Subject: MONITORING / FIELD VISIT REPORT OF ASSISTANT REGIONAL


MANAGER PMU-NPIW-II D.G.KHAN AT WATERCOURSE # 9520/L.

Kindly refer to this office letter No RM/PMU/NPIW-II/DGK/822 dated:


02.08.2023 wherein field tour program of D.G.Khan Region was sent to your Office.
2. Assistant Regional Manager along with Assistant Director Agriculture
(OFWM) conducted the field visit on 16/08/2023 of (site detail) wherein all aspects,
according to the circulated checklists, were covered and this report is prepared on the
inspection report performa which is attached at Annex-A. During the conducted field visit,
following shortfalls are observed:-
Sr.
Site Address List of Shortfalls. Recommendations
No.
 One (01) Nakka structure was  WUA should be advised to
W/C No. cracked at new lining. carry out the repairing work
9520/L  One (01) culvert back earth for old & new lining as time to
NPIW-II (Add.) filling was improper. time operation.
F.Y 2021-22  At new lining of watercourse,  WMS & consultant should
FCR dated PCPS joints were poorly filled ensure the proper back earth
1
28/09/2022 with mortar. filling at the time of FCR.
Mouza Nari  Bushes were found along &  WMS & consultant should
Shumali Tehsil on the old lining. ensure proper mortar filling at
Taunsa District joints and its curing.
D.G.Khan (Pictorial evidence is attached at  WUA should be advised to
Annex-B) maintain watercourse.
4. In view of above conducted visit, it is proposed that the shortfalls may kindly be
reported to concerned authority for rectification and further necessary action.
5. It is further submitted that after this field visit report, updated monitoring report of
PMU, NPIW-II, D.G.Khan Division is attached at Annex-C.

(Khaleeq Ur Rehman)
Regional Manager
PMU-NPIW-II, D.G.Khan

C.C:-
The Director Agriculture (OFWM), D.G.Khan.
Annex-B

Bushes along and on the old lining

Leakage was observed at new lining

One Nakka structure was cracked One culvert back earth filling was improper