Organization of Spreadsheet:
Descriptions - explains the spreadsheet cells
FMEA - the actual sheet used to enter data
Severity/Likelihood/Detectability - guidelines for the 1-10 rankins in these categories
Example - a partial example of an FMEA document
Sheet Protection:
Some sheets are protected. There is no password. 31-Jul-98
Introduction
most attention.
Descriptions
Action Results
Potential P
New RPN
New Occ
New Sev
New Det
S D R Responsibility &
Potential Failure Potential Effect(s) Cause(s)/ r Current Design Recommended
Item / Function e e P Target Completion Actions Taken
Mode(s) of Failure Mechanism(s) of o Controls Action(s)
v t N Date
Failure b
0 0
Coolant Crack/break. Leak 8 Over pressure 8 Burst, validation 1 64 Test included in J.P. Aguire 0
containment. Burst. Side wall pressure cycle. prototype and 11/1/95 E. Eglin
Hose connection. flex. Bad seal. production 8/1/96
Coolant fill. M Poor hose rete validation testing.
0 0
Write down each failure mode 0 Response Plans and Tracking 0
and potential consequence(s) 0 0
of that failure. 0 0
0 0
Risk Priority Number - The combined weighting of
Severity - On a scale of 1- Severity, Likelihood, and Detectability.
10, rate the Severity of each RPN
0 = Sev X Occ X Det 0
failure (10= most severe).
See Severity sheet.
0 0
0 0
Likelihood - Write down the Detectability -0Examine the current 0
potential cause(s), and on a design, then, on
0 a scale of 1-10, rate 0
scale of 1-10, rate the the Detectability of each failure
0 0
Likelihood of each failure (10 = least detectable). See
0 0
(10= most likely). See Detectability sheet.
Likelihood sheet. 0 0
0 0
Page 3
Descriptions
Page 4
System Potential FMEA Number
Subsystem Failure Mode and Effects Analysis Prepared By
Component (Design FMEA) FMEA Date
Design Lead Key Date Revision Date
Core Team Page of
Action Results
New RPN
New Occ
New Sev
New Det
S Potential Cause(s)/ D R Responsibility &
Potential Failure Potential Effect(s) r Current Design Recommended
Item / Function e Mechanism(s) of e P Target Completion Actions Taken
Mode(s) of Failure o Controls Action(s)
v Failure t N Date
b
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Page 5
Severity
None No effect 1
Page 6
Severity
Page 7
Severity
Page 8
Severity
Page 9
Severity
Page 10
Severity
Page 11
Probability
Page 12
Probability
Page 13
Probability
Page 14
Probability
Page 15
Probability
Page 16
Probability
Page 17
Detectability
Page 18
Detectability
Page 19
Detectability
Page 20
Detectability
Page 21
Detectability
Page 22
Detectability
Page 23
Detectability
Page 24
Detectability
Page 25