Students must finalize their storyboards before filming their foundation portfolio production. They need to create a production schedule detailing what resources are needed, the dates they are required, and who is responsible. This schedule and images of the storyboards must be shared on a blog to help prepare for filming on January 10th.
Students must finalize their storyboards before filming their foundation portfolio production. They need to create a production schedule detailing what resources are needed, the dates they are required, and who is responsible. This schedule and images of the storyboards must be shared on a blog to help prepare for filming on January 10th.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online from Scribd
Students must finalize their storyboards before filming their foundation portfolio production. They need to create a production schedule detailing what resources are needed, the dates they are required, and who is responsible. This schedule and images of the storyboards must be shared on a blog to help prepare for filming on January 10th.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online from Scribd
your foundation portfolio production. Storyboard Finalised Your storyboard(s) needs to be finalised and checked before you have permission to film.
Every shot needs to have a single storyboard
frame, including editing shots such as titles and credits. Production Schedule Share your individual production schedule with the rest of your coursework group. Compile a production schedule making sure that you have a what you need, when you need it and know who is responsible for it:
What? When? Who?
e.g. Actors e.g. 17.01.10 e.g. Mantas Blog Update 1. Create a blog post of an image of your storyboard.