EPC UPGRADING PRODUCTION FACILITY & DISMANTLING PRODUCTION FACILITY SAMBOJA FIELD

RT STATUS
NO. DRAWING NO./SPOOL NO. JOINT NO. SCH DIA WELDER ORIGINAL R1 R2 RS / RSC RESULT Film Type Film Size REPORT NO.
STAMP Test Date Sht Test Date LOC. Sht Test Date LOC. Sht Test Date LOC. Sht

1 KP 00 P 23 M 001 40 3 01 20/04/20 3 ACC FUJI IX 100 4 X 10 001


120
121
122
123
124
125
126
127
128
129
130
131
132
133
SUMMARY RADIOGRAPHY
EPC UPGRADING PRODUCTION FACILITY &
DISMANTLING PRODUCTION FACILITY SAMBOJA FIELD
DAILY PROGRESS
RT STATUS
REPORT
NO. DRAWING NO./SPOOL NO. JOINT NO. SCH DIA WELDER ORIGINAL RESULT LOCATION DEFECT
STAMP Test Date Sht NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

30
TOTAL : JOINT REP : JOINT