You are on page 1of 9

Line Marking Parameter Information

Units
Parameter

Air Pressure MPa

Press Force kgf

Speed mm/s

Temperature C

Holding Time secs

Machine Condition -

Jig Set-up -

Appearance -
Min Max Actual Setting

0.35 0.65 0.51 MPa

- - 91.11 kgf

- - -

150° 160° 155°

6 - 6 secs

- - No Abnormality

- - No Offset

No Faded / No Excess Line Marking / No Incomplete or


- -
Broken / No Insufficient / No Line Marking
Build # MASSPRO

Evaluation Date 07/14/2023

Record By Jam

FAI# (If Applicable) Appearance

Parameter Description 155°C

Part #1

Part #2

Part Serial Number Part #3

Part #4

Part #5
Appearance

155°C

No Faded / No Excess Line Marking / N


OK
Broken / No Insufficient / No Line

No Faded / No Excess Line Marking / N


OK
Broken / No Insufficient / No Line

No Faded / No Excess Line Marking / N


OK
Broken / No Insufficient / No Line

No Faded / No Excess Line Marking / N


OK
Broken / No Insufficient / No Line

No Faded / No Excess Line Marking / N


OK
Broken / No Insufficient / No Line
xcess Line Marking / No Incomplete or
o Insufficient / No Line Marking

xcess Line Marking / No Incomplete or


o Insufficient / No Line Marking

xcess Line Marking / No Incomplete or


o Insufficient / No Line Marking

xcess Line Marking / No Incomplete or


o Insufficient / No Line Marking

xcess Line Marking / No Incomplete or


o Insufficient / No Line Marking
STRIPPING MACHINE

PROCESS NAME MACHINE NAME

STRIPPING

MAIN AND
SECONDARY JACKET
STRIPPING EXCESS CUTTING
E
MACHINE CYCLE TIME

ELEMENTS 21-Sep REMARKS

Output Monitoring (Time Start) 0.094

Checksheet EPB 0.010

Getting Wire Harness 1.997

Load on Machine 3.980

Machine Start 3.237

Unload on Machine 3.440

Remove Excess Paper 4.670

Visual Inspection 4.533

Load

Align and Clamp

Cutting
ONGOING
Appearance and Dimension Check

Returning harness on rack

Erp Transaction

Output Monitoring (Time End)

TOTAL CT 22.0

TARGET CT 28.0

CT GAP 6.04

UPH 320

TARGET UPH 127

UPH GAP 512

MC QTY / HC 2
Line Marking (AFTER)
MACHINE CYCLE TIM

PROCESS NAME MACHINE NAME


ELEMENTS

PRODUCT CHECKSHEET

BRACKET ASSEMBLY

BRACKET CRIMPING AND LINE MARKING


BRACKET ASSEMBLY UNLOADING ON MACHINE
AND LEAK TEST,
BRACKET ASSY
CIRCUIT TEST, LINE
MARKING VISUAL AND AIR BLOWING

OUTPUT MONITORING

ERP COMPLETE

TOTAL CT

TARGET CT

CT GAP

UPH

TARGET UPH

UPH GAP

MC QTY / HC
MACHINE CYCLE TIME

14-Jul REMARKS

0.010

13.600

22.357

5.793
OK
2.180

0.139

0.061

44.1

58.8

14.63

80

61

19

You might also like