6.86

LABOUR

No

5.49

0.16

26.54

5.65

22

3.85

Per Meter : Rs 70.52


Per Meter : Rs 22.50

1,720

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-79-c

(British) :

Rft

PVC conduit for surface wiring (dura duct) 1.5" including all
charges for nail screws etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

PVC Conduit 1-1/2"

30.00

Rft

TOTAL

MATERIAL

Rft

30.00

63.40

30.00

LABOUR
0.009

Electrician II

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

43.46

Labour Rates Per

Rft

Rs.

6.86

LABOUR

No

5.49

0.16

14.60

5.65

22

7.81

Per Meter : Rs 142.55


Per Meter : Rs 22.50

1,721

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-79-d

(British) :

Rft

PVC conduit for surface wiring (dura duct) 2" including all charges
for nail screws etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

PVC Conduit 2"

42.00

Rft

TOTAL

MATERIAL

Rft

42.00

66.33

42.00

LABOUR
0.009

Electrician II

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

58.10

Labour Rates Per

Rft

Rs.

6.86

LABOUR

No

5.49

0.16

11.67

5.65

22

10.45

Per Meter : Rs 190.57


Per Meter : Rs 22.50

1,722

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-80

(British) :

each

Supply and Fixing dimmer switch complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Dimmer Switch

250.00

No

TOTAL

60.48

MATERIAL

No

250.00

250.00

LABOUR
0.100

Electrician II

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

No

60.00

1.80

17.52

61.80

22

Composite Rates Per

each

Rs.

380.00

Cost Per Each: 380.00

Labour Rates Per

each

Rs.

75.00

Cost Per Each: 75.00

68.20

1,723

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-81

(British) :

each

Supply and Fixing 20 Amp power plug

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plug 20 Amp

100.00

No

TOTAL

46.88

MATERIAL

No

100.00

100.00

LABOUR
0.100

Electrician II

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

No

60.00

1.80

31.13

61.80

22

Composite Rates Per

each

Rs.

197.00

Cost Per Each: 197.00

Labour Rates Per

each

Rs.

75.00

Cost Per Each: 75.00

35.20

1,724

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-82

(British) :

each

Supply and Fixing Asia porcelin power plug 30 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plug 30 Amp

120.00

No

TOTAL

50.00

MATERIAL

No

120.00

120.00

LABOUR
0.100

Electrician II

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

No

60.00

1.80

28.00

61.80

22

Composite Rates Per

each

Rs.

221.40

Cost Per Each: 221.40

Labour Rates Per

each

Rs.

75.00

Cost Per Each: 75.00

39.60

1,725

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-83

(British) :

each

Supply and fixing light plug 10 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plug 10 Amp

60.00

No

TOTAL

37.50

MATERIAL

No

60.00

60.00

LABOUR
0.100

Electrician II

600.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

No

60.00

1.80

40.50

61.80

22

Composite Rates Per

each

Rs.

148.20

Cost Per Each: 148.20

Labour Rates Per

each

Rs.

75.00

Cost Per Each: 75.00

26.40

1,726

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-84

(British) :

each

Supply and fitting of capacitor 2.2 uf for ceiling fans

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Capacitor 2.2 uf

85.00

No

TOTAL

MATERIAL

No

85.00

49.04

85.00

Day

45.00

1.35

28.96

46.35

22

LABOUR
0.050

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

each

Rs.

159.95

Cost Per Each: 159.95

Labour Rates Per

each

Rs.

56.25

Cost Per Each: 56.25

28.60

1,727

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-85

(British) :

each

Supply and fitting of ball bearing of size 6201, 6202 or 6203 for
ceiling fans

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Ball Bearing of size (6201,


6202, 6203)

200.00

No

TOTAL

MATERIAL

No

200.00

58.54

200.00

Day

56.25

1.69

19.46

57.94

22

LABOUR
0.063

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

each

Rs.

314.31

Cost Per Each: 314.31

Labour Rates Per

each

Rs.

70.31

Cost Per Each: 70.31

56.38

1,728

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-86

(British) :

each

Supply and erection of cut out, bakelite open type

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cut out bakelite open type

1.000

Day

65.00

Day

65.00

Screw 1"

2.000

Doz

24.00

Doz

48.00

68.96

113.00

Day

9.90

0.30

9.04

10.20

22

TOTAL

MATERIAL

LABOUR
0.011

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

each

Rs.

150.23

Cost Per Each: 150.23

Labour Rates Per

each

Rs.

12.37

Cost Per Each: 12.37

27.04

1,729

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-87

(British) :

Supply and erection of cut out bakelite Recessed

Detail

Qty

Unit

each

type cut out

Rate (Rs)

Amount

MATERIAL
Cut out bakelite recessed type

1.000

No

70.00

No

70.00

Screw 1"

2.000

Doz

24.00

Doz

48.00

69.19

118.00

Day

9.90

0.30

8.81

10.20

22

TOTAL

MATERIAL

LABOUR
0.011

Electrician I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

each

Rs.

156.33

Cost Per Each: 156.33

Labour Rates Per

each

Rs.

12.37

Cost Per Each: 12.37

28.14

1,730

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-88

(British) :

each

Supply and erection of kit kat 500 volts 15/20 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Kit Kat 500 volts 15/20 Amp

1.000

No

34.00

No

34.00

Screw 1"

1.000

Doz

24.00

Doz

24.00

58.40

58.00

TOTAL

MATERIAL

LABOUR
Coolie

0.004

Day

500.00

Day

2.08

Electrician I

0.016

Day

900.00

Day

14.40

0.49

19.60

16.97

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

each

Rs.

91.36

Cost Per Each: 91.36

Labour Rates Per

each

Rs.

20.60

Cost Per Each: 20.60

16.39

1,731

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-89

(British) :

Each

Supply and erection of kit kat 500 volts 30/35 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Kit Kat 500 volts 30/35 Amp

1.000

No

134.00

No

134.00

Screw 1"

1.000

Doz

24.00

Doz

24.00

67.16

158.00

TOTAL

MATERIAL

LABOUR
Coolie

0.004

Day

500.00

Day

2.25

Electrician I

0.018

Day

900.00

Day

16.20

0.55

10.84

19.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

215.82

Cost Per Each: 215.82

Labour Rates Per

Each

Rs.

23.06

Cost Per Each: 23.06

38.82

1,732

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-90

(British) :

each

Supply and erection of kit kat 500 volts 60/65 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Kit Kat 500 volts 60/65 Amp

1.000

No

220.00

No

220.00

Screw 1"

1.000

Doz

24.00

Doz

24.00

67.71

244.00

TOTAL

MATERIAL

LABOUR
Coolie

0.004

Day

500.00

Day

1.97

Electrician I

0.027

Day

900.00

Day

24.30

0.79

10.29

27.06

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

each

Rs.

330.52

Cost Per Each: 330.52

Labour Rates Per

each

Rs.

32.84

Cost Per Each: 32.84

59.46

1,733

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-91

(British) :

each

Supply and erection of kit kat 500 volts 100 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Kit Kat 500 volts 100 Amp

1.000

No

480.00

No

480.00

Screw 1"

1.000

Doz

24.00

Doz

24.00

70.57

504.00

TOTAL

MATERIAL

LABOUR
Coolie

0.007

Day

500.00

Day

3.57

Electrician I

0.031

Day

900.00

Day

28.08

0.95

7.43

32.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

each

Rs.

654.44

Cost Per Each: 654.44

Labour Rates Per

each

Rs.

39.56

Cost Per Each: 39.56

117.84

1,734

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-92

(British) :

Each

Supply and erection of kit kat 500 volts 200 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Kit Kat 500 volts 200 Amp

1.000

No

480.00

No

480.00

Screw 1"

1.000

Doz

24.00

Doz

24.00

69.92

504.00

TOTAL

MATERIAL

LABOUR
Coolie

0.009

Day

500.00

Day

4.46

Electrician I

0.036

Day

900.00

Day

32.13

1.10

8.08

37.69

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

660.62

Cost Per Each: 660.62

Labour Rates Per

Each

Rs.

45.74

Cost Per Each: 45.74

118.93

1,735

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-93

(British) :

Each

Supply and erection of kit kat 500 volts 300 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Kit Kat 500 volts 300 Amp

1.000

No

480.00

No

480.00

Screw 1"

1.000

Doz

24.00

Doz

24.00

69.92

504.00

TOTAL

MATERIAL

LABOUR
Coolie

0.009

Day

500.00

Day

4.46

Electrician I

0.036

Day

900.00

Day

32.13

1.10

8.08

37.69

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

660.62

Cost Per Each: 660.62

Labour Rates Per

Each

Rs.

45.74

Cost Per Each: 45.74

118.93

1,736

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-94

(British) :

Each

Supply and erection of kit kat 500 volts 400 Amp

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Kit Kat 500 volts 400 Amp

1.000

No

480.00

No

480.00

Screw 1"

1.000

Doz

24.00

Doz

24.00

68.73

504.00

TOTAL

MATERIAL

LABOUR
Coolie

0.020

Day

500.00

Day

10.00

Electrician I

0.040

Day

900.00

Day

36.00

1.38

9.27

47.38

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

672.38

Cost Per Each: 672.38

Labour Rates Per

Each

Rs.

57.50

Cost Per Each: 57.50

121.00

1,737

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-95-a

(British) :

Each

Providing & Fixing Honda Generator EP 2500ex, 2.2 KVA Petrol


driven.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Honda 2.2 KVA Gernerator EP 25

1.000

No

85,000.00

No

Extension lead

10.000

Yard

30.00

Yard

Change over switch three pole

30.000

Amp

2,500.00

Amp

75,000.00

Board, Power Plug & Power


Socket etc complete
Cost of Oil (initial start)

1.000

Set

300.00

Set

300.00

10.000

Ltr

220.00

Ltr

2,200.00

74.66

162,800.00

TOTAL

MATERIAL

85,000.00
300.00

LABOUR
Skilled Coolie

0.500

Day

600.00

Day

300.00

Electrician I

0.500

Day

900.00

Day

450.00

22.50

3.34

772.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

35,981.00

Composite Rates Per

Each

Rs.

199,553.50

Cost Per Each: 199,553.50

Labour Rates Per

Each

Rs.

937.50

Cost Per Each: 937.50

1,738

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-95-b

(British) :

Each

Providing & Fixing Honda Generator EP 2500ex, 2.2 KVA


Petrol-cum-Gas driven

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Honda 2.2 KVA Gernerator EP 25

1.000

No

85,000.00

No

Extension lead

10.000

Yard

30.00

Yard

Change over switch three pole

30.000

Amp

2,500.00

Amp

75,000.00

Board, Power Plug & Power


Socket etc complete
Cost of Oil (initial start)

1.000

Set

300.00

Set

300.00

10.000

Ltr

220.00

Ltr

2,200.00

Gas conversion kit

1.000

No

1,000.00

No

1,000.00

TOTAL

MATERIAL

85,000.00
300.00

74.66

163,800.00

LABOUR
Skilled Coolie

0.500

Day

600.00

Day

300.00

Electrician I

0.500

Day

900.00

Day

450.00

22.50

3.34

772.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

36,201.00

Composite Rates Per

Each

Rs.

200,773.50

Cost Per Each: 200,773.50

Labour Rates Per

Each

Rs.

937.50

Cost Per Each: 937.50

1,739

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-95-c

(British) :

Each

Providing & Fixing Honda Generator EP 2800ex, 3.1 KVA


Petrol-cum-Gas driven.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Extension lead

10.000

Yard

30.00

Yard

Change over switch three pole

30.000

Amp

2,500.00

Amp

75,000.00

Board, Power Plug & Power


Socket etc complete
Cost of Oil (initial start)

1.000

Set

300.00

Set

300.00

10.000

Ltr

220.00

Ltr

2,200.00

Honda 3.1 KVA Gernerator EP 28

1.000

No

95,000.00

No

95,000.00

Gas conversion kit

1.000

No

1,000.00

No

1,000.00

TOTAL

MATERIAL

300.00

74.68

173,800.00

LABOUR
Skilled Coolie

0.500

Day

600.00

Day

300.00

Electrician I

0.500

Day

900.00

Day

450.00

22.50

3.32

772.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

38,401.00

Composite Rates Per

Each

Rs.

212,973.50

Cost Per Each: 212,973.50

Labour Rates Per

Each

Rs.

937.50

Cost Per Each: 937.50

1,740

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 15 , ELECTRIC INSTALLATIONS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

15-95-d

(British) :

Each

Providing & Fixing Honda Generator EP 2800ex, 3.1 KVA Petrol


driven.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Extension lead

10.000

Yard

30.00

Yard

Change over switch three pole

30.000

Amp

2,500.00

Amp

75,000.00

Board, Power Plug & Power


Socket etc complete
Cost of Oil (initial start)

1.000

Set

300.00

Set

300.00

10.000

Ltr

220.00

Ltr

2,200.00

Honda 3.1 KVA Gernerator EP 28

1.000

No

95,000.00

No

95,000.00

TOTAL

MATERIAL

300.00

74.68

172,800.00

LABOUR
Skilled Coolie

0.500

Day

600.00

Day

300.00

Electrician I

0.500

Day

900.00

Day

450.00

22.50

3.32

772.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

38,181.00

Composite Rates Per

Each

Rs.

211,753.50

Cost Per Each: 211,753.50

Labour Rates Per

Each

Rs.

937.50

Cost Per Each: 937.50

1,741

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-01

(British) :

100 Cft

Providing and Laying sub-base course of brick on edge 4.5" thick


including compaction to required camber & grade

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

22.000

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

484.00

100 Cft

11,475.00

1,000 No

57.25

11,959.00

LABOUR
Mason

1.760

Day

900.00

Day

1,584.00

Coolie

4.000

Day

500.00

Day

2,000.00

Bhishti

0.250

Day

500.00

Day

125.00

111.27

20.75

3,820.27

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,446.96

Composite Rates Per

100 Cft

Rs.

19,226.23

Per CUM : Rs 6,789.69

Labour Rates Per

100 Cft

Rs.

4,636.25

Per CUM : Rs 1,637.28

1,742

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-02

(British) :

100 Cft

Providing and Laying sub-base course of brick aggregate, including


compaction to required camber, grade & density

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brick Aggregate

130.000

1,789.00

Cft

TOTAL

MATERIAL

100 Cft

2,325.70

44.11

2,325.70

Day

1,500.00

45.00

31.45

1,545.00

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with blade/plough

0.113

Hour

800.00

Hour

90.64

Water Tank 1000g

0.028

Hour

350.00

Hour

9.90

Vibrator Roller 12ton

0.028

Hour

1,000.00

Hour

28.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

2.44

22

Composite Rates Per

100 Cft

Rs.

4,869.18

Per CUM : Rs 1,719.54

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

128.54

869.93

1,743

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-03-a

(British) :

100 Cft

Granular Sub Base Course using Pit Run Gravel

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pitrun Gravel (NHA Specified)

125.000

2,000.00

Cft

TOTAL

MATERIAL

100 Cft

2,500.00

53.36

2,500.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Dresser

0.500

Day

600.00

Day

300.00

Superviser

0.010

Day

550.00

Day

5.50

24.17

20.19

829.67

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with blade/plough

0.113

Hour

800.00

Hour

90.64

Water Tank 1000g

0.056

Hour

350.00

Hour

19.60

Vibrator Roller 12ton

0.042

Hour

1,000.00

Hour

42.00

Lab Test

0.080

Job

700.00

Job

56.00

4.44

208.24

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

4,310.93

Per CUM : Rs 1,522.39

Labour Rates Per

100 Cft

Rs.

1,006.88

Per CUM : Rs 355.57

773.02

1,744

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-03-b

Item Name :

(British) :

100 Cft

Granular Sub Base Using Crushed Stone Aggregate

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Crushed Aggregate 1

125.000

3,500.00

Cft

TOTAL

MATERIAL

4,375.00

100 Cft

63.91

4,375.00

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Dresser

0.300

Day

600.00

Day

180.00

Superviser

0.010

Day

550.00

Day

5.50

14.57

10.09

500.07

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with blade/plough

0.113

Hour

800.00

Hour

90.40

Water Tank 1000g

0.056

Hour

350.00

Hour

19.60

Vibrator Roller 12ton

0.056

Hour

1,000.00

Hour

56.00

Grader 165 HP

0.013

Hour

4,000.00

Hour

52.00

Lab Test

0.080

Job

700.00

Job

56.00

4.00

274.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

1,129.59

Composite Rates Per

100 Cft

Rs.

6,278.66

Per CUM : Rs 2,217.29

Labour Rates Per

100 Cft

Rs.

606.88

Per CUM : Rs 214.32

1,745

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-04-a

Item Name :

(British) :

100 Cft

Aggregate Base Course

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Stone Dust

20.000

Cft

2,000.00

100 Cft

400.00

Crushed Aggregate 1

125.000

Cft

3,500.00

100 Cft

4,375.00

TOTAL

MATERIAL

62.91

4,775.00

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Dresser

0.300

Day

600.00

Day

180.00

Superviser

0.010

Day

550.00

Day

5.50

14.57

9.40

500.07

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with blade/plough

0.113

Hour

800.00

Hour

90.40

Water Tank 1000g

0.113

Hour

350.00

Hour

39.55

Vibrator Roller 12ton

0.085

Hour

1,000.00

Hour

84.90

Static Roller (8T)

0.156

Hour

700.00

Hour

109.20

Grader 165 HP

0.013

Hour

4,000.00

Hour

52.00

Lab Test

0.080

each

700.00

each

56.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

5.69

22

432.05

1,252.36

Composite Rates Per

100 Cft

Rs.

6,959.48

Per CUM : Rs 2,457.72

Labour Rates Per

100 Cft

Rs.

606.88

Per CUM : Rs 214.32

1,746

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-04-b

Item Name :

(British) :

100 Cft

Water Bound Macadam Base Course

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Stone Dust

22.000

Cft

2,000.00

100 Cft

440.00

Crushed Aggregate 1

125.020

Cft

3,500.00

100 Cft

4,375.70

TOTAL

MATERIAL

62.89

4,815.70

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Dresser

0.300

Day

600.00

Day

180.00

Superviser

0.010

Day

550.00

Day

5.50

14.57

9.34

500.07

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with blade/plough

0.113

Hour

800.00

Hour

90.40

Water Tank 1000g

0.141

Hour

350.00

Hour

49.52

Vibrator Roller 12ton

0.085

Hour

1,000.00

Hour

85.00

Static Roller (8T)

0.156

Hour

700.00

Hour

109.20

Grader 165 HP

0.013

Hour

4,000.00

Hour

52.00

Lab Test

0.080

Each

700.00

Each

56.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

5.77

22

442.13

1,263.53

Composite Rates Per

100 Cft

Rs.

7,021.42

Per CUM : Rs 2,479.59

Labour Rates Per

100 Cft

Rs.

606.88

Per CUM : Rs 214.32

1,747

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-05

(British) :

100 Rft

Providing and Laying road edging of 3" wide & 9" deep brick on end,
complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Burnt Brick

400.000

8,500.00

No

TOTAL

MATERIAL

1,000 No

3,400.00

52.58

3,400.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

Day

500.00

Day

1,000.00

43.50

25.42

1,493.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

5,960.50

Labour Rates Per

100 Rft

Rs.

1,812.50

1,067.00

Per Meter : Rs 195.50


Per Meter : Rs 59.45

1,748

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-06

Item Name :

(British) :

100 Sft

Bitumenous Prime Coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.034

Mds

400.00

Mds

13.60

Kerosene Oil

5.576

Ltr

120.00

Ltr

669.12

Asphalt

5.576

Kg

85.00

Kg

473.96

TOTAL

MATERIAL

72.28

1,156.68

Day

13.94

0.42

3.87

14.35

LABOUR
Skilled Coolie

0.023

600.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.019

Hour

1,000.00

Hour

18.50

Tar Boiler

0.037

Hour

300.00

Hour

11.15

1.85

29.65

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

1,464.74

Per SQM : Rs 157.61

Labour Rates Per

100 Sft

Rs.

17.42

Per SQM : Rs 1.87

264.06

1,749

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-07

Item Name :

(British) :

100 Sft

Bitumenous Tack Coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.034

Mds

400.00

Mds

13.60

Asphalt

4.182

Kg

85.00

Kg

355.47

TOTAL

MATERIAL

61.65

369.07

LABOUR
Coolie

0.046

Day

500.00

Day

23.23

Skilled Coolie

0.023

Day

600.00

Day

13.93

1.11

9.21

38.27

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.037

Hour

1,000.00

Hour

37.16

Tar Boiler

0.019

Hour

300.00

Hour

5.57

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

7.14

22

Composite Rates Per

100 Sft

Rs.

548.85

Per SQM : Rs 59.06

Labour Rates Per

100 Sft

Rs.

46.45

Per SQM : Rs 5.00

42.73

98.77

1,750

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-08-a

Item Name :

(British) :

100 Sft

Single bitumenous Surface Treatment

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.250

Mds

400.00

Crushed Aggregate 1

4.483

Cft

3,500.00

Asphalt

15.705

Kg

85.00

TOTAL

MATERIAL

Mds

100.00

100 Cft

156.90

Kg

1,334.93

70.01

1,591.83

LABOUR
Coolie

0.032

Day

500.00

Day

15.75

Skilled Coolie

0.016

Day

600.00

Day

9.48

0.76

4.11

25.99

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.075

Hour

700.00

Hour

52.50

Tar Boiler

0.119

Hour

300.00

Hour

35.70

3.88

88.20

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

2,081.17

Per SQM : Rs 223.93

Labour Rates Per

100 Sft

Rs.

31.54

Per SQM : Rs 3.39

375.16

1,751

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-08-b

Item Name :

(British) :

100 Sft

Double bitumenous Surface Treatment

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.363

Mds

400.00

Crushed Aggregate 1

10.086

Cft

3,500.00

Asphalt

33.360

Kg

85.00

TOTAL

MATERIAL

Mds

145.20

100 Cft

353.01

Kg

2,835.60

70.47

3,333.81

LABOUR
Coolie

0.048

Day

500.00

Day

24.00

Skilled Coolie

0.024

Day

600.00

Day

14.40

1.15

3.81

39.55

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.149

Hour

700.00

Hour

104.30

Tar Boiler

0.238

Hour

300.00

Hour

71.40

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

3.71

22

Composite Rates Per

100 Sft

Rs.

4,329.60

Per SQM : Rs 465.87

Labour Rates Per

100 Sft

Rs.

48.00

Per SQM : Rs 5.16

175.70

780.54

1,752

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-08-c

Item Name :

(British) :

100 Sft

Triple bitumenous Surface Treatment

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.500

Mds

400.00

Crushed Aggregate 1

12.607

Cft

3,500.00

Asphalt

39.680

Kg

85.00

TOTAL

MATERIAL

Mds

200.00

100 Cft

441.24

Kg

3,372.80

69.82

4,014.05

LABOUR
Coolie

0.079

Day

500.00

Day

39.50

Skilled Coolie

0.040

Day

600.00

Day

24.00

1.91

4.10

65.41

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.198

Hour

700.00

Hour

138.60

Tar Boiler

0.319

Hour

300.00

Hour

95.70

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

4.08

22

Composite Rates Per

100 Sft

Rs.

5,262.36

Per SQM : Rs 566.23

Labour Rates Per

100 Sft

Rs.

79.38

Per SQM : Rs 8.54

234.30

948.61

1,753

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-09-a

Item Name :

(British) :

100 Sft

Resurfacing of road complete with per 100sft : 22 Ibs. bitumen,


2.5"cft bajri/crush aggregate

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.034

Mds

400.00

Crushed Aggregate 1

2.500

Cft

3,500.00

Asphalt

10.000

Kg

85.00

TOTAL

MATERIAL

Mds

13.80

100 Cft

87.50

Kg

850.00

64.45

951.30

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Skilled Coolie

0.005

Day

600.00

Day

3.00

1.89

7.27

64.89

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.046

Hour

1,000.00

Hour

46.40

Static Roller (8T)

0.046

Hour

700.00

Hour

32.48

Tar Boiler

0.046

Hour

300.00

Hour

13.92

6.29

92.80

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

1,352.55

Per SQM : Rs 145.53

Labour Rates Per

100 Sft

Rs.

78.75

Per SQM : Rs 8.47

243.56

1,754

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-09-b

Item Name :

(British) :

100 Sft

Resurfacing of road complete with per 100sft : 20 Ibs. bitumen,


2"cft bajri/crush aggregate

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.034

Mds

400.00

Crushed Aggregate 1

2.044

Cft

3,500.00

Asphalt

9.072

Kg

85.00

TOTAL

MATERIAL

Mds

13.60

100 Cft

71.53

Kg

771.12

61.79

856.25

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Skilled Coolie

0.050

Day

600.00

Day

30.10

2.70

9.50

92.80

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.046

Hour

1,000.00

Hour

46.45

Static Roller (8T)

0.046

Hour

700.00

Hour

32.51

Tar Boiler

0.046

Hour

300.00

Hour

13.94

6.70

92.90

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

1,270.58

Per SQM : Rs 136.71

Labour Rates Per

100 Sft

Rs.

112.62

Per SQM : Rs 12.12

228.63

1,755

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-10

(British) :

100 Sft

Scarifying/Dismantling old road surface, including removal of


debris within one chain (NHA specified)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Composite Rates Per

100 Sft

Rs.

312.50

Per SQM : Rs 33.63

Labour Rates Per

100 Sft

Rs.

312.50

Per SQM : Rs 33.63

1,756

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-11-a

Item Name :

(British) :

Dense Graded Hot Bitmac (Mobile Asphalt Mixer)

Detail

Qty

Unit

100 Sft

1" Thick

Rate (Rs)

Amount

MATERIAL
Sand

5.460

Cft

2,200.00

Fuel Wood

0.120

Mds

400.00

Mds

48.00

Kerosene Oil

0.115

Ltr

120.00

Ltr

13.80

Crushed Aggregate 1

10.920

Cft

3,500.00

100 Cft

382.20

Asphalt

19.000

Kg

85.00

TOTAL

MATERIAL

100 Cft

Kg

120.12

1,615.00

61.72

2,179.12

LABOUR
Coolie

0.300

Day

500.00

Day

150.00

Skilled Coolie

0.150

Day

600.00

Day

90.00

Rake Man

0.070

Day

600.00

Day

42.00

8.46

10.99

290.46

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.110

Hour

700.00

Hour

77.00

Mini Asphalt Mixer

0.110

Hour

1,000.00

Hour

110.00

5.30

187.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

3,239.17

Per SQM : Rs 348.53

Labour Rates Per

100 Sft

Rs.

352.50

Per SQM : Rs 37.93

582.59

1,757

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-11-b

Item Name :

(British) :

Dense Graded Hot Bitmac (Mobile Asphalt Mixer)

Detail

Qty

Unit

100 Sft

1.5" Thick

Rate (Rs)

Amount

MATERIAL
Sand

8.216

Cft

2,200.00

Fuel Wood

0.019

Mds

400.00

Mds

7.60

Kerosene Oil

0.172

Ltr

120.00

Ltr

20.64

Crushed Aggregate 1

16.432

Cft

3,500.00

100 Cft

575.12

Asphalt

28.500

Kg

85.00

TOTAL

MATERIAL

100 Cft

Kg

180.75

2,422.50

62.07

3,206.61

LABOUR
Coolie

0.425

Day

500.00

Day

212.50

Skilled Coolie

0.215

Day

600.00

Day

129.00

Rake Man

0.105

Day

600.00

Day

63.00

12.14

10.83

416.63

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.155

Hour

700.00

Hour

108.50

Mini Asphalt Mixer

0.155

Hour

1,000.00

Hour

155.00

5.10

263.50

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

4,739.16

Per SQM : Rs 509.93

Labour Rates Per

100 Sft

Rs.

505.63

Per SQM : Rs 54.41

852.41

1,758

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-11-c

Item Name :

(British) :

Dense Graded Hot Bitmac (Mobile Asphalt Mixer)

Detail

Qty

Unit

100 Sft

2" Thick

Rate (Rs)

Amount

MATERIAL
Sand

10.920

Cft

2,200.00

Fuel Wood

0.025

Mds

400.00

Mds

10.00

Kerosene Oil

0.130

Ltr

120.00

Ltr

15.60

Crushed Aggregate 1

21.840

Cft

3,500.00

100 Cft

764.40

Asphalt

38.000

Kg

85.00

TOTAL

MATERIAL

100 Cft

Kg

240.24

3,230.00

62.32

4,260.24

LABOUR
Coolie

0.550

Day

500.00

Day

275.00

Skilled Coolie

0.280

Day

600.00

Day

168.00

Rake Man

0.140

Day

600.00

Day

84.00

15.81

10.71

542.81

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.200

Hour

700.00

Hour

140.00

Mini Asphalt Mixer

0.200

Hour

1,000.00

Hour

200.00

4.97

340.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

6,271.04

Per SQM : Rs 674.76

Labour Rates Per

100 Sft

Rs.

658.75

Per SQM : Rs 70.88

1,127.99

1,759

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-12-a

Item Name :

(British) :

100 Cft

Asphaltic Base Course (Asphalt Batch Plant Hot Mixed)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Stone Dust

71.472

Cft

2,000.00

100 Cft

1,429.43

Crushed Aggregate 1

143.000

Cft

3,500.00

100 Cft

5,005.00

Asphat in Bulk

244.620

Kg.

85.00

TOTAL

MATERIAL

Kg.

20,792.70

50.95

27,227.13

LABOUR
Coolie

0.566

Day

500.00

Day

283.15

Skilled Coolie

0.283

Day

600.00

Day

169.90

Rake Man

0.283

Day

600.00

Day

169.90

18.69

4.17

641.64

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Procuring/Transport/Laying/Com

6.795

1,800.00

Tonne

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Tonne

12,231.00

22.89

12,231.00

22

8,817.84

Composite Rates Per

100 Cft

Rs.

48,917.61

Per CUM : Rs 17,275.11

Labour Rates Per

100 Cft

Rs.

778.69

Per CUM : Rs 274.99

1,760

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-12-b

Item Name :

(British) :

100 Cft

Asphaltic Wearing Course (Asphalt Batch Plant Hot Mixed)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Stone Dust

71.472

Cft

2,000.00

100 Cft

1,429.43

Crushed Aggregate 1

143.000

Cft

3,500.00

100 Cft

5,005.00

Asphat in Bulk

305.775

Kg.

85.00

TOTAL

MATERIAL

Kg.

25,990.88

53.71

32,425.31

LABOUR
Coolie

0.566

Day

500.00

Day

283.15

Skilled Coolie

0.283

Day

600.00

Day

169.90

Rake Man

0.283

Day

600.00

Day

169.90

18.69

4.03

641.64

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Procuring/Transport/Laying/Com

6.795

1,800.00

Tonne

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Tonne

12,231.00

20.26

12,231.00

22

9,961.44

Composite Rates Per

100 Cft

Rs.

55,259.38

Per CUM : Rs 19,514.68

Labour Rates Per

100 Cft

Rs.

778.69

Per CUM : Rs 274.99

1,761

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-12-c

Item Name :

(British) :

Mile/Ton

Carriage of asphalt concrete from asphalt batch plant to the site


of work by dump trucks.

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Carriage Charges #8

0.322

30.00

EQUIPMENT

Mile

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Mile

9.66

75.00

9.66

22

Composite Rates Per

Mile/Ton

Rs.

11.79

Cost Per km/Ton: 7.32

Labour Rates Per

Mile/Ton

Rs.

0.00

Cost Per km/Ton: 0.00

2.13

1,762

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-13

(British) :

100 Rft

Providing RCC railing on bridges (3 feet high)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
RCC Railing

100.000

400.00

Ft

TOTAL

MATERIAL

40,000.00

Ft

54.10

40,000.00

LABOUR
Mason

3.353

Day

900.00

Day

3,017.43

Coolie

20.000

Day

500.00

Day

10,000.00

Bhishti

4.877

Day

500.00

Day

2,438.35

463.67

23.90

15,919.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

68,119.72

Labour Rates Per

100 Rft

Rs.

19,319.73

12,200.27

Per Meter : Rs 2,234.33


Per Meter : Rs 633.69

1,763

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-14

Item Name :

(British) :

100 Rft/3row

Providing and fixing GI pipe railing (3 feet high)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

56.090

Kg

97.00

Kg

5,440.73

Paint : Enamel

4.000

Ltr

495.00

Ltr

1,980.00

G.I pipe (light) 2"

330.000

Ft

210.00

Ft

69,300.00

TOTAL

MATERIAL

68.71

76,720.73

LABOUR
Mason

0.915

Day

900.00

Day

823.50

Coolie

3.000

Day

500.00

Day

1,500.00

Painter / Polisher

2.000

Day

1,000.00

Day

2,000.00

Steel Fixer

3.000

Day

900.00

Day

2,700.00

210.71

9.29

7,234.21

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

18,423.73

Composite Rates Per

100 Rft/3

Rs.

102,378.67

Cost Per m/3rows: 3,358.02

Labour Rates Per

100 Rft/3

Rs.

8,779.38

Cost Per m/3rows: 287.96

1,764

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-15-a

Item Name :

(British) :

Each

P&E at site : RCC km stone

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.300

Bag

490.00

Sand

6.250

Cft

2,200.00

Rfcnt Steel: Plain/Local

0.004

Tonne

81,500.00

Crushed Aggregate 1

12.490

Cft

3,500.00

TOTAL

MATERIAL

Bag

637.00

100 Cft

137.50

326.00

Tonne

437.15

100 Cft

36.35

1,537.65

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Painter / Polisher

1.000

Day

1,000.00

Day

1,000.00

Steel Fixer

0.150

Day

900.00

Day

135.00

49.05

41.65

1,684.05

22

697.98

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

3,919.68

Cost Per Each: 3,919.68

Labour Rates Per

Each

Rs.

2,043.75

Cost Per Each: 2,043.75

1,765

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-15-b

Item Name :

(British) :

Each

P&E at site : RCC 1/10th km stone.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.170

Bag

490.00

Sand

0.810

Cft

2,200.00

Rfcnt Steel: Plain/Local

0.001

Tonne

81,500.00

Crushed Aggregate 1

1.620

Cft

3,500.00

TOTAL

MATERIAL

Bag

83.30

100 Cft

17.82

Tonne

100 Cft

55.42
56.70

26.38

213.24

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Painter / Polisher

0.250

Day

1,000.00

Day

250.00

Steel Fixer

0.020

Day

900.00

Day

18.00

11.79

51.62

404.79

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

751.40

Cost Per Each: 751.40

Labour Rates Per

Each

Rs.

491.25

Cost Per Each: 491.25

133.37

1,766

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-15-c

Item Name :

(British) :

Each

P&E at site : RCC boundry pillar.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.400

Bag

490.00

Sand

1.120

Cft

2,200.00

Rfcnt Steel: Plain/Local

0.004

Tonne

81,500.00

Crushed Aggregate 1

2.250

Cft

3,500.00

TOTAL

MATERIAL

Bag

196.00

100 Cft

24.64

362.67

Tonne

78.75

100 Cft

55.66

662.06

LABOUR
Mason

0.100

Day

900.00

Day

90.00

Coolie

0.150

Day

500.00

Day

75.00

Painter / Polisher

0.020

Day

1,000.00

Day

20.00

Steel Fixer

0.050

Day

900.00

Day

45.00

6.90

22.34

236.90

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

196.25

Composite Rates Per

Each

Rs.

1,095.22

Cost Per Each: 1,095.22

Labour Rates Per

Each

Rs.

287.50

Cost Per Each: 287.50

1,767

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-16-a

Item Name :

(British) :

100 Sft

Road signs (not exceeding 1 m2) without reflection sheet &


lettering : Supply and Fixing at site with PCC 1:3:6 upto max 3'
depth

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

7.990

Bag

490.00

Bag

3,914.90

Sand

29.543

Cft

2,200.00

100 Cft

649.95

Crushed Aggregate 1

59.086

Cft

3,500.00

100 Cft

2,068.01

Steel Structural Section

306.580

Kg

97.00

Kg

29,738.26

Steel Sheet

125.419

Kg

113.00

Kg

14,172.35

TOTAL

MATERIAL

61.52

50,543.46

LABOUR
Coolie

9.290

Day

500.00

Day

4,645.00

Painter / Polisher

1.557

Day

1,000.00

Day

1,557.00

Welder II

6.967

Day

700.00

Day

4,876.90

332.37

16.48

11,411.27

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

13,556.92

Composite Rates Per

100 Sft

Rs.

75,511.65

Per SQM : Rs 8,125.05

Labour Rates Per

100 Sft

Rs.

13,848.63

Per SQM : Rs 1,490.11

1,768

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-16-b

(British) :

100 Sft

Road signs (not exceeding 1 m2) without reflection sheet &


lettering : Supply to the C&W store/site of work

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel Structural Section

306.580

Kg

97.00

Kg

29,738.26

Steel Sheet

125.419

Kg

113.00

Kg

14,172.35

TOTAL

MATERIAL

62.26

43,910.60

LABOUR
Coolie

2.645

Day

500.00

Day

1,322.55

Painter / Polisher

2.787

Day

1,000.00

Day

2,787.00

Welder II

6.968

Day

700.00

Day

4,877.39

269.61

15.74

9,256.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,637.46

Composite Rates Per

100 Sft

Rs.

64,804.61

Per SQM : Rs 6,972.98

Labour Rates Per

100 Sft

Rs.

11,233.68

Per SQM : Rs 1,208.74

1,769

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-17-a

Item Name :

(British) :

100 Sft

Road sign (any size) double pedestal 4"x2"x0.25" 11' long without
reflection sheet & lettering: Supply and Fixing at site with PCC
1:3:6 max 3' depth

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

16.072

Bag

490.00

Bag

7,875.38

Sand

59.086

Cft

2,200.00

100 Cft

1,299.89

Crushed Aggregate 1

118.172

Cft

3,500.00

100 Cft

4,136.02

Steel Structural Section

401.990

Kg

97.00

Kg

38,993.03

Steel Sheet

231.328

Kg

113.00

Kg

26,140.06

TOTAL

MATERIAL

62.13

78,444.38

LABOUR
Coolie

13.933

Day

500.00

Day

6,966.50

Painter / Polisher

2.787

Day

1,000.00

Day

2,787.00

Welder II

9.290

Day

700.00

Day

6,503.21

487.70

15.87

16,744.41

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

20,834.24

Composite Rates Per

100 Sft

Rs.

116,023.03

Per SQM : Rs 12,484.08

Labour Rates Per

100 Sft

Rs.

20,320.89

Per SQM : Rs 2,186.53

1,770

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-17-b

(British) :

100 Sft

Road sign (any size) double pedestal 4"x2"x0.25" 11' long without
reflection sheet & lettering: Supply to the C&W store/site of work

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel Structural Section

401.990

Kg

97.00

Kg

38,993.03

Steel Sheet

231.328

Kg

113.00

Kg

26,140.06

TOTAL

MATERIAL

62.08

65,133.09

LABOUR
Coolie

2.968

Day

500.00

Day

1,483.85

Painter / Polisher

5.574

Day

1,000.00

Day

5,574.00

Welder II

9.290

Day

700.00

Day

6,503.21

406.83

15.92

13,967.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

17,312.71

Composite Rates Per

100 Sft

Rs.

96,413.70

Per SQM : Rs 10,374.11

Labour Rates Per

100 Sft

Rs.

16,951.33

Per SQM : Rs 1,823.96

1,771

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-18-a

(British) :

100 Sft

Supply and Fixing reflective sheet on MS/aluminium road signs etc


including lettering : Diamond grade

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ref Sheet Diamond Grade

100.000

500.00

Sft

TOTAL

MATERIAL

Sft

50,000.00

72.83

50,000.00

Day

1,486.45

44.59

5.17

1,531.04

22

LABOUR
Reflective Sheet Fixer

1.858

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,327.02

Composite Rates Per

100 Sft

Rs.

62,858.06

Per SQM : Rs 6,763.53

Labour Rates Per

100 Sft

Rs.

1,858.06

Per SQM : Rs 199.93

1,772

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-18-b

(British) :

100 Sft

Supply and Fixing reflective sheet on MS/aluminium road signs etc


including lettering : High intensity grade

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ref Sheet Hi-intensity Grd

100.000

400.00

Sft

TOTAL

MATERIAL

Sft

40,000.00

72.31

40,000.00

Day

1,486.45

44.59

5.69

1,531.04

22

LABOUR
Reflective Sheet Fixer

1.858

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

9,127.02

Composite Rates Per

100 Sft

Rs.

50,658.06

Per SQM : Rs 5,450.81

Labour Rates Per

100 Sft

Rs.

1,858.06

Per SQM : Rs 199.93

1,773

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-18-c

(British) :

100 Sft

Supply and Fixing reflective sheet on MS/aluminium road signs etc


including lettering : Engineering grade

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ref Sheet Engineering Grd

100.000

50.00

Sft

TOTAL

MATERIAL

Sft

5,000.00

57.81

5,000.00

Day

1,486.45

44.59

20.19

1,531.04

22

LABOUR
Reflective Sheet Fixer

1.858

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

7,958.06

Per SQM : Rs 856.29

Labour Rates Per

100 Sft

Rs.

1,858.06

Per SQM : Rs 199.93

1,427.02

1,774

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-19-a-01

(British) :

Each

Supply and Fixing aluminium alloy road studs as per specs Large,
strip 146x30mm, 171 beads: Uni-direction

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Road Stud 210x100x40 Uni

530.00

No

TOTAL

MATERIAL

No

530.00

69.13

530.00

Day

45.00

1.35

8.87

46.35

22

LABOUR
0.090

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

702.85

Cost Per Each: 702.85

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

126.50

1,775

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-19-a-02

(British) :

Each

Supply and Fixing aluminium alloy road studs as per specs Large,
strip 146x30mm, 171 beads: Bi-direction

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Road Stud 210x100x40 Bi

710.00

No

TOTAL

MATERIAL

No

710.00

70.53

710.00

Day

45.00

1.35

7.47

46.35

22

LABOUR
0.090

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

922.45

Cost Per Each: 922.45

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

166.10

1,776

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-19-b-01

(British) :

Each

Supply and Fixing aluminium alloy road studs as per specs Medium,
strip 114x18mm, 74 beads: Uni-direction

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Road Stud 170x90x25 Uni

350.00

No

TOTAL

MATERIAL

No

350.00

66.46

350.00

Day

45.00

1.35

11.54

46.35

22

LABOUR
0.090

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

483.25

Cost Per Each: 483.25

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

86.90

1,777

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-19-b-02

(British) :

Each

Supply and Fixing aluminium alloy road studs as per specs Medium,
strip 114x18mm, 74 beads: Bi-direction

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Road Stud 170x90x25 Bi

460.00

No

TOTAL

MATERIAL

No

460.00

68.32

460.00

Day

45.00

1.35

9.68

46.35

22

LABOUR
0.090

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

617.45

Cost Per Each: 617.45

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

111.10

1,778

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-19-c-01

(British) :

Each

Supply and Fixing aluminium alloy road studs as per specs Small,
strip 75x14mm, 43 beads: Uni-directional

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Road Stud 100x80x20 Uni

255.00

No

TOTAL

MATERIAL

No

255.00

63.75

255.00

Day

45.00

1.35

14.25

46.35

22

LABOUR
0.090

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

367.35

Cost Per Each: 367.35

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

66.00

1,779

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-19-c-02

(British) :

Each

Supply and Fixing aluminium alloy road studs as per specs Small,
strip 75x14mm, 43 beads: Bi-directional

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Road Stud 100x80x20 Bi

330.00

No

TOTAL

MATERIAL

No

330.00

66.00

330.00

Day

45.00

1.35

12.00

46.35

22

LABOUR
0.090

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

458.85

Cost Per Each: 458.85

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

82.50

1,780

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-19-c-03

(British) :

Each

Supply & Fixing Cat Eye single as specified

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cat Eye

230.00

No

TOTAL

MATERIAL

No

230.00

62.73

230.00

Day

45.00

1.35

15.27

46.35

22

LABOUR
0.090

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

336.85

Cost Per Each: 336.85

Labour Rates Per

Each

Rs.

56.25

Cost Per Each: 56.25

60.50

1,781

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-20

(British) :

Cwt

Providing and Fixing gantry of structural steel sections as per


design / drawings including foundation complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
53.340

Steel (Struct. Sections)

97.00

Kg

TOTAL

MATERIAL

Kg

5,173.98

56.44

5,173.98

LABOUR
Mason

0.254

Day

900.00

Day

228.60

Coolie

1.016

Day

500.00

Day

508.00

Black Smith

0.508

Day

900.00

Day

457.20

Welder I

0.508

Day

1,000.00

Day

508.00

51.05

21.56

1,752.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cwt

Rs.

8,439.51

Cost Per kg: 165.41

Labour Rates Per

Cwt

Rs.

2,127.25

Cost Per kg: 41.69

1,512.67

1,782

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-21

(British) :

100 Cft

Providing and Laying dry brick pavement/soling in streets etc


including prep, water, compaction & sand cushion

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

35.368

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

778.09

100 Cft

11,475.00

1,000 No

63.61

12,253.09

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

2.000

Day

500.00

Day

1,000.00

57.00

12.86

1,957.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Road Roller (Static) 12 T

0.250

Hour

1,000.00

Hour

250.00

Water Tank 1000g

0.125

Hour

350.00

Hour

43.75

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

1.52

22

293.75

3,178.30

Composite Rates Per

100 Cft

Rs.

17,682.14

Per CUM : Rs 6,244.40

Labour Rates Per

100 Cft

Rs.

2,375.00

Per CUM : Rs 838.72

1,783

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-22

(British) :

100 Cft

Supply & spreading 1"-1.5" guage shingle on road surface including


compaction

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Shingle

123.000

1,700.00

Cft

TOTAL

MATERIAL

100 Cft

2,091.00

71.69

2,091.00

Day

7.50

0.23

3.26

7.73

LABOUR
Coolie

0.015

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Road Roller (Static) 12 T

0.057

Hour

1,000.00

Hour

56.63

Tractor with blade/plough

0.028

Hour

800.00

Hour

22.65

Water Tank 1000g

0.028

Hour

350.00

Hour

9.91

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

3.06

22

Composite Rates Per

100 Cft

Rs.

2,669.21

Per CUM : Rs 942.62

Labour Rates Per

100 Cft

Rs.

9.38

Per CUM : Rs 3.31

89.19

481.29

1,784

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-23-a

(British) :

100 Rft

Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 460mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.140

Bag

490.00

Sand

53.650

Cft

2,200.00

Pipe RCC 18" Class-II "B"

100.000

Rft

400.00

TOTAL

MATERIAL

Bag

4,478.60

100 Cft

1,180.30

Rft

40,000.00

56.80

45,658.90

LABOUR
Mason

6.090

Day

900.00

Day

5,481.00

Coolie

18.290

Day

500.00

Day

9,145.00

438.78

21.20

15,064.78

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

73,986.36

Labour Rates Per

100 Rft

Rs.

18,282.50

13,262.68

Per Meter : Rs 2,426.75


Per Meter : Rs 599.67

1,785

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-23-b

(British) :

100 Rft

Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 610mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

15.240

Bag

490.00

Sand

80.480

Cft

2,200.00

Pipe RCC 24" Class-II "B"

100.000

Rft

537.50

TOTAL

MATERIAL

Bag

7,467.60

100 Cft

1,770.56

Rft

53,750.00

58.12

62,988.16

LABOUR
Mason

7.620

Day

900.00

Day

6,857.91

Coolie

22.859

Day

500.00

Day

11,429.50

548.62

19.88

18,836.03

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

99,704.82

Labour Rates Per

100 Rft

Rs.

22,859.26

17,880.63

Per Meter : Rs 3,270.32


Per Meter : Rs 749.78

1,786

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-23-c

(British) :

100 Rft

Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 760mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

15.240

Bag

490.00

Sand

107.620

Cft

2,200.00

Pipe RCC 30" Class-II "B"

100.000

Rft

812.50

TOTAL

MATERIAL

Bag

7,467.60

100 Cft

2,367.64

Rft

81,250.00

60.44

91,085.24

LABOUR
Mason

9.144

Day

900.00

Day

8,229.51

Coolie

27.432

Day

500.00

Day

13,716.00

658.37

17.56

22,603.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

138,555.88

Labour Rates Per

100 Rft

Rs.

27,431.89

24,866.76

Per Meter : Rs 4,544.63


Per Meter : Rs 899.77

1,787

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-23-d

(British) :

100 Rft

Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 910mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

21.340

Bag

490.00

Sand

128.960

Cft

2,200.00

Pipe RCC 36" Class-II "B"

100.000

Rft

1,250.00

TOTAL

MATERIAL

Bag

10,456.60

100 Cft

2,837.12

Rft

125,000.00

63.28

138,293.72

LABOUR
Mason

10.667

Day

900.00

Day

9,600.30

Coolie

32.000

Day

500.00

Day

16,000.00

768.01

14.72

26,368.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

200,718.71

Labour Rates Per

100 Rft

Rs.

32,000.38

36,056.68

Per Meter : Rs 6,583.57


Per Meter : Rs 1,049.61

1,788

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-23-e

(British) :

100 Rft

Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1070mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

24.390

Bag

490.00

Sand

161.280

Cft

2,200.00

Pipe RCC 42" Class-II "B"

100.000

Rft

1,625.00

TOTAL

MATERIAL

Bag

11,951.10

100 Cft

3,548.16

Rft

162,500.00

64.41

177,999.26

LABOUR
Mason

12.190

Day

900.00

Day

10,971.00

Coolie

36.576

Day

500.00

Day

18,287.95

877.77

13.59

30,136.72

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

253,732.79

Labour Rates Per

100 Rft

Rs.

36,573.69

45,596.81

Per Meter : Rs 8,322.44


Per Meter : Rs 1,199.62

1,789

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-23-f

(British) :

100 Rft

Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1220mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

27.430

Bag

490.00

Sand

193.590

Cft

2,200.00

Pipe RCC 48" Class-II "B"

100.000

Rft

2,125.00

TOTAL

MATERIAL

Bag

13,440.70

100 Cft

4,258.98

Rft

212,500.00

65.62

230,199.68

LABOUR
Mason

13.720

Day

900.00

Day

12,348.00

Coolie

41.148

Day

500.00

Day

20,574.00

987.66

12.38

33,909.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

321,996.11

Labour Rates Per

100 Rft

Rs.

41,152.50

57,886.77

Per Meter : Rs 10,561.47


Per Meter : Rs 1,349.80

1,790

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-23-g

(British) :

100 Rft

Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1520mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

30.480

Bag

490.00

Sand

215.320

Cft

2,200.00

Pipe RCC 60" Class-II "B"

100.000

Rft

3,750.00

TOTAL

MATERIAL

Bag

14,935.20

100 Cft

4,737.04

Rft

375,000.00

68.64

394,672.24

LABOUR
Mason

15.240

Day

900.00

Day

13,715.91

Coolie

45.719

Day

500.00

Day

22,859.50

1,097.26

9.36

37,672.67

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

527,219.40

Labour Rates Per

100 Rft

Rs.

45,719.26

94,874.48

Per Meter : Rs 17,292.80


Per Meter : Rs 1,499.59

1,791

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-24

(British) :

100 Cft

Granular Material in Bed to RCC Pipe Culvert

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
110.010

Sand

2,200.00

Cft

TOTAL

MATERIAL

100 Cft

2,420.22

54.87

2,420.22

Day

467.20

14.02

13.59

481.22

Hour

420.48

9.53

420.48

22

LABOUR
Coolie

0.934

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Plate Compactor

0.934

450.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

4,049.65

Per CUM : Rs 1,430.12

Labour Rates Per

100 Cft

Rs.

584.00

Per CUM : Rs 206.24

727.74

1,792

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-25-a

(British) :

100 Rft

Confirmatory Boring including SPT's, samples, lab test bore-hole


logs & Report : Alluvial Soils

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Laboratory Staff complete

100.000

900.00

Ft

Sundries (Labour Only):


TOTAL

LABOUR

Ft

90,000.00

2,700.00

31.13

92,700.00

EQUIPMENT
Boring Rig : Rotary #1

100.000

1,500.00

Ft

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Rft

Rs.

295,500.00

Labour Rates Per

100 Rft

Rs.

112,500.00

Ft

150,000.00

46.88

150,000.00

22

52,800.00

Per Meter : Rs 9,692.40


Per Meter : Rs 3,690.00

1,793

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-25-b

(British) :

100 Rft

Confirmatory Boring including SPT's, samples, lab test, bore-hole


logs, report : in Gravelly Soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Laboratory Staff complete

100.000

900.00

Ft

Sundries (Labour Only):


TOTAL

LABOUR

Ft

90,000.00

2,700.00

32.35

92,700.00

EQUIPMENT
Boring Rig: Percussion #1

100.000

1,400.00

Ft

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Rft

Rs.

283,300.00

Labour Rates Per

100 Rft

Rs.

112,500.00

Ft

140,000.00

45.65

140,000.00

22

50,600.00

Per Meter : Rs 9,292.24


Per Meter : Rs 3,690.00

1,794

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-26-a

(British) :

Job

Pile Load Testing : Max Load up to 240 tonne

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Boring of Anchor Pile(760mm Di

20.000

7,500.00

150,000.00

RCC 1:1.5:3 Concrete of Ancho

9.720

M3

5,921.00

M3

57,552.12

Steel G-60 Deformed Vertical B

0.613

Tonne

95,000.00

Tonne

58,235.00

Steel G-40 Deformed Helix


Bars (10mm @ 150 c/c = 1.943

0.170

Tonne

90,000.00

Tonne

15,300.00

TOTAL

MATERIAL

52.56

281,087.12

Job

120,000.00

22.44

120,000.00

22

88,239.17

EQUIPMENT
1.000

Kentlage Load Test Charges fo

120,000.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Job

Rs.

489,326.28

Cost Per Job: 489,326.28

Labour Rates Per

Job

Rs.

0.00

Cost Per Job: 0.00

1,795

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-26-b

(British) :

Job

Pile Load Testing : Max Load 240 - 300 tonne

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Boring of Anchor Pile(760mm Di

20.000

7,500.00

150,000.00

RCC 1:1.5:3 Concrete of Ancho

9.720

M3

5,921.00

M3

57,552.12

Steel G-60 Deformed Vertical B

0.613

Tonne

95,000.00

Tonne

58,235.00

Steel G-40 Deformed Helix


Bars (10mm @ 150 c/c = 1.943

0.170

Tonne

90,000.00

Tonne

15,300.00

TOTAL

MATERIAL

48.90

281,087.12

Job

150,000.00

26.10

150,000.00

22

94,839.17

EQUIPMENT
1.000

Kentlage Load Test Charges fo

150,000.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Job

Rs.

525,926.28

Cost Per Job: 525,926.28

Labour Rates Per

Job

Rs.

0.00

Cost Per Job: 0.00

1,796

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-26-c

(British) :

Job

Pile Load Testing : Max Load 300 - 360 tonne

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Boring of Anchor Pile(760mm Di

20.000

7,500.00

150,000.00

RCC 1:1.5:3 Concrete of Ancho

9.720

M3

5,921.00

M3

57,552.12

Steel G-60 Deformed Vertical B

0.613

Tonne

95,000.00

Tonne

58,235.00

Steel G-40 Deformed Helix


Bars (10mm @ 150 c/c = 1.943

0.170

Tonne

90,000.00

Tonne

15,300.00

TOTAL

MATERIAL

45.72

281,087.12

Job

180,000.00

29.28

180,000.00

22

EQUIPMENT
1.000

Kentlage Load Test Charges fo

180,000.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

101,439.17

Composite Rates Per

Job

Rs.

562,526.28

Cost Per Job: 562,526.28

Labour Rates Per

Job

Rs.

0.00

Cost Per Job: 0.00

1,797

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-26-d

(British) :

Job

Pile Load Testing : Max Load 360 - 600 tonne

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Boring of Anchor Pile(760mm Di

20.000

7,500.00

150,000.00

RCC 1:1.5:3 Concrete of Ancho

9.720

M3

5,921.00

M3

57,552.12

Steel G-60 Deformed Vertical B

0.613

Tonne

95,000.00

Tonne

58,235.00

Steel G-40 Deformed Helix


Bars (10mm @ 150 c/c = 1.943

0.170

Tonne

90,000.00

Tonne

15,300.00

TOTAL

MATERIAL

43.82

281,087.12

Job

200,000.00

31.18

200,000.00

22

EQUIPMENT
1.000

Kentlage Load Test Charges fo

200,000.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

105,839.17

Composite Rates Per

Job

Rs.

586,926.28

Cost Per Job: 586,926.28

Labour Rates Per

Job

Rs.

0.00

Cost Per Job: 0.00

1,798

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-27-a

(British) :

100 Rft

Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia up to


760mm

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Boring Rig : Rotary #1

100.000

1,500.00

Ft

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Rft

Rs.

183,000.00

Labour Rates Per

100 Rft

Rs.

0.00

Ft

150,000.00

75.00

150,000.00

22

33,000.00

Per Meter : Rs 6,002.40


Per Meter : Rs 0.00

1,799

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-27-b

(British) :

100 Rft

Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 760 1220 mm

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Boring Rig : Rotary #2

100.000

1,800.00

Ft

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Rft

Rs.

219,600.00

Labour Rates Per

100 Rft

Rs.

0.00

Ft

180,000.00

75.00

180,000.00

22

39,600.00

Per Meter : Rs 7,202.88


Per Meter : Rs 0.00

1,800

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-27-c

(British) :

100 Cft

Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 1220 2000 mm

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Boring Rig : Rotary #3

100.000

2,000.00

Ft

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

244,000.00

Labour Rates Per

100 Cft

Rs.

0.00

Ft

200,000.00

75.00

200,000.00

22

44,000.00

Per Meter : Rs 8,003.20


Per Meter : Rs 0.00

1,801

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-28-a

(British) :

100 Rft

Boring for Cast-in-place RCC Piles in Gravelly Soils : Dia up to


660mm

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Boring Rig: Percussion #1

100.000

1,400.00

Ft

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Rft

Rs.

170,800.00

Labour Rates Per

100 Rft

Rs.

0.00

Ft

140,000.00

75.00

140,000.00

22

30,800.00

Per Meter : Rs 5,602.24


Per Meter : Rs 0.00

1,802

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-28-b

(British) :

100 Rft

Boring for Cast-in-place RCC Piles in Gravelly Soils : Dia 660 910 mm

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
Boring Rig: Percussion #2

100.000

1,800.00

Ft

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Rft

Rs.

219,600.00

Labour Rates Per

100 Rft

Rs.

0.00

Ft

180,000.00

75.00

180,000.00

22

39,600.00

Per Meter : Rs 7,202.88


Per Meter : Rs 0.00

1,803

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-29

(British) :

Cwt

Supply fabricate & install welded MS lining in piles of thickness


as per specs/drwg

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
53.342

M.S Sheet

125.00

Kg

TOTAL

MATERIAL

Kg

6,667.75

68.38

6,667.75

LABOUR
Coolie

0.810

Day

500.00

Day

405.00

Skilled Coolie

0.400

Day

600.00

Day

240.00

19.35

9.62

664.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cwt

Rs.

8,940.91

Cost Per kg: 175.24

Labour Rates Per

Cwt

Rs.

806.25

Cost Per kg: 15.80

1,608.81

1,804

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-30-a

(British) :

Cubic Inch

Supply and Fixing Neoprene Bearing Pad as per specs & design

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bearing Pad (Elastomeric)

1.000

18.00

Cubic I

TOTAL

MATERIAL

Cubic I

18.00

61.39

18.00

LABOUR
Mason

0.002

Day

900.00

Day

1.89

Coolie

0.004

Day

500.00

Day

2.10

0.12

16.61

4.11

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cubic Inc

Rs.

26.95

Cost Per cm3: 1.64

Labour Rates Per

Cubic Inc

Rs.

4.99

Cost Per cm3: 0.30

4.84

1,805

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-30-b

Item Name :

(British) :

Cwt

Supply and Fixing Steel Bearing Pads as per specs & design

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
50.802

Bearing Pad (Steel)

140.00

Kg

TOTAL

MATERIAL

Kg

7,112.28

63.25

7,112.28

LABOUR
Coolie

1.016

Day

500.00

Day

508.00

Black Smith

0.508

Day

900.00

Day

457.20

Welder II

0.508

Day

700.00

Day

355.60

39.62

14.75

1,360.42

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cwt

Rs.

10,327.98

Cost Per kg: 202.43

Labour Rates Per

Cwt

Rs.

1,651.00

Cost Per kg: 32.36

1,855.28

1,806

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-34

(British) :

100 Rft

Supply and Fixing spirally wound sheath of 50mm dia. for


pre-stressing of cables in precast conc. girders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sheath Pipe

110.000

25.00

Ft

TOTAL

MATERIAL

Ft

2,750.00

57.73

2,750.00

Day

822.95

24.69

20.27

847.64

22

LABOUR
Steel Fixer

0.914

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

4,383.69

Labour Rates Per

100 Rft

Rs.

1,028.69

786.05

Per Meter : Rs 143.78


Per Meter : Rs 33.74

1,807

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-35

(British) :

Set

Supply and Fixing stressing anchorages for high tensile steel wire
cables in precast girders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Stress Anchor

650.00

No

TOTAL

MATERIAL

No

650.00

62.10

650.00

Day

135.00

4.05

15.90

139.05

22

LABOUR
0.150

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Set

Rs.

961.75

Cost Per Set: 961.75

Labour Rates Per

Set

Rs.

168.75

Cost Per Set: 168.75

172.70

1,808

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-36

(British) :

Ft

Launching girders in place, including lifting & handli any number


of time including temporary works comp

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.488

Day

500.00

Day

243.90

Skilled Coolie

0.244

Day

600.00

Day

146.34

Mates

0.030

Day

700.00

Day

21.34

12.35

60.86

423.92

Job

121.90

17.14

121.90

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
0.012

PSC Girder Launching Set

10,000.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Ft

Rs.

663.19

Labour Rates Per

Ft

Rs.

514.47

EQUIPMENT

117.36

Per Meter : Rs 2,175.26


Per Meter : Rs 1,687.46

1,809

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-37

(British) :

Each

Stressing Cable of High Tensile Steel Wire Strands

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Helper

0.900

Day

600.00

Day

540.00

Stressing Jack Operator for Ca

0.300

Day

800.00

Day

240.00

23.40

48.70

803.40

Hour

500.00

29.30

500.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
1.000

Stressing Jack for Cable

500.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

281.60

Composite Rates Per

Each

Rs.

1,585.00

Cost Per Each: 1,585.00

Labour Rates Per

Each

Rs.

975.00

Cost Per Each: 975.00

1,810

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-38

(British) :

100 Rft

Inject Cement Grout in Sheath Pipe after stressing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.914

Bag

490.00

Sand

75.285

Cft

2,200.00

TOTAL

MATERIAL

Bag

448.05

100 Cft

1,656.28

57.83

2,104.33

LABOUR
Coolie

0.610

Day

500.00

Day

304.79

Stressing Jack Operator for Ca

0.305

Day

800.00

Day

243.83

16.46

18.08

565.09

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Grouting Pump set

0.305

250.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Rft

Rs.

3,346.03

Labour Rates Per

100 Rft

Rs.

685.78

Hour

76.20

2.09

76.20

22

600.41

Per Meter : Rs 109.75


Per Meter : Rs 22.49

1,811

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-39

Item Name :

(British) :

Each

Cut off projecting wire ends of cables & make good anchorage recess
with 1:2:4 cem. conc.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.110

Bag

490.00

Sand

0.275

Cft

Crushed Aggregate 1

0.551

Cft

TOTAL

Bag

53.90

2,200.00

100 Cft

6.05

3,500.00

100 Cft

19.28

MATERIAL

27.34

79.24

LABOUR
Mason

0.042

Day

900.00

Day

37.80

Coolie

0.083

Day

500.00

Day

41.50

Bhishti

0.042

Day

500.00

Day

21.00

Steel Fixer

0.042

Day

900.00

Day

37.80

4.14

50.66

142.24

22

47.81

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

269.29

Cost Per Each: 269.29

Labour Rates Per

Each

Rs.

172.62

Cost Per Each: 172.62

1,812

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-40

(British) :

Cwt

Supply and place in position MS expansion joint assemblies as


specified & as per drawing

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
53.340

Steel (Struct. Sections)

97.00

Kg

TOTAL

MATERIAL

Kg

5,173.98

58.83

5,173.98

LABOUR
Mason

0.508

Day

900.00

Day

457.20

Coolie

1.016

Day

500.00

Day

508.00

Black Smith

0.508

Day

900.00

Day

457.20

42.67

19.17

1,465.07

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Cwt

Rs.

8,090.26

Cost Per kg: 158.57

Labour Rates Per

Cwt

Rs.

1,778.00

Cost Per kg: 34.85

1,451.20

1,813

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-41

(British) :

Each

Supply and place in position galvanised steel 3" dia drain scuppers
in deck slab as per specs/drwg

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I Drain Scupper

360.00

Ft

TOTAL

MATERIAL

Ft

360.00

54.00

360.00

LABOUR
Mason

0.050

Day

900.00

Day

45.00

Coolie

0.100

Day

500.00

Day

50.00

Steel Fixer

0.050

Day

900.00

Day

45.00

4.20

24.00

144.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

614.20

Cost Per Each: 614.20

Labour Rates Per

Each

Rs.

175.00

Cost Per Each: 175.00

110.00

1,814

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-42

(British) :

Each

Providing and Fixing rain water outlet of AC pipe

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
3.280

A.C.pipe (b) 3"

150.00

Ft

TOTAL

MATERIAL

Ft

492.00

65.66

492.00

LABOUR
Mason

0.050

Day

900.00

Day

45.00

Coolie

0.050

Day

500.00

Day

25.00

2.10

12.34

72.10

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

687.74

Cost Per Each: 687.74

Labour Rates Per

Each

Rs.

87.50

Cost Per Each: 87.50

123.64

1,815

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-43

(British) :

100 Cft

Supply and Fixing polystrene fill in expansion joints & under


diaphragms at transoms.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Polystyrene

100.000

138.00

Cft

TOTAL

100 Cft

2.92

MATERIAL

138.00

138.00

LABOUR
Coolie

3.766

Day

500.00

Day

1,883.00

Carpenter

1.900

Day

800.00

Day

1,520.00

102.09

75.08

3,505.09

22

779.02

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,422.11

Per CUM : Rs 1,561.65

Labour Rates Per

100 Cft

Rs.

4,253.75

Per CUM : Rs 1,502.20

1,816

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-44

(British) :

100 Rft

Providing and Laying expansion joint of neoprene strip 4"x1/4" and


plastic bitumen

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Neoprene Strip Exp

100.000

105.00

Ft

TOTAL

MATERIAL

10,500.00

Ft

47.62

10,500.00

Day

6,036.00

181.08

30.38

6,217.08

22

LABOUR
Skilled Coolie

10.060

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

20,355.00

Labour Rates Per

100 Rft

Rs.

7,545.00

3,637.92

Per Meter : Rs 667.64


Per Meter : Rs 247.48

1,817

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-46

(British) :

100 Rft

Repair to cracks to reinforced or plain cement concrete work by


grouting with cement gun in (1:2) cement sand mortar including
cutting the chase of required size.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.050

Bag

490.00

Sand

2.000

Cft

2,200.00

Hire charges of cement gun

0.500

Hour

600.00

TOTAL

MATERIAL

Bag

514.50

100 Cft

44.00

Hour

300.00

20.88

858.50

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.250

Day

500.00

Day

125.00

Chiseller

1.000

Day

700.00

Day

700.00

66.75

57.12

2,291.75

22

678.37

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

3,828.62

Labour Rates Per

100 Rft

Rs.

2,781.25

Per Meter : Rs 125.58


Per Meter : Rs 91.23

1,818

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-47

(British) :

100 Sft

Dismantling bitumen carpet of any description from existing roads


surface including its removal and disposal within 3 chains lead as
desired.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

500.00

15.00

78.00

515.00

22

Composite Rates Per

100 Sft

Rs.

625.00

Per SQM : Rs 67.25

Labour Rates Per

100 Sft

Rs.

625.00

Per SQM : Rs 67.25

110.00

1,819

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-48

(British) :

100 Sft

Removing the existing worn out bitumanious surface having pot holes
and ruts in patches of regular shape brushing and re-carpeting with
1" thick (consolidated) asphalt macadam as per specifications.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

2.500

Cft

2,200.00

Liquid Asphalt

0.034

Tonne

85,000.00

1/2" size screened bajri

10.000

Sft

3,200.00

Wire Brush and Broom

1.000

No

150.00

TOTAL

MATERIAL

100 Cft
1

Tonne

100 Sft
1

No

55.00
2,890.00
320.00
150.00

52.77

3,415.00

LABOUR
Coolie

2.150

Day

500.00

Day

1,075.00

Chowkidar

0.021

Day

500.00

Day

10.50

Superviser

0.095

Day

550.00

Day

52.25

34.13

20.58

1,171.88

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.167

Hour

700.00

Hour

116.90

Tar Boiler

0.167

Hour

300.00

Hour

50.10

Concrete Mixer 1 Bag

0.167

Hour

800.00

Hour

133.60

4.65

300.60

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

5,955.22

Per SQM : Rs 640.78

Labour Rates Per

100 Sft

Rs.

1,422.19

Per SQM : Rs 153.03

1,067.74

1,820

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-49

(British) :

100 Sft

Providing and Laying 1" thick(consolidated) asphalt macadam with


liquid asphalt (cut backs) of any approved grade with premixed sand
seal coat, as specified.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Sand

2.500

Cft

2,200.00

Liquid Asphalt

0.034

Tonne

85,000.00

1/2" size screened bajri

10.000

Sft

3,200.00

Wire Brush and Broom

1.000

No

150.00

TOTAL

MATERIAL

100 Cft
1

Tonne

100 Sft
1

No

55.00
2,890.00
320.00
150.00

57.19

3,415.00

LABOUR
Coolie

1.400

Day

500.00

Day

700.00

Chowkidar

0.021

Day

500.00

Day

10.50

Superviser

0.095

Day

550.00

Day

52.25

22.88

15.77

785.63

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.167

Hour

700.00

Hour

116.90

Tar Boiler

0.167

Hour

300.00

Hour

50.10

Concrete Mixer 1 Bag

0.167

Hour

800.00

Hour

133.60

5.03

300.60

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

5,486.47

Per SQM : Rs 590.34

Labour Rates Per

100 Sft

Rs.

953.44

Per SQM : Rs 102.59

985.24

1,821

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-50

Item Name :

(British) :

100 Sft

Removing the existing worn out bitumanious surface pot holes and
ruts in patches of regular shape brushing and re-carpeting with 2"
thick(consolidated) asphalt macadam as per specificaiton complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Crushed Aggregate 1

26.000

Cft

3,500.00

Liquid Asphalt

0.043

Tonne

85,000.00

Tonne

Wire Brush and Broom

2.000

No

150.00

No

TOTAL

MATERIAL

100 Cft

910.00
3,672.00
300.00

56.37

4,882.00

LABOUR
Coolie

2.350

Day

500.00

Day

1,175.00

Chowkidar

0.028

Day

500.00

Day

14.00

Superviser

0.029

Day

550.00

Day

15.95

36.15

16.91

1,241.10

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.227

Hour

700.00

Hour

158.90

Tar Boiler

0.227

Hour

300.00

Hour

68.10

Concrete Mixer 1 Bag

0.227

Hour

800.00

Hour

181.60

4.72

408.60

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

7,960.72

Per SQM : Rs 856.57

Labour Rates Per

100 Sft

Rs.

1,506.19

Per SQM : Rs 162.07

1,429.02

1,822

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-51

Item Name :

(British) :

100 Sft

Providing and Laying 2" thick (consolidated) asphalt macadam with


liquid asphalt(cut backs) of approved grade with precoated bajri
seal coat as specified.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Crushed Aggregate 1

26.000

Cft

3,500.00

Liquid Asphalt

0.043

Tonne

85,000.00

Tonne

Wire Brush and Broom

2.000

No

150.00

No

TOTAL

MATERIAL

100 Cft

910.00
3,672.00
300.00

59.82

4,882.00

LABOUR
Coolie

1.600

Day

500.00

Day

800.00

Chowkidar

0.028

Day

500.00

Day

14.00

Superviser

0.029

Day

550.00

Day

15.95

24.90

13.17

854.85

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.227

Hour

700.00

Hour

158.90

Tar Boiler

0.227

Hour

300.00

Hour

68.10

Concrete Mixer 1 Bag

0.227

Hour

800.00

Hour

181.60

5.01

408.60

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

7,491.97

Per SQM : Rs 806.14

Labour Rates Per

100 Sft

Rs.

1,037.44

Per SQM : Rs 111.63

1,346.52

1,823

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-52

Item Name :

(British) :

100 Sft

Removing of existing worn out bitumanious surface pot holes and


ruts in patches and re-carpeting with 3" thick(consolidated)
asphalt macadam as per specifiedcomplete including disposal of
excavated stuff within one chain

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Crushed Aggregate 1

38.000

Cft

3,500.00

Liquid Asphalt

0.063

Tonne

85,000.00

Tonne

Wire Brush and Broom

2.000

No

150.00

No

TOTAL

MATERIAL

1,330.00

100 Cft

5,355.00
300.00

56.81

6,985.00

LABOUR
Coolie

2.950

Day

500.00

Day

1,475.00

Chowkidar

0.049

Day

500.00

Day

24.50

Superviser

0.050

Day

550.00

Day

27.50

45.81

15.42

1,572.81

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.394

Hour

700.00

Hour

275.80

Tar Boiler

0.394

Hour

300.00

Hour

118.20

Concrete Mixer 1 Bag

0.394

Hour

800.00

Hour

315.12

5.77

709.12

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

2,028.65

Composite Rates Per

100 Sft

Rs.

11,295.58

Per SQM : Rs 1,215.40

Labour Rates Per

100 Sft

Rs.

1,908.75

Per SQM : Rs 205.38

1,824

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-53

Item Name :

(British) :

100 Sft

Providing and Laying 3" thick (consolidated) asphalt macadam with


liquid asphalt(cut backs) of approved grade with precoated bajri
seal coat as specified.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Crushed Aggregate 1

38.000

Cft

3,500.00

Liquid Asphalt

0.063

Tonne

85,000.00

Tonne

Wire Brush and Broom

2.000

No

150.00

No

TOTAL

MATERIAL

1,330.00

100 Cft

5,355.00
300.00

59.22

6,985.00

LABOUR
Coolie

2.200

Day

500.00

Day

1,100.00

Chowkidar

0.049

Day

500.00

Day

24.50

Superviser

0.050

Day

550.00

Day

27.50

34.56

12.77

1,186.56

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.394

Hour

700.00

Hour

275.80

Tar Boiler

0.394

Hour

300.00

Hour

118.20

Concrete Mixer 1 Bag

0.394

Hour

800.00

Hour

315.12

6.01

709.12

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

1,946.15

Composite Rates Per

100 Sft

Rs.

10,826.83

Per SQM : Rs 1,164.97

Labour Rates Per

100 Sft

Rs.

1,440.00

Per SQM : Rs 154.94

1,825

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-54

Item Name :

(British) :

100 Sft

Surface dressing with bituman 80/100 or any other approved grade on


a primary coat of liquid asphalt (cut backs) of any approved grade
primer at 22lbs&bituman at 35lbs with 5cft of 1/2 standard size
bajri per %sft of road surface complete with rolling.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Crushed Aggregate 1

5.020

Cft

3,500.00

Liquid Asphalt

0.026

Tonne

85,000.00

Tonne

Wire Brush and Broom

1.000

No

150.00

No

TOTAL

MATERIAL

100 Cft

175.70
2,210.00
150.00

70.71

2,535.70

LABOUR
Coolie

0.015

Day

500.00

Day

7.50

Bhishti

0.038

Day

500.00

Day

18.95

Chowkidar

0.015

Day

500.00

Day

7.50

1.02

3.95

34.97

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

0.120

Hour

700.00

Hour

84.00

Tar Boiler

0.120

Hour

300.00

Hour

36.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

3.35

22

Composite Rates Per

100 Sft

Rs.

3,282.39

Per SQM : Rs 353.19

Labour Rates Per

100 Sft

Rs.

42.44

Per SQM : Rs 4.57

120.00

591.72

1,826

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-55
Providing and Laying
for utilities.

Detail

(British) :

10 Rft

PVC pipe (b) 8" dia in foot path of bridge

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pvc Pipe (b) 8"

10.000

396.34

Rft

TOTAL

MATERIAL

Rft

3,963.40

73.88

3,963.40

Day

60.00

1.80

4.12

61.80

22

LABOUR
Pipe Layer

0.100

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

10 Rft

Rs.

4,910.35

Labour Rates Per

10 Rft

Rs.

75.00

885.15

Per Meter : Rs 1,610.59


Per Meter : Rs 24.60

1,827

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-56

(British) :

100 Cft

Providing and filling sand behind abutment of bridges, culverts.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
100.000

Sand

2,200.00

Cft

TOTAL

MATERIAL

100 Cft

2,200.00

48.64

2,200.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Dresser

0.200

Day

600.00

Day

120.00

Water Sprinkler

0.120

Day

600.00

Day

72.00

35.76

29.36

1,227.76

22

746.24

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,174.00

Per CUM : Rs 1,474.04

Labour Rates Per

100 Cft

Rs.

1,490.00

Per CUM : Rs 526.19

1,828

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-57

(British) :

1000 Cft

Formation of shoulder with permeable material Passing less than 7 %


from 200 seive and P.I less than 4 as specified.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pitrun Gravel (NHA Specified)

1500.000

2,000.00

Cft

TOTAL

MATERIAL

30,000.00

100 Cft

69.25

30,000.00

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Dresser

0.200

Day

600.00

Day

120.00

Water Sprinkler

0.120

Day

600.00

Day

72.00

50.76

6.91

1,742.76

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with plough/blade

0.500

Hour

900.00

Hour

450.00

Static Roller (8T)

0.500

Hour

700.00

Hour

350.00

1.85

800.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

7,148.24

Composite Rates Per

1000 Cft

Rs.

39,691.00

Per CUM : Rs 1,401.68

Labour Rates Per

1000 Cft

Rs.

2,115.00

Per CUM : Rs 74.69

1,829

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-58-a

(British) :

100 Sft

Cold Milling of asphalt concrete 0-70 mm

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.150

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

75.00

2.25

7.23

77.25

EQUIPMENT
Tractor with blade/plough

0.130

Hour

800.00

Hour

104.00

Milling Machine/Milling Drum

0.230

Hour

5,000.00

Hour

1,150.00

70.77

1,254.00

22

292.38

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

1,623.63

Per SQM : Rs 174.70

Labour Rates Per

100 Sft

Rs.

93.75

Per SQM : Rs 10.09

1,830

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-58-b

(British) :

100 Sft

Cold Milling of asphalt concrete 0-50 mm

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.100

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

50.00

1.50

7.07

51.50

EQUIPMENT
Tractor with blade/plough

0.090

Hour

800.00

Hour

72.00

Milling Machine/Milling Drum

0.160

Hour

5,000.00

Hour

800.00

70.93

872.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

1,126.34

Per SQM : Rs 121.19

Labour Rates Per

100 Sft

Rs.

62.50

Per SQM : Rs 6.73

202.84

1,831

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-58-c

(British) :

100 Sft

Cold Milling of asphalt concrete 0-30 mm

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.060

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

30.00

0.90

7.33

30.90

EQUIPMENT
Tractor with blade/plough

0.050

Hour

800.00

Hour

40.00

Milling Machine/Milling Drum

0.090

Hour

5,000.00

Hour

450.00

70.67

490.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

635.30

Per SQM : Rs 68.36

Labour Rates Per

100 Sft

Rs.

37.50

Per SQM : Rs 4.04

114.40

1,832

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-59

Item Name :

(British) :

100 Sft

Seal Coat / Pad Coat

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.500

Mds

400.00

Crushed Aggregate 1

0.750

Cft

3,500.00

Bitumen (in drums)

4.640

Kg

85.00

TOTAL

MATERIAL

Mds

200.00

100 Cft

26.25

Kg

394.40

50.95

620.65

LABOUR
Coolie

0.360

Day

500.00

Day

180.00

Skilled Coolie

0.030

Day

600.00

Day

18.00

5.94

19.25

203.94

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor With Trolly

0.030

Hour

1,000.00

Hour

30.00

Static Roller (8T)

0.080

Hour

700.00

Hour

56.00

Tar Boiler

0.030

Hour

300.00

Hour

9.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

7.80

22

Composite Rates Per

100 Sft

Rs.

1,120.59

Per SQM : Rs 120.58

Labour Rates Per

100 Sft

Rs.

247.50

Per SQM : Rs 26.63

95.00

201.00

1,833

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-60

Item Name :

(British) :

100 Cft

Providing and Laying Asphalt concrete in pot holes/ deep patching


upto 30 cm including ramming completel

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

1.000

Mds

400.00

Crushed Aggregate 1

43.000

Cft

3,500.00

Bitumen (in drums)

112.000

Kg

85.00

TOTAL

MATERIAL

Mds

400.00

100 Cft

1,505.00

9,520.00

Kg

53.81

11,425.00

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

93.00

17.60

3,193.00

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Mini Asphalt Mixer

0.500

Hour

1,000.00

Hour

500.00

Plate Compactor

2.000

Hour

450.00

Hour

900.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

6.59

22

1,400.00

3,503.50

Composite Rates Per

100 Cft

Rs.

19,521.50

Per CUM : Rs 6,893.96

Labour Rates Per

100 Cft

Rs.

3,875.00

Per CUM : Rs 1,368.44

1,834

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-61

(British) :

100 Sft

Grooving in existing BT road of size 4x4 cm @ 2 meter c/c.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Skilled Coolie

0.100

Day

600.00

Day

60.00

9.30

78.00

319.30

22

68.20

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

387.50

Per SQM : Rs 41.70

Labour Rates Per

100 Sft

Rs.

387.50

Per SQM : Rs 41.70

1,835

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-62

(British) :

100 Sft

Leveling dressing and compaction with power roller of existing base


coarse layer after asphalt scarification.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

Day

500.00

Day

625.00

Skilled Coolie

0.025

Day

600.00

Day

15.00

19.20

49.15

659.20

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Tractor with plough/blade

0.250

Hour

900.00

Hour

225.00

Static Roller (8T)

0.250

Hour

700.00

Hour

175.00

28.85

400.00

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

1,288.00

Per SQM : Rs 138.59

Labour Rates Per

100 Sft

Rs.

800.00

Per SQM : Rs 86.08

228.80

1,836

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-63-a

(British) :

100 Rft

Providing and fixing kerb stone (12"x18"x6") in cement sand mortar


1:3 in center media or round about as specified.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.890

Bag

490.00

Sand

3.400

Cft

2,200.00

CC Kerb Block Factory made 12"

100.000

No

145.00

TOTAL

MATERIAL

Bag

436.10

100 Cft

74.80

No

14,500.00

66.57

15,010.90

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

57.00

11.43

1,957.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

20,688.30

Labour Rates Per

100 Rft

Rs.

2,375.00

3,720.40

Per Meter : Rs 678.58


Per Meter : Rs 77.90

1,837

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-63-b

(British) :

100 Rft

Providing and fixing kerb stone (12"x14"x6") in cement sand mortar


1:3 in center media or round about as specified.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.890

Bag

490.00

Sand

3.400

Cft

2,200.00

CC Kerb Block Factory made 12"

100.000

No

120.00

TOTAL

MATERIAL

Bag

436.10

100 Cft

74.80

No

12,000.00

65.11

12,510.90

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

57.00

12.89

1,957.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

17,638.30

Labour Rates Per

100 Rft

Rs.

2,375.00

3,170.40

Per Meter : Rs 578.54


Per Meter : Rs 77.90

1,838

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-63-c

(British) :

100 Rft

Providing and fixing kerb stone (12"x12"x6") in cement sand mortar


1:3 in center media or round about as specified.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.890

Bag

490.00

Sand

3.400

Cft

2,200.00

CC Kerb Block Factory made 12"

100.000

No

120.00

TOTAL

MATERIAL

Bag

436.10

100 Cft

74.80

No

12,000.00

65.11

12,510.90

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

57.00

12.89

1,957.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

17,638.30

Labour Rates Per

100 Rft

Rs.

2,375.00

3,170.40

Per Meter : Rs 578.54


Per Meter : Rs 77.90

1,839

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-64

(British) :

100 Cft

Bailing out water by Mechanical mean.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.015

Day

500.00

Day

7.50

Skilled Coolie

0.005

Day

600.00

Day

3.00

0.32

19.41

10.82

Hour

37.50

58.59

37.50

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Diesel Dewatering Pump 1/2 Cs

0.050

750.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Cft

Rs.

58.88

Per CUM : Rs 20.79

Labour Rates Per

100 Cft

Rs.

13.13

Per CUM : Rs 4.64

10.56

1,840

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-65-a

(British) :

100 Rft

Pavement marking in reflective thermoplast paint with glass beads


for line 15 cm width.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Reflective Thermoplast Paint w

50.000

70.00

Sft

TOTAL

MATERIAL

Sft

3,500.00

69.54

3,500.00

Day

275.00

8.25

8.46

283.25

22

LABOUR
Coolie

0.550

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

4,613.75

Labour Rates Per

100 Rft

Rs.

343.75

830.50

Per Meter : Rs 151.33


Per Meter : Rs 11.28

1,841

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-65-b

(British) :

100 Rft

Pavement marking in reflective thermoplast paint with glass beads


for line 20 cm width.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Reflective Thermoplast Paint w

67.000

70.00

Sft

TOTAL

MATERIAL

Sft

4,690.00

70.85

4,690.00

Day

275.00

8.25

7.15

283.25

22

LABOUR
Coolie

0.550

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

6,065.55

Labour Rates Per

100 Rft

Rs.

343.75

1,092.30

Per Meter : Rs 198.95


Per Meter : Rs 11.28

1,842

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-66-a

(British) :

Pavement marking in non-reflective thermoplast paint


cm width.

Detail

Qty

Unit

100 Rft

for line 15

Rate (Rs)

Amount

MATERIAL
Thermoplast Paint (Non-Reflect

50.000

75.00

Sft

TOTAL

MATERIAL

Sft

3,750.00

69.88

3,750.00

Day

275.00

8.25

8.12

283.25

22

LABOUR
Coolie

0.550

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

4,918.75

Labour Rates Per

100 Rft

Rs.

343.75

885.50

Per Meter : Rs 161.34


Per Meter : Rs 11.28

1,843

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-66-b

(British) :

Pavement marking in non-reflective thermoplast paint


cm width.

Detail

Qty

Unit

100 Rft

for line 20

Rate (Rs)

Amount

MATERIAL
Thermoplast Paint (Non-Reflect

67.000

75.00

Sft

TOTAL

MATERIAL

Sft

5,025.00

71.11

5,025.00

Day

275.00

8.25

6.89

283.25

22

LABOUR
Coolie

0.550

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

6,474.25

Labour Rates Per

100 Rft

Rs.

343.75

1,166.00

Per Meter : Rs 212.36


Per Meter : Rs 11.28

1,844

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-67-a

(British) :

100 Rft

Pavement marking in reflective chlorinated rubber paint with glass


beads for line 15 cm width.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Chlorinated Rubber Paint with

50.000

500.00

Sft

TOTAL

MATERIAL

Sft

25,000.00

74.18

25,000.00

Day

275.00

8.25

3.82

283.25

22

LABOUR
Coolie

0.550

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

30,843.75

Labour Rates Per

100 Rft

Rs.

343.75

5,560.50

Per Meter : Rs 1,011.68


Per Meter : Rs 11.28

1,845

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-67-b

(British) :

100 Rft

Pavement marking in reflective chlorinated rubber paint with glass


beads for line 20 cm width.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Chlorinated Rubber Paint with

67.000

500.00

Sft

TOTAL

MATERIAL

Sft

33,500.00

74.39

33,500.00

Day

275.00

8.25

3.61

283.25

22

LABOUR
Coolie

0.550

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

41,213.75

Labour Rates Per

100 Rft

Rs.

343.75

7,430.50

Per Meter : Rs 1,351.81


Per Meter : Rs 11.28

1,846

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-68-a

(British) :

100 Rft

Pavement marking in reflective chlorinated rubber paint for line 15


cm width.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Chlorinated Rubber Paint with

50.000

500.00

Sft

TOTAL

MATERIAL

Sft

25,000.00

74.18

25,000.00

Day

275.00

8.25

3.82

283.25

22

LABOUR
Coolie

0.550

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

30,843.75

Labour Rates Per

100 Rft

Rs.

343.75

5,560.50

Per Meter : Rs 1,011.68


Per Meter : Rs 11.28

1,847

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-68-b

(British) :

Pavement marking in reflective chlorinated rubber paint


20 cm width.

Detail

Qty

Unit

100 Rft
for line

Rate (Rs)

Amount

MATERIAL
Chlorinated Rubber Paint with

67.000

500.00

Sft

TOTAL

MATERIAL

Sft

33,500.00

74.39

33,500.00

Day

275.00

8.25

3.61

283.25

22

LABOUR
Coolie

0.550

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

41,213.75

Labour Rates Per

100 Rft

Rs.

343.75

7,430.50

Per Meter : Rs 1,351.81


Per Meter : Rs 11.28

1,848

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-69

(British) :

100 Cft

Providing & laying stone soling in water logged area including


granular filling & compaction complete.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

Cft

3,200.00

100 Cft

3,200.00

Local Sand

15.000

Cft

1,600.00

100 Cft

240.00

TOTAL

MATERIAL

50.44

3,440.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.500

Day

500.00

Day

750.00

29.25

17.30

1,004.25

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Static Roller (8T)

1.000

700.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

700.00

10.26

700.00

22

1,125.30

Composite Rates Per

100 Cft

Rs.

6,269.55

Per CUM : Rs 2,214.07

Labour Rates Per

100 Cft

Rs.

1,218.75

Per CUM : Rs 430.40

1,849

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-70

(British) :

100 Sft

Tucking and chipping of road surface before hot surface dressing


over existing road.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

250.00

7.50

78.00

257.50

22

55.00

Composite Rates Per

100 Sft

Rs.

312.50

Per SQM : Rs 33.63

Labour Rates Per

100 Sft

Rs.

312.50

Per SQM : Rs 33.63

1,850

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

16-71

Item Name :

(British) :

100 Cft

Leveling course on existing surface of road.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Stone Dust

62.470

Cft

2,000.00

100 Cft

1,249.40

Crushed Aggregate 1

125.000

Cft

3,500.00

100 Cft

4,375.00

Asphalt

213.820

Kg

85.00

TOTAL

MATERIAL

Kg

18,174.70

50.97

23,799.10

LABOUR
Coolie

0.506

Day

500.00

Day

253.00

Skilled Coolie

0.253

Day

600.00

Day

151.80

Rake Man

0.230

Day

600.00

Day

138.00

16.28

4.16

559.08

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Procuring/Transport/Laying/Com

5.930

1,800.00

Tonne

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Tonne

10,674.00

22.86

10,674.00

22

7,703.50

Composite Rates Per

100 Cft

Rs.

42,735.68

Per CUM : Rs 15,091.98

Labour Rates Per

100 Cft

Rs.

678.50

Per CUM : Rs 239.61

1,851

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-72-a

(British) :

Each

Jack Anchorage For 20 to 24 Wires 0.5" Strand (Comprising Trumpet,


Stressing Block & Wedges Complete)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Jack Anchorage For 20 to 24 Wi

11,400.00

Set

TOTAL

MATERIAL

Set

11,400.00

74.12

11,400.00

Day

135.00

4.05

3.88

139.05

22

LABOUR
0.150

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,537.70

Composite Rates Per

Each

Rs.

14,076.75

Cost Per Each: 14,076.75

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,852

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-72-b

(British) :

Each

Jack Anchorage For 16 to 19 Wires 0.5" Strand (Comprising Trumpet,


Stressing Block & Wedges Complete)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Jack Anchorage For 16 to 19 Wi

9,120.00

Set

TOTAL

MATERIAL

Set

9,120.00

73.91

9,120.00

Day

135.00

4.05

4.09

139.05

22

LABOUR
0.150

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,036.10

Composite Rates Per

Each

Rs.

11,295.15

Cost Per Each: 11,295.15

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,853

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-72-c

(British) :

Each

Jack Anchorage For 10 to 12 Wires 0.5" Strand (Comprising Trumpet,


Stressing Block & Wedges Complete)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Jack Anchorage For 10 to 12 Wi

7,000.00

Set

TOTAL

MATERIAL

Set

7,000.00

73.58

7,000.00

Day

135.00

4.05

4.42

139.05

22

LABOUR
0.150

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,569.70

Composite Rates Per

Each

Rs.

8,708.75

Cost Per Each: 8,708.75

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,854

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-72-d

(British) :

Each

Jack Anchorage For 13 to 15 Wires 0.5" Strand (Comprising Trumpet,


Stressing Block & Wedges Complete)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Jack Anchorage For 13 to 15 Wi

7,800.00

Set

TOTAL

MATERIAL

Set

7,800.00

73.72

7,800.00

Day

135.00

4.05

4.28

139.05

22

LABOUR
0.150

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,745.70

Composite Rates Per

Each

Rs.

9,684.75

Cost Per Each: 9,684.75

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,855

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-72-e

(British) :

Each

Jack Anchorage For 8 to 9 Wires 0.5" Strand (Comprising Trumpet,


Stressing Block & Wedges Complete)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Jack Anchorage For 8 to 9 Wire

5,000.00

Set

TOTAL

MATERIAL

Set

5,000.00

73.03

5,000.00

Day

135.00

4.05

4.97

139.05

22

LABOUR
0.150

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,129.70

Composite Rates Per

Each

Rs.

6,268.75

Cost Per Each: 6,268.75

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,856

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-72-f

(British) :

Each

Jack Anchorage For 5 to 7 Wires 0.5" Strand (Comprising Trumpet,


Stressing Block & Wedges Complete)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Jack Anchorage For 5 to 7 Wire

4,500.00

Set

TOTAL

MATERIAL

Set

4,500.00

72.82

4,500.00

Day

135.00

4.05

5.18

139.05

22

LABOUR
0.150

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,019.70

Composite Rates Per

Each

Rs.

5,658.75

Cost Per Each: 5,658.75

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,857

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-72-g

(British) :

Each

Jack Anchorage For upto 4 Wires 0.5" Strand (Comprising Trumpet,


Stressing Block & Wedges Complete)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Jack Anchorage For upto 4 Wire

3,200.00

Set

TOTAL

MATERIAL

Set

3,200.00

71.96

3,200.00

Day

135.00

4.05

6.04

139.05

22

LABOUR
0.150

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

733.70

Composite Rates Per

Each

Rs.

4,072.75

Cost Per Each: 4,072.75

Labour Rates Per

Each

Rs.

168.75

Cost Per Each: 168.75

1,858

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-a

(British) :

Rft

Un-galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Un-galvanized Sheath for 20 t

75.00

Rft

TOTAL

MATERIAL

Rft

75.00

67.59

75.00

Day

8.23

0.25

10.41

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

101.78

Labour Rates Per

Rft

Rs.

10.28

LABOUR

18.31

Per Meter : Rs 333.85


Per Meter : Rs 33.73

1,859

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-b

(British) :

Rft

Un-galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Un-galvanized Sheath for 16 t

65.00

Rft

TOTAL

MATERIAL

Rft

65.00

66.57

65.00

Day

8.23

0.25

11.43

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

89.58

Labour Rates Per

Rft

Rs.

10.28

LABOUR

16.11

Per Meter : Rs 293.83


Per Meter : Rs 33.73

1,860

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-c

(British) :

Rft

Un-galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Un-galvanized Sheath for 13


to 15 Wires 0.5" Strand Cable

35.00

Rft

TOTAL

MATERIAL

Rft

35.00

60.73

35.00

Day

8.23

0.25

17.27

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

52.98

Labour Rates Per

Rft

Rs.

10.28

LABOUR

9.51

Per Meter : Rs 173.78


Per Meter : Rs 33.73

1,861

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-d

(British) :

Rft

Un-galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Un-galvanized Sheath for 10 t

32.00

Rft

TOTAL

MATERIAL

Rft

32.00

59.66

32.00

Day

8.23

0.25

18.34

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

49.32

Labour Rates Per

Rft

Rs.

10.28

LABOUR

8.85

Per Meter : Rs 161.78


Per Meter : Rs 33.73

1,862

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-e

(British) :

Rft

Un-galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Un-galvanized Sheath for 8 to

30.00

Rft

TOTAL

MATERIAL

Rft

30.00

58.86

30.00

Day

8.23

0.25

19.14

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

46.88

Labour Rates Per

Rft

Rs.

10.28

LABOUR

8.41

Per Meter : Rs 153.77


Per Meter : Rs 33.73

1,863

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-f

(British) :

Rft

Un-galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Un-galvanized Sheath for 5 to

29.00

Rft

TOTAL

MATERIAL

Rft

29.00

58.43

29.00

Day

8.23

0.25

19.57

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

45.66

Labour Rates Per

Rft

Rs.

10.28

LABOUR

8.19

Per Meter : Rs 149.77


Per Meter : Rs 33.73

1,864

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-g

(British) :

Rft

Un-galvanized Sheath for upto 4 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Un-galvanized Sheath for upto

26.00

Rft

TOTAL

MATERIAL

Rft

26.00

56.97

26.00

Day

8.23

0.25

21.03

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

42.00

Labour Rates Per

Rft

Rs.

10.28

LABOUR

7.53

Per Meter : Rs 137.77


Per Meter : Rs 33.73

1,865

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-h

(British) :

Each

Stressing and Grouting for Cables upto 24/0.5" (Single End


Stressing).

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Helper

0.900

Day

600.00

Day

540.00

Stressing Jack Operator for St

0.300

Day

800.00

Day

240.00

23.40

24.04

803.40

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
1.000

Stressing Jack for Strand

2,000.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

2,000.00

53.96

2,000.00

22

611.60

Composite Rates Per

Each

Rs.

3,415.00

Cost Per Each: 3,415.00

Labour Rates Per

Each

Rs.

975.00

Cost Per Each: 975.00

1,866

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-i

(British) :

Each

Stressing and Grouting for Cables ranging from 13/0.5" to 24/.05"


(Single End Stressing).

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Helper

0.600

Day

600.00

Day

360.00

Stressing Jack Operator for St

0.200

Day

800.00

Day

160.00

15.60

18.48

535.60

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
1.000

Stressing Jack for Strand

2,000.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

2,000.00

59.52

2,000.00

22

554.40

Composite Rates Per

Each

Rs.

3,090.00

Cost Per Each: 3,090.00

Labour Rates Per

Each

Rs.

650.00

Cost Per Each: 650.00

1,867

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-73-j

(British) :

Each

Stressing and Grouting for Cable below 13/0.5" (Single End


Stressing).

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Helper

0.400

Day

600.00

Day

240.00

Stressing Jack Operator for St

0.150

Day

800.00

Day

120.00

10.80

14.44

370.80

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
1.000

Stressing Jack for Strand

2,000.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Hour

2,000.00

63.56

2,000.00

22

519.20

Composite Rates Per

Each

Rs.

2,890.00

Cost Per Each: 2,890.00

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

1,868

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-74-a

(British) :

Tonne

Supply of High Tensile Pre-stressed concrete steel wire strand


Grade 270K 0.5" dia. Packed in standard reeless/weldless coils of
two 2000 kgs approximately binded and wraped in Hessian Cloth.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Supply of High Tensile P.C Ste

1.000

134,000.00

Tonne

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

Tonne

134,000.00

75.00

134,000.00

22

29,480.00

Composite Rates Per

Tonne

Rs.

163,480.00

Cost Per ton: 166,103.36

Labour Rates Per

Tonne

Rs.

0.00

Cost Per ton: 0.00

1,869

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-74-b

(British) :

tonne

Supply of P.C Steel wire Dia 7 mm and 8 mm. Packed in reeless coils
of 600 kgs to 800kgs properly binded.

Detail

Qty

Unit

Rate (Rs)

Tonne

115.00

Amount

MATERIAL
High Tensile Steel

1000.000

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

Tonne

115,000.00

75.00

115,000.00

22

25,300.00

Composite Rates Per

tonne

Rs.

140,300.00

Cost Per ton: 142,551.39

Labour Rates Per

tonne

Rs.

0.00

Cost Per ton: 0.00

1,870

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-74-c

(British) :

Tonne

Supply of P.C Steel wire Dia 4 mm and 5 mm. Packed in reeless coils
of 600 kgs to 800kgs properly binded.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Supply of P.C Steel wire Dia 4

1.000

130,000.00

Tonne

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

Tonne

130,000.00

75.00

130,000.00

22

28,600.00

Composite Rates Per

Tonne

Rs.

158,600.00

Cost Per ton: 161,145.05

Labour Rates Per

Tonne

Rs.

0.00

Cost Per ton: 0.00

1,871

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-75-a

(British) :

Rft

Galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Galvanized Sheath for 20 to 2

166.80

Rft

TOTAL

MATERIAL

Rft

166.80

71.48

166.80

Day

8.23

0.25

6.52

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

213.78

Labour Rates Per

Rft

Rs.

10.28

LABOUR

38.51

Per Meter : Rs 701.19


Per Meter : Rs 33.73

1,872

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-75-b

(British) :

Rft

Galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Galvanized Sheath for 16 to 1

144.00

Rft

TOTAL

MATERIAL

Rft

144.00

70.95

144.00

Day

8.23

0.25

7.05

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

185.96

Labour Rates Per

Rft

Rs.

10.28

LABOUR

33.49

Per Meter : Rs 609.96


Per Meter : Rs 33.73

1,873

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-75-c

(British) :

Rft

Galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Galvanized Sheath for 13 to 1

123.60

Rft

TOTAL

MATERIAL

Rft

123.60

70.32

123.60

Day

8.23

0.25

7.68

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

161.07

Labour Rates Per

Rft

Rs.

10.28

LABOUR

29.00

Per Meter : Rs 528.32


Per Meter : Rs 33.73

1,874

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-75-d

(British) :

Rft

Galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Galvanized Sheath for 10 to 1

106.80

Rft

TOTAL

MATERIAL

Rft

106.80

69.64

106.80

Day

8.23

0.25

8.36

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

140.58

Labour Rates Per

Rft

Rs.

10.28

LABOUR

25.31

Per Meter : Rs 461.10


Per Meter : Rs 33.73

1,875

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-75-e

(British) :

Rft

Galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Galvanized Sheath for 8 to 9 W

98.00

Rft

TOTAL

MATERIAL

Rft

98.00

69.19

98.00

Day

8.23

0.25

8.81

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

129.84

Labour Rates Per

Rft

Rs.

10.28

LABOUR

23.37

Per Meter : Rs 425.88


Per Meter : Rs 33.73

1,876

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-75-f

(British) :

Rft

Galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Galvanized Sheath for 5 to 7 W

88.00

Rft

TOTAL

MATERIAL

Rft

88.00

68.59

88.00

Day

8.23

0.25

9.41

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

117.64

Labour Rates Per

Rft

Rs.

10.28

LABOUR

21.17

Per Meter : Rs 385.87


Per Meter : Rs 33.73

1,877

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-75-g

(British) :

Rft

Galvanized Sheath for upto 4 Wires 0.5" Strand Cable

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Galvanized Sheath for upto 4 W

74.00

Rft

TOTAL

MATERIAL

Rft

74.00

67.50

74.00

Day

8.23

0.25

10.50

8.47

22

LABOUR
0.009

Steel Fixer

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

100.56

Labour Rates Per

Rft

Rs.

10.28

LABOUR

18.09

Per Meter : Rs 329.84


Per Meter : Rs 33.73

1,878

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-76-a

(British) :

8 Rft

Precast Reinfored Concrete Kerb New Jersy Barrier for Median


(Double Face)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
P.C.C (1:4:8) (1x8'x28"x5"=7.7

7.770

Cft

18,000.00

100 Cft

1,398.60

P.C.C (1:2:4) (1x8"x20"x4"=4.4

20.770

Cft

25,000.00

100 Cft

5,192.50

Steel G-60 Deformed Bars =(20.

1.360

Cwt

4,547.00

Form Wrok (2x8'x5"=6.66 Sqf)+

51.040

Sft

5,500.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

Composite Rates Per

8 Rft

Rs.

19,010.31

Labour Rates Per

8 Rft

Rs.

0.00

Cwt

6,183.92

100 Sft

2,807.20

75.00

15,582.22

22

3,428.09

Per Meter : Rs 7,794.23


Per Meter : Rs 0.00

1,879

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-76-b

(British) :

8 Rft

Precast Reinforced Concrete Kerb New Jersy Barrier for Bridge


(Single Face)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
P.C.C (1:4:8)

5.830

Cft

180.00

100 Cft

10.49

P.C.C (1:2:4)

15.710

Cft

250.00

100 Cft

39.28

Steel G-60 Deformed Bars (15.7

1.030

Cwt

4,547.00

Form Work (Vertical)

43.520

Sft

60.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

Composite Rates Per

8 Rft

Rs.

5,806.33

Labour Rates Per

8 Rft

Rs.

0.00

Cwt

4,683.41

100 Sft

26.11

75.00

22

4,759.29

1,047.04

Per Meter : Rs 2,380.60


Per Meter : Rs 0.00

1,880

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

16-77

(British) :

100 Sft

Repair to pot holes including cleaning, brushing, removal of loose


material and filling of the same with clean stone of size 0.75" to
1.5" with hot bitumen manual compaction with rammer (water bound 3%
biutmen)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Fuel Wood

0.250

Mds

400.00

Mds

100.00

Wire Brush and Broom

1.000

No

150.00

No

150.00

Crushed aggregate 0.75" to 1.5

20.000

Cft

32.00

100 Cft

6.40

Crushed aggregate 0.25" to 0.5

9.500

Cft

37.00

100 Cft

3.52

Bitumen 3 % (in Drums)

30.000

Kg

85.00

TOTAL

MATERIAL

Kg

2,550.00

47.31

2,809.92

LABOUR
Coolie

3.040

Day

500.00

Day

1,520.00

Bhishti

0.250

Day

500.00

Day

125.00

49.35

30.69

1,694.35

22

980.08

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,484.35

Per SQM : Rs 590.12

Labour Rates Per

100 Sft

Rs.

2,056.25

Per SQM : Rs 221.25

1,881

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Rft

Item Name :

16-78-a

(British) :

Metal Guard Rail as per NHA (604a)

Detail

Qty

Unit

Rate (Rs)

1 Rft

850.00

Amount

MATERIAL
1.000

Metal Guard Rail

TOTAL

MATERIAL

1 Rft

850.00

71.81

850.00

LABOUR
Helper

0.023

Day

600.00

Day

13.80

Welder I

0.024

Day

1,000.00

Day

24.00

1.13

6.19

38.93

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,084.25

Labour Rates Per

Rft

Rs.

47.25

195.32

Per Meter : Rs 3,556.34


Per Meter : Rs 154.98

1,882

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Each

Item Name :

16-78-b

(British) :

Metal Guard Rail End Pieces as per NHA (604b)

Detail

Qty

Unit

Rate (Rs)

1 Rft

1,800.00

Amount

MATERIAL
1.000

Metal Guard Rail End Pieces

TOTAL

MATERIAL

1 Rft

1,800.00

73.05

1,800.00

LABOUR
Helper

0.030

Day

600.00

Day

18.00

Welder I

0.030

Day

1,000.00

Day

30.00

1.44

4.95

49.44

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

406.56

Composite Rates Per

Each

Rs.

2,256.00

Cost Per Each: 2,256.00

Labour Rates Per

Each

Rs.

60.00

Cost Per Each: 60.00

1,883

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 16 , ROADS AND BRIDGES
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Each

Item Name :

16-78-c

(British) :

Steel Post of Metal Guard Rail as per NHA (604d)

Detail

Qty

Unit

Rate (Rs)

Each

7,000.00

Amount

MATERIAL
1.000

Steel Post of Metal Guard Rail

TOTAL

MATERIAL

Each

7,000.00

73.32

7,000.00

LABOUR
Helper

0.100

Day

600.00

Day

60.00

Welder I

0.100

Day

1,000.00

Day

100.00

4.80

4.68

164.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,575.20

Composite Rates Per

Each

Rs.

8,740.00

Cost Per Each: 8,740.00

Labour Rates Per

Each

Rs.

200.00

Cost Per Each: 200.00

1,884

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-01-a

(British) :

100 Sft

Formation, dressing and preparing sub-grade in bed

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Dresser

0.330

Day

600.00

Day

198.00

17.19

78.00

590.19

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

716.25

Per SQM : Rs 77.07

Labour Rates Per

100 Sft

Rs.

716.25

Per SQM : Rs 77.07

126.06

1,885

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-01-b

(British) :

100 Sft

Formation, dressing and preparing sub-grade On slope

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Dresser

0.500

Day

600.00

Day

300.00

24.00

78.00

824.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,000.00

Per SQM : Rs 107.60

Labour Rates Per

100 Sft

Rs.

1,000.00

Per SQM : Rs 107.60

176.00

1,886

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-02

Stabilized layer of cement, sand mortar 1:30

Detail

Qty

Unit

(British) :

100 Sft

2" thick on slope

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.500

Bag

490.00

Sand

18.000

Cft

2,200.00

TOTAL

MATERIAL

Bag

245.00

100 Cft

396.00

22.99

641.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

43.50

55.01

1,493.50

22

460.02

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,594.52

Per SQM : Rs 279.17

Labour Rates Per

100 Sft

Rs.

1,812.50

Per SQM : Rs 195.03

1,887

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-03-a

(British) :

100 Sft

1/2" thick plaster of cement, sand motar 1:10 in bed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.340

Bag

490.00

Sand

4.200

Cft

2,200.00

TOTAL

MATERIAL

Bag

166.60

100 Cft

92.40

14.87

259.00

LABOUR
Mason

0.330

Day

900.00

Day

297.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.500

Day

500.00

Day

250.00

31.41

63.13

1,078.41

22

287.32

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,624.73

Per SQM : Rs 174.82

Labour Rates Per

100 Sft

Rs.

1,308.75

Per SQM : Rs 140.82

1,888

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-03-b

(British) :

100 Sft

1/2" thick plaster of cement, sand motar 1:10 On slope

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.340

Bag

490.00

Sand

4.200

Cft

2,200.00

TOTAL

MATERIAL

Bag

166.60

100 Cft

92.40

12.26

259.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.500

Day

500.00

Day

250.00

39.75

65.74

1,364.75

22

348.48

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,972.23

Per SQM : Rs 212.21

Labour Rates Per

100 Sft

Rs.

1,656.25

Per SQM : Rs 178.21

1,889

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-04-a

(British) :

100 Sft

1" thick plaster of cement, sand mortar 1:6 in bed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.650

Bag

490.00

Sand

11.700

Cft

2,200.00

TOTAL

MATERIAL

Bag

808.50

100 Cft

257.40

33.44

1,065.90

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.500

Day

500.00

Day

250.00

39.75

44.56

1,364.75

22

526.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,956.65

Per SQM : Rs 318.14

Labour Rates Per

100 Sft

Rs.

1,656.25

Per SQM : Rs 178.21

1,890

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-04-b

(British) :

100 Sft

1" thick plaster of cement, sand mortar 1:6 On slope

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.650

Bag

490.00

Sand

11.700

Cft

2,200.00

TOTAL

MATERIAL

Bag

808.50

100 Cft

257.40

29.17

1,065.90

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.500

Day

500.00

Day

750.00

Bhishti

0.500

Day

500.00

Day

250.00

50.25

48.83

1,725.25

22

603.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,394.15

Per SQM : Rs 365.21

Labour Rates Per

100 Sft

Rs.

2,093.75

Per SQM : Rs 225.29

1,891

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-05-a

(British) :

100 Sft

3/8" thick plaster of cement, sand mortar 1:3 in bed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.710

Bag

490.00

Sand

2.500

Cft

2,200.00

TOTAL

MATERIAL

Bag

347.90

100 Cft

55.00

20.84

402.90

LABOUR
Mason

0.330

Day

900.00

Day

297.00

Coolie

1.000

Day

500.00

Day

500.00

Bhishti

0.500

Day

500.00

Day

250.00

31.41

57.16

1,078.41

22

318.98

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

1,800.29

Per SQM : Rs 193.71

Labour Rates Per

100 Sft

Rs.

1,308.75

Per SQM : Rs 140.82

1,892

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-05-b

(British) :

100 Sft

3/8" thick plaster of cement, sand mortar 1:3 On slope

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.710

Bag

490.00

Sand

2.500

Cft

2,200.00

TOTAL

MATERIAL

Bag

347.90

100 Cft

55.00

17.49

402.90

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.250

Day

500.00

Day

625.00

Bhishti

0.500

Day

500.00

Day

250.00

39.75

60.51

1,364.75

22

380.14

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,147.79

Per SQM : Rs 231.10

Labour Rates Per

100 Sft

Rs.

1,656.25

Per SQM : Rs 178.21

1,893

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-06-a

(British) :

100 Cft

Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer
of 1/8" thick c/s mortar 1:6 (in bed)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.440

Bag

490.00

Sand

25.700

Cft

2,200.00

Brick Tile (12"x6"x2")

1200.000

No

14,000.00

TOTAL

MATERIAL

Bag

1,685.60

100 Cft

565.40

16,800.00

1,000 No

59.10

19,051.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

153.75

18.90

5,278.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,318.72

Composite Rates Per

100 Cft

Rs.

29,648.47

Per CUM : Rs 10,470.27

Labour Rates Per

100 Cft

Rs.

6,406.25

Per CUM : Rs 2,262.35

1,894

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-06-b

(British) :

100 Cft

Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer
of 1/8" thick c/s mortar 1:6 (On slope)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.440

Bag

490.00

Sand

25.700

Cft

2,200.00

Brick Tile (12"x6"x2")

1200.000

No

14,000.00

TOTAL

MATERIAL

Bag

1,685.60

100 Cft

565.40

16,800.00

1,000 No

57.38

19,051.00

LABOUR
Mason

2.750

Day

900.00

Day

2,475.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.750

Day

500.00

Day

375.00

175.50

20.62

6,025.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,478.22

Composite Rates Per

100 Cft

Rs.

30,554.72

Per CUM : Rs 10,790.31

Labour Rates Per

100 Cft

Rs.

7,312.50

Per CUM : Rs 2,582.39

1,895

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-07-a

(British) :

100 Cft

Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer
of 1/8" thick c/s mortar 1:3 (in bed)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

Brick Tile (12"x6"x2")

1200.000

No

14,000.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

16,800.00

1,000 No

59.84

20,235.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

153.75

18.16

5,278.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,579.20

Composite Rates Per

100 Cft

Rs.

31,092.95

Per CUM : Rs 10,980.38

Labour Rates Per

100 Cft

Rs.

6,406.25

Per CUM : Rs 2,262.35

1,896

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-07-b

(British) :

100 Cft

Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer
of 1/8" thick c/s mortar 1:3 (On slope)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

Brick Tile (12"x6"x2")

1200.000

No

14,000.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

16,800.00

1,000 No

58.18

20,235.00

LABOUR
Mason

2.750

Day

900.00

Day

2,475.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.750

Day

500.00

Day

375.00

175.50

19.82

6,025.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,738.70

Composite Rates Per

100 Cft

Rs.

31,999.20

Per CUM : Rs 11,300.42

Labour Rates Per

100 Cft

Rs.

7,312.50

Per CUM : Rs 2,582.39

1,897

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-08-a

(British) :

100 Cft

Lining with bricks 9"x4.5"x3" (First Class) in c/s mort. 1:6 ove a
layer of 1/8" thick c/s mortar 1:6 (in bed)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.440

Bag

490.00

Sand

25.700

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

1,685.60

100 Cft

565.40

11,475.00

1,000 No

54.61

13,726.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

153.75

23.39

5,278.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,147.22

Composite Rates Per

100 Cft

Rs.

23,151.97

Per CUM : Rs 8,176.05

Labour Rates Per

100 Cft

Rs.

6,406.25

Per CUM : Rs 2,262.35

1,898

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-08-b

(British) :

100 Cft

Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:6 over
a layer of 1/8" thick c/s mortar 1:6 (On slope)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

3.440

Bag

490.00

Sand

25.700

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

1,685.60

100 Cft

565.40

11,475.00

1,000 No

52.59

13,726.00

LABOUR
Mason

2.750

Day

900.00

Day

2,475.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.750

Day

500.00

Day

375.00

175.50

25.41

6,025.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,306.72

Composite Rates Per

100 Cft

Rs.

24,058.22

Per CUM : Rs 8,496.09

Labour Rates Per

100 Cft

Rs.

7,312.50

Per CUM : Rs 2,582.39

1,899

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-09-a

(British) :

100 Cft

Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over
a layer of 1/8" thick c/s mortar 1:3 (in bed)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

11,475.00

1,000 No

55.81

14,910.00

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

5.000

Day

500.00

Day

2,500.00

Bhishti

0.750

Day

500.00

Day

375.00

153.75

22.19

5,278.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,407.70

Composite Rates Per

100 Cft

Rs.

24,596.45

Per CUM : Rs 8,686.16

Labour Rates Per

100 Cft

Rs.

6,406.25

Per CUM : Rs 2,262.35

1,900

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-09-b

(British) :

100 Cft

Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over
a layer of 1/8" thick c/s mortar 1:3 (On slope)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

Burnt Brick

1350.000

No

8,500.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

11,475.00

1,000 No

53.87

14,910.00

LABOUR
Mason

2.750

Day

900.00

Day

2,475.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.750

Day

500.00

Day

375.00

175.50

24.13

6,025.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,567.20

Composite Rates Per

100 Cft

Rs.

25,502.70

Per CUM : Rs 9,006.20

Labour Rates Per

100 Cft

Rs.

7,312.50

Per CUM : Rs 2,582.39

1,901

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-10-a-01

(British) :

100 Cft

4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:2:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.620

Bag

490.00

Sand

44.000

Cft

Crushed Aggregate

88.000

Cft

TOTAL

Bag

8,633.80

2,200.00

100 Cft

968.00

2,800.00

100 Cft

2,464.00

MATERIAL

55.81

12,065.80

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

22.19

4,274.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,567.48

Composite Rates Per

100 Cft

Rs.

19,907.78

Per CUM : Rs 7,030.37

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

1,902

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-10-a-02

(British) :

100 Cft

4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:3:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

13.000

Bag

490.00

Sand

46.000

Cft

Crushed Aggregate

92.000

Cft

TOTAL

Bag

6,370.00

2,200.00

100 Cft

1,012.00

2,800.00

100 Cft

2,576.00

MATERIAL

52.94

9,958.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

25.06

4,274.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,103.76

Composite Rates Per

100 Cft

Rs.

17,336.26

Per CUM : Rs 6,122.25

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

1,903

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-10-a-03

(British) :

100 Cft

4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : in bed : Ratio 1:4:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.000

Bag

490.00

Sand

48.000

Cft

Crushed Aggregate

96.000

Cft

TOTAL

Bag

4,410.00

2,200.00

100 Cft

1,056.00

2,800.00

100 Cft

2,688.00

MATERIAL

49.70

8,154.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

6.000

Day

500.00

Day

3,000.00

Bhishti

0.500

Day

500.00

Day

250.00

124.50

28.30

4,274.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,706.88

Composite Rates Per

100 Cft

Rs.

15,135.38

Per CUM : Rs 5,345.01

Labour Rates Per

100 Cft

Rs.

5,187.50

Per CUM : Rs 1,831.95

1,904

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-10-b-01

(British) :

100 Cft

4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:2:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.620

Bag

490.00

Sand

44.000

Cft

Crushed Aggregate

88.000

Cft

TOTAL

Bag

8,633.80

2,200.00

100 Cft

968.00

2,800.00

100 Cft

2,464.00

MATERIAL

53.42

12,065.80

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

7.000

Day

500.00

Day

3,500.00

Bhishti

0.500

Day

500.00

Day

250.00

146.25

24.58

5,021.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,726.98

Composite Rates Per

100 Cft

Rs.

20,814.03

Per CUM : Rs 7,350.41

Labour Rates Per

100 Cft

Rs.

6,093.75

Per CUM : Rs 2,151.99

1,905

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-10-b-02

(British) :

100 Cft

4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:3:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

13.000

Bag

490.00

Sand

46.000

Cft

Crushed Aggregate

92.000

Cft

TOTAL

Bag

6,370.00

2,200.00

100 Cft

1,012.00

2,800.00

100 Cft

2,576.00

MATERIAL

50.35

9,958.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

7.000

Day

500.00

Day

3,500.00

Bhishti

0.500

Day

500.00

Day

250.00

146.25

27.65

5,021.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,263.26

Composite Rates Per

100 Cft

Rs.

18,242.51

Per CUM : Rs 6,442.29

Labour Rates Per

100 Cft

Rs.

6,093.75

Per CUM : Rs 2,151.99

1,906

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-10-b-03

(British) :

100 Cft

4" thick PCC lining, using washed screened & graded/curshed stone
aggregate : On slope : Ratio 1:4:8

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

9.000

Bag

490.00

Sand

48.000

Cft

Crushed Aggregate

96.000

Cft

TOTAL

Bag

4,410.00

2,200.00

100 Cft

1,056.00

2,800.00

100 Cft

2,688.00

MATERIAL

46.94

8,154.00

LABOUR
Mason

1.250

Day

900.00

Day

1,125.00

Coolie

7.000

Day

500.00

Day

3,500.00

Bhishti

0.500

Day

500.00

Day

250.00

146.25

31.06

5,021.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,866.38

Composite Rates Per

100 Cft

Rs.

16,041.63

Per CUM : Rs 5,665.05

Labour Rates Per

100 Cft

Rs.

6,093.75

Per CUM : Rs 2,151.99

1,907

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-11-a
Providing and Laying
Type A

Detail

(British) :

Rft

segments in Precast lining (Parabola type)

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.625

Bag

490.00

Sand

2.000

Cft

Crushed Aggregate

2.340

Cft

TOTAL

Bag

306.25

2,200.00

100 Cft

44.00

2,800.00

100 Cft

65.52

MATERIAL

50.03

415.77

LABOUR
Mason

0.050

Day

900.00

Day

45.00

Coolie

0.200

Day

500.00

Day

100.00

Bhishti

0.005

Day

500.00

Day

2.50

Skilled Coolie

0.100

Day

600.00

Day

60.00

6.23

27.97

213.73

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

766.61

Labour Rates Per

Rft

Rs.

259.38

LABOUR

137.12

Per Meter : Rs 2,514.50


Per Meter : Rs 850.75

1,908

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-11-b
Providing and Laying
Type B

Detail

(British) :

Rft

segments in Precast lining (Parabola type)

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.250

Bag

490.00

Sand

1.000

Cft

Crushed Aggregate

1.227

Cft

TOTAL

Bag

122.50

2,200.00

100 Cft

22.00

2,800.00

100 Cft

34.35

MATERIAL

42.29

178.85

LABOUR
Mason

0.033

Day

900.00

Day

30.00

Coolie

0.133

Day

500.00

Day

66.67

Bhishti

0.003

Day

500.00

Day

1.67

Skilled Coolie

0.067

Day

600.00

Day

40.00

4.15

35.71

142.48

22

69.78

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

391.11

Labour Rates Per

Rft

Rs.

172.92

LABOUR

Per Meter : Rs 1,282.84


Per Meter : Rs 567.17

1,909

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-11-c
Providing and Laying
type) Type C

Detail

(British) :

Rft

PCC segments in Precast lining (Parabola

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.167

Bag

490.00

Sand

0.667

Cft

Crushed Aggregate

1.000

Cft

TOTAL

Bag

81.67

2,200.00

100 Cft

14.67

2,800.00

100 Cft

28.00

MATERIAL

39.51

124.33

LABOUR
Mason

0.033

Day

900.00

Day

30.00

Coolie

0.100

Day

500.00

Day

50.00

Bhishti

0.003

Day

500.00

Day

1.67

Skilled Coolie

0.050

Day

600.00

Day

30.00

3.35

38.49

115.02

22

51.92

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

291.27

Labour Rates Per

Rft

Rs.

139.58

LABOUR

Per Meter : Rs 955.37


Per Meter : Rs 457.83

1,910

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-11-d
Providing and Laying
type) Type D

Detail

(British) :

Rft

PCC segments in Precast lining (Parabola

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.117

Bag

490.00

Sand

0.520

Cft

Crushed Aggregate

1.000

Cft

TOTAL

Bag

57.17

2,200.00

100 Cft

11.44

2,800.00

100 Cft

28.00

MATERIAL

34.79

96.61

LABOUR
Mason

0.033

Day

900.00

Day

30.00

Coolie

0.100

Day

500.00

Day

50.00

Bhishti

0.003

Day

500.00

Day

1.67

Skilled Coolie

0.050

Day

600.00

Day

30.00

3.35

43.21

115.02

22

45.82

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

257.44

Labour Rates Per

Rft

Rs.

139.58

LABOUR

Per Meter : Rs 844.41


Per Meter : Rs 457.83

1,911

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-11-e
Providing and Laying
type) Type SPL D

Detail

(British) :

Rft

PCC segments in Precast lining (Parabola

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.083

Bag

490.00

Sand

0.500

Cft

Crushed Aggregate

0.833

Cft

TOTAL

Bag

40.83

2,200.00

100 Cft

11.00

2,800.00

100 Cft

23.33

MATERIAL

31.88

75.17

LABOUR
Mason

0.033

Day

900.00

Day

30.00

Coolie

0.100

Day

500.00

Day

50.00

Bhishti

0.003

Day

500.00

Day

1.67

Skilled Coolie

0.033

Day

600.00

Day

20.00

3.05

46.12

104.72

22

38.90

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

218.79

Labour Rates Per

Rft

Rs.

127.08

LABOUR

Per Meter : Rs 717.62


Per Meter : Rs 416.83

1,912

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 17 , LINING OF CANALS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

17-11-f
Providing and Laying
type) Type E

Detail

(British) :

Rft

PCC segments in Precast lining (Parabola

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.067

Bag

490.00

Sand

0.433

Cft

Crushed Aggregate

0.667

Cft

TOTAL

Bag

32.67

2,200.00

100 Cft

9.53

2,800.00

100 Cft

18.67

MATERIAL

28.09

60.87

LABOUR
Mason

0.033

Day

900.00

Day

30.00

Coolie

0.100

Day

500.00

Day

50.00

Bhishti

0.003

Day

500.00

Day

1.67

Skilled Coolie

0.033

Day

600.00

Day

20.00

3.05

49.91

104.72

22

35.76

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

201.34

Labour Rates Per

Rft

Rs.

127.08

LABOUR

Per Meter : Rs 660.40


Per Meter : Rs 416.83

1,913

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-01

(British) :

Each

Cutting Ransome & Larson piles.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.250

Black Smith

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

225.00

6.75

78.00

231.75

22

49.50

Composite Rates Per

Each

Rs.

281.25

Cost Per Cut: 281.25

Labour Rates Per

Each

Rs.

281.25

Cost Per Cut: 281.25

1,914

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-02

(British) :

Each

Cutting universal piles

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.270

Black Smith

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

243.00

7.29

78.00

250.29

22

53.46

Composite Rates Per

Each

Rs.

303.75

Cost Per Cut: 303.75

Labour Rates Per

Each

Rs.

303.75

Cost Per Cut: 303.75

1,915

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-03-a

(British) :

Rft

Driving steel piles to depth of: Upto 15'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.066

Day

500.00

Day

32.77

Skilled Coolie

0.082

Day

600.00

Day

49.39

2.46

78.00

84.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

102.71

Labour Rates Per

Rft

Rs.

102.71

LABOUR

18.08

Per Meter : Rs 336.88


Per Meter : Rs 336.88

1,916

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-03-b

(British) :

Rft

Driving steel piles to depth of: More than 15' to 25'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.066

Day

500.00

Day

32.77

Skilled Coolie

0.131

Day

600.00

Day

78.66

3.34

78.00

114.78

22

24.52

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

139.29

Labour Rates Per

Rft

Rs.

139.29

LABOUR

Per Meter : Rs 456.88


Per Meter : Rs 456.88

1,917

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-03-c

(British) :

Rft

Driving steel piles to depth of: More than 25' to 30'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.066

Day

500.00

Day

32.77

Skilled Coolie

0.139

Day

600.00

Day

83.60

3.49

78.00

119.86

22

25.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

145.46

Labour Rates Per

Rft

Rs.

145.46

LABOUR

Per Meter : Rs 477.13


Per Meter : Rs 477.13

1,918

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-04

(British) :

Each

Dolleying piles upto 5'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Dolleyman

0.200

Day

600.00

Day

120.00

6.60

78.00

226.60

22

48.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

275.00

Cost Per Each: 275.00

Labour Rates Per

Each

Rs.

275.00

Cost Per Each: 275.00

1,919

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-05

(British) :

Each

Drilling holes in piles by hand

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.030

Black Smith

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

27.00

0.81

78.00

27.81

22

5.94

Composite Rates Per

Each

Rs.

33.75

Cost Per Each: 33.75

Labour Rates Per

Each

Rs.

33.75

Cost Per Each: 33.75

1,920

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-06

(British) :

Each

Raising and lowering machine

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.380

Day

500.00

Day

2,190.00

Fitter II

2.190

Day

600.00

Day

1,314.00

Skilled Coolie

8.750

Day

600.00

Day

5,250.00

262.62

78.00

9,016.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,925.88

Composite Rates Per

Each

Rs.

10,942.50

Cost Per Each: 10,942.50

Labour Rates Per

Each

Rs.

10,942.50

Cost Per Each: 10,942.50

1,921

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-07-a

(British) :

Job

Turning Machine : 90

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Fitter II

1.000

Day

600.00

Day

600.00

Skilled Coolie

5.000

Day

600.00

Day

3,000.00

153.00

78.00

5,253.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,122.00

Composite Rates Per

Job

Rs.

6,375.00

Cost Per Job: 6,375.00

Labour Rates Per

Job

Rs.

6,375.00

Cost Per Job: 6,375.00

1,922

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-07-b

(British) :

Job

Turning Machine : 135

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.000

Day

500.00

Day

2,500.00

Fitter II

1.000

Day

600.00

Day

600.00

Skilled Coolie

5.500

Day

600.00

Day

3,300.00

192.00

78.00

6,592.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,408.00

Composite Rates Per

Job

Rs.

8,000.00

Cost Per Job: 8,000.00

Labour Rates Per

Job

Rs.

8,000.00

Cost Per Job: 8,000.00

1,923

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-07-c

(British) :

Job

Turning Machine : 180

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.000

Day

500.00

Day

3,500.00

Fitter II

1.000

Day

600.00

Day

600.00

Skilled Coolie

7.000

Day

600.00

Day

4,200.00

249.00

78.00

8,549.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,826.00

Composite Rates Per

Job

Rs.

10,375.00

Cost Per Job: 10,375.00

Labour Rates Per

Job

Rs.

10,375.00

Cost Per Job: 10,375.00

1,924

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-08

(British) :

50 meter

Travelling machine (light)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.800

Day

500.00

Day

3,400.00

Fitter II

1.000

Day

600.00

Day

600.00

Skilled Coolie

6.800

Day

600.00

Day

4,080.00

242.40

78.00

8,322.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,777.60

Composite Rates Per

50 meter

Rs.

10,100.00

Cost Per 50 m: 10,100.00

Labour Rates Per

50 meter

Rs.

10,100.00

Cost Per 50 m: 10,100.00

1,925

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-09

(British) :

tonne

Loading and unloading piles

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.370

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

231.25

Labour Rates Per

tonne

Rs.

231.25

LABOUR

Day

185.00

5.55

78.00

190.55

22

40.70

Per Tonne : Rs 231.25


Per Tonne : Rs 231.25

1,926

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-10

(British) :

50 meter

Carriage of piling machine under different conditions

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.750

Day

500.00

Day

1,875.00

Fitter II

1.000

Day

600.00

Day

600.00

Skilled Coolie

2.500

Day

600.00

Day

1,500.00

119.25

78.00

4,094.25

22

874.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

50 meter

Rs.

4,968.75

Cost Per 50 m: 4,968.75

Labour Rates Per

50 meter

Rs.

4,968.75

Cost Per 50 m: 4,968.75

1,927

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-11

(British) :

Each

Erecting piling machines

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.600

Day

500.00

Day

3,800.00

Fitter II

14.400

Day

600.00

Day

8,640.00

Skilled Coolie

9.600

Day

600.00

Day

5,760.00

Foreman

2.400

Day

1,200.00

Day

2,880.00

632.40

78.00

21,712.40

22

4,637.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

26,350.00

Cost Per Each: 26,350.00

Labour Rates Per

Each

Rs.

26,350.00

Cost Per Each: 26,350.00

1,928

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 18 , SHEET PILING
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

18-12
Dismantling

(British) :

Each

piling machine

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.600

Day

500.00

Day

3,800.00

Fitter II

14.400

Day

600.00

Day

8,640.00

Skilled Coolie

9.600

Day

600.00

Day

5,760.00

Foreman

2.400

Day

1,200.00

Day

2,880.00

632.40

78.00

21,712.40

22

4,637.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

26,350.00

Cost Per Each: 26,350.00

Labour Rates Per

Each

Rs.

26,350.00

Cost Per Each: 26,350.00

1,929

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-01

(British) :

100 Cft

Cutting pilchi, frash or sarkanda including carriage within 1.5 km.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.900

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

950.00

28.50

78.00

978.50

22

Composite Rates Per

100 Cft

Rs.

1,187.50

Per CUM : Rs 419.36

Labour Rates Per

100 Cft

Rs.

1,187.50

Per CUM : Rs 419.36

209.00

1,930

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-02

(British) :

100 Sft

Weaving matresses

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.600

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,800.00

54.00

78.00

1,854.00

22

396.00

Composite Rates Per

100 Sft

Rs.

2,250.00

Per SQM : Rs 242.10

Labour Rates Per

100 Sft

Rs.

2,250.00

Per SQM : Rs 242.10

1,931

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-03-a

(British) :

Each

Supply & fill used synthetic fibre/plastic bags 1.25cft capacity


with sand or earth, sewing & stacking : in dry

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Synthetic fibre/Plastic Bags 1

15.00

No

TOTAL

MATERIAL

No

15.00

20.27

15.00

Day

40.50

1.22

57.73

41.72

22

LABOUR
0.081

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

68.93

Cost Per Each: 68.93

Labour Rates Per

Each

Rs.

50.63

Cost Per Each: 50.63

12.21

1,932

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-03-b

(British) :

Each

Supply & fill used synthetic fibre/plastic bags 1.25cft capacity


with sand or earth, sewing & stacking : Under water

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Synthetic fibre/Plastic Bags 1

15.00

No

TOTAL

MATERIAL

No

15.00

17.18

15.00

Day

50.50

1.52

60.82

52.02

22

LABOUR
0.101

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

81.43

Cost Per Each: 81.43

Labour Rates Per

Each

Rs.

63.13

Cost Per Each: 63.13

14.41

1,933

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-03-c

(British) :

Each

Supply & fill used cotton bags 1.25 cft capacity with sand or
earth, sewing & stacking : in dry

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cotton bags 1.25 cft

60.00

No

TOTAL

MATERIAL

No

60.00

44.78

60.00

Day

40.50

1.22

33.22

41.72

22

LABOUR
0.081

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

123.83

Cost Per each: 123.83

Labour Rates Per

Each

Rs.

50.63

Cost Per each: 50.63

22.11

1,934

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-03-d

(British) :

Each

Supply & fill used cotton bags 1.25 cft capacity with sand or
earth, sewing & stacking : Under Water

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cotton bags 1.25 cft

60.00

No

TOTAL

MATERIAL

No

60.00

40.72

60.00

Day

50.50

1.52

37.28

52.02

22

LABOUR
0.101

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

136.33

Cost Per each: 136.33

Labour Rates Per

Each

Rs.

63.13

Cost Per each: 63.13

24.31

1,935

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-04-a

(British) :

Each

Supply & fill new synthetic fibre/plastic bags 4-5cft capacity


with sand or earth,sewing, stacking : in dry

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Synthetic fibre/plastic Bag 4.

30.00

No

TOTAL

MATERIAL

No

30.00

11.72

30.00

Day

162.00

4.86

66.28

166.86

22

42.24

LABOUR
0.324

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

239.10

Cost Per Each: 239.10

Labour Rates Per

Each

Rs.

202.50

Cost Per Each: 202.50

1,936

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-04-b

(British) :

Each

Supply & fill new synthetic fibre/plastic bags 4-5cft capacity with
sand or earth,sewing, stacking : Under water

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Synthetic fibre/plastic Bag 4.

30.00

No

TOTAL

9.70

MATERIAL

No

30.00

30.00

Day

202.00

6.06

68.30

208.06

22

51.04

LABOUR
0.404

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

289.10

Cost Per Each: 289.10

Labour Rates Per

Each

Rs.

252.50

Cost Per Each: 252.50

1,937

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

19-04-c

Item Name :

(British) :

Each

Supply & fill used cotton bags 4-5 cft capacity with sand or earth,
sewing & stacking : in dry

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cotton bags 4-5 cft

150.00

No

TOTAL

36.06

MATERIAL

No

150.00

150.00

LABOUR
0.324

Coolie

500.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

No

162.00

4.86

41.94

166.86

22

68.64

Composite Rates Per

Each

Rs.

385.50

Cost Per Each: 385.50

Labour Rates Per

Each

Rs.

202.50

Cost Per Each: 202.50

1,938

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

19-04-d

Item Name :

(British) :

Each

Supply & fill used cotton bags 4-5 cft capacity with sand or earth,
sewing & stacking : Under Water

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cotton bags 4-5 cft

150.00

No

TOTAL

31.96

MATERIAL

No

150.00

150.00

LABOUR
0.404

Coolie

500.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

No

202.00

6.06

46.04

208.06

22

77.44

Composite Rates Per

Each

Rs.

435.50

Cost Per Each: 435.50

Labour Rates Per

Each

Rs.

252.50

Cost Per Each: 252.50

1,939

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-05-a

(British) :

100 No.

Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled


with sand / earth : 1st 50 m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.410

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

205.00

6.15

78.00

211.15

22

45.10

Composite Rates Per

100 No.

Rs.

256.25

Cost Per 100 No.: 256.25

Labour Rates Per

100 No.

Rs.

256.25

Cost Per 100 No.: 256.25

1,940

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-05-b

(British) :

100No/50m

Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled


with sand / earth : 2nd & 3rd 50 m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.310

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

155.00

4.65

78.00

159.65

22

34.10

Composite Rates Per

100No/50m

Rs.

193.75

Cost Per 100No/50m: 193.75

Labour Rates Per

100No/50m

Rs.

193.75

Cost Per 100No/50m: 193.75

1,941

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-05-c

(British) :

100No/50m

Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled


with sand / earth : 4th and subsequent 50 m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.034

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

17.00

0.51

78.00

17.51

22

3.74

Composite Rates Per

100No/50m

Rs.

21.25

Cost Per 100No/50m: 21.25

Labour Rates Per

100No/50m

Rs.

21.25

Cost Per 100No/50m: 21.25

1,942

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-06-a

(British) :

100 No.

Carriage of new synthetic fibre/plastic bags 4-5 cft capacity


filled with sand/earth : 1st 50 m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.640

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

820.00

24.60

78.00

844.60

22

180.40

Composite Rates Per

100 No.

Rs.

1,025.00

Cost Per 100 No.: 1,025.00

Labour Rates Per

100 No.

Rs.

1,025.00

Cost Per 100 No.: 1,025.00

1,943

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-06-b

(British) :

100No/50m

Carriage of new synthetic fibre/plastic bags 4-5 cft capacity


filled with sand/earth : 2nd & 3rd 50 m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.240

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

620.00

18.60

78.00

638.60

22

136.40

Composite Rates Per

100No/50m

Rs.

775.00

Cost Per 100No/50m: 775.00

Labour Rates Per

100No/50m

Rs.

775.00

Cost Per 100No/50m: 775.00

1,944

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-06-c

(British) :

100No/50m

Carriage of new synthetic fibre/plastic bags 4-5 cft capacity


filled with sand/earth : 4th & subsequent 50 m

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.136

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

68.00

2.04

78.00

70.04

22

14.96

Composite Rates Per

100No/50m

Rs.

85.00

Cost Per 100No/50m: 85.00

Labour Rates Per

100No/50m

Rs.

85.00

Cost Per 100No/50m: 85.00

1,945

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-07-a

(British) :

100 Sft

Rolling matresses to river edge & floating, after unrolling with


area : Upto 200 m2

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.100

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

550.00

16.50

78.00

566.50

22

Composite Rates Per

100 Sft

Rs.

687.50

Per SQM : Rs 73.98

Labour Rates Per

100 Sft

Rs.

687.50

Per SQM : Rs 73.98

121.00

1,946

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-07-b

(British) :

100 Sft

Rolling matresses to river edge & floating, after unrolling with


area : Over 200 to 250 m2

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

875.00

26.25

78.00

901.25

22

Composite Rates Per

100 Sft

Rs.

1,093.75

Per SQM : Rs 117.69

Labour Rates Per

100 Sft

Rs.

1,093.75

Per SQM : Rs 117.69

192.50

1,947

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-07-c

(British) :

100 Sft

Rolling matresses to river edge & floating, after unrolling with


area : Over 250 m2

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.090

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,045.00

31.35

78.00

1,076.35

22

229.90

Composite Rates Per

100 Sft

Rs.

1,306.25

Per SQM : Rs 140.55

Labour Rates Per

100 Sft

Rs.

1,306.25

Per SQM : Rs 140.55

1,948

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-08

(British) :

100 No.

Sewing empty cement bags in sheets

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Jute String

0.910

375.00

Kg

TOTAL

MATERIAL

Kg

341.25

24.00

341.25

Day

725.00

21.75

54.00

746.75

22

LABOUR
Coolie

1.450

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

234.58

Composite Rates Per

100 No.

Rs.

1,322.58

Cost Per 100 No.: 1,322.58

Labour Rates Per

100 No.

Rs.

906.25

Cost Per 100 No.: 906.25

1,949

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-09

(British) :

100 Cft

Making compact round pilchi, frash or sarkanda round bundles of


specified size for the work

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.950

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

975.00

29.25

78.00

1,004.25

22

214.50

Composite Rates Per

100 Cft

Rs.

1,218.75

Per CUM : Rs 430.40

Labour Rates Per

100 Cft

Rs.

1,218.75

Per CUM : Rs 430.40

1,950

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-10

(British) :

100 Cft

Launching the bundles mentioned in Item 19-09 above & placing in


position

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.200

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

600.00

18.00

78.00

618.00

22

Composite Rates Per

100 Cft

Rs.

750.00

Per CUM : Rs 264.86

Labour Rates Per

100 Cft

Rs.

750.00

Per CUM : Rs 264.86

132.00

1,951

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-11-a

(British) :

100 Cft

Supply within 150m (500 feet) : Boulders 9" and above

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.620

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,810.00

54.30

78.00

1,864.30

22

398.20

Composite Rates Per

100 Cft

Rs.

2,262.50

Per CUM : Rs 799.00

Labour Rates Per

100 Cft

Rs.

2,262.50

Per CUM : Rs 799.00

1,952

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-11-b

(British) :

100 Cft

Supply within 150m (500 feet) : Over size shingle 3" to 9"

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.420

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,210.00

36.30

78.00

1,246.30

22

266.20

Composite Rates Per

100 Cft

Rs.

1,512.50

Per CUM : Rs 534.13

Labour Rates Per

100 Cft

Rs.

1,512.50

Per CUM : Rs 534.13

1,953

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-11-c

(British) :

100 Cft

Supply within 150m (500 feet): Mixed graded shingle

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.860

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,430.00

42.90

78.00

1,472.90

22

314.60

Composite Rates Per

100 Cft

Rs.

1,787.50

Per CUM : Rs 631.25

Labour Rates Per

100 Cft

Rs.

1,787.50

Per CUM : Rs 631.25

1,954

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-12

(British) :

Each

Supplying munj or patha trungers (6" mesh to hold 3 cft)


stones/boulders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.905

Baan

50.00

Kg

TOTAL

MATERIAL

Kg

45.25

19.93

45.25

Day

125.00

3.75

58.07

128.75

22

37.46

LABOUR
0.250

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

211.46

Cost Per Each: 211.46

Labour Rates Per

Each

Rs.

156.25

Cost Per Each: 156.25

1,955

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-a-01

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 6"x9" mesh : 15 SWG
wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 15 SWG

4.000

180.00

Kg

TOTAL

MATERIAL

Kg

720.00

30.51

720.00

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Black Smith

0.750

Day

900.00

Day

675.00

31.50

47.49

1,081.50

22

389.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,190.90

Per SQM : Rs 235.74

Labour Rates Per

100 Sft

Rs.

1,312.50

Per SQM : Rs 141.23

1,956

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-a-02

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 6"x9" mesh : 10 SWG
wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 15 SWG

12.970

180.00

Kg

TOTAL

MATERIAL

Kg

2,334.60

51.73

2,334.60

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Black Smith

0.750

Day

900.00

Day

675.00

31.50

26.27

1,081.50

22

744.61

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,160.71

Per SQM : Rs 447.69

Labour Rates Per

100 Sft

Rs.

1,312.50

Per SQM : Rs 141.23

1,957

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-a-03

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG
wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I wire 8 SWG

15.650

160.00

Kg

TOTAL

MATERIAL

Kg

2,504.00

52.84

2,504.00

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Black Smith

0.750

Day

900.00

Day

675.00

31.50

25.16

1,081.50

22

781.88

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,367.38

Per SQM : Rs 469.93

Labour Rates Per

100 Sft

Rs.

1,312.50

Per SQM : Rs 141.23

1,958

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-b-01

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 6"x6" mesh : 15 SWG
wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 15 SWG

3.080

180.00

Kg

TOTAL

MATERIAL

Kg

554.40

22.92

554.40

LABOUR
Coolie

0.900

Day

500.00

Day

450.00

Black Smith

0.900

Day

900.00

Day

810.00

37.80

55.08

1,297.80

22

399.17

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,251.37

Per SQM : Rs 242.25

Labour Rates Per

100 Sft

Rs.

1,575.00

Per SQM : Rs 169.47

1,959

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-b-02

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 6"x6" mesh : 10 SWG
wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 10 SWG

9.980

170.00

Kg

TOTAL

MATERIAL

Kg

1,696.60

43.04

1,696.60

LABOUR
Coolie

0.900

Day

500.00

Day

450.00

Black Smith

0.900

Day

900.00

Day

810.00

37.80

34.96

1,297.80

22

650.45

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

3,644.85

Per SQM : Rs 392.19

Labour Rates Per

100 Sft

Rs.

1,575.00

Per SQM : Rs 169.47

1,960

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-b-03

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 6"x6" mesh :
wire

Detail

Qty

Unit

8 SWG

Rate (Rs)

Amount

MATERIAL
G.I wire 8 SWG

20.420

160.00

Kg

TOTAL

MATERIAL

Kg

3,267.20

54.13

3,267.20

LABOUR
Coolie

0.900

Day

500.00

Day

450.00

Black Smith

0.900

Day

900.00

Day

810.00

37.80

23.87

1,297.80

22

995.98

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,560.98

Per SQM : Rs 598.36

Labour Rates Per

100 Sft

Rs.

1,575.00

Per SQM : Rs 169.47

1,961

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-c-01

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 4"x4" mesh : 15 SWG
wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 15 SWG

4.630

180.00

Kg

TOTAL

MATERIAL

Kg

833.40

27.99

833.40

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

42.00

50.01

1,442.00

22

491.35

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,766.75

Per SQM : Rs 297.70

Labour Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

1,962

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-c-02

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 4"x4" mesh : 10 SWG
wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 10 SWG

14.970

170.00

Kg

TOTAL

MATERIAL

Kg

2,544.90

48.38

2,544.90

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Day

900.00

Day

900.00

42.00

29.62

1,442.00

22

867.88

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,854.78

Per SQM : Rs 522.37

Labour Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

1,963

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-13-c-03

(British) :

100 Sft

Provide & weave GI wire netting for wire crates 4"x4" mesh : 8 SWG
wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I wire 8 SWG

23.470

160.00

Kg

TOTAL

MATERIAL

Kg

3,755.20

54.63

3,755.20

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Black Smith

1.000

Kg

900.00

Kg

900.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

42.00

23.37

1,442.00

22

Composite Rates Per

100 Sft

Rs.

6,331.34

Per SQM : Rs 681.25

Labour Rates Per

100 Sft

Rs.

1,750.00

Per SQM : Rs 188.30

1,134.14

1,964

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-14

(British) :

100 Cft

Providing and Laying shingle on top of bund, including handling of


materials within 100 m.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Shingle

100.000

1,700.00

Cft

TOTAL

MATERIAL

100 Cft

1,700.00

57.95

1,700.00

Day

500.00

15.00

20.05

515.00

22

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,699.00

Per CUM : Rs 953.14

Labour Rates Per

100 Cft

Rs.

625.00

Per CUM : Rs 220.72

484.00

1,965

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-15-a

(British) :

100 Cft

Supply & dump at site, without boat, including handling within 100m
: Stone

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
100.000

Stone

2,000.00

Cft

TOTAL

MATERIAL

100 Cft

2,000.00

50.00

2,000.00

Day

1,000.00

30.00

28.00

1,030.00

22

660.00

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,690.00

Per CUM : Rs 1,303.11

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

1,966

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-15-a-01

(British) :

100 Cft

Supply & dump at site, without boat, including handling within 100m
: boulders

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Boulder (Screened/Washed)

100.000

1,900.00

Cft

TOTAL

100 Cft

49.14

MATERIAL

1,900.00

1,900.00

LABOUR
Coolie

2.000

500.00

No

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

No

1,000.00

30.00

28.86

1,030.00

22

638.00

Composite Rates Per

100 Cft

Rs.

3,568.00

Per CUM : Rs 1,260.03

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

1,967

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-15-b

(British) :

100 Cft

Supply & dump at site, without boat, including handling within 100m
: Shingle or spawls

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Shingle

100.000

1,700.00

Cft

TOTAL

MATERIAL

100 Cft

1,700.00

47.22

1,700.00

Day

1,000.00

30.00

30.78

1,030.00

22

594.00

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,324.00

Per CUM : Rs 1,173.86

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

1,968

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-15-c

(British) :

100 Cft

Supply & dump at site, without boat, including handling within 100m
: Brick bats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Rubble Or Broken Brick

100.000

3,167.00

Cft

TOTAL

MATERIAL

100 Cft

3,167.00

60.64

3,167.00

Day

750.00

22.50

17.36

772.50

22

LABOUR
Coolie

1.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,801.24

Per CUM : Rs 1,695.54

Labour Rates Per

100 Cft

Rs.

937.50

Per CUM : Rs 331.08

861.74

1,969

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-16-a

(British) :

100 Cft

Supplying and dumping by boat, including loading within 100m lead :


Stone or boulder

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Boulder (Screened/Washed)

100.000

1,900.00

Cft

TOTAL

MATERIAL

1,900.00

100 Cft

19.26

1,900.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Boatman With Boat

2.000

Day

2,500.00

Day

5,000.00

165.00

58.74

5,665.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,628.00

Composite Rates Per

100 Cft

Rs.

9,193.00

Per CUM : Rs 3,246.48

Labour Rates Per

100 Cft

Rs.

6,875.00

Per CUM : Rs 2,427.89

1,970

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-16-b

(British) :

100 Cft

Supplying and dumping by boat, including loading within 100m lead :


Shingle or spawls

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Shingle

100.000

1,700.00

Cft

TOTAL

MATERIAL

1,700.00

100 Cft

17.71

1,700.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Boatman With Boat

2.000

Day

2,500.00

Day

5,000.00

165.00

60.29

5,665.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,584.00

Composite Rates Per

100 Cft

Rs.

8,949.00

Per CUM : Rs 3,160.31

Labour Rates Per

100 Cft

Rs.

6,875.00

Per CUM : Rs 2,427.89

1,971

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-16-c

(British) :

100 Cft

Supplying and dumping by boat, including loading within 100m lead :


Brick bats

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Rubble Or Broken Brick

100.000

3,167.00

Cft

TOTAL

MATERIAL

3,167.00

100 Cft

32.02

3,167.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Boatman With Boat

1.500

Day

2,500.00

Day

3,750.00

127.50

45.98

4,377.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,631.74

Composite Rates Per

100 Cft

Rs.

9,176.24

Per CUM : Rs 3,240.56

Labour Rates Per

100 Cft

Rs.

5,312.50

Per CUM : Rs 1,876.09

1,972

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-17-a

(British) :

100 Cft

Provide & fill brick bats in crates, excluding cost of crates :


without hand packing.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Rubble Or Broken Brick

100.000

3,167.00

Cft

TOTAL

MATERIAL

100 Cft

3,167.00

53.78

3,167.00

Day

1,250.00

37.50

24.22

1,287.50

22

971.74

LABOUR
Coolie

2.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

5,426.24

Per CUM : Rs 1,916.26

Labour Rates Per

100 Cft

Rs.

1,562.50

Per CUM : Rs 551.79

1,973

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-17-b

(British) :

100 Cft

Provide & fill brick bats in crates, excluding cost of crates :


with hand packing.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Rubble Or Broken Brick

100.000

3,167.00

Cft

TOTAL

MATERIAL

3,167.00

100 Cft

50.89

3,167.00

Day

1,500.00

45.00

27.11

1,545.00

22

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,026.74

Composite Rates Per

100 Cft

Rs.

5,738.74

Per CUM : Rs 2,026.62

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

1,974

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-18-a

(British) :

100 Cft

Supply & fill bricks in wire crates including sewing crates, excl
cost of crates : Stone or boulder

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Boulder (Screened/Washed)

100.000

1,900.00

Cft

TOTAL

MATERIAL

100 Cft

1,900.00

47.82

1,900.00

Day

1,080.00

32.40

30.18

1,112.40

22

655.60

LABOUR
Coolie

2.160

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,668.00

Per CUM : Rs 1,295.34

Labour Rates Per

100 Cft

Rs.

1,350.00

Per CUM : Rs 476.75

1,975

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-18-b

(British) :

100 Cft

Supply & fill bricks in wire crates including sewing crates, excl
cost of crates : Shingle or spawls

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Shingle

100.000

1,700.00

Cft

TOTAL

MATERIAL

100 Cft

1,700.00

45.95

1,700.00

Day

1,075.00

32.25

32.05

1,107.25

22

610.50

LABOUR
Coolie

2.150

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,417.75

Per CUM : Rs 1,206.97

Labour Rates Per

100 Cft

Rs.

1,343.75

Per CUM : Rs 474.54

1,976

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-19

(British) :

100 Cft

Extra for anchoring boat for dumping by boats or tipping crates

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.200

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

100.00

3.00

78.00

103.00

22

22.00

Composite Rates Per

100 Cft

Rs.

125.00

Per CUM : Rs 44.14

Labour Rates Per

100 Cft

Rs.

125.00

Per CUM : Rs 44.14

1,977

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-20

(British) :

100 Cft

Extra for tipping crates (in addition to achoring boats)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

1,978

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-21

(British) :

100 Sft

Pilchi revetment, including carriage upto 1.5 km

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pilchi

200.000

Cft

800.00

Wooden Peg

10.000

No

7.00

MATERIAL

57.72

1,670.00

Day

500.00

15.00

20.28

515.00

22

TOTAL

100 Cft
No

1,600.00
70.00

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

2,662.40

Per SQM : Rs 286.47

Labour Rates Per

100 Sft

Rs.

625.00

Per SQM : Rs 67.25

477.40

1,979

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-22

(British) :

100 Sft

Surface protection with pilchi matresses including carriage upto


1.5 km.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pilchi

20.000

800.00

Cft

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

100 Cft

160.00

75.00

160.00

22

35.20

Composite Rates Per

100 Sft

Rs.

195.20

Per SQM : Rs 21.00

Labour Rates Per

100 Sft

Rs.

0.00

Per SQM : Rs 0.00

1,980

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-23

(British) :

100 Sft

Pilchi, sarkanda or frash pitching on slopes, incl supply within


1.5 km, pegging & tying with wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Pilchi

216.000

Cft

800.00

Wooden Peg

50.000

No

7.00

No

350.00

Baan

5.000

Kg

50.00

Kg

250.00

TOTAL

MATERIAL

100 Cft

1,728.00

52.46

2,328.00

Day

1,000.00

30.00

25.54

1,030.00

22

732.16

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,090.16

Per SQM : Rs 440.10

Labour Rates Per

100 Sft

Rs.

1,250.00

Per SQM : Rs 134.50

1,981

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-24-a

(British) :

100 Sft

P&E groynes, vertical wooden stakes 7"-12" dia Upto 1.5 m high,
single row of stakes at 0.3m

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Baan

3.330

Kg

50.00

Kg

166.50

Wooden Stake

28.000

No

140.00

No

3,920.00

TOTAL

MATERIAL

59.09

4,086.50

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

33.00

18.91

1,133.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,360.53

Per SQM : Rs 684.39

Labour Rates Per

100 Sft

Rs.

1,375.00

Per SQM : Rs 147.95

1,141.03

1,982

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-24-b

(British) :

100 Sft

P&E groynes, vertical wooden stakes 7"-12" dia Upto 3 m high,


double row of stakes at 0.6m

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Baan

3.330

Kg

50.00

Kg

166.50

Wooden Stake

32.000

No

140.00

No

4,480.00

TOTAL

MATERIAL

52.83

4,646.50

LABOUR
Coolie

1.500

Day

500.00

Day

750.00

Skilled Coolie

2.000

Day

600.00

Day

1,200.00

58.50

25.17

2,008.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,106.23

Per SQM : Rs 872.23

Labour Rates Per

100 Sft

Rs.

2,437.50

Per SQM : Rs 262.28

1,451.23

1,983

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-25

(British) :

100 Cft

Providing and Laying stone pithcing/filling, dry hand packed in


pitching & aprons

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

3,200.00

Cft

TOTAL

MATERIAL

3,200.00

100 Cft

52.17

3,200.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

42.00

25.83

1,442.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,012.00

Composite Rates Per

100 Cft

Rs.

5,654.00

Per CUM : Rs 1,996.69

Labour Rates Per

100 Cft

Rs.

1,750.00

Per CUM : Rs 618.01

1,984

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-26

(British) :

100 Cft

Supplying stone and stone filling in GI wire crate and its sewing,
excluding cost of crates

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

100.000

3,200.00

Cft

TOTAL

MATERIAL

3,200.00

100 Cft

51.06

3,200.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

45.00

26.94

1,545.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,034.00

Composite Rates Per

100 Cft

Rs.

5,779.00

Per CUM : Rs 2,040.84

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

1,985

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-27

(British) :

100 Cft

Providing and Laying stone pitching with hammer dressed stones on


surface, laid in courses

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

120.000

3,200.00

Cft

TOTAL

MATERIAL

3,840.00

100 Cft

40.34

3,840.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.000

Day

500.00

Day

1,500.00

99.00

37.66

3,399.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,570.80

Composite Rates Per

100 Cft

Rs.

8,809.80

Per CUM : Rs 3,111.15

Labour Rates Per

100 Cft

Rs.

4,125.00

Per CUM : Rs 1,456.73

1,986

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-28-a

(British) :

100 Cft

Providing and Laying stone pitching for top layer only : On slope

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

120.000

3,200.00

Cft

TOTAL

MATERIAL

3,840.00

100 Cft

35.38

3,840.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

129.00

42.62

4,429.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,790.80

Composite Rates Per

100 Cft

Rs.

10,059.80

Per CUM : Rs 3,552.59

Labour Rates Per

100 Cft

Rs.

5,375.00

Per CUM : Rs 1,898.17

1,987

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-28-b

(British) :

100 Cft

Providing and Laying stone pitching for top layer only : On level

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

120.000

3,200.00

Cft

TOTAL

MATERIAL

3,840.00

100 Cft

40.34

3,840.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.000

Day

500.00

Day

1,500.00

99.00

37.66

3,399.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,570.80

Composite Rates Per

100 Cft

Rs.

8,809.80

Per CUM : Rs 3,111.15

Labour Rates Per

100 Cft

Rs.

4,125.00

Per CUM : Rs 1,456.73

1,988

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-29-a

(British) :

100 Cft

Providing and Laying stone or spawl filling : On slope

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

110.000

3,200.00

Cft

TOTAL

MATERIAL

100 Cft

3,520.00

62.19

3,520.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

15.81

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

5,200.65

Per CUM : Rs 1,836.59

Labour Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

933.90

1,989

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-29-b

(British) :

100 Cft

Providing and Laying stone or spawl filling : On level

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

110.000

3,200.00

Cft

TOTAL

MATERIAL

100 Cft

3,520.00

64.08

3,520.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

0.750

Day

500.00

Day

375.00

18.00

13.92

618.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

5,044.40

Per CUM : Rs 1,781.41

Labour Rates Per

100 Cft

Rs.

750.00

Per CUM : Rs 264.86

906.40

1,990

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-30-a

(British) :

100 Cft

Providing and Laying grouted stone pitching, in 1:8 c/s mortar Top
layer on slope

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.750

Bag

490.00

Sand

26.500

Cft

Quarried Stone

120.000

Cft

TOTAL

Bag

1,347.50

2,200.00

100 Cft

583.00

3,200.00

100 Cft

3,840.00

MATERIAL

39.27

5,770.50

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

6.000

Day

500.00

Day

3,000.00

157.50

38.73

5,407.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,424.51

Composite Rates Per

100 Cft

Rs.

13,602.51

Per CUM : Rs 4,803.69

Labour Rates Per

100 Cft

Rs.

6,562.50

Per CUM : Rs 2,317.53

1,991

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-30-b

(British) :

100 Cft

Providing and Laying grouted stone pitching, in 1:8 c/s mortar Top
layer on level

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.750

Bag

490.00

Sand

26.500

Cft

Quarried Stone

120.000

Cft

TOTAL

Bag

1,347.50

2,200.00

100 Cft

583.00

3,200.00

100 Cft

3,840.00

MATERIAL

42.98

5,770.50

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

129.00

35.02

4,429.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,215.51

Composite Rates Per

100 Cft

Rs.

12,415.01

Per CUM : Rs 4,384.32

Labour Rates Per

100 Cft

Rs.

5,375.00

Per CUM : Rs 1,898.17

1,992

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-30-c

(British) :

100 Cft

Providing and Laying grouted stone pitching, in 1:8 c/s mortar


Stone pitching/filling on slope or on level

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.750

Bag

490.00

Sand

26.500

Cft

Quarried Stone

120.000

Cft

TOTAL

Bag

1,347.50

2,200.00

100 Cft

583.00

3,200.00

100 Cft

3,840.00

MATERIAL

46.31

5,770.50

LABOUR
Mason

1.750

Day

900.00

Day

1,575.00

Coolie

4.000

Day

500.00

Day

2,000.00

107.25

31.69

3,682.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,056.01

Composite Rates Per

100 Cft

Rs.

11,508.76

Per CUM : Rs 4,064.28

Labour Rates Per

100 Cft

Rs.

4,468.75

Per CUM : Rs 1,578.13

1,993

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-31-a

(British) :

100 Sft

Grouting stone pitching or apron etc, in : Cement, sand mortar


(1:3)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.000

Bag

490.00

Sand

22.500

Cft

2,200.00

TOTAL

MATERIAL

Bag

2,940.00

100 Cft

495.00

46.97

3,435.00

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

2.500

Day

500.00

Day

1,250.00

Bhishti

0.250

Day

500.00

Day

125.00

61.50

31.03

2,111.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,753.20

Per SQM : Rs 726.64

Labour Rates Per

100 Sft

Rs.

2,562.50

Per SQM : Rs 275.73

1,206.70

1,994

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-31-b

(British) :

100 Sft

Grouting stone pitching or apron etc, in : Cement, sand mortar


(1:8)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.660

Bag

490.00

Sand

26.660

Cft

2,200.00

TOTAL

MATERIAL

Bag

1,303.40

100 Cft

586.52

35.98

1,889.92

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

2.500

Day

500.00

Day

1,250.00

Bhishti

0.250

Day

500.00

Day

125.00

61.50

42.02

2,111.50

22

866.78

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

4,868.20

Per SQM : Rs 523.82

Labour Rates Per

100 Sft

Rs.

2,562.50

Per SQM : Rs 275.73

1,995

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-32

(British) :

100 Sft

Sand grouting in stone apron, with high pressure hose

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
30.000

Sand

2,200.00

Cft

TOTAL

MATERIAL

100 Cft

660.00

29.91

660.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

35.85

746.75

Hour

270.00

12.24

270.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
High Press Gruting Set

1.500

180.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft

Rs.

2,040.85

Per SQM : Rs 219.60

Labour Rates Per

100 Sft

Rs.

906.25

Per SQM : Rs 97.51

364.10

1,996

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-33

(British) :

100 Cft

Grouting stone filling or pitching with bajri

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Crushed Aggregate

30.000

2,800.00

Cft

TOTAL

MATERIAL

100 Cft

840.00

43.00

840.00

Day

625.00

18.75

35.00

643.75

22

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,806.05

Per CUM : Rs 637.80

Labour Rates Per

100 Cft

Rs.

781.25

Per CUM : Rs 275.90

322.30

1,997

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-34

(British) :

100 Cft

Remove stone & repitching hand packed, on slopes or level, making


good damaged portion

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

3.000

Day

500.00

Day

1,500.00

Skilled Coolie

2.000

Day

600.00

Day

1,200.00

108.00

78.00

3,708.00

22

792.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

4,500.00

Per CUM : Rs 1,589.16

Labour Rates Per

100 Cft

Rs.

4,500.00

Per CUM : Rs 1,589.16

1,998

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-35

(British) :

100 Cft

Collect & stack boulders from nullah beds or loose shale etc within
100m lead

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,500.00

45.00

78.00

1,545.00

22

330.00

Composite Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

Labour Rates Per

100 Cft

Rs.

1,875.00

Per CUM : Rs 662.15

1,999

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-36

(British) :

100 Cft

Levelling and dressing stone filling under blocks and grouting with
shingle

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Shingle

30.000

1,700.00

Cft

TOTAL

MATERIAL

100 Cft

510.00

30.97

510.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

47.03

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,528.45

Per CUM : Rs 539.77

Labour Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

271.70

2,000

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-37

(British) :

100 Cft

Grouting jharies between blocks with bajri

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Crushed Aggregate

30.000

2,800.00

Cft

TOTAL

MATERIAL

100 Cft

840.00

30.88

840.00

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.500

Day

500.00

Day

750.00

36.00

47.12

1,236.00

22

448.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,524.80

Per CUM : Rs 891.63

Labour Rates Per

100 Cft

Rs.

1,500.00

Per CUM : Rs 529.72

2,001

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-a

(British) :

100 Cft

Breaking stone into spawls and stacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

750.00

22.50

78.00

772.50

22

Composite Rates Per

100 Cft

Rs.

937.50

Per CUM : Rs 331.08

Labour Rates Per

100 Cft

Rs.

937.50

Per CUM : Rs 331.08

165.00

2,002

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-b

(British) :

100 Cft

Stone pitching with hammer dressed stone on surface laid in courses


including carriage of material with in 91.50 (300 feet) meters.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

120.000

3,200.00

Cft

TOTAL

MATERIAL

3,840.00

100 Cft

34.43

3,840.00

LABOUR
Mason

2.250

Day

900.00

Day

2,025.00

Coolie

5.000

Day

500.00

Day

2,500.00

135.75

43.57

4,660.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,840.30

Composite Rates Per

100 Cft

Rs.

10,341.05

Per CUM : Rs 3,651.91

Labour Rates Per

100 Cft

Rs.

5,656.25

Per CUM : Rs 1,997.49

2,003

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-c

(British) :

100 Cft

Stone pitching hand packed with surface levelled off to the correct
section with hammer dressed stone and voids filled in 1:8 cement
mortar in floors of bridges and along banks and in aprons etc
including 91.50 meter lead.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.700

Bag

490.00

Sand

26.400

Cft

Quarried Stone

120.000

Cft

TOTAL

Bag

1,323.00

2,200.00

100 Cft

580.80

3,200.00

100 Cft

3,840.00

MATERIAL

39.18

5,743.80

LABOUR
Mason

2.500

Day

900.00

Day

2,250.00

Coolie

6.000

Day

500.00

Day

3,000.00

157.50

38.82

5,407.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,418.64

Composite Rates Per

100 Cft

Rs.

13,569.94

Per CUM : Rs 4,792.18

Labour Rates Per

100 Cft

Rs.

6,562.50

Per CUM : Rs 2,317.53

2,004

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-d

(British) :

100 Cft

Removing stone and repitching, hand packed on slopes after making


good damage slope.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

3.000

Day

500.00

Day

1,500.00

58.50

78.00

2,008.50

22

429.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,437.50

Per CUM : Rs 860.80

Labour Rates Per

100 Cft

Rs.

2,437.50

Per CUM : Rs 860.80

2,005

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-e

(British) :

100 Cft

Collecting and stacking boulders from nullah beds or loose shale


from any other site, within 91.50 (300 feet) meter lead

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,000.00

30.00

78.00

1,030.00

22

220.00

Composite Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

Labour Rates Per

100 Cft

Rs.

1,250.00

Per CUM : Rs 441.43

2,006

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-f-01

(British) :

100 Cft

Stone pitching for top layer only on slop

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

120.000

3,200.00

Cft

TOTAL

MATERIAL

3,840.00

100 Cft

35.38

3,840.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

5.000

Day

500.00

Day

2,500.00

129.00

42.62

4,429.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,790.80

Composite Rates Per

100 Cft

Rs.

10,059.80

Per CUM : Rs 3,552.59

Labour Rates Per

100 Cft

Rs.

5,375.00

Per CUM : Rs 1,898.17

2,007

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-f-02

(British) :

100 Cft

Stone pitching for top layer only on Bed

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

120.000

3,200.00

Cft

TOTAL

MATERIAL

3,840.00

100 Cft

40.34

3,840.00

LABOUR
Mason

2.000

Day

900.00

Day

1,800.00

Coolie

3.000

Day

500.00

Day

1,500.00

99.00

37.66

3,399.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,570.80

Composite Rates Per

100 Cft

Rs.

8,809.80

Per CUM : Rs 3,111.15

Labour Rates Per

100 Cft

Rs.

4,125.00

Per CUM : Rs 1,456.73

2,008

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-g-01

(British) :

100 Cft

Laying stone or spawl filling. a)on level

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

110.000

3,200.00

Cft

TOTAL

MATERIAL

100 Cft

3,520.00

64.08

3,520.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

0.750

Day

500.00

Day

375.00

18.00

13.92

618.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

5,044.40

Per CUM : Rs 1,781.41

Labour Rates Per

100 Cft

Rs.

750.00

Per CUM : Rs 264.86

906.40

2,009

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-38-g-02

(British) :

100 Cft

Laying stone or spawl filling. a)on slop

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Quarried Stone

110.000

3,200.00

Cft

TOTAL

MATERIAL

100 Cft

3,520.00

62.19

3,520.00

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.000

Day

500.00

Day

500.00

21.75

15.81

746.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

5,200.65

Per CUM : Rs 1,836.59

Labour Rates Per

100 Cft

Rs.

906.25

Per CUM : Rs 320.04

933.90

2,010

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-39-a

(British) :

Each

Fix floating spurs, with material from canal plantation within 1 km


: Upto 2' FS depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.035

Day

500.00

Day

17.50

Carpenter

0.005

Day

800.00

Day

4.00

Skilled Coolie

0.005

Day

600.00

Day

3.00

0.74

78.00

25.24

22

5.39

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

30.63

Cost Per Each: 30.63

Labour Rates Per

Each

Rs.

30.63

Cost Per Each: 30.63

2,011

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-39-b

(British) :

Each

Fix floating spurs, with material from canal plantation within 1 km


: Over 2' to 3' FS depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.050

Day

500.00

Day

25.00

Carpenter

0.007

Day

800.00

Day

5.60

Skilled Coolie

0.007

Day

600.00

Day

4.20

1.04

78.00

35.84

22

7.66

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

43.50

Cost Per Each: 43.50

Labour Rates Per

Each

Rs.

43.50

Cost Per Each: 43.50

2,012

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-39-c

(British) :

Each

Fix floating spurs, with material from canal plantation within 1 km


: Over 3' to 4' FS depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.070

Day

500.00

Day

35.00

Carpenter

0.010

Day

800.00

Day

8.00

Skilled Coolie

0.010

Day

600.00

Day

6.00

1.47

78.00

50.47

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

Labour Rates Per

Each

Rs.

61.25

Cost Per Each: 61.25

10.78

2,013

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-39-d

(British) :

Each

Fix floating spurs, with material from canal plantation within 1 km


: Exceeding 4' depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.140

Day

500.00

Day

70.00

Carpenter

0.020

Day

800.00

Day

16.00

Skilled Coolie

0.020

Day

600.00

Day

12.00

2.94

78.00

100.94

22

21.56

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

122.50

Cost Per Each: 122.50

Labour Rates Per

Each

Rs.

122.50

Cost Per Each: 122.50

2,014

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-a-01

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia:
Unsharpened within 1km

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Canal Plantation

100.000

2.40

MATERIAL

10.32

240.00

No

TOTAL

No

240.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Carpenter

0.630

Day

800.00

Day

504.00

45.12

67.68

1,549.12

22

383.68

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

2,172.80

Cost Per 100 No.: 2,172.80

Labour Rates Per

100 No.

Rs.

1,880.00

Cost Per 100 No.: 1,880.00

2,015

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-a-02

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia:
Sharpening one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

0.750

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

600.00

18.00

78.00

618.00

22

132.00

Composite Rates Per

100 No.

Rs.

750.00

Cost Per 100 No.: 750.00

Labour Rates Per

100 No.

Rs.

750.00

Cost Per 100 No.: 750.00

2,016

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-a-03

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia:
Driving 1' below ground

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

137.50

Composite Rates Per

100 No.

Rs.

781.25

Cost Per 100 No.: 781.25

Labour Rates Per

100 No.

Rs.

781.25

Cost Per 100 No.: 781.25

2,017

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-a-04

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia:
Tying with munj, patha ban

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.500

Baan

50.00

Kg

TOTAL

6.82

MATERIAL

25.00

Kg

25.00

Day

250.00

7.50

71.18

257.50

22

60.50

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

343.00

Cost Per 100 Rft: 343.00

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,018

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-a-05

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia:
Wattle+intertwine brushwood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

100.000

10.00

No

TOTAL

MATERIAL

No

1,000.00

27.27

1,000.00

Day

1,750.00

52.50

50.73

1,802.50

22

605.00

LABOUR
Coolie

3.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

3,407.50

Cost Per 100 Rft: 3,407.50

Labour Rates Per

100 Rft

Rs.

2,187.50

Cost Per 100 Rft: 2,187.50

2,019

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-b-01

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia:
Unsharpened within 1km

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

100.000

10.00

No

TOTAL

MATERIAL

No

1,000.00

27.23

1,000.00

LABOUR
Coolie

2.500

Day

500.00

Day

1,250.00

Carpenter

0.630

Day

800.00

Day

504.00

52.62

50.77

1,806.62

22

605.88

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

3,412.50

Cost Per 100 No.: 3,412.50

Labour Rates Per

100 No.

Rs.

2,192.50

Cost Per 100 No.: 2,192.50

2,020

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-b-02

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia:
Sharpening one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

0.750

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

600.00

18.00

78.00

618.00

22

132.00

Composite Rates Per

100 No.

Rs.

750.00

Cost Per 100 No.: 750.00

Labour Rates Per

100 No.

Rs.

750.00

Cost Per 100 No.: 750.00

2,021

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-b-03

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia:
Driving 1.25' below ground

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.750

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

875.00

26.25

78.00

901.25

22

192.50

Composite Rates Per

100 No.

Rs.

1,093.75

Cost Per 100 No.: 1,093.75

Labour Rates Per

100 No.

Rs.

1,093.75

Cost Per 100 No.: 1,093.75

2,022

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-b-04

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia:
Tying with munj, patha ban

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.500

Baan

50.00

Kg

TOTAL

6.82

MATERIAL

25.00

Kg

25.00

Day

250.00

7.50

71.18

257.50

22

60.50

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

343.00

Cost Per 100 Rft: 343.00

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,023

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-b-05

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia:
Wattle+intertwine brushwood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

100.000

10.00

No

TOTAL

MATERIAL

No

1,000.00

24.00

1,000.00

Day

2,125.00

63.75

54.00

2,188.75

22

687.50

LABOUR
Coolie

4.250

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

3,876.25

Cost Per 100 Rft: 3,876.25

Labour Rates Per

100 Rft

Rs.

2,656.25

Cost Per 100 Rft: 2,656.25

2,024

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-c-01

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia:
Unsharpened within 1km

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Canal Plantation

100.000

2.40

No

TOTAL

7.86

MATERIAL

No

240.00

240.00

LABOUR
Coolie

2.500

Day

500.00

Day

1,250.00

Carpenter

1.000

Day

800.00

Day

800.00

61.50

70.14

2,111.50

22

503.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

2,855.30

Cost Per 100 No.: 2,855.30

Labour Rates Per

100 No.

Rs.

2,562.50

Cost Per 100 No.: 2,562.50

2,025

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-c-02

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia:
Sharpening one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

0.800

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

640.00

19.20

78.00

659.20

22

140.80

Composite Rates Per

100 No.

Rs.

800.00

Cost Per 100 No.: 800.00

Labour Rates Per

100 No.

Rs.

800.00

Cost Per 100 No.: 800.00

2,026

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-c-03

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia:
Driving 1.5' below ground

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

1.330

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

798.00

23.94

78.00

821.94

22

175.56

Composite Rates Per

100 No.

Rs.

997.50

Cost Per 100 No.: 997.50

Labour Rates Per

100 No.

Rs.

997.50

Cost Per 100 No.: 997.50

2,027

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-c-04

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia:
Tying with munj, patha ban

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.500

Baan

50.00

Kg

TOTAL

6.82

MATERIAL

25.00

Kg

25.00

Day

250.00

7.50

71.18

257.50

22

60.50

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

343.00

Cost Per 100 Rft: 343.00

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,028

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-c-05

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia:
Wattle+intertwine brushwood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

100.000

10.00

No

TOTAL

MATERIAL

No

1,000.00

20.83

1,000.00

Day

2,600.00

78.00

57.17

2,678.00

22

792.00

LABOUR
Coolie

5.200

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

4,470.00

Cost Per 100 Rft: 4,470.00

Labour Rates Per

100 Rft

Rs.

3,250.00

Cost Per 100 Rft: 3,250.00

2,029

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-d-01

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia:
Unsharpened within 1km

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Canal Plantation

100.000

2.40

No

TOTAL

6.57

MATERIAL

No

240.00

240.00

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Carpenter

1.250

Day

800.00

Day

1,000.00

75.00

71.43

2,575.00

22

602.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 No.

Rs.

3,417.80

Cost Per 100 No.: 3,417.80

Labour Rates Per

100 No.

Rs.

3,125.00

Cost Per 100 No.: 3,125.00

2,030

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-d-02

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia:
Sharpening one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

0.930

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

744.00

22.32

78.00

766.32

22

163.68

Composite Rates Per

100 No.

Rs.

930.00

Cost Per 100 No.: 930.00

Labour Rates Per

100 No.

Rs.

930.00

Cost Per 100 No.: 930.00

2,031

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-d-03

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia:
Driving 1.75' below ground

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

1.567

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

940.20

28.21

78.00

968.41

22

206.84

Composite Rates Per

100 No.

Rs.

1,175.25

Cost Per 100 No.: 1,175.25

Labour Rates Per

100 No.

Rs.

1,175.25

Cost Per 100 No.: 1,175.25

2,032

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-d-04

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia:
Tying with munj, patha ban

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.500

Baan

50.00

Kg

TOTAL

6.82

MATERIAL

25.00

Kg

25.00

Day

250.00

7.50

71.18

257.50

22

60.50

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

343.00

Cost Per 100 Rft: 343.00

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,033

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-d-05

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia:
Wattle+intertwine brushwood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

100.000

10.00

No

TOTAL

MATERIAL

No

1,000.00

17.65

1,000.00

Day

3,250.00

97.50

60.35

3,347.50

22

935.00

LABOUR
Coolie

6.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

5,282.50

Cost Per 100 Rft: 5,282.50

Labour Rates Per

100 Rft

Rs.

4,062.50

Cost Per 100 Rft: 4,062.50

2,034

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-e-01

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia:
Unsharpened within 1km

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Canal Plantation

100.000

2.40

No

TOTAL

3.28

MATERIAL

No

240.00

240.00

LABOUR
Coolie

6.500

Day

500.00

Day

3,250.00

Carpenter

2.500

Day

800.00

Day

2,000.00

157.50

74.72

5,407.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,207.80

Composite Rates Per

100 No.

Rs.

6,855.30

Cost Per 100 No.: 6,855.30

Labour Rates Per

100 No.

Rs.

6,562.50

Cost Per 100 No.: 6,562.50

2,035

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-e-02

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia:
Sharpening one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

1.170

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

936.00

28.08

78.00

964.08

22

205.92

Composite Rates Per

100 No.

Rs.

1,170.00

Cost Per 100 No.: 1,170.00

Labour Rates Per

100 No.

Rs.

1,170.00

Cost Per 100 No.: 1,170.00

2,036

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-e-03

(British) :

100 No.

Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia:
Driving 2' below ground

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

1.733

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,039.80

31.19

78.00

1,070.99

22

228.76

Composite Rates Per

100 No.

Rs.

1,299.75

Cost Per 100 No.: 1,299.75

Labour Rates Per

100 No.

Rs.

1,299.75

Cost Per 100 No.: 1,299.75

2,037

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-e-04

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia:
Tying with munj, patha ban

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.600

Baan

50.00

Kg

TOTAL

8.04

MATERIAL

30.00

Kg

30.00

Day

250.00

7.50

69.96

257.50

22

61.60

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

349.10

Cost Per 100 Rft: 349.10

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,038

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-40-e-05

(British) :

100 Rft

Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia:
Wattle+intertwine brushwood

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

100.000

10.00

No

TOTAL

MATERIAL

No

1,000.00

15.79

1,000.00

Day

3,750.00

112.50

62.21

3,862.50

22

LABOUR
Coolie

7.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,045.00

Composite Rates Per

100 Rft

Rs.

5,907.50

Cost Per 100 Rft: 5,907.50

Labour Rates Per

100 Rft

Rs.

4,687.50

Cost Per 100 Rft: 4,687.50

2,039

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-a-01

(British) :

100 No.

Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia
: Supply bamboo

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bamboo 8'-10' Long

100.000

180.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

No

18,000.00

75.00

18,000.00

22

3,960.00

Composite Rates Per

100 No.

Rs.

21,960.00

Cost Per 100 No.: 21,960.00

Labour Rates Per

100 No.

Rs.

0.00

Cost Per 100 No.: 0.00

2,040

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-a-02

(British) :

100 No.

Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia
: Sharpen one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

1.000

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

800.00

24.00

78.00

824.00

22

176.00

Composite Rates Per

100 No.

Rs.

1,000.00

Cost Per 100 No.: 1,000.00

Labour Rates Per

100 No.

Rs.

1,000.00

Cost Per 100 No.: 1,000.00

2,041

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-a-03

(British) :

100 No.

Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia
: Driving bamboo 2.5'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

2.000

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,200.00

36.00

78.00

1,236.00

22

264.00

Composite Rates Per

100 No.

Rs.

1,500.00

Cost Per 100 No.: 1,500.00

Labour Rates Per

100 No.

Rs.

1,500.00

Cost Per 100 No.: 1,500.00

2,042

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-a-04

(British) :

100 Rft

Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia
: Tying bamboo with wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.600

Baan

50.00

Kg

TOTAL

4.25

MATERIAL

30.00

Kg

30.00

Day

500.00

15.00

73.75

515.00

22

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

116.60

Composite Rates Per

100 Rft

Rs.

661.60

Cost Per 100 Rft: 661.60

Labour Rates Per

100 Rft

Rs.

625.00

Cost Per 100 Rft: 625.00

2,043

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-a-05

(British) :

100 Rft

Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia
: Wattle & intertwine

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

160.000

10.00

No

TOTAL

MATERIAL

No

1,600.00

18.90

1,600.00

Day

4,750.00

142.50

59.10

4,892.50

22

LABOUR
Coolie

9.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,397.00

Composite Rates Per

100 Rft

Rs.

7,889.50

Cost Per 100 Rft: 7,889.50

Labour Rates Per

100 Rft

Rs.

5,937.50

Cost Per 100 Rft: 5,937.50

2,044

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

19-41-b-01

Item Name :

(British) :

100 No.

Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5"
dia : Supply bamboo

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bamboo 10'-12' Long

100.000

230.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

No

23,000.00

75.00

23,000.00

22

5,060.00

Composite Rates Per

100 No.

Rs.

28,060.00

Cost Per 100 No.: 28,060.00

Labour Rates Per

100 No.

Rs.

0.00

Cost Per 100 No.: 0.00

2,045

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-b-02

(British) :

100 No.

Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5"
dia : Sharpen one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

1.170

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

936.00

28.08

78.00

964.08

22

205.92

Composite Rates Per

100 No.

Rs.

1,170.00

Cost Per 100 No.: 1,170.00

Labour Rates Per

100 No.

Rs.

1,170.00

Cost Per 100 No.: 1,170.00

2,046

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-b-03

(British) :

100 No.

Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5"
dia : Driving bamboo 2.75'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

2.100

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,260.00

37.80

78.00

1,297.80

22

277.20

Composite Rates Per

100 No.

Rs.

1,575.00

Cost Per 100 No.: 1,575.00

Labour Rates Per

100 No.

Rs.

1,575.00

Cost Per 100 No.: 1,575.00

2,047

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-b-04

(British) :

100 Rft

Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5"
dia : Tying bamboo with wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 15 SWG

15.900

180.00

Kg

TOTAL

MATERIAL

Kg

2,862.00

68.97

2,862.00

Day

250.00

7.50

9.03

257.50

22

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

684.64

Composite Rates Per

100 Rft

Rs.

3,804.14

Cost Per 100 Rft: 3,804.14

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,048

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-b-05

(British) :

100 Rft

Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5"
dia : Wattle & intertwine

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

200.000

10.00

No

TOTAL

MATERIAL

No

2,000.00

18.99

2,000.00

Day

5,900.00

177.00

59.01

6,077.00

22

LABOUR
Coolie

11.800

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,738.00

Composite Rates Per

100 Rft

Rs.

9,815.00

Cost Per 100 Rft: 9,815.00

Labour Rates Per

100 Rft

Rs.

7,375.00

Cost Per 100 Rft: 7,375.00

2,049

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

19-41-c-01

Item Name :

(British) :

100 No.

Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5"
dia : Supply bamboo

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bamboo 12'-14' Long

100.000

275.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

No

27,500.00

75.00

27,500.00

22

6,050.00

Composite Rates Per

100 No.

Rs.

33,550.00

Cost Per 100 No.: 33,550.00

Labour Rates Per

100 No.

Rs.

0.00

Cost Per 100 No.: 0.00

2,050

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-c-02

(British) :

100 No.

Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5"
dia : Sharpen one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

1.320

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,056.00

31.68

78.00

1,087.68

22

232.32

Composite Rates Per

100 No.

Rs.

1,320.00

Cost Per 100 No.: 1,320.00

Labour Rates Per

100 No.

Rs.

1,320.00

Cost Per 100 No.: 1,320.00

2,051

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-c-03

(British) :

100 No.

Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5"
dia : Driving bamboo 3.5'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

2.333

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,399.80

41.99

78.00

1,441.79

22

307.96

Composite Rates Per

100 No.

Rs.

1,749.75

Cost Per 100 No.: 1,749.75

Labour Rates Per

100 No.

Rs.

1,749.75

Cost Per 100 No.: 1,749.75

2,052

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-c-04

(British) :

100 Rft

Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5"
dia : Tying bamboo with wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 15 SWG

15.900

180.00

Kg

TOTAL

MATERIAL

Kg

2,862.00

68.97

2,862.00

Day

250.00

7.50

9.03

257.50

22

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

684.64

Composite Rates Per

100 Rft

Rs.

3,804.14

Cost Per 100 Rft: 3,804.14

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,053

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-c-05

(British) :

100 Rft

Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5"
dia : Wattle & intertwine

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

280.000

10.00

No

TOTAL

MATERIAL

No

2,800.00

21.68

2,800.00

Day

6,885.00

206.55

56.32

7,091.55

22

LABOUR
Coolie

13.770

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,130.70

Composite Rates Per

100 Rft

Rs.

12,022.25

Cost Per 100 Rft: 12,022.25

Labour Rates Per

100 Rft

Rs.

8,606.25

Cost Per 100 Rft: 8,606.25

2,054

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

19-41-d-01

Item Name :

(British) :

100 No.

Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5"
dia : Supply bamboo

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bamboo 14'-16' Long

100.000

325.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

No

32,500.00

75.00

32,500.00

22

7,150.00

Composite Rates Per

100 No.

Rs.

39,650.00

Cost Per 100 No.: 39,650.00

Labour Rates Per

100 No.

Rs.

0.00

Cost Per 100 No.: 0.00

2,055

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-d-02

(British) :

100 No.

Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5"
dia : Sharpen one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

1.500

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,200.00

36.00

78.00

1,236.00

22

264.00

Composite Rates Per

100 No.

Rs.

1,500.00

Cost Per 100 No.: 1,500.00

Labour Rates Per

100 No.

Rs.

1,500.00

Cost Per 100 No.: 1,500.00

2,056

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-d-03

(British) :

100 No.

Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5"
dia : Driving bamboo 4'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

2.600

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,560.00

46.80

78.00

1,606.80

22

343.20

Composite Rates Per

100 No.

Rs.

1,950.00

Cost Per 100 No.: 1,950.00

Labour Rates Per

100 No.

Rs.

1,950.00

Cost Per 100 No.: 1,950.00

2,057

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-d-04

(British) :

100 Rft

Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5"
dia : Tying bamboo with wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 15 SWG

15.900

180.00

Kg

TOTAL

MATERIAL

Kg

2,862.00

68.97

2,862.00

Day

250.00

7.50

9.03

257.50

22

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

684.64

Composite Rates Per

100 Rft

Rs.

3,804.14

Cost Per 100 Rft: 3,804.14

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,058

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-d-05

(British) :

100 Rft

Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5"
dia : Wattle & intertwine

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

320.000

10.00

No

TOTAL

MATERIAL

No

3,200.00

23.53

3,200.00

Day

7,000.00

210.00

54.47

7,210.00

22

LABOUR
Coolie

14.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,244.00

Composite Rates Per

100 Rft

Rs.

12,654.00

Cost Per 100 Rft: 12,654.00

Labour Rates Per

100 Rft

Rs.

8,750.00

Cost Per 100 Rft: 8,750.00

2,059

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

19-41-e-01

Item Name :

(British) :

100 No.

Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5"
dia : Supply bamboo

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bamboo 16'-20' Long

100.000

375.00

No

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

MATERIAL

No

37,500.00

75.00

37,500.00

22

8,250.00

Composite Rates Per

100 No.

Rs.

45,750.00

Cost Per 100 No.: 45,750.00

Labour Rates Per

100 No.

Rs.

0.00

Cost Per 100 No.: 0.00

2,060

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-e-02

(British) :

100 No.

Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5"
dia : Sharpen one end

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Carpenter

1.760

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,408.00

42.24

78.00

1,450.24

22

309.76

Composite Rates Per

100 No.

Rs.

1,760.00

Cost Per 100 No.: 1,760.00

Labour Rates Per

100 No.

Rs.

1,760.00

Cost Per 100 No.: 1,760.00

2,061

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-e-03

(British) :

100 No.

Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5"
dia : Driving bamboo 4'

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

3.133

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,879.80

56.39

78.00

1,936.19

22

413.56

Composite Rates Per

100 No.

Rs.

2,349.75

Cost Per 100 No.: 2,349.75

Labour Rates Per

100 No.

Rs.

2,349.75

Cost Per 100 No.: 2,349.75

2,062

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-e-04

(British) :

100 Rft

Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5"
dia : Tying bamboo with wire

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
G.I Wire 15 SWG

15.900

180.00

Kg

TOTAL

MATERIAL

Kg

2,862.00

68.97

2,862.00

Day

250.00

7.50

9.03

257.50

22

LABOUR
Coolie

0.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

684.64

Composite Rates Per

100 Rft

Rs.

3,804.14

Cost Per 100 Rft: 3,804.14

Labour Rates Per

100 Rft

Rs.

312.50

Cost Per 100 Rft: 312.50

2,063

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-41-e-05

(British) :

100 Rft

Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5"
dia : Wattle & intertwine

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

360.000

10.00

No

TOTAL

MATERIAL

No

3,600.00

24.32

3,600.00

Day

7,500.00

225.00

53.68

7,725.00

22

LABOUR
Coolie

15.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,442.00

Composite Rates Per

100 Rft

Rs.

13,767.00

Cost Per 100 Rft: 13,767.00

Labour Rates Per

100 Rft

Rs.

9,375.00

Cost Per 100 Rft: 9,375.00

2,064

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-42

(British) :

100 Cft

Cut & supply brushwood from canal plantation or from any other
source, within 1.5 km.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Brushwood

70.070

10.00

No

TOTAL

MATERIAL

No

700.70

43.77

700.70

Day

500.07

15.00

34.23

515.08

22

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

1,479.95

Per CUM : Rs 522.64

Labour Rates Per

100 Cft

Rs.

625.09

Per CUM : Rs 220.75

264.17

2,065

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-43

(British) :

100 Cft

Filling brush wood only, thoroughly packed

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.498

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

249.19

7.48

78.00

256.66

22

54.82

Composite Rates Per

100 Cft

Rs.

311.49

Per CUM : Rs 110.00

Labour Rates Per

100 Cft

Rs.

311.49

Per CUM : Rs 110.00

2,066

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-44

(British) :

100 Rft

Covering road 10' to 12' wide, with 3" sarkanda or jungle, upto 50m
lead

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.598

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

299.00

8.97

78.00

307.97

22

65.78

Composite Rates Per

100 Rft

Rs.

373.75

Cost Per 50 m: 612.95

Labour Rates Per

100 Rft

Rs.

373.75

Cost Per 50 m: 612.95

2,067

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-45

(British) :

100 Sft

Gachi pitching 1' thick

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.506

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,252.79

97.58

78.00

3,350.37

22

715.61

Composite Rates Per

100 Sft

Rs.

4,065.99

Per SQM : Rs 437.50

Labour Rates Per

100 Sft

Rs.

4,065.99

Per SQM : Rs 437.50

2,068

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-46

(British) :

100 Sft

Gachi pitching done with silt clearance and berm dressing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.502

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,750.93

82.53

78.00

2,833.46

22

605.20

Composite Rates Per

100 Sft

Rs.

3,438.66

Per SQM : Rs 370.00

Labour Rates Per

100 Sft

Rs.

3,438.66

Per SQM : Rs 370.00

2,069

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 19 , PROTECTION AND DIVERSION WORKS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

19-47

(British) :

100 Cft

Filter granular backfill behind retaining wall (stone/boulder


filling upto one meter to prevent choking of weep holes).

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Boulder (Screened/Washed)

100.000

Cft

1,900.00

100 Cft

1,900.00

Mixed graded shingle NHA speci

35.000

Cft

11.00

100 Cft

3.85

TOTAL

MATERIAL

47.54

1,903.85

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Skilled Coolie

1.000

Day

600.00

Day

600.00

33.00

30.46

1,133.00

22

660.85

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,697.70

Per CUM : Rs 1,305.83

Labour Rates Per

100 Cft

Rs.

1,375.00

Per CUM : Rs 485.58

2,070

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-01-a

(British) :

Job

Earthwork for Outlets : Exc/Refill/Ram/Puddle Upto 50 cusecs


channel discharge

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
2.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,250.00

37.50

78.00

1,287.50

22

275.00

Composite Rates Per

Job

Rs.

1,562.50

Cost Per Job: 1,562.50

Labour Rates Per

Job

Rs.

1,562.50

Cost Per Job: 1,562.50

2,071

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-01-b

(British) :

Job

Earthwork for outlets : Exc/Refill/Ram/Puddle 51-100 cusecs channel


discharge

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
3.300

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,650.00

49.50

78.00

1,699.50

22

363.00

Composite Rates Per

Job

Rs.

2,062.50

Cost Per Job: 2,062.50

Labour Rates Per

Job

Rs.

2,062.50

Cost Per Job: 2,062.50

2,072

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-01-c

(British) :

Job

Earthwork for outlets : Exc/Refill/Ram/Puddle 101-200 cusecs


channel discharge

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
5.000

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,500.00

75.00

78.00

2,575.00

22

550.00

Composite Rates Per

Job

Rs.

3,125.00

Cost Per Job: 3,125.00

Labour Rates Per

Job

Rs.

3,125.00

Cost Per Job: 3,125.00

2,073

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-01-d

(British) :

Job

Earthwork for outlets : Exc/Refill/Ram/Puddle 201-350 cusecs


channel discharge

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
6.750

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,375.00

101.25

78.00

3,476.25

22

742.50

Composite Rates Per

Job

Rs.

4,218.75

Cost Per Job: 4,218.75

Labour Rates Per

Job

Rs.

4,218.75

Cost Per Job: 4,218.75

2,074

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-01-e

(British) :

Job

Earthwork for Outlets : Ex/Refill/Ram/Puddle Over 350 cusecs


channel discharge

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
10.000

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,000.00

150.00

78.00

5,150.00

22

1,100.00

Composite Rates Per

Job

Rs.

6,250.00

Cost Per Job: 6,250.00

Labour Rates Per

Job

Rs.

6,250.00

Cost Per Job: 6,250.00

2,075

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-02-a

(British) :

Each

Dismantling outlets: Old types such as KGO's orfices, etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
2.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,250.00

37.50

78.00

1,287.50

22

275.00

Composite Rates Per

Each

Rs.

1,562.50

Cost Per Each: 1,562.50

Labour Rates Per

Each

Rs.

1,562.50

Cost Per Each: 1,562.50

2,076

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-02-b

(British) :

Each

Dismantling outlets: APM or OF, 'H' upto 2.0 ft.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
3.750

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,875.00

56.25

78.00

1,931.25

22

412.50

Composite Rates Per

Each

Rs.

2,343.75

Cost Per Each: 2,343.75

Labour Rates Per

Each

Rs.

2,343.75

Cost Per Each: 2,343.75

2,077

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-02-c

(British) :

Each

Dismantling outlets: APM or OF, 'H' from 2.1-3.0ft

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
5.000

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,500.00

75.00

78.00

2,575.00

22

550.00

Composite Rates Per

Each

Rs.

3,125.00

Cost Per Each: 3,125.00

Labour Rates Per

Each

Rs.

3,125.00

Cost Per Each: 3,125.00

2,078

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-02-d

(British) :

Each

Dismantling outlets: APM or OF, 'H' above 3.0 ft

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
6.250

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,125.00

93.75

78.00

3,218.75

22

687.50

Composite Rates Per

Each

Rs.

3,906.25

Cost Per Each: 3,906.25

Labour Rates Per

Each

Rs.

3,906.25

Cost Per Each: 3,906.25

2,079

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-02-e

(British) :

Each

Dismantling outlets: Tail cluster bifurcation

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
3.750

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,875.00

56.25

78.00

1,931.25

22

412.50

Composite Rates Per

Each

Rs.

2,343.75

Cost Per Each: 2,343.75

Labour Rates Per

Each

Rs.

2,343.75

Cost Per Each: 2,343.75

2,080

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-02-f

(British) :

Each

Dismantling outlets: Tail cluster trifurcation

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
5.000

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,500.00

75.00

78.00

2,575.00

22

550.00

Composite Rates Per

Each

Rs.

3,125.00

Cost Per Each: 3,125.00

Labour Rates Per

Each

Rs.

3,125.00

Cost Per Each: 3,125.00

2,081

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-02-g

(British) :

Each

Dismantling outlets: Tail cluster quardification

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
6.250

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,125.00

93.75

78.00

3,218.75

22

687.50

Composite Rates Per

Each

Rs.

3,906.25

Cost Per Each: 3,906.25

Labour Rates Per

Each

Rs.

3,906.25

Cost Per Each: 3,906.25

2,082

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-03

(British) :

Each

Making temporary APM brick block & fixing at site

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.250

Bag

490.00

Sand

1.000

Cft

2,200.00

Burnt Brick

20.000

No

8,500.00

TOTAL

MATERIAL

Bag

122.50

100 Cft

22.00

1,000 No

170.00

30.38

314.50

LABOUR
Mason

0.330

Day

900.00

Day

297.00

Coolie

0.330

Day

500.00

Day

165.00

13.86

47.62

475.86

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

961.19

Cost Per Each: 961.19

Labour Rates Per

Each

Rs.

577.50

Cost Per Each: 577.50

170.83

2,083

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-04

(British) :

Job

Dismantling walls, taking out temporary APM brick block, fixing


iron block & rebuilding walls

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

35.25

78.00

1,210.25

22

258.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Job

Rs.

1,468.75

Cost Per Job: 1,468.75

Labour Rates Per

Job

Rs.

1,468.75

Cost Per Job: 1,468.75

2,084

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-05

(British) :

Each

Dismantling walls & fitting iron block of OF outlet

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.000

Day

500.00

Day

500.00

35.25

78.00

1,210.25

22

258.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

1,468.75

Cost Per Each: 1,468.75

Labour Rates Per

Each

Rs.

1,468.75

Cost Per Each: 1,468.75

2,085

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-06-a

(British) :

Each

Constructing, watching & removing bund for outlet built in running


water : Upto 3' depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
5.000

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,500.00

75.00

78.00

2,575.00

22

550.00

Composite Rates Per

Each

Rs.

3,125.00

Cost Per Each: 3,125.00

Labour Rates Per

Each

Rs.

3,125.00

Cost Per Each: 3,125.00

2,086

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-06-b

(British) :

Each

Constructing, watching & removing bund for outlet built in running


water : Over 3' depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
6.750

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,375.00

101.25

78.00

3,476.25

22

742.50

Composite Rates Per

Each

Rs.

4,218.75

Cost Per Each: 4,218.75

Labour Rates Per

Each

Rs.

4,218.75

Cost Per Each: 4,218.75

2,087

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-07

(British) :

Each

Adjusting "B" of tail cluster by dismantling and rebuilding throat


walls

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.300

Bag

490.00

Sand

2.000

Cft

2,200.00

Burnt Brick

30.000

No

8,500.00

TOTAL

MATERIAL

Bag

147.00

100 Cft

44.00

255.00

1,000 No

28.32

446.00

LABOUR
Mason

0.400

Day

900.00

Day

360.00

Coolie

0.750

Day

500.00

Day

375.00

22.05

49.68

757.05

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

259.82

Composite Rates Per

Each

Rs.

1,462.87

Cost Per Each: 1,462.87

Labour Rates Per

Each

Rs.

918.75

Cost Per Each: 918.75

2,088

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-08

(British) :

Each

Adjusting "Y" of an APM outlet, including dismantling and


rebuilding

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.500

Bag

490.00

Sand

2.000

Cft

2,200.00

Burnt Brick

50.000

No

8,500.00

TOTAL

MATERIAL

Bag

245.00

100 Cft

44.00

425.00

1,000 No

25.04

714.00

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.500

Day

500.00

Day

750.00

42.75

52.96

1,467.75

22

470.58

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

2,652.33

Cost Per Each: 2,652.33

Labour Rates Per

Each

Rs.

1,781.25

Cost Per Each: 1,781.25

2,089

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-09-a

(British) :

Each

Extra labour in fixing APM and OF outlet blocks Depth exceeding


5.0'

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.200

Bag

490.00

Sand

1.000

Cft

2,200.00

TOTAL

Bag

98.00

100 Cft

22.00

5.92

MATERIAL

120.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

42.00

72.08

1,442.00

22

334.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

1,896.40

Cost Per Each: 1,896.40

Labour Rates Per

Each

Rs.

1,750.00

Cost Per Each: 1,750.00

2,090

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-09-b

(British) :

Each

Extra labour in fixing APM and OF outlet blocks Depth more than
4.0' to 5.0'

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.200

Bag

490.00

Sand

1.000

Cft

2,200.00

TOTAL

Bag

98.00

100 Cft

22.00

7.69

MATERIAL

120.00

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

0.750

Day

500.00

Day

375.00

31.50

70.31

1,081.50

22

257.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

1,458.90

Cost Per Each: 1,458.90

Labour Rates Per

Each

Rs.

1,312.50

Cost Per Each: 1,312.50

2,091

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-09-c

(British) :

Each

Extra labour in fixing APM and OF outlet blocks Depth more than
3.0' to 4.0'

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.200

Bag

490.00

Sand

1.000

Cft

2,200.00

TOTAL

Bag

98.00

100 Cft

22.00

9.38

MATERIAL

120.00

LABOUR
Mason

0.600

Day

900.00

Day

540.00

Coolie

0.600

Day

500.00

Day

300.00

25.20

68.63

865.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

211.20

Composite Rates Per

Each

Rs.

1,196.40

Cost Per Each: 1,196.40

Labour Rates Per

Each

Rs.

1,050.00

Cost Per Each: 1,050.00

2,092

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-09-d

(British) :

Each

Extra labour in fixing APM and OF outlet blocks Depth more than
2.0' to 3.0'

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.150

Bag

490.00

Sand

1.000

Cft

2,200.00

TOTAL

Bag

73.50

100 Cft

22.00

9.00

MATERIAL

95.50

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

0.500

Day

500.00

Day

250.00

21.00

69.00

721.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

991.51

Cost Per Each: 991.51

Labour Rates Per

Each

Rs.

875.00

Cost Per Each: 875.00

175.01

2,093

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-09-e

(British) :

Each

Extra labour in fixing APM and OF outlet blocks Depth upto 2.0'

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.100

Bag

490.00

Sand

1.000

Cft

2,200.00

TOTAL

Bag

49.00

100 Cft

22.00

8.44

MATERIAL

71.00

LABOUR
Mason

0.400

Day

900.00

Day

360.00

Coolie

0.400

Day

500.00

Day

200.00

16.80

69.56

576.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

786.62

Cost Per Each: 786.62

Labour Rates Per

Each

Rs.

700.00

Cost Per Each: 700.00

138.82

2,094

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-10

(British) :

Each

Repairing damaged reducing collar of hume pipe outlets

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Shingle

1.000

Cft

1,700.00

Ordinary Portland Cement

0.250

Bag

490.00

Sand

1.000

Cft

2,200.00

TOTAL

MATERIAL

100 Cft

17.00

Bag

122.50

100 Cft

22.00

19.43

161.50

LABOUR
Mason

0.330

Day

900.00

Day

297.00

Coolie

0.330

Day

500.00

Day

165.00

13.86

58.57

475.86

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

774.53

Cost Per Each: 774.53

Labour Rates Per

Each

Rs.

577.50

Cost Per Each: 577.50

137.17

2,095

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-11

(British) :

Rft

Laying iron pipes for outlets.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.020

Day

900.00

Day

18.11

Coolie

0.040

Day

500.00

Day

20.00

1.14

78.00

39.25

22

8.38

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

47.64

Labour Rates Per

Rft

Rs.

47.64

LABOUR

Per Meter : Rs 156.25


Per Meter : Rs 156.25

2,096

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-12

(British) :

Each

Water allowance for constructing outlets or culverts, when canal


water not flowing

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
1.250

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

625.00

18.75

78.00

643.75

22

Composite Rates Per

Each

Rs.

781.25

Cost Per Each: 781.25

Labour Rates Per

Each

Rs.

781.25

Cost Per Each: 781.25

137.50

2,097

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-13

(British) :

Each

Hoisting and placing RC slab or stone in position on outlets or WC


culverts

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.200

Day

900.00

Day

180.00

Coolie

0.650

Day

500.00

Day

325.00

15.15

78.00

520.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

631.25

Cost Per Each: 631.25

Labour Rates Per

Each

Rs.

631.25

Cost Per Each: 631.25

111.10

2,098

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-14-a

(British) :

Rft

Fixing pipe outlet, including backfilling of earth & puddling :


Portion under bank

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.017

Bag

490.00

Sand

0.082

Cft

2,200.00

TOTAL

Bag

8.22

100 Cft

1.81

6.71

MATERIAL

10.03

LABOUR
Mason

0.021

Day

900.00

Day

18.66

Coolie

0.167

Day

500.00

Day

83.38

3.06

71.29

105.10

22

24.66

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

139.79

Labour Rates Per

Rft

Rs.

127.55

LABOUR

Per Meter : Rs 458.50


Per Meter : Rs 418.37

2,099

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-14-b

(British) :

Rft

Fixing pipe outlet, including backfilling of earth & puddling :


Portion under road, beyond bank

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.017

Bag

490.00

Sand

0.082

Cft

2,200.00

TOTAL

MATERIAL

Bag

8.22

100 Cft

1.81

13.34

10.03

LABOUR
Mason

0.017

Day

900.00

Day

15.09

Coolie

0.063

Day

500.00

Day

31.25

1.39

64.66

47.73

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

70.16

Labour Rates Per

Rft

Rs.

57.93

LABOUR

12.40

Per Meter : Rs 230.13


Per Meter : Rs 190.00

2,100

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-15-a

(British) :

Rft

Removing pipe outlet,refilling earth & puddling Portion under bank

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.167

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

104.23

Labour Rates Per

Rft

Rs.

104.23

LABOUR

Day

83.38

2.50

78.00

85.89

22

18.34

Per Meter : Rs 341.87


Per Meter : Rs 341.87

2,101

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-15-b

(British) :

Rft

Removing pipe outlet,refilling earth & puddling Portion under road,


beyond

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.063

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

39.06

Labour Rates Per

Rft

Rs.

39.06

LABOUR

Day

31.25

0.94

78.00

32.19

22

6.88

Per Meter : Rs 128.13


Per Meter : Rs 128.13

2,102

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-16-a

(British) :

Rft

Changing pipe outlets by removing one pipe & replacing : Portion


under bank

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.017

Bag

490.00

Sand

0.082

Cft

2,200.00

TOTAL

Bag

8.22

100 Cft

1.81

5.81

MATERIAL

10.03

LABOUR
Mason

0.017

Day

900.00

Day

15.09

Coolie

0.209

Day

500.00

Day

104.27

3.58

72.19

122.94

22

28.47

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

161.43

Labour Rates Per

Rft

Rs.

149.20

LABOUR

Per Meter : Rs 529.50


Per Meter : Rs 489.38

2,103

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 20 , OUTLETS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

20-16-b

(British) :

Rft

Changing pipe outlets by removing one pipe & replacing : Portion


under road, beyond

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.017

Bag

490.00

Sand

0.082

Cft

2,200.00

TOTAL

MATERIAL

Bag

8.22

100 Cft

1.81

10.81

10.03

LABOUR
Mason

0.008

Day

900.00

Day

7.41

Coolie

0.104

Day

500.00

Day

52.13

1.79

67.19

61.33

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

86.66

Labour Rates Per

Rft

Rs.

74.43

LABOUR

15.31

Per Meter : Rs 284.25


Per Meter : Rs 244.12

2,104

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-a-01

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in ordinary soil
or sand : Upto 1.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.742

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

370.95

11.13

78.00

382.08

22

81.61

Composite Rates Per

100 Cft

Rs.

463.69

Per CUM : Rs 163.75

Labour Rates Per

100 Cft

Rs.

463.69

Per CUM : Rs 163.75

2,105

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-a-02

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in ordinary soil
or sand : 1.5 to 3 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.776

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

387.94

11.64

78.00

399.58

22

85.35

Composite Rates Per

100 Cft

Rs.

484.93

Per CUM : Rs 171.25

Labour Rates Per

100 Cft

Rs.

484.93

Per CUM : Rs 171.25

2,106

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-a-03

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in ordinary soil
or sand : 3 to 4.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.875

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

437.49

13.12

78.00

450.62

22

96.25

Composite Rates Per

100 Cft

Rs.

546.87

Per CUM : Rs 193.12

Labour Rates Per

100 Cft

Rs.

546.87

Per CUM : Rs 193.12

2,107

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-a-04

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in ordinary soil
or sand : 4.5 to 6 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

499.79

14.99

78.00

514.79

22

Composite Rates Per

100 Cft

Rs.

624.74

Per CUM : Rs 220.62

Labour Rates Per

100 Cft

Rs.

624.74

Per CUM : Rs 220.62

109.95

2,108

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-b-01

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in hard soil :
Upto 1.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.906

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

453.07

13.59

78.00

466.66

22

99.68

Composite Rates Per

100 Cft

Rs.

566.34

Per CUM : Rs 200.00

Labour Rates Per

100 Cft

Rs.

566.34

Per CUM : Rs 200.00

2,109

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-b-02

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in hard soil :
Above 1.5 to 3 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.946

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

472.89

14.19

78.00

487.08

22

Composite Rates Per

100 Cft

Rs.

591.11

Per CUM : Rs 208.75

Labour Rates Per

100 Cft

Rs.

591.11

Per CUM : Rs 208.75

104.04

2,110

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-b-03

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in hard soil :
Above 3 to 4.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.034

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

516.78

15.50

78.00

532.29

22

Composite Rates Per

100 Cft

Rs.

645.98

Per CUM : Rs 228.13

Labour Rates Per

100 Cft

Rs.

645.98

Per CUM : Rs 228.13

113.69

2,111

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-b-04

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in hard soil :
Above 4.5 to 6 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.164

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

581.91

17.46

78.00

599.37

22

Composite Rates Per

100 Cft

Rs.

727.39

Per CUM : Rs 256.87

Labour Rates Per

100 Cft

Rs.

727.39

Per CUM : Rs 256.87

128.02

2,112

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-c-01

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in hard strata
like shingle : Upto 1.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.951

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

975.51

29.27

78.00

1,004.78

22

214.61

Composite Rates Per

100 Cft

Rs.

1,219.39

Per CUM : Rs 430.63

Labour Rates Per

100 Cft

Rs.

1,219.39

Per CUM : Rs 430.63

2,113

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-c-02

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in hard strata
like shingle :1.5 to 3 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.022

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,010.91

30.33

78.00

1,041.24

22

222.40

Composite Rates Per

100 Cft

Rs.

1,263.64

Per CUM : Rs 446.25

Labour Rates Per

100 Cft

Rs.

1,263.64

Per CUM : Rs 446.25

2,114

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-c-03

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in hard strata
like shingle : 3 to 4.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.107

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,053.39

31.60

78.00

1,084.99

22

231.74

Composite Rates Per

100 Cft

Rs.

1,316.73

Per CUM : Rs 465.00

Labour Rates Per

100 Cft

Rs.

1,316.73

Per CUM : Rs 465.00

2,115

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-01-c-04

(British) :

100 Cft

Excavate well in dry & dispose of soil within 50m in hard strata
like shingle : 4.5 to 6 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.263

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,131.26

33.94

78.00

1,165.19

22

248.88

Composite Rates Per

100 Cft

Rs.

1,414.07

Per CUM : Rs 499.38

Labour Rates Per

100 Cft

Rs.

1,414.07

Per CUM : Rs 499.38

2,116

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-a-01

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in ordinary soil
: 3 to 4.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

4.001

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,000.58

60.02

78.00

2,060.60

22

440.13

Composite Rates Per

100 Cft

Rs.

2,500.73

Per CUM : Rs 883.13

Labour Rates Per

100 Cft

Rs.

2,500.73

Per CUM : Rs 883.13

2,117

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-a-02

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in ordinary soil
: 4.5 to 6 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.001

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,500.38

75.01

78.00

2,575.39

22

550.08

Composite Rates Per

100 Cft

Rs.

3,125.47

Per CUM : Rs 1,103.75

Labour Rates Per

100 Cft

Rs.

3,125.47

Per CUM : Rs 1,103.75

2,118

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-a-03

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in ordinary soil
: 6 to 7.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,000.17

90.01

78.00

3,090.17

22

660.04

Composite Rates Per

100 Cft

Rs.

3,750.21

Per CUM : Rs 1,324.37

Labour Rates Per

100 Cft

Rs.

3,750.21

Per CUM : Rs 1,324.37

2,119

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-a-04

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in ordinary soil
: 7.5 to 9 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,499.96

105.00

78.00

3,604.96

22

769.99

Composite Rates Per

100 Cft

Rs.

4,374.95

Per CUM : Rs 1,545.00

Labour Rates Per

100 Cft

Rs.

4,374.95

Per CUM : Rs 1,545.00

2,120

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-a-05

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in ordinary soil
: 9 to 10.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

8.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,999.75

119.99

78.00

4,119.74

22

879.95

Composite Rates Per

100 Cft

Rs.

4,999.69

Per CUM : Rs 1,765.62

Labour Rates Per

100 Cft

Rs.

4,999.69

Per CUM : Rs 1,765.62

2,121

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-a-06

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in ordinary soil
: 10.5 to 12 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

8.999

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,499.54

134.99

78.00

4,634.53

22

989.90

Composite Rates Per

100 Cft

Rs.

5,624.43

Per CUM : Rs 1,986.25

Labour Rates Per

100 Cft

Rs.

5,624.43

Per CUM : Rs 1,986.25

2,122

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-a-07

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in ordinary soil
: 12 to 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.002

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,000.75

150.02

78.00

5,150.77

22

1,100.17

Composite Rates Per

100 Cft

Rs.

6,250.94

Per CUM : Rs 2,207.50

Labour Rates Per

100 Cft

Rs.

6,250.94

Per CUM : Rs 2,207.50

2,123

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-a-08

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in ordinary soil
: Exceeding 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

11.001

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,500.54

165.02

78.00

5,665.56

22

1,210.12

Composite Rates Per

100 Cft

Rs.

6,875.68

Per CUM : Rs 2,428.12

Labour Rates Per

100 Cft

Rs.

6,875.68

Per CUM : Rs 2,428.12

2,124

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-b-01

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard soil : 3
to 4.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

5.499

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,749.56

82.49

78.00

2,832.05

22

604.90

Composite Rates Per

100 Cft

Rs.

3,436.95

Per CUM : Rs 1,213.75

Labour Rates Per

100 Cft

Rs.

3,436.95

Per CUM : Rs 1,213.75

2,125

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-b-02

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard soil :
4.5 to 6 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.499

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,249.35

97.48

78.00

3,346.84

22

714.86

Composite Rates Per

100 Cft

Rs.

4,061.69

Per CUM : Rs 1,434.37

Labour Rates Per

100 Cft

Rs.

4,061.69

Per CUM : Rs 1,434.37

2,126

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-b-03

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard soil : 6
to 7.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.501

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,750.56

112.52

78.00

3,863.08

22

825.12

Composite Rates Per

100 Cft

Rs.

4,688.20

Per CUM : Rs 1,655.62

Labour Rates Per

100 Cft

Rs.

4,688.20

Per CUM : Rs 1,655.62

2,127

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-b-04

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard soil :
7.5 to 9 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

8.501

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,250.35

127.51

78.00

4,377.87

22

935.08

Composite Rates Per

100 Cft

Rs.

5,312.94

Per CUM : Rs 1,876.25

Labour Rates Per

100 Cft

Rs.

5,312.94

Per CUM : Rs 1,876.25

2,128

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-b-05

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard soil : 9
to 10.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,750.15

142.50

78.00

4,892.65

22

1,045.03

Composite Rates Per

100 Cft

Rs.

5,937.68

Per CUM : Rs 2,096.87

Labour Rates Per

100 Cft

Rs.

5,937.68

Per CUM : Rs 2,096.87

2,129

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-b-06

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard soil :
10.5 to 12 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,249.94

157.50

78.00

5,407.44

22

1,154.99

Composite Rates Per

100 Cft

Rs.

6,562.42

Per CUM : Rs 2,317.50

Labour Rates Per

100 Cft

Rs.

6,562.42

Per CUM : Rs 2,317.50

2,130

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-b-07

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard soil : 12
to 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

11.499

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,749.73

172.49

78.00

5,922.22

22

1,264.94

Composite Rates Per

100 Cft

Rs.

7,187.16

Per CUM : Rs 2,538.12

Labour Rates Per

100 Cft

Rs.

7,187.16

Per CUM : Rs 2,538.12

2,131

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-b-08

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard soil :
Exceeding 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.499

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

6,249.52

187.49

78.00

6,437.01

22

1,374.89

Composite Rates Per

100 Cft

Rs.

7,811.90

Per CUM : Rs 2,758.75

Labour Rates Per

100 Cft

Rs.

7,811.90

Per CUM : Rs 2,758.75

2,132

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-c-01

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard strata
like shingle : 3 to 4.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.498

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

3,749.15

112.47

78.00

3,861.62

22

824.81

Composite Rates Per

100 Cft

Rs.

4,686.43

Per CUM : Rs 1,655.00

Labour Rates Per

100 Cft

Rs.

4,686.43

Per CUM : Rs 1,655.00

2,133

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-c-02

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard strata
like shingle : 4.5 to 6 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

8.501

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,250.35

127.51

78.00

4,377.87

22

935.08

Composite Rates Per

100 Cft

Rs.

5,312.94

Per CUM : Rs 1,876.25

Labour Rates Per

100 Cft

Rs.

5,312.94

Per CUM : Rs 1,876.25

2,134

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-c-03

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard strata
like shingle : 6 to 7.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

4,750.15

142.50

78.00

4,892.65

22

1,045.03

Composite Rates Per

100 Cft

Rs.

5,937.68

Per CUM : Rs 2,096.87

Labour Rates Per

100 Cft

Rs.

5,937.68

Per CUM : Rs 2,096.87

2,135

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-c-04

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard strata
like shingle : 7.5 to 9 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

10.500

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,249.94

157.50

78.00

5,407.44

22

1,154.99

Composite Rates Per

100 Cft

Rs.

6,562.42

Per CUM : Rs 2,317.50

Labour Rates Per

100 Cft

Rs.

6,562.42

Per CUM : Rs 2,317.50

2,136

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-c-05

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard strata
like shingle : 9 to 10.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

11.499

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

5,749.73

172.49

78.00

5,922.22

22

1,264.94

Composite Rates Per

100 Cft

Rs.

7,187.16

Per CUM : Rs 2,538.12

Labour Rates Per

100 Cft

Rs.

7,187.16

Per CUM : Rs 2,538.12

2,137

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-c-06

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard strata
like shingle : 10.5 to 12 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.499

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

6,249.52

187.49

78.00

6,437.01

22

1,374.89

Composite Rates Per

100 Cft

Rs.

7,811.90

Per CUM : Rs 2,758.75

Labour Rates Per

100 Cft

Rs.

7,811.90

Per CUM : Rs 2,758.75

2,138

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-c-07

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard strata
like shingle : 12 to 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

13.501

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

6,750.73

202.52

78.00

6,953.25

22

1,485.16

Composite Rates Per

100 Cft

Rs.

8,438.41

Per CUM : Rs 2,980.00

Labour Rates Per

100 Cft

Rs.

8,438.41

Per CUM : Rs 2,980.00

2,139

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-02-c-08

(British) :

100 Cft

Dry sinking of well & disposal of soil within 50m in hard strata
like shingle : Over 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

14.501

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

7,250.52

217.52

78.00

7,468.04

22

1,595.11

Composite Rates Per

100 Cft

Rs.

9,063.15

Per CUM : Rs 3,200.62

Labour Rates Per

100 Cft

Rs.

9,063.15

Per CUM : Rs 3,200.62

2,140

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-01

(British) :

100 Cft

Wet sinking of well for depths below spring level Upto 1.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

2.778

Day

500.00

Day

1,388.94

Diver

1.110

Day

600.00

Day

666.01

61.65

78.00

2,116.60

22

452.09

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

2,568.69

Per CUM : Rs 907.12

Labour Rates Per

100 Cft

Rs.

2,568.69

Per CUM : Rs 907.13

2,141

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-02

(British) :

100 Cft

Wet sinking of well for depths below spring level Above 1.5 to 3 m
depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.000

Day

500.00

Day

3,000.17

Diver

1.999

Day

600.00

Day

1,199.50

125.99

78.00

4,325.66

22

923.93

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

5,249.58

Per CUM : Rs 1,853.87

Labour Rates Per

100 Cft

Rs.

5,249.58

Per CUM : Rs 1,853.87

2,142

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-03

(British) :

100 Cft

Wet sinking of well for depths below spring level Above 3 to 4.5 m
depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

9.231

Day

500.00

Day

4,615.64

Diver

3.078

Day

600.00

Day

1,846.82

193.87

78.00

6,656.34

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,421.74

Composite Rates Per

100 Cft

Rs.

8,078.08

Per CUM : Rs 2,852.75

Labour Rates Per

100 Cft

Rs.

8,078.08

Per CUM : Rs 2,852.75

2,143

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-04

(British) :

100 Cft

Wet sinking of well for depths below spring level Above 4.5 to 6 m
depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

12.499

Day

500.00

Day

6,249.52

Diver

4.165

Day

600.00

Day

2,499.24

262.46

78.00

9,011.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,924.73

Composite Rates Per

100 Cft

Rs.

10,935.96

Per CUM : Rs 3,862.00

Labour Rates Per

100 Cft

Rs.

10,935.96

Per CUM : Rs 3,862.00

2,144

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-05

(British) :

100 Cft

Wet sinking of well for depths below spring level Above 6 to 7.5 m
depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

16.506

Day

500.00

Day

8,252.94

Diver

5.479

Day

600.00

Day

3,287.58

346.22

78.00

11,886.74

22

2,538.91

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

14,425.65

Per CUM : Rs 5,094.38

Labour Rates Per

100 Cft

Rs.

14,425.65

Per CUM : Rs 5,094.38

2,145

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-06

(British) :

100 Cft

Wet sinking of well for depths below spring level Above 7.5 to 9 m
depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

21.054

Day

500.00

Day

10,526.78

Diver

7.017

Day

600.00

Day

4,210.14

442.11

78.00

15,179.03

22

3,242.12

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

18,421.15

Per CUM : Rs 6,505.37

Labour Rates Per

100 Cft

Rs.

18,421.15

Per CUM : Rs 6,505.37

2,146

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-07

(British) :

100 Cft

Wet sinking of well for depths below spring level Above 9 to 10.5 m
depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

25.533

Day

500.00

Day

12,766.64

Diver

8.512

Day

600.00

Day

5,107.22

536.22

78.00

18,410.08

22

3,932.25

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

22,342.33

Per CUM : Rs 7,890.13

Labour Rates Per

100 Cft

Rs.

22,342.32

Per CUM : Rs 7,890.12

2,147

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-08

(British) :

100 Cft

Wet sinking of well for depths below spring level Above 10.5 to 12
m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

31.573

Day

500.00

Day

15,786.63

Diver

10.525

Day

600.00

Day

6,315.22

663.06

78.00

22,764.90

22

4,862.41

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

27,627.31

Per CUM : Rs 9,756.50

Labour Rates Per

100 Cft

Rs.

27,627.30

Per CUM : Rs 9,756.50

2,148

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-09

(British) :

100 Cft

Wet sinking of well for depths below spring level Above 12 to 13.5
m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

37.491

Day

500.00

Day

18,745.73

Diver

12.499

Day

600.00

Day

7,499.43

787.35

78.00

27,032.52

22

5,773.94

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

32,806.45

Per CUM : Rs 11,585.50

Labour Rates Per

100 Cft

Rs.

32,806.45

Per CUM : Rs 11,585.50

2,149

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-a-10

(British) :

100 Cft

Wet sinking of well for depths below spring level Exceeding 13.5 m
depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

45.109

Day

500.00

Day

22,554.35

Diver

15.039

Day

600.00

Day

9,023.44

947.33

78.00

32,525.12

22

6,947.11

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

39,472.23

Per CUM : Rs 13,939.50

Labour Rates Per

100 Cft

Rs.

39,472.23

Per CUM : Rs 13,939.50

2,150

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-01

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Upto 1.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

3.571

Day

500.00

Day

1,785.38

Diver

1.430

Day

600.00

Day

858.00

79.30

78.00

2,722.68

22

581.54

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

3,304.22

Per CUM : Rs 1,166.88

Labour Rates Per

100 Cft

Rs.

3,304.22

Per CUM : Rs 1,166.88

2,151

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-02

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: 1.5 to 3 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.501

Day

500.00

Day

3,750.56

Diver

2.500

Day

600.00

Day

1,500.23

157.52

78.00

5,408.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,155.17

Composite Rates Per

100 Cft

Rs.

6,563.48

Per CUM : Rs 2,317.88

Labour Rates Per

100 Cft

Rs.

6,563.49

Per CUM : Rs 2,317.88

2,152

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-03

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Above 3 to 4.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

11.321

Day

500.00

Day

5,660.53

Diver

3.775

Day

600.00

Day

2,264.78

237.76

78.00

8,163.07

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,743.57

Composite Rates Per

100 Cft

Rs.

9,906.64

Per CUM : Rs 3,498.50

Labour Rates Per

100 Cft

Rs.

9,906.64

Per CUM : Rs 3,498.50

2,153

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-04

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Above 4.5 to 6 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

14.999

Day

500.00

Day

7,499.71

Diver

5.001

Day

600.00

Day

3,000.45

315.00

78.00

10,815.16

22

2,310.04

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

13,125.20

Per CUM : Rs 4,635.12

Labour Rates Per

100 Cft

Rs.

13,125.20

Per CUM : Rs 4,635.13

2,154

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-05

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Above 6 to 7.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

20.691

Day

500.00

Day

10,345.55

Diver

6.895

Day

600.00

Day

4,137.09

434.48

78.00

14,917.12

22

3,186.18

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

18,103.30

Per CUM : Rs 6,393.13

Labour Rates Per

100 Cft

Rs.

18,103.30

Per CUM : Rs 6,393.13

2,155

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-06

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Above 7.5 to 9 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

26.088

Day

500.00

Day

13,044.14

Diver

8.696

Day

600.00

Day

5,217.66

547.85

78.00

18,809.65

22

4,017.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

22,827.25

Per CUM : Rs 8,061.38

Labour Rates Per

100 Cft

Rs.

22,827.25

Per CUM : Rs 8,061.38

2,156

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-07

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Above 9 to 10.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

31.998

Day

500.00

Day

15,999.00

Diver

10.667

Day

600.00

Day

6,400.17

671.98

78.00

23,071.15

22

4,927.82

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

27,998.96

Per CUM : Rs 9,887.75

Labour Rates Per

100 Cft

Rs.

27,998.96

Per CUM : Rs 9,887.75

2,157

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-08

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Above 10.5 to 12 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

40.012

Day

500.00

Day

20,005.83

Diver

13.332

Day

600.00

Day

7,998.94

840.14

78.00

28,844.91

22

6,161.05

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

35,005.96

Per CUM : Rs 12,362.25

Labour Rates Per

100 Cft

Rs.

35,005.96

Per CUM : Rs 12,362.25

2,158

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-09

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Above 12 to 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

46.864

Day

500.00

Day

23,432.17

Diver

15.625

Day

600.00

Day

9,375.13

984.22

78.00

33,791.52

22

7,217.61

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

41,009.13

Per CUM : Rs 14,482.25

Labour Rates Per

100 Cft

Rs.

41,009.13

Per CUM : Rs 14,482.25

2,159

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-b-10

(British) :

100 Cft

Wet sinking of well for depths below spring level in cohesive soil
: Exceeding 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

56.067

Day

500.00

Day

28,033.65

Diver

18.692

Day

600.00

Day

11,215.16

1,177.46

78.00

40,426.27

22

8,634.74

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

49,061.01

Per CUM : Rs 17,325.75

Labour Rates Per

100 Cft

Rs.

49,061.01

Per CUM : Rs 17,325.75

2,160

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-01

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : Upto 1.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.400

Day

500.00

Day

3,199.80

Diver

3.200

Day

600.00

Day

1,919.88

153.59

78.00

5,273.27

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,126.33

Composite Rates Per

100 Cft

Rs.

6,399.60

Per CUM : Rs 2,260.00

Labour Rates Per

100 Cft

Rs.

6,399.60

Per CUM : Rs 2,260.00

2,161

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-02

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : 1.5 to 3 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

15.237

Day

500.00

Day

7,618.64

Diver

7.620

Day

600.00

Day

4,572.03

365.72

78.00

12,556.39

22

2,681.95

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

15,238.34

Per CUM : Rs 5,381.38

Labour Rates Per

100 Cft

Rs.

15,238.34

Per CUM : Rs 5,381.38

2,162

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-03

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : 3 to 4.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

20.779

Day

500.00

Day

10,389.44

Diver

10.389

Day

600.00

Day

6,233.66

498.69

78.00

17,121.80

22

3,657.08

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

20,778.88

Per CUM : Rs 7,338.00

Labour Rates Per

100 Cft

Rs.

20,778.88

Per CUM : Rs 7,338.00

2,163

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-04

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : 4.5 to 6 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

28.770

Day

500.00

Day

14,384.94

Diver

14.388

Day

600.00

Day

8,632.67

690.53

78.00

23,708.14

22

5,063.87

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

28,772.01

Per CUM : Rs 10,160.75

Labour Rates Per

100 Cft

Rs.

28,772.01

Per CUM : Rs 10,160.75

2,164

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-05

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : 6 to 7.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

43.240

Day

500.00

Day

21,619.89

Diver

21.623

Day

600.00

Day

12,973.63

1,037.81

78.00

35,631.33

22

7,610.58

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

43,241.91

Per CUM : Rs 15,270.75

Labour Rates Per

100 Cft

Rs.

43,241.91

Per CUM : Rs 15,270.75

2,165

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-06

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : 7.5 to 9 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

55.954

Day

500.00

Day

27,977.02

Diver

27.971

Day

600.00

Day

16,782.81

1,342.79

78.00

46,102.62

22

9,847.16

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

55,949.79

Per CUM : Rs 19,758.50

Labour Rates Per

100 Cft

Rs.

55,949.79

Per CUM : Rs 19,758.50

2,166

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-07

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : 9 to 10.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

70.169

Day

500.00

Day

35,084.54

Diver

35.085

Day

600.00

Day

21,050.72

1,684.06

78.00

57,819.33

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

12,349.76

Composite Rates Per

100 Cft

Rs.

70,169.08

Per CUM : Rs 24,780.00

Labour Rates Per

100 Cft

Rs.

70,169.08

Per CUM : Rs 24,780.00

2,167

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-08

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : 10.5 to 12 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

90.897

Day

500.00

Day

45,448.49

Diver

45.448

Day

600.00

Day

27,269.10

2,181.53

78.00

74,899.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

15,997.87

Composite Rates Per

100 Cft

Rs.

90,896.98

Per CUM : Rs 32,100.00

Labour Rates Per

100 Cft

Rs.

90,896.98

Per CUM : Rs 32,100.00

2,168

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-09

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : 12 to 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

114.287

Day

500.00

Day

57,143.34

Diver

57.143

Day

600.00

Day

34,286.01

2,742.88

78.00

94,172.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

20,114.46

Composite Rates Per

100 Cft

Rs.

114,286.69

Per CUM : Rs 40,360.00

Labour Rates Per

100 Cft

Rs.

114,286.69

Per CUM : Rs 40,360.00

2,169

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-03-c-10

(British) :

100 Cft

Wet sinking of well for depths below spring level in shingle/gravel


etc : Exceeding 13.5 m depth

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

145.464

Day

500.00

Day

72,731.75

Diver

72.689

Day

600.00

Day

43,613.57

3,490.36

78.00

119,835.68

22

25,595.97

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

145,431.65

Per CUM : Rs 51,358.75

Labour Rates Per

100 Cft

Rs.

145,431.64

Per CUM : Rs 51,358.75

2,170

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-04

(British) :

100 Cft

Making & fixing in position, kikar wood well curb

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Kiker

150.000

850.00

Cft

TOTAL

MATERIAL

Cft

127,500.00

34.00

127,500.00

LABOUR
Mason

14.999

Day

900.00

Day

13,499.48

Coolie

200.568

Day

500.00

Day

100,284.00

Carpenter

50.007

Day

800.00

Day

40,006.00

4,613.68

44.00

158,403.16

22

61,883.69

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

347,786.85

Per CUM : Rs 122,819.88

Labour Rates Per

100 Cft

Rs.

192,236.86

Per CUM : Rs 67,887.87

2,171

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-05

(British) :

Each

Laying well curb in position only

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.500

Day

500.00

Day

750.00

29.25

78.00

1,004.25

22

214.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

1,218.75

Cost Per Each: 1,218.75

Labour Rates Per

Each

Rs.

1,218.75

Cost Per Each: 1,218.75

2,172

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-06-a

(British) :

100 Cft

Providing & laying RCC well curb in position, using coarse sand :
Ratio 1:1.5:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

22.523

Bag

490.00

Bag

11,036.37

Sand

45.307

Cft

2,200.00

100 Cft

996.75

Crushed Aggregate

90.614

Cft

2,800.00

100 Cft

2,537.19

Form Work I

3.058

Sft

10.00

TOTAL

MATERIAL

Sft

30.58

39.91

14,600.89

LABOUR
Mason

6.006

Day

900.00

Day

5,405.40

Coolie

10.010

Day

500.00

Day

5,005.00

Carpenter

0.501

Day

800.00

Day

400.97

Black Smith

0.249

Day

900.00

Day

224.27

Skilled Coolie

3.004

Day

600.00

Day

1,802.65

385.15

38.09

13,223.43

22

6,036.62

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

33,860.93

Per CUM : Rs 11,957.89

Labour Rates Per

100 Cft

Rs.

16,047.85

Per CUM : Rs 5,667.25

2,173

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-06-b

(British) :

100 Cft

Providing & laying RCC well curb in position, using coarse sand :
Ratio 1:2:4

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

17.619

Bag

490.00

Bag

8,633.17

Sand

50.008

Cft

2,200.00

100 Cft

1,100.17

Crushed Aggregate

100.043

Cft

2,800.00

100 Cft

2,801.21

Form Work I

9.911

Sft

10.00

TOTAL

MATERIAL

Sft

99.11

37.20

12,633.66

LABOUR
Mason

6.006

Day

900.00

Day

5,405.40

Coolie

10.010

Day

500.00

Day

5,005.00

Carpenter

0.501

Day

800.00

Day

400.97

Black Smith

0.249

Day

900.00

Day

224.27

Skilled Coolie

3.004

Day

600.00

Day

1,802.65

385.15

40.80

13,223.43

22

5,603.83

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Cft

Rs.

31,460.92

Per CUM : Rs 11,110.33

Labour Rates Per

100 Cft

Rs.

16,047.85

Per CUM : Rs 5,667.25

2,174

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 21 , SINKING OF WELLS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

21-07

(British) :

Ton

Providing and fixing structural steel for cutting edge

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1016.000

Iron Sheet

120.00

Kg

TOTAL

MATERIAL

Kg

121,920.00

62.24

121,920.00

LABOUR
Coolie

20.000

Day

500.00

Day

10,000.00

Black Smith

10.000

Day

900.00

Day

9,000.00

Skilled Coolie

10.000

Day

600.00

Day

6,000.00

750.00

15.76

25,750.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Ton

Rs.

179,992.40

Labour Rates Per

Ton

Rs.

31,250.00

32,322.40

Per Tonne : Rs 177,148.52


Per Tonne : Rs 30,756.25

2,175

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-01-a-01

(British) :

100 Rft

Tega formed of pacca bricks on end, laid in and over c/s mortar :
3" thick : Ratio 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.000

Bag

490.00

Sand

4.963

Cft

2,200.00

Burnt Brick

200.064

No

8,500.00

TOTAL

MATERIAL

Bag

490.15

100 Cft

109.20

1,000 No

1,700.54

52.66

2,299.89

LABOUR
Mason

0.250

Day

900.00

Day

225.27

Coolie

1.000

Day

500.00

Day

500.15

Bhishti

0.500

Day

500.00

Day

250.15

29.27

25.34

1,004.85

22

720.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

4,025.34

Labour Rates Per

100 Rft

Rs.

1,219.47

Per Meter : Rs 132.03


Per Meter : Rs 40.00

2,176

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-01-a-02

(British) :

100 Rft

Tega formed of pacca bricks on end, laid in and over c/s mortar :
3" thick : Ratio 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.600

Bag

490.00

Sand

3.049

Cft

2,200.00

Burnt Brick

200.064

No

8,500.00

TOTAL

MATERIAL

Bag

294.15

100 Cft

67.07

1,000 No

1,700.54

50.91

2,061.77

LABOUR
Mason

0.250

Day

900.00

Day

225.27

Coolie

1.000

Day

500.00

Day

500.15

Bhishti

0.500

Day

500.00

Day

250.15

29.27

27.09

1,004.85

22

668.22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

3,734.83

Labour Rates Per

100 Rft

Rs.

1,219.47

Per Meter : Rs 122.50


Per Meter : Rs 40.00

2,177

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-01-b-01

(British) :

100 Rft

Tega formed of pacca bricks on end, laid in and over c/s mortar :
4.5" thick : Ratio 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.097

Bag

490.00

Sand

3.220

Cft

2,200.00

Burnt Brick

253.000

No

8,500.00

TOTAL

MATERIAL

Bag

537.53

100 Cft

70.84

1,000 No

2,150.50

54.11

2,758.87

LABOUR
Mason

0.350

Day

900.00

Day

315.00

Coolie

1.000

Day

500.00

Day

500.15

Bhishti

0.500

Day

500.00

Day

250.15

31.96

23.89

1,097.26

22

841.32

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

4,697.45

Labour Rates Per

100 Rft

Rs.

1,331.63

Per Meter : Rs 154.08


Per Meter : Rs 43.68

2,178

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-01-b-02

(British) :

100 Rft

Tega formed of pacca bricks on end, laid in and over c/s mortar :
4.5" thick : Ratio 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.750

Bag

490.00

Sand

5.000

Cft

2,200.00

Burnt Brick

253.000

No

8,500.00

TOTAL

MATERIAL

Bag

367.50

100 Cft

110.00

1,000 No

2,150.50

53.37

2,628.00

LABOUR
Mason

0.350

Day

900.00

Day

315.00

Coolie

1.000

Day

500.00

Day

500.15

Bhishti

0.500

Day

500.00

Day

250.15

31.96

24.63

1,097.26

22

812.53

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

4,537.79

Labour Rates Per

100 Rft

Rs.

1,331.63

Per Meter : Rs 148.84


Per Meter : Rs 43.68

2,179

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-02-a

(British) :

100 Sft

Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on


sides of drains etc : Ratio 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.501

Bag

490.00

Sand

5.576

Cft

2,200.00

Burnt Brick

338.104

No

8,500.00

TOTAL

MATERIAL

Bag

735.27

100 Cft

122.68

1,000 No

2,873.88

55.62

3,731.83

LABOUR
Mason

0.750

Day

900.00

Day

675.25

Coolie

1.000

Day

500.00

Day

500.19

Bhishti

0.250

Day

500.00

Day

125.05

39.01

22.38

1,339.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,178.44

Per SQM : Rs 664.80

Labour Rates Per

100 Sft

Rs.

1,625.60

Per SQM : Rs 174.92

1,107.11

2,180

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-02-b

(British) :

100 Sft

Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on


sides of drains etc : Ratio 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.000

Bag

490.00

Sand

5.905

Cft

2,200.00

Burnt Brick

338.104

No

8,500.00

TOTAL

MATERIAL

Bag

490.18

100 Cft

129.91

1,000 No

2,873.88

54.66

3,493.98

LABOUR
Mason

0.750

Day

900.00

Day

675.25

Coolie

1.000

Day

500.00

Day

500.19

Bhishti

0.250

Day

500.00

Day

125.05

39.01

23.34

1,339.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,888.26

Per SQM : Rs 633.58

Labour Rates Per

100 Sft

Rs.

1,625.60

Per SQM : Rs 174.92

1,054.78

2,181

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-02-c

(British) :

100 Sft

Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on


sides of drains etc : Ratio 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.860

Bag

490.00

Sand

5.905

Cft

2,200.00

Burnt Brick

338.104

No

8,500.00

TOTAL

MATERIAL

Bag

421.55

100 Cft

129.91

1,000 No

2,873.88

54.36

3,425.35

LABOUR
Mason

0.750

Day

900.00

Day

675.25

Coolie

1.000

Day

500.00

Day

500.19

Bhishti

0.250

Day

500.00

Day

125.05

39.01

23.64

1,339.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

5,804.53

Per SQM : Rs 624.57

Labour Rates Per

100 Sft

Rs.

1,625.60

Per SQM : Rs 174.92

1,039.68

2,182

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-03-a

(British) :

100 Sft

Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides


of drains etc : Ratio 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

2.251

Bag

490.00

Sand

8.201

Cft

2,200.00

Burnt Brick

506.227

No

8,500.00

TOTAL

MATERIAL

Bag

1,102.91

100 Cft

180.42

1,000 No

4,302.93

59.42

5,586.26

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.300

Day

500.00

Day

650.23

Bhishti

0.280

Day

500.00

Day

140.06

43.96

18.58

1,509.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,646.85

Per SQM : Rs 930.40

Labour Rates Per

100 Sft

Rs.

1,831.61

Per SQM : Rs 197.08

1,551.34

2,183

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-03-b

(British) :

100 Sft

Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides


of drains etc : Ratio 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.496

Bag

490.00

Sand

9.185

Cft

2,200.00

Burnt Brick

506.180

No

8,500.00

TOTAL

MATERIAL

Bag

733.04

100 Cft

202.07

1,000 No

4,302.53

58.60

5,237.64

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.300

Day

500.00

Day

650.23

Bhishti

0.280

Day

500.00

Day

140.06

43.96

19.40

1,509.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,221.53

Per SQM : Rs 884.64

Labour Rates Per

100 Sft

Rs.

1,831.61

Per SQM : Rs 197.08

1,474.64

2,184

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-03-c

(British) :

100 Sft

Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides


of drains etc : Ratio 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.282

Bag

490.00

Sand

9.185

Cft

2,200.00

Burnt Brick

506.227

No

8,500.00

TOTAL

MATERIAL

Bag

628.18

100 Cft

202.07

1,000 No

4,302.93

58.35

5,133.18

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

1.300

Day

500.00

Day

650.23

Bhishti

0.280

Day

500.00

Day

140.06

43.96

19.65

1,509.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

8,094.09

Per SQM : Rs 870.92

Labour Rates Per

100 Sft

Rs.

1,831.61

Per SQM : Rs 197.08

1,451.66

2,185

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-04-a

(British) :

100 Sft

Pacca flat brick, Herring bond pitching in c/s mortar laid to line,
grade, slope etc : Ratio 1:3

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.701

Bag

490.00

Sand

6.233

Cft

2,200.00

Burnt Brick

380.112

No

8,500.00

TOTAL

MATERIAL

Bag

833.32

100 Cft

137.13

1,000 No

3,230.95

58.06

4,201.39

LABOUR
Mason

0.650

Day

900.00

Day

585.25

Coolie

1.000

Day

500.00

Day

500.19

Bhishti

0.280

Day

500.00

Day

140.06

36.76

19.94

1,262.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,657.57

Per SQM : Rs 716.35

Labour Rates Per

100 Sft

Rs.

1,531.87

Per SQM : Rs 164.83

1,193.91

2,186

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-04-b

(British) :

100 Sft

Pacca flat brick, Herring bond pitching in c/s mortar laid to line,
grade, slope etc : Ratio 1:5

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.125

Bag

490.00

Sand

6.889

Cft

2,200.00

Burnt Brick

380.112

No

8,500.00

TOTAL

MATERIAL

Bag

551.48

100 Cft

151.56

1,000 No

3,230.95

57.19

3,933.98

LABOUR
Mason

0.650

Day

900.00

Day

585.25

Coolie

1.000

Day

500.00

Day

500.19

Bhishti

0.280

Day

500.00

Day

140.06

36.76

20.81

1,262.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,331.33

Per SQM : Rs 681.25

Labour Rates Per

100 Sft

Rs.

1,531.87

Per SQM : Rs 164.83

1,135.08

2,187

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-04-c

(British) :

100 Sft

Pacca flat brick, Herring bond pitching in c/s mortar laid to line,
grade, slope etc : Ratio 1:6

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.000

Bag

490.00

Sand

6.987

Cft

2,200.00

Burnt Brick

380.112

No

8,500.00

TOTAL

MATERIAL

Bag

490.18

100 Cft

153.71

1,000 No

3,230.95

56.98

3,874.84

LABOUR
Mason

0.650

Day

900.00

Day

585.25

Coolie

1.000

Day

500.00

Day

500.19

Bhishti

0.280

Day

500.00

Day

140.06

36.76

21.02

1,262.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Sft

Rs.

6,259.18

Per SQM : Rs 673.49

Labour Rates Per

100 Sft

Rs.

1,531.87

Per SQM : Rs 164.83

1,122.07

2,188

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-a

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type I

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

6.646

Bag

490.00

Sand

18.295

Cft

Crushed Aggregate

37.667

Cft

TOTAL

Bag

3,256.54

2,200.00

100 Cft

402.49

2,800.00

100 Cft

1,054.68

MATERIAL

59.21

4,713.71

LABOUR
Mason

0.262

Day

900.00

Day

235.70

Coolie

1.768

Day

500.00

Day

884.00

Bhishti

0.274

Day

500.00

Day

137.00

37.70

18.79

1,294.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

7,321.60

Labour Rates Per

100 Rft

Rs.

1,570.88

1,313.49

Per Meter : Rs 240.15


Per Meter : Rs 51.52

2,189

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-b

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type II

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

14.542

Bag

490.00

Sand

48.429

Cft

Crushed Aggregate

96.859

Cft

TOTAL

Bag

7,125.58

2,200.00

100 Cft

1,065.44

2,800.00

100 Cft

2,712.05

MATERIAL

57.99

10,903.07

LABOUR
Mason

0.640

Day

900.00

Day

576.00

Coolie

4.512

Day

500.00

Day

2,256.00

Bhishti

0.731

Day

500.00

Day

365.50

95.93

20.01

3,293.43

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

17,298.62

Labour Rates Per

100 Rft

Rs.

3,996.88

3,102.13

Per Meter : Rs 567.39


Per Meter : Rs 131.10

2,190

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-c

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type III

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

18.356

Bag

490.00

Sand

61.344

Cft

Crushed Aggregate

123.760

Cft

TOTAL

Bag

8,994.64

2,200.00

100 Cft

1,349.57

2,800.00

100 Cft

3,465.28

MATERIAL

57.95

13,809.48

LABOUR
Mason

0.823

Day

900.00

Day

740.70

Coolie

5.701

Day

500.00

Day

2,850.50

Bhishti

0.945

Day

500.00

Day

472.50

121.91

20.05

4,185.61

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

21,927.20

Labour Rates Per

100 Rft

Rs.

5,079.62

3,932.10

Per Meter : Rs 719.21


Per Meter : Rs 166.61

2,191

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-d

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type IV

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

18.466

Bag

490.00

Bag

9,048.57

Sand

66.725

Cft

2,200.00

100 Cft

1,467.95

Crushed Aggregate

134.527

Cft

2,800.00

100 Cft

3,766.76

Brick Tile (12"x6"x2")

200.670

No

14,000.00

TOTAL

MATERIAL

2,809.38

1,000 No

59.71

17,092.65

LABOUR
Mason

0.884

Day

900.00

Day

795.60

Coolie

6.159

Day

500.00

Day

3,079.42

Bhishti

1.006

Day

500.00

Day

503.00

131.34

18.29

4,509.36

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

26,325.56

Labour Rates Per

100 Rft

Rs.

5,472.53

4,723.55

Per Meter : Rs 863.48


Per Meter : Rs 179.50

2,192

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-e

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type V

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

23.541

Bag

490.00

Bag

11,535.17

Sand

90.400

Cft

2,200.00

100 Cft

1,988.80

Crushed Aggregate

180.804

Cft

2,800.00

100 Cft

5,062.51

Brick Tile (12"x6"x2")

300.091

No

14,000.00

TOTAL

MATERIAL

4,201.28

1,000 No

59.64

22,787.76

LABOUR
Mason

1.189

Day

900.00

Day

1,070.10

Coolie

8.231

Day

500.00

Day

4,115.50

Bhishti

1.371

Day

500.00

Day

685.50

176.13

18.36

6,047.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

35,139.94

Labour Rates Per

100 Rft

Rs.

7,338.88

6,304.95

Per Meter : Rs 1,152.59


Per Meter : Rs 240.72

2,193

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-f

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type VI

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

25.277

Bag

490.00

Bag

12,385.50

Sand

102.744

Cft

2,200.00

100 Cft

2,260.37

Crushed Aggregate

205.488

Cft

2,800.00

100 Cft

5,753.66

Brick Tile (12"x6"x2")

400.122

No

14,000.00

TOTAL

MATERIAL

5,601.71

1,000 No

59.75

26,001.23

LABOUR
Mason

1.359

Day

900.00

Day

1,222.96

Coolie

9.298

Day

500.00

Day

4,649.00

Bhishti

1.524

Day

500.00

Day

762.00

199.02

18.25

6,832.98

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

40,013.94

Labour Rates Per

100 Rft

Rs.

8,292.45

7,179.74

Per Meter : Rs 1,312.46


Per Meter : Rs 271.99

2,194

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-g

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type VII

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

25.276

Bag

490.00

Bag

12,385.05

Sand

104.573

Cft

2,200.00

100 Cft

2,300.61

Crushed Aggregate

209.146

Cft

2,800.00

100 Cft

5,856.10

Brick Tile (12"x6"x2")

500.152

No

14,000.00

TOTAL

MATERIAL

7,002.13

1,000 No

60.26

27,543.89

LABOUR
Mason

1.371

Day

900.00

Day

1,233.90

Coolie

9.451

Day

500.00

Day

4,725.50

Bhishti

1.554

Day

500.00

Day

777.00

202.09

17.74

6,938.49

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

42,024.05

Labour Rates Per

100 Rft

Rs.

8,420.50

7,541.66

Per Meter : Rs 1,378.39


Per Meter : Rs 276.19

2,195

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-h

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type VIII

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

37.286

Bag

490.00

Bag

18,270.14

Sand

157.124

Cft

2,200.00

100 Cft

3,456.73

Crushed Aggregate

314.256

Cft

2,800.00

100 Cft

8,799.17

Brick Tile (12"x6"x2")

750.213

No

14,000.00

TOTAL

MATERIAL

10,502.98

1,000 No

60.13

41,029.02

LABOUR
Mason

2.076

Day

900.00

Day

1,868.05

Coolie

14.207

Day

500.00

Day

7,103.50

Bhishti

2.347

Day

500.00

Day

1,173.50

304.35

17.87

10,449.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

62,736.71

Labour Rates Per

100 Rft

Rs.

12,681.31

11,258.29

Per Meter : Rs 2,057.76


Per Meter : Rs 415.95

2,196

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-i

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type IX

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

43.485

Bag

490.00

Bag

21,307.83

Sand

178.652

Cft

2,200.00

100 Cft

3,930.34

Crushed Aggregate

357.300

Cft

2,800.00

100 Cft

10,004.40

Brick Tile (12"x6"x2")

750.213

No

14,000.00

TOTAL

MATERIAL

10,502.98

1,000 No

59.86

45,745.55

LABOUR
Mason

2.347

Day

900.00

Day

2,112.30

Coolie

16.230

Day

500.00

Day

8,115.09

Bhishti

2.682

Day

500.00

Day

1,341.00

347.05

18.14

11,915.44

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

70,270.06

Labour Rates Per

100 Rft

Rs.

14,460.49

12,609.07

Per Meter : Rs 2,304.86


Per Meter : Rs 474.30

2,197

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-j

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type X

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

46.097

Bag

490.00

Bag

22,587.53

Sand

192.643

Cft

2,200.00

100 Cft

4,238.15

Crushed Aggregate

385.286

Cft

2,800.00

100 Cft

10,788.01

Brick Tile (12"x6"x2")

1350.411

No

14,000.00

TOTAL

MATERIAL

18,905.75

1,000 No

61.44

56,519.44

LABOUR
Mason

2.547

Day

900.00

Day

2,291.98

Coolie

17.463

Day

500.00

Day

8,731.40

Bhishti

2.911

Day

500.00

Day

1,455.49

374.37

16.56

12,853.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

84,552.30

Labour Rates Per

100 Rft

Rs.

15,598.59

15,179.63

Per Meter : Rs 2,773.32


Per Meter : Rs 511.63

2,198

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-k

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type XI

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

48.902

Bag

490.00

Bag

23,961.98

Sand

210.366

Cft

2,200.00

100 Cft

4,628.05

Crushed Aggregate

422.350

Cft

2,800.00

100 Cft

11,825.80

Brick Tile (12"x6"x2")

1350.411

No

14,000.00

TOTAL

MATERIAL

18,905.75

1,000 No

60.98

59,321.58

LABOUR
Mason

2.774

Day

900.00

Day

2,496.60

Coolie

19.120

Day

500.00

Day

9,560.06

Bhishti

3.170

Day

500.00

Day

1,585.00

409.25

17.02

14,050.91

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

89,424.41

Labour Rates Per

100 Rft

Rs.

17,052.07

16,051.91

Per Meter : Rs 2,933.12


Per Meter : Rs 559.31

2,199

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-05-l

(British) :

100 Rft

Construct Punjab standard drains, of cement concrete 1:1.5:3,


complete : Type XII

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

49.847

Bag

490.00

Bag

24,425.03

Sand

215.243

Cft

2,200.00

100 Cft

4,735.35

Crushed Aggregate

431.564

Cft

2,800.00

100 Cft

12,083.79

Brick Tile (12"x6"x2")

1400.427

No

14,000.00

TOTAL

MATERIAL

19,605.98

1,000 No

61.02

60,850.14

LABOUR
Mason

2.835

Day

900.00

Day

2,551.50

Coolie

19.555

Day

500.00

Day

9,777.59

Bhishti

3.231

Day

500.00

Day

1,615.50

418.34

16.98

14,362.93

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

91,667.91

Labour Rates Per

100 Rft

Rs.

17,430.74

16,454.84

Per Meter : Rs 3,006.71


Per Meter : Rs 571.73

2,200

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-06-a

(British) :

100 Rft

Laying RC hume pipes in position including jointing 6" to 12" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.610

Bag

490.00

Sand

3.121

Cft

2,200.00

TOTAL

Bag

298.90

100 Cft

68.66

3.62

MATERIAL

367.56

LABOUR
Mason

2.501

Day

900.00

Day

2,250.82

Coolie

10.003

Day

500.00

Day

5,001.52

217.57

74.38

7,469.92

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

9,513.86

Labour Rates Per

100 Rft

Rs.

9,065.44

1,676.38

Per Meter : Rs 312.05


Per Meter : Rs 297.35

2,201

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-06-b

(British) :

100 Rft

Laying RC hume pipes in position including jointing 12" to 24" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.250

Bag

490.00

Sand

6.000

Cft

2,200.00

TOTAL

Bag

612.65

100 Cft

132.00

4.75

MATERIAL

744.65

LABOUR
Mason

2.501

Day

900.00

Day

2,250.82

Coolie

17.518

Day

500.00

Day

8,758.84

330.29

73.25

11,339.95

22

2,585.95

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

14,670.55

Labour Rates Per

100 Rft

Rs.

13,762.08

Per Meter : Rs 481.19


Per Meter : Rs 451.40

2,202

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 22 , SURFACE DRAINAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

22-06-c

(British) :

100 Rft

Laying RC hume pipes in position including jointing 24" to 36" dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.876

Bag

490.00

Sand

9.363

Cft

2,200.00

TOTAL

Bag

919.05

100 Cft

205.99

5.39

MATERIAL

1,125.03

LABOUR
Mason

5.002

Day

900.00

Day

4,501.37

Coolie

20.060

Day

500.00

Day

10,030.00

435.94

72.61

14,967.31

22

3,444.41

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

100 Rft

Rs.

19,536.76

Labour Rates Per

100 Rft

Rs.

18,164.22

Per Meter : Rs 640.81


Per Meter : Rs 595.79

2,203

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-01-a

(British) :

Rft

Providing and Laying RCC pipe, moulded with cement concrete


1:1.5:3, including cost of reinforcement, testing etc : 4" dia:

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 4" BS-5911 "L"

85.00

RFT

TOTAL

MATERIAL

RFT

85.00

40.50

85.00

LABOUR
Coolie

0.099

Day

500.00

Day

49.54

Fitter II

0.038

Day

600.00

Day

22.87

2.17

37.50

74.58

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

194.21

Labour Rates Per

Rft

Rs.

90.51

LABOUR

34.63

Per Meter : Rs 637.01


Per Meter : Rs 296.87

2,204

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-01-b

(British) :

Rft

Providing and Laying RCC pipe, moulded with cement concrete


1:1.5:3, including cost of reinforcement, testing etc : 6" dia:

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 6" BS-5911 "L"

95.00

RFT

TOTAL

MATERIAL

RFT

95.00

40.89

95.00

LABOUR
Coolie

0.099

Day

500.00

Day

49.54

Fitter II

0.050

Day

600.00

Day

29.73

2.38

37.11

81.65

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

214.99

Labour Rates Per

Rft

Rs.

99.09

LABOUR

38.34

Per Meter : Rs 705.15


Per Meter : Rs 325.00

2,205

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-01-c

(British) :

Rft

Providing and Laying RCC pipe, moulded with cement concrete


1:1.5:3, including cost of reinforcement, testing etc : 9" dia:

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 9" BS-5911 "L"

115.00

RFT

TOTAL

MATERIAL

RFT

115.00

41.02

115.00

LABOUR
Coolie

0.145

Day

500.00

Day

72.41

Fitter II

0.038

Day

600.00

Day

22.87

2.86

36.98

98.13

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

259.39

Labour Rates Per

Rft

Rs.

119.09

LABOUR

46.26

Per Meter : Rs 850.81


Per Meter : Rs 390.62

2,206

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-02-a

(British) :

Rft

Providing and Laying non-reinforced concrete pipe, moulded with


cement concrete 1:1.5:3 complete : 4" internal diameter

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe CC 4" ASTM Class-2

100.00

RFT

TOTAL

MATERIAL

RFT

100.00

46.59

100.00

LABOUR
Coolie

0.076

Day

500.00

Day

38.11

Fitter II

0.038

Day

600.00

Day

22.87

1.83

31.41

62.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

198.22

Labour Rates Per

Rft

Rs.

76.22

LABOUR

35.41

Per Meter : Rs 650.16


Per Meter : Rs 250.00

2,207

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-02-b

(British) :

Rft

Providing and Laying non-reinforced concrete pipe, moulded with


cement concrete 1:1.5:3 complete : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe CC 6" ASTM Class-2

125.00

RFT

TOTAL

MATERIAL

RFT

125.00

45.90

125.00

LABOUR
Coolie

0.099

Day

500.00

Day

49.54

Fitter II

0.050

Day

600.00

Day

29.73

2.38

32.10

81.65

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

251.59

Labour Rates Per

Rft

Rs.

99.09

LABOUR

44.94

Per Meter : Rs 825.20


Per Meter : Rs 325.00

2,208

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-02-c

(British) :

Rft

Providing and Laying non-reinforced concrete pipe, moulded with


cement concrete : 9" i/d wall thickness 1".

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe CC 9" ASTM Class-2

162.50

RFT

TOTAL

MATERIAL

RFT

162.50

43.78

162.50

LABOUR
Coolie

0.145

Day

500.00

Day

72.41

Fitter II

0.072

Day

600.00

Day

43.45

3.48

34.22

119.33

22

61.24

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

343.07

Labour Rates Per

Rft

Rs.

144.82

LABOUR

Per Meter : Rs 1,125.26


Per Meter : Rs 475.00

2,209

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-01

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 12" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 12" Class-II "B"

250.00

RFT

TOTAL

MATERIAL

RFT

250.00

41.84

250.00

LABOUR
Coolie

0.248

Day

500.00

Day

123.86

Fitter II

0.124

Day

600.00

Day

74.31

5.95

36.16

204.12

22

98.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

552.71

Labour Rates Per

Rft

Rs.

247.71

LABOUR

Per Meter : Rs 1,812.90


Per Meter : Rs 812.50

2,210

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-02

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 15" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 15" Class-II "B"

337.50

RFT

TOTAL

MATERIAL

RFT

337.50

43.54

337.50

LABOUR
Coolie

0.305

Day

500.00

Day

152.44

Fitter II

0.152

Day

600.00

Day

91.46

7.32

34.46

251.22

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

716.63

Labour Rates Per

Rft

Rs.

304.88

LABOUR

127.91

Per Meter : Rs 2,350.54


Per Meter : Rs 1,000.00

2,211

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-03

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 18" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 18" Class-II "B"

400.00

RFT

TOTAL

MATERIAL

RFT

400.00

43.03

400.00

LABOUR
Coolie

0.372

Day

500.00

Day

185.79

Fitter II

0.186

Day

600.00

Day

111.47

8.92

34.97

306.17

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

859.57

Labour Rates Per

Rft

Rs.

371.57

LABOUR

153.40

Per Meter : Rs 2,819.39


Per Meter : Rs 1,218.75

2,212

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-04

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 21" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 21" Class-II "B"

475.00

RFT

TOTAL

MATERIAL

RFT

475.00

42.82

475.00

LABOUR
Coolie

0.429

Day

500.00

Day

214.37

Fitter II

0.238

Day

600.00

Day

142.68

10.71

35.18

367.76

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,025.81

Labour Rates Per

Rft

Rs.

446.31

183.05

Per Meter : Rs 3,364.67


Per Meter : Rs 1,463.91

2,213

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-05

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 24" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 24" Class-II "B"

537.50

RFT

TOTAL

MATERIAL

RFT

537.50

43.17

537.50

LABOUR
Coolie

0.495

Day

500.00

Day

247.71

Fitter II

0.248

Day

600.00

Day

148.63

11.89

34.83

408.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,151.18

Labour Rates Per

Rft

Rs.

495.43

205.45

Per Meter : Rs 3,775.86


Per Meter : Rs 1,625.00

2,214

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-06

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 27" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 27" Class-II "B"

687.50

RFT

TOTAL

MATERIAL

RFT

687.50

42.23

687.50

LABOUR
Coolie

0.667

Day

500.00

Day

333.31

Fitter II

0.333

Day

600.00

Day

200.08

16.00

35.77

549.39

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,505.48

Labour Rates Per

Rft

Rs.

666.73

268.59

Per Meter : Rs 4,937.98


Per Meter : Rs 2,186.88

2,215

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-07

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 30" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 30" Class-II "B"

812.50

RFT

TOTAL

MATERIAL

RFT

812.50

43.31

812.50

LABOUR
Coolie

0.743

Day

500.00

Day

371.57

Fitter II

0.372

Day

600.00

Day

222.94

17.84

34.69

612.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,734.39

Labour Rates Per

Rft

Rs.

743.14

309.54

Per Meter : Rs 5,688.80


Per Meter : Rs 2,437.50

2,216

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-08

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 33" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 33" Class-II "B"

1,075.00

RFT

TOTAL

MATERIAL

RFT

1,075.00

46.80

1,075.00

LABOUR
Coolie

0.810

Day

500.00

Day

404.92

Fitter II

0.405

Day

600.00

Day

242.95

19.44

31.20

667.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,121.33

Labour Rates Per

Rft

Rs.

809.83

379.03

Per Meter : Rs 6,957.97


Per Meter : Rs 2,656.25

2,217

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-09

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 36" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 36" Class-II "B"

1,250.00

RFT

TOTAL

MATERIAL

RFT

1,250.00

47.87

1,250.00

LABOUR
Coolie

0.885

Day

500.00

Day

442.42

Fitter II

0.443

Day

600.00

Day

265.82

21.25

30.13

729.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,410.29

Labour Rates Per

Rft

Rs.

885.29

430.81

Per Meter : Rs 7,905.75


Per Meter : Rs 2,903.75

2,218

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-10

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 42" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 42" Class-II "B"

1,625.00

RFT

TOTAL

MATERIAL

RFT

1,625.00

47.99

1,625.00

LABOUR
Coolie

1.143

Day

500.00

Day

571.65

Fitter II

0.572

Day

600.00

Day

342.99

27.44

30.01

942.07

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,125.79

Labour Rates Per

Rft

Rs.

1,143.29

558.72

Per Meter : Rs 10,252.60


Per Meter : Rs 3,750.00

2,219

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-11

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 48" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 48" Class-II "B"

2,125.00

RFT

TOTAL

MATERIAL

RFT

2,125.00

50.17

2,125.00

LABOUR
Coolie

1.315

Day

500.00

Day

657.39

Fitter II

0.657

Day

600.00

Day

394.44

31.56

27.83

1,083.39

22

698.90

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,907.29

Labour Rates Per

Rft

Rs.

1,314.79

Per Meter : Rs 12,815.92


Per Meter : Rs 4,312.52

2,220

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-12

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 54" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 54" Class-II "B"

2,625.00

RFT

TOTAL

MATERIAL

RFT

2,625.00

49.26

2,625.00

LABOUR
Coolie

1.715

Day

500.00

Day

857.47

Fitter II

0.857

Day

600.00

Day

514.48

41.16

28.74

1,413.11

22

879.33

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,917.44

Labour Rates Per

Rft

Rs.

1,714.94

Per Meter : Rs 16,129.20


Per Meter : Rs 5,625.00

2,221

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-13

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 60" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 60" Class-II "B"

3,750.00

RFT

TOTAL

MATERIAL

RFT

3,750.00

49.86

3,750.00

LABOUR
Coolie

2.363

Day

500.00

Day

1,181.40

Fitter II

1.181

Day

600.00

Day

708.84

56.71

28.14

1,946.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

6,937.80

Labour Rates Per

Rft

Rs.

2,362.80

1,240.85

Per Meter : Rs 22,756.00


Per Meter : Rs 7,750.00

2,222

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-14

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 66" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 66" Class-II "B"

4,600.00

RFT

TOTAL

MATERIAL

RFT

4,600.00

47.93

4,600.00

LABOUR
Coolie

3.257

Day

500.00

Day

1,628.62

Fitter II

1.615

Day

600.00

Day

968.94

77.93

30.07

2,675.49

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

8,858.95

Labour Rates Per

Rft

Rs.

3,246.95

1,583.46

Per Meter : Rs 29,057.36


Per Meter : Rs 10,650.00

2,223

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-a-15

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class II : 72" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 72" Class-II "B"

6,000.00

RFT

TOTAL

MATERIAL

RFT

6,000.00

47.22

6,000.00

LABOUR
Coolie

4.411

Day

500.00

Day

2,205.60

Fitter II

2.206

Day

600.00

Day

1,323.36

105.87

30.78

3,634.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

11,731.21

Labour Rates Per

Rft

Rs.

4,411.21

2,096.37

Per Meter : Rs 38,478.35


Per Meter : Rs 14,468.75

2,224

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-01

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 12" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 12" Class-III B

275.00

RFT

TOTAL

MATERIAL

RFT

275.00

43.59

275.00

LABOUR
Coolie

0.248

Day

500.00

Day

123.86

Fitter II

0.124

Day

600.00

Day

74.31

5.95

34.41

204.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

583.21

Labour Rates Per

Rft

Rs.

247.71

LABOUR

104.10

Per Meter : Rs 1,912.94


Per Meter : Rs 812.50

2,225

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-02

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 15" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 15" Class-III B

375.00

RFT

TOTAL

MATERIAL

RFT

375.00

45.44

375.00

LABOUR
Coolie

0.305

Day

500.00

Day

152.44

Fitter II

0.152

Day

600.00

Day

91.46

7.32

32.56

251.22

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

762.38

Labour Rates Per

Rft

Rs.

304.88

LABOUR

136.16

Per Meter : Rs 2,500.60


Per Meter : Rs 1,000.00

2,226

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-03

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 18" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 18" Class-III B

475.00

RFT

TOTAL

MATERIAL

RFT

475.00

46.13

475.00

LABOUR
Coolie

0.372

Day

500.00

Day

185.79

Fitter II

0.186

Day

600.00

Day

111.47

8.92

31.87

306.17

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

951.07

Labour Rates Per

Rft

Rs.

371.57

LABOUR

169.90

Per Meter : Rs 3,119.51


Per Meter : Rs 1,218.75

2,227

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-04

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 21" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 21" Class-III B

600.00

RFT

TOTAL

MATERIAL

RFT

600.00

47.04

600.00

LABOUR
Coolie

0.429

Day

500.00

Day

214.37

Fitter II

0.237

Day

600.00

Day

142.34

10.70

30.96

367.41

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,177.89

Labour Rates Per

Rft

Rs.

445.89

210.48

Per Meter : Rs 3,863.46


Per Meter : Rs 1,462.50

2,228

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-05

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 24" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 24" Class-III B

687.50

RFT

TOTAL

MATERIAL

RFT

687.50

47.57

687.50

LABOUR
Coolie

0.495

Day

500.00

Day

247.71

Fitter II

0.248

Day

600.00

Day

148.63

11.89

30.43

408.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,334.18

Labour Rates Per

Rft

Rs.

495.43

238.45

Per Meter : Rs 4,376.10


Per Meter : Rs 1,625.00

2,229

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-06

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 27" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 27" Class-III B

875.00

RFT

TOTAL

MATERIAL

RFT

875.00

46.59

875.00

LABOUR
Coolie

0.667

Day

500.00

Day

333.46

Fitter II

0.334

Day

600.00

Day

200.12

16.01

31.41

549.59

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,734.48

Labour Rates Per

Rft

Rs.

666.98

309.89

Per Meter : Rs 5,689.09


Per Meter : Rs 2,187.69

2,230

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-07

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 30" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 30" Class-III B

1,125.00

RFT

TOTAL

MATERIAL

RFT

1,125.00

49.07

1,125.00

LABOUR
Coolie

0.743

Day

500.00

Day

371.57

Fitter II

0.372

Day

600.00

Day

222.94

17.84

28.93

612.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,115.64

Labour Rates Per

Rft

Rs.

743.14

378.29

Per Meter : Rs 6,939.30


Per Meter : Rs 2,437.50

2,231

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-08

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 33" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 33" Class-III B

1,400.00

RFT

TOTAL

MATERIAL

RFT

1,400.00

51.27

1,400.00

LABOUR
Coolie

0.810

Day

500.00

Day

404.92

Fitter II

0.405

Day

600.00

Day

242.95

19.44

26.73

667.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,517.83

Labour Rates Per

Rft

Rs.

809.83

450.53

Per Meter : Rs 8,258.49


Per Meter : Rs 2,656.25

2,232

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-09

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 36" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 36" Class-III B

1,450.00

RFT

TOTAL

MATERIAL

RFT

1,450.00

50.38

1,450.00

LABOUR
Coolie

0.886

Day

500.00

Day

442.99

Fitter II

0.443

Day

600.00

Day

265.79

21.26

27.62

730.04

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,654.98

Labour Rates Per

Rft

Rs.

885.98

474.93

Per Meter : Rs 8,708.32


Per Meter : Rs 2,906.00

2,233

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-10

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 42" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 42" Class-III B

2,000.00

RFT

TOTAL

MATERIAL

RFT

2,000.00

51.46

2,000.00

LABOUR
Coolie

1.143

Day

500.00

Day

571.65

Fitter II

0.572

Day

600.00

Day

342.99

27.44

26.54

942.07

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,583.29

Labour Rates Per

Rft

Rs.

1,143.29

641.22

Per Meter : Rs 11,753.20


Per Meter : Rs 3,750.00

2,234

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-11

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 48" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 48" Class-III B

2,500.00

RFT

TOTAL

MATERIAL

RFT

2,500.00

52.78

2,500.00

LABOUR
Coolie

1.315

Day

500.00

Day

657.39

Fitter II

0.658

Day

600.00

Day

394.81

31.57

25.22

1,083.77

22

781.48

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,365.25

Labour Rates Per

Rft

Rs.

1,315.25

Per Meter : Rs 14,318.02


Per Meter : Rs 4,314.02

2,235

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-12

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 54" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 54" Class-III B

3,200.00

RFT

TOTAL

MATERIAL

RFT

3,200.00

52.49

3,200.00

LABOUR
Coolie

1.715

Day

500.00

Day

857.47

Fitter II

0.857

Day

600.00

Day

514.48

41.16

25.51

1,413.11

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

5,618.94

Labour Rates Per

Rft

Rs.

1,714.94

1,005.83

Per Meter : Rs 18,430.12


Per Meter : Rs 5,625.00

2,236

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-13

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 60" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 60" Class-III B

4,000.00

RFT

TOTAL

MATERIAL

RFT

4,000.00

50.93

4,000.00

LABOUR
Coolie

2.363

Day

500.00

Day

1,181.40

Fitter II

1.181

Day

600.00

Day

708.84

56.71

27.07

1,946.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

7,242.80

Labour Rates Per

Rft

Rs.

2,362.80

1,295.85

Per Meter : Rs 23,756.40


Per Meter : Rs 7,750.00

2,237

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-14

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 66" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 66" Class-III B

5,300.00

RFT

TOTAL

MATERIAL

RFT

5,300.00

50.42

5,300.00

LABOUR
Coolie

3.230

Day

500.00

Day

1,614.90

Fitter II

1.615

Day

600.00

Day

968.94

77.52

27.58

2,661.36

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

9,695.80

Labour Rates Per

Rft

Rs.

3,229.80

1,734.45

Per Meter : Rs 31,802.23


Per Meter : Rs 10,593.75

2,238

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-b-15

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class III : 72" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 72" Class-III B

7,000.00

RFT

TOTAL

MATERIAL

RFT

7,000.00

49.86

7,000.00

LABOUR
Coolie

4.411

Day

500.00

Day

2,205.60

Fitter II

2.206

Day

600.00

Day

1,323.36

105.87

28.14

3,634.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

12,951.21

Labour Rates Per

Rft

Rs.

4,411.21

2,316.37

Per Meter : Rs 42,479.95


Per Meter : Rs 14,468.75

2,239

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-01

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 12" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 12" Class-IV "B"

300.00

RFT

TOTAL

MATERIAL

RFT

300.00

45.17

300.00

LABOUR
Coolie

0.248

Day

500.00

Day

123.86

Fitter II

0.124

Day

600.00

Day

74.31

5.95

32.83

204.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

613.71

Labour Rates Per

Rft

Rs.

247.71

LABOUR

109.60

Per Meter : Rs 2,012.98


Per Meter : Rs 812.50

2,240

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-02

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 15" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 15" Class-IV "B"

350.00

RFT

TOTAL

MATERIAL

RFT

350.00

44.20

350.00

LABOUR
Coolie

0.305

Day

500.00

Day

152.44

Fitter II

0.152

Day

600.00

Day

91.46

7.32

33.80

251.22

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

731.88

Labour Rates Per

Rft

Rs.

304.88

LABOUR

130.66

Per Meter : Rs 2,400.56


Per Meter : Rs 1,000.00

2,241

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-03

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 18" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 18" Class-IV "B"

480.00

RFT

TOTAL

MATERIAL

RFT

480.00

46.32

480.00

LABOUR
Coolie

0.372

Day

500.00

Day

185.79

Fitter II

0.186

Day

600.00

Day

111.47

8.92

31.68

306.17

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

957.17

Labour Rates Per

Rft

Rs.

371.57

LABOUR

171.00

Per Meter : Rs 3,139.52


Per Meter : Rs 1,218.75

2,242

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-04

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 21" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 21" Class-IV "B"

625.00

RFT

TOTAL

MATERIAL

RFT

625.00

47.75

625.00

LABOUR
Coolie

0.429

Day

500.00

Day

214.37

Fitter II

0.237

Day

600.00

Day

142.34

10.70

30.25

367.41

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,208.39

Labour Rates Per

Rft

Rs.

445.89

215.98

Per Meter : Rs 3,963.50


Per Meter : Rs 1,462.50

2,243

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-05

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 24" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 24" Class-IV "B"

1,000.00

RFT

TOTAL

MATERIAL

RFT

1,000.00

53.71

1,000.00

LABOUR
Coolie

0.495

Day

500.00

Day

247.71

Fitter II

0.248

Day

600.00

Day

148.63

11.89

24.29

408.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,715.43

Labour Rates Per

Rft

Rs.

495.43

307.20

Per Meter : Rs 5,626.60


Per Meter : Rs 1,625.00

2,244

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-06

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 27" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 27" Class-IV "B"

1,050.00

RFT

TOTAL

MATERIAL

RFT

1,050.00

49.73

1,050.00

LABOUR
Coolie

0.667

Day

500.00

Day

333.46

Fitter II

0.333

Day

600.00

Day

199.94

16.00

28.27

549.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,947.75

Labour Rates Per

Rft

Rs.

666.75

348.35

Per Meter : Rs 6,388.62


Per Meter : Rs 2,186.94

2,245

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-07

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 30" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 30" Class-IV "B"

1,300.00

RFT

TOTAL

MATERIAL

RFT

1,300.00

51.46

1,300.00

LABOUR
Coolie

0.743

Day

500.00

Day

371.57

Fitter II

0.372

Day

600.00

Day

222.94

17.84

26.54

612.35

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,329.14

Labour Rates Per

Rft

Rs.

743.14

416.79

Per Meter : Rs 7,639.58


Per Meter : Rs 2,437.50

2,246

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-08

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 33" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 33" Class-IV "B"

1,950.00

RFT

TOTAL

MATERIAL

RFT

1,950.00

56.30

1,950.00

LABOUR
Coolie

0.810

Day

500.00

Day

404.92

Fitter II

0.405

Day

600.00

Day

242.95

19.44

21.70

667.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,188.83

Labour Rates Per

Rft

Rs.

809.83

571.53

Per Meter : Rs 10,459.37


Per Meter : Rs 2,656.25

2,247

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-09

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 36" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 36" Class-IV "B"

2,100.00

RFT

TOTAL

MATERIAL

RFT

2,100.00

56.09

2,100.00

LABOUR
Coolie

0.884

Day

500.00

Day

442.07

Fitter II

0.443

Day

600.00

Day

265.79

21.24

21.91

729.10

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,446.83

Labour Rates Per

Rft

Rs.

884.83

617.73

Per Meter : Rs 11,305.61


Per Meter : Rs 2,902.25

2,248

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-10

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 42" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 42" Class-IV "B"

2,550.00

RFT

TOTAL

MATERIAL

RFT

2,550.00

55.20

2,550.00

LABOUR
Coolie

1.143

Day

500.00

Day

571.65

Fitter II

0.572

Day

600.00

Day

342.99

27.44

22.80

942.07

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,254.29

Labour Rates Per

Rft

Rs.

1,143.29

762.22

Per Meter : Rs 13,954.08


Per Meter : Rs 3,750.00

2,249

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-11

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 48" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 48" Class-IV "B"

3,300.00

RFT

TOTAL

MATERIAL

RFT

3,300.00

56.87

3,300.00

LABOUR
Coolie

1.315

Day

500.00

Day

657.39

Fitter II

0.658

Day

600.00

Day

394.81

31.57

21.13

1,083.77

22

957.48

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

5,341.25

Labour Rates Per

Rft

Rs.

1,315.25

Per Meter : Rs 17,519.30


Per Meter : Rs 4,314.02

2,250

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-12

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 54" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 54" Class-IV "B"

4,250.00

RFT

TOTAL

MATERIAL

RFT

4,250.00

56.70

4,250.00

LABOUR
Coolie

1.715

Day

500.00

Day

857.47

Fitter II

0.857

Day

600.00

Day

514.48

41.16

21.30

1,413.11

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

6,899.94

Labour Rates Per

Rft

Rs.

1,714.94

1,236.83

Per Meter : Rs 22,631.80


Per Meter : Rs 5,625.00

2,251

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-13

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 60" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 60" Class-IV "B"

5,400.00

RFT

TOTAL

MATERIAL

RFT

5,400.00

55.55

5,400.00

LABOUR
Coolie

2.363

Day

500.00

Day

1,181.40

Fitter II

1.181

Day

600.00

Day

708.84

56.71

22.45

1,946.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

8,950.80

Labour Rates Per

Rft

Rs.

2,362.80

1,603.85

Per Meter : Rs 29,358.64


Per Meter : Rs 7,750.00

2,252

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-14

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 66" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 66" Class-IV "B"

7,400.00

RFT

TOTAL

MATERIAL

RFT

7,400.00

55.59

7,400.00

LABOUR
Coolie

3.230

Day

500.00

Day

1,614.90

Fitter II

1.615

Day

600.00

Day

968.94

77.52

22.41

2,661.36

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

12,257.80

Labour Rates Per

Rft

Rs.

3,229.80

2,196.45

Per Meter : Rs 40,205.59


Per Meter : Rs 10,593.75

2,253

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-03-c-15

(British) :

Rft

Providing and Laying RCC pipe sewers complete As per ASTM C-76-79,
Class IV : 72" i/d, Wall B

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pipe RCC 72" Class-IV "B"

9,750.00

RFT

TOTAL

MATERIAL

RFT

9,750.00

55.07

9,750.00

LABOUR
Coolie

4.411

Day

500.00

Day

2,205.60

Fitter II

2.206

Day

600.00

Day

1,323.36

105.87

22.93

3,634.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

16,306.21

Labour Rates Per

Rft

Rs.

4,411.21

2,921.37

Per Meter : Rs 53,484.35


Per Meter : Rs 14,468.75

2,254

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-a

(British) :

Rft

Lowering of sub-soil water table by tubewells Upto 1 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.305

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

185.98

Labour Rates Per

Rft

Rs.

0.00

EQUIPMENT

Job

152.44

75.00

152.44

22

33.54

Per Meter : Rs 610.00


Per Meter : Rs 0.00

2,255

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-b

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 2 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
0.648

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

395.20

Labour Rates Per

Rft

Rs.

0.00

EQUIPMENT

Job

323.93

75.00

323.93

22

71.27

Per Meter : Rs 1,296.25


Per Meter : Rs 0.00

2,256

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-c

(British) :

Rft

Lowering of sub-soil water table by tubewell 0 - 3 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.021

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

623.02

Labour Rates Per

Rft

Rs.

0.00

EQUIPMENT

Job

510.67

75.00

510.67

22

112.35

Per Meter : Rs 2,043.50


Per Meter : Rs 0.00

2,257

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-d

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 4 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.418

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

864.79

Labour Rates Per

Rft

Rs.

0.00

EQUIPMENT

Job

708.84

75.00

708.84

22

155.95

Per Meter : Rs 2,836.50


Per Meter : Rs 0.00

2,258

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-e

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 5 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.860

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

1,134.45

Labour Rates Per

Rft

Rs.

0.00

Job

929.88

75.00

929.88

22

204.57

Per Meter : Rs 3,721.00


Per Meter : Rs 0.00

2,259

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-f

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 6 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
2.317

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

1,413.41

Labour Rates Per

Rft

Rs.

0.00

Job

1,158.54

75.00

1,158.54

22

254.88

Per Meter : Rs 4,636.00


Per Meter : Rs 0.00

2,260

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-g

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 7 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
2.744

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

1,673.78

Labour Rates Per

Rft

Rs.

0.00

Job

1,371.95

75.00

1,371.95

22

301.83

Per Meter : Rs 5,490.00


Per Meter : Rs 0.00

2,261

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-h

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 8 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
3.140

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

1,915.55

Labour Rates Per

Rft

Rs.

0.00

Job

1,570.12

75.00

1,570.12

22

345.43

Per Meter : Rs 6,283.00


Per Meter : Rs 0.00

2,262

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-i

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 9 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
3.567

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

2,175.91

Labour Rates Per

Rft

Rs.

0.00

Job

1,783.54

75.00

1,783.54

22

392.38

Per Meter : Rs 7,137.00


Per Meter : Rs 0.00

2,263

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-j

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 10 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
4.207

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

2,566.46

Labour Rates Per

Rft

Rs.

0.00

Job

2,103.66

75.00

2,103.66

22

462.80

Per Meter : Rs 8,418.00


Per Meter : Rs 0.00

2,264

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-k

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 11 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
4.451

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

2,715.24

Labour Rates Per

Rft

Rs.

0.00

Job

2,225.61

75.00

2,225.61

22

489.63

Per Meter : Rs 8,906.00


Per Meter : Rs 0.00

2,265

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-04-l

(British) :

Rft

Lowering of sub-soil water table by tubewells 0 - 12 ft below SSWL

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
4.878

Dewatering Equipment comp

500.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

2,975.61

Labour Rates Per

Rft

Rs.

0.00

Job

2,439.02

75.00

2,439.02

22

536.59

Per Meter : Rs 9,760.00


Per Meter : Rs 0.00

2,266

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-05-a

(British) :

Constructing gully grating chamber complete With CI


trap,weighing 81 lbs. frame hinged

Detail

Qty

Unit

Each

gully

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.600

Bag

490.00

Bag

294.00

Sand

3.500

Cft

2,200.00

100 Cft

77.00

Crushed Aggregate

3.500

Cft

2,800.00

100 Cft

98.00

Steel (bars/rods/section)

2.490

Kg

82.00

Burnt Brick

100.000

No

8,500.00

Wood - Shishim

0.074

Cft

1,800.00

Cft

C.I. gully Trap (81lbs)

36.741

Kg

85.00

Kg

TOTAL

MATERIAL

Kg

204.18

1,000 No

850.00

133.20
3,122.99

58.33

4,779.37

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.566

Day

500.00

Day

783.00

Bhishti

0.250

Day

500.00

Day

125.00

Black Smith

0.005

Day

900.00

Day

4.50

Hammer Man

0.005

Day

700.00

Day

3.50

40.98

19.67

1,406.98

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,351.98

Composite Rates Per

Each

Rs.

7,538.33

Cost Per Each: 7,538.33

Labour Rates Per

Each

Rs.

1,707.50

Cost Per Each: 1,707.50

2,267

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-05-b

(British) :

Each

Constructing gully grating chamber complete Concrete gully trap

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.400

Bag

490.00

Bag

196.00

Sand

2.300

Cft

2,200.00

100 Cft

50.60

Crushed Aggregate

2.200

Cft

2,800.00

100 Cft

61.60

Steel (bars/rods/section)

18.200

Kg

82.00

Burnt Brick

52.000

No

8,500.00

Wood - Shishim

0.160

Cft

1,800.00

TOTAL

MATERIAL

Kg

1,492.40

1,000 No

442.00

Cft

288.00

48.71

2,530.60

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

1.566

Day

500.00

Day

783.00

Bhishti

0.250

Day

500.00

Day

125.00

Black Smith

0.005

Day

900.00

Day

4.50

Hammer Man

0.005

Day

700.00

Day

3.50

40.98

29.29

1,406.98

22

857.25

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

4,794.83

Cost Per Each: 4,794.83

Labour Rates Per

Each

Rs.

1,707.50

Cost Per Each: 1,707.50

2,268

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-06

(British) :

Set

Fixing manhole frame and cover in RCC slab, including carriage to


site

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Mason

0.250

Day

900.00

Day

225.00

Coolie

1.600

Day

500.00

Day

800.00

30.75

78.00

1,055.75

22

225.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Set

Rs.

1,281.25

Cost Per Set: 1,281.25

Labour Rates Per

Set

Rs.

1,281.25

Cost Per Set: 1,281.25

2,269

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-07

(British) :

Set

Providing and Fixing 3" thick RCC manhole cover, 22" dia with tee
shaped CI frame of 20" clear i/d complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.102

Bag

490.00

Bag

49.79

Sand

0.240

Cft

2,200.00

100 Cft

5.28

Crushed Aggregate

0.480

Cft

2,800.00

100 Cft

13.45

Steel (bars/rods/section)

4.450

Kg

82.00

Kg

364.90

Steel (Struct. Sections)

29.500

Kg

97.00

Kg

2,861.50

TOTAL

MATERIAL

43.72

3,294.92

LABOUR
Mason

0.500

Day

900.00

Day

450.00

Coolie

2.000

day

500.00

day

1,000.00

Bhishti

0.216

Day

500.00

Day

107.85

Black Smith

0.500

Day

900.00

Day

450.00

Hammer Man

0.500

day

700.00

day

350.00

70.74

34.28

2,428.59

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,243.61

Composite Rates Per

Set

Rs.

6,967.11

Cost Per Set: 6,967.11

Labour Rates Per

Set

Rs.

2,947.31

Cost Per Set: 2,947.31

2,270

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-08-a

(British) :

Set

RCC manhole cover 22" dia with: Tee shaped CI frame, 22" i/d
complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.203

Bag

490.00

Bag

99.47

Sand

0.480

Cft

2,200.00

100 Cft

10.56

Crushed Aggregate

0.960

Cft

2,800.00

100 Cft

26.88

Steel (bars/rods/section)

99.552

Kg

82.00

Kg

8,163.26

Steel (Struct. Sections)

37.240

Kg

97.00

Kg

3,612.28

Wood - Shishim

0.080

Cft

1,800.00

Cft

144.00

58.96

12,056.45

TOTAL

MATERIAL

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

2.500

Day

500.00

Day

1,250.00

Bhishti

0.302

Day

500.00

Day

151.00

Black Smith

0.750

Day

900.00

Day

675.00

Hammer Man

0.755

Day

700.00

Day

528.50

98.39

19.04

3,377.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,373.91

Composite Rates Per

Set

Rs.

18,808.25

Cost Per Set: 18,808.25

Labour Rates Per

Set

Rs.

4,099.38

Cost Per Set: 4,099.38

2,271

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-08-b

(British) :

Set

RCC manhole cover 22" dia with: 3"x3"x1/4" angle iron frame, 22"
i/d complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.203

Bag

490.00

Bag

99.47

Sand

0.480

Cft

2,200.00

100 Cft

10.56

Crushed Aggregate

0.960

Cft

2,800.00

100 Cft

26.88

Steel (bars/rods/section)

99.573

Kg

82.00

Kg

8,164.99

Steel (Struct. Sections)

20.964

Kg

97.00

Kg

2,033.51

Wood - Shishim

0.080

Cft

1,800.00

Cft

144.00

57.14

10,479.40

TOTAL

MATERIAL

LABOUR
Mason

0.750

Day

900.00

Day

675.00

Coolie

2.500

Day

500.00

Day

1,250.00

Bhishti

0.302

Day

500.00

Day

151.00

Black Smith

0.750

Day

900.00

Day

675.00

Hammer Man

0.750

Day

700.00

Day

525.00

98.28

20.86

3,374.28

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,026.19

Composite Rates Per

Set

Rs.

16,879.87

Cost Per Set: 16,879.87

Labour Rates Per

Set

Rs.

4,095.00

Cost Per Set: 4,095.00

2,272

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-09-a

(British) :

100 Kg

Providing and Fixing CI ventilating shaft of 9" i/d, painted with


bitumenous paint complete : 18 ft. long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Bituminous

8.000

Kg

40.00

Kg

320.00

CI Vent Shaft

100.000

Kg

115.00

Kg

11,500.00

TOTAL

MATERIAL

73.51

11,820.00

LABOUR
Coolie

0.300

Day

500.00

Day

150.00

Fitter II

0.150

Day

600.00

Day

90.00

7.20

4.49

247.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,653.20

Composite Rates Per

100 Kg

Rs.

14,720.40

Cost Per 100 Kg: 14,720.40

Labour Rates Per

100 Kg

Rs.

300.00

Cost Per 100 Kg: 300.00

2,273

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-09-b

(British) :

100 Kg

Providing and Fixing CI ventilating shaft of 9" i/d, painted with


bitumenous paint complete : 24 ft. long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Bituminous

8.000

Kg

40.00

Kg

320.00

CI Vent Shaft

100.000

Kg

115.00

Kg

11,500.00

TOTAL

MATERIAL

73.02

11,820.00

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Fitter II

0.200

Day

600.00

Day

120.00

9.60

4.98

329.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,670.80

Composite Rates Per

100 Kg

Rs.

14,820.40

Cost Per 100 Kg: 14,820.40

Labour Rates Per

100 Kg

Rs.

400.00

Cost Per 100 Kg: 400.00

2,274

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-09-c

(British) :

100 Kg

Providing and Fixing CI ventilating shaft of 9" i/d, painted with


bitumenous paint complete : 30 ft. long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Bituminous

8.000

Kg

40.00

Kg

320.00

CI Vent Shaft

100.000

Kg

115.00

Kg

11,500.00

TOTAL

MATERIAL

72.55

11,820.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Fitter II

0.250

Day

600.00

Day

150.00

12.00

5.45

412.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,688.40

Composite Rates Per

100 Kg

Rs.

14,920.40

Cost Per 100 Kg: 14,920.40

Labour Rates Per

100 Kg

Rs.

500.00

Cost Per 100 Kg: 500.00

2,275

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-09-d

(British) :

100 Kg

Providing and Fixing CI ventilating shaft of 9" i/d, painted with


bitumenous paint complete : 36 ft. long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Bituminous

8.000

Kg

40.00

Kg

320.00

CI Vent Shaft

100.000

Kg

115.00

Kg

11,500.00

TOTAL

MATERIAL

72.07

11,820.00

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Fitter II

0.300

Day

600.00

Day

180.00

14.40

5.93

494.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,706.00

Composite Rates Per

100 Kg

Rs.

15,020.40

Cost Per 100 Kg: 15,020.40

Labour Rates Per

100 Kg

Rs.

600.00

Cost Per 100 Kg: 600.00

2,276

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-10

(British) :

Each

Septic Tank (int.Size: 7'x2'x5') complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

12.920

Bag

490.00

Bag

6,330.80

Sand

44.000

Cft

2,200.00

100 Cft

968.00

Crushed Aggregate

90.000

Cft

2,800.00

100 Cft

2,520.00

Steel (bars/rods/section)

16.280

Kg

82.00

TOTAL

MATERIAL

Kg

1,334.96

62.18

11,153.76

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Steel Fixer

1.000

Day

900.00

Day

900.00

69.00

15.82

2,369.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,959.83

Composite Rates Per

Each

Rs.

16,482.59

Cost Per Each: 16,482.59

Labour Rates Per

Each

Rs.

2,875.00

Cost Per Each: 2,875.00

2,277

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 23 , SEWERAGE
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

23-11

(British) :

Each

Soakage Pit (6'dia x 15' deep) complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.820

Bag

490.00

Bag

891.80

Sand

0.640

Cft

2,200.00

100 Cft

14.08

Crushed Aggregate

0.400

Cft

2,800.00

100 Cft

11.20

Steel (bars/rods/section)

32.000

Kg

82.00

Boulder (Screened/Washed)

424.000

Cft

1,900.00

TOTAL

MATERIAL

Kg

100 Cft

2,624.00
8,056.00

62.59

11,597.08

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

Steel Fixer

1.000

Day

900.00

Day

900.00

69.00

15.41

2,369.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,057.36

Composite Rates Per

Each

Rs.

17,023.44

Cost Per Each: 17,023.44

Labour Rates Per

Each

Rs.

2,875.00

Cost Per Each: 2,875.00

2,278

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-01

(British) :

Job

Mobilization of plant, equipment and camping arrangements etc &


demobilization after completion

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.000

Mobilization

35,000.00

LS

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

LS

35,000.00

75.00

35,000.00

22

7,700.00

Composite Rates Per

Job

Rs.

42,700.00

Cost Per Job: 42,700.00

Labour Rates Per

Job

Rs.

0.00

Cost Per Job: 0.00

2,279

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-01

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.083

Day

500.00

Day

41.26

Fitter II

0.033

Day

600.00

Day

19.51

Helper

0.033

Day

600.00

Day

19.51

2.41

43.06

82.68

70.00

RFT

70.00

EQUIPMENT

34.94

70.00

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
1.000

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

185.74

Labour Rates Per

Rft

Rs.

100.34

33.06

Per Meter : Rs 609.23


Per Meter : Rs 329.12

2,280

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-02

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.122

Day

500.00

Day

60.98

Fitter II

0.049

Day

600.00

Day

29.26

Helper

0.049

Day

600.00

Day

29.27

3.59

42.92

123.09

70.00

RFT

105.00

EQUIPMENT

35.08

105.00

22

49.39

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
1.500

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

277.48

Labour Rates Per

Rft

Rs.

149.38

Per Meter : Rs 910.13


Per Meter : Rs 489.96

2,281

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-03

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.185

Day

500.00

Day

92.50

Fitter II

0.073

Day

600.00

Day

43.89

Helper

0.073

Day

600.00

Day

43.80

5.41

43.65

185.59

70.00

RFT

152.25

EQUIPMENT

34.35

152.25

22

73.14

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
2.175

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

410.98

Labour Rates Per

Rft

Rs.

225.23

Per Meter : Rs 1,348.01


Per Meter : Rs 738.77

2,282

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-04

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.279

Day

500.00

Day

139.26

Fitter II

0.110

Day

600.00

Day

65.83

Helper

0.110

Day

600.00

Day

65.83

8.13

44.98

279.05

70.00

RFT

213.15

EQUIPMENT

33.02

213.15

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
3.045

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

598.70

Labour Rates Per

Rft

Rs.

338.66

106.50

Per Meter : Rs 1,963.73


Per Meter : Rs 1,110.79

2,283

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-05

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.418

Day

500.00

Day

208.89

Fitter II

0.165

Day

600.00

Day

98.75

Helper

0.165

Day

600.00

Day

98.75

12.19

46.91

418.58

70.00

RFT

287.75

EQUIPMENT

31.09

287.75

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
4.111

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

859.05

Labour Rates Per

Rft

Rs.

507.99

152.71

Per Meter : Rs 2,817.67


Per Meter : Rs 1,666.20

2,284

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-06

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.627

Day

500.00

Day

313.34

Fitter II

0.247

Day

600.00

Day

148.12

Helper

0.247

Day

600.00

Day

148.12

18.29

50.17

627.87

70.00

RFT

359.69

EQUIPMENT

27.83

359.69

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
5.138

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,200.80

Labour Rates Per

Rft

Rs.

761.98

213.24

Per Meter : Rs 3,938.64


Per Meter : Rs 2,499.30

2,285

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-07

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.783

Day

500.00

Day

391.67

Fitter II

0.309

Day

600.00

Day

185.15

Helper

0.309

Day

600.00

Day

185.15

22.86

50.88

784.84

70.00

RFT

431.63

EQUIPMENT

27.12

431.63

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
6.166

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,479.06

Labour Rates Per

Rft

Rs.

952.48

262.59

Per Meter : Rs 4,851.33


Per Meter : Rs 3,124.13

2,286

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-08

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 15" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.979

Day

500.00

Day

489.59

Fitter II

0.386

Day

600.00

Day

231.44

Helper

0.386

Day

600.00

Day

231.46

28.57

52.31

981.07

70.00

RFT

496.37

EQUIPMENT

25.69

496.37

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
7.091

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,796.19

Labour Rates Per

Rft

Rs.

1,190.62

318.75

Per Meter : Rs 5,891.52


Per Meter : Rs 3,905.23

2,287

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-a-09

(British) :

Rft

Tubewell boring in all soils except shingle/rock From ground upto


100' below ground : 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.224

Day

500.00

Day

612.02

Fitter II

0.482

Day

600.00

Day

289.30

Helper

0.482

Day

600.00

Day

289.30

35.72

54.42

1,226.34

70.00

RFT

546.01

EQUIPMENT

23.58

546.01

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
7.800

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,154.41

Labour Rates Per

Rft

Rs.

1,488.28

382.06

Per Meter : Rs 7,066.47


Per Meter : Rs 4,881.55

2,288

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-b-01

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 100' to 200'


below ground : 5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.316

Day

500.00

Day

157.83

Fitter II

0.124

Day

600.00

Day

74.61

Helper

0.124

Day

600.00

Day

74.61

9.21

43.70

316.26

70.00

RFT

258.83

EQUIPMENT

34.30

258.83

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
3.697

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

699.58

Labour Rates Per

Rft

Rs.

383.82

124.49

Per Meter : Rs 2,294.63


Per Meter : Rs 1,258.92

2,289

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-b-02

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 100' to 200'


below ground : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.446

Day

500.00

Day

222.82

Fitter II

0.176

Day

600.00

Day

105.33

Helper

0.176

Day

600.00

Day

105.33

13.00

38.55

446.49

70.00

RFT

481.04

EQUIPMENT

39.45

481.04

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
6.872

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,128.72

Labour Rates Per

Rft

Rs.

541.86

201.20

Per Meter : Rs 3,702.22


Per Meter : Rs 1,777.29

2,290

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-b-03

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 100' to 200'


below ground : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.543

Day

500.00

Day

271.56

Fitter II

0.214

Day

600.00

Day

128.37

Helper

0.214

Day

600.00

Day

128.37

15.85

46.91

544.16

70.00

RFT

374.08

EQUIPMENT

31.09

374.08

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
5.344

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,116.76

Labour Rates Per

Rft

Rs.

660.39

198.53

Per Meter : Rs 3,662.98


Per Meter : Rs 2,166.06

2,291

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-b-04

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 100' to 200'


below ground : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.752

Day

500.00

Day

376.00

Fitter II

0.174

Day

600.00

Day

104.58

Helper

0.174

Day

600.00

Day

104.58

17.55

46.16

602.71

70.00

RFT

431.63

EQUIPMENT

31.84

431.63

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
6.166

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,258.04

Labour Rates Per

Rft

Rs.

731.45

223.69

Per Meter : Rs 4,126.36


Per Meter : Rs 2,399.15

2,292

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-b-05

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 100' to 200'


below ground : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.752

Day

500.00

Day

376.00

Fitter II

0.355

Day

600.00

Day

212.93

Helper

0.355

Day

600.00

Day

212.93

24.06

49.32

825.91

70.00

RFT

496.37

EQUIPMENT

28.68

496.37

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
7.091

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,607.90

Labour Rates Per

Rft

Rs.

1,002.32

285.61

Per Meter : Rs 5,273.90


Per Meter : Rs 3,287.62

2,293

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-b-06

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 100' to 200'


below ground : 15" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.126

Day

500.00

Day

563.03

Fitter II

0.444

Day

600.00

Day

266.16

Helper

0.444

Day

600.00

Day

266.16

32.86

52.31

1,128.21

70.00

RFT

570.83

EQUIPMENT

25.69

570.83

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
8.155

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,065.59

Labour Rates Per

Rft

Rs.

1,369.18

366.56

Per Meter : Rs 6,775.15


Per Meter : Rs 4,490.92

2,294

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-b-07

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 100' to 200'


below ground : 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.408

Day

500.00

Day

703.79

Fitter II

0.554

Day

600.00

Day

332.70

Helper

0.554

Day

600.00

Day

332.70

41.08

54.42

1,410.26

70.00

RFT

627.91

EQUIPMENT

23.58

627.91

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
8.970

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,477.53

Labour Rates Per

Rft

Rs.

1,711.48

439.36

Per Meter : Rs 8,126.30


Per Meter : Rs 5,613.64

2,295

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-c-01

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 200' to 300'


below ground : 5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.426

Day

500.00

Day

213.07

Fitter II

0.168

Day

600.00

Day

100.76

Helper

0.168

Day

600.00

Day

100.76

12.44

43.70

427.03

70.00

RFT

349.41

EQUIPMENT

34.30

349.41

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
4.992

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

944.52

Labour Rates Per

Rft

Rs.

518.24

168.08

Per Meter : Rs 3,098.03


Per Meter : Rs 1,699.82

2,296

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-c-02

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 200' to 300'


below ground : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.557

Day

500.00

Day

278.61

Fitter II

0.219

Day

600.00

Day

131.67

Helper

0.219

Day

600.00

Day

131.67

16.26

44.98

558.20

70.00

RFT

426.30

EQUIPMENT

33.02

426.30

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
6.090

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,197.52

Labour Rates Per

Rft

Rs.

677.43

213.01

Per Meter : Rs 3,927.86


Per Meter : Rs 2,221.97

2,297

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-c-03

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 200' to 300'


below ground : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.374

Day

500.00

Day

187.01

Fitter II

0.268

Day

600.00

Day

160.56

Helper

0.268

Day

600.00

Day

160.56

15.24

42.06

523.37

70.00

RFT

467.60

EQUIPMENT

35.94

467.60

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
6.680

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,205.63

Labour Rates Per

Rft

Rs.

635.16

214.66

Per Meter : Rs 3,954.46


Per Meter : Rs 2,083.32

2,298

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-c-04

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 200' to 300'


below ground : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.902

Day

500.00

Day

451.21

Fitter II

0.355

Day

600.00

Day

213.30

Helper

0.355

Day

600.00

Day

213.30

26.33

50.17

904.14

70.00

RFT

517.95

EQUIPMENT

27.83

517.95

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
7.399

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,729.16

Labour Rates Per

Rft

Rs.

1,097.25

307.07

Per Meter : Rs 5,671.64


Per Meter : Rs 3,598.99

2,299

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-c-05

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 200' to 300'


below ground : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.081

Day

500.00

Day

540.51

Fitter II

0.426

Day

600.00

Day

255.51

Helper

0.426

Day

600.00

Day

255.51

31.55

50.88

1,083.08

70.00

RFT

595.65

EQUIPMENT

27.12

595.65

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
8.509

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,041.10

Labour Rates Per

Rft

Rs.

1,314.41

362.38

Per Meter : Rs 6,694.82


Per Meter : Rs 4,311.28

2,300

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-c-06

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 200' to 300'


below ground : 15" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.239

Day

500.00

Day

619.33

Fitter II

0.488

Day

600.00

Day

292.77

Helper

0.488

Day

600.00

Day

292.77

36.15

52.31

1,241.03

70.00

RFT

627.91

EQUIPMENT

25.69

627.91

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
8.970

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,272.15

Labour Rates Per

Rft

Rs.

1,506.10

403.21

Per Meter : Rs 7,452.66


Per Meter : Rs 4,940.01

2,301

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-c-07

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 200' to 300'


below ground : 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.548

Day

500.00

Day

774.16

Fitter II

0.612

Day

600.00

Day

367.01

Helper

0.612

Day

600.00

Day

367.01

45.25

54.44

1,553.42

70.00

RFT

690.70

EQUIPMENT

23.56

690.70

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
9.867

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,727.88

Labour Rates Per

Rft

Rs.

1,885.22

483.75

Per Meter : Rs 8,947.44


Per Meter : Rs 6,183.52

2,302

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-d-01

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 300' to 400'


below ground : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.815

Day

500.00

Day

407.34

Fitter II

0.321

Day

600.00

Day

192.56

Helper

0.321

Day

600.00

Day

192.56

23.77

46.91

816.23

70.00

RFT

561.12

EQUIPMENT

31.09

561.12

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
8.016

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

1,675.14

Labour Rates Per

Rft

Rs.

990.57

297.79

Per Meter : Rs 5,494.44


Per Meter : Rs 3,249.08

2,303

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-d-02

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 300' to 400'


below ground : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.083

Day

500.00

Day

541.45

Fitter II

0.427

Day

600.00

Day

255.96

Helper

0.427

Day

600.00

Day

255.96

31.60

50.17

1,084.96

70.00

RFT

621.55

EQUIPMENT

27.83

621.55

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
8.879

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,074.99

Labour Rates Per

Rft

Rs.

1,316.70

368.48

Per Meter : Rs 6,805.96


Per Meter : Rs 4,318.78

2,304

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-d-03

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 300' to 400'


below ground : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.297

Day

500.00

Day

648.61

Fitter II

0.511

Day

600.00

Day

306.61

Helper

0.511

Day

600.00

Day

306.61

37.86

50.88

1,299.69

70.00

RFT

714.78

EQUIPMENT

27.12

714.78

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
10.211

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,449.33

Labour Rates Per

Rft

Rs.

1,577.30

434.86

Per Meter : Rs 8,033.79


Per Meter : Rs 5,173.54

2,305

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-d-04

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 300' to 400'


below ground : 15" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.488

Day

500.00

Day

743.90

Fitter II

0.586

Day

600.00

Day

351.33

Helper

0.586

Day

600.00

Day

351.33

43.40

52.31

1,489.96

70.00

RFT

753.49

EQUIPMENT

25.69

753.49

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
10.764

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

2,727.46

Labour Rates Per

Rft

Rs.

1,808.20

484.01

Per Meter : Rs 8,946.08


Per Meter : Rs 5,930.90

2,306

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-02-d-05

(British) :

Rft

Tubewell boring in all soils except shingle/rock From 300' to 400'


below ground : 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.858

Day

500.00

Day

929.00

Fitter II

0.732

Day.

600.00

Day.

439.16

Helper

0.732

Day

600.00

Day

439.16

54.22

54.42

1,861.54

70.00

RFT

828.84

EQUIPMENT

23.58

828.84

22

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
11.841

Tubewell Boring Eqmt. Set

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

3,270.34

Labour Rates Per

Rft

Rs.

2,259.15

579.96

Per Meter : Rs 10,726.71


Per Meter : Rs 7,410.01

2,307

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-03-a-01

(British) :

Rft

Rotary drilling except in shingle, gravel & rock From ground to


250' below ground : 5"-18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.000

Rotary Drill Eqmt. Set #1

1,800.00

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

2,196.00

Labour Rates Per

Rft

Rs.

0.00

RFT

1,800.00

75.00

1,800.00

22

396.00

Per Meter : Rs 7,202.88


Per Meter : Rs 0.00

2,308

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-03-a-02

(British) :

Rft

Rotary drilling except in shingle, gravel & rock From ground to


250' below ground : 20"-26" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.000

Rotary Drill Eqmt. Set #2

1,800.00

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

2,196.00

Labour Rates Per

Rft

Rs.

0.00

RFT

1,800.00

75.00

1,800.00

22

396.00

Per Meter : Rs 7,202.88


Per Meter : Rs 0.00

2,309

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-03-b-01

(British) :

Rft

Rotary drilling except in shingle, gravel & rock Exceeding 250'


below ground : 5"-18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.250

Rotary Drill Eqmt. Set #1

1,800.00

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

2,745.00

Labour Rates Per

Rft

Rs.

0.00

RFT

2,250.00

75.00

2,250.00

22

495.00

Per Meter : Rs 9,003.60


Per Meter : Rs 0.00

2,310

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-03-b-02

(British) :

Rft

Rotary drilling except in shingle, gravel & rock Exceeding 250'


below ground : 20"-26" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
1.250

Rotary Drill Eqmt. Set #2

1,800.00

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

2,745.00

Labour Rates Per

Rft

Rs.

0.00

RFT

2,250.00

75.00

2,250.00

22

495.00

Per Meter : Rs 9,003.60


Per Meter : Rs 0.00

2,311

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-04-a-01

(British) :

Rft

Boring for tubewell in shingle, gravel & rock From ground to 200'
below ground : 12"-18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
2.500

Rotary Drill Eqmt. Set #1

1,800.00

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

5,490.00

Labour Rates Per

Rft

Rs.

0.00

RFT

4,500.00

75.00

4,500.00

22

990.00

Per Meter : Rs 18,007.20


Per Meter : Rs 0.00

2,312

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-04-a-02

(British) :

Rft

Boring for tubewell in shingle, gravel & rock From ground to 200'
below ground : 20"-26" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
2.500

Rotary Drill Eqmt. Set #2

1,800.00

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

5,490.00

Labour Rates Per

Rft

Rs.

0.00

RFT

4,500.00

75.00

4,500.00

22

990.00

Per Meter : Rs 18,007.20


Per Meter : Rs 0.00

2,313

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-04-b-01

(British) :

Rft

Boring for tubewell in shingle, gravel & rock Over 200' depth below
ground : 12"-18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
3.130

Rotary Drill Eqmt. Set #1

1,800.00

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

6,873.48

Labour Rates Per

Rft

Rs.

0.00

RFT

5,634.00

75.00

5,634.00

22

1,239.48

Per Meter : Rs 22,545.01


Per Meter : Rs 0.00

2,314

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-04-b-02

(British) :

Rft

Boring for tubewell in shingle, gravel & rock Over 200' depth below
ground : 20"-26" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
3.130

Rotary Drill Eqmt. Set #2

1,800.00

RFT

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

6,873.48

Labour Rates Per

Rft

Rs.

0.00

RFT

5,634.00

75.00

5,634.00

22

1,239.48

Per Meter : Rs 22,545.01


Per Meter : Rs 0.00

2,315

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-05

(British) :

Job

Providing strong substantially built box of deodar 4'x2'x9", with


compartments & lock

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood Deodar

2.366

Cft

2,600.00

Cft

Locks & Hinges

1.000

No

200.00

No

TOTAL

MATERIAL

6,151.60
200.00

65.47

6,351.60

LABOUR
Carpenter

1.000

Day

800.00

Day

800.00

Painter / Polisher

0.125

Day

1,000.00

Day

125.00

27.75

12.53

952.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,600.85

Composite Rates Per

Job

Rs.

8,905.20

Cost Per Job: 8,905.20

Labour Rates Per

Job

Rs.

1,156.25

Cost Per Job: 1,156.25

2,316

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-06

(British) :

Per set

Furnishing sample of water from bore hole

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Bottle

2.000

120.00

No

TOTAL

8.04

MATERIAL

No

240.00

240.00

Day

2,000.00

60.00

69.96

2,060.00

22

492.80

LABOUR
Coolie

4.000

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Per set

Rs.

2,792.80

Cost Per Per set: 2,792.80

Labour Rates Per

Per set

Rs.

2,500.00

Cost Per Per set: 2,500.00

2,317

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-07-a
Providing and installing
i/d, 3/16" thick

Detail

Qty

(British) :

Rft

brass strainer in tubewell bore hole 6"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass Strainer 6"dx 3/16"

2,700.00

RFT

TOTAL

MATERIAL

RFT

2,700.00

67.39

2,700.00

LABOUR
Coolie

0.381

Day

500.00

Day

190.55

Fitter II

0.191

Day

600.00

Day

114.33

9.15

10.61

314.02

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,675.10

Labour Rates Per

Rft

Rs.

381.10

661.07

Per Meter : Rs 12,054.32


Per Meter : Rs 1,250.00

2,318

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-07-b
Providing and installing
i/d, 3/16" thick

Detail

Qty

(British) :

Rft

brass strainer in tubewell bore hole 8"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass Strainer 8"dx 3/16"

3,500.00

RFT

TOTAL

MATERIAL

RFT

3,500.00

66.53

3,500.00

LABOUR
Coolie

0.572

Day

500.00

Day

285.82

Fitter II

0.267

Day

600.00

Day

160.06

13.38

11.47

459.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,827.36

Labour Rates Per

Rft

Rs.

557.36

868.09

Per Meter : Rs 15,833.73


Per Meter : Rs 1,828.13

2,319

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-07-c
Providing and installing
i/d 3/16" thick

Detail

Qty

(British) :

Rft

brass strainer in tubewell bore hole 10"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass Strainer 10"dx3/16"

4,000.00

RFT

TOTAL

MATERIAL

RFT

4,000.00

67.31

4,000.00

LABOUR
Coolie

0.572

Day

500.00

Day

285.82

Fitter II

0.286

Day

600.00

Day

171.49

13.72

10.69

471.04

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

5,451.65

Labour Rates Per

Rft

Rs.

571.65

980.61

Per Meter : Rs 17,881.40


Per Meter : Rs 1,875.00

2,320

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-07-d
Providing and installing
i/d, 1/4" thick

Detail

Qty

(British) :

Rft

brass strainer in tubewell bore hole 10"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass Strainer 10"dx 1/4"

5,100.00

RFT

TOTAL

MATERIAL

RFT

5,100.00

68.83

5,100.00

LABOUR
Coolie

0.572

Day

500.00

Day

285.82

Fitter II

0.286

Day

600.00

Day

171.49

13.72

9.17

471.04

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

6,793.65

Labour Rates Per

Rft

Rs.

571.65

1,222.61

Per Meter : Rs 22,283.16


Per Meter : Rs 1,875.00

2,321

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-07-e
Providing and installing
i/d, 1/4" thick

Detail

Qty

(British) :

Rft

brass strainer in tubewell bore hole 12"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Brass Strainer 12"dx 1/4"

6,200.00

RFT

TOTAL

MATERIAL

RFT

6,200.00

69.53

6,200.00

LABOUR
Coolie

0.610

Day

500.00

Day

304.88

Fitter II

0.305

Day

600.00

Day

182.93

14.63

8.47

502.44

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

8,173.76

Labour Rates Per

Rft

Rs.

609.76

1,471.32

Per Meter : Rs 26,809.92


Per Meter : Rs 2,000.00

2,322

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-08-a
Providing and installing
i/d, 2 ft. long

Detail

Qty

(British) :

Rft

MS bail plug in tubewell bore hole 6"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Bail Plug 6"

2,700.00

No

TOTAL

MATERIAL

No

2,700.00

70.00

2,700.00

LABOUR
Coolie

0.195

Day

500.00

Day

97.56

Fitter II

0.159

Day

600.00

Day

95.12

5.78

8.00

198.46

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,534.85

Labour Rates Per

Rft

Rs.

240.85

636.39

Per Meter : Rs 11,594.32


Per Meter : Rs 790.00

2,323

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-08-b
Providing and installing
i/d, 2 ft. long

Detail

Qty

(British) :

Rft

MS bail plug in tubewell bore hole 8"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Bail Plug 8"

3,700.00

No

TOTAL

MATERIAL

No

3,700.00

70.97

3,700.00

LABOUR
Coolie

0.274

Day

500.00

Day

137.20

Fitter II

0.122

Day

600.00

Day

73.17

6.31

7.03

216.68

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,776.96

Labour Rates Per

Rft

Rs.

262.96

860.28

Per Meter : Rs 15,668.42


Per Meter : Rs 862.50

2,324

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-08-c
Providing and installing
i/d, 2 ft. long

Detail

Qty

(British) :

Rft

MS bail plug in tubewell bore hole 10"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Bail Plug 10"

4,600.00

No

TOTAL

MATERIAL

4,600.00

No

71.72

4,600.00

LABOUR
Coolie

0.274

Day

500.00

Day

137.20

Fitter II

0.122

Day

600.00

Day

73.17

6.31

6.28

216.68

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

5,874.96

Labour Rates Per

Rft

Rs.

262.96

1,058.28

Per Meter : Rs 19,269.86


Per Meter : Rs 862.50

2,325

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-08-d
Providing and installing
i/d, 2 ft. long

Detail

Qty

(British) :

Rft

MS bail plug in tubewell bore hole 12"

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Bail Plug 12"

6,000.00

No

TOTAL

MATERIAL

6,000.00

No

72.33

6,000.00

LABOUR
Coolie

0.274

Day

500.00

Day

137.20

Fitter II

0.140

Day

600.00

Day

84.15

6.64

5.67

227.98

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

7,596.68

Labour Rates Per

Rft

Rs.

276.68

1,368.70

Per Meter : Rs 24,917.10


Per Meter : Rs 907.50

2,326

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-09-a-01

Item Name :

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'B' working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (b) 6"

275.00

RFT

TOTAL

MATERIAL

RFT

275.00

36.33

275.00

LABOUR
Coolie

0.366

Day

500.00

Day

182.93

Pipe Layer

0.183

Day

600.00

Day

109.76

8.78

41.67

301.46

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

701.35

Labour Rates Per

Rft

Rs.

365.85

LABOUR

124.89

Per Meter : Rs 2,300.44


Per Meter : Rs 1,200.00

2,327

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-09-a-02

Item Name :

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'B' working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (b) 8"

425.00

RFT

TOTAL

MATERIAL

RFT

425.00

40.30

425.00

LABOUR
Coolie

0.457

Day

500.00

Day

228.66

Pipe Layer

0.229

Day

600.00

Day

137.20

10.98

37.70

376.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

975.82

Labour Rates Per

Rft

Rs.

457.32

LABOUR

173.99

Per Meter : Rs 3,200.68


Per Meter : Rs 1,500.00

2,328

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-09-a-03

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'B' working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (b) 10"

725.00

RFT

TOTAL

MATERIAL

RFT

725.00

48.76

725.00

LABOUR
Coolie

0.488

Day

500.00

Day

243.90

Pipe Layer

0.244

Day

600.00

Day

146.34

11.71

29.24

401.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,372.30

Labour Rates Per

Rft

Rs.

487.80

245.35

Per Meter : Rs 4,501.16


Per Meter : Rs 1,600.00

2,329

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-09-a-04

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'B' working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (b) 12"

1,000.00

RFT

TOTAL

MATERIAL

RFT

1,000.00

52.12

1,000.00

LABOUR
Coolie

0.549

Day

500.00

Day

274.39

Pipe Layer

0.274

Day

600.00

Day

164.63

13.17

25.88

452.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,768.78

Labour Rates Per

Rft

Rs.

548.78

316.59

Per Meter : Rs 5,801.60


Per Meter : Rs 1,800.00

2,330

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-09-b-01

Item Name :

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'C' working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (c) 6"

480.00

RFT

TOTAL

MATERIAL

RFT

480.00

46.59

480.00

LABOUR
Coolie

0.366

Day

500.00

Day

182.93

Pipe Layer

0.183

Day

600.00

Day

109.76

8.78

31.41

301.46

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

951.45

Labour Rates Per

Rft

Rs.

365.85

LABOUR

169.99

Per Meter : Rs 3,120.77


Per Meter : Rs 1,200.00

2,331

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-09-b-02

Item Name :

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'C' working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (c) 8"

600.00

RFT

TOTAL

MATERIAL

RFT

600.00

46.59

600.00

LABOUR
Coolie

0.457

Day

500.00

Day

228.66

Pipe Layer

0.229

Day

600.00

Day

137.20

10.98

31.41

376.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,189.32

Labour Rates Per

Rft

Rs.

457.32

212.49

Per Meter : Rs 3,900.96


Per Meter : Rs 1,500.00

2,332

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-09-b-03

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'C' working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (c) 10"

1,050.00

RFT

TOTAL

MATERIAL

RFT

1,050.00

54.68

1,050.00

LABOUR
Coolie

0.488

Day

500.00

Day

243.90

Pipe Layer

0.244

Day

600.00

Day

146.34

11.71

23.32

401.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,768.80

Labour Rates Per

Rft

Rs.

487.80

316.85

Per Meter : Rs 5,801.68


Per Meter : Rs 1,600.00

2,333

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-09-b-04

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'C' working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (c) 12"

1,250.00

RFT

TOTAL

MATERIAL

RFT

1,250.00

55.51

1,250.00

LABOUR
Coolie

0.549

Day

500.00

Day

274.39

Pipe Layer

0.274

Day

600.00

Day

164.63

13.17

22.49

452.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,073.78

Labour Rates Per

Rft

Rs.

548.78

371.59

Per Meter : Rs 6,802.00


Per Meter : Rs 1,800.00

2,334

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-09-c-01

Item Name :

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'D' working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (d) 6"

550.00

RFT

TOTAL

MATERIAL

RFT

550.00

48.95

550.00

LABOUR
Coolie

0.366

Day

500.00

Day

182.93

Pipe Layer

0.183

Day

600.00

Day

109.76

8.78

29.05

301.46

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,036.85

Labour Rates Per

Rft

Rs.

365.85

185.39

Per Meter : Rs 3,400.88


Per Meter : Rs 1,200.00

2,335

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-09-c-02

Item Name :

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'D' working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (d) 8"

790.00

RFT

TOTAL

MATERIAL

RFT

790.00

51.26

790.00

LABOUR
Coolie

0.457

Day

500.00

Day

228.66

Pipe Layer

0.229

Day

600.00

Day

137.20

10.98

26.74

376.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,421.12

Labour Rates Per

Rft

Rs.

457.32

254.29

Per Meter : Rs 4,661.26


Per Meter : Rs 1,500.00

2,336

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-09-c-03

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'D' working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (d) 10"

1,200.00

RFT

TOTAL

MATERIAL

RFT

1,200.00

56.60

1,200.00

LABOUR
Coolie

0.488

Day

500.00

Day

243.90

Pipe Layer

0.244

Day

600.00

Day

146.34

11.71

21.40

401.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,951.80

Labour Rates Per

Rft

Rs.

487.80

349.85

Per Meter : Rs 6,401.92


Per Meter : Rs 1,600.00

2,337

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-09-c-04

(British) :

Rft

Providing and installing PVC strainer, in tubewell borehole comp.


BSS Class 'D' working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Strainer (d) 12"

1,650.00

RFT

TOTAL

MATERIAL

RFT

1,650.00

59.24

1,650.00

LABOUR
Coolie

0.549

Day

500.00

Day

274.39

Pipe Layer

0.274

Day

600.00

Day

164.63

13.17

18.76

452.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,561.78

Labour Rates Per

Rft

Rs.

548.78

459.59

Per Meter : Rs 8,402.64


Per Meter : Rs 1,800.00

2,338

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-a-01

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'B' working pressure : 6" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (b) 6"

260.67

RFT

TOTAL

MATERIAL

RFT

513.00

46.19

513.00

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Pipe Layer

0.200

Day

600.00

Day

120.00

9.60

31.81

329.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

183.26

Composite Rates Per

Each

Rs.

1,025.86

Cost Per Each: 1,025.86

Labour Rates Per

Each

Rs.

400.00

Cost Per Each: 400.00

2,339

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-a-02

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'B' working pressure : 8" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (b) 8"

396.34

RFT

TOTAL

MATERIAL

RFT

780.00

49.58

780.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Layer

0.250

Day

600.00

Day

150.00

12.00

28.42

412.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

259.60

Composite Rates Per

Each

Rs.

1,451.60

Cost Per Each: 1,451.60

Labour Rates Per

Each

Rs.

500.00

Cost Per Each: 500.00

2,340

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-a-03

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'B' working pressure : 10" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (b) 10"

609.75

RFT

TOTAL

MATERIAL

RFT

1,199.99

56.25

1,199.99

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Layer

0.250

Day

600.00

Day

150.00

12.00

21.75

412.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

352.00

Composite Rates Per

Each

Rs.

1,963.99

Cost Per Each: 1,963.99

Labour Rates Per

Each

Rs.

500.00

Cost Per Each: 500.00

2,341

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-a-04

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'B' working pressure : 12" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (b) 12"

882.62

RFT

TOTAL

MATERIAL

RFT

1,737.00

58.76

1,737.00

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Pipe Layer

0.300

Day

600.00

Day

180.00

14.40

19.24

494.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

487.74

Composite Rates Per

Each

Rs.

2,719.14

Cost Per Each: 2,719.14

Labour Rates Per

Each

Rs.

600.00

Cost Per Each: 600.00

2,342

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-b-01

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'C' working pressure : 6" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (c) 6"

387.19

RFT

TOTAL

MATERIAL

RFT

761.99

52.82

761.99

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Pipe Layer

0.200

Day

600.00

Day

120.00

9.60

25.18

329.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

238.04

Composite Rates Per

Each

Rs.

1,329.63

Cost Per Each: 1,329.63

Labour Rates Per

Each

Rs.

400.00

Cost Per Each: 400.00

2,343

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-b-02

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'C' working pressure : 8" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (c) 8"

588.41

RFT

TOTAL

MATERIAL

RFT

1,157.99

55.74

1,157.99

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Layer

0.250

Day

600.00

Day

150.00

12.00

22.26

412.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

342.76

Composite Rates Per

Each

Rs.

1,912.75

Cost Per Each: 1,912.75

Labour Rates Per

Each

Rs.

500.00

Cost Per Each: 500.00

2,344

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-b-03

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'C' working pressure : 10" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (c) 10"

882.62

RFT

TOTAL

MATERIAL

RFT

1,737.00

60.96

1,737.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Layer

0.250

Day

600.00

Day

150.00

12.00

17.04

412.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

470.14

Composite Rates Per

Each

Rs.

2,619.14

Cost Per Each: 2,619.14

Labour Rates Per

Each

Rs.

500.00

Cost Per Each: 500.00

2,345

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-b-04

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'C' working pressure : 12" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (c) 12"

2,092.31

RFT

TOTAL

MATERIAL

RFT

4,117.67

67.17

4,117.67

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Pipe Layer

0.300

Day

600.00

Day

180.00

14.40

10.83

494.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,011.49

Composite Rates Per

Each

Rs.

5,623.55

Cost Per Each: 5,623.55

Labour Rates Per

Each

Rs.

600.00

Cost Per Each: 600.00

2,346

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-c-01

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'D' working pressure : 6" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (d) 6"

503.04

RFT

TOTAL

MATERIAL

RFT

989.98

56.68

989.98

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Pipe Layer

0.200

Day

600.00

Day

120.00

9.60

21.32

329.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

288.20

Composite Rates Per

Each

Rs.

1,607.78

Cost Per Each: 1,607.78

Labour Rates Per

Each

Rs.

400.00

Cost Per Each: 400.00

2,347

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-c-02

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'D' working pressure : 8" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (d) 8"

753.04

RFT

TOTAL

MATERIAL

RFT

1,481.98

59.06

1,481.98

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Layer

0.250

Day

600.00

Day

150.00

12.00

18.94

412.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

414.04

Composite Rates Per

Each

Rs.

2,308.02

Cost Per Each: 2,308.02

Labour Rates Per

Each

Rs.

500.00

Cost Per Each: 500.00

2,348

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-c-03

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'D' working pressure : 10" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (d) 10"

1,152.43

RFT

TOTAL

MATERIAL

RFT

2,267.98

63.76

2,267.98

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Layer

0.250

Day

600.00

Day

150.00

12.00

14.24

412.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

586.96

Composite Rates Per

Each

Rs.

3,266.94

Cost Per Each: 3,266.94

Labour Rates Per

Each

Rs.

500.00

Cost Per Each: 500.00

2,349

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-10-c-04

(British) :

Each

Providing and installing PVC pipe with wooden bail plug in


tubewell BSS Class 'D' working pressure : 12" i/d : 2' long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.968

Pvc Pipe (d) 12"

2,769.23

RFT

TOTAL

MATERIAL

RFT

5,449.84

68.93

5,449.84

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Pipe Layer

0.300

Day

600.00

Day

180.00

14.40

9.07

494.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,304.57

Composite Rates Per

Each

Rs.

7,248.81

Cost Per Each: 7,248.81

Labour Rates Per

Each

Rs.

600.00

Cost Per Each: 600.00

2,350

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-11-a

(British) :

Rft

Providing and installing MS blind pipe socket/welded joint MS


reducer in tubewell borehole : 6" i/d, 3/16" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Blind Pipe 6"

850.00

RFT

TOTAL

MATERIAL

RFT

850.00

45.58

850.00

LABOUR
Coolie

0.686

Day

500.00

Day

342.99

Pipe Layer

0.343

Day

600.00

Day

205.79

16.46

32.42

565.24

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,722.98

Labour Rates Per

Rft

Rs.

685.98

307.73

Per Meter : Rs 5,651.36


Per Meter : Rs 2,250.00

2,351

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-11-b

(British) :

Rft

Providing and installing MS blind pipe socket/welded joint MS


reducer in tubewell borehole : 8" i/d, 3/16" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Blind Pipe 8"

900.00

RFT

TOTAL

MATERIAL

RFT

900.00

43.82

900.00

LABOUR
Coolie

0.800

Day

500.00

Day

400.15

Pipe Layer

0.400

Day

600.00

Day

240.09

19.21

34.18

659.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,898.30

Labour Rates Per

Rft

Rs.

800.30

338.85

Per Meter : Rs 6,226.44


Per Meter : Rs 2,625.00

2,352

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-11-c

(British) :

Rft

Providing and installing MS blind pipe socket/welded joint MS


reducer in tubewell borehole : 10" i/d 3/16" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Blind Pipe 10"

950.00

RFT

TOTAL

MATERIAL

RFT

950.00

41.61

950.00

LABOUR
Coolie

0.953

Day

500.00

Day

476.37

Pipe Layer

0.476

Day

600.00

Day

285.82

22.87

36.39

785.06

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,111.74

Labour Rates Per

Rft

Rs.

952.74

376.68

Per Meter : Rs 6,926.52


Per Meter : Rs 3,125.00

2,353

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-11-d

(British) :

Rft

Providing and installing MS blind pipe socket/welded joint MS


reducer in tubewell borehole : 12" i/d, 1/4" thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Blind Pipe 12"

1,600.00

RFT

TOTAL

MATERIAL

RFT

1,600.00

48.43

1,600.00

LABOUR
Coolie

1.098

Day

500.00

Day

548.78

Pipe Layer

0.549

Day

600.00

Day

329.27

26.34

29.57

904.39

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,049.56

Labour Rates Per

Rft

Rs.

1,097.56

545.17

Per Meter : Rs 10,002.56


Per Meter : Rs 3,600.00

2,354

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-a-01

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'B' working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 6"

260.67

RFT

TOTAL

MATERIAL

RFT

260.67

25.30

260.67

LABOUR
Coolie

0.640

Day

500.00

Day

320.12

Pipe Layer

0.320

Day

600.00

Day

192.07

15.37

52.70

527.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

958.26

Labour Rates Per

Rft

Rs.

640.24

LABOUR

170.03

Per Meter : Rs 3,143.10


Per Meter : Rs 2,100.00

2,355

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-a-02

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'B' working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 8"

396.34

RFT

TOTAL

MATERIAL

RFT

396.34

29.55

396.34

LABOUR
Coolie

0.762

Day

500.00

Day

381.10

Pipe Layer

0.381

Day

600.00

Day

228.66

18.29

48.45

628.05

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,245.73

Labour Rates Per

Rft

Rs.

762.20

221.34

Per Meter : Rs 4,085.99


Per Meter : Rs 2,500.00

2,356

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-a-03

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'B' working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 10"

609.75

RFT

TOTAL

MATERIAL

RFT

609.75

31.17

609.75

LABOUR
Coolie

1.212

Day

500.00

Day

605.95

Pipe Layer

0.419

Day

600.00

Day

251.52

25.72

46.83

883.19

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,815.73

Labour Rates Per

Rft

Rs.

1,071.84

322.79

Per Meter : Rs 5,955.60


Per Meter : Rs 3,515.62

2,357

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-a-04

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'B' working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 12"

882.62

RFT

TOTAL

MATERIAL

RFT

882.62

38.81

882.62

LABOUR
Coolie

1.029

Day

500.00

Day

514.48

Pipe Layer

0.514

Day

600.00

Day

308.69

24.70

39.19

847.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,105.76

Labour Rates Per

Rft

Rs.

1,028.96

375.27

Per Meter : Rs 6,906.89


Per Meter : Rs 3,375.00

2,358

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-b-01

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'C' working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 6"

387.19

RFT

TOTAL

MATERIAL

RFT

387.19

32.07

387.19

LABOUR
Coolie

0.648

Day

500.00

Day

323.93

Pipe Layer

0.324

Day

600.00

Day

194.36

15.55

45.93

533.84

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,120.24

Labour Rates Per

Rft

Rs.

647.87

199.21

Per Meter : Rs 3,674.38


Per Meter : Rs 2,125.00

2,359

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-b-02

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'C' working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 8"

588.41

RFT

TOTAL

MATERIAL

RFT

588.41

36.83

588.41

LABOUR
Coolie

0.762

Day

500.00

Day

381.10

Pipe Layer

0.381

Day

600.00

Day

228.66

18.29

41.17

628.05

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,480.06

Labour Rates Per

Rft

Rs.

762.20

263.60

Per Meter : Rs 4,854.58


Per Meter : Rs 2,500.00

2,360

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-b-03

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'C' working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 10"

882.62

RFT

TOTAL

MATERIAL

RFT

882.62

42.62

882.62

LABOUR
Coolie

0.838

Day

500.00

Day

419.21

Pipe Layer

0.419

Day

600.00

Day

251.52

20.12

35.38

690.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,915.21

Labour Rates Per

Rft

Rs.

838.41

341.74

Per Meter : Rs 6,281.89


Per Meter : Rs 2,750.00

2,361

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-b-04

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'C' working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 12"

2,092.31

RFT

TOTAL

MATERIAL

RFT

2,092.31

53.82

2,092.31

LABOUR
Coolie

1.029

Day

500.00

Day

514.48

Pipe Layer

0.514

Day

600.00

Day

308.69

24.70

24.18

847.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,581.58

Labour Rates Per

Rft

Rs.

1,028.96

641.41

Per Meter : Rs 11,747.59


Per Meter : Rs 3,375.00

2,362

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-c-01

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'D' working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 6"

503.04

RFT

TOTAL

MATERIAL

RFT

503.04

36.94

503.04

LABOUR
Coolie

0.648

Day

500.00

Day

323.93

Pipe Layer

0.324

Day

600.00

Day

194.36

15.55

41.06

533.84

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,261.57

Labour Rates Per

Rft

Rs.

647.87

224.69

Per Meter : Rs 4,137.96


Per Meter : Rs 2,125.00

2,363

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-c-02

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'D' working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 8"

753.04

RFT

TOTAL

MATERIAL

RFT

753.04

41.44

753.04

LABOUR
Coolie

0.762

Day

500.00

Day

381.10

Pipe Layer

0.381

Day

600.00

Day

228.66

18.29

36.56

628.05

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,680.90

Labour Rates Per

Rft

Rs.

762.20

299.82

Per Meter : Rs 5,513.36


Per Meter : Rs 2,500.00

2,364

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-c-03

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'D' working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 10"

1,152.43

RFT

TOTAL

MATERIAL

RFT

1,152.43

47.41

1,152.43

LABOUR
Coolie

0.838

Day

500.00

Day

419.21

Pipe Layer

0.419

Day

600.00

Day

251.52

20.12

30.59

690.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,244.38

Labour Rates Per

Rft

Rs.

838.41

401.10

Per Meter : Rs 7,361.56


Per Meter : Rs 2,750.00

2,365

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-12-c-04

(British) :

Rft

Providing and installing PVC blind pipe in tubewell with strainer


BSS Class 'D' working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 12"

2,769.23

RFT

TOTAL

MATERIAL

RFT

2,769.23

57.81

2,769.23

LABOUR
Coolie

1.029

Day

500.00

Day

514.48

Pipe Layer

0.514

Day

600.00

Day

308.69

24.70

20.19

847.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,407.42

Labour Rates Per

Rft

Rs.

1,028.96

790.33

Per Meter : Rs 14,456.35


Per Meter : Rs 3,375.00

2,366

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-13-a

(British) :

Hour

Test & develop tubewell of size 6" i/d & above continuously : Upto
1.5 cusecs discharge

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
350.000

Miscellaneous

2.00

LS

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

LS

75.00

22

Composite Rates Per

Hour

Rs.

854.00

Cost Per Hour: 854.00

Labour Rates Per

Hour

Rs.

0.00

Cost Per Hour: 0.00

700.00

700.00

154.00

2,367

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-13-b

(British) :

Hour

Test & develop tubewell of size 6" i/d & above continuously : Over
1.5 cusecs discharge with DNT unit

Detail

Qty

Unit

Rate (Rs)

Amount

EQUIPMENT
410.000

Miscellaneous

2.00

LS

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

820.00

LS

75.00

22

820.00

180.40

Composite Rates Per

Hour

Rs.

1,000.40

Cost Per Hour: 1,000.40

Labour Rates Per

Hour

Rs.

0.00

Cost Per Hour: 0.00

2,368

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-14

(British) :

Rft

Shrouding with graded pack grave 3/8" to 1/8" around tubewell in


bore hole

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
5.381

Pea Gravel

3,800.00

Cft

TOTAL

MATERIAL

100 Cft

204.48

38.82

204.48

Day

190.55

5.72

39.18

196.27

22

86.91

LABOUR
0.381

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

487.65

Labour Rates Per

Rft

Rs.

238.19

LABOUR

Per Meter : Rs 1,599.50


Per Meter : Rs 781.25

2,369

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-15-a

(British) :

Rft

Providing and Laying cut, joint, test & disinfect, CI pipeline in


trenches, complete : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cast Iron Pipe 3"

350.00

RFT

TOTAL

MATERIAL

RFT

350.00

66.33

350.00

LABOUR
Coolie

0.057

Day

500.00

Day

28.58

Pipe Layer

0.029

Day

600.00

Day

17.15

1.37

11.67

47.10

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

484.16

Labour Rates Per

Rft

Rs.

57.16

LABOUR

87.06

Per Meter : Rs 1,588.06


Per Meter : Rs 187.50

2,370

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-15-b

(British) :

Rft

Providing and Laying cut, joint, test & disinfect, CI pipeline in


trenches, complete : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cast Iron Pipe 4"

450.00

RFT

TOTAL

MATERIAL

RFT

450.00

66.05

450.00

LABOUR
Coolie

0.076

Day

500.00

Day

38.11

Pipe Layer

0.038

Day

600.00

Day

22.87

1.83

11.95

62.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

625.22

Labour Rates Per

Rft

Rs.

76.22

LABOUR

112.41

Per Meter : Rs 2,050.72


Per Meter : Rs 250.00

2,371

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-15-c

(British) :

Rft

Providing and Laying cut, joint, test & disinfect, CI pipeline in


trenches, complete : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cast Iron Pipe 6"

800.00

RFT

TOTAL

MATERIAL

RFT

800.00

67.31

800.00

LABOUR
Coolie

0.114

Day

500.00

Day

57.16

Pipe Layer

0.057

Day

600.00

Day

34.30

2.74

10.69

94.21

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,090.33

Labour Rates Per

Rft

Rs.

114.33

196.12

Per Meter : Rs 3,576.28


Per Meter : Rs 375.00

2,372

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-15-d

(British) :

Rft

Providing and Laying cut, joint, test & disinfect, CI pipeline in


trenches. complete : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cast Iron Pipe 8"

2,000.00

RFT

TOTAL

MATERIAL

RFT

2,000.00

69.69

2,000.00

LABOUR
Coolie

0.191

Day

500.00

Day

95.27

Pipe Layer

0.095

Day

600.00

Day

57.16

4.57

8.31

157.01

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,630.55

Labour Rates Per

Rft

Rs.

190.55

473.54

Per Meter : Rs 8,628.20


Per Meter : Rs 625.00

2,373

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-15-e

(British) :

Rft

Providing and Laying cut, joint, test & disinfect, CI pipeline in


trenches, complete : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cast Iron Pipe 10"

2,150.00

RFT

TOTAL

MATERIAL

RFT

2,150.00

68.67

2,150.00

LABOUR
Coolie

0.248

Day

500.00

Day

123.86

Pipe Layer

0.124

Day

600.00

Day

74.31

5.95

9.33

204.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,870.71

Labour Rates Per

Rft

Rs.

247.71

516.60

Per Meter : Rs 9,415.94


Per Meter : Rs 812.50

2,374

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-15-f

(British) :

Rft

Providing and Laying cut, joint, test & disinfect, CI pipeline in


trenches, complete : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cast Iron Pipe 12"

2,450.00

RFT

TOTAL

MATERIAL

RFT

2,450.00

69.39

2,450.00

LABOUR
Coolie

0.248

Day

500.00

Day

123.86

Pipe Layer

0.124

Day

600.00

Day

74.31

5.95

8.61

204.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,236.71

Labour Rates Per

Rft

Rs.

247.71

582.60

Per Meter : Rs 10,616.42


Per Meter : Rs 812.50

2,375

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-16-a-01

Item Name :

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using heavy quality GI Pipe : 4" Dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (heavy) 4"

575.00

RFT

TOTAL

MATERIAL

RFT

575.00

68.14

575.00

LABOUR
Coolie

0.072

Day

500.00

Day

36.20

Pipe Layer

0.036

Day

600.00

Day

21.72

1.74

9.86

59.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

773.91

Labour Rates Per

Rft

Rs.

72.41

LABOUR

139.24

Per Meter : Rs 2,538.42


Per Meter : Rs 237.50

2,376

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-16-a-02

Item Name :

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using heavy quality GI Pipe : 6" Dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (heavy) 5"

850.00

RFT

TOTAL

MATERIAL

RFT

850.00

68.38

850.00

LABOUR
Coolie

0.103

Day

500.00

Day

51.45

Pipe Layer

0.051

Day

600.00

Day

30.87

2.47

9.62

84.79

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,139.90

Labour Rates Per

Rft

Rs.

102.90

205.11

Per Meter : Rs 3,738.86


Per Meter : Rs 337.50

2,377

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-16-a-03

Item Name :

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using heavy quality GI Pipe : 8" Dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (heavy) 6"

1,100.00

RFT

TOTAL

MATERIAL

RFT

1,100.00

68.37

1,100.00

LABOUR
Coolie

0.133

Day

500.00

Day

66.69

Pipe Layer

0.067

Day

600.00

Day

40.02

3.20

9.63

109.91

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,475.38

Labour Rates Per

Rft

Rs.

133.38

265.48

Per Meter : Rs 4,839.26


Per Meter : Rs 437.50

2,378

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-16-b-01

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using medium quality GI Pipe : 4" Dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (medium) 4"

525.00

RFT

TOTAL

MATERIAL

RFT

525.00

67.55

525.00

LABOUR
Coolie

0.072

Day

500.00

Day

36.20

Pipe Layer

0.036

Day

600.00

Day

21.72

1.74

10.45

59.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

712.91

Labour Rates Per

Rft

Rs.

72.41

LABOUR

128.24

Per Meter : Rs 2,338.34


Per Meter : Rs 237.50

2,379

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-16-b-02

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using medium quality GI Pipe : 6" Dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (medium) 6"

900.00

RFT

TOTAL

MATERIAL

RFT

900.00

68.72

900.00

LABOUR
Coolie

0.103

Day

500.00

Day

51.45

Pipe Layer

0.051

Day

600.00

Day

30.87

2.47

9.28

84.79

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,200.90

Labour Rates Per

Rft

Rs.

102.90

216.11

Per Meter : Rs 3,938.94


Per Meter : Rs 337.50

2,380

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-16-b-03

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using medium quality GI Pipe : 8" Dia

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (medium) 8"

1,650.00

RFT

TOTAL

MATERIAL

RFT

1,650.00

70.44

1,650.00

LABOUR
Coolie

0.133

Day

500.00

Day

66.69

Pipe Layer

0.067

Day

600.00

Day

40.02

3.20

7.56

109.91

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,146.38

Labour Rates Per

Rft

Rs.

133.38

386.48

Per Meter : Rs 7,040.14


Per Meter : Rs 437.50

2,381

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-16-c-01

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 1/2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 0.5"

50.00

RFT

TOTAL

MATERIAL

RFT

50.00

57.48

50.00

LABOUR
Coolie

0.019

Day

500.00

Day

9.53

Pipe Layer

0.010

Day

600.00

Day

5.72

0.46

20.52

15.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

80.05

Labour Rates Per

Rft

Rs.

19.05

LABOUR

14.35

Per Meter : Rs 262.58


Per Meter : Rs 62.50

2,382

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-16-c-02

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 3/4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 0.75"

75.00

RFT

TOTAL

MATERIAL

RFT

75.00

60.29

75.00

LABOUR
Coolie

0.023

Day

500.00

Day

11.43

Pipe Layer

0.011

Day

600.00

Day

6.86

0.55

17.71

18.84

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

114.37

Labour Rates Per

Rft

Rs.

22.87

LABOUR

20.52

Per Meter : Rs 375.12


Per Meter : Rs 75.00

2,383

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-16-c-03

Item Name :

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 1" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 1"

95.00

RFT

TOTAL

MATERIAL

RFT

95.00

61.85

95.00

LABOUR
Coolie

0.027

Day

500.00

Day

13.34

Pipe Layer

0.011

Day

600.00

Day

6.86

0.61

16.15

20.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

141.15

Labour Rates Per

Rft

Rs.

25.25

LABOUR

25.34

Per Meter : Rs 462.96


Per Meter : Rs 82.81

2,384

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-16-c-04

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 1.25" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 1.25"

125.00

RFT

TOTAL

MATERIAL

RFT

125.00

62.76

125.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Layer

0.015

Day

600.00

Day

9.15

0.73

15.24

25.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

182.99

Labour Rates Per

Rft

Rs.

30.49

LABOUR

32.87

Per Meter : Rs 600.20


Per Meter : Rs 100.00

2,385

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-16-c-05

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 1.5"

160.00

RFT

TOTAL

MATERIAL

RFT

160.00

64.02

160.00

LABOUR
Coolie

0.034

Day

500.00

Day

17.15

Pipe Layer

0.017

Day

600.00

Day

10.29

0.82

13.98

28.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

229.50

Labour Rates Per

Rft

Rs.

34.30

LABOUR

41.24

Per Meter : Rs 752.76


Per Meter : Rs 112.50

2,386

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-16-c-06

Item Name :

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 2"

210.00

RFT

TOTAL

MATERIAL

RFT

210.00

65.48

210.00

LABOUR
Coolie

0.038

Day

500.00

Day

19.05

Pipe Layer

0.019

Day

600.00

Day

11.48

0.92

12.52

31.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

294.37

Labour Rates Per

Rft

Rs.

38.17

LABOUR

52.92

Per Meter : Rs 965.52


Per Meter : Rs 125.19

2,387

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-16-c-07

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 2.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 2.5"

275.00

RFT

TOTAL

MATERIAL

RFT

275.00

66.85

275.00

LABOUR
Coolie

0.042

Day

500.00

Day

20.96

Pipe Layer

0.021

Day

600.00

Day

12.58

1.01

11.15

34.54

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

377.42

Labour Rates Per

Rft

Rs.

41.92

LABOUR

67.88

Per Meter : Rs 1,237.94


Per Meter : Rs 137.50

2,388

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-16-c-08

Item Name :

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 3"

325.00

RFT

TOTAL

MATERIAL

RFT

325.00

65.75

325.00

LABOUR
Coolie

0.057

Day

500.00

Day

28.58

Pipe Layer

0.029

Day

600.00

Day

17.15

1.37

12.25

47.10

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

453.66

Labour Rates Per

Rft

Rs.

57.16

LABOUR

81.56

Per Meter : Rs 1,488.02


Per Meter : Rs 187.50

2,389

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-16-c-09

Item Name :

(British) :

Rft

Providing and Laying cut, joint, test & disinfect GI pipe line
Using light quality GI Pipe : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 4"

450.00

RFT

TOTAL

MATERIAL

RFT

450.00

66.45

450.00

LABOUR
Coolie

0.072

Day

500.00

Day

36.20

Pipe Layer

0.036

Day

600.00

Day

21.72

1.74

11.55

59.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

621.41

Labour Rates Per

Rft

Rs.

72.41

LABOUR

111.74

Per Meter : Rs 2,038.22


Per Meter : Rs 237.50

2,390

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-01

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 3"

150.00

RFT

TOTAL

MATERIAL

RFT

150.00

64.51

150.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Layer

0.015

Day

600.00

Day

9.15

0.73

13.49

25.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

213.49

Labour Rates Per

Rft

Rs.

30.49

LABOUR

38.37

Per Meter : Rs 700.24


Per Meter : Rs 100.00

2,391

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-02

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 4"

190.00

RFT

TOTAL

MATERIAL

RFT

190.00

65.54

190.00

LABOUR
Coolie

0.034

Day

500.00

Day

17.15

Pipe Layer

0.017

Day

600.00

Day

10.29

0.82

12.46

28.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

266.10

Labour Rates Per

Rft

Rs.

34.30

LABOUR

47.84

Per Meter : Rs 872.80


Per Meter : Rs 112.50

2,392

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-03

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 6"

300.00

RFT

TOTAL

MATERIAL

RFT

300.00

66.25

300.00

LABOUR
Coolie

0.050

Day

500.00

Day

24.77

Pipe Layer

0.025

Day

600.00

Day

14.86

1.19

11.75

40.82

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

415.54

Labour Rates Per

Rft

Rs.

49.54

LABOUR

74.72

Per Meter : Rs 1,362.98


Per Meter : Rs 162.50

2,393

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-04

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 8"

500.00

RFT

TOTAL

MATERIAL

RFT

500.00

67.58

500.00

LABOUR
Coolie

0.069

Day

500.00

Day

34.30

Pipe Layer

0.034

Day

600.00

Day

20.58

1.65

10.42

56.52

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

678.60

Labour Rates Per

Rft

Rs.

68.60

LABOUR

122.07

Per Meter : Rs 2,225.80


Per Meter : Rs 225.00

2,394

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-05

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 10"

675.00

RFT

TOTAL

MATERIAL

RFT

675.00

68.28

675.00

LABOUR
Coolie

0.088

Day

500.00

Day

43.83

Pipe Layer

0.038

Day

600.00

Day

22.64

1.99

9.72

68.46

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

906.58

Labour Rates Per

Rft

Rs.

83.08

LABOUR

163.12

Per Meter : Rs 2,973.58


Per Meter : Rs 272.50

2,395

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-06

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 12"

900.00

RFT

TOTAL

MATERIAL

RFT

900.00

68.08

900.00

LABOUR
Coolie

0.114

Day

500.00

Day

57.16

Pipe Layer

0.057

Day

600.00

Day

34.30

2.74

9.92

94.21

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,212.33

Labour Rates Per

Rft

Rs.

114.33

218.12

Per Meter : Rs 3,976.44


Per Meter : Rs 375.00

2,396

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-07

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 14" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 14"

1,250.00

RFT

TOTAL

MATERIAL

RFT

1,250.00

69.10

1,250.00

LABOUR
Coolie

0.133

Day

500.00

Day

66.69

Pipe Layer

0.067

Day

600.00

Day

40.02

3.20

8.90

109.91

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,658.38

Labour Rates Per

Rft

Rs.

133.38

298.48

Per Meter : Rs 5,439.50


Per Meter : Rs 437.50

2,397

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-08

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 16" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 16"

1,500.00

RFT

TOTAL

MATERIAL

RFT

1,500.00

69.36

1,500.00

LABOUR
Coolie

0.152

Day

500.00

Day

76.22

Pipe Layer

0.076

Day

600.00

Day

45.73

3.66

8.64

125.61

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,982.44

Labour Rates Per

Rft

Rs.

152.44

356.83

Per Meter : Rs 6,502.40


Per Meter : Rs 500.00

2,398

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-09

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 18"

1,850.00

RFT

TOTAL

MATERIAL

RFT

1,850.00

69.72

1,850.00

LABOUR
Coolie

0.175

Day

500.00

Day

87.65

Pipe Layer

0.088

Day

600.00

Day

52.59

4.21

8.28

144.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,432.30

Labour Rates Per

Rft

Rs.

175.30

437.85

Per Meter : Rs 7,977.96


Per Meter : Rs 575.00

2,399

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-10

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 20" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 20"

2,275.00

RFT

TOTAL

MATERIAL

RFT

2,275.00

69.94

2,275.00

LABOUR
Coolie

0.206

Day

500.00

Day

102.90

Pipe Layer

0.103

Day

600.00

Day

61.74

4.94

8.06

169.57

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,981.29

Labour Rates Per

Rft

Rs.

205.79

536.72

Per Meter : Rs 9,778.64


Per Meter : Rs 675.00

2,400

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-a-11

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'B'working pressure : 24" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (b) 24"

3,150.00

RFT

TOTAL

MATERIAL

RFT

3,150.00

70.63

3,150.00

LABOUR
Coolie

0.244

Day

500.00

Day

121.95

Pipe Layer

0.122

Day

600.00

Day

73.17

5.85

7.37

200.98

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,086.90

Labour Rates Per

Rft

Rs.

243.90

735.93

Per Meter : Rs 13,405.04


Per Meter : Rs 800.00

2,401

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-01

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 3"

175.00

RFT

TOTAL

MATERIAL

RFT

175.00

65.83

175.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Layer

0.015

Day

600.00

Day

9.15

0.73

12.17

25.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

243.99

Labour Rates Per

Rft

Rs.

30.49

LABOUR

43.87

Per Meter : Rs 800.28


Per Meter : Rs 100.00

2,402

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-02

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 4"

195.00

RFT

TOTAL

MATERIAL

RFT

195.00

65.75

195.00

LABOUR
Coolie

0.034

Day

500.00

Day

17.15

Pipe Layer

0.017

Day

600.00

Day

10.29

0.82

12.25

28.26

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

272.20

Labour Rates Per

Rft

Rs.

34.30

LABOUR

48.94

Per Meter : Rs 892.81


Per Meter : Rs 112.50

2,403

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-03

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 6"

350.00

RFT

TOTAL

MATERIAL

RFT

350.00

67.37

350.00

LABOUR
Coolie

0.050

Day

500.00

Day

24.77

Pipe Layer

0.025

Day

600.00

Day

14.86

1.19

10.63

40.82

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

476.54

Labour Rates Per

Rft

Rs.

49.54

LABOUR

85.72

Per Meter : Rs 1,563.06


Per Meter : Rs 162.50

2,404

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-04

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 8"

600.00

RFT

TOTAL

MATERIAL

RFT

600.00

68.72

600.00

LABOUR
Coolie

0.069

Day

500.00

Day

34.30

Pipe Layer

0.034

Day

600.00

Day

20.58

1.65

9.28

56.52

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

800.60

Labour Rates Per

Rft

Rs.

68.60

LABOUR

144.07

Per Meter : Rs 2,625.96


Per Meter : Rs 225.00

2,405

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-05

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 10"

780.00

RFT

TOTAL

MATERIAL

RFT

780.00

68.81

780.00

LABOUR
Coolie

0.088

Day

500.00

Day

43.83

Pipe Layer

0.044

Day

600.00

Day

26.30

2.10

9.19

72.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,039.25

Labour Rates Per

Rft

Rs.

87.65

187.03

Per Meter : Rs 3,408.75


Per Meter : Rs 287.50

2,406

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-06

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 12"

1,050.00

RFT

TOTAL

MATERIAL

RFT

1,050.00

67.97

1,050.00

LABOUR
Coolie

0.114

Day

500.00

Day

57.16

Pipe Fitter I

0.057

Day

900.00

Day

51.45

3.26

10.03

111.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,416.77

Labour Rates Per

Rft

Rs.

135.77

254.89

Per Meter : Rs 4,646.99


Per Meter : Rs 445.31

2,407

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-07

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 14" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 14"

1,650.00

RFT

TOTAL

MATERIAL

RFT

1,650.00

70.44

1,650.00

LABOUR
Coolie

0.133

Day

500.00

Day

66.69

Pipe Layer

0.067

Day

600.00

Day

40.02

3.20

7.56

109.91

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,146.38

Labour Rates Per

Rft

Rs.

133.38

386.48

Per Meter : Rs 7,040.14


Per Meter : Rs 437.50

2,408

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-08

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 16" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 16"

2,150.00

RFT

TOTAL

MATERIAL

RFT

2,150.00

70.97

2,150.00

LABOUR
Coolie

0.152

Day

500.00

Day

76.22

Pipe Layer

0.076

Day

600.00

Day

45.73

3.66

7.03

125.61

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,775.44

Labour Rates Per

Rft

Rs.

152.44

499.83

Per Meter : Rs 9,103.44


Per Meter : Rs 500.00

2,409

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-09

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 18"

2,600.00

RFT

TOTAL

MATERIAL

RFT

2,600.00

71.16

2,600.00

LABOUR
Coolie

0.175

Day

500.00

Day

87.65

Pipe Layer

0.088

Day

600.00

Day

52.59

4.21

6.84

144.45

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,347.30

Labour Rates Per

Rft

Rs.

175.30

602.85

Per Meter : Rs 10,979.16


Per Meter : Rs 575.00

2,410

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-10

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 20" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 20"

3,100.00

RFT

TOTAL

MATERIAL

RFT

3,100.00

71.22

3,100.00

LABOUR
Coolie

0.206

Day

500.00

Day

102.90

Pipe Layer

0.103

Day

600.00

Day

61.74

4.94

6.78

169.57

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,987.79

Labour Rates Per

Rft

Rs.

205.79

718.22

Per Meter : Rs 13,079.96


Per Meter : Rs 675.00

2,411

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-b-11

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'C'working pressure : 24" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (c) 24"

4,350.00

RFT

TOTAL

MATERIAL

RFT

4,350.00

71.78

4,350.00

LABOUR
Coolie

0.244

Day

500.00

Day

121.95

Pipe Layer

0.122

Day

600.00

Day

73.17

5.85

6.22

200.98

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

5,550.90

Labour Rates Per

Rft

Rs.

243.90

999.93

Per Meter : Rs 18,206.96


Per Meter : Rs 800.00

2,412

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-01

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 3"

175.00

RFT

TOTAL

MATERIAL

RFT

175.00

65.83

175.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Layer

0.015

Day

600.00

Day

9.15

0.73

12.17

25.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

243.99

Labour Rates Per

Rft

Rs.

30.49

LABOUR

43.87

Per Meter : Rs 800.28


Per Meter : Rs 100.00

2,413

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-02

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 4"

250.00

RFT

TOTAL

MATERIAL

RFT

250.00

66.35

250.00

LABOUR
Coolie

0.034

Day

500.00

Day

17.15

Pipe Fitter I

0.017

Day

900.00

Day

15.43

0.98

11.65

33.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

345.73

Labour Rates Per

Rft

Rs.

40.73

LABOUR

62.17

Per Meter : Rs 1,133.99


Per Meter : Rs 133.59

2,414

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-03

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 6"

450.00

RFT

TOTAL

MATERIAL

RFT

450.00

67.90

450.00

LABOUR
Coolie

0.050

Day

500.00

Day

24.77

Pipe Fitter I

0.025

Day

900.00

Day

22.29

1.41

10.10

48.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

607.83

Labour Rates Per

Rft

Rs.

58.83

LABOUR

109.35

Per Meter : Rs 1,993.69


Per Meter : Rs 192.97

2,415

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-04

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 8"

750.00

RFT

TOTAL

MATERIAL

RFT

750.00

69.00

750.00

LABOUR
Coolie

0.069

Day

500.00

Day

34.30

Pipe Fitter I

0.034

Day

900.00

Day

30.87

1.96

9.00

67.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

996.46

Labour Rates Per

Rft

Rs.

81.46

LABOUR

179.34

Per Meter : Rs 3,268.39


Per Meter : Rs 267.19

2,416

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-05

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 10"

1,100.00

RFT

TOTAL

MATERIAL

RFT

1,100.00

69.24

1,100.00

LABOUR
Coolie

0.088

Day

500.00

Day

43.83

Pipe Fitter I

0.053

Day

900.00

Day

47.68

2.75

8.76

94.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,456.38

Labour Rates Per

Rft

Rs.

114.38

262.13

Per Meter : Rs 4,776.92


Per Meter : Rs 375.16

2,417

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-06

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 12"

1,750.00

RFT

TOTAL

MATERIAL

RFT

1,750.00

70.62

1,750.00

LABOUR
Coolie

0.114

Day

500.00

Day

57.16

Pipe Fitter I

0.057

Day

900.00

Day

51.45

3.26

7.38

111.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,270.77

Labour Rates Per

Rft

Rs.

135.77

408.89

Per Meter : Rs 7,448.11


Per Meter : Rs 445.31

2,418

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-07

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 14" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 14"

2,450.00

RFT

TOTAL

MATERIAL

RFT

2,450.00

71.31

2,450.00

LABOUR
Coolie

0.133

Day

500.00

Day

66.69

Pipe Fitter I

0.067

Day

900.00

Day

60.02

3.80

6.69

130.52

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,147.39

Labour Rates Per

Rft

Rs.

158.39

566.88

Per Meter : Rs 10,323.45


Per Meter : Rs 519.53

2,419

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-08

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 16" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 16"

3,150.00

RFT

TOTAL

MATERIAL

RFT

3,150.00

71.70

3,150.00

LABOUR
Coolie

0.152

Day

500.00

Day

76.22

Pipe Fitter I

0.076

Day

900.00

Day

68.60

4.34

6.30

149.16

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,024.02

Labour Rates Per

Rft

Rs.

181.02

724.86

Per Meter : Rs 13,198.79


Per Meter : Rs 593.75

2,420

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-09

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 18"

3,750.00

RFT

TOTAL

MATERIAL

RFT

3,750.00

71.81

3,750.00

LABOUR
Coolie

0.175

Day

500.00

Day

87.65

Pipe Fitter I

0.088

Day

900.00

Day

78.89

5.00

6.19

171.54

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,783.17

Labour Rates Per

Rft

Rs.

208.17

861.64

Per Meter : Rs 15,688.81


Per Meter : Rs 682.81

2,421

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-10

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 20" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 20"

4,650.00

RFT

TOTAL

MATERIAL

RFT

4,650.00

71.97

4,650.00

LABOUR
Coolie

0.206

Day

500.00

Day

102.90

Pipe Fitter I

0.103

Day

900.00

Day

92.61

5.87

6.03

201.37

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

5,917.38

Labour Rates Per

Rft

Rs.

244.38

1,066.01

Per Meter : Rs 19,409.00


Per Meter : Rs 801.56

2,422

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-17-c-11

(British) :

Rft

Providing and Laying cut, joint, test & disinfect AC pipe line BSS
Class 'D'working pressure : 24" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

A.C.pipe (d) 24"

7,500.00

RFT

TOTAL

MATERIAL

RFT

7,500.00

72.75

7,500.00

LABOUR
Coolie

0.244

Day

500.00

Day

121.95

Pipe Fitter I

0.122

Day

900.00

Day

109.76

6.95

5.25

238.66

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

9,439.63

Labour Rates Per

Rft

Rs.

289.63

1,700.98

Per Meter : Rs 30,962.00


Per Meter : Rs 950.00

2,423

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-a-01

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'B'working pressure : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 3"

87.80

RFT

TOTAL

MATERIAL

RFT

87.80

56.40

87.80

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter I

0.015

Day

900.00

Day

13.72

0.87

21.60

29.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

143.32

Labour Rates Per

Rft

Rs.

36.20

LABOUR

25.69

Per Meter : Rs 470.09


Per Meter : Rs 118.75

2,424

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-a-02

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'B'working pressure : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 4"

131.09

RFT

TOTAL

MATERIAL

RFT

131.09

60.07

131.09

LABOUR
Coolie

0.034

Day

500.00

Day

17.15

Pipe Fitter I

0.017

Day

900.00

Day

15.43

0.98

17.93

33.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

200.66

Labour Rates Per

Rft

Rs.

40.73

LABOUR

36.01

Per Meter : Rs 658.16


Per Meter : Rs 133.59

2,425

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-a-03

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'B'working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 6"

260.67

RFT

TOTAL

MATERIAL

RFT

260.67

63.53

260.67

LABOUR
Coolie

0.050

Day

500.00

Day

24.77

Pipe Fitter I

0.025

Day

900.00

Day

22.29

1.41

14.47

48.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

376.85

Labour Rates Per

Rft

Rs.

58.83

LABOUR

67.70

Per Meter : Rs 1,236.07


Per Meter : Rs 192.97

2,426

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-a-04

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'B'working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 8"

396.34

RFT

TOTAL

MATERIAL

RFT

396.34

64.41

396.34

LABOUR
Coolie

0.069

Day

500.00

Day

34.30

Pipe Fitter I

0.034

Day

900.00

Day

30.87

1.96

13.59

67.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

564.99

Labour Rates Per

Rft

Rs.

81.46

LABOUR

101.53

Per Meter : Rs 1,853.18


Per Meter : Rs 267.19

2,427

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-a-05

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'B'working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 10"

609.75

RFT

TOTAL

MATERIAL

RFT

609.75

65.99

609.75

LABOUR
Coolie

0.088

Day

500.00

Day

43.83

Pipe Fitter I

0.044

Day

900.00

Day

39.44

2.50

12.01

85.77

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

847.98

Labour Rates Per

Rft

Rs.

104.09

LABOUR

152.46

Per Meter : Rs 2,781.38


Per Meter : Rs 341.41

2,428

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-a-06

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'B'working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (b) 12"

882.62

RFT

TOTAL

MATERIAL

RFT

882.62

66.78

882.62

LABOUR
Coolie

0.114

Day

500.00

Day

57.16

Pipe Fitter I

0.057

Day

900.00

Day

51.45

3.26

11.22

111.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,212.56

Labour Rates Per

Rft

Rs.

135.77

218.07

Per Meter : Rs 3,977.20


Per Meter : Rs 445.31

2,429

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-b-01

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'C'working pressure : 2.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 2"

80.00

RFT

TOTAL

MATERIAL

RFT

80.00

55.06

80.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter I

0.015

Day

900.00

Day

13.72

0.87

22.94

29.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

133.80

Labour Rates Per

Rft

Rs.

36.20

LABOUR

23.97

Per Meter : Rs 438.88


Per Meter : Rs 118.75

2,430

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-b-02

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'C'working pressure : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 3"

109.75

RFT

TOTAL

MATERIAL

RFT

109.75

59.34

109.75

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter I

0.015

Day

900.00

Day

13.72

0.87

18.66

29.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

170.10

Labour Rates Per

Rft

Rs.

36.20

LABOUR

30.52

Per Meter : Rs 557.93


Per Meter : Rs 118.75

2,431

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-b-03

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'C'working pressure : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 4"

173.78

RFT

TOTAL

MATERIAL

RFT

173.78

63.16

173.78

LABOUR
Coolie

0.034

Day

500.00

Day

17.15

Pipe Fitter I

0.017

Day

900.00

Day

15.43

0.98

14.84

33.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

252.74

Labour Rates Per

Rft

Rs.

40.73

LABOUR

45.40

Per Meter : Rs 828.99


Per Meter : Rs 133.59

2,432

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-b-04

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'C'working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 6"

387.19

RFT

TOTAL

MATERIAL

RFT

387.19

66.87

387.19

LABOUR
Coolie

0.050

Day

500.00

Day

24.77

Pipe Fitter I

0.025

Day

900.00

Day

22.29

1.41

11.13

48.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

531.20

Labour Rates Per

Rft

Rs.

58.83

LABOUR

95.54

Per Meter : Rs 1,742.35


Per Meter : Rs 192.97

2,433

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-b-05

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'C'working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 8"

588.41

RFT

TOTAL

MATERIAL

RFT

588.41

67.52

588.41

LABOUR
Coolie

0.069

Day

500.00

Day

34.30

Pipe Fitter I

0.034

Day

900.00

Day

30.87

1.96

10.48

67.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

799.32

Labour Rates Per

Rft

Rs.

81.46

LABOUR

143.79

Per Meter : Rs 2,621.77


Per Meter : Rs 267.19

2,434

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-b-06

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'C'working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 10"

882.62

RFT

TOTAL

MATERIAL

RFT

882.62

68.53

882.62

LABOUR
Coolie

0.088

Day

500.00

Day

43.83

Pipe Fitter I

0.044

Day

900.00

Day

39.44

2.50

9.47

85.77

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,180.88

Labour Rates Per

Rft

Rs.

104.09

212.50

Per Meter : Rs 3,873.30


Per Meter : Rs 341.41

2,435

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-b-07

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'C'working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (c) 12"

2,092.31

RFT

TOTAL

MATERIAL

RFT

2,092.31

71.30

2,092.31

LABOUR
Coolie

0.114

Day

500.00

Day

57.16

Pipe Fitter I

0.057

Day

900.00

Day

51.45

3.26

6.70

111.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,688.38

Labour Rates Per

Rft

Rs.

135.77

484.20

Per Meter : Rs 8,817.90


Per Meter : Rs 445.31

2,436

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-01

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 1.25" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 1.25"

51.07

RFT

TOTAL

MATERIAL

RFT

51.07

51.59

51.07

LABOUR
Coolie

0.024

Day

500.00

Day

12.20

Pipe Fitter I

0.012

Day

900.00

Day

10.98

0.70

26.41

23.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

91.27

Labour Rates Per

Rft

Rs.

28.96

LABOUR

16.33

Per Meter : Rs 299.36


Per Meter : Rs 95.00

2,437

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-02

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 1.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 1.5"

41.15

RFT

TOTAL

MATERIAL

RFT

41.15

45.36

41.15

LABOUR
Coolie

0.027

Day

500.00

Day

13.72

Pipe Fitter I

0.015

Day

900.00

Day

13.17

0.81

32.64

27.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

83.82

Labour Rates Per

Rft

Rs.

33.61

LABOUR

14.97

Per Meter : Rs 274.92


Per Meter : Rs 110.25

2,438

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-03

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 2" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 2"

62.50

RFT

TOTAL

MATERIAL

RFT

62.50

52.44

62.50

LABOUR
Coolie

0.027

Day

500.00

Day

13.72

Pipe Fitter I

0.015

Day

900.00

Day

13.17

0.81

25.56

27.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

109.86

Labour Rates Per

Rft

Rs.

33.61

LABOUR

19.67

Per Meter : Rs 360.35


Per Meter : Rs 110.25

2,439

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-04

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 2.5" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 2.5"

75.00

RFT

TOTAL

MATERIAL

RFT

75.00

54.11

75.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter I

0.015

Day

900.00

Day

13.72

0.87

23.89

29.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

127.70

Labour Rates Per

Rft

Rs.

36.20

LABOUR

22.87

Per Meter : Rs 418.87


Per Meter : Rs 118.75

2,440

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-05

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

PVC Pipe (d) 3"

148.00

RFT

TOTAL

MATERIAL

RFT

148.00

62.72

148.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter I

0.015

Day

900.00

Day

13.72

0.87

15.28

29.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

216.76

Labour Rates Per

Rft

Rs.

36.20

LABOUR

38.93

Per Meter : Rs 710.99


Per Meter : Rs 118.75

2,441

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-06

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 4"

237.80

RFT

TOTAL

MATERIAL

RFT

237.80

65.96

237.80

LABOUR
Coolie

0.034

Day

500.00

Day

17.15

Pipe Fitter I

0.017

Day

900.00

Day

15.43

0.98

12.04

33.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

330.85

Labour Rates Per

Rft

Rs.

40.73

LABOUR

59.48

Per Meter : Rs 1,085.17


Per Meter : Rs 133.59

2,442

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-07

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 6"

503.04

RFT

TOTAL

MATERIAL

RFT

503.04

68.58

503.04

LABOUR
Coolie

0.050

Day

500.00

Day

24.77

Pipe Fitter I

0.025

Day

900.00

Day

22.29

1.41

9.42

48.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

672.54

Labour Rates Per

Rft

Rs.

58.83

LABOUR

121.02

Per Meter : Rs 2,205.93


Per Meter : Rs 192.97

2,443

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-08

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 8"

753.04

RFT

TOTAL

MATERIAL

RFT

753.04

69.03

753.04

LABOUR
Coolie

0.069

Day

500.00

Day

34.30

Pipe Fitter I

0.034

Day

900.00

Day

30.87

1.96

8.97

67.12

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,000.17

Labour Rates Per

Rft

Rs.

81.46

180.01

Per Meter : Rs 3,280.55


Per Meter : Rs 267.19

2,444

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-09

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 10"

1,152.43

RFT

TOTAL

MATERIAL

RFT

1,152.43

69.95

1,152.43

LABOUR
Coolie

0.088

Day

500.00

Day

43.83

Pipe Fitter I

0.044

Day

900.00

Day

39.44

2.50

8.05

85.77

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,510.05

Labour Rates Per

Rft

Rs.

104.09

271.85

Per Meter : Rs 4,952.97


Per Meter : Rs 341.41

2,445

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-c-10

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'D' working pressure : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (d) 12"

2,769.23

RFT

TOTAL

MATERIAL

RFT

2,769.23

72.17

2,769.23

LABOUR
Coolie

0.114

Day

500.00

Day

57.16

Pipe Fitter I

0.057

Day

900.00

Day

51.45

3.26

5.83

111.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,514.23

Labour Rates Per

Rft

Rs.

135.77

633.13

Per Meter : Rs 11,526.66


Per Meter : Rs 445.31

2,446

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-d-01

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'E' working pressure : 3/4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (e) 0.75"

19.00

RFT

TOTAL

MATERIAL

RFT

19.00

32.52

19.00

LABOUR
Coolie

0.024

Day

500.00

Day

12.20

Pipe Fitter I

0.014

Day

900.00

Day

12.62

0.74

45.48

25.56

22

9.64

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

54.20

Labour Rates Per

Rft

Rs.

31.02

LABOUR

Per Meter : Rs 177.78


Per Meter : Rs 101.75

2,447

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-18-d-02

(British) :

Rft

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS
Class 'E' working pressure : 1" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Pvc Pipe (e) 1"

27.40

RFT

TOTAL

MATERIAL

RFT

27.40

51.35

27.40

Day

12.62

0.38

26.65

13.00

22

8.80

LABOUR
0.014

Pipe Fitter I

900.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

49.21

Labour Rates Per

Rft

Rs.

15.78

LABOUR

Per Meter : Rs 161.39


Per Meter : Rs 51.75

2,448

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-19-a-01

(British) :

kg

Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CISS
specials, with spigot & socket : 3"-6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CI Specials

150.00

Kg

TOTAL

MATERIAL

Kg

165.00

58.24

165.00

LABOUR
Coolie

0.050

Day

500.00

Day

25.00

Pipe Fitter I

0.025

Day

900.00

Day

22.50

1.43

19.76

48.93

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

260.68

Cost Per kg: 260.68

Labour Rates Per

kg

Rs.

59.38

Cost Per kg: 59.38

46.75

2,449

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-19-a-02

(British) :

kg

Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CISS
specials, with spigot & socket : 8"-12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CI Specials

150.00

Kg

TOTAL

MATERIAL

Kg

165.00

55.87

165.00

LABOUR
Coolie

0.050

Day

500.00

Day

25.00

Pipe Fitter I

0.035

Day

900.00

Day

31.50

1.70

22.13

58.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

271.93

Cost Per kg: 271.93

Labour Rates Per

kg

Rs.

70.63

Cost Per kg: 70.63

48.73

2,450

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-19-b-01

(British) :

kg

Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CI
flanged specials with flanged joint : 3"-6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CI Specials

150.00

Kg

TOTAL

MATERIAL

Kg

165.00

65.56

165.00

LABOUR
Coolie

0.025

Day

500.00

Day

12.50

Pipe Fitter I

0.013

Day

900.00

Day

11.25

0.71

12.44

24.46

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

230.99

Cost Per kg: 230.99

Labour Rates Per

kg

Rs.

29.69

Cost Per kg: 29.69

41.53

2,451

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-19-b-02

(British) :

kg

Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CI
flanged specials with flanged joint : 8"-12" i/

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CI Specials

150.00

Kg

TOTAL

MATERIAL

Kg

165.00

60.96

165.00

LABOUR
Coolie

0.040

Day

500.00

Day

20.00

Pipe Fitter I

0.020

Day

900.00

Day

18.00

1.14

17.04

39.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

248.80

Cost Per kg: 248.80

Labour Rates Per

kg

Rs.

47.50

Cost Per kg: 47.50

44.66

2,452

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-19-c-01

(British) :

kg

Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CI
specials with tyton joints : 3"-6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CI Specials

150.00

Kg

TOTAL

MATERIAL

Kg

165.00

70.32

165.00

LABOUR
Coolie

0.013

Day

500.00

Day

6.25

Pipe Fitter I

0.005

Day

900.00

Day

4.72

0.33

7.68

11.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

215.02

Cost Per kg: 215.02

Labour Rates Per

kg

Rs.

13.72

Cost Per kg: 13.72

38.71

2,453

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-19-c-02

(British) :

kg

Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CI
specials with tyton joints : 8"-12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CI Specials

150.00

Kg

TOTAL

MATERIAL

Kg

165.00

66.84

165.00

LABOUR
Coolie

0.025

Day

500.00

Day

12.50

Pipe Fitter I

0.009

Day

900.00

Day

7.65

0.60

11.16

20.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

226.49

Cost Per kg: 226.49

Labour Rates Per

kg

Rs.

25.19

Cost Per kg: 25.19

40.73

2,454

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-20-a

(British) :

kg

Providing and Fixing CI specials of BSS Class 'B', 'C' & 'D'
working pressure for AC pipe line : 3" to 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CI Specials

150.00

Kg

TOTAL

MATERIAL

Kg

165.00

54.71

165.00

LABOUR
Coolie

0.063

Day

500.00

Day

31.25

Pipe Fitter I

0.033

Day

900.00

Day

29.93

1.84

23.29

63.01

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

277.77

Cost Per kg: 277.77

Labour Rates Per

kg

Rs.

76.47

Cost Per kg: 76.47

49.76

2,455

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-20-b

(British) :

kg

Providing and Fixing CI specials of BSS Class 'B', 'C' & 'D'
working pressure for AC pipe line : 8" to 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

CI Specials

150.00

Kg

TOTAL

MATERIAL

Kg

165.00

47.60

165.00

LABOUR
Coolie

0.100

Day

500.00

Day

50.00

Pipe Fitter I

0.050

Day

900.00

Day

45.00

2.85

30.40

97.85

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

320.05

Cost Per kg: 320.05

Labour Rates Per

kg

Rs.

118.75

Cost Per kg: 118.75

57.20

2,456

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-21-a

(British) :

Each

Providing and Fixing sluice valve, BSS quality/weight, Class 'B'


working pressure for CI & AC pipe line : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Sluice Valve 3"

9,800.00

No

TOTAL

MATERIAL

No

9,800.00

65.20

9,800.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Pipe Fitter I

0.525

Day

900.00

Day

472.50

44.18

12.80

1,516.67

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,479.95

Composite Rates Per

Each

Rs.

13,796.62

Cost Per Each: 13,796.62

Labour Rates Per

Each

Rs.

1,840.63

Cost Per Each: 1,840.63

2,457

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-21-b

(British) :

Each

Providing and Fixing sluice valve, BSS quality/weight, Class 'B'


working pressure for CI & AC pipe line : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Sluice Valve 4"

11,000.00

No

TOTAL

MATERIAL

11,000.00

No

72.50

11,000.00

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Pipe Fitter I

0.200

Day

900.00

Day

180.00

11.40

5.50

391.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,503.60

Composite Rates Per

Each

Rs.

13,895.00

Cost Per Each: 13,895.00

Labour Rates Per

Each

Rs.

475.00

Cost Per Each: 475.00

2,458

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-21-c

(British) :

Each

Providing and Fixing sluice valve, BSS quality/weight, Class 'B'


working pressure for CI & AC pipe line : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Sluice Valve 6"

14,500.00

No

TOTAL

MATERIAL

No

14,500.00

67.80

14,500.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Pipe Fitter I

0.600

Day

900.00

Day

540.00

46.20

10.20

1,586.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,528.80

Composite Rates Per

Each

Rs.

19,615.00

Cost Per Each: 19,615.00

Labour Rates Per

Each

Rs.

1,925.00

Cost Per Each: 1,925.00

2,459

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-21-d

(British) :

Each

Providing and Fixing sluice valve, BSS quality/weight, Class 'B'


working pressure for CI & AC pipe line : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Sluice Valve 8"

22,000.00

No

TOTAL

MATERIAL

No

22,000.00

70.09

22,000.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Pipe Fitter I

0.600

Day

900.00

Day

540.00

46.20

7.91

1,586.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,178.80

Composite Rates Per

Each

Rs.

28,765.00

Cost Per Each: 28,765.00

Labour Rates Per

Each

Rs.

1,925.00

Cost Per Each: 1,925.00

2,460

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-21-e

(British) :

Each

Providing and Fixing sluice valve, BSS quality/weight, Class 'B'


working pressure for CI & AC pipe line : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Sluice Valve 10"

28,900.00

No

TOTAL

MATERIAL

No

28,900.00

70.37

28,900.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Pipe Fitter I

1.000

Day

900.00

Day

900.00

57.00

7.63

1,957.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

6,776.00

Composite Rates Per

Each

Rs.

37,633.00

Cost Per Each: 37,633.00

Labour Rates Per

Each

Rs.

2,375.00

Cost Per Each: 2,375.00

2,461

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-21-f

(British) :

Each

Providing and Fixing sluice valve, BSS quality/weight, Class 'B'


working pressure for CI & AC pipe line : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Sluice Valve 12"

48,000.00

No

TOTAL

MATERIAL

No

48,000.00

70.80

48,000.00

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Pipe Fitter I

1.500

Day

900.00

Day

1,350.00

85.50

7.20

2,935.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

11,187.00

Composite Rates Per

Each

Rs.

62,122.50

Cost Per Each: 62,122.50

Labour Rates Per

Each

Rs.

3,562.50

Cost Per Each: 3,562.50

2,462

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-22-a

(British) :

Each

Providing and Fixing sluice valve of BSS quality weight for GI &
PVC pipe line including jointing material : 3" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

C.I. Sluice Valve 3"

9,800.00

No

TOTAL

MATERIAL

No

10,780.00

65.51

10,780.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Pipe Fitter I

0.625

Day

900.00

Day

562.50

46.88

12.49

1,609.38

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,715.35

Composite Rates Per

Each

Rs.

15,104.73

Cost Per Each: 15,104.73

Labour Rates Per

Each

Rs.

1,953.13

Cost Per Each: 1,953.13

2,463

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-22-b

(British) :

Each

Providing and Fixing sluice valve of BSS quality weight for GI &
PVC pipe line including jointing material : 4" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

C.I. Sluice Valve 4"

11,000.00

No

TOTAL

MATERIAL

No

12,100.00

66.42

12,100.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Pipe Fitter I

0.625

Day

900.00

Day

562.50

46.88

11.58

1,609.38

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,005.75

Composite Rates Per

Each

Rs.

16,715.13

Cost Per Each: 16,715.13

Labour Rates Per

Each

Rs.

1,953.13

Cost Per Each: 1,953.13

2,464

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-22-c

(British) :

Each

Providing and Fixing sluice valve of BSS quality weight for GI &
PVC pipe line including jointing material : 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

C.I. Sluice Valve 6"

14,500.00

No

TOTAL

MATERIAL

No

15,950.00

67.02

15,950.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Pipe Fitter I

1.000

Day

900.00

Day

900.00

57.00

10.98

1,957.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,927.00

Composite Rates Per

Each

Rs.

21,834.00

Cost Per Each: 21,834.00

Labour Rates Per

Each

Rs.

2,375.00

Cost Per Each: 2,375.00

2,465

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-22-d

(British) :

Each

Providing and Fixing sluice valve of BSS quality weight for GI &
PVC pipe line including jointing material : 8" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

C.I. Sluice Valve 8"

22,000.00

No

TOTAL

MATERIAL

No

24,200.00

68.30

24,200.00

LABOUR
Coolie

2.500

Day

500.00

Day

1,250.00

Pipe Fitter I

1.250

Day

900.00

Day

1,125.00

71.25

9.70

2,446.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

5,846.50

Composite Rates Per

Each

Rs.

32,492.75

Cost Per Each: 32,492.75

Labour Rates Per

Each

Rs.

2,968.75

Cost Per Each: 2,968.75

2,466

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-22-e

(British) :

Each

Providing and Fixing sluice valve of BSS quality weight for GI &
PVC pipe line including jointing material : 10" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

C.I. Sluice Valve 10"

28,900.00

No

TOTAL

MATERIAL

No

31,790.00

68.39

31,790.00

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Pipe Fitter I

1.750

Day

900.00

Day

1,575.00

92.25

9.61

3,167.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

7,670.30

Composite Rates Per

Each

Rs.

42,627.55

Cost Per Each: 42,627.55

Labour Rates Per

Each

Rs.

3,843.75

Cost Per Each: 3,843.75

2,467

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-22-f

(British) :

Each

Providing and Fixing sluice valve of BSS quality weight for GI &
PVC pipe line including jointing material : 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

C.I. Sluice Valve 12"

48,000.00

No

TOTAL

MATERIAL

No

52,800.00

69.96

52,800.00

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Pipe Fitter I

2.000

Day

900.00

Day

1,800.00

114.00

8.04

3,914.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

12,452.00

Composite Rates Per

Each

Rs.

69,166.00

Cost Per Each: 69,166.00

Labour Rates Per

Each

Rs.

4,750.00

Cost Per Each: 4,750.00

2,468

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-22-g

(British) :

Each

Providing and Fixing sluice valve of BSS quality weight for GI &
PVC pipe line including jointing material : 15" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Sluice Valve 15"

102,000.00

No

TOTAL

MATERIAL

No

102,000.00

72.31

102,000.00

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Pipe Fitter I

2.000

Day

900.00

Day

1,800.00

114.00

5.69

3,914.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

23,276.00

Composite Rates Per

Each

Rs.

129,190.00

Cost Per Each: 129,190.00

Labour Rates Per

Each

Rs.

4,750.00

Cost Per Each: 4,750.00

2,469

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-22-h

(British) :

Each

Providing and Fixing sluice valve of BSS quality weight for GI &
PVC pipe line including jointing material : 18" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.100

C.I. Sluice Valve 18"

134,000.00

No

TOTAL

MATERIAL

No

147,400.00

73.12

147,400.00

LABOUR
Coolie

4.000

Day

500.00

Day

2,000.00

Pipe Fitter I

2.000

Day

900.00

Day

1,800.00

114.00

4.88

3,914.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

33,264.00

Composite Rates Per

Each

Rs.

184,578.00

Cost Per Each: 184,578.00

Labour Rates Per

Each

Rs.

4,750.00

Cost Per Each: 4,750.00

2,470

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-23

(British) :

Each

Providing and Fixing fire hydrants BSS quality and weight of 2.5"
dia (including cost of jointing material)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Fire Hydrant

6,100.00

No

TOTAL

MATERIAL

No

6,100.00

51.12

6,100.00

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Pipe Fitter I

1.500

Day

900.00

Day

1,350.00

85.50

26.88

2,935.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,969.00

Composite Rates Per

Each

Rs.

11,004.50

Cost Per Each: 11,004.50

Labour Rates Per

Each

Rs.

3,562.50

Cost Per Each: 3,562.50

2,471

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-24-a

(British) :

Each

Providing and Fixing air valve 2" i/d of BSS quality and weight
complete with jointing material : Single

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Air Valve (single)

2,750.00

No

TOTAL

MATERIAL

No

2,750.00

44.35

2,750.00

LABOUR
Coolie

2.000

Day

500.00

Day

1,000.00

Pipe Fitter I

1.000

Day

900.00

Day

900.00

57.00

33.65

1,957.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,023.00

Composite Rates Per

Each

Rs.

5,730.00

Cost Per Each: 5,730.00

Labour Rates Per

Each

Rs.

2,375.00

Cost Per Each: 2,375.00

2,472

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-24-b

(British) :

Each

Providing and Fixing air valve 2" i/d of BSS quality and weight
complete with jointing material : Double

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Air Valve (double)

4,200.00

No

TOTAL

MATERIAL

No

4,200.00

44.68

4,200.00

LABOUR
Coolie

3.000

Day

500.00

Day

1,500.00

Pipe Fitter I

1.500

Day

900.00

Day

1,350.00

85.50

33.32

2,935.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,551.00

Composite Rates Per

Each

Rs.

8,686.50

Cost Per Each: 8,686.50

Labour Rates Per

Each

Rs.

3,562.50

Cost Per Each: 3,562.50

2,473

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

24-25-a

Item Name :

(British) :

Each

Providing and Fixing CI flanges 5/8" thick on pipes including


turning, facing & fitting etc complete : 3" to 6" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Flange 3" - 6"

2,400.00

No

TOTAL

MATERIAL

No

2,400.00

50.53

2,400.00

LABOUR
Coolie

1.200

Day

500.00

Day

600.00

Pipe Fitter I

0.625

Day

900.00

Day

562.50

34.88

27.47

1,197.38

22

783.75

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

4,381.13

Cost Per Each: 4,381.13

Labour Rates Per

Each

Rs.

1,453.13

Cost Per Each: 1,453.13

2,474

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-25-b

(British) :

Each

Providing and Fixing CI flanges 5/8" thick on pipes including


turning, facing & fitting etc complete : 8" to 12" i/d

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

C.I. Flange 8" - 12"

3,700.00

No

TOTAL

MATERIAL

No

3,700.00

51.32

3,700.00

LABOUR
Coolie

1.750

Day

500.00

Day

875.00

Pipe Fitter I

0.925

Day

900.00

Day

832.50

51.23

26.68

1,758.73

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,189.65

Composite Rates Per

Each

Rs.

6,648.38

Cost Per Each: 6,648.38

Labour Rates Per

Each

Rs.

2,134.38

Cost Per Each: 2,134.38

2,475

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-a-01
Providing and installing
2" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (b) 2"

91.00

No

TOTAL

MATERIAL

No

100.10

28.56

100.10

LABOUR
Coolie

0.172

Day

500.00

Day

86.25

Pipe Fitter I

0.085

Day

900.00

Day

76.50

4.88

49.44

167.63

22

57.83

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

325.56

Cost Per Each: 325.56

Labour Rates Per

Each

Rs.

203.44

Cost Per Each: 203.44

2,476

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-a-02
Providing and installing
3" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (b) 3"

208.00

No

TOTAL

MATERIAL

No

228.80

42.17

228.80

LABOUR
Coolie

0.188

Day

500.00

Day

93.75

Pipe Fitter I

0.094

Day

900.00

Day

84.38

5.34

35.83

183.47

22

89.52

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

501.79

Cost Per Each: 501.79

Labour Rates Per

Each

Rs.

222.66

Cost Per Each: 222.66

2,477

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-a-03
Providing and installing
4" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (b) 4"

277.00

No

TOTAL

MATERIAL

No

304.70

42.15

304.70

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

35.85

244.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

668.61

Cost Per Each: 668.61

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

119.28

2,478

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-a-04
Providing and installing
6" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (b) 6"

879.00

No

TOTAL

MATERIAL

966.90

No

55.30

966.90

LABOUR
Coolie

0.363

Day

500.00

Day

181.25

Pipe Fitter I

0.181

Day

900.00

Day

163.13

10.33

22.70

354.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

288.48

Composite Rates Per

Each

Rs.

1,610.09

Cost Per Each: 1,610.09

Labour Rates Per

Each

Rs.

430.47

Cost Per Each: 430.47

2,479

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-a-05
Providing and installing
8" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (b) 8"

2,500.00

No

TOTAL

MATERIAL

No

2,750.00

63.95

2,750.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Fitter I

0.250

Day

900.00

Day

225.00

14.25

14.05

489.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

709.50

Composite Rates Per

Each

Rs.

3,948.75

Cost Per Each: 3,948.75

Labour Rates Per

Each

Rs.

593.75

Cost Per Each: 593.75

2,480

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-a-06
Providing and installing
10" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (b) 10"

4,000.00

No

TOTAL

MATERIAL

4,400.00

No

67.35

4,400.00

LABOUR
Coolie

0.625

Day

500.00

Day

312.50

Pipe Layer

0.313

Day

600.00

Day

187.50

15.00

10.65

515.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,078.00

Composite Rates Per

Each

Rs.

5,993.00

Cost Per Each: 5,993.00

Labour Rates Per

Each

Rs.

625.00

Cost Per Each: 625.00

2,481

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-a-07
Providing and installing
12" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (b) 12"

5,000.00

No

TOTAL

MATERIAL

5,500.00

No

67.62

5,500.00

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Pipe Layer

0.375

Day

600.00

Day

225.00

18.00

10.38

618.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,342.00

Composite Rates Per

Each

Rs.

7,460.00

Cost Per Each: 7,460.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

2,482

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-b-01
Providing and installing
2" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (c) 2"

91.00

No

TOTAL

MATERIAL

No

100.10

31.63

100.10

LABOUR
Coolie

0.172

Day

500.00

Day

86.25

Pipe Layer

0.085

Day

600.00

Day

51.00

4.12

46.37

141.37

22

52.22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

293.68

Cost Per Each: 293.68

Labour Rates Per

Each

Rs.

171.56

Cost Per Each: 171.56

2,483

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-b-02
Providing and installing
3" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (c) 3"

208.00

No

TOTAL

MATERIAL

No

228.80

45.30

228.80

LABOUR
Coolie

0.188

Day

500.00

Day

93.75

Pipe Layer

0.094

Day

600.00

Day

56.25

4.50

32.70

154.50

22

83.34

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

466.64

Cost Per Each: 466.64

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

2,484

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-b-03
Providing and installing
4" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (c) 4"

277.00

No

TOTAL

MATERIAL

No

304.70

45.28

304.70

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Layer

0.125

Day

600.00

Day

75.00

6.00

32.72

206.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

621.73

Cost Per Each: 621.73

Labour Rates Per

Each

Rs.

250.00

Cost Per Each: 250.00

111.03

2,485

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-b-04
Providing and installing
6" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (c) 6"

879.00

No

TOTAL

MATERIAL

966.90

No

57.70

966.90

LABOUR
Coolie

0.363

Day

500.00

Day

181.25

Pipe Layer

0.181

Day

600.00

Day

108.75

8.70

20.30

298.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

276.52

Composite Rates Per

Each

Rs.

1,542.12

Cost Per Each: 1,542.12

Labour Rates Per

Each

Rs.

362.50

Cost Per Each: 362.50

2,486

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-b-05
Providing and installing
8" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (c) 8"

3,250.00

No

TOTAL

MATERIAL

No

3,575.00

67.45

3,575.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Layer

0.250

Day

600.00

Day

150.00

12.00

10.55

412.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

874.50

Composite Rates Per

Each

Rs.

4,861.50

Cost Per Each: 4,861.50

Labour Rates Per

Each

Rs.

500.00

Cost Per Each: 500.00

2,487

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-b-06
Providing and installing
10" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (c) 10"

5,000.00

No

TOTAL

MATERIAL

5,500.00

No

68.75

5,500.00

LABOUR
Coolie

0.625

Day

500.00

Day

312.50

Pipe Layer

0.313

Day

600.00

Day

187.50

15.00

9.25

515.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,320.00

Composite Rates Per

Each

Rs.

7,335.00

Cost Per Each: 7,335.00

Labour Rates Per

Each

Rs.

625.00

Cost Per Each: 625.00

2,488

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-b-07
Providing and installing
12" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (c) 12"

5,300.00

No

TOTAL

MATERIAL

5,830.00

No

68.00

5,830.00

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Pipe Layer

0.375

Day

600.00

Day

225.00

18.00

10.00

618.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,414.60

Composite Rates Per

Each

Rs.

7,862.60

Cost Per Each: 7,862.60

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

2,489

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-c-01
Providing and installing
2" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (d) 2"

91.00

No

TOTAL

MATERIAL

No

100.10

31.63

100.10

LABOUR
Coolie

0.172

Day

500.00

Day

86.25

Pipe Layer

0.085

Day

600.00

Day

51.00

4.12

46.37

141.37

22

52.22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

293.68

Cost Per Each: 293.68

Labour Rates Per

Each

Rs.

171.56

Cost Per Each: 171.56

2,490

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-c-02
Providing and installing
3" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (d) 3"

208.00

No

TOTAL

MATERIAL

No

228.80

45.30

228.80

LABOUR
Coolie

0.188

Day

500.00

Day

93.75

Pipe Layer

0.094

Day

600.00

Day

56.25

4.50

32.70

154.50

22

83.34

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

466.64

Cost Per Each: 466.64

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

2,491

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-c-03
Providing and installing
4" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (d) 4"

277.00

No

TOTAL

MATERIAL

No

304.70

42.15

304.70

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

35.85

244.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

668.61

Cost Per Each: 668.61

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

119.28

2,492

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-c-04
Providing and installing
6" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (d) 6"

879.00

No

TOTAL

MATERIAL

966.90

No

55.30

966.90

LABOUR
Coolie

0.363

Day

500.00

Day

181.25

Pipe Fitter I

0.181

Day

900.00

Day

163.13

10.33

22.70

354.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

288.48

Composite Rates Per

Each

Rs.

1,610.09

Cost Per Each: 1,610.09

Labour Rates Per

Each

Rs.

430.47

Cost Per Each: 430.47

2,493

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-c-05
Providing and installing
8" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (d) 8"

4,300.00

No

TOTAL

MATERIAL

4,730.00

No

68.16

4,730.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Fitter I

0.250

Day

900.00

Day

225.00

14.25

9.84

489.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,145.10

Composite Rates Per

Each

Rs.

6,364.35

Cost Per Each: 6,364.35

Labour Rates Per

Each

Rs.

593.75

Cost Per Each: 593.75

2,494

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-c-06
Providing and installing
10" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (d) 10"

6,000.00

No

TOTAL

MATERIAL

6,600.00

No

68.81

6,600.00

LABOUR
Coolie

0.625

Day

500.00

Day

312.50

Pipe Fitter I

0.313

Day

900.00

Day

281.25

17.81

9.19

611.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,582.63

Composite Rates Per

Each

Rs.

8,794.19

Cost Per Each: 8,794.19

Labour Rates Per

Each

Rs.

742.19

Cost Per Each: 742.19

2,495

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-26-c-07
Providing and installing
12" i/d

Detail

Qty

(British) :

Each

PVC bends BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Bend (d) 12"

6,500.00

No

TOTAL

MATERIAL

7,150.00

No

68.20

7,150.00

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Pipe Fitter I

0.375

Day

900.00

Day

337.50

21.38

9.80

733.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,729.75

Composite Rates Per

Each

Rs.

9,613.63

Cost Per Each: 9,613.63

Labour Rates Per

Each

Rs.

890.63

Cost Per Each: 890.63

2,496

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-a-01
Providing and installing
2" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (b) 2"

117.00

No

TOTAL

MATERIAL

No

128.70

26.36

128.70

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

51.64

244.63

22

80.56

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

453.89

Cost Per Each: 453.89

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,497

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-a-02
Providing and installing
3" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (b) 3"

295.00

No

TOTAL

MATERIAL

No

324.50

39.93

324.50

LABOUR
Coolie

0.300

Day

500.00

Day

150.00

Pipe Fitter I

0.150

Day

900.00

Day

135.00

8.55

38.07

293.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

752.14

Cost Per Each: 752.14

Labour Rates Per

Each

Rs.

356.25

Cost Per Each: 356.25

134.09

2,498

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-a-03
Providing and installing
4" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (b) 4"

428.00

No

TOTAL

MATERIAL

470.80

No

41.50

470.80

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Pipe Fitter I

0.200

Day

900.00

Day

180.00

11.40

36.50

391.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

187.18

Composite Rates Per

Each

Rs.

1,049.38

Cost Per Each: 1,049.38

Labour Rates Per

Each

Rs.

475.00

Cost Per Each: 475.00

2,499

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-a-04
Providing and installing
6" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (b) 6"

1,421.00

No

TOTAL

MATERIAL

No

1,563.10

56.21

1,563.10

LABOUR
Coolie

0.550

Day

500.00

Day

275.00

Pipe Fitter I

0.275

Day

900.00

Day

247.50

15.68

21.79

538.18

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

458.83

Composite Rates Per

Each

Rs.

2,560.11

Cost Per Each: 2,560.11

Labour Rates Per

Each

Rs.

653.13

Cost Per Each: 653.13

2,500

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-a-05
Providing and installing
8" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (b) 8"

2,600.00

No

TOTAL

MATERIAL

No

2,860.00

59.06

2,860.00

LABOUR
Coolie

0.813

Day

500.00

Day

406.25

Pipe Fitter I

0.406

Day

900.00

Day

365.63

23.16

18.94

795.03

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

799.01

Composite Rates Per

Each

Rs.

4,454.04

Cost Per Each: 4,454.04

Labour Rates Per

Each

Rs.

964.84

Cost Per Each: 964.84

2,501

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-a-06
Providing and installing
10" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (b) 10"

2,650.00

No

TOTAL

MATERIAL

No

2,915.00

57.45

2,915.00

LABOUR
Coolie

0.938

Day

500.00

Day

468.75

Pipe Fitter I

0.469

Day

900.00

Day

421.88

26.72

20.55

917.34

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

837.24

Composite Rates Per

Each

Rs.

4,669.58

Cost Per Each: 4,669.58

Labour Rates Per

Each

Rs.

1,113.28

Cost Per Each: 1,113.28

2,502

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-a-07
Providing and installing
12" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'B'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (b) 12"

3,000.00

No

TOTAL

MATERIAL

No

3,300.00

56.65

3,300.00

LABOUR
Coolie

1.125

Day

500.00

Day

562.50

Pipe Fitter I

0.563

Day

900.00

Day

506.25

32.06

21.35

1,100.81

22

961.13

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

5,361.94

Cost Per Each: 5,361.94

Labour Rates Per

Each

Rs.

1,335.94

Cost Per Each: 1,335.94

2,503

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-b-01
Providing and installing
2" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (c) 2"

117.00

No

TOTAL

MATERIAL

No

128.70

26.36

128.70

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

51.64

244.63

22

80.56

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

453.89

Cost Per Each: 453.89

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,504

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-b-02
Providing and installing
3" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (c) 3"

295.00

No

TOTAL

MATERIAL

No

324.50

39.93

324.50

LABOUR
Coolie

0.300

Day

500.00

Day

150.00

Pipe Fitter I

0.150

Day

900.00

Day

135.00

8.55

38.07

293.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

752.14

Cost Per Each: 752.14

Labour Rates Per

Each

Rs.

356.25

Cost Per Each: 356.25

134.09

2,505

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-b-03
Providing and installing
4" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (c) 4"

428.00

No

TOTAL

MATERIAL

470.80

No

41.50

470.80

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Pipe Fitter I

0.200

Day

900.00

Day

180.00

11.40

36.50

391.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

187.18

Composite Rates Per

Each

Rs.

1,049.38

Cost Per Each: 1,049.38

Labour Rates Per

Each

Rs.

475.00

Cost Per Each: 475.00

2,506

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-b-04
Providing and installing
6" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (c) 6"

1,421.00

No

TOTAL

MATERIAL

No

1,563.10

56.21

1,563.10

LABOUR
Coolie

0.550

Day

500.00

Day

275.00

Pipe Fitter I

0.275

Day

900.00

Day

247.50

15.68

21.79

538.18

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

458.83

Composite Rates Per

Each

Rs.

2,560.11

Cost Per Each: 2,560.11

Labour Rates Per

Each

Rs.

653.13

Cost Per Each: 653.13

2,507

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-b-05
Providing and installing
8" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (c) 8"

6,750.00

No

TOTAL

MATERIAL

7,425.00

No

67.94

7,425.00

LABOUR
Coolie

0.813

Day

500.00

Day

406.25

Pipe Fitter I

0.406

Day

900.00

Day

365.63

23.16

10.06

795.03

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,803.31

Composite Rates Per

Each

Rs.

10,023.34

Cost Per Each: 10,023.34

Labour Rates Per

Each

Rs.

964.84

Cost Per Each: 964.84

2,508

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-b-06
Providing and installing
10" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (c) 10"

6,150.00

No

TOTAL

MATERIAL

No

6,765.00

66.31

6,765.00

LABOUR
Coolie

0.938

Day

500.00

Day

468.75

Pipe Fitter I

0.464

Day

900.00

Day

417.38

26.58

11.69

912.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,683.25

Composite Rates Per

Each

Rs.

9,360.96

Cost Per Each: 9,360.96

Labour Rates Per

Each

Rs.

1,107.66

Cost Per Each: 1,107.66

2,509

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-b-07
Providing and installing
12" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'C'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (c) 12"

8,250.00

No

TOTAL

MATERIAL

No

9,075.00

67.10

9,075.00

LABOUR
Coolie

1.125

Day

500.00

Day

562.50

Pipe Fitter I

0.563

Day

900.00

Day

506.25

32.06

10.90

1,100.81

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,231.63

Composite Rates Per

Each

Rs.

12,407.44

Cost Per Each: 12,407.44

Labour Rates Per

Each

Rs.

1,335.94

Cost Per Each: 1,335.94

2,510

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-c-01
Providing and installing
2" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (d) 2"

117.00

No

TOTAL

MATERIAL

No

128.70

26.36

128.70

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

51.64

244.63

22

80.56

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

453.89

Cost Per Each: 453.89

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,511

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-c-02
Providing and installing
3" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (d) 3"

295.00

No

TOTAL

MATERIAL

No

324.50

39.93

324.50

LABOUR
Coolie

0.300

Day

500.00

Day

150.00

Pipe Fitter I

0.150

Day

900.00

Day

135.00

8.55

38.07

293.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

752.14

Cost Per Each: 752.14

Labour Rates Per

Each

Rs.

356.25

Cost Per Each: 356.25

134.09

2,512

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-c-03
Providing and installing
4" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (d) 4"

428.00

No

TOTAL

MATERIAL

470.80

No

41.50

470.80

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Pipe Fitter I

0.200

Day

900.00

Day

180.00

11.40

36.50

391.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

187.18

Composite Rates Per

Each

Rs.

1,049.38

Cost Per Each: 1,049.38

Labour Rates Per

Each

Rs.

475.00

Cost Per Each: 475.00

2,513

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-c-04
Providing and installing
6" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (d) 6"

1,421.00

No

TOTAL

MATERIAL

No

1,563.10

56.21

1,563.10

LABOUR
Coolie

0.550

Day

500.00

Day

275.00

Pipe Fitter I

0.275

Day

900.00

Day

247.50

15.68

21.79

538.18

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

458.83

Composite Rates Per

Each

Rs.

2,560.11

Cost Per Each: 2,560.11

Labour Rates Per

Each

Rs.

653.13

Cost Per Each: 653.13

2,514

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-c-05
Providing and installing
8" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (d) 8"

3,850.00

No

TOTAL

MATERIAL

4,235.00

No

63.44

4,235.00

LABOUR
Coolie

0.813

Day

500.00

Day

406.25

Pipe Fitter I

0.406

Day

900.00

Day

365.63

23.16

14.56

795.03

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,101.51

Composite Rates Per

Each

Rs.

6,131.54

Cost Per Each: 6,131.54

Labour Rates Per

Each

Rs.

964.84

Cost Per Each: 964.84

2,515

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-c-06
Providing and installing
10" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (d) 10"

6,250.00

No

TOTAL

MATERIAL

No

6,875.00

66.40

6,875.00

LABOUR
Coolie

0.938

Day

500.00

Day

468.75

Pipe Fitter I

0.469

Day

900.00

Day

421.88

26.72

11.60

917.34

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,708.44

Composite Rates Per

Each

Rs.

9,500.78

Cost Per Each: 9,500.78

Labour Rates Per

Each

Rs.

1,113.28

Cost Per Each: 1,113.28

2,516

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-27-c-07
Providing and installing
12" i/d

Detail

Qty

(British) :

Each

PVC tees BSS Class 'D'working pressure :

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tee (d) 12"

7,000.00

No

TOTAL

MATERIAL

No

7,700.00

65.86

7,700.00

LABOUR
Coolie

1.125

Day

500.00

Day

562.50

Pipe Fitter I

0.563

Day

900.00

Day

506.25

32.06

12.14

1,100.81

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,929.13

Composite Rates Per

Each

Rs.

10,729.94

Cost Per Each: 10,729.94

Labour Rates Per

Each

Rs.

1,335.94

Cost Per Each: 1,335.94

2,517

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-a-01
Providing and installing
: 2" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'B'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (b) 2"

74.00

No

TOTAL

MATERIAL

No

81.40

37.94

81.40

LABOUR
Coolie

0.083

Day

500.00

Day

41.25

Pipe Fitter I

0.043

Day

900.00

Day

38.25

2.39

40.06

81.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

198.68

Cost Per Each: 198.68

Labour Rates Per

Each

Rs.

99.38

Cost Per Each: 99.38

35.40

2,518

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-a-02
Providing and installing
: 3" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'B'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (b) 3"

143.00

No

TOTAL

MATERIAL

No

157.30

49.07

157.30

LABOUR
Coolie

0.087

Day

500.00

Day

43.75

Pipe Fitter I

0.044

Day

900.00

Day

39.38

2.49

28.93

85.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

295.81

Cost Per Each: 295.81

Labour Rates Per

Each

Rs.

103.91

Cost Per Each: 103.91

52.89

2,519

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-a-03
Providing and installing
: 4" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'B'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (b) 4"

173.00

No

TOTAL

MATERIAL

No

190.30

46.18

190.30

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Pipe Fitter I

0.063

Day

900.00

Day

56.25

3.56

31.82

122.31

22

67.99

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

380.60

Cost Per Each: 380.60

Labour Rates Per

Each

Rs.

148.44

Cost Per Each: 148.44

2,520

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-a-04
Providing and installing
: 6" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'B'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (b) 6"

620.00

No

TOTAL

MATERIAL

682.00

No

32.85

682.00

LABOUR
Coolie

0.175

Day

500.00

Day

87.65

Pipe Fitter I

0.875

Day

900.00

Day

787.50

26.25

45.15

901.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

342.57

Composite Rates Per

Each

Rs.

1,925.98

Cost Per Each: 1,925.98

Labour Rates Per

Each

Rs.

1,093.94

Cost Per Each: 1,093.94

2,521

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-a-05
Providing and installing
: 8" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'B'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (b) 8"

1,959.00

No

TOTAL

MATERIAL

No

2,154.90

67.55

2,154.90

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

10.45

244.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

526.33

Composite Rates Per

Each

Rs.

2,925.85

Cost Per Each: 2,925.85

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,522

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-a-06
Providing and installing
: 10" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'B'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (b) 10"

1,250.00

No

TOTAL

MATERIAL

No

1,375.00

61.69

1,375.00

LABOUR
Coolie

0.313

Day

500.00

Day

156.25

Pipe Fitter I

0.156

Day

900.00

Day

140.40

8.90

16.31

305.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

367.76

Composite Rates Per

Each

Rs.

2,048.31

Cost Per Each: 2,048.31

Labour Rates Per

Each

Rs.

370.81

Cost Per Each: 370.81

2,523

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-a-07
Providing and installing
: 12" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'B'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (b) 12"

1,550.00

No

TOTAL

MATERIAL

No

1,705.00

62.04

1,705.00

LABOUR
Coolie

0.375

Day

500.00

Day

187.50

Pipe Fitter I

0.188

Day

900.00

Day

168.75

10.69

15.96

366.94

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

453.48

Composite Rates Per

Each

Rs.

2,525.41

Cost Per Each: 2,525.41

Labour Rates Per

Each

Rs.

445.31

Cost Per Each: 445.31

2,524

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-b-01
Providing and installing
: 2" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'C'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (c) 2"

74.00

No

TOTAL

MATERIAL

No

81.40

37.94

81.40

LABOUR
Coolie

0.083

Day

500.00

Day

41.25

Pipe Fitter I

0.043

Day

900.00

Day

38.25

2.39

40.06

81.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

198.68

Cost Per Each: 198.68

Labour Rates Per

Each

Rs.

99.38

Cost Per Each: 99.38

35.40

2,525

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-b-02
Providing and installing
: 3" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'C'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (c) 3"

143.00

No

TOTAL

MATERIAL

No

157.30

19.83

157.30

LABOUR
Coolie

0.087

Day

500.00

Day

43.75

Pipe Fitter I

0.438

Day

900.00

Day

393.75

13.13

58.17

450.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

738.78

Cost Per Each: 738.78

Labour Rates Per

Each

Rs.

546.88

Cost Per Each: 546.88

130.86

2,526

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-b-03
Providing and installing
: 4" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'C'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (c) 4"

173.00

No

TOTAL

MATERIAL

No

190.30

46.18

190.30

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Pipe Fitter I

0.063

Day

900.00

Day

56.25

3.56

31.82

122.31

22

67.99

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

380.60

Cost Per Each: 380.60

Labour Rates Per

Each

Rs.

148.44

Cost Per Each: 148.44

2,527

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-b-04
Providing and installing
: 6" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'C'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (c) 6"

620.00

No

TOTAL

MATERIAL

682.00

No

60.30

682.00

LABOUR
Coolie

0.175

Day

500.00

Day

87.50

Pipe Fitter I

0.087

Day

900.00

Day

78.75

4.99

17.70

171.24

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

186.62

Composite Rates Per

Each

Rs.

1,039.85

Cost Per Each: 1,039.85

Labour Rates Per

Each

Rs.

207.81

Cost Per Each: 207.81

2,528

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-b-05
Providing and installing
: 8" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'C'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (c) 8"

1,959.00

No

TOTAL

MATERIAL

No

2,154.90

67.55

2,154.90

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

10.45

244.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

526.33

Composite Rates Per

Each

Rs.

2,925.85

Cost Per Each: 2,925.85

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,529

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-b-06
Providing and installing
: 10" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'C'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (c) 10"

1,700.00

No

TOTAL

MATERIAL

No

1,870.00

64.72

1,870.00

LABOUR
Coolie

0.313

Day

500.00

Day

156.25

Pipe Fitter I

0.156

Day

900.00

Day

140.63

8.91

13.28

305.78

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

476.71

Composite Rates Per

Each

Rs.

2,652.49

Cost Per Each: 2,652.49

Labour Rates Per

Each

Rs.

371.09

Cost Per Each: 371.09

2,530

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-b-07
Providing and installing
: 12" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'C'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (c) 12"

2,450.00

No

TOTAL

MATERIAL

No

2,695.00

66.24

2,695.00

LABOUR
Coolie

0.375

Day

500.00

Day

187.50

Pipe Fitter I

0.188

Day

900.00

Day

168.75

10.69

11.76

366.94

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

671.28

Composite Rates Per

Each

Rs.

3,733.21

Cost Per Each: 3,733.21

Labour Rates Per

Each

Rs.

445.31

Cost Per Each: 445.31

2,531

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-c-01
Providing and installing
: 2" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'D'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (d) 2"

74.00

No

TOTAL

MATERIAL

No

81.40

37.94

81.40

LABOUR
Coolie

0.083

Day

500.00

Day

41.25

Pipe Fitter I

0.043

Day

900.00

Day

38.25

2.39

40.06

81.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

198.68

Cost Per Each: 198.68

Labour Rates Per

Each

Rs.

99.38

Cost Per Each: 99.38

35.40

2,532

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-c-02
Providing and installing
: 3" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'D'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (d) 3"

143.00

No

TOTAL

MATERIAL

No

157.30

49.07

157.30

LABOUR
Coolie

0.087

Day

500.00

Day

43.75

Pipe Fitter I

0.044

Day

900.00

Day

39.38

2.49

28.93

85.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

295.81

Cost Per Each: 295.81

Labour Rates Per

Each

Rs.

103.91

Cost Per Each: 103.91

52.89

2,533

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-c-03
Providing and installing
: 4" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'D'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (d) 4"

173.00

No

TOTAL

MATERIAL

No

190.30

46.18

190.30

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Pipe Fitter I

0.063

Day

900.00

Day

56.25

3.56

31.82

122.31

22

67.99

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

380.60

Cost Per Each: 380.60

Labour Rates Per

Each

Rs.

148.44

Cost Per Each: 148.44

2,534

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-c-04
Providing and installing
: 6" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'D'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (d) 6"

620.00

No

TOTAL

MATERIAL

682.00

No

60.30

682.00

LABOUR
Coolie

0.175

Day

500.00

Day

87.50

Pipe Fitter I

0.087

Day

900.00

Day

78.75

4.99

17.70

171.24

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

186.62

Composite Rates Per

Each

Rs.

1,039.85

Cost Per Each: 1,039.85

Labour Rates Per

Each

Rs.

207.81

Cost Per Each: 207.81

2,535

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-c-05
Providing and installing
: 8" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'D'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (d) 8"

1,959.00

No

TOTAL

MATERIAL

No

2,154.90

67.55

2,154.90

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

10.45

244.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

526.33

Composite Rates Per

Each

Rs.

2,925.85

Cost Per Each: 2,925.85

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,536

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-c-06
Providing and installing
: 10" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'D'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (d) 10"

2,100.00

No

TOTAL

MATERIAL

No

2,310.00

66.46

2,310.00

LABOUR
Coolie

0.313

Day

500.00

Day

156.25

Pipe Fitter I

0.156

Day

900.00

Day

140.63

8.91

11.54

305.78

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

573.51

Composite Rates Per

Each

Rs.

3,189.29

Cost Per Each: 3,189.29

Labour Rates Per

Each

Rs.

371.09

Cost Per Each: 371.09

2,537

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-28-c-07
Providing and installing
: 12" i/d

Detail

Qty

(British) :

Each

PVC sockets BSS Class 'D'working pressure

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Socket (d) 12"

2,750.00

No

TOTAL

MATERIAL

No

3,025.00

67.10

3,025.00

LABOUR
Coolie

0.375

Day

500.00

Day

187.50

Pipe Fitter I

0.188

Day

900.00

Day

168.75

10.69

10.90

366.94

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

743.88

Composite Rates Per

Each

Rs.

4,135.81

Cost Per Each: 4,135.81

Labour Rates Per

Each

Rs.

445.31

Cost Per Each: 445.31

2,538

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-a-01
Providing and installing
pressure : 2" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'B'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (b) 2"

75.00

No

TOTAL

MATERIAL

No

82.50

25.23

82.50

LABOUR
Coolie

0.172

Day

500.00

Day

86.25

Pipe Fitter I

0.085

Day

900.00

Day

76.50

4.88

52.77

167.63

22

53.96

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

304.09

Cost Per Each: 304.09

Labour Rates Per

Each

Rs.

203.44

Cost Per Each: 203.44

2,539

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-a-02
Providing and installing
pressure : 3" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'B'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (b) 3"

90.00

No

TOTAL

MATERIAL

No

99.00

26.79

99.00

LABOUR
Coolie

0.188

Day

500.00

Day

93.75

Pipe Fitter I

0.094

Day

900.00

Day

84.38

5.34

51.21

183.47

22

60.97

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

343.44

Cost Per Each: 343.44

Labour Rates Per

Each

Rs.

222.66

Cost Per Each: 222.66

2,540

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-a-03
Providing and installing
pressure : 4" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'B'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (b) 4"

105.00

No

TOTAL

MATERIAL

No

115.50

24.54

115.50

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

53.46

244.63

22

77.66

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

437.79

Cost Per Each: 437.79

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,541

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-a-04
Providing and installing
pressure : 6" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'B'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (b) 6"

140.00

No

TOTAL

MATERIAL

No

154.00

23.18

154.00

LABOUR
Coolie

0.363

Day

500.00

Day

181.25

Pipe Fitter I

0.181

Day

900.00

Day

163.13

10.33

54.82

354.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

618.35

Cost Per Each: 618.35

Labour Rates Per

Each

Rs.

430.47

Cost Per Each: 430.47

109.64

2,542

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-a-05
Providing and installing
pressure : 8" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'B'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (b) 8"

240.00

No

TOTAL

MATERIAL

No

264.00

26.79

264.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Fitter I

0.250

Day

900.00

Day

225.00

14.25

51.21

489.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

915.83

Cost Per Each: 915.83

Labour Rates Per

Each

Rs.

593.75

Cost Per Each: 593.75

162.58

2,543

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-a-06
Providing and installing
pressure : 10" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'B'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (b) 10"

400.00

No

TOTAL

MATERIAL

440.00

No

31.92

440.00

LABOUR
Coolie

0.625

Day

500.00

Day

312.50

Pipe Fitter I

0.313

Day

900.00

Day

281.25

17.81

46.08

611.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

227.43

Composite Rates Per

Each

Rs.

1,278.99

Cost Per Each: 1,278.99

Labour Rates Per

Each

Rs.

742.19

Cost Per Each: 742.19

2,544

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-a-07
Providing and installing
pressure : 12" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'B'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (b) 12

440.00

No

TOTAL

MATERIAL

484.00

No

30.59

484.00

LABOUR
Coolie

0.730

Day

500.00

Day

365.00

Pipe Fitter I

0.375

Day

900.00

Day

337.50

21.08

47.41

723.58

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

261.03

Composite Rates Per

Each

Rs.

1,468.61

Cost Per Each: 1,468.61

Labour Rates Per

Each

Rs.

878.13

Cost Per Each: 878.13

2,545

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-b-01
Providing and installing
pressure : 2" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'C'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (c) 2"

80.00

No

TOTAL

MATERIAL

No

88.00

26.32

88.00

LABOUR
Coolie

0.172

Day

500.00

Day

86.25

Pipe Fitter I

0.085

Day

900.00

Day

76.50

4.88

51.68

167.63

22

55.17

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

310.80

Cost Per Each: 310.80

Labour Rates Per

Each

Rs.

203.44

Cost Per Each: 203.44

2,546

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-b-02
Providing and installing
pressure : 3" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'C'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (c) 3"

95.00

No

TOTAL

MATERIAL

No

104.50

27.73

104.50

LABOUR
Coolie

0.188

Day

500.00

Day

93.75

Pipe Fitter I

0.094

Day

900.00

Day

84.38

5.34

50.27

183.47

22

62.18

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

350.15

Cost Per Each: 350.15

Labour Rates Per

Each

Rs.

222.66

Cost Per Each: 222.66

2,547

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-b-03
Providing and installing
pressure : 4" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'C'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (c) 4"

115.00

No

TOTAL

MATERIAL

No

126.50

26.06

126.50

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

51.94

244.63

22

80.08

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

451.21

Cost Per Each: 451.21

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,548

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-b-04
Providing and installing
pressure : 6" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'C'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (c) 6"

150.00

No

TOTAL

MATERIAL

No

165.00

24.27

165.00

LABOUR
Coolie

0.363

Day

500.00

Day

181.25

Pipe Fitter I

0.182

Day

900.00

Day

163.57

10.34

53.73

355.17

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

632.33

Cost Per Each: 632.33

Labour Rates Per

Each

Rs.

431.03

Cost Per Each: 431.03

112.16

2,549

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-b-05
Providing and installing
pressure : 8" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'C'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (c) 8"

250.00

No

TOTAL

MATERIAL

No

275.00

27.50

275.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Fitter I

0.250

Day

900.00

Day

225.00

14.25

50.50

489.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

929.25

Cost Per Each: 929.25

Labour Rates Per

Each

Rs.

593.75

Cost Per Each: 593.75

165.00

2,550

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-b-06
Providing and installing
pressure : 10" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'C'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (c) 10"

420.00

No

TOTAL

MATERIAL

462.00

No

32.82

462.00

LABOUR
Coolie

0.625

Day

500.00

Day

312.50

Pipe Fitter I

0.313

Day

900.00

Day

281.25

17.81

45.18

611.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

232.27

Composite Rates Per

Each

Rs.

1,305.83

Cost Per Each: 1,305.83

Labour Rates Per

Each

Rs.

742.19

Cost Per Each: 742.19

2,551

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-b-07
Providing and installing
pressure : 12" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'C'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (c) 12"

500.00

No

TOTAL

MATERIAL

550.00

No

32.63

550.00

LABOUR
Coolie

0.753

Day

500.00

Day

376.50

Pipe Fitter I

0.375

Day

900.00

Day

337.50

21.42

45.37

735.42

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

278.08

Composite Rates Per

Each

Rs.

1,563.50

Cost Per Each: 1,563.50

Labour Rates Per

Each

Rs.

892.50

Cost Per Each: 892.50

2,552

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-c-01
Providing and installing
pressure : 2" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'D'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (d) 2"

75.00

No

TOTAL

MATERIAL

No

82.50

25.23

82.50

LABOUR
Coolie

0.172

Day

500.00

Day

86.25

Pipe Fitter I

0.085

Day

900.00

Day

76.50

4.88

52.77

167.63

22

53.96

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

304.09

Cost Per Each: 304.09

Labour Rates Per

Each

Rs.

203.44

Cost Per Each: 203.44

2,553

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-c-02
Providing and installing
pressure : 3" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'D'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (d) 3"

90.00

No

TOTAL

MATERIAL

No

99.00

26.79

99.00

LABOUR
Coolie

0.188

Day

500.00

Day

93.75

Pipe Fitter I

0.094

Day

900.00

Day

84.38

5.34

51.21

183.47

22

60.97

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

343.44

Cost Per Each: 343.44

Labour Rates Per

Each

Rs.

222.66

Cost Per Each: 222.66

2,554

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-c-03
Providing and installing
pressure : 4" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'D'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (d) 4"

140.00

No

TOTAL

MATERIAL

No

154.00

29.50

154.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

48.50

244.63

22

86.13

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

484.76

Cost Per Each: 484.76

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,555

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-c-04
Providing and installing
pressure : 6" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'D'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (d) 6"

200.00

No

TOTAL

MATERIAL

No

220.00

29.24

220.00

LABOUR
Coolie

0.363

Day

500.00

Day

181.25

Pipe Fitter I

0.181

Day

900.00

Day

163.13

10.33

48.76

354.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

698.87

Cost Per Each: 698.87

Labour Rates Per

Each

Rs.

430.47

Cost Per Each: 430.47

124.16

2,556

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-c-05
Providing and installing
pressure : 8" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'D'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (d) 8"

340.00

No

TOTAL

MATERIAL

374.00

No

33.04

374.00

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Pipe Fitter I

0.250

Day

900.00

Day

225.00

14.25

44.96

489.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

186.78

Composite Rates Per

Each

Rs.

1,050.03

Cost Per Each: 1,050.03

Labour Rates Per

Each

Rs.

593.75

Cost Per Each: 593.75

2,557

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-c-06
Providing and installing
pressure : 10" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'D'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (d) 10"

620.00

No

TOTAL

MATERIAL

682.00

No

40.09

682.00

LABOUR
Coolie

0.625

Day

500.00

Day

312.50

Pipe Fitter I

0.313

Day

900.00

Day

281.25

17.81

37.91

611.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

280.67

Composite Rates Per

Each

Rs.

1,574.23

Cost Per Each: 1,574.23

Labour Rates Per

Each

Rs.

742.19

Cost Per Each: 742.19

2,558

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-29-c-07
Providing and installing
pressure : 12" i/d

Detail

Qty

(British) :

Each

PVC Tapered core BSS Class 'D'working

Unit

Rate (Rs)

Amount

MATERIAL
1.100

Pvc Tappered Core (d) 12"

715.00

No

TOTAL

MATERIAL

786.50

No

39.35

786.50

LABOUR
Coolie

0.750

Day

500.00

Day

375.00

Pipe Fitter I

0.375

Day

900.00

Day

337.50

21.38

38.65

733.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

329.78

Composite Rates Per

Each

Rs.

1,850.16

Cost Per Each: 1,850.16

Labour Rates Per

Each

Rs.

890.63

Cost Per Each: 890.63

2,559

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-a-01

(British) :

Rft

Providing and Laying HDPE pipe Din-/Din-/ISO-4427 incl testing &


disinfect complete (20mm dia)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Pipe 20mm

14.00

RFT

TOTAL

MATERIAL

RFT

14.00

29.46

14.00

LABOUR
Coolie

0.021

Day

500.00

Day

10.67

Pipe Fitter I

0.012

Day

900.00

Day

10.98

0.65

48.54

22.30

22

7.84

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

44.14

Labour Rates Per

Rft

Rs.

27.06

LABOUR

Per Meter : Rs 144.77


Per Meter : Rs 88.75

2,560

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-a-02

(British) :

Rft

Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427


including testing & disinfect complete (25mm dia)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Pipe 25mm

19.00

RFT

TOTAL

MATERIAL

RFT

19.00

35.06

19.00

LABOUR
Coolie

0.021

Day

500.00

Day

10.67

Pipe Fitter I

0.012

Day

900.00

Day

10.98

0.65

42.94

22.30

22

8.94

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

50.24

Labour Rates Per

Rft

Rs.

27.06

LABOUR

Per Meter : Rs 164.78


Per Meter : Rs 88.75

2,561

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-a-03

(British) :

Rft

Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427 incl


testing & disinfect complete (32mm dia)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Pipe 32mm

26.00

RFT

TOTAL

MATERIAL

RFT

26.00

40.93

26.00

LABOUR
Coolie

0.021

Day

500.00

Day

10.67

Pipe Fitter I

0.012

Day

900.00

Day

10.98

0.65

37.07

22.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

58.78

Labour Rates Per

Rft

Rs.

27.06

LABOUR

10.48

Per Meter : Rs 192.79


Per Meter : Rs 88.75

2,562

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-a-04

(British) :

Rft

Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427


including testing & disinfect complete (40mm dia)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Pipe 40mm

40.00

RFT

TOTAL

MATERIAL

RFT

40.00

43.50

40.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter I

0.015

Day

900.00

Day

13.72

0.87

34.50

29.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

85.00

Labour Rates Per

Rft

Rs.

36.20

LABOUR

15.17

Per Meter : Rs 278.81


Per Meter : Rs 118.75

2,563

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-a-05

(British) :

Rft

Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427


including testing & disinfect complete (50mm dia)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Pipe 50mm

61.00

RFT

TOTAL

MATERIAL

RFT

61.00

50.85

61.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter I

0.015

Day

900.00

Day

13.72

0.87

27.15

29.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

110.62

Labour Rates Per

Rft

Rs.

36.20

LABOUR

19.79

Per Meter : Rs 362.85


Per Meter : Rs 118.75

2,564

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-a-06

(British) :

Rft

Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427 incl


testing & disinfect complete (75mm dia)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Pipe 80mm

134.00

RFT

TOTAL

MATERIAL

RFT

134.00

61.67

134.00

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Pipe Fitter I

0.015

Day

900.00

Day

13.72

0.87

16.33

29.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

199.68

Labour Rates Per

Rft

Rs.

36.20

LABOUR

35.85

Per Meter : Rs 654.96


Per Meter : Rs 118.75

2,565

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-a-07

(British) :

Rft

Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427


including testing & disinfect complete (110mm dia)

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Pipe 110mm

286.00

RFT

TOTAL

MATERIAL

RFT

286.00

67.33

286.00

LABOUR
Coolie

0.034

Day

500.00

Day

17.15

Pipe Fitter I

0.017

Day

900.00

Day

15.43

0.98

10.67

33.56

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

389.65

Labour Rates Per

Rft

Rs.

40.73

LABOUR

70.09

Per Meter : Rs 1,278.05


Per Meter : Rs 133.59

2,566

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-b-01
Providing and installing

Detail

Qty

(British) :

Each

HDPE Socket 20mm dia

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Socket 20mm

70.00

Each

TOTAL

MATERIAL

Each

70.00

41.34

70.00

LABOUR
Coolie

0.060

Day

500.00

Day

30.00

Pipe Fitter I

0.030

Day

900.00

Day

27.00

1.71

36.66

58.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

156.65

Cost Per Each: 156.65

Labour Rates Per

Each

Rs.

71.25

Cost Per Each: 71.25

27.94

2,567

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-b-02
Providing and installing

Detail

Qty

(British) :

Each

HDPE Socket 25mm dia

Unit

Rate (Rs)

Each

110.00

Amount

MATERIAL
1.000

HDPE Socket 25mm

TOTAL

MATERIAL

Each

110.00

49.40

110.00

LABOUR
Coolie

0.060

Day

500.00

Day

30.00

Pipe Fitter I

0.030

Day

900.00

Day

27.00

1.71

28.60

58.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

205.45

Cost Per Each: 205.45

Labour Rates Per

Each

Rs.

71.25

Cost Per Each: 71.25

36.74

2,568

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-b-03
Providing and installing

Detail

Qty

(British) :

Each

HDPE Socket 32mm dia

Unit

Rate (Rs)

Each

160.00

Amount

MATERIAL
1.000

HDPE Socket 32mm

TOTAL

MATERIAL

Each

160.00

55.30

160.00

LABOUR
Coolie

0.060

Day

500.00

Day

30.00

Pipe Fitter I

0.030

Day

900.00

Day

27.00

1.71

22.70

58.71

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

266.45

Cost Per Each: 266.45

Labour Rates Per

Each

Rs.

71.25

Cost Per Each: 71.25

47.74

2,569

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-b-04
Providing and installing

Detail

Qty

(British) :

Each

HDPE Socket 40mm dia

Unit

Rate (Rs)

Each

300.00

Amount

MATERIAL
1.000

HDPE Socket 40mm

TOTAL

MATERIAL

Each

300.00

59.29

300.00

LABOUR
Coolie

0.083

Day

500.00

Day

41.25

Pipe Fitter I

0.043

Day

900.00

Day

38.25

2.39

18.71

81.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

465.38

Cost Per Each: 465.38

Labour Rates Per

Each

Rs.

99.38

Cost Per Each: 99.38

83.49

2,570

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-b-05
Providing and installing

Detail

Qty

(British) :

Each

HDPE Socket 50mm dia

Unit

Rate (Rs)

Each

500.00

Amount

MATERIAL
1.000

HDPE Socket 50mm

TOTAL

MATERIAL

Each

500.00

39.44

500.00

LABOUR
Coolie

0.825

Day

500.00

Day

412.50

Pipe Fitter I

0.043

Day

900.00

Day

38.25

13.52

38.56

464.27

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

209.17

Composite Rates Per

Each

Rs.

1,173.44

Cost Per Each: 1,173.44

Labour Rates Per

Each

Rs.

563.44

Cost Per Each: 563.44

2,571

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-b-06
Providing and installing

Detail

Qty

(British) :

Each

HDPE Socket 75mm dia

Unit

Rate (Rs)

Each

1,150.00

Amount

MATERIAL
1.000

HDPE Socket 75mm

TOTAL

MATERIAL

Each

1,150.00

69.94

1,150.00

LABOUR
Coolie

0.087

Day

500.00

Day

43.75

Pipe Fitter I

0.044

Day

900.00

Day

39.38

2.49

8.06

85.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

271.29

Composite Rates Per

Each

Rs.

1,506.91

Cost Per Each: 1,506.91

Labour Rates Per

Each

Rs.

103.91

Cost Per Each: 103.91

2,572

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-b-07
Providing and installing

Detail

Qty

(British) :

Each

HDPE Socket 110mm dia

Unit

Rate (Rs)

Each

4,000.00

Amount

MATERIAL
1.000

HDPE Socket 110mm

TOTAL

MATERIAL

Each

4,000.00

72.84

4,000.00

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Pipe Fitter I

0.063

Day

900.00

Day

56.25

3.56

5.16

122.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

906.13

Composite Rates Per

Each

Rs.

5,028.44

Cost Per Each: 5,028.44

Labour Rates Per

Each

Rs.

148.44

Cost Per Each: 148.44

2,573

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-c-01
Providing and installing

Detail

Qty

(British) :

Each

HDPE Tee 20mm dia

Unit

Rate (Rs)

Each

115.00

Amount

MATERIAL
1.000

HDPE Tees 20mm

TOTAL

MATERIAL

Each

115.00

28.28

115.00

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Pipe Fitter I

0.100

Day

900.00

Day

90.00

5.70

49.72

195.70

22

67.10

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

377.80

Cost Per Each: 377.80

Labour Rates Per

Each

Rs.

237.50

Cost Per Each: 237.50

2,574

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-c-02
Providing and installing

Detail

Qty

(British) :

Each

HDPE Tee 25mm dia

Unit

Rate (Rs)

Each

185.00

Amount

MATERIAL
1.000

HDPE Tees 25mm

TOTAL

MATERIAL

Each

185.00

37.00

185.00

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Pipe Fitter I

0.100

Day

900.00

Day

90.00

5.70

41.00

195.70

22

82.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

463.20

Cost Per Each: 463.20

Labour Rates Per

Each

Rs.

237.50

Cost Per Each: 237.50

2,575

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-c-03
Providing and installing

Detail

Qty

(British) :

Each

HDPE Tee 32mm dia

Unit

Rate (Rs)

Each

275.00

Amount

MATERIAL
1.000

HDPE Tees 32mm

TOTAL

MATERIAL

Each

275.00

44.35

275.00

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Pipe Fitter I

0.100

Day

900.00

Day

90.00

5.70

33.65

195.70

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

573.00

Cost Per Each: 573.00

Labour Rates Per

Each

Rs.

237.50

Cost Per Each: 237.50

102.30

2,576

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-c-04
Providing and installing

Detail

Qty

(British) :

Each

HDPE Tee 40mm dia

Unit

Rate (Rs)

Each

525.00

Amount

MATERIAL
1.000

HDPE Tees 40mm

TOTAL

MATERIAL

Each

525.00

51.64

525.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

26.36

244.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

937.38

Cost Per Each: 937.38

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

167.75

2,577

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-c-05
Providing and installing

Detail

Qty

(British) :

Each

HDPE Tee 50mm dia

Unit

Rate (Rs)

Each

900.00

Amount

MATERIAL
1.000

HDPE Tees 50mm

TOTAL

MATERIAL

Each

900.00

59.34

900.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Pipe Fitter I

0.125

Day

900.00

Day

112.50

7.13

18.66

244.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

250.25

Composite Rates Per

Each

Rs.

1,394.88

Cost Per Each: 1,394.88

Labour Rates Per

Each

Rs.

296.88

Cost Per Each: 296.88

2,578

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-c-06
Providing and installing

Detail

Qty

(British) :

Each

HDPE Tee 75mm dia

Unit

Rate (Rs)

Each

1,950.00

Amount

MATERIAL
1.000

HDPE Tees 75mm

TOTAL

MATERIAL

Each

1,950.00

65.44

1,950.00

LABOUR
Coolie

0.300

Day

500.00

Day

150.00

Pipe Fitter I

0.150

Day

900.00

Day

135.00

8.55

12.56

293.55

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

491.70

Composite Rates Per

Each

Rs.

2,735.25

Cost Per Each: 2,735.25

Labour Rates Per

Each

Rs.

356.25

Cost Per Each: 356.25

2,579

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-c-07
Providing and installing

Detail

Qty

(British) :

Each

HDPE Tee 110mm dia

Unit

Rate (Rs)

Each

6,300.00

Amount

MATERIAL
1.000

HDPE Tees 110mm

TOTAL

MATERIAL

Each

6,300.00

70.73

6,300.00

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Pipe Fitter I

0.200

Day

900.00

Day

180.00

11.40

7.27

391.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,469.60

Composite Rates Per

Each

Rs.

8,161.00

Cost Per Each: 8,161.00

Labour Rates Per

Each

Rs.

475.00

Cost Per Each: 475.00

2,580

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-d-01
Providing and installing

Detail

Qty

(British) :

Each

HDPE bend 20mm dia

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Bends 20mm

75.00

Each

TOTAL

MATERIAL

Each

75.00

28.85

75.00

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Fitter I

0.075

Day

800.00

Day

60.00

3.60

49.15

123.60

22

42.90

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

241.50

Cost Per Each: 241.50

Labour Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

2,581

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-d-02
Providing and installing

Detail

Qty

(British) :

Each

HDPE bend 25mm dia

Unit

Rate (Rs)

Each

120.00

Amount

MATERIAL
1.000

HDPE Bends 25mm

TOTAL

MATERIAL

Each

120.00

37.50

120.00

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Fitter I

0.075

Day

800.00

Day

60.00

3.60

40.50

123.60

22

52.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

296.40

Cost Per Each: 296.40

Labour Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

2,582

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-d-03
Providing and installing

Detail

Qty

(British) :

Each

HDPE bend 32mm dia

Unit

Rate (Rs)

Each

170.00

Amount

MATERIAL
1.000

HDPE Bends 32mm

TOTAL

MATERIAL

Each

170.00

43.97

170.00

LABOUR
Coolie

0.120

Day

500.00

Day

60.00

Fitter I

0.075

Day

800.00

Day

60.00

3.60

34.03

123.60

22

63.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

357.40

Cost Per Each: 357.40

Labour Rates Per

Each

Rs.

150.00

Cost Per Each: 150.00

2,583

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-d-04
Providing and installing

Detail

Qty

(British) :

Each

HDPE bend 40mm dia

Unit

Rate (Rs)

Each

250.00

Amount

MATERIAL
1.000

HDPE Bends 40mm

TOTAL

MATERIAL

Each

250.00

46.38

250.00

LABOUR
Coolie

0.172

Day

500.00

Day

86.25

Fitter I

0.085

Day

800.00

Day

68.00

4.63

31.62

158.88

22

88.94

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

497.81

Cost Per Each: 497.81

Labour Rates Per

Each

Rs.

192.81

Cost Per Each: 192.81

2,584

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-d-05
Providing and installing

Detail

Qty

(British) :

Each

HDPE bend 50mm dia

Unit

Rate (Rs)

Each

550.00

Amount

MATERIAL
1.000

HDPE Bends 50mm

TOTAL

MATERIAL

Each

550.00

58.57

550.00

LABOUR
Coolie

0.172

Day

500.00

Day

86.25

Fitter I

0.085

Day

800.00

Day

68.00

4.63

19.43

158.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

863.81

Cost Per Each: 863.81

Labour Rates Per

Each

Rs.

192.81

Cost Per Each: 192.81

154.94

2,585

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-d-06
Providing and installing

Detail

Qty

(British) :

Each

HDPE bend 75mm dia

Unit

Rate (Rs)

Each

1,500.00

Amount

MATERIAL
1.000

HDPE Bends 75mm

TOTAL

MATERIAL

Each

1,500.00

67.04

1,500.00

LABOUR
Coolie

0.188

Day

500.00

Day

93.75

Pipe Fitter I

0.094

Day

900.00

Day

84.38

5.34

10.96

183.47

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

369.19

Composite Rates Per

Each

Rs.

2,052.66

Cost Per Each: 2,052.66

Labour Rates Per

Each

Rs.

222.66

Cost Per Each: 222.66

2,586

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-d-07
Providing and installing

Detail

Qty

(British) :

Each

HDPE bend 110mm dia

Unit

Rate (Rs)

Each

4,200.00

Amount

MATERIAL
1.000

HDPE Bends 100mm

TOTAL

MATERIAL

Each

4,200.00

71.19

4,200.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Fitter I

0.125

Day

800.00

Day

100.00

6.75

6.81

231.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

973.50

Composite Rates Per

Each

Rs.

5,405.25

Cost Per Each: 5,405.25

Labour Rates Per

Each

Rs.

281.25

Cost Per Each: 281.25

2,587

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-e-01
Providing and installing

Detail

Qty

(British) :

Each

HDPE adaptor 20mm

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Adaptors 20mmx0.5"

55.00

Each

TOTAL

MATERIAL

Each

55.00

34.96

55.00

LABOUR
Coolie

0.070

Day

500.00

Day

35.00

Fitter I

0.035

Day

800.00

Day

28.00

1.89

43.04

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

145.85

Cost Per Each: 145.85

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

25.96

2,588

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-e-02
Providing and installing

Detail

Qty

(British) :

Each

HDPE adaptor 25mm

Unit

Rate (Rs)

Amount

MATERIAL
1.000

HDPE Adaptors 25mmx0.75"

80.00

Each

TOTAL

MATERIAL

Each

80.00

41.96

80.00

LABOUR
Coolie

0.070

Day

500.00

Day

35.00

Fitter I

0.035

Day

800.00

Day

28.00

1.89

36.04

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

176.35

Cost Per Each: 176.35

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

31.46

2,589

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-e-03
Providing and installing

Detail

Qty

(British) :

Each

HDPE adaptor 32mm

Unit

Rate (Rs)

Each

115.00

Amount

MATERIAL
1.000

HDPE Adaptors 32mmx1"

TOTAL

MATERIAL

Each

115.00

48.46

115.00

LABOUR
Coolie

0.070

Day

500.00

Day

35.00

Fitter I

0.035

Day

800.00

Day

28.00

1.89

29.54

64.89

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

219.05

Cost Per Each: 219.05

Labour Rates Per

Each

Rs.

78.75

Cost Per Each: 78.75

39.16

2,590

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-e-04
Providing and installing

Detail

Qty

(British) :

Each

HDPE adaptor 40mm

Unit

Rate (Rs)

Each

200.00

Amount

MATERIAL
1.000

HDPE Adaptors 40mmx1.25"

TOTAL

MATERIAL

Each

200.00

54.50

200.00

LABOUR
Coolie

0.083

Day

500.00

Day

41.25

Fitter I

0.043

Day

800.00

Day

34.00

2.26

23.50

77.51

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

338.06

Cost Per Each: 338.06

Labour Rates Per

Each

Rs.

94.06

Cost Per Each: 94.06

60.56

2,591

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-e-05
Providing and installing

Detail

Qty

(British) :

Each

HDPE adaptor 50mm

Unit

Rate (Rs)

Each

350.00

Amount

MATERIAL
1.000

HDPE Adaptors 50mmx1.5"

TOTAL

MATERIAL

Each

350.00

61.73

350.00

LABOUR
Coolie

0.083

Day

500.00

Day

41.25

Fitter I

0.043

Day

800.00

Day

34.00

2.26

16.27

77.51

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

521.06

Cost Per Each: 521.06

Labour Rates Per

Each

Rs.

94.06

Cost Per Each: 94.06

93.56

2,592

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-e-06
Providing and installing

Detail

Qty

(British) :

Each

HDPE adaptor 75mm

Unit

Rate (Rs)

Each

856.00

Amount

MATERIAL
1.000

HDPE Adaptors 75mmx2.5"

TOTAL

MATERIAL

Each

856.00

68.68

856.00

LABOUR
Coolie

0.087

Day

500.00

Day

43.75

Fitter I

0.044

Day

800.00

Day

35.00

2.36

9.32

81.11

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

205.65

Composite Rates Per

Each

Rs.

1,142.76

Cost Per Each: 1,142.76

Labour Rates Per

Each

Rs.

98.44

Cost Per Each: 98.44

2,593

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-30-e-07
Providing and installing

Detail

Qty

(British) :

Each

HDPE adaptor 110mm

Unit

Rate (Rs)

Each

2,500.00

Amount

MATERIAL
1.000

HDPE Adaptors 100mmx3.5"

TOTAL

MATERIAL

Each

2,500.00

71.77

2,500.00

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Fitter I

0.063

Day

800.00

Day

50.00

3.38

6.23

115.88

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

574.75

Composite Rates Per

Each

Rs.

3,190.63

Cost Per Each: 3,190.63

Labour Rates Per

Each

Rs.

140.63

Cost Per Each: 140.63

2,594

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-31-a

(British) :

Rft

S/H/J G.I. Flanged Pipe 18" i/d 6.35mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I. Flanged Pipe 18" dia

5,750.00

RFT

TOTAL

MATERIAL

RFT

5,750.00

64.00

5,750.00

LABOUR
Coolie

1.098

Day

500.00

Day

548.78

Fitter I

0.549

Day

800.00

Day

439.02

29.63

14.00

1,017.44

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

8,249.76

Labour Rates Per

Rft

Rs.

1,234.76

1,482.32

Per Meter : Rs 27,059.20


Per Meter : Rs 4,050.00

2,595

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-31-b

(British) :

Rft

S/H/J G.I. Flanged Pipe 16" i/d 6.35mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I. Flanged Pipe 16"

4,750.00

RFT

TOTAL

MATERIAL

RFT

4,750.00

68.98

4,750.00

LABOUR
Coolie

0.732

Day

500.00

Day

365.85

Fitter I

0.061

Day

800.00

Day

48.78

12.44

9.02

427.07

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

6,313.29

Labour Rates Per

Rft

Rs.

518.29

1,136.22

Per Meter : Rs 20,707.60


Per Meter : Rs 1,700.00

2,596

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-31-c

(British) :

Rft

S/H/J G.I. Flanged Pipe 12" i/d 6.35mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I. Flanged Pipe 12" dia

4,500.00

RFT

TOTAL

MATERIAL

RFT

4,500.00

67.58

4,500.00

LABOUR
Coolie

0.549

Day

500.00

Day

274.39

Fitter I

0.274

Day

800.00

Day

219.51

14.82

10.42

508.72

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

6,107.38

Labour Rates Per

Rft

Rs.

617.38

1,098.66

Per Meter : Rs 20,032.20


Per Meter : Rs 2,025.00

2,597

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-31-d

(British) :

Rft

S/H/J G.I. Flanged Pipe 10" i/d 6.35mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I. Flanged Pipe 10" dia

3,500.00

RFT

TOTAL

MATERIAL

RFT

3,500.00

67.11

3,500.00

LABOUR
Coolie

0.457

Day

500.00

Day

228.66

Fitter I

0.229

Day

800.00

Day

182.93

12.35

10.89

423.93

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,784.48

Labour Rates Per

Rft

Rs.

514.48

860.55

Per Meter : Rs 15,693.10


Per Meter : Rs 1,687.50

2,598

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-31-e

(British) :

Rft

S/H/J G.I. Flanged Pipe 8" i/d 5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I. Flanged Pipe 8" dia

3,000.00

RFT

TOTAL

MATERIAL

RFT

3,000.00

67.58

3,000.00

LABOUR
Coolie

0.366

Day

500.00

Day

182.93

Fitter I

0.183

Day

800.00

Day

146.34

9.88

10.42

339.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,071.59

Labour Rates Per

Rft

Rs.

411.59

732.44

Per Meter : Rs 13,354.80


Per Meter : Rs 1,350.00

2,599

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-31-f

(British) :

Rft

S/H/J G.I. Flanged Pipe 6" i/d 5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I. Flanged Pipe 6" dia

1,750.00

RFT

TOTAL

MATERIAL

RFT

1,750.00

65.73

1,750.00

LABOUR
Coolie

0.274

Day

500.00

Day

137.20

Fitter I

0.137

Day

800.00

Day

109.76

7.41

12.27

254.36

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,443.69

Labour Rates Per

Rft

Rs.

308.69

439.33

Per Meter : Rs 8,015.30


Per Meter : Rs 1,012.50

2,600

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-31-g

(British) :

Rft

S/H/J G.I. Flanged Pipe 4" i/d 5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I. Flanged Pipe 4" dia

1,360.00

RFT

TOTAL

MATERIAL

RFT

1,360.00

66.90

1,360.00

LABOUR
Coolie

0.183

Day

500.00

Day

91.46

Fitter I

0.091

Day

800.00

Day

73.17

4.94

11.10

169.57

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,864.99

Labour Rates Per

Rft

Rs.

205.79

335.42

Per Meter : Rs 6,117.18


Per Meter : Rs 675.00

2,601

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-32-a

(British) :

Rft

S/H/J MS Flanged Pipe 18" i/d 6.35mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Flanged Pipe 18" dia

5,250.00

RFT

TOTAL

MATERIAL

RFT

5,250.00

64.83

5,250.00

LABOUR
Coolie

0.915

Day

500.00

Day

457.32

Fitter I

0.457

Day

800.00

Day

365.85

24.70

13.17

847.87

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

7,433.96

Labour Rates Per

Rft

Rs.

1,028.96

1,336.10

Per Meter : Rs 24,383.40


Per Meter : Rs 3,375.00

2,602

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-32-b

(British) :

Rft

S/H/J MS Flanged Pipe 16" i/d 6.35mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Flanged Pipe 16" dia

6,500.00

RFT

TOTAL

MATERIAL

RFT

6,500.00

69.16

6,500.00

LABOUR
Coolie

0.610

Day

500.00

Day

304.88

Fitter I

0.305

Day

800.00

Day

243.90

16.46

8.84

565.24

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

8,615.98

Labour Rates Per

Rft

Rs.

685.98

1,550.73

Per Meter : Rs 28,260.40


Per Meter : Rs 2,250.00

2,603

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-32-c

(British) :

Rft

S/H/J MS Flanged Pipe 12" i/d 6.35mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Flanged Pipe 12" dia

3,350.00

RFT

TOTAL

MATERIAL

RFT

3,350.00

66.79

3,350.00

LABOUR
Coolie

0.457

Day

500.00

Day

228.66

Fitter I

0.229

Day

800.00

Day

182.93

12.35

11.21

423.93

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

4,601.48

Labour Rates Per

Rft

Rs.

514.48

827.55

Per Meter : Rs 15,092.86


Per Meter : Rs 1,687.50

2,604

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-32-d

(British) :

Rft

S/H/J MS Flanged Pipe 10" i/d 6.35mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Flanged Pipe 10" dia

2,650.00

RFT

TOTAL

MATERIAL

RFT

2,650.00

66.71

2,650.00

LABOUR
Coolie

0.366

Day

500.00

Day

182.93

Fitter I

0.183

Day

800.00

Day

146.34

9.88

11.29

339.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

3,644.59

Labour Rates Per

Rft

Rs.

411.59

655.44

Per Meter : Rs 11,954.24


Per Meter : Rs 1,350.00

2,605

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-32-e

(British) :

Rft

S/H/J MS Flanged Pipe 8" i/d 5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Flanged Pipe 8" dia

2,150.00

RFT

TOTAL

MATERIAL

RFT

2,150.00

66.51

2,150.00

LABOUR
Coolie

0.305

Day

500.00

Day

152.44

Fitter I

0.152

Day

800.00

Day

121.95

8.23

11.49

282.62

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,965.99

Labour Rates Per

Rft

Rs.

342.99

533.37

Per Meter : Rs 9,728.44


Per Meter : Rs 1,125.00

2,606

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-32-f

(British) :

Rft

S/H/J MS Flanged Pipe 6" i/d 5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Flanged Pipe 6" dia

1,500.00

RFT

TOTAL

MATERIAL

RFT

1,500.00

65.43

1,500.00

LABOUR
Coolie

0.244

Day

500.00

Day

121.95

Fitter I

0.122

Day

800.00

Day

97.56

6.59

12.57

226.10

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,104.39

Labour Rates Per

Rft

Rs.

274.39

378.29

Per Meter : Rs 6,902.40


Per Meter : Rs 900.00

2,607

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-32-g

(British) :

Rft

S/H/J MS Flanged Pipe 4" i/d 5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

MS Flanged Pipe 4" dia

850.00

RFT

TOTAL

MATERIAL

RFT

850.00

64.58

850.00

LABOUR
Coolie

0.152

Day

500.00

Day

76.22

Fitter I

0.076

Day

800.00

Day

60.98

4.12

13.42

141.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,208.49

Labour Rates Per

Rft

Rs.

171.49

217.18

Per Meter : Rs 3,963.86


Per Meter : Rs 562.50

2,608

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-33

(British) :

Sft

Supplying and Fixing MS manhole cover of 0.25" thick sheet & angle
iron frame 2"x2"x0.25" with lock complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

4.322

Kg

97.00

Kg

419.19

Iron Sheet

0.697

Kg

120.00

Kg

83.64

TOTAL

MATERIAL

66.30

502.83

LABOUR
Mason

0.019

Day

900.00

Day

16.73

Coolie

0.056

Day

500.00

Day

27.88

Black Smith

0.009

Day

900.00

Day

8.36

Welder II

0.019

Day

700.00

Day

13.01

1.98

11.70

67.96

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

695.94

Per SQM : Rs 7,488.31

Labour Rates Per

Sft

Rs.

82.48

Per SQM : Rs 887.50

125.14

2,609

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-34

(British) :

Rft

Supplying and Fixing flat iron (2"x3/8") ladder for OHR, holes @
15" c/c, steps of MS bars 5/8" i/d & paint compl

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

0.579

Kg

82.00

Kg

47.50

Steel (Struct. Sections)

4.421

Kg

97.00

Kg

428.81

Welding Rod

0.091

Pack

400.00

Pack

TOTAL

MATERIAL

36.59

69.93

512.90

LABOUR
Coolie

0.030

Day

500.00

Day

15.24

Black Smith

0.009

Day

900.00

Day

8.23

Fitter I

0.009

Day

800.00

Day

7.32

Welder II

0.009

Day

700.00

Day

6.40

1.12

8.07

38.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

672.23

Labour Rates Per

Rft

Rs.

46.49

LABOUR

121.02

Per Meter : Rs 2,204.91


Per Meter : Rs 152.50

2,610

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-35
Supplying and Fixing
jally etc

Detail

(British) :

Rft

C.I. vent pipe for storage tanks including

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.305

Cast Iron Pipe 4"

140.00

Kg

TOTAL

MATERIAL

Kg

42.68

70.47

42.68

LABOUR
Coolie

0.003

Day

500.00

Day

1.52

Fitter I

0.002

Day

800.00

Day

1.22

0.08

7.53

2.83

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

55.50

Labour Rates Per

Rft

Rs.

3.43

LABOUR

9.99

Per Meter : Rs 182.05


Per Meter : Rs 11.25

2,611

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-36-a
Supplying and Fixing

Detail

(British) :

Each

MS cap of 3/16" thick sheet : 10" i/d

Qty

Unit

Rate (Rs)

Each

3,000.00

Amount

MATERIAL
1.000

MS Cap 10" dia

TOTAL

MATERIAL

Each

3,000.00

74.60

3,000.00

Day

16.00

0.48

3.40

16.48

22

LABOUR
0.020

Fitter I

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

663.52

Composite Rates Per

Each

Rs.

3,680.00

Cost Per Each: 3,680.00

Labour Rates Per

Each

Rs.

20.00

Cost Per Each: 20.00

2,612

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-36-b
Supplying and Fixing

Detail

(British) :

Each

MS Cap of 3/16" thick sheet : 8" i/d

Qty

Unit

Rate (Rs)

Each

2,800.00

Amount

MATERIAL
1.000

MS Cap 8" dia

TOTAL

MATERIAL

Each

2,800.00

74.57

2,800.00

Day

16.00

0.48

3.43

16.48

22

LABOUR
0.020

Fitter I

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

619.52

Composite Rates Per

Each

Rs.

3,436.00

Cost Per Each: 3,436.00

Labour Rates Per

Each

Rs.

20.00

Cost Per Each: 20.00

2,613

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-36-c
Supplying and Fixing

Detail

(British) :

Each

MS Cap of 3/16" thick sheet : 6" i/d

Qty

Unit

Rate (Rs)

Each

2,600.00

Amount

MATERIAL
1.000

MS Cap 6" dia

TOTAL

MATERIAL

Each

2,600.00

74.54

2,600.00

Day

16.00

0.48

3.46

16.48

22

LABOUR
0.020

Fitter I

800.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

575.52

Composite Rates Per

Each

Rs.

3,192.00

Cost Per Each: 3,192.00

Labour Rates Per

Each

Rs.

20.00

Cost Per Each: 20.00

2,614

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-38-a
Supplying and Fixing

Detail

(British) :

Each

Flanged Expansion Joints BSS 2035: 18" i/d

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flanged Exp Joint 18"

65,000.00

Each

TOTAL

MATERIAL

Each

65,000.00

54.05

65,000.00

LABOUR
Coolie

28.000

Day

500.00

Day

14,000.00

Fitter I

14.000

Day

800.00

Day

11,200.00

756.00

23.95

25,956.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

19,844.00

Composite Rates Per

Each

Rs.

110,800.00

Cost Per Each: 110,800.00

Labour Rates Per

Each

Rs.

31,500.00

Cost Per Each: 31,500.00

2,615

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-38-b
Supplying and Fixing

Detail

(British) :

Each

Flanged Expansion Joint BS-2035 : 16" i/d

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flanged Exp Joint 16"

50,000.00

Each

TOTAL

MATERIAL

Each

50,000.00

55.15

50,000.00

LABOUR
Coolie

20.000

Day

500.00

Day

10,000.00

Fitter I

10.000

Day

800.00

Day

8,000.00

540.00

22.85

18,540.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

14,960.00

Composite Rates Per

Each

Rs.

83,500.00

Cost Per Each: 83,500.00

Labour Rates Per

Each

Rs.

22,500.00

Cost Per Each: 22,500.00

2,616

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-38-c
Supplying and Fixing

Detail

(British) :

Each

Flanged Expansion Joint BS-2035 : 12" i/d

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flanged Exp Joint 12"

26,000.00

Each

TOTAL

MATERIAL

Each

26,000.00

57.90

26,000.00

LABOUR
Coolie

9.600

Day

500.00

Day

4,800.00

Fitter II

4.800

Day

600.00

Day

2,880.00

230.40

20.10

7,910.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

7,409.60

Composite Rates Per

Each

Rs.

41,320.00

Cost Per Each: 41,320.00

Labour Rates Per

Each

Rs.

9,600.00

Cost Per Each: 9,600.00

2,617

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-38-d
Supplying and Fixing

Detail

(British) :

Each

Flanged Expansion Joint BSS-2035 : 10" i/d

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flanged Exp Joint 10"

15,500.00

Each

TOTAL

MATERIAL

Each

15,500.00

54.68

15,500.00

LABOUR
Coolie

6.400

Day

500.00

Day

3,200.00

Fitter I

3.200

Day

800.00

Day

2,560.00

172.80

23.32

5,932.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

4,677.20

Composite Rates Per

Each

Rs.

26,110.00

Cost Per Each: 26,110.00

Labour Rates Per

Each

Rs.

7,200.00

Cost Per Each: 7,200.00

2,618

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-38-e
Supplying and Fixing

Detail

(British) :

Each

Flanged Expansion Joint BSS 2035 : 8" i/d

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Flanged Exp Joint 8"

12,000.00

Each

TOTAL

MATERIAL

Each

12,000.00

53.96

12,000.00

LABOUR
Coolie

5.200

Day

500.00

Day

2,600.00

Fitter I

2.600

Day

800.00

Day

2,080.00

140.40

24.04

4,820.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,669.60

Composite Rates Per

Each

Rs.

20,490.00

Cost Per Each: 20,490.00

Labour Rates Per

Each

Rs.

5,850.00

Cost Per Each: 5,850.00

2,619

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-38-f
Supplying and Fixing

Detail

(British) :

Each

Flanged Expansion Joints BSS 2035 : 6" i/d

Qty

Unit

Rate (Rs)

Each

8,000.00

Amount

MATERIAL
1.000

Flanged Exp Joint 6"

TOTAL

MATERIAL

Each

8,000.00

57.03

8,000.00

LABOUR
Coolie

2.800

Day

500.00

Day

1,400.00

Fitter I

1.400

Day

800.00

Day

1,120.00

75.60

20.97

2,595.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,314.40

Composite Rates Per

Each

Rs.

12,910.00

Cost Per Each: 12,910.00

Labour Rates Per

Each

Rs.

3,150.00

Cost Per Each: 3,150.00

2,620

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-38-g
Supplying and Fixing

Detail

(British) :

Each

Flanged Expansion Joint BSS-2035 : 4" i/d

Qty

Unit

Rate (Rs)

Each

7,000.00

Amount

MATERIAL
1.000

Flanged Exp Joint 4"

TOTAL

MATERIAL

Each

7,000.00

57.31

7,000.00

LABOUR
Coolie

2.400

Day

500.00

Day

1,200.00

Fitter I

1.200

Day

800.00

Day

960.00

64.80

20.69

2,224.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,015.20

Composite Rates Per

Each

Rs.

11,240.00

Cost Per Each: 11,240.00

Labour Rates Per

Each

Rs.

2,700.00

Cost Per Each: 2,700.00

2,621

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-39-a
Supplying and Fixing
pipe : 18" i/d

Detail

(British) :

Each

MS Suspension Clamp 3/8" thick for housing

Qty

Unit

Rate (Rs)

Each

2,750.00

Amount

MATERIAL
1.000

MS Clamp 18" dia

TOTAL

MATERIAL

Each

2,750.00

42.01

2,750.00

LABOUR
Coolie

2.400

Day

500.00

Day

1,200.00

Fitter I

1.200

Day

800.00

Day

960.00

64.80

35.99

2,224.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,080.20

Composite Rates Per

Each

Rs.

6,055.00

Cost Per Each: 6,055.00

Labour Rates Per

Each

Rs.

2,700.00

Cost Per Each: 2,700.00

2,622

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-39-b
Supplying and Fixing
pipe : 16" i/d

Detail

(British) :

Each

MS Suspension Clamp 3/8" thick for housing

Qty

Unit

Rate (Rs)

Each

1,750.00

Amount

MATERIAL
1.000

MS Clamp 16" dia

TOTAL

MATERIAL

Each

1,750.00

41.14

1,750.00

LABOUR
Coolie

1.600

Day

500.00

Day

800.00

Fitter I

0.800

Day

800.00

Day

640.00

43.20

36.86

1,483.20

22

701.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

3,935.00

Cost Per Each: 3,935.00

Labour Rates Per

Each

Rs.

1,800.00

Cost Per Each: 1,800.00

2,623

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-39-c
Supplying and Fixing
pipe : 12" i/d

Detail

(British) :

Each

MS Suspension Clamp 3/8" thick for housing

Qty

Unit

Rate (Rs)

Each

1,000.00

Amount

MATERIAL
1.000

MS Clamp 12" dia

TOTAL

MATERIAL

Each

1,000.00

39.47

1,000.00

LABOUR
Coolie

1.000

Day

500.00

Day

500.00

Fitter I

0.500

Day

800.00

Day

400.00

27.00

38.53

927.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

418.00

Composite Rates Per

Each

Rs.

2,345.00

Cost Per Each: 2,345.00

Labour Rates Per

Each

Rs.

1,125.00

Cost Per Each: 1,125.00

2,624

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-39-d
Supplying and Fixing
pipe : 10" i/d

Detail

(British) :

Each

MS Suspension Clamp 3/8" thick for housing

Qty

Unit

Rate (Rs)

Each

800.00

Amount

MATERIAL
1.000

MS Clamp 10" dia

TOTAL

MATERIAL

Each

800.00

44.78

800.00

LABOUR
Coolie

0.600

Day

500.00

Day

300.00

Fitter I

0.300

Day

800.00

Day

240.00

16.20

33.22

556.20

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

294.80

Composite Rates Per

Each

Rs.

1,651.00

Cost Per Each: 1,651.00

Labour Rates Per

Each

Rs.

675.00

Cost Per Each: 675.00

2,625

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-39-e
Supplying and Fixing
pipe : 8" i/d

Detail

(British) :

Each

MS Suspension Clamp 3/8" thick for housing

Qty

Unit

Rate (Rs)

Each

540.00

Amount

MATERIAL
1.000

MS Clamp 8" dia

TOTAL

MATERIAL

Each

540.00

45.00

540.00

LABOUR
Coolie

0.400

Day

500.00

Day

200.00

Fitter I

0.200

Day

800.00

Day

160.00

10.80

33.00

370.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

198.00

Composite Rates Per

Each

Rs.

1,108.80

Cost Per Each: 1,108.80

Labour Rates Per

Each

Rs.

450.00

Cost Per Each: 450.00

2,626

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-39-f
Supplying and Fixing
pipe : 6" i/d

Detail

(British) :

Each

MS Suspension Clamp 3/8" thick for housing

Qty

Unit

Rate (Rs)

Each

470.00

Amount

MATERIAL
1.000

MS Clamp 6" dia

TOTAL

MATERIAL

Each

470.00

47.64

470.00

LABOUR
Coolie

0.300

Day

500.00

Day

150.00

Fitter I

0.150

Day

800.00

Day

120.00

8.10

30.36

278.10

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

910.90

Cost Per Each: 910.90

Labour Rates Per

Each

Rs.

337.50

Cost Per Each: 337.50

162.80

2,627

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-39-g
Supplying and Fixing
pipe : 4" i/d

Detail

(British) :

Each

MS Suspension Clamp 3/8" thick for housing

Qty

Unit

Rate (Rs)

Each

450.00

Amount

MATERIAL
1.000

MS Clamp 4" dia

TOTAL

MATERIAL

Each

450.00

53.57

450.00

LABOUR
Coolie

0.200

Day

500.00

Day

100.00

Fitter I

0.100

Day

800.00

Day

80.00

5.40

24.43

185.40

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

774.00

Cost Per Each: 774.00

Labour Rates Per

Each

Rs.

225.00

Cost Per Each: 225.00

138.60

2,628

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-40
Supplying and Fixing

Detail

(British) :

Rft

PVC Water Stopper 8" wide 3/8" thick

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Water Stop 8"wide x 3/8"

200.00

RFT

TOTAL

MATERIAL

RFT

200.00

71.10

200.00

LABOUR
Coolie

0.012

Day

500.00

Day

6.10

Fitter I

0.006

Day

800.00

Day

4.88

0.33

6.90

11.30

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

257.72

Labour Rates Per

Rft

Rs.

13.72

LABOUR

46.41

Per Meter : Rs 845.32


Per Meter : Rs 45.00

2,629

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-41

(British) :

No

Conducting Elec: Resistivity survey of the area and furnishing its


reports.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
2.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

1,250.00

37.50

6.10

1,287.50

EQUIPMENT
Transportation

1.000

LS

2,000.00

LS

2,000.00

Probes

3.000

No

9,000.00

No

27,000.00

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

71.90

29,000.00

22

6,655.00

Composite Rates Per

No

Rs.

36,942.50

Cost Per no: 36,942.50

Labour Rates Per

No

Rs.

1,562.50

Cost Per no: 1,562.50

2,630

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-42

(British) :

Job

Logging of bore hole with electrical equipment and furnishing


reports.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
3.000

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

1,500.00

45.00

8.23

1,545.00

Job

20,000.00

69.77

20,000.00

22

4,730.00

EQUIPMENT
1.000

Electrical Equipment

20,000.00

Job

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Job

Rs.

26,275.00

Cost Per job: 26,275.00

Labour Rates Per

Job

Rs.

1,875.00

Cost Per job: 1,875.00

2,631

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-43

(British) :

Rft

Providing and lowering pezu meter 1.25" GI pipe including all


accessories.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

G.I pipe (light) 1.25"

125.00

RFt

TOTAL

MATERIAL

RFt

125.00

51.26

125.00

LABOUR
Coolie

0.072

Day

500.00

Day

36.13

Pipe Layer

0.036

Day

600.00

Day

21.77

1.74

26.74

59.63

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

224.87

Labour Rates Per

Rft

Rs.

72.37

LABOUR

40.24

Per Meter : Rs 737.57


Per Meter : Rs 237.37

2,632

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-44

(British) :

Rft

P&L Reflux valves (C.I) of BSS quality/weight including jointing


material 3" i/d-6" i/d.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.335

C.I Reflux Valve 3" I/d-6"I/d

3,600.00

Rft

TOTAL

MATERIAL

Rft

1,207.32

53.42

1,207.32

LABOUR
Coolie

0.610

Day

500.00

Day

304.88

Pipe Layer

0.305

Day

600.00

Day

182.93

14.63

24.58

502.44

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

2,082.68

Labour Rates Per

Rft

Rs.

609.76

372.93

Per Meter : Rs 6,831.20


Per Meter : Rs 2,000.00

2,633

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-45-a

(British) :

No

Laying cut, joint, test & disinfect of 8"i/d of GI pipe line


including cost of welding, excavation and filling compaction etc
complete.

Detail

Qty

Unit

Rate (Rs)

Joint

864.00

Amount

MATERIAL
1.000

GI Pipe 8" I/d

TOTAL

MATERIAL

Joint

864.00

61.49

864.00

LABOUR
Coolie

0.237

Day

500.00

Day

118.50

Pipe Layer

0.119

Day

600.00

Day

71.40

5.70

16.51

195.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

231.86

Composite Rates Per

No

Rs.

1,291.46

Cost Per joint: 1,291.46

Labour Rates Per

No

Rs.

237.38

Cost Per joint: 237.38

2,634

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-45-b

(British) :

joint

Laying cut, joint, test & disinfect of 6"i/d of GI pipe line


including cost of welding, excavation and filling compaction etc
complete.

Detail

Qty

Unit

Rate (Rs)

Joint

925.00

Amount

MATERIAL
GI Pipe 6" I/d

1.000

TOTAL

MATERIAL

Joint

925.00

62.23

925.00

LABOUR
Coolie

0.237

Day

500.00

Day

118.50

Pipe Layer

0.119

Day

600.00

Day

71.40

5.70

15.77

195.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

245.28

Composite Rates Per

joint

Rs.

1,365.88

Cost Per joint: 1,365.88

Labour Rates Per

joint

Rs.

237.38

Cost Per joint: 237.38

2,635

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-45-c

(British) :

joint

Laying cut, joint, test & disinfect of 4"i/d of GI pipe line


including cost of welding, excavation and filling compaction etc
complete.

Detail

Qty

Unit

Rate (Rs)

Joint

480.00

Amount

MATERIAL
GI Pipe 4" I/d

1.000

TOTAL

MATERIAL

Joint

480.00

53.74

480.00

LABOUR
Coolie

0.237

Day

500.00

Day

118.50

Pipe Layer

0.119

Day

600.00

Day

71.40

5.70

24.26

195.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

joint

Rs.

822.98

Cost Per joint: 822.98

Labour Rates Per

joint

Rs.

237.38

Cost Per joint: 237.38

147.38

2,636

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-45-d

(British) :

Joint

Laying cut, joint, test & disinfect of 3"i/d of GI pipe line


including cost of welding, excavation and filling compaction etc
complete.

Detail

Qty

Unit

Rate (Rs)

Joint

339.00

Amount

MATERIAL
GI Pipe 3" I/d

1.000

TOTAL

MATERIAL

Joint

339.00

48.07

339.00

LABOUR
Coolie

0.237

Day

500.00

Day

118.50

Pipe Layer

0.119

Day

600.00

Day

71.40

5.70

29.93

195.60

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Joint

Rs.

650.96

Cost Per joint: 650.96

Labour Rates Per

Joint

Rs.

237.38

Cost Per joint: 237.38

116.36

2,637

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-46

(British) :

Rft

Testing of soil for bearing capacity & chemical contents upto any
depth.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
1.220

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

Day

609.76

18.29

12.38

628.05

EQUIPMENT
Transportation

0.229

LS

2,000.00

LS

Testing charges

0.305

Job

12,500.00

Job

3,810.98

65.62

4,268.29

22

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

Rft

Rs.

5,969.51

Labour Rates Per

Rft

Rs.

762.20

457.32

1,073.17

Per Meter : Rs 19,580.00


Per Meter : Rs 2,500.00

2,638

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-47

(British) :

Each

Supply and Fixing Affridev type hand pump upto 170 Feet

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

AfriDev Hand Pump Machinary Co

14,950.00

Each

TOTAL

72.11

MATERIAL

Each

14,950.00

14,950.00

LABOUR
Fitter II

0.500

Each

600.00

Each

300.00

Helper

0.500

Each

600.00

Each

300.00

18.00

5.89

618.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

3,421.00

Composite Rates Per

Each

Rs.

18,989.00

Cost Per Each: 18,989.00

Labour Rates Per

Each

Rs.

750.00

Cost Per Each: 750.00

2,639

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-48-a

(British) :

Each

Supply and Fixing Voltage Regulator 20 KVA

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Voltage Regulator 20 KVA = 30

36,000.00

Each

TOTAL

73.17

MATERIAL

Each

36,000.00

36,000.00

LABOUR
1.000

Electrician I

900.00

Each

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Each

900.00

27.00

4.83

927.00

22

8,118.00

Composite Rates Per

Each

Rs.

45,045.00

Cost Per Each: 45,045.00

Labour Rates Per

Each

Rs.

1,125.00

Cost Per Each: 1,125.00

2,640

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-48-b

(British) :

Each

Supply and Fixing Voltage Regulator 25 KVA

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Voltage Regulator 25 KVA = 35

38,000.00

Each

TOTAL

73.26

MATERIAL

Each

38,000.00

38,000.00

LABOUR
1.000

Electrician I

900.00

Each

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Each

900.00

27.00

4.74

927.00

22

8,558.00

Composite Rates Per

Each

Rs.

47,485.00

Cost Per Each: 47,485.00

Labour Rates Per

Each

Rs.

1,125.00

Cost Per Each: 1,125.00

2,641

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-48-c

(British) :

Each

Supply and Fixing Voltage Regulator 30 KVA

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Voltage Regulator 30 KVA = 40

41,000.00

Each

TOTAL

73.39

MATERIAL

Each

41,000.00

41,000.00

LABOUR
1.000

Electrician I

900.00

Each

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Each

900.00

27.00

4.61

927.00

22

9,218.00

Composite Rates Per

Each

Rs.

51,145.00

Cost Per Each: 51,145.00

Labour Rates Per

Each

Rs.

1,125.00

Cost Per Each: 1,125.00

2,642

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-48-d

(British) :

Each

Supply and Fixing Voltage Regulator 50 KVA

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Voltage Regulator 50 KVA = 70

50,000.00

Each

TOTAL

73.67

MATERIAL

Each

50,000.00

50,000.00

LABOUR
1.000

Electrician I

900.00

Each

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Each

900.00

27.00

4.33

927.00

22

11,198.00

Composite Rates Per

Each

Rs.

62,125.00

Cost Per Each: 62,125.00

Labour Rates Per

Each

Rs.

1,125.00

Cost Per Each: 1,125.00

2,643

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-48-e

(British) :

Each

Supply and Fixing Voltage Regulator 75 KVA

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Voltage Regulator 75 KVA = 95

75,000.00

Each

TOTAL

74.11

MATERIAL

Each

75,000.00

75,000.00

LABOUR
1.000

Electrician I

900.00

Each

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Each

900.00

27.00

3.89

927.00

22

16,698.00

Composite Rates Per

Each

Rs.

92,625.00

Cost Per Each: 92,625.00

Labour Rates Per

Each

Rs.

1,125.00

Cost Per Each: 1,125.00

2,644

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-48-f

(British) :

Each

Supply and Fixing Voltage Regulator 100 KVA

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Voltage Regulator 100 KVA = 12

110,000.00

Each

TOTAL

74.39

MATERIAL

Each

110,000.00

110,000.00

LABOUR
1.000

Electrician I

900.00

Each

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Each

900.00

27.00

3.61

927.00

22

24,398.00

Composite Rates Per

Each

Rs.

135,325.00

Cost Per Each: 135,325.00

Labour Rates Per

Each

Rs.

1,125.00

Cost Per Each: 1,125.00

2,645

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-49-a

Providing and Fixing Brass peet / gate valve

Detail

Qty

Unit

(British) :

Each

1" dia

Rate (Rs)

Amount

MATERIAL
1.000

Brass Peet Valve / Gate Valve

1,100.00

No

TOTAL

MATERIAL

No

1,100.00

71.37

1,100.00

Day

56.00

1.68

6.63

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

254.32

Composite Rates Per

Each

Rs.

1,412.00

Cost Per Each: 1,412.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

2,646

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-49-b

Providing and Fixing Brass peet / gate valve

Detail

Qty

Unit

(British) :

Each

1.25" dia

Rate (Rs)

Amount

MATERIAL
1.000

Brass Peet Valve / Gate Valve

1,750.00

No

TOTAL

MATERIAL

No

1,750.00

72.67

1,750.00

Day

56.00

1.68

5.33

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

397.32

Composite Rates Per

Each

Rs.

2,205.00

Cost Per Each: 2,205.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

2,647

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-49-c

Providing and Fixing Brass peet / gate valve

Detail

Qty

Unit

(British) :

Each

1.5" dia

Rate (Rs)

Amount

MATERIAL
1.000

Brass Peet Valve / Gate Valve

2,100.00

No

TOTAL

MATERIAL

No

2,100.00

73.05

2,100.00

Day

56.00

1.68

4.95

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

474.32

Composite Rates Per

Each

Rs.

2,632.00

Cost Per Each: 2,632.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

2,648

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-49-d

Providing and Fixing Brass peet / gate valve

Detail

Qty

Unit

(British) :

Each

2" dia

Rate (Rs)

Amount

MATERIAL
1.000

Brass Peet Valve / Gate Valve

3,200.00

No

TOTAL

MATERIAL

No

3,200.00

73.71

3,200.00

Day

56.00

1.68

4.29

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

716.32

Composite Rates Per

Each

Rs.

3,974.00

Cost Per Each: 3,974.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

2,649

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-49-e

Providing and Fixing Brass peet / gate valve

Detail

Qty

Unit

(British) :

Each

2.5" dia

Rate (Rs)

Amount

MATERIAL
1.000

Brass Peet Valve / Gate Valve

4,300.00

No

TOTAL

MATERIAL

No

4,300.00

74.04

4,300.00

Day

56.00

1.68

3.96

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

958.32

Composite Rates Per

Each

Rs.

5,316.00

Cost Per Each: 5,316.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

2,650

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-49-f

Providing and Fixing Brass peet / gate valve

Detail

Qty

Unit

(British) :

Each

3" dia

Rate (Rs)

Amount

MATERIAL
1.000

Brass Peet Valve / Gate Valve

7,500.00

No

TOTAL

MATERIAL

No

7,500.00

74.44

7,500.00

Day

56.00

1.68

3.56

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,662.32

Composite Rates Per

Each

Rs.

9,220.00

Cost Per Each: 9,220.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

2,651

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 24 , TUBEWELL AND WATER SUPPLY
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

24-49-g

Providing and Fixing Brass peet / gate valve

Detail

Qty

Unit

(British) :

Each

4" dia

Rate (Rs)

Amount

MATERIAL
1.000

Brass Peet Valve / Gate Valve

11,000.00

No

TOTAL

MATERIAL

No

11,000.00

74.62

11,000.00

Day

56.00

1.68

3.38

57.68

22

LABOUR
0.080

Plumber II

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

2,432.32

Composite Rates Per

Each

Rs.

13,490.00

Cost Per Each: 13,490.00

Labour Rates Per

Each

Rs.

70.00

Cost Per Each: 70.00

2,652

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-01

(British) :

Rft

Laying, linking and packing tramway line

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.023

Day

500.00

Day

11.67

Skilled Coolie

0.003

Day

600.00

Day

2.00

Mates

0.003

Day

700.00

Day

2.33

0.48

78.00

16.49

22

3.52

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

20.01

Labour Rates Per

Rft

Rs.

20.01

LABOUR

Per Meter : Rs 65.63


Per Meter : Rs 65.63

2,653

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-02

(British) :

Rft

Dismantling tramway track

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.008

Day

500.00

Day

4.17

Skilled Coolie

0.001

Day

600.00

Day

0.50

Mates

0.001

Day

700.00

Day

0.58

0.16

78.00

5.41

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

6.56

Labour Rates Per

Rft

Rs.

6.56

LABOUR

1.15

Per Meter : Rs 21.52


Per Meter : Rs 21.52

2,654

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-03
Laying, linking of
levelling

Detail

(British) :

Rft

BG track, including packing, straightening and

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.060

Day

500.00

Day

30.01

Skilled Coolie

0.010

Day

600.00

Day

6.00

Mates

0.010

Day

700.00

Day

7.00

1.29

78.00

44.30

22

9.46

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

53.77

Labour Rates Per

Rft

Rs.

53.77

LABOUR

Per Meter : Rs 176.35


Per Meter : Rs 176.35

2,655

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-04

(British) :

Each

Linking points and crossings, complete with fastenings

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

7.000

Day

500.00

Day

3,500.00

Mates

0.500

Day

700.00

Day

350.00

Smithy Coolie

0.500

Day

700.00

Day

350.00

126.00

78.00

4,326.00

22

924.00

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

5,250.00

Cost Per Each: 5,250.00

Labour Rates Per

Each

Rs.

5,250.00

Cost Per Each: 5,250.00

2,656

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-05

(British) :

Each

Bending or straightening BG rail with jim crow

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.500

Day

500.00

Day

250.00

Black Smith

0.250

Day

900.00

Day

225.00

14.25

78.00

489.25

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

593.75

Cost Per Each: 593.75

Labour Rates Per

Each

Rs.

593.75

Cost Per Each: 593.75

104.50

2,657

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-06

(British) :

Each

Fixing street lamp posts

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
3.000

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

1,500.00

45.00

78.00

1,545.00

22

330.00

Composite Rates Per

Each

Rs.

1,875.00

Cost Per Each: 1,875.00

Labour Rates Per

Each

Rs.

1,875.00

Cost Per Each: 1,875.00

2,658

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-07

(British) :

Each

Binding ends of sleepers and timbers of all sizes & kinds,


including spreading & restacking

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.075

Day

500.00

Day

37.50

Fitter II

0.020

Day

600.00

Day

12.00

Mates

0.005

Day

700.00

Day

3.50

1.59

78.00

54.59

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

66.25

Cost Per Each: 66.25

Labour Rates Per

Each

Rs.

66.25

Cost Per Each: 66.25

11.66

2,659

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-08

(British) :

Each

Opening stacks of sleepers & timber of all kinds and sizes,


including spreading for inspection

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.012

Day

500.00

Day

5.77

Mates

0.001

Day

700.00

Day

0.54

0.19

78.00

6.50

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

7.89

Cost Per Each: 7.89

Labour Rates Per

Each

Rs.

7.89

Cost Per Each: 7.89

1.39

2,660

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-09

(British) :

tonne

Small iron work, such as gusset plates, knees, bends, stirrups,


straps, rings etc excluding erection

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

1000.000

97.00

Kg

TOTAL

MATERIAL

Kg

97,000.00

50.45

97,000.00

LABOUR
Coolie

80.000

Day

500.00

Day

40,000.00

Black Smith

8.000

Day

900.00

Day

7,200.00

1,416.00

27.55

48,616.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

tonne

Rs.

177,340.00

Labour Rates Per

tonne

Rs.

59,000.00

31,724.00

Per Tonne : Rs 177,340.00


Per Tonne : Rs 59,000.00

2,661

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-10

(British) :

tonne

Fabrication of heavy steel work with angle, tees, sheet iron etc
for making trusses, girders etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

1000.000

97.00

Kg

TOTAL

MATERIAL

Kg

97,000.00

56.40

97,000.00

LABOUR
Black Smith

20.000

Day

900.00

Day

18,000.00

Hammer Man

20.000

Day

700.00

Day

14,000.00

960.00

21.60

32,960.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

tonne

Rs.

158,340.00

Labour Rates Per

tonne

Rs.

40,000.00

28,380.00

Per Tonne : Rs 158,340.00


Per Tonne : Rs 40,000.00

2,662

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-11

(British) :

tonne

Erection and fitting in position iron trusses, staging of water


tanks, etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

6.349

Day

500.00

Day

3,174.50

Fitter II

6.349

Day

600.00

Day

3,809.40

209.52

78.00

7,193.42

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

tonne

Rs.

8,729.87

Labour Rates Per

tonne

Rs.

8,729.87

1,536.46

Per Tonne : Rs 8,729.87


Per Tonne : Rs 8,729.87

2,663

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-12

(British) :

Sft

Fixing corrugated iron sheet including rivetting, etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.008

Day

500.00

Day

3.98

Black Smith

0.008

Day

900.00

Day

7.17

0.33

78.00

11.49

22

2.45

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

13.94

Per SQM : Rs 150.03

Labour Rates Per

Sft

Rs.

13.94

Per SQM : Rs 150.03

2,664

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-13

(British) :

tonne

Erecting corrugated iron sheet tanks, upto 20' height

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

15.200

Day

500.00

Day

7,600.00

Black Smith

3.200

Day

900.00

Day

2,880.00

314.40

78.00

10,794.40

22

2,305.60

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

tonne

Rs.

13,100.00

Labour Rates Per

tonne

Rs.

13,100.00

Per Tonne : Rs 13,100.00


Per Tonne : Rs 13,100.00

2,665

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-14

(British) :

tonne

Erecting rolled steel beams or old rails, in roof etc, erection &
fixing in position

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

1.160

Day

500.00

Day

580.00

Black Smith

0.040

Day

900.00

Day

36.00

18.48

78.00

634.48

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

770.00

Labour Rates Per

tonne

Rs.

770.00

LABOUR

135.52

Per Tonne : Rs 770.00


Per Tonne : Rs 770.00

2,666

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-15

(British) :

tonne

Erecting rolled steel beams or rails, erection for posts etc (other
than in roofs)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.540

Day

500.00

Day

270.00

Black Smith

0.040

Day

900.00

Day

36.00

9.18

78.00

315.18

22

67.32

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

tonne

Rs.

382.50

Labour Rates Per

tonne

Rs.

382.50

LABOUR

Per Tonne : Rs 382.50


Per Tonne : Rs 382.50

2,667

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-16

(British) :

kg

Making bolts & nuts of iron rods

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.740

Steel (Struct. Sections)

97.00

Kg

TOTAL

MATERIAL

Kg

71.78

30.45

71.78

LABOUR
Coolie

0.035

Day

500.00

Day

17.50

Black Smith

0.070

Day

900.00

Day

63.00

Hammer Man

0.035

Day

700.00

Day

24.50

3.15

47.55

108.15

22

38.89

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

218.82

Cost Per kg: 218.82

Labour Rates Per

kg

Rs.

131.25

Cost Per kg: 131.25

2,668

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-17-a

(British) :

Each cut

Cutting rails,rolled steel joist & beams, with hacksaw : Upto 6"
size

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.167

Day

500.00

Day

83.33

Fitter II

0.167

Day

600.00

Day

100.00

5.50

78.00

188.83

22

40.33

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each cut

Rs.

229.16

Cost Per Each cut: 229.16

Labour Rates Per

Each cut

Rs.

229.16

Cost Per Each cut: 229.16

2,669

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-17-b

(British) :

Each cut

Cutting rails,rolled steel joist & beams, with hacksaw : Above 6"
size

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Fitter II

0.250

Day

600.00

Day

150.00

8.25

78.00

283.25

22

60.50

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each cut

Rs.

343.75

Cost Per Each cut: 343.75

Labour Rates Per

Each cut

Rs.

343.75

Cost Per Each cut: 343.75

2,670

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-18

(British) :

Each cut

Cutting rails or rolled steel beams of size below 6" with jim

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.083

Day

500.00

Day

41.66

Fitter II

0.083

Day

600.00

Day

50.00

2.75

78.00

94.41

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

20.17

Composite Rates Per

Each cut

Rs.

114.58

Cost Per Each cut: 114.58

Labour Rates Per

Each cut

Rs.

114.58

Cost Per Each cut: 114.58

2,671

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-19

(British) :

Per Bend

Bending rolled steel beams or rails

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
21.429

Coal

40.00

Kg

TOTAL

MATERIAL

Kg

857.14

63.38

857.14

LABOUR
Coolie

0.143

Day

500.00

Day

71.43

Fitter II

0.143

Day

600.00

Day

85.72

4.71

14.62

161.86

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

223.14

Composite Rates Per

Per Bend

Rs.

1,242.15

Cost Per Per Bend: 1,242.15

Labour Rates Per

Per Bend

Rs.

196.43

Cost Per Per Bend: 196.43

2,672

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-20

(British) :

Each hole

Drilling holes,in plates upto 1/2" thick per inch dia. or part
thereof

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.067

Day

500.00

Day

33.33

Fitter II

0.017

Day

600.00

Day

10.00

1.30

78.00

44.63

22

9.53

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each hole

Rs.

54.16

Cost Per Each hole: 54.16

Labour Rates Per

Each hole

Rs.

54.16

Cost Per Each hole: 54.16

2,673

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-21

(British) :

Each hole

Extra for drilling holes in plates over 1/2" thick per inch dia, or
part thereof

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.040

Day

500.00

Day

20.00

Fitter II

0.002

Day

600.00

Day

1.50

0.65

78.00

22.15

22

4.73

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each hole

Rs.

26.88

Cost Per Each hole: 26.88

Labour Rates Per

Each hole

Rs.

26.88

Cost Per Each hole: 26.88

2,674

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-22

(British) :

Each

Rivetting 1/8" dia

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.005

Day

500.00

Day

2.50

Fitter II

0.005

Day

600.00

Day

3.00

0.17

78.00

5.67

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

6.88

Cost Per Each: 6.88

Labour Rates Per

Each

Rs.

6.88

Cost Per Each: 6.88

1.21

2,675

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-23

(British) :

Each

Cutting out Rivets, all sizes.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Fitter II

0.014

Day

600.00

Day

8.33

Hammer Man

0.014

Day

700.00

Day

9.72

0.54

78.00

18.59

22

3.97

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

22.56

Cost Per Each: 22.56

Labour Rates Per

Each

Rs.

22.56

Cost Per Each: 22.56

2,676

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-24

(British) :

Rft

Fitting and erection of gutters of sheet iron

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.050

Day

500.00

Day

25.01

Black Smith

0.005

Day

900.00

Day

4.50

Fitter II

0.005

Day

600.00

Day

3.00

0.98

78.00

33.49

22

7.15

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

40.64

Labour Rates Per

Rft

Rs.

40.64

LABOUR

Per Meter : Rs 133.30


Per Meter : Rs 133.30

2,677

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-25

(British) :

Each

Cutting and fixing iron bars, for barred windows

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.033

Day

500.00

Day

16.67

Carpenter

0.017

Day

800.00

Day

13.33

Fitter II

0.017

Day

600.00

Day

10.00

1.20

78.00

41.19

22

8.80

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

49.99

Cost Per Each: 49.99

Labour Rates Per

Each

Rs.

49.99

Cost Per Each: 49.99

2,678

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-26

(British) :

Each

Cutting GI sheets of 2'-8" wide.

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Fitter II

0.017

Day

600.00

Day

10.00

Hammer Man

0.017

Day

700.00

Day

11.66

0.65

78.00

22.31

22

4.76

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

27.07

Cost Per Each: 27.07

Labour Rates Per

Each

Rs.

27.07

Cost Per Each: 27.07

2,679

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-27

(British) :

Each cut

Notching web or foot of rail posts for housing rail beams

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.833

Coal

40.00

Kg

TOTAL

4.41

MATERIAL

Kg

33.33

33.33

LABOUR
Black Smith

0.333

Day

900.00

Day

300.00

Hammer Man

0.333

Day

700.00

Day

233.33

16.00

73.59

549.33

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

124.67

Composite Rates Per

Each cut

Rs.

707.33

Cost Per Each cut: 707.33

Labour Rates Per

Each cut

Rs.

666.66

Cost Per Each cut: 666.66

2,680

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-28

(British) :

Sft

Hoop iron netted trellis work fixed with nails

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.014

Nails

120.00

Kg

TOTAL

2.79

MATERIAL

Kg

1.72

1.72

LABOUR
Black Smith

0.028

Day

900.00

Day

25.01

Hammer Man

0.028

Day

700.00

Day

19.45

1.33

75.21

45.79

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

57.67

Per SQM : Rs 620.51

Labour Rates Per

Sft

Rs.

55.58

Per SQM : Rs 598.00

10.16

2,681

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-29
Fixing zinc, iron or

Detail

(British) :

Sft

GI sheet on table tops

Qty

Unit

Rate (Rs)

Amount

MATERIAL
0.005

Nails

120.00

Kg

TOTAL

2.67

MATERIAL

Kg

0.64

0.64

LABOUR
Coolie

0.013

Day

500.00

Day

6.67

Carpenter

0.013

Day

800.00

Day

10.67

0.52

75.33

17.86

22

3.96

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

22.46

Per SQM : Rs 241.62

Labour Rates Per

Sft

Rs.

21.67

Per SQM : Rs 233.22

2,682

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

25-30

Item Name :

(British) :

Sft

Making and fixing steel grated doors, complete with locking


arrangements & angle iron frame

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

1.839

Kg

97.00

Kg

178.43

Hold Fast With Bolt

0.214

Kg

170.00

Kg

36.44

Lock Arrangement

0.036

No

140.00

No

5.00

Coal

0.929

Kg

40.00

Kg

37.17

TOTAL

MATERIAL

28.95

257.04

LABOUR
Black Smith

0.186

Day

900.00

Day

167.29

Bellowman

0.186

Day

600.00

Day

111.52

Hammer Man

0.186

Day

700.00

Day

130.11

12.27

49.05

421.19

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

824.75

Per SQM : Rs 8,874.27

Labour Rates Per

Sft

Rs.

511.15

Per SQM : Rs 5,500.00

146.51

2,683

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

25-31

Item Name :

(British) :

Sft

Making and fixing steel grated door, with 1/16" thick sheeting,
including angle iron frame & lock

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

1.839

Kg

82.00

Kg

150.84

Steel (Struct. Sections)

1.775

Kg

97.00

Kg

172.18

Hold Fast With Bolt

0.214

Kg

170.00

Kg

36.43

Lock Arrangement

0.036

No

140.00

No

5.00

Coal

0.929

Kg

40.00

Kg

37.17

TOTAL

MATERIAL

37.55

401.63

LABOUR
Black Smith

0.186

Day

900.00

Day

167.29

Bellowman

0.172

Day

600.00

Day

103.16

Hammer Man

0.186

Day

700.00

Day

130.11

12.02

40.45

412.57

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

990.68

Per SQM : Rs 10,659.74

Labour Rates Per

Sft

Rs.

500.70

Per SQM : Rs 5,387.50

176.48

2,684

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-32

(British) :

Sft

Making and fixing grating in opening, including fixing at site with


flat iron 2"x3/8" and 3/4" sq. bars

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

0.836

Kg

97.00

Kg

81.13

Coal

0.100

Kg

40.00

Kg

4.00

TOTAL

MATERIAL

32.72

85.13

LABOUR
Black Smith

0.050

Day

900.00

Day

45.00

Bellowman

0.050

Day

600.00

Day

30.00

Hammer Man

0.050

Day

700.00

Day

35.00

3.30

45.28

113.31

22

42.93

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

241.38

Per SQM : Rs 2,597.21

Labour Rates Per

Sft

Rs.

137.51

Per SQM : Rs 1,479.64

2,685

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-33

(British) :

Sft

Providing and Fixing terrace railing of 2" i/d conduit pipe 16 SWG
welded with 5/8"x5/8" sq bar 2.75' high complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

1.799

Kg

82.00

Kg

147.52

Pipe MS 16 SWG 2" i/d

0.320

RFT

75.00

RFT

24.01

Welding Spot

1.525

No

25.00

No

38.12

TOTAL

MATERIAL

56.54

209.64

LABOUR
Black Smith

0.002

Day

900.00

Day

1.37

Skilled Coolie

0.076

Day

600.00

Day

45.74

Welder II

0.030

Day

700.00

Day

21.34

2.05

21.46

70.51

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

341.34

Per SQM : Rs 3,672.78

Labour Rates Per

Sft

Rs.

85.57

Per SQM : Rs 920.74

61.18

2,686

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-34

(British) :

Sft

Providing and Fixing collapsible gate made of 2"x2"x1/4" tee iron


at top & bottom, lock etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.050

Ltr

495.00

Ltr

24.76

Collapsible Gate

1.000

Sft

450.00

Sft

450.00

52.16

474.76

TOTAL

MATERIAL

LABOUR
Black Smith

0.080

Day

900.00

Day

71.93

Fitter II

0.080

Day

600.00

Day

47.96

Skilled Coolie

0.080

Day

600.00

Day

47.96

Painter / Polisher

0.040

Day

1,000.00

Day

40.06

6.24

25.84

214.14

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

839.08

Per SQM : Rs 9,028.51

Labour Rates Per

Sft

Rs.

259.87

Per SQM : Rs 2,796.25

150.18

2,687

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-35

(British) :

Sft

Providing and Fixing 24 SWG GI sheet rolling shutter of steel frame


of MS channel 2"x1.25"x1/8" complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.050

Ltr

495.00

Ltr

24.76

G.I Sheet Shutter

1.000

Sft

150.00

Sft

150.00

Spring Roller

0.100

No

90.00

No

TOTAL

MATERIAL

9.00

65.70

183.76

LABOUR
Black Smith

0.010

Day

900.00

Day

9.00

Fitter II

0.010

Day

600.00

Day

6.00

Skilled Coolie

0.010

Day

600.00

Day

6.00

Painter / Polisher

0.005

Day

1,000.00

Day

5.00

0.78

12.30

26.79

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

256.70

Per SQM : Rs 2,762.12

Labour Rates Per

Sft

Rs.

32.51

Per SQM : Rs 349.83

46.15

2,688

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-36

(British) :

Rft

Providing and Fixing MS angle iron 1"x1"x1/4" edge protector


nozing of steps of stairs, complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.651

Steel (bars/rods/section)

82.00

Kg

TOTAL

MATERIAL

Kg

135.34

61.30

135.34

LABOUR
Mason

0.020

Day

900.00

Day

18.01

Coolie

0.020

Day

500.00

Day

10.00

Black Smith

0.002

Day

900.00

Day

2.25

0.91

16.70

31.17

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

202.94

Labour Rates Per

Rft

Rs.

37.82

LABOUR

36.43

Per Meter : Rs 665.64


Per Meter : Rs 124.06

2,689

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-37

(British) :

Rft

Providing and Fixing stair railing of 2.5" i/d GI pipe, welded with
5/8"x5/8" MS bars 2'-9" high, fixed in each step

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (bars/rods/section)

1.210

Kg

82.00

Kg

99.25

Paint : Enamel

0.045

Ltr

495.00

Ltr

22.28

Welding Rod

0.009

Pack

400.00

Pack

3.73

G.I pipe (light) 2.5"

0.710

RFT

275.00

RFT

195.25

54.32

320.52

TOTAL

MATERIAL

LABOUR
Mason

0.010

Day

900.00

Day

9.00

Coolie

0.030

Day

500.00

Day

15.00

Black Smith

0.040

Day

900.00

Day

36.01

Bellowman

0.040

Day

600.00

Day

24.01

Hammer Man

0.040

Day

700.00

Day

28.01

Painter / Polisher

0.010

Day

1,000.00

Day

10.00

3.66

23.68

125.70

22

97.36

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

543.58

Labour Rates Per

Rft

Rs.

152.55

LABOUR

Per Meter : Rs 1,782.93


Per Meter : Rs 500.35

2,690

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-38

(British) :

Sft

Providing and Fixing GI wire gauze 24 SWG, 12x12 meshes per sq.in.,
fixed to steel windows or doors etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Welding Rod

0.053

Pack

400.00

Pack

21.34

G.I Wire Gauze 12x12

1.000

Sft

45.00

Sft

45.00

35.09

66.34

TOTAL

MATERIAL

LABOUR
Mason

0.056

Day

900.00

Day

50.42

Coolie

0.050

Day

500.00

Day

25.01

2.26

42.91

77.69

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

175.21

Per SQM : Rs 1,885.30

Labour Rates Per

Sft

Rs.

94.28

Per SQM : Rs 1,014.50

31.19

2,691

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-a-01

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels Without wire guaze : Glass pane 2mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.176

Ltr

495.00

Ltr

87.36

Glass 2mm Local

1.000

Sft

28.00

Sft

28.00

Steel Window

1.000

Sft

425.00

Sft

425.00

71.81

540.36

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.010

Day

1,000.00

Day

10.00

0.72

6.19

24.73

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

689.25

Per SQM : Rs 7,416.35

Labour Rates Per

Sft

Rs.

30.01

Per SQM : Rs 322.92

124.16

2,692

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-a-02

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels Without wire gauze : Glass pane 2.5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.176

Ltr

495.00

Ltr

87.36

Steel Window

1.000

Sft

425.00

Sft

425.00

Glass 2.5mm Local

1.000

Sft

28.00

Sft

28.00

71.81

540.36

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.010

Day

1,000.00

Day

10.00

0.72

6.19

24.73

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

689.25

Per SQM : Rs 7,416.35

Labour Rates Per

Sft

Rs.

30.01

Per SQM : Rs 322.92

124.16

2,693

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-a-03

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels Without wire gauze : Glass pane 3mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.176

Ltr

495.00

Ltr

87.36

Steel Window

1.000

Sft

425.00

Sft

425.00

Glass 3mm Local

1.000

Sft

38.00

Sft

38.00

71.86

550.36

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.010

Day

1,000.00

Day

10.00

0.72

6.14

24.73

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

701.45

Per SQM : Rs 7,547.62

Labour Rates Per

Sft

Rs.

30.01

Per SQM : Rs 322.92

126.36

2,694

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-a-04

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels Without wire gauze : Glass pane 4mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.176

Ltr

495.00

Ltr

87.36

Steel Window

1.000

Sft

425.00

Sft

425.00

Glass 4mm Local

1.000

Sft

48.00

Sft

48.00

71.92

560.36

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.010

Day

1,000.00

Day

10.00

0.72

6.08

24.73

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

713.65

Per SQM : Rs 7,678.89

Labour Rates Per

Sft

Rs.

30.01

Per SQM : Rs 322.92

128.56

2,695

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-a-05

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels Without wire gauze : Glass pane 5mm thick

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.176

Ltr

495.00

Ltr

87.36

Steel Window

1.000

Sft

425.00

Sft

425.00

Glass 5mm Local

1.000

Sft

55.00

Sft

55.00

71.96

567.36

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.010

Day

1,000.00

Day

10.00

0.72

6.04

24.73

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

722.19

Per SQM : Rs 7,770.78

Labour Rates Per

Sft

Rs.

30.01

Per SQM : Rs 322.92

130.10

2,696

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-b-01

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels With 22 SWG wire gauze : Glass pane 2mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.235

Ltr

495.00

Ltr

116.48

Glass 2mm Local

1.000

Sft

28.00

Sft

28.00

G.I Wire Gauze 12x12

1.000

Sft

45.00

Sft

45.00

Steel Window

1.000

Sft

425.00

Sft

425.00

71.90

614.48

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.013

Day

1,000.00

Day

12.50

0.80

6.10

27.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

782.80

Per SQM : Rs 8,422.98

Labour Rates Per

Sft

Rs.

33.14

Per SQM : Rs 356.56

141.02

2,697

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-b-02

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels With 22 SWG wire gauze : Glass pane 2.5mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.235

Ltr

495.00

Ltr

116.48

G.I Wire Gauze 12x12

1.000

Sft

45.00

Sft

45.00

Steel Window

1.000

Sft

425.00

Sft

425.00

Glass 2.5mm Local

1.000

Sft

28.00

Sft

28.00

71.90

614.48

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.013

Day

1,000.00

Day

12.50

0.80

6.10

27.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

782.80

Per SQM : Rs 8,422.98

Labour Rates Per

Sft

Rs.

33.14

Per SQM : Rs 356.56

141.02

2,698

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-b-03

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels With 22 SWG wire gauze : Glass pane 3mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.235

Ltr

495.00

Ltr

116.48

G.I Wire Gauze 12x12

1.000

Sft

45.00

Sft

45.00

Steel Window

1.000

Sft

425.00

Sft

425.00

Glass 3mm Local

1.000

Sft

38.00

Sft

38.00

71.95

624.48

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.013

Day

1,000.00

Day

12.50

0.80

6.05

27.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

795.00

Per SQM : Rs 8,554.25

Labour Rates Per

Sft

Rs.

33.14

Per SQM : Rs 356.56

143.22

2,699

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-b-04

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels With 22 SWG wire gauze : Glass pane 4mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.235

Ltr

495.00

Ltr

116.48

G.I Wire Gauze 12x12

1.000

Sft

45.00

Sft

45.00

Steel Window

1.000

Sft

425.00

Sft

425.00

Glass 4mm Local

1.000

Sft

48.00

Sft

48.00

71.99

634.48

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.013

Day

1,000.00

Day

12.50

0.80

6.01

27.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

807.20

Per SQM : Rs 8,685.52

Labour Rates Per

Sft

Rs.

33.14

Per SQM : Rs 356.56

145.42

2,700

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-39-b-05

(British) :

Sft

Providing and Fixing steel windows 18 gauge with openable glazed


panels With 22 SWG wire gauze : Glass pane 5mm

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Paint : Enamel

0.235

Ltr

495.00

Ltr

116.48

G.I Wire Gauze 12x12

1.000

Sft

45.00

Sft

45.00

Steel Window

1.000

Sft

425.00

Sft

425.00

Glass 5mm Local

1.000

Sft

55.00

Sft

55.00

72.02

641.48

TOTAL

MATERIAL

LABOUR
Coolie

0.010

Day

500.00

Day

5.00

Black Smith

0.010

Day

900.00

Day

9.00

Painter / Polisher

0.013

Day

1,000.00

Day

12.50

0.80

5.98

27.31

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

815.74

Per SQM : Rs 8,777.41

Labour Rates Per

Sft

Rs.

33.14

Per SQM : Rs 356.56

146.96

2,701

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-40

(British) :

Sft

Supply and Fixing iron grating for fire place

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
3.032

Steel (bars/rods/section)

82.00

Kg

TOTAL

MATERIAL

Kg

248.59

28.74

248.59

LABOUR
Coolie

0.500

Day

500.00

Day

250.09

Fitter II

0.250

Day

600.00

Day

150.06

12.00

49.26

412.15

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

803.47

Per SQM : Rs 8,645.30

Labour Rates Per

Sft

Rs.

500.19

Per SQM : Rs 5,382.00

142.72

2,702

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-41

(British) :

Rft

Providing and Fixing angle iron railing, using 2.5"x2.5"x3/8" angle


iron post 4.5'long, 5'to 6" apart, complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

6.452

Kg

97.00

Kg

625.84

Paint : Enamel

0.350

Ltr

495.00

Ltr

173.30

U-bolt 1.5"long

0.300

No

40.00

No

12.00

TOTAL

MATERIAL

57.46

811.15

LABOUR
Mason

0.075

Day

900.00

Day

67.53

Coolie

0.075

Day

500.00

Day

37.52

Black Smith

0.075

Day

900.00

Day

67.53

Painter / Polisher

0.075

Day

1,000.00

Day

75.03

7.43

20.54

255.03

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Rft

Rs.

1,299.10

Labour Rates Per

Rft

Rs.

309.50

232.92

Per Meter : Rs 4,261.05


Per Meter : Rs 1,015.16

2,703

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

25-42

Item Name :

(British) :

Rft

Providing and Fixing barbed wire fencing of 1.5"x1.5"x3/16" angle


iron post 3.25' long, 5 to 6 ft. centre to centre

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.012

Bag

490.00

Sand

0.002

Cft

2,200.00

Steel (Struct. Sections)

0.305

Kg

97.00

Crushed Aggregate 1

0.004

Cft

3,500.00

Paint : Enamel

0.107

Ltr

495.00

Ltr

52.82

Barbed Wire

0.114

Kg

130.00

Kg

14.77

TOTAL

Bag

5.73

100 Cft

0.04

MATERIAL

Kg

100 Cft

29.57
0.12

50.40

103.06

LABOUR
Mason

0.015

Day

900.00

Day

13.72

Coolie

0.015

Day

500.00

Day

7.62

Black Smith

0.015

Day

900.00

Day

13.72

Hammer Man

0.015

Day

700.00

Day

10.67

Painter / Polisher

0.005

Day

1,000.00

Day

4.57

1.51

27.60

51.81

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

188.62

Labour Rates Per

Rft

Rs.

62.88

LABOUR

33.74

Per Meter : Rs 618.66


Per Meter : Rs 206.25

2,704

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

25-43

Item Name :

(British) :

Rft

Providing and Fixing barbed wire fencing on compound wall of


1.5"x1.5"x3/16" angle iron post 3' long, 4' apart

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.005

Bag

490.00

Sand

0.001

Cft

2,200.00

Steel (Struct. Sections)

0.427

Kg

97.00

Crushed Aggregate 1

0.001

Cft

3,500.00

Paint : Enamel

0.107

Ltr

495.00

Ltr

52.82

Barbed Wire

0.152

Kg

130.00

Kg

19.70

TOTAL

Bag

2.35

100 Cft

0.02

MATERIAL

Kg

100 Cft

41.40
0.05

51.24

116.34

LABOUR
Mason

0.015

Day

900.00

Day

13.72

Coolie

0.020

Day

500.00

Day

9.91

Black Smith

0.017

Day

900.00

Day

15.09

Hammer Man

0.015

Day

700.00

Day

10.67

Painter / Polisher

0.005

Day

1,000.00

Day

4.57

1.62

26.76

55.58

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

209.39

Labour Rates Per

Rft

Rs.

67.45

LABOUR

37.47

Per Meter : Rs 686.80


Per Meter : Rs 221.25

2,705

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

25-46

(British) :

Sft

Supplying and Fixing 18SWG Steel Almirah, 12" max depth including
box shelves, back, shelves, lock, spray paint complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Iron Sheet

3.839

Kg

120.00

Kg

460.71

Handles 6"

0.125

No

50.00

No

6.25

Paint : Enamel

0.063

Ltr

495.00

Ltr

30.94

Welding Rod

0.100

Pack

400.00

Pack

40.00

Lock Arrangement

0.063

No

140.00

No

8.75

Terpentine Oil

0.093

Ltr

155.00

Ltr

14.41

63.65

561.05

TOTAL

MATERIAL

LABOUR
Coolie

0.078

Day

500.00

Day

39.06

Black Smith

0.016

Day

900.00

Day

14.06

Painter / Polisher

0.016

Day

1,000.00

Day

15.62

Welder I

0.031

Day

1,000.00

Day

31.25

3.00

14.35

103.00

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

809.48

Per SQM : Rs 8,709.99

Labour Rates Per

Sft

Rs.

125.00

Per SQM : Rs 1,344.99

145.43

2,706

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

25-47-a

Item Name :

(British) :

Sft

Supplying and Fixing 18 SWG MS Sheet Door with angle iron frame
(1.5"x1.5"x1/8"), bolt, hinges, paint etc complete

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Iron Sheet

2.040

Kg

120.00

Kg

244.80

Hold Fast With Bolt

0.143

Kg

170.00

Kg

24.28

Hinges 5"

0.018

Doz

550.00

Doz

9.82

Handles 6"

0.107

No

50.00

No

5.34

Tower Bolt 10 Inch I

0.071

No

130.00

No

9.29

Paint : Enamel

0.036

Ltr

495.00

Ltr

17.68

Welding Rod

0.125

Pack

400.00

Pack

50.00

Terpentine Oil

0.036

Ltr

155.00

Ltr

5.54

58.15

366.75

TOTAL

MATERIAL

LABOUR
Coolie

0.009

Day

500.00

Day

4.47

Black Smith

0.054

Day

900.00

Day

48.21

Painter / Polisher

0.018

Day.

1,000.00

Day.

17.85

Welder I

0.036

Day

1,000.00

Day

35.72

3.19

19.85

109.43

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

580.24

Per SQM : Rs 6,243.35

Labour Rates Per

Sft

Rs.

132.81

Per SQM : Rs 1,429.01

104.06

2,707

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 25 , IRON WORK
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

25-47-b

Item Name :

(British) :

Sft

Supplying and Fixing 18 SWG MS Sheet Gate with angle iron frame
(2"x2"x3/16") with side window, lock, painting etc

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

1.430

Kg

97.00

Kg

138.74

Iron Sheet

2.040

Kg

120.00

Kg

244.80

Hold Fast With Bolt

0.056

Kg

170.00

Kg

9.48

Tower Bolt 10 Inch I

0.028

No

130.00

No

3.61

Sliding bolt 18 Inch Long

0.014

No

650.00

No

9.03

Paint : Enamel

0.028

Ltr

495.00

Ltr

13.75

Welding Rod

0.125

Pack

400.00

Pack

50.00

Terpentine Oil

0.028

Ltr

155.00

Ltr

4.31

55.60

473.71

TOTAL

MATERIAL

LABOUR
Mason

0.028

Day

900.00

Day

25.00

Coolie

0.097

Day

500.00

Day

48.61

Black Smith

0.056

Day

900.00

Day

50.00

Painter / Polisher

0.014

Day

1,000.00

Day

13.88

Welder I

0.028

Day

1,000.00

Day

27.78

4.96

22.40

170.23

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Sft

Rs.

784.51

Per SQM : Rs 8,441.35

Labour Rates Per

Sft

Rs.

206.59

Per SQM : Rs 2,222.91

140.58

2,708

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-01

(British) :

Each

Supplying bamboo jhandies 10' to 12' with iron shoes and flags 15"
square

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Cloth

0.500

Mtr

50.00

Mtr

25.00

Bamboo 8'-10' Long

1.000

No

180.00

No

180.00

Iron Shoe

1.000

No

88.00

No

88.00

TOTAL

MATERIAL

61.38

293.00

LABOUR
Coolie

0.050

Day

500.00

Day

25.00

Carpenter

0.050

Day

800.00

Day

40.00

1.95

16.62

66.95

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

438.71

Cost Per Each: 438.71

Labour Rates Per

Each

Rs.

81.25

Cost Per Each: 81.25

78.76

2,709

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-02

(British) :

100 No.

Supplying wooden pegs for levelling 1.5" square 6" long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Kiker

0.780

850.00

Cft

TOTAL

MATERIAL

Cft

663.00

53.73

663.00

LABOUR
Coolie

0.125

Day

500.00

Day

62.50

Carpenter

0.250

Day

800.00

Day

200.00

7.88

24.27

270.38

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

203.61

Composite Rates Per

100 No.

Rs.

1,136.99

Cost Per 100 No.: 1,136.99

Labour Rates Per

100 No.

Rs.

328.13

Cost Per 100 No.: 328.13

2,710

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-03

(British) :

100 No.

Supplying wooden pegs for alignment, 2" to 3" square, 9" long

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Wood - Kiker

1.540

850.00

Cft

TOTAL

MATERIAL

Cft

1,309.00

43.95

1,309.00

LABOUR
Coolie

0.250

Day

500.00

Day

125.00

Carpenter

1.000

Day

800.00

Day

800.00

27.75

34.05

952.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

491.48

Composite Rates Per

100 No.

Rs.

2,753.23

Cost Per 100 No.: 2,753.23

Labour Rates Per

100 No.

Rs.

1,156.25

Cost Per 100 No.: 1,156.25

2,711

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-04

(British) :

Each

Fixing enamelled iron gauges flush with masonry including cost of


hooks

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
6.000

Hook

20.00

No

TOTAL

5.92

MATERIAL

120.00

No

120.00

LABOUR
Mason

1.000

Day

900.00

Day

900.00

Coolie

1.000

Day

500.00

Day

500.00

42.00

72.08

1,442.00

22

334.40

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

1,896.40

Cost Per Each: 1,896.40

Labour Rates Per

Each

Rs.

1,750.00

Cost Per Each: 1,750.00

2,712

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-05

(British) :

Each

Supply & fix boundry pillars in position, including digging pits

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.072

Bag

490.00

Bag

35.33

Sand

0.288

Cft

2,200.00

100 Cft

6.34

Crushed Aggregate

0.581

Cft

2,800.00

100 Cft

16.27

Lime (unslaked)

0.005

Mds

380.00

Mds

1.90

Pipe CC 6" ASTM Class-2

3.280

RFT

125.00

RFT

410.00

48.95

469.84

Day

250.00

7.50

29.05

257.50

22

TOTAL

MATERIAL

LABOUR
0.500

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

885.70

Cost Per Each: 885.70

Labour Rates Per

Each

Rs.

312.50

Cost Per Each: 312.50

158.36

2,713

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-06

(British) :

Each

Fixing main line type distance mark in position including making


1:3:6 cement concrete base block

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.400

Bag

490.00

Bag

196.00

Sand

0.530

Cft

2,200.00

100 Cft

11.66

Crushed Aggregate

0.283

Cft

2,800.00

100 Cft

7.92

Distance Mark

1.000

No

45.00

TOTAL

MATERIAL

No

45.00

47.60

260.58

Day

150.00

4.50

30.40

154.50

22

90.33

LABOUR
0.300

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

505.41

Cost Per Each: 505.41

Labour Rates Per

Each

Rs.

187.50

Cost Per Each: 187.50

2,714

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-07-a

(British) :

Rft

Boring and fixing 1.5" dia pressure pipe in ordinary soil

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.107

Day

500.00

Day

53.35

Fitter II

0.030

Day

600.00

Day

18.29

2.15

78.00

73.80

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

89.56

Labour Rates Per

Rft

Rs.

89.56

LABOUR

15.76

Per Meter : Rs 293.75


Per Meter : Rs 293.75

2,715

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-07-b

(British) :

Rft

Boring and fixing 1.5 dia pressure pipe in clay

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.244

Day

500.00

Day

121.95

Fitter II

0.030

Day

600.00

Day

18.29

4.21

78.00

144.45

22

30.85

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

175.30

Labour Rates Per

Rft

Rs.

175.30

LABOUR

Per Meter : Rs 575.00


Per Meter : Rs 575.00

2,716

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-07-c

(British) :

Rft

Boring and fixing 1.5" dia pressure pipe in shingle

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.381

Day

500.00

Day

190.55

Fitter II

0.030

Day

600.00

Day

18.29

6.27

78.00

215.11

22

45.95

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

261.05

Labour Rates Per

Rft

Rs.

261.05

LABOUR

Per Meter : Rs 856.25


Per Meter : Rs 856.25

2,717

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-08

(British) :

Rft

Repairs to hand pump, pulling out & refitting

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Coolie

0.012

Day

500.00

Day

6.00

Black Smith

0.050

Day

900.00

Day

45.00

1.53

78.00

52.53

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

63.75

Labour Rates Per

Rft

Rs.

63.75

LABOUR

11.22

Per Meter : Rs 209.10


Per Meter : Rs 209.10

2,718

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-09

(British) :

Each

Fixing hand pump (machine only)

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.400

Fitter II

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

240.00

7.20

78.00

247.20

22

52.80

Composite Rates Per

Each

Rs.

300.00

Cost Per Each: 300.00

Labour Rates Per

Each

Rs.

300.00

Cost Per Each: 300.00

2,719

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-10-a

(British) :

100 Sft

Washing of Durries / Synthetic Matting

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
Skilled Coolie

3.486

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

2,091.41

62.74

78.00

2,154.15

22

460.11

Composite Rates Per

100 Sft

Rs.

2,614.27

Per SQM : Rs 281.29

Labour Rates Per

100 Sft

Rs.

2,614.27

Per SQM : Rs 281.29

2,720

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-10-b

(British) :

Each

Washing of Bed Sheets

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.075

Skilled Coolie

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

45.18

1.36

78.00

46.54

22

9.94

Composite Rates Per

Each

Rs.

56.48

Cost Per Each: 56.48

Labour Rates Per

Each

Rs.

56.48

Cost Per Each: 56.48

2,721

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-10-c

(British) :

Each

Washing of Table Cloth / Napkins / Dusters etc

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.038

Skilled Coolie

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

22.56

0.68

78.00

23.24

22

4.96

Composite Rates Per

Each

Rs.

28.20

Cost Per Each: 28.20

Labour Rates Per

Each

Rs.

28.20

Cost Per Each: 28.20

2,722

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-11-a

(British) :

kg

Recaning of chairs/stools : With plastic cane.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Plastic Cane

300.00

Kg

TOTAL

MATERIAL

Kg

300.00

50.00

300.00

Day

150.00

4.50

28.00

154.50

22

99.00

LABOUR
0.250

Canner

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

553.50

Cost Per kg: 553.50

Labour Rates Per

kg

Rs.

187.50

Cost Per kg: 187.50

2,723

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-11-b

(British) :

kg

Recaning of chairs/stools : With willow cane.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
1.000

Cane

750.00

Kg

TOTAL

MATERIAL

Kg

750.00

58.59

750.00

Day

210.00

6.30

19.41

216.30

22

LABOUR
0.350

Canner

600.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

kg

Rs.

1,177.50

Cost Per kg: 1,177.50

Labour Rates Per

kg

Rs.

262.50

Cost Per kg: 262.50

211.20

2,724

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-12

(British) :

Each

Sweeping chimneys

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
3.280

Rope

30.00

Rft

TOTAL

MATERIAL

Rft

98.40

33.03

98.40

Day

125.00

3.75

44.97

128.75

22

49.15

LABOUR
0.250

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

276.30

Cost Per Each: 276.30

Labour Rates Per

Each

Rs.

156.25

Cost Per Each: 156.25

2,725

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-13

(British) :

Each

Cleaning of water tanks upto 400 gallons capacity

Detail

Qty

Unit

Rate (Rs)

Amount

LABOUR
0.252

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Day

126.00

3.78

78.00

129.78

22

27.72

Composite Rates Per

Each

Rs.

157.50

Cost Per Each: 157.50

Labour Rates Per

Each

Rs.

157.50

Cost Per Each: 157.50

2,726

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-14

(British) :

Cart load

Supplying manure

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Manure

35.315

1,000.00

Cft

TOTAL

MATERIAL

Cft

35,314.70

74.58

35,314.70

Day

200.00

6.00

3.42

206.00

22

LABOUR
Coolie

0.400

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

7,813.23

Composite Rates Per

Cart load

Rs.

43,333.93

Cost Per Cart load: 43,333.

Labour Rates Per

Cart load

Rs.

250.00

Cost Per Cart load: 250.00

2,727

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

26-15

Item Name :

(British) :

100 Sft/spra

Spraying anti-termite liquid mixed with water in the ratio of 1:40

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Anti Termite Liquid

0.125

550.00

Ltr

TOTAL

MATERIAL

Ltr

68.49

47.39

68.49

Day

15.00

0.45

13.38

15.45

Hour

24.90

17.23

24.90

22

LABOUR
Skilled Coolie

0.025

600.00

Day

Sundries (Labour Only):


TOTAL

LABOUR

EQUIPMENT
Antitermite Spray Machine

0.249

100.00

Hour

TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

EQUIPMENT

Composite Rates Per

100 Sft/s

Rs.

132.69

Per SQM : Rs 14.28

Labour Rates Per

100 Sft/s

Rs.

18.75

Per SQM : Rs 2.02

23.85

2,728

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-16-a

(British) :

Rft

Providing and Fixing barbed wire fencing with 4 horizontal & 2


cross wires : Without PCC base

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Steel (Struct. Sections)

0.003

Kg

97.00

Kg

0.25

Barbed Wire

0.116

Kg

130.00

Kg

15.06

RCC Post

0.125

No

960.00

No

120.00

TOTAL

MATERIAL

70.86

135.31

Day

7.90

0.24

7.14

8.14

22

LABOUR
0.016

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

174.96

Labour Rates Per

Rft

Rs.

9.88

LABOUR

31.51

Per Meter : Rs 573.87


Per Meter : Rs 32.40

2,729

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

26-16-b

Item Name :

(British) :

Rft

Providing and Fixing barbed wire fencing with 4 horizontal & 2


cross wires : With PCC 1:4:8 base 12"x12"x21"

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

0.011

Bag

490.00

Sand

0.043

Cft

2,200.00

Steel (Struct. Sections)

0.003

Kg

97.00

Crushed Aggregate 1

0.085

Cft

3,500.00

Barbed Wire

0.117

Kg

130.00

Kg

15.26

RCC Post

0.120

No

960.00

No

115.23

TOTAL

Bag

5.38

100 Cft

0.95

MATERIAL

Kg

100 Cft

0.25
2.99

70.99

140.05

Day

7.90

0.24

7.01

8.14

22

LABOUR
0.016

Coolie

500.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

Composite Rates Per

Rft

Rs.

180.74

Labour Rates Per

Rft

Rs.

9.88

LABOUR

32.55

Per Meter : Rs 592.83


Per Meter : Rs 32.40

2,730

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-17

(British) :

100 Sft

Making notice board 1/2" thick of c/s mortar 1:3 with 2"x1/2"
beading

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Ordinary Portland Cement

1.190

Bag

490.00

Sand

4.740

Cft

2,200.00

TOTAL

Bag

582.90

100 Cft

104.28

5.79

MATERIAL

687.17

LABOUR
Mason

4.980

Day

900.00

Day

4,481.60

Coolie

7.469

Day

500.00

Day

3,734.67

246.49

72.21

8,462.75

22

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

1,958.76

Composite Rates Per

100 Sft

Rs.

11,108.68

Per SQM : Rs 1,195.29

Labour Rates Per

100 Sft

Rs.

10,270.33

Per SQM : Rs 1,105.09

2,731

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-18

(British) :

Each

Binding office books/registers.

Detail

Qty

Unit

Rate (Rs)

Amount

MATERIAL
Soft Board

1.000

Sft

40.00

Sft

40.00

Covering Sheet

1.000

No

5.00

No

5.00

Gum Bottle

1.000

No

40.00

No

40.00

TOTAL

MATERIAL

53.13

85.00

Day

35.00

1.05

24.88

36.05

22

LABOUR
0.050

Book Binder

700.00

Day

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Composite Rates Per

Each

Rs.

147.45

Cost Per Each: 147.45

Labour Rates Per

Each

Rs.

43.75

Cost Per Each: 43.75

26.40

2,732

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-19

(British) :

Per Cut

Cutting of Pipes upto 2" Dia

Detail

Qty

Unit

Rate (Rs)

Days

900.00

Amount

LABOUR
Plumber I

0.110

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Days

99.00

2.97

78.00

101.97

22

21.78

Composite Rates Per

Per Cut

Rs.

123.75

Cost Per Per Cut: 123.75

Labour Rates Per

Per Cut

Rs.

123.75

Cost Per Per Cut: 123.75

2,733

GOVERNMENT OF KHYBER PAKHTUNKHWA


CSR CELL FINANCE DEPARTMENT
MARKET RATE SYSTEM
As on Apr-Jun (Qtr-2) 2015
CHAPTER NO. 26 , MISCELLANEOUS
DESCRIPTION OF ITEM :

Spec. No :

Item Code :

Unit

Item Name :

26-20

(British) :

Per Cut

Cutting of Pipes above 2" Dia upto 4" dia

Detail

Qty

Unit

Rate (Rs)

Days

900.00

Amount

LABOUR
Plumber I

0.200

Sundries (Labour Only):


TOTAL

Cont. Profit + Over Heads (Material+Labour+Equipment)

LABOUR

Days

180.00

5.40

78.00

185.40

22

39.60

Composite Rates Per

Per Cut

Rs.

225.00

Cost Per Per Cut: 225.00

Labour Rates Per

Per Cut

Rs.

225.00

Cost Per Per Cut: 225.00

2,734

You might also like