This document provides details for administrative approval of emergency works to strengthen a damaged embankment in the Khushiyara Right embankment in Sylhet, Bangladesh. The embankment was severely damaged by flash flooding and heavy rainfall, putting it in a vulnerable condition. If not repaired on an emergency basis, the damaged portion could breach during future floods, which would be more costly to repair and put local crops, property, and lives at risk. The estimated cost for repairing 45 meters of the embankment is 495,258.50 Taka. Approval is requested to utilize funds from the government's non-development revenue budget to complete the critical repairs.
This document provides details for administrative approval of emergency works to strengthen a damaged embankment in the Khushiyara Right embankment in Sylhet, Bangladesh. The embankment was severely damaged by flash flooding and heavy rainfall, putting it in a vulnerable condition. If not repaired on an emergency basis, the damaged portion could breach during future floods, which would be more costly to repair and put local crops, property, and lives at risk. The estimated cost for repairing 45 meters of the embankment is 495,258.50 Taka. Approval is requested to utilize funds from the government's non-development revenue budget to complete the critical repairs.
This document provides details for administrative approval of emergency works to strengthen a damaged embankment in the Khushiyara Right embankment in Sylhet, Bangladesh. The embankment was severely damaged by flash flooding and heavy rainfall, putting it in a vulnerable condition. If not repaired on an emergency basis, the damaged portion could breach during future floods, which would be more costly to repair and put local crops, property, and lives at risk. The estimated cost for repairing 45 meters of the embankment is 495,258.50 Taka. Approval is requested to utilize funds from the government's non-development revenue budget to complete the critical repairs.
PROFORMA FOR ADMINISTRATIVE APPROVAL FOR WORKS UNDER
EMERGENCY IN DISASTROUS/CATASTROPHIC SITUATION.
1 Zone/Project : North-Eastern Zone Zone, BWDB, Sylhet
Circle : Sylhet O&M Circle, BWDB, Sylhet. Division : Sylhet O&M Division, BWDB, Sylhet. 2 Location of the proposed work : Emergency backing of Khushiyara Right embankment for strengthening flood control Embankment during flood from km 13.655 to km 13.700 = 45m in upazila - Zakigonj, Dist.- Sylhet. under Non-Development Revenue Budget during the year 2016-17. 3 Memo no of the declaration of : Superintending Engineer, Sylhet O&M Circle, emergency BWDB, Sylhet’s office memo no- cvD‡ev/ZtcÖt/eb¨v-651/Gm,wm/366(10), date- 05/09/2016 wLªt| 4 Status of the project i) Ongoing : ii) Completed : Completed, Upper Surma-Kushiyara Project (USKP) 5 Estimated / Contract (Same) cost of : Tk. 4,95,258.50 (Abstract cost attached) the work (Attach abstract of cost estimate) 6 Consequences if the work is not taken : The portion of embankment in Upper Surma- up under emergency (Description + Kushiyara Project was damaged severely due Quantification) to flash flood & heavy rainfall on 01-09-2016. At present, the embankment is in vulnerable condition, any time it may be breached . If the damage portion of embankment is not taken up in emergency basis, the damaged portion will be breached by the thrust of flash flood of Kushiyara River and the situation would go beyond control which would need more cost to build up. Again to protect the standing crops, properties and lives of the local people, this work should be done immediately. 7 Probable source of fund : GOB (Non-Development Revenue Budget) 8 If fund is not available whether : Yes contractor will agree to payment in the next financial year
Sub-Divisional Engineer Executive Engineer
Sylhet O&M Sub-Division-III Sylhet O&M Division BWDB, Sylhet BWDB, Sylhet 9 Comments/ Recommendation/order : of the higher officers