XEROX CR √ CRLV PS

Programme Page Document No:


Nuvera 1 of 1 UW06525
Part Number Part name Type Value S/S
101E21951-C Guide, Hard Drive Lower 71.1
Originator/ Location/ Department Critical Raised Date
Stephen O'Leyar Major 1/21/2021
Ordinary √

Brief Problem Statement (Max 46 Characters)


Update specifications to match parts off tool (Part-to-Print).

Problem Statement (Clarify gap between ‘What is’ and ‘What Should be’) Measurement
When new vendor made first parts off of the previously used tool, they noticed PDT #
several areas where the parts did not meet the specifications. UMR
1. The edges on the pins were rounded-over. SDR
2. The recycling code protrudes from surface. SDR Code
3. There was flash present on some edges. DPHM
POPO
UMC Delta $
Request
Part Usage
Standard Time
# Failures per Month
Material Continuity
Other (Explanation Reqd)

SOURCE
Partner S/S Test
CRU Life Hallway
ICAT ECAT
Fast Fix CTO
FRDT PVT
ESG Escalation
NASG Escalation
Cost Down/Resourcing
Other (Explanation Reqd)

FIT VALIDATION CODE FIT COMMENTS TEST DAYS

EMC
Date to S/S Team Attachments: Responsible Engineer

Initiating document Phil Quatrano


Reject
Close out document Approval
Close
Task
Accept S/W version Leader
Functional Description
Release Tool design only Tool Manufacture
affected Y/N
Explanation of Disposition Partner Impact
Cut-in Build Block:………………..
Module Number:………………….. Comments: *Note: The UMC/Hard Tooling Impacted on
Date:……………………….……… this CR does not automatically constitute an
Short Run $ Delta:………………… Accept outlined deviations
Soft Tool $ Delta:……………….. adjustment on the set target price. This CR
Lead Time:………………………… will be reviewed with the target review board
UMC $ Delta*:……………………. and you will be notified of the outcome
Hard Tool $ Cost*:………………...
Lead Time…………………………. Partner: X
X……………
……………