Subject:- PC-II STUDY OF WATER RESOURCE DEVELOPMENT IN

NON POTHWAR AREA BARANI TRACT

As desired by Secretary, P&D, the PC-II study of water


resource development in non Potohar areas Barani tract was discussed
in a meeting held with the representative of Director General, ABAD on
26.10.2009. After detailed discussions the following changes were
proposed to be incorporated in the PC-II:-
1. The study will be based on different ecological zones in non
Potohar areas.
2. The man-months of team leader and other specialist
involved in the study may be reduced as per actual
requirement of the study.
3. The provision for administrative expenses (visit of ABAD
staff, transportation, stationery and misc.) amounting to Rs.
1.500 million may be deleted from the PC-II.
4. Period of study may be reduced from 12 months to 6
months.

Director General, ABAD has been requested to provide the


revised PC-II in the light of above for placing PDWP.

(Dr. Mahmood Khalid


Qamar)
Chief (Regional Planning)
27.10.2009

SECRETARY, P&D