INSPECTION AND TEST PLAN

INSTALL CONDUITS IN CONCRETE SLABS OF FLOOR LEVEL 1


SYSTEM: CONDUIT INSIDE CONCRETE LOCATION: Floor Level 1 SPECIFICATIONS: As Spec. DRAWINGS: ELC/SOC/001 Preliminary 1 2 3 4 5 6 7 Installation 8 Check arrangement of conduits acording to layout drawing according to axis( ., .) Locating position, check Invert levels and depth of burial for conduit Install conduit under floor slabs complete Fixed all conduit under floor slabs complete Install and fixed waiting box under floor slabs complete Check all conduit f20,f25 install conduits in concrete slabs finished (Minimum cover, Conduit size, Bends) Draw cords (Polypropylene cord) Marking Work Task Folder prepared. Shop Drawings issued, approved and attached. Materials/ Equipment approved and & record avail. Technical schedules issued, approved & attached. List of materials and tools available. Safe Work Method Statement complete & avail. Toolbox Meeting has been held for activity. axis( ., .. ) NSC: TECHGEL CONTRACTOR: IREKA CLIENT: DELTA ATTACHMENTS: NSC Yes No

PROJECT: City International Hospital PACKAGE: Electrical DATE: 21-Nov-2011 NO.: REV: PAGE: NAME: NAME: NAME: ITP/ELC/COD/001 0 01 of 01

Contractor Yes No

Client Yes No

Remark

According to techinical specification for the electrical sevices.

9 10 11 12 13

14 15

Testing & Commissioning 16 17 Check installation works final complete Assured for pour concrete TECHGEL by Name: Position: Signature: IECVCL by

According to techinical specification for the electrical sevices.

Engineer's Rep. by

Distribution Original to ___________ Copy to Contractor (_____ copies) Copy to Client __________ (_____ copies).