You are on page 1of 11

Name of Topic

Student Names

UNIVERSITY OF MUMBAI
Thakur College of Engineering & Technology, Mumbai.

2010-2011
Project Name

PREPARED BY:

Submitted in the partial fulfilment of the requirements of PROJECT II

For the award of

Bachelor of Engineering degree

In

COMPUTER ENGINEERING

To

UNIVERSITY OF MUMBAI

Through

Thakur College of Engineering & Technology, Mumbai.

In

2010-2011

2
3
CERTIFICATE

This is to certify that the report titled

“Project Name”

Submitted by

Student Names

Embodies the bonafide work done at

Thakur College of Engineering & Technology, Mumbai


by them under my guidance and supervision.

Signature of internal guide


Name :
Designation :
Date :

This is to certify that

Student Names
Have satisfactorily completed the requirements of the
Term Work OF PROJECT II
as prescribed by the

University of Mumbai.

4
Project Coordinator HOD - CMPN Principal
(Prof. Sheetal Rathi/
Prof.Shiwani Gupta) (Prof. Rahul Khokale) (Dr.B.K.Mishra)

This report has been examined by us as per the University requirements at


TCET, Mumbai on _______________

Signature……………………… Signature…………………….

Name………………………… Name…………………………

Internal Examiner External Examiner

5
ACKNOWLEDGEMENT
CONTENTS
CHAPTER SECTION TOPIC PAGE NO.
NO. NO.
Acknowledgement 05
Abstract 06

1. OVERVIEW
1.1 Project Specification 07
1.2 Literature Survey 08
1.3 Selection Criteria Of the Task 10

2. ANALYSIS and DESIGN


2.1 Requirement Analysis 14
2.2 Feasibility Study 18
2.3 Design Development(DFD,UML,Flowchart) 19
2.4 Technology and Software Details 21
2.5 Project Planning 22

3. PROJECT DESCRIPTION 23

4. PROJECT IMPLEMENTATION
4.1 Coding of Technical part of the project 25

5. SCREENSHOTS 30

6. PROJECT TEST REPORT


6.1 Black Box Testing Report 43
6.2 White Box Testing Report 43

7. RESULTS AND DISCUSSIONS 44

8. CONCLUSION
8.1 Conclusion 45
8.2 Proposed Future Work 46
9. REFERENCES 52

6
ABSTRACT

OVERVIEW

1.1 PROJECT SPECIFICATION

1.2 LITERATURE SURVEY

1.3 STUDY AND ANALYSIS

1.4 SELECTION CRITERIA OF THE TASK

ANALYSIS and DESIGN

2.1 REQUIREMENT ANALYSIS

2.1.1 Data Requirements


Input :

7
Processing:

Output:

2.1.2 System Requirements Specification (SRS)

1. Introduction

1.1. Purpose:

1.2. Scope:

1.3. Definitions, Acronyms and Abbreviations


1.4 References:

1.5. Overview

2. General Description

2.1. Product Perspective

2.2. Product Functions

2.3. User Characteristics

2.4. General Constraints

2.5. Assumptions and Dependencies

8
3. Specific requirements

3.1. Functional Requirements

3.2. External Interface Requirements

3.3. Performance Requirements

3.4 Design Constraints

3.5. Attributes

3.6. Other Requirements

2.2 FEASIBILITY STUDY

2.3 DESIGN DEVELOPMENT (DFD, UML, FLOWCHART)

2.4 TECHNOLOGY AND SOFTWARE DETAILS

2.5 PROJECT PLANNING


2.5.1 Gantt Chart:

PROJECT DESCRIPTION

9
PROJECT IMPLEMENTATION

4.1 Coding of Technical Part of the Project

SCREENSHOTS

PROJECT TEST REPORT

METHODOLOGY USED FOR TESTING

Unit testing:-

6.1 Black box testing: -

6.2 White box testing: -

RESULTS AND DISCUSSIONS

10
CONCLUSION

8.1 CONCLUSION

8.2 PROPOSED FUTURE WORK

REFERENCES

Text Books:

Web Resources:

11

You might also like