Professional Documents
Culture Documents
Problem Statement (Clarify gap between ‘What is’ and ‘What Should be’) Measurement
When new vendor made first parts off of the previously used tool, they noticed PDT #
several areas where the parts did not meet the specifications. UMR
1. The edges on the pins were rounded-over. SDR
2. The recycling code protrudes from surface. SDR Code
3. There was flash present on some edges. DPHM
POPO
UMC Delta $
Request
Part Usage
Standard Time
# Failures per Month
Material Continuity
Other (Explanation Reqd)
SOURCE
Partner S/S Test
CRU Life Hallway
ICAT ECAT
Fast Fix CTO
FRDT PVT
ESG Escalation
NASG Escalation
Cost Down/Resourcing
Other (Explanation Reqd)
EMC
Date to S/S Team Attachments: Responsible Engineer
As a CR, the information on this form is the exclusive property of Xerox Corporation and/ or Xerox Ltd. / Fuji Xerox Co. Ltd.