FAULTS REPORT analysis 21september – 5 october

1. Focus (Faults) 21-28 September

Power Equipment Other- Harare Link Total


Failure Software Hardware ISP/
Vandalism
7 0 1 0 0 8
2. Focus (Faults) 29 Sept. - 5 October

Power Equipment Other- Harare Link Total


Failure Software Hardware ISP/
Vandalism
2 0 3 0 0 5

2.1. Fault Management

Table 1-Duration of fault rectification by type

Rectification time/Hrs Rectification time/Hrs


Type of fault (21-28 September) (29 Sept. - 5 October)

Power 12.3 12.2


Software 0 0
Hardware 0.67 3
Harare 0 0

Table 2- Fault Rectification Efficiency

No of Faults No of Faults
Rectification time (21-28 September) (29 Sept.-5 October)
24hrs 8 5
48hrs 0 0
72hrs 0 0
72hrs + 0 0
FAULTS REPORT analysis 21september – 5 october

FAULT RECTIFICATION EFFICIENCY


(21 -28 Sept.)

24HRS
48HRS
72HRS
72+

100%
FAULTS REPORT analysis 21september – 5 october

FAULT RECTIFICATION EFFICIENCY


(29 Sept- 5Oct.)

24HRS
48HRS
72HRS
72+

100%

Commissioned Links

1. Radar Metal Industries on the 21st of Sept.


2. Netone Gweru on the 22nd of Sept.
3. Holiday Inn on the 27th of Sept.
4. Interfin Gweru on the 29th of Sept.