Professional Documents
Culture Documents
Importance: High
NOW IS THE TIME TO TRY YOUR FIRST CONTAINMENT BOX SUPER TALL AND SUPER LARGE OVER THE BOP AREA!
Now should have been the time to put a special machined BRANKO R. BABIC COUNTER PRESSURE PLUG SLEEVE
OVER THE BOP FLANGE machined to seal on flange and collect ALL OIL AND GAS up a 21 inch full flow riser after
SHUTOFF into a wye connection to take off oil through shutoff’s to flanges to TWO SHIPS splitting up the capture
responsibilities but also making you use a 45 degree ell with shutoff flanged to surface which should have flotation
riser pipe allowing ship to CUT LOOSE SHUTTING DOWN IN CASE OF HURRICANE allowing the pipe to just SIT below
the surface SEALED at some 200 feet deep until brought up by crane later to hook up again after HURRICANE PASSES.
MAYDAY TWENTY -- Riser shattered above horizontal diamond cut straight up wall STEEL PARTICLES POSSIBLY
JAMMED AND MUST BE REMOVED IN TOP HAT 4 AND RISER CONNECTION.
1
Phone: 813-286-2333
062310 @ 12:37 PM Eastern
ART WEB PAGE: http://www.alternativeresponsetechnology.com/Ralph_C._Whitley_Sr_Backflow_Prevention_Inc.html
SCRIBD: ralphwhitleysr
SKYPE: ralphwhitleysr