DESCRIPTION OF ITEM:
Item No. 1 Providing and fitting glazed earthen ware water closet European Type,
excluding seat and cover.
(i) White
MATERIAL
Total 965.23
Contractor's Profit & Overheads 20.00 Percent 193.05
Total 1,158.28
LABOURFor 4 Nos.
Total 330.00
Sundries 10.00 Percent 33.00
Total 363.00
Contractor's Profit & Overheads 20.00 Percent 72.60
Total 435.60
ITEM RATES
Page 1
DESCRIPTION OF ITEM:
Item No. 1 Providing and fitting glazed earthen ware water closet European Type,
excluding seat and cover.
(ii) Coloured
MATERIAL
Total 1025.23
Contractor's Profit & Overheads 20.00 Percent 205.05
Total 1,230.28
LABOURFor 4 Nos.
Total 330.00
Sundries 10.00 Percent 33.00
Total 363.00
Contractor's Profit & Overheads 20.00 Percent 72.60
Total 435.60
ITEM RATES
Page 2
DESCRIPTION OF ITEM:
Item No. 2 Providing and fixing double seat and cover only.
(i) Bakelite.
MATERIAL
1 Seat and cover double (Bakelite) 1.00 No. 275.00 each 275.00
Total 275.00
Contractor's Profit & Overheads 20.00 Percent 55.00
Total 330.00
LABOURFor 48 Nos.
Total 42.50
Sundries 10.00 Percent 4.25
Total 46.75
Contractor's Profit & Overheads 20.00 Percent 9.35
Total 56.10
ITEM RATES
Page 3
DESCRIPTION OF ITEM:
Item No. 2 Providing and fixing double seat and cover only.
(ii) Plastic.
MATERIAL
1 Seat and cover double (Plastic) 1.00 No. 150.00 each 150.00
Total 150.00
Contractor's Profit & Overheads 20.00 Percent 30.00
Total 180.00
LABOURFor 48 Nos.
Total 42.50
Sundries 10.00 Percent 4.25
Total 46.75
Contractor's Profit & Overheads 20.00 Percent 9.35
Total 56.10
ITEM RATES
Page 4
DESCRIPTION OF ITEM:
Item No. 3 Providing and fitting glazed earthen ware water closet, squatter type
(orisa pattern) combined with foot rest.
(i) White
MATERIAL
1 W.C Orisa pattern with foot rest 1.00 No. 675.00 each 675.00
2 Cement 0.021 Bag 230.00 Bag 4.83
3 Sand 0.056 Cft. 350.00 % Cft. 0.20
Total 680.03
Contractor's Profit & Overheads 20.00 Percent 136.01
Total 816.03
LABOURFor 4 Nos.
Total 240.00
Sundries 10.00 Percent 24.00
Total 264.00
Contractor's Profit & Overheads 20.00 Percent 52.80
Total 316.80
ITEM RATES
Page 5
Item No. 3 Providing and fitting glazed earthen ware water closet, squatter type
(orisa pattern) combined with foot rest.
(ii) Coloured.
MATERIAL
1 W.C Orisa pattern with foot rest 1.00 No. 815.00 each 815.00
coloured
2 Cement 0.021 Bag 230.00 Bag 4.83
3 Sand 0.056 Cft. 350.00 % Cft. 0.20
Total 820.03
Contractor's Profit & Overheads 20.00 Percent 164.01
Total 984.03
LABOURFor 4 Nos.
Total 240.00
Sundries 10.00 Percent 24.00
Total 264.00
Contractor's Profit & Overheads 20.00 Percent 52.80
Total 316.80
ITEM RATES
Page 6
DESCRIPTION OF ITEM:
Item No. 4 Providing and fitting white glazed earthen ware water closet, squatter type
with separate foot rest.
MATERIAL
Total 490.00
Contractor's Profit & Overheads 20.00 Percent 98.00
Total 588.00
LABOURFor 4 Nos.
Total 240.00
Sundries 10.00 Percent 24.00
Total 264.00
Contractor's Profit & Overheads 20.00 Percent 52.80
Total 316.80
ITEM RATES
Page 7
DESCRIPTION OF ITEM:
Item No. 5 Providing and fitting water closet squatter type of terrazzo concrete.
MATERIAL
1 W.C. squatter type of terrazzo concrete 1.00 No. 175.00 each 175.00
2 Cement 0.021 Bag 230.00 Bag 4.83
3 Sand 0.056 Cft. 350.00 % Cft. 0.20
Total 180.03
Contractor's Profit & Overheads 20.00 Percent 36.01
Total 216.03
LABOURFor 4 Nos.
Total 240.00
Sundries 10.00 Percent 24.00
Total 264.00
Contractor's Profit & Overheads 20.00 Percent 52.80
Total 316.80
ITEM RATES
Page 8
DESCRIPTION OF ITEM:
Item No. 6 Providing and fitting glazed earthen ware wash hand basin 56 x 40 cm
(22" x 16"), including bracket set, waste pipe and waste coupling, etc.
MATERIAL
1 Glazed earthen ware wash hand basin 1.00 No. 885.00 each 885.00
2 Padestal 1.00 No. 250.00 each 250.00
3 Waste coupling, Bracket, Waste Pipe 1.00 No. 105.00 each 105.00
Total 1240.00
Contractor's Profit & Overheads 20.00 Percent 248.00
Total 1,488.00
LABOURFor 4 Nos.
Total 310.00
Sundries 10.00 Percent 31.00
Total 341.00
Contractor's Profit & Overheads 20.00 Percent 68.20
Total 409.20
ITEM RATES
Page 9
DESCRIPTION OF ITEM:
Item No. 6 Providing and fitting glazed earthen ware wash hand basin 56 x 40 cm
(22" x 16"), including bracket set, waste pipe and waste coupling, etc.
MATERIAL
1 Earthen ware wash hand basin (coloured) 1.00 No. 1085.00 each 1085.00
2 Pedestal 1.00 No. 250.00 each 250.00
3 Waste coupling, Bracket Waste
Pipe 1.00 No. 105.00 each 105.00
Total 1440.00
Contractor's Profit & Overheads 20.00 Percent 288.00
Total 1,728.00
LABOURFor 4 Nos.
Total 310.00
Sundries 10.00 Percent 31.00
Total 341.00
Contractor's Profit & Overheads 20.00 Percent 68.20
Total 409.20
ITEM RATES
Page 10
DESCRIPTION OF ITEM:
Item No. 6 Providing and fitting glazed earthen ware wash hand basin 56 x 40 cm
(22" x 16"), including bracket set, waste pipe and waste coupling, etc.
MATERIAL
Total 740.00
Contractor's Profit & Overheads 20.00 Percent 148.00
Total 888.00
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 11
DESCRIPTION OF ITEM:
Item No. 6 Providing and fitting glazed earthen ware wash hand basin 56 x 40 cm
(22" x 16"), including bracket set, waste pipe and waste coupling, etc.
MATERIAL
Total 840.00
Contractor's Profit & Overheads 20.00 Percent 168.00
Total 1,008.00
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 12
DESCRIPTION OF ITEM:
Item No. 7 Providing and fixing stainless steel sink with drain board, size 120 x 60 cm
(48" x 24") including bracket set, waste pipe and waste coupling.
MATERIAL
Total 1750.12
Contractor's Profit & Overheads 20.00 Percent 350.02
Total 2,100.14
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 13
DESCRIPTION OF ITEM:
Item No. 8 Providing and fitting terrazzo concrete sink 60 x 45 cm (24" x 18") with
drain board of mosaic including bracket set waste pipe and waste coupling.
MATERIAL
Total 456.39
Contractor's Profit & Overheads 20.00 Percent 91.28
Total 547.67
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 14
DESCRIPTION OF ITEM:
Item No. 9 Providing and fixing glazed earthen ware sink, including bracket set, waste
pipe and waste coupling.
MATERIAL
Total 672.69
Contractor's Profit & Overheads 20.00 Percent 134.54
Total 807.23
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 15
DESCRIPTION OF ITEM:
Item No. 9 Providing and fixing glazed earthen ware sink, including bracket set, waste
pipe and waste coupling.
MATERIAL
Total 502.69
Contractor's Profit & Overheads 20.00 Percent 100.54
Total 603.23
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 16
DESCRIPTION OF ITEM:
Item No. 10 Providing and fixing glazed earthen ware Flat Back Urinal.
MATERIAL
1 G.E. flat Back Urinal Complete set 1.00 No. 400.00 each 400.00
2 Gutties 2.00 Nos. 6.00 P. Doz 1.00
3 Screw (75 mm) 3" long 2.00 Nos. 0.44 each 0.88
Total 401.88
Contractor's Profit & Overheads 20.00 Percent 80.38
Total 482.26
LABOURFor 4 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 17
DESCRIPTION OF ITEM:
Item No. 11 Providing and fitting glazed earthen ware low down flushing cistern 13.63
litres (3 gallons) capacity, including bracket set, copper connection, etc.
(i) White
MATERIAL
Total 760.01
Contractor's Profit & Overheads 20.00 Percent 152.00
Total 912.01
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 18
DESCRIPTION OF ITEM:
Item No. 11 Providing and fitting glazed earthen ware low down flushing cistern 13.63
litres (3 gallons) capacity, including bracket set, copper connection, etc.
(ii) Coloured
MATERIAL
Total 860.01
Contractor's Profit & Overheads 20.00 Percent 172.00
Total 1,032.01
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 19
DESCRIPTION OF ITEM:
Item No. 12 Providing and fitting plastic made low down flushing cistern 13.63 litres
(3 gallons) capacity, including bracket set, copper connection, etc.,
complete.
MATERIAL
Total 510.01
Contractor's Profit & Overheads 20.00 Percent 102.00
Total 612.01
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 20
DESCRIPTION OF ITEM:
Item No. 13 Providing and fixing white enamelled cast iron low down flushing cistern
13.63 litters (3 gallons) capacity, including bracket set, copper connection
etc.
MATERIAL
Total 785.03
Contractor's Profit & Overheads 20.00 Percent 157.01
Total 942.03
LABOURFor 4 Nos.
Total 275.00
Sundries 10.00 Percent 27.50
Total 302.50
Contractor's Profit & Overheads 20.00 Percent 60.50
Total 363.00
ITEM RATES
Page 21
DESCRIPTION OF ITEM:
Item No. 14 Providing and fixing C.I. highlevel flushing cistern including cost of
bracket set copper connection etc.
MATERIAL
1 C.I. High level flushing cistern 1.00 No. 580.00 each 580.00
13.63 letters or 3 gallon
capacity including
accessories.
2 C.I. Bracket one pair 20.00 per pair 20.00
3 Cement 0.021 Bag 230.00 Bag 4.83
4 Sand 0.056 Cft. 350.00 % Cft. 0.20
Total 605.03
Contractor's Profit & Overheads 20.00 Percent 121.01
Total 726.03
LABOURFor 4 Nos.
Total 292.00
Sundries 10.00 Percent 29.20
Total 321.20
Contractor's Profit & Overheads 20.00 Percent 64.24
Total 385.44
ITEM RATES
Page 22
DESCRIPTION OF ITEM:
Item No. 14 Providing and fixing C.I. highlevel flushing cistern including cost of
bracket set copper connection etc.
MATERIAL
1 C.I. High level flushing cistern 1.00 No. 432.00 each 432.00
I/C all accessaries
2 C.I. Bracket one pair 20.00 per pair 20.00
3 Cement 0.021 Bag 230.00 Bag 4.83
4 Sand 0.056 Cft. 350.00 % Cft. 0.20
Total 457.03
Contractor's Profit & Overheads 20.00 Percent 91.41
Total 548.43
LABOURFor 4 Nos.
Total 292.00
Sundries 10.00 Percent 29.20
Total 321.20
Contractor's Profit & Overheads 20.00 Percent 64.24
Total 385.44
ITEM RATES
Page 23
DESCRIPTION OF ITEM:
MATERIAL
Total 91.28
Contractor's Profit & Overheads 20.00 Percent 18.26
Total 109.54
LABOURFor 40 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 24
DESCRIPTION OF ITEM:
Item No. 16 Providing and fitting, glazed earthen ware soap dish.
(i) White.
MATERIAL
1 Glazed earthen ware soap dish 1.00 No. 110.00 each 110.00
2 Gutties Plastic 2.00 Nos. 6.00 P. Doz 1.00
3 Screws 3/4" 2.00 Nos. 1.68 P. Doz 0.28
Total 111.28
Contractor's Profit & Overheads 20.00 Percent 22.26
Total 133.54
LABOURFor 40 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 25
DESCRIPTION OF ITEM:
Item No. 16 Providing and fitting, glazed earthen ware soap dish.
MATERIAL
Total 121.28
Contractor's Profit & Overheads 20.00 Percent 24.26
Total 145.54
LABOURFor 40 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 26
DESCRIPTION OF ITEM:
Item No. 17 Providing and fixing chromium plated toilet paper holder.
MATERIAL
Total 94.07
Contractor's Profit & Overheads 20.00 Percent 18.81
Total 112.88
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 27
DESCRIPTION OF ITEM:
MATERIAL
Total 151.56
Contractor's Profit & Overheads 20.00 Percent 30.31
Total 181.87
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 28
DESCRIPTION OF ITEM:
MATERIAL
Total 101.56
Contractor's Profit & Overheads 20.00 Percent 20.31
Total 121.87
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 29
DESCRIPTION OF ITEM:
Item No. 19 Providing and fixing looking glass 55 x 40 cm (22" x 16") size and 5 mm
thick first quality.
MATERIAL
Total 330.56
Contractor's Profit & Overheads 20.00 Percent 66.11
Total 396.67
LABOURFor 16 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 30
DESCRIPTION OF ITEM:
Item No. 20 Providing and fixing glass shelf 60 x 13 cm (24" x 5") with 5 mm thick
glass.
MATERIAL
Total 114.07
Contractor's Profit & Overheads 20.00 Percent 22.81
Total 136.88
LABOURFor 16 Nos.
Total 210.00
Sundries 10.00 Percent 21.00
Total 231.00
Contractor's Profit & Overheads 20.00 Percent 46.20
Total 277.20
ITEM RATES
Page 31
DESCRIPTION OF ITEM:
Item No. 20 Providing and fixing glass shelf 60 x 13 cm (24" x 5") with 5 mm thick
glass.
(ii) Glass Shelf only without chromium plated brackets and railing.
MATERIAL
Total 60.00
Contractor's Profit & Overheads 20.00 Percent 12.00
Total 72.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 32
DESCRIPTION OF ITEM:
Item No. 21 Providing and fitting glazed earthen ware shelf 60 x 13 cm (24" x 5") with
chromium plated bracket and railing.
(i) White.
MATERIAL
Total 154.07
Contractor's Profit & Overheads 20.00 Percent 30.81
Total 184.88
LABOURFor 16 Nos.
Total 210.00
Sundries 10.00 Percent 21.00
Total 231.00
Contractor's Profit & Overheads 20.00 Percent 46.20
Total 277.20
ITEM RATES
Page 33
DESCRIPTION OF ITEM:
Item No. 21 Providing and fitting glazed earthen ware shelf 60 x 13 cm (24" x 5") with
chromium plated bracket and railing.
(ii) Coloured.
MATERIAL
Total 164.07
Contractor's Profit & Overheads 20.00 Percent 32.81
Total 196.88
LABOURFor 16 Nos.
Total 210.00
Sundries 10.00 Percent 21.00
Total 231.00
Contractor's Profit & Overheads 20.00 Percent 46.20
Total 277.20
ITEM RATES
Page 34
DESCRIPTION OF ITEM:
MATERIAL
Total 42.53
Contractor's Profit & Overheads 20.00 Percent 8.51
Total 51.04
LABOURFor 40 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 35
DESCRIPTION OF ITEM:
MATERIAL
Total 89.59
Contractor's Profit & Overheads 20.00 Percent 17.92
Total 107.51
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 36
DESCRIPTION OF ITEM:
MATERIAL
Total 64.59
Contractor's Profit & Overheads 20.00 Percent 12.92
Total 77.51
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 37
DESCRIPTION OF ITEM:
MATERIAL
Total 57.07
Contractor's Profit & Overheads 20.00 Percent 11.41
Total 68.49
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 38
DESCRIPTION OF ITEM:
Item No. 23 Providing and fixing chromium plated pillar - cock, heavy.
(i) 2 cm (¾").
MATERIAL
Total 180.00
Contractor's Profit & Overheads 20.00 Percent 36.00
Total 216.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 39
DESCRIPTION OF ITEM:
Item No. 23 Providing and fixing chromium plated pillar - cock, heavy.
MATERIAL
Total 150.00
Contractor's Profit & Overheads 20.00 Percent 30.00
Total 180.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 40
DESCRIPTION OF ITEM:
Item No. 24 Providing and fixing chromium plated stop Cock Heavy.
(i) 2 cm (¾").
MATERIAL
Total 200.00
Contractor's Profit & Overheads 20.00 Percent 40.00
Total 240.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 41
DESCRIPTION OF ITEM:
Item No. 24 Providing and fixing chromium plated stop Cock Heavy.
MATERIAL
Total 165.00
Contractor's Profit & Overheads 20.00 Percent 33.00
Total 198.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 42
DESCRIPTION OF ITEM:
Item No. 25 Providing and fixing underground stop cock 13 mm (½") with chromium
plated cover.
MATERIAL
Total 207.62
Contractor's Profit & Overheads 20.00 Percent 41.52
Total 249.14
LABOURFor 30 Nos.
Total 247.50
Sundries 10.00 Percent 24.75
Total 272.25
Contractor's Profit & Overheads 20.00 Percent 54.45
Total 326.70
ITEM RATES
Page 43
DESCRIPTION OF ITEM:
(i) 2 cm (¾").
MATERIAL
Total 150.00
Contractor's Profit & Overheads 20.00 Percent 30.00
Total 180.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 44
DESCRIPTION OF ITEM:
MATERIAL
Total 120.00
Contractor's Profit & Overheads 20.00 Percent 24.00
Total 144.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 45
DESCRIPTION OF ITEM:
Item No. 27 Providing and fixing chromium plated tee stop cock 1.5 cm (½").
MATERIAL
Total 85.00
Contractor's Profit & Overheads 20.00 Percent 17.00
Total 102.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 46
DESCRIPTION OF ITEM:
MATERIAL
Total 150.00
Contractor's Profit & Overheads 20.00 Percent 30.00
Total 180.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 47
DESCRIPTION OF ITEM:
MATERIAL
Total 200.00
Contractor's Profit & Overheads 20.00 Percent 40.00
Total 240.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 48
DESCRIPTION OF ITEM:
Item No. 29 Providing & Fixing, chromium plated mixing valve, for wash hand basin,
sinks or shower.
MATERIAL
Total 525.00
Contractor's Profit & Overheads 20.00 Percent 105.00
Total 630.00
LABOURFor 24 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 49
DESCRIPTION OF ITEM:
Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).
MATERIAL
Total 265.00
Contractor's Profit & Overheads 20.00 Percent 53.00
Total 318.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 50
DESCRIPTION OF ITEM:
Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).
MATERIAL
1 G.M. Peet Valve 4 cm (1½") dia 1.00 No. 310.00 each 310.00
Total 310.00
Contractor's Profit & Overheads 20.00 Percent 62.00
Total 372.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 51
DESCRIPTION OF ITEM:
Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).
MATERIAL
1 G.M. Peet Valve 5 cm (2" dia) 1.00 No. 380.00 each 380.00
Total 380.00
Contractor's Profit & Overheads 20.00 Percent 76.00
Total 456.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 52
DESCRIPTION OF ITEM:
Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).
MATERIAL
1 G.M. Peet Valve 6.5 cm (2½" dia) 1.00 No. 430.00 each 430.00
Total 430.00
Contractor's Profit & Overheads 20.00 Percent 86.00
Total 516.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 53
DESCRIPTION OF ITEM:
Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).
MATERIAL
1 G.M. Peet Valve 7.5 cm (3" dia) 1.00 No. 490.00 each 490.00
Total 490.00
Contractor's Profit & Overheads 20.00 Percent 98.00
Total 588.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 54
DESCRIPTION OF ITEM:
Item No. 31 Providing and fitting, Chromium plated or brass oxidised, swan neck cock
1.5 cm (½" dia).
MATERIAL
Total 225.00
Contractor's Profit & Overheads 20.00 Percent 45.00
Total 270.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 55
DESCRIPTION OF ITEM:
Item No. 31 Providing and fitting, Chromium plated or brass oxidised, swan neck cock
1.5 cm (½" dia).
MATERIAL
Total 325.00
Contractor's Profit & Overheads 20.00 Percent 65.00
Total 390.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 56
DESCRIPTION OF ITEM:
Item No. 31 Providing and fitting, Chromium plated or brass oxidised, swan neck cock
1.5 cm (½" dia).
MATERIAL
Total 425.00
Contractor's Profit & Overheads 20.00 Percent 85.00
Total 510.00
LABOURFor 15 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 57
DESCRIPTION OF ITEM:
MATERIAL
Total 52.00
Contractor's Profit & Overheads 20.00 Percent 10.40
Total 62.40
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 58
DESCRIPTION OF ITEM:
MATERIAL
Total 80.00
Contractor's Profit & Overheads 20.00 Percent 16.00
Total 96.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 59
DESCRIPTION OF ITEM:
Item No. 33 Providing and fixing floor trap of Cast Iron including concrete chamber
all-round and C.I grating.
(i) 10 x 5 cm (4" x 2").
MATERIAL
Total 111.25
Contractor's Profit & Overheads 20.00 Percent 22.25
Total 133.49
LABOURFor 10 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 60
DESCRIPTION OF ITEM:
Item No. 33 Providing and fixing floor trap of Cast Iron including concrete chamber
all-round and C.I grating.
MATERIAL
Total 126.25
Contractor's Profit & Overheads 20.00 Percent 25.25
Total 151.49
LABOURFor 10 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 61
DESCRIPTION OF ITEM:
Item No. 34 Providing and fitting P-trap including concrete chamber with cast iron
gully grating.
MATERIAL
Total 140.32
Contractor's Profit & Overheads 20.00 Percent 28.06
Total 168.38
LABOURFor 12 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Labour rate for Each Rs. 18.70 Say 18.70
Composite rate for Each Rs. 187.08 Say 187.10
Page 62
DESCRIPTION OF ITEM:
MATERIAL
1 Glazed Pee trap 10 cm (4" dia) 1.00 No. 40.00 each 40.00
2 Cement 0.016 Bag 230.00 Bag 3.68
3 Sand 0.040 Cft. 350.00 % Cft. 0.14
4 Crushed Stone 0.081 Cft. 1850.00 % Cft. 1.50
Total 45.32
Contractor's Profit & Overheads 20.00 Percent 9.06
Total 54.38
LABOURFor 12 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 63
DESCRIPTION OF ITEM:
Item No. 35 Providing and fitting 10 cm (4") gully trap, including cement cncrete,
costof PVC grating 15 x 15 cm (6" x 6") and Masonry chamber 30 x 30
cm(12" x 12").
MATERIAL
Total 183.01
Contractor's Profit & Overheads 20.00 Percent 36.60
Total 219.61
LABOURFor 8 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Labour rate for Each Rs. 28.05 Say 28.05
Composite rate for Each Rs. 247.66 Say 247.65
Page 64
DESCRIPTION OF ITEM:
Item No. 36 (i) Providing & fitting cast iron soil pipe with:
1 C.I Soil 10 cm (4") dia 2.00 Metre 350.00 per metre 700.00
Cost of lead joint
a) Lead 2.36 Kg. 20.00 Per Kg. 47.20
b) Yarn 0.25 Lbs 16.00 Lbs 4.00
c) Fuel wood 1.45 Kg. 2.75 Per Kg. 3.99
Total 755.19
Contractor's Profit & Overheads 20.00 Percent 151.04
Total 906.23
Material cost/metre
906.23 = 453.11 453.11
2
LABOURFor 20 Metre
Total 450.00
Sundries 10.00 Percent 45.00
Total 495.00
Contractor's Profit & Overheads 20.00 Percent 99.00
Total 594.00
ITEM RATES
Page 65
DESCRIPTION OF ITEM:
Item No. 36 (i) Providing & fitting cast iron soil pipe with:
1 C.I Soil 5 cm (2") dia 2.00 Metre 200.00 per metre 400.00
Cost of lead joint
a) Lead 0.23 Kg. 20.00 Per Kg. 4.60
b) Yarn 0.13 Lbs 16.00 Lbs 2.00
c) Fuel wood 0.73 Kg. 2.75 Per Kg. 2.01
Total 408.61
Contractor's Profit & Overheads 20.00 Percent 81.72
Total 490.33
Material cost/metre
449.46 = 224.73 245.1645
2
LABOURFor 50 Metre
Total 450.00
Sundries 10.00 Percent 45.00
Total 495.00
Contractor's Profit & Overheads 20.00 Percent 99.00
Total 594.00
ITEM RATES
Page 66
DESCRIPTION OF ITEM:
1 C.I Soil pipe 10 cm (4") dia 2.00 Meter 350.00 per metre 700.00
2 Yarn 0.25 Lbs 16.00 Lbs 4.00
3 Cement 0.022 Bag 230.00 Bag 5.06
Total 709.06
Contractor's Profit & Overheads 20.00 Percent 141.81
Total 850.87
Material cost per metre 425.44
LABOURFor 40 Metres
Total 205.00
Sundries 10.00 Percent 20.50
Total 225.50
Contractor's Profit & Overheads 20.00 Percent 45.10
Total 270.60
ITEM RATES
Page 67
DESCRIPTION OF ITEM:
1 C.I Soil pipe 5 cm (2") dia 2.00 Metre 200.00 per metre 400.00
2 Yarn 0.13 Lbs 16.00 Lbs 2.00
3 Cement 0.011 Bag 230.00 Bag 2.53
Total 404.53
Contractor's Profit & Overheads 20.00 Percent 80.91
Total 485.44
Material cost per metre 242.72
Total 205.00
Sundries 10.00 Percent 20.50
Total 225.50
Contractor's Profit & Overheads 20.00 Percent 45.10
Total 270.60
ITEM RATES
Page 68
DESCRIPTION OF ITEM:
Item No. 37 Providing and fitting, A.C Soil pipe with cement caulked joint, including all
specials.
(i) 6 cm i/d.
Total 199.80
Contractor's Profit & Overheads 20.00 Percent 39.96
Total 239.76
Material cost per metre 79.92
LABOURFor 50 Metre
Total 205.00
Sundries 10.00 Percent 20.50
Total 225.50
Contractor's Profit & Overheads 20.00 Percent 45.10
Total 270.60
ITEM RATES
Page 69
DESCRIPTION OF ITEM:
Item No. 37 Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.
495.35
Contractor's Profit & Overheads 20.00 Percent 99.07
Total 594.42
Material cost per metre 198.14
LABOURFor 45 Metre
Total 205.00
Sundries 10.00 Percent 20.50
Total 225.50
Contractor's Profit & Overheads 20.00 Percent 45.10
Total 270.60
ITEM RATES
Page 70
DESCRIPTION OF ITEM:
Item No. 37 Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.
961.32
Contractor's Profit & Overheads 20.00 Percent 192.26
Total 1,153.58
Material cost per metre 288.39
LABOURFor 40 Metre
Total 205.00
Sundries 10.00 Percent 20.50
Total 225.50
Contractor's Profit & Overheads 20.00 Percent 45.10
Total 270.60
ITEM RATES
Page 71
DESCRIPTION OF ITEM:
Item No. 37 Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.
1 A.C Soil pipe 50 cm (6" dia) 4.00 Metre 300.58 per metre 1202.32
2 Special at 10% 120.23
3 Yarn 0.500 Lbs 16.00 Lbs 8.00
4 Cement 0.044 Bag 230.00 Bag 10.12
1340.67
Contractor's Profit & Overheads 20.00 Percent 268.13
Total 1,608.81
Material cost per metre 402.20
LABOURFor 30 Metre
Total 205.00
Sundries 10.00 Percent 20.50
Total 225.50
Contractor's Profit & Overheads 20.00 Percent 45.10
Total 270.60
ITEM RATES
Page 72
DESCRIPTION OF ITEM:
Item No. 38 Providing and fitting cast iron specials, such as tee bend, collar, cross, etc.
plain type.
Total 184.20
Contractor's Profit & Overheads 20.00 Percent 36.84
Total cost for 5 kg 221.04
Material cost per Kg 44.21
LABOURFOR 60 NOS.
Total 338.00
Sundries 10.00 Percent 33.80
Total 371.80
Contractor's Profit & Overheads 20.00 Percent 74.36
Total 446.16
ITEM RATES
Page 73
DESCRIPTION OF ITEM:
Item No. 38 Providing and fitting cast iron specials, such as tee bend, collar,
cross, etc. plain type.
Total 168.01
Contractor's Profit & Overheads 20.00 Percent 33.60
Total 201.61
Material cost per Kg 40.32
LABOURFor 90 Nos.
Total 310.00
Sundries 10.00 Percent 31.00
Total 341.00
Contractor's Profit & Overheads 20.00 Percent 68.20
Total 409.20
ITEM RATES
Page 74
DESCRIPTION OF ITEM:
Item No. 39 Supply and fitting of cast iron Manhole cover with frame, etc. complete.
MATERIAL
Total 120.00
Contractor's Profit & Overheads 20.00 Percent 24.00
Total 144.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 75
DESCRIPTION OF ITEM:
Item No. 39 Supply and fitting of cast iron Manhole cover with frame, etc. complete.
MATERIAL
1 C.I. manhole cover with frame 45 cm 1.00 No. 220.00 each 220.00
(18" dia)
Total 220.00
Contractor's Profit & Overheads 20.00 Percent 44.00
Total 264.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 76
DESCRIPTION OF ITEM:
Item No. 39 Supply and fitting of cast iron Manhole cover with frame, etc. complete.
MATERIAL
1 C.I manhole cover with frame 60 cm (24" dia) 1.00 No. 400.00 each 400.00
Total 400.00
Contractor's Profit & Overheads 20.00 Percent 80.00
Total 480.00
LABOURFor 15 Nos.
Total 205.00
Sundries 10.00 Percent 20.50
Total 225.50
Contractor's Profit & Overheads 20.00 Percent 45.10
Total 270.60
ITEM RATES
Page 77
DESCRIPTION OF ITEM:
Item No. 40 Providing and fitting R.C.C Pipe 10 cm (4" dia) including
laying and jointing in trenches.
Total 131.20
Contractor's Profit & Overheads 20.00 Percent 26.24
Total 157.44
Material cost per metre 78.72
LABOURFor 40 Metre
Total 450.00
Sundries 10.00 Percent 45.00
Total 495.00
Contractor's Profit & Overheads 20.00 Percent 99.00
Total 594.00
ITEM RATES
Page 78
DESCRIPTION OF ITEM:
Item No. 41 Providing and fitting chromium plated or oxidised gas Cock
6 mm (¼" dia)
MATERIAL
Total 60.00
Contractor's Profit & Overheads 20.00 Percent 12.00
Total 72.00
LABOURFor 30 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 79
DESCRIPTION OF ITEM:
Item No. 41 Providing and fitting chromium plated or oxidised gas Cock
6 mm (¼" dia)
MATERIAL
Total 65.00
Contractor's Profit & Overheads 20.00 Percent 13.00
Total 78.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 80
DESCRIPTION OF ITEM:
Item No. 41 Providing and fitting chromium plated or oxidised gas Cock
6 mm (¼" dia)
MATERIAL
Total 70.00
Contractor's Profit & Overheads 20.00 Percent 14.00
Total 84.00
LABOURFor 15 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 81
DESCRIPTION OF ITEM:
Item No. 42 Providing and fitting nipple or bush 6 mm to 10 mm (¼" - 3/8") i/d.
MATERIAL
1 Nipple or bush 6 mm to 10 mm
(1/4" - 3/8") i/d. 1.00 No. 6.00 each 6.00
Total 6.00
Contractor's Profit & Overheads 20.00 Percent 1.20
Total 7.20
LABOURFor 40 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 82
DESCRIPTION OF ITEM:
MATERIAL
1 Brass gas cock 1.5 cm (½" dia) 1.00 No. 60.00 each 60.00
Total 60.00
Contractor's Profit & Overheads 20.00 Percent 12.00
Total 72.00
LABOURFor 48 Nos.
Total 42.50
Sundries 10.00 Percent 4.25
Total 46.75
Contractor's Profit & Overheads 20.00 Percent 9.35
Total 56.10
ITEM RATES
Page 83
DESCRIPTION OF ITEM:
MATERIAL
1 Brass gas cock 2 cm (¾" dia) 1.00 No. 75.00 each 75.00
75.00
Contractor's Profit & Overheads 20.00 Percent 15.00
Total 90.00
LABOURFor 48 Nos.
Total 42.50
Sundries 10.00 Percent 4.25
Total 46.75
Contractor's Profit & Overheads 20.00 Percent 9.35
Total 56.10
ITEM RATES
Page 84
DESCRIPTION OF ITEM:
MATERIAL
Total 38.00
Contractor's Profit & Overheads 20.00 Percent 7.60
Total 45.60
LABOURFor 30 Nos.
Total 42.50
Sundries 10.00 Percent 4.25
Total 46.75
Contractor's Profit & Overheads 20.00 Percent 9.35
Total 56.10
ITEM RATES
Page 85
DESCRIPTION OF ITEM:
MATERIAL
1 Brass stop cock/brass bib cock 1.00 No. 65.00 each 65.00
Total 65.00
Contractor's Profit & Overheads 20.00 Percent 13.00
Total 78.00
LABOURFor 30 Nos.
Total 42.50
Sundries 10.00 Percent 4.25
Total 46.75
Contractor's Profit & Overheads 20.00 Percent 9.35
Total 56.10
ITEM RATES
Page 86
DESCRIPTION OF ITEM:
Item No. 45 Hoisting and placing in position precast R.C latrine seats.
LABOURFor 8 Nos.
Total 650.00
Sundries 10.00 Percent 65.00
Total 715.00
Contractor's Profit & Overheads 20.00 Percent 143.00
Total 858.00
ITEM RATES
Page 87
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
Total 70.00
Contractor's Profit & Overheads 20.00 Percent 14.00
Total 84.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 88
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
Total 75.00
Contractor's Profit & Overheads 20.00 Percent 15.00
Total 90.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 89
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
Total 25.00
Contractor's Profit & Overheads 20.00 Percent 5.00
Total 30.00
LABOURFor 50 Nos.
Total 17.00
Sundries 10.00 Percent 1.70
Total 18.70
Contractor's Profit & Overheads 20.00 Percent 3.74
Total 22.44
ITEM RATES
Page 90
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
Total 25.00
Contractor's Profit & Overheads 20.00 Percent 5.00
Total 30.00
LABOURFor 50 Nos.
Total 17.00
Sundries 10.00 Percent 1.70
Total 18.70
Contractor's Profit & Overheads 20.00 Percent 3.74
Total 22.44
ITEM RATES
Page 91
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 P.V.C. waste pipe 3 cm (1¼" dia) 1.00 No. 12.00 each 12.00
Total 12.00
Contractor's Profit & Overheads 20.00 Percent 2.40
Total 14.40
LABOURFor 40 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 92
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 P.V.C. waste pipe 4 cm (1½" dia) 1.00 No. 15.00 each 15.00
Total 15.00
Contractor's Profit & Overheads 20.00 Percent 3.00
Total 18.00
LABOURFor 40 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 93
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 P.V.C. flushing bend 3 cm (1¼" dia) 1.00 No. 18.00 each 18.00
Total 18.00
Contractor's Profit & Overheads 20.00 Percent 3.60
Total 21.60
LABOURFor 45 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 94
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 P.V.C. Flusing bend 4 cm (1½" dia) 1.00 No. 20.00 each 20.00
Total 20.00
Contractor's Profit & Overheads 20.00 Percent 4.00
Total 24.00
LABOURFor 45 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 95
REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 5 Providing and fixing chromium plated bottle trap with waste
pipe etc. complete.
MATERIAL
1 C.P Bottle trap with waste pipe 1.00 No. 362.00 each 362.00
362.00
Contractor's Profit & Overheads 20.00 Percent 72.40
Total 434.40
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 96
REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 5 Providing and fixing chromium plated bottle trap with waste
pipe etc. complete.
MATERIAL
1 C.P Bottle trap 4 cm with waste pipe 1.00 No. 365.00 each 365.00
365.00
Contractor's Profit & Overheads 20.00 Percent 73.00
Total 438.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 97
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
Total 34.00
Contractor's Profit & Overheads 20.00 Percent 6.80
Total 40.80
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 98
REPLACEMENT
DESCRIPTION OF ITEM:
(ii) Sink.
MATERIAL
1 Angle Iron Bracket for Sink 2.00 Nos. 18.00 each 36.00
2 Nail with cutter 4.00 Nos. 1.00 each 4.00
Total 40.00
Contractor's Profit & Overheads 20.00 Percent 8.00
Total 48.00
LABOURFor 20 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 99
REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 7 Providing and fixing 1.5 cm (½" dia) connection, including check
nuts etc.
MATERIAL
Total 20.00
Contractor's Profit & Overheads 20.00 Percent 4.00
Total 24.00
LABOURFor 50 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 100
REPLACEMENT
DESCRIPTION OF ITEM:
Item No. 7 Providing and fixing 1.5 cm (½" dia) connection, including check
nuts etc.
MATERIAL
1 Copper Connection
assessories 1.00 Nos. 30.00 each 30.00
Total 30.00
Contractor's Profit & Overheads 20.00 Percent 6.00
Total 36.00
LABOURFor 50 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 101
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
50.00
Contractor's Profit & Overheads 20.00 Percent 10.00
Total 60.00
LABOURFor 24 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 102
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 Brass ball valve 2 cm (¾" dia) 1.00 No. 65.00 each 65.00
Total 65.00
Contractor's Profit & Overheads 20.00 Percent 13.00
Total 78.00
LABOURFor 24 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 103
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 Brass ball valve 2.5 cm (1" dia) 1.00 No. 85.00 each 85.00
Total 85.00
Contractor's Profit & Overheads 20.00 Percent 17.00
Total 102.00
LABOURFor 24 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 104
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 Brass ball float valve 3 cm (¼" dia) 1.00 No. 125.00 each 125.00
Total 125.00
Contractor's Profit & Overheads 20.00 Percent 25.00
Total 150.00
LABOURFor 24 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 105
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 Brass ball float valve 4 cm (1½" dia) 1.00 No. 170.00 each 170.00
Total 170.00
Contractor's Profit & Overheads 20.00 Percent 34.00
Total 204.00
LABOURFor 24 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 106
REPLACEMENT
DESCRIPTION OF ITEM:
MATERIAL
1 Brass ball float valve 5 cm (2" dia) 1.00 No. 250.00 each 250.00
Total 250.00
Contractor's Profit & Overheads 20.00 Percent 50.00
Total 300.00
LABOURFor 24 Nos.
Total 170.00
Sundries 10.00 Percent 17.00
Total 187.00
Contractor's Profit & Overheads 20.00 Percent 37.40
Total 224.40
ITEM RATES
Page 107