DIAMER BASHA DAM PROJECT–CONSTRUCTION OF DAM

PART (CIVIL WORKS) AND TANGIR HYDROPOWER WORKS


POWERCHINA-FWO JOINT VENTURE (JV)

No. PFJV/DBDP/DBCG-PM/TMP/2022/004 Date: 04 Jan, 2022


Project Manager/Engineer’s Representative
Diamer Basha Consultants Group (DBCG)
Attention: Mr. Sakir Cengiz
Add: 49-H, Gulberg -III Lahore
Tel: 042-35846601-2, 042-35846619
E-mail: sakir.cengiz@dolsar.com.tr, dbcg786@gmail.com, tmhayat786@yahoo.com

Project: Diamer Basha Dam Project – Contract No. MW-1


Procurement of Dam Part (Civil Works) and Tangir Hydropower Works

Subject: Submission of Engineering Geological Conditions of Headrace Tunnel of Tangir


HPP
Reference: 1) Engineer Letter No. MW1-PFJV-021-388 dated 29 Nov, 2021

Dear Sir,

With reference to your comments at Ref 1), we hereby submit the Engineering Geological Conditions of
Headrace Tunnel of Tangir HPP (D2) as attachment 1) for your approval.

Doc. No. Doc. Title


Engineering Geological Conditions of Headrace Tunnel of
E02-TPC-11-006-D2
Tangir HPP

Should you need any clarifications, please do not hesitate to feed back at any time.
Yours Faithfully,
Mr. Du Yibin

Project Manager/Contractor’s Representative


POWERCHINA-FWO JV

Attachment1) Engineering Geological Conditions of Headrace Tunnel of Tangir HPP


2) Reply to 20211129 MW1-PFJV-021-388 Engineering Geological Conditions of Headrace
Tunnel of Tangir HPP
3) Borehole Logs
4) Photograph of Borehole Core
5) Discontinuities Survey Results
Add: House#18, Street#26, F-6/2, Islamabad, Pakistan
Tel: 051-2656311 Fax:051-2656316Email: bashadamjv@gmail.com
1/2
DIAMER BASHA DAM PROJECT–CONSTRUCTION OF DAM
PART (CIVIL WORKS) AND TANGIR HYDROPOWER WORKS
POWERCHINA-FWO JOINT VENTURE (JV)

1) Geological map and layout of Headrace Tunnel

CC: Mr. Muhammad Yousaf Rao -- GM, DBDC


Mr. Abdul Rashid -- CE, DBDC
Brig. Ghazi Shameel Haider -- PM, FWO

Add: House#18, Street#26, F-6/2, Islamabad, Pakistan


Tel: 051-2656311 Fax:051-2656316Email: bashadamjv@gmail.com
2/2