Professional Documents
Culture Documents
Alpha Project
Toluca, Mexico
Covid 19:
All ventilation systems shall be designed in a way that it is minimizing covid / other germ impact (no
recycling air, filter / sanitation with UV light where needed, separation of compartments, etc.)
Acknowledged. The proposal includes filters MERV 13, air renewal and outside air intake to minimize
COVID.
All door and window knobs shall be of germ-killing material (for example copper or other disinfectant
or self-opening / closing) Acknowledged and confirmed (Door handles are standard, not made of
copper or any other special material against viruses and bacteria).
1 Overview
A greenfield building is planned in Toluca, Mexico. The campus includes:
A building manufacturing plant of approximately 14,186 m2 area building to be located adjacent to existing
Client Facility, which includes production area, warehouse, docks, offices, canteen, service rooms and labs
area. Included
Before applying for a building permit, you should send the design to the corporate insurer and obtain a
confirmation that the design meets their requirements. Acknowledged and Confirmed
Developer will provide all design and construction services to build an expansion manufacturing facility
including material, labor, tools, equipment, provisional equipment, provisional utilities and coordinate the
various activities required for the type of disciplines mentioned in this document. Included
Plant should be located adjacent to existing client Facility Proposed site is at 2.1 kms, 5 min driving range
The scope of projects shall also include
o Architecture and Engineering Included
o Construction Permits Included, management, licenses/permits and municipality contribution
auditable are considered in the Lease Proposal
o Temporary utilities and services for construction Included
o Bonds and Insurance Included
o Site work Included
o Energy permits and contracts kVAs to be paid directly by Tenant, cost of Infrastructure nor
contributions to CFE are considered. Any management, procurement and/or payments related to
kVAs capacity and/or connection to utilities, including electricity, shall be performed/paid directly
by Tenant to the utility provider, to the Industrial Park, CRE or CFE.
o Some sample products for typical used materials Included
o All needed building management and supervision Included
o All not included design / evaluation work must be detailed Included, ZF must assist and provide
information throughout the detailed design process, any additional scope that is not considered in
this document will be handled as a Purchase Order
o All potential environmental impacts like earthquakes, flooding, and other location risks Included
o Foundation works to necessity of design and location Included
Generally, all relevant national rules and regulations have to be considered in the offer. All materials must
have the official registration in Mexico (free of poison materials). Therefore, the equipment has to be
designed with regard to safety, light, emission, noise and environmental requirements according to
specific country standards. Acknowledged
Inbound logistics
The logistics area consists of 14 inbound loading docks (cross dock), 1 grade level, 2 waste recovery docks
14 inbound loading docks included (cross dock, 7 on each side), 1 grade level, 2 waste recovery docks
Please consider enough space for truck operations and maneuverability Included
Consider closest park road circulation (Exit/Entrance) Access and Exit through Industria Minera Street, as
indicated on the layout.
Back loading platforms for incoming goods must be designed accordingly. Included
2 Functional Requirements
One production and storage building, without basement, consists of a production hall with a
usable floor area (building footprint) of approximately 14,186 m2 production, warehouse and
office for plant staff. Included, whole facility consists of 14,186 sqm
Steel construction. Foundation to be reinforced concrete monolithic reinforced concrete pillars,
concrete floor slab, insulated metal panel walls, insulated metal roof Included, concrete piles,
concrete floor slab 20 cms (excluding offices and utility rooms whole axis which is 10 cms), Walls:
Single metal sheet TR 101, Roof: Standing Seam KR-18, 2” insulation blanket
Breakdown of the building into fire zones: Included, Sprinkler System in Production Hall and
Warehouse compliant with NFPA Standards. Fire Zones as equivalent to American/National Standards.
The following fire zones of the building should be provided:
• Production hall (PM) with a fire load of ≤ 500 MJ / m2, Included (equivalent)
• Warehouse fire zone (PM) with a fire load of ≤ 4000 MJ / m2, Included (equivalent)
• Fire zone of office in plant Included
• Transformer station fire station and low and medium voltage switchgear, Included
• Compressor fire zone Included
• Server room fire department in switch rooms Included
Fire protections to be designed and later reviewed and approved by corporate insurer company and
follow local design and construction codes. Acknowledged, ZF to confirm which system must be
followed, whether NFPA, FM Global or Local Codes. According to insurance company requests and
premium. – NFPA Local Codes included
3.1 General Requirements for the Manufacturing Facility
Usable floor area: about 14,186 m2 (production, warehouse, logistics) Included, whole facility consists of
14,186 sqm
Expected construction span (dimensions in column axes): 15.24m x 15.24m or similar (50’x50’) Considered
span (dimensions to column axes): 15.24m x 15.24 m (last axis of 14.00m x 15.24m)
Hall height: 10 m from the floor to the ceiling (No special high bay requirement) Considered free height on
sides in Base Proposal 9.50m ZF- 10m free height Free Height of 10.00 m on sides is considered.
Around 200 people can be in the hall during the shift change over. The maximum number of people on the
largest shift change-over can be 100 people Included
Sanitary nodes with separate sanitation facilities for women and men should be provided. We assume a
65%/35% split (men/women) but it needs to be flexible to adapt easily, based on 100 occupants Included
Partition walls made of gypsum plasterboard on metal grid 100 in SINIAT system or similar, full height,
double plated. Avoid creating horizontal flat surfaces where dust may accumulate Included SINIAT or
similar
2.8 Kitchen/Canteen
Include approximately 100 m2 for industrial kitchen next to canteen area. Included as equipment and
mechanical guide for 100 people, considered in the Office Area. ANSUL Fire suppression is not included, Fire
suppression excluded only in cooking area.
The canteen of approximately 250 m2 includes a food distribution for the employees and a lounge for about
100 people where the employees can eat. Included as equipment and mechanical guide for 100 people,
considered in the Office Area
Generally, we will follow the national rules and regulations / requirements (quantity). Acknowledged
3.2 Windows
Windows office area:
Client standard/aluminum Included
Double glazing isolated windows () Included as double-glazing isolated windows, Tilt and Turn system
not included
Inside sun protection (anti-glare shield). Not Included
3.3 Doors
Entrance office: automatic door in storefront system Included
Entrance production hall: hollow metal with glazing, brand to be defined Included
Office doors: wood, brand to be defined Included – Production door will have glass, Office door Not
Included
Floor doors: Client standard, aluminium/stainless steel frame with glass -Included
Toilets doors: materials and/or brand still have to be defined after sampling. Included as enamel steel
Fire protection doors according to national rules and regulations. Included
3.5 Floor
Office part ground floor: Reinforced concrete floor slab for service load 5kN/m² Included
Office part upper floor: Reinforced concrete floor slab or similar for service load 5kN/m Included as offices
in ground floor level only, upper floor is not required
In the hall and the support area the finishing Polished concrete Ashford finish Included
Office: Porcelain tile, 50x50 cm, color and grout to be selected Included
Locker room, canteen, kitchenette, corridors: Porcelain tiles, 50x50 cm, color and grout to be selected (no
PVC flooring) Included
Toilets and washroom: Porcelain tile, 50x50 cm, color and grout to be selected Included
Service Closet for janitorial service: polished concrete Included
Tool Room, 1.5 mil of Epoxy coating (No ESD requirement). Included
3.6 Ceiling
• Toilets: Suspended ceilings - Armstrong 1200x60cm on Armstrong Prelude 24 ceiling. Armstrong moisture
resistant ceiling tiles or 100x100mm ceiling hinges from Color System, with recessed LED light fixtures
Included, Armstrong or similar products and brands
• Canteen: Suspended ceilings - Armstrong Ultima + OP 1200x60cm on Armstrong Prelude 24 ceiling.
Included, Armstrong or similar products and brands Armstrong Ultima white or 100x100mm ceiling hinges from
Color System, with recessed LED light fixtures
• Ceiling office: Suspended ceilings - Armstrong Ultima + OP 120x60cm on Armstrong Prelude 24 ceiling.
Armstrong Ultima white or 100x100mm ceiling hinges from Color System, with recessed LED light fixtures
Included, Armstrong or similar products and brands
• Ceiling conference and meeting rooms: Suspended ceilings - Armstrong Ultima + OP 1200x60cm on
Armstrong Prelude 24 ceiling. Armstrong Ultima white or 100x100mm ceiling hinges from Color System, with
recessed LED light fixtures Included, Armstrong or similar products and brands
3.7 Construction
3.8 Roof
Provide insulated metal roof system in accordance local regulations. Included, Standing Seam roof KR-18,
2” insulation blanket
The roof should be provided with light-emitting polycarbonate luminescence skylights min 3% or better
with current technical approval and fire classification and fall protection. Included 3% to be considered
Roof drainage - gravitational, spheroidal cast iron pipes or HDPE pipes. Included as metal sheet
downspouts
Provide emergency overflow openings. Included
Provide stair for access to the roofs of buildings for maintenance. Included
Roof must contain perimeter fall protection. Provide fixed points for fixing fall protection devices from
height during building maintenance and facade cleaning. Included, however it is not a certified fall
protection system
Provide a faucet with running water on the roof of the hall. Included
Rainwater collection system to support landscaping irrigation Included
Access control card system. Construction only takes care about the power & network interface to the different
access points. For CCTV, BMS, Automation, Access control and other Special Systems only empty conduits are
considered.
4 Technical building equipment
4.1 Heating system (not required)
4.2 Air condition and ventilation system
HVAC System
Use chillers for heating Not Included
o Either reversibly as heat pump during cold season or by using waste heat from chiller for heating Not
Included
Low temperature heat distribution system for high efficiency and to all the use of renewable energy sources Not
Included
Store and boost heat to cover infrequent, low heating demand. Store waste heat in storage tank, add heating
rod in the storage tank to boost temperature via electric energy if needed Not Included
Warm water: use decentralized, effect electric water heaters for restrooms. If larger amounts of warm
water are required, install solar thermal panels or PVT collectors to provide the necessary heat Not
Included
Main components of the heating system must be exchangeable without construction/demolition impacts to
building structure Not Included
Cooling Network
Stainless steel distribution pipe system (diameter <DN65) with 50-200% mineral wool insulation Carbon
steel insulated pipe loop (supply and return) / Includes pumping equipment
Four pipe system for radiant surface heating/cooling Carbon steel insulated pipe loop (supply and return) /
Includes pumping equipment Not Included, the carbon steel insulated pipe loop is for process water
(supply and return), including the chiller.
Hydraulic balancing Not included – CHUFANI WILL REVIEW Not Included
For warehouse area and Production hall ventilation on washed air systems with approximately 6 ACH.
Temperature according to national rules and requirements. According to this specification, please provide
an optimized suggestion for cooling in summer with proper hall ventilation. Included
Offices with air conditioning Included
Metrology lab and special rooms with PAC’s at minimum 19°C +/-1.5°C, humidity 45% +/-15%. Included
The loading from the technical equipment for ventilation, air conditioning and cable for the machines are
important. It is to account for the frame and static. Included in design
Mechanical ventilation for social rooms is mandatory and has to be considered according to the national
rules and regulations. Included in design
Overpressure ventilation in locker rooms, under-pressure ventilation in toilets (only if national rules and
requirements are not contrary to this specification) The proposal includes exhaust in toilets and lockers.
AC control requirements: zoning necessary, centralized digital controlling and timer. Included
Metering and automation – Concept
Metering structure supports transparent energy monitoring and includes at least the following:
o Entrance meters Not Included
o Separate metering on all machines Not Included-
o Separate metering for large energy consumers, renewable energy assemblies, air compressors Not
Included
o Lighting and use electricity consumption per building unit (i.e. office, warehouse, etc.) Not Included
Energy consumption metering for renewable energy produced on site (i.e. PV) Not Included
Building automation levels Not Included
4.2.1 Cleanliness
NOT USED, Not Included
Cold water supply ring for feeding production lines with water pumps and isolated cold-water tank cooled
by one 150T chiller (Carrier 30RBF15065-L0-3), (valve drops and amount to be defined according to
layout)
Included, 150-ton chiller Carrier 30RBF15065-L0-3.
Included, C-40 Carbon Steel pipe with seam and insulation for the cold-water ring that feeds the
production lines is considered. Automation and control for cold water is not considered.
4.3.5 Rainwater
• Follow the national rules and requirements. Included
Roof drainage - gravitational, spheroidal cast iron pipes or HDPE pipes. Included as metal sheet
downspouts
Collect and store rainwater for use in irrigation system Rainwater collection system is Not considered to
be reused in irrigation
4.4 Fire protection system The fire protection is according to national standards and NFPA 13 & NFPA 20. In
rack sprinklers are not included. The proposal for IT includes a fire suppression system with FM 200. The
proposal includes storage tank and pump for fire protection system.
Fire protection design (i.e. sprinkler, fire alarm system, smoke extraction, etc.) according to local
regulations and standards. Included
The new building must have a fire protection concept that considers all details for the approval process.
Minimum requirement is a central and automatic fire/smoke detection and alarm system, with fire
protection sprinklers. Control room is at the guardhouse. Included
Ceiling sprinklers in suspended ceilings, in accordance with NFPA 13, latest edition. Included
Verify Industrial Park FP system and capacity Since proposed site is not inside an Industrial Park, Fire
Suppression Tank, Pump Room and Pumping Equipment are considered.
Sprinkler system in Hall compliant with NFPA standards Included
Avoid in-rack sprinklers in warehouse. In-rack sprinklers are not included
Installation of internal hydrants, DN 52 with hose flat folded. Included
Building with connection to the industrial park centralized fire protection system. Since proposed site is not
inside an Industrial Park, Fire Suppression Tank, Pump Room and Pumping Equipment are considered
Installation of sprinkler and sprinkler system monitoring with control devices for pump control panel, flow
sensors and valves in sprinkler control and alarm systems, as well as actuators in fire (fire doors, smoke
extraction, access control, crane fire). The installation should also include fire detection in areas not
covered by the sprinklers. It should also be equipped with Hand Fire Switches (pulls stations) on
evacuation routes. Installation must be approved by local state regulation. Included
Exterior circumference fire piping system and external hydrants Included
Fire road in accordance with the local regulation Included
Production Hall - Install compressed air ring from 6” Aluminum pipes on both sides (twisted or clamped) in a
main ring system with a pressure of 8.5 bar on each connection. The spacing and location of the
connections should be adapted to the production technology. 6” black iron Loop is Included (only piping),
however compressors nor any equipment is included.
Compressors room
A space of at least 135 m2 with access from the building and direct access from the outside. The pressure of
the compressed air on the end connections in the production hall should be 8 bar. Compressor Room is
Included
Grounding in both IT rooms lockable door, stable fire and intrusion proof walls all around Included
in IT Room and in Server Room
Dedicated climate control Included
Air conditioned (duplication machine/redundancy 2x 100%) with relative humidity control < 30 -
50%). Monitoring of the air-conditioned system has to be fulfilled and alarms have to be sent to
the security department (guard). The temperature shouldn’t be over 21 degrees. Waste heat
server ~5.000 watt; backup ~3.000 watt. The actual temperature is 21°C under full service to
calculate. Air conditioned, duplication/redundancy included in Minisplit equipment. Precision
equipment included. Alarm system is not included. (Precision equipment was not included) –
Included Liebert Equipment
Fire protection system per FM 200 or FM 300 Included FM200
No-raised floor, but only raceways on top of racks Included
Racks according standard Not Included
Non-production / clean power lines Power lines coming into the IT and Service Room are Included
If there are two independent power providers, both power lines are needed in both rooms (if
applicable) Not Included
A corresponding UPS for the IT active devices Included only one UPS 30KVA for 5min at full load.
To determine if 2 x 15 kVA UPS can be considered Two (2) IT Rooms considered.
4.6.4 Further ICT requirements For CCTV, BMS, Automation, Access control, IT and other Special Systems
only empty conduits are considered. As agreed on technical meeting with ZF.
The following elements will be described in a separate document or decided at a later stage in the project:
Further requirement for rooms
Telecommunication system
Interphone system
Electro acoustics frame
TV- and antenna installation
Alarm system
Fire alarm system
Power grid
Frame
Power plant
4.6.5 General
35.4KV main cables should come in from the electrical utility to mid-voltage electrical substation. 1 x 2,500
KVA pad Mounted three phase PROLEC Transformers 34500V-480/227V (parallel), installation of HV and LV in
accordance with local electric utility and Client. The space for HV and LV equipment has to be considered. The
power factor shall be 0.95 or better. Transformer of 1,250 kVAs is Included. The protection for HV Feeder is
only for an initial load of 1,250 KVA. However, transformers, automatic recloser and all infrastructure needed
for future load is not Included. The additional kVAs needed for future load will also be provided by the Tenant.
Any management and/or payments related to the kVAs capacity and/or connection to utilities, including
electricity, will be paid directly by the Tenant, either to the service provider in question, the CRE or the CFE.
Consider preparation for another two more transformers of 2,000KVA type to reach out a max cap of 6500
KVA. Transformer of 1,250 kVAs is Included. The protection for HV Feeder is only for an initial load of 1,250
KVA. However, transformers, automatic recloser and all infrastructure needed for future load is not Included.
The additional kVAs needed for future load will also be provided by the Tenant. Any management and/or
payments related to the kVAs capacity and/or connection to utilities, including electricity, will be paid directly
by the Tenant, either to the service provider in question, the Industrial Park, the CRE or the CFE.
The interface between the power installation building and equipment is the power cabinet around the
production (is to be specified later in the drawings). All HV and LV equipment must be equipped with power
meters and software for visualization (Janitza meters with Grid Vis business http://www.janitza.com/products-
solutions.html) DIN Rail mounted only. Metering for energy consumption is Janitza Not Included (Note Leed
Cert) (For CCTV, BMS, Automation, Access control, IT and other Special Systems only empty conduits are
considered. As agreed on technical meeting with ZF.)
Electrical – Concept
Locate transformers, switchgear and low voltage main distribution on ground floor as close to main feed as
possible Included
Peak load management with energy ud > 10 GWh/a Included 5 charging points, the charging units are not
included since we do not have enough information
Install electric charging points for X% of car parking space, where X is the projected national market share
of EV at time of planning Included 5 charging points, the charging units are not included since we do not
have enough information
o If X<1 or no information is available, install at least one charging point Included 5 charging points,
the charging units are not included since we do not have enough information
o No more than half shall be installed on parking spots reserved for customers and visitors Included 5
charging points, the charging units are not included since we do not have enough information
Electrical – System
Electrical system must fulfill energy efficiency class EIEC4 Included
Transformers: use cast resin transformers Not Included
Connect switchgear to BMS Not Included connection for JANITZA meters. (For CCTV, BMS, Automation,
Access control, IT and other Special Systems only empty conduits are considered. As agreed on technical
meeting with ZF.)
Electrical – Network
Installation: Vertical installations in cable ladders, horizontal installations in cable trays/ladders Included
Use copper cables Included on base proposal, Value Engineering to change main feeders from copper to
aluminum
Pre-install empty conduits for electric charging for at least 50% of all parking rows. 5 spots Included
o No more than half shall be installed in parking reserved for customers and visitors
Included
Provide 25% spatial reserve in all cable trays/ladders Included
Lighting
All LED lighting: includes interior and exterior Included
Lighting must be centrally controllable (linked to BMS, includes lighting controls, occupancy sensors,
daylight sensors) Not Included. For CCTV, BMS, Automation, Access control, IT and other Special Systems
only empty conduits are considered. As agreed on technical meeting with ZF.
Lighting must be manually controllable Included
4.6.9 Emergency lighting according to International Building Code and local regulations Included
according to local regulations
4.6.10 Plant Power
The interface to the production equipment is the power line to LV cabinet. (Location will be decided later
4.7.1.). All LV drops must be equipped with electrical meters and software for visualization. Included
There is no machine connection in the build to lease contract. On each second column around the plant an
electrical box has to be installed. Included duplex 110V power outlets
Same in the maintenance area and where the forklift charging station is located (Total approximately 4
locations). 4 @480V 28.8A Max In Current Charging Stations for 24/36/48/72/80V DC Out Voltage. Included
Building Transformers
Building transformers to be located in individual interior transformer vaults, medium voltage switchgear
and low voltage switchgear, Included, substation of 1,250 kVA. The protection for HV Feeder is only
for an initial load of 1,250 KVA.
The assumed power consumption is 4.5MW. medium voltage lines will be supplied to the building.
Included, substation of 1,250 kVA. The protection for HV Feeder is only for an initial load of 1,250 KVA.
It should be foreseen:
o Medium voltage switchgear fully equipped to served initial loads and future loads.
Transformer of 1,250 kVAs is Included. The protection for HV Feeder is only for an initial load
of 1,250 KVA. However, transformers, automatic recloser and all infrastructure needed for
future load is not Included (only included civil works preparations). The additional kVAs
needed for future load will also be provided by the Tenant. Any management and/or payments
related to the kVAs capacity and/or connection to utilities, including electricity, will be paid
directly by the Tenant, either to the service provider in question, the Industrial Park,the CRE or
the CFE.
o Low Voltage Pad Mounted three phase PROLEC Transformers 34500V-480/227V Included,
substation of 1,250 kVA.
Table showing the electricity demand by year Acknowledged, ZF will buy directly the rights for kVAs, therefore
all obtention and connection procedures must be done directly by ZF. Cost of kVAs to be paid directly by ZF.
Low voltage switchgear: Fully equipped to serve all building loads (Main distribution panelboard with Main
breaker 2500 KVAS type Masterpack NW type 480/277 VOL, 3000A, 65 KA, protection unit 6.0. The number of
total feeders in each section to be confirmed. Included
Powering the server room with the generator set. Included
The possibility of connecting the generator to the power supply of the plant. Included
Possibility to monitor real-time average power consumption (energy meter from Janitza) Included
Two double duplex receptacles 120V (127V) with different power circuits (IT and general) per each 8 m² office
or workplace. Included
One double duplex receptacle per every second column in hall. Included duplex 110V power outlets
Provide conduits, raceways, and pathways for IS low voltage cabling and 110V computer receptacles,
including floor boxes in the meeting room floor. The investor specifies how to approach the floor in
conceptual design. Included
4.6.12 Illumination system All lightning is LED Cooper lighting brand, according to lighting Lux
requirements
All lighting must be LED. Design and specifications shall follow Recommended Practices as published by
Illuminating Engineering Society of North America (IESNA) and Client requirements. Included
Plantwide LED lighting must be used, for high bay (> 9m), production (< 9m), outside (Walls, Driveway and
Parking Lot). Fixtures installed outdoors shall be rated for wet location. Included
Lux requirement according to german specifcations (ArbStättV, section 4 ASR7/3) different requirement
according to national rules and regulations. Included as per local specifications and regulations
Lighting in Offices, hallways and Meeting rooms LED ceiling lighting (use supplier list and LED product from
Client, Verbatim as used on current building or Client approved North American manufacturers) Included,
Verbatim or similar brands or products
All social rooms must be equipped with LED lighting. LED light catalogue from approved list and
equipped with motion sensors. If not available in similar quality, pricing, and warranty local products.
Included
Entrance area: LED spots ceiling lights, approved North American manufacturers. Included
For the logistic area consider consider High Bay luminaires (Verbatim high bay as current building, or
Client approved North American manufacturers). Included, Verbatim or similar brands or products
Production Area lights must be zoned. Please consider the required amount of light switches. Included
Lighting in min. six zones (one truck = one zone) with six light switches for logistics area. Included
Hallways & Walkways: 150 LUX Included
Break room: 100 LUX Included
Toilets, washrooms: 100 LUX Included
Locker room: 100 LUX Included
Production area: 300 LUX LED; generally rule for hall: high beam > 9 m, LED light band < 9m both
equipped with DALI ballast (incl. in lights) and DALI bus system in productive areas switch
gears/electrical cabinets. Included. For CCTV, BMS, Automation, Access control, IT and other Special
Systems only empty conduits are considered.
Logistic area and walkways: 250 LUX Included
Technical rooms: 200 LUX Included
External areas: facade and column luminaires, the intensity off illumination according to functional use of space
and local norms. Included as per local norms and regulations
Site Security
The buildings shall be designed and constructed of materials which resist unlawful entry including the
employees’ parking lot. The perimeter security shall be installed according to security advice based on the
risks identified in the site security risk assessment and local park regulations. Included
Neighborhood Security fence 180 cm. The fencing is to be constructed as such to avoid climbing over or
crawling under. Included
Perimeter signage – Premises shall be posted with signs warning against unauthorized entry. No
trespassing signs installed on the perimeter fencing. Included
In case of new fences, steel wire fences must be used if need be for increased security demand. Included
Perimeter security zones to patrol visually entire perimeter with no blind spots. For CCTV, BMS,
Automation, Access control, IT and other Special Systems only empty conduits are considered. As agreed
on technical meeting with ZF.
Client site must be secured stringently and reliably from unauthorized access, either by staff or technical
devices. The planning and design of the external shell needs to prevent unauthorized access.
Acknowledged
2 Security building separate access (2 sides) for truck and employee including amenities (toilet) for truck
drivers. (Guard room at the entrance with a control center for firefighting and other safety requirements)
Only 1 guardhouse is included, which will monitor heavy traffic and vehicle access.
1 Security building separate access (2) sides for employee and visitor entrance including amenities (toilet)
for guards Only 1 guardhouse is included, which will monitor heavy traffic and vehicle access.
Turnstiles for employees with badge access Turnstiles are Not Included. For CCTV, BMS, Automation,
Access control, IT and other Special Systems only empty conduits are considered. As agreed, on technical
meeting with ZF.
Visitor workers excluded from plant area with fence and turnstiles released by a staff card. For CCTV, BMS,
Automation, Access control, IT and other Special Systems only empty conduits are considered.
Electrical connections for signs and CCTV cameras. For CCTV, BMS, Automation, Access control, IT and
other Special Systems only empty conduits are considered.
External lighting of building and perimeter with LED Included as per local norms and regulations
Parking Lot
Parking spaces for cars, total of 60 slots including 3 larger slots for disabled people, 5 slots for hybrid or
electrical car with electricity plug (high voltage) and 10 slots for visitors. Included, as per layout and local
regulations.
Min 2” asphalt and 8” thickness for base, or as required per soils report. Included,
Rubber bumpers at handicap stalls. Handicap Signs Yellow traffic paint. Tack Coat 1.5 lt/m2 and Asphalt
paving 5cm thick. Included,
Curb: Will be concrete f´c=200 kg/cm2, reinforced with 900 gr/m3 polypropylene fiber. Included,
Sidewalks: 4" (100mm) thick f’c=200 kg/cm2 TMA 3/4" concrete floor sidewalk, reinforced with 900 gr/m3
polypropylene fiber, 1.5 to 1 Max relation for control joints. Included,
Pluvial water All discharges of rainwater are directed to a retention well through asphalt pavement, and
then the water will be filter to subsoil, the dimensions will be designed. Included,
Outside cameras (CCTV) are installed according to Client safety requirements. For CCTV, BMS, Automation,
Access control, IT and other Special Systems only empty conduits are considered. As agreed on technical
meeting with ZF.
Exclusions, Deviations and Clarifications
Steel Structure
The finishing for the steel structure is Primer only.
Skylights approved to fire classification and fall protection.
Plumbing
Roof storm downspouts with HDPE pipe are not included. The pluvial downspouts will be of
sheet metal
Rainwater collection system is not considered to be reused in irrigation
Process drainage not included
Electric water coolers with bottle filling stations (filtered) are not considered, i.e. Elkay EZh20
It is not considered a standard system for providing drinking water to employees (ie, a reverse
osmosis treatment system) on all drinking water supplies
Does not consider softener, reverse osmosis to cooling water that will be used in production
and don´t comply with PH and hardness
Clarification. C-40 carbon steel pipe with seam and insulation for the cold-water ring that feeds
the production lines is considered
Automation and control for cold water is not considered
The supply and installation of air compressors & accessories is not considered
The cost per natural gas measurement and regulation station is not included. This must be
provided by the Gas company with which the user makes the contract
It is not considered an exclusive open channel for rainwater
Is not considered retention well for stormwater discharges from roads and roofs
Electrical
The protection for HV feeder is only for an initial load of 1,250KVA
Tenant will be responsible for purchasing the rights of kVAs, which will be used by Tenant at
the Leased Property. Any procurement and/or payments related to kVAs capacity and/or
connection to utilities, including electricity, shall be paid directly by Tenant to the utility
provider, CRE or CFE. Transformers, restorer station and all infrastructure needed for future
load is not Included. The additional kVAs needed for future load will also be provided by the
Tenant. Any management and/or payments related to the kVAs capacity and/or connection to
utilities, including electricity, will be paid directly by the Tenant, either to the service provider in
question, the CRE or the CFE.
The feeder for busbar is considering maximum distance of 64 mts from the main panel
The industrial luminaries are Cooper lighting
Metering on all machines and renewable energy assemblies is not included
Energy consumption metering for renewable energy produced on site is not included
Metering for energy consumption is 10 devices Janitza model UMG-512-PRO
Feeders for electric water coolers are not included
Electrical feeders for pumps for rainwater and irrigation system are not included
Independent power providers lines not included. This is not applicable since the power provided is CFE.
The High Voltage Janitza power meter is not included
Cast resin transformers are not included
On each second column around the plant included duplex 110V power outlets
All Lighting is LED Cooper lighting brand
The HV line with two incoming points/redundancy is not included
Electrical connections for signs and CCTV cameras are not included, only empty conduits
HVAC
The proposal includes filters MERV 13, air renewal and outside air intake. To minimizing COVID.
The proposal includes exhaust and injection to kitchen. The kitchen includes air curtain.
The IT Room includes mini split and back up. The minisplit considered has a redundancy/double
functionality. No HVAC is considered for service room adjacent to IT. – Liebert Equipment Included
The proposal includes Tool room a precision equipment to obtain 19°C ±1.5°C, humidity 45% +/-15%.
The proposal maintenance shop area includes package unit
Chemical room does not include any HVAC system.
The exhaust system includes 6 CPH include exhaust and louvers.
Included: 150-ton chiller + C40 Carbon Steel insulated pipe loop (supply and return) / Includes
pumping equipment. Only ventilation is considered (6 CPH), Offices do include air conditioning, as well
as special rooms. The proposal includes equipment to obtain 19°C +/-1.5°C, humidity 45% +/-15% for
metrology and tools room. The proposal includes exhaust in toilets and lockers. In the hall between
offices and toilets include grills to supply air conditioning to hall at toilets. Doesn’t include dehumidifier
for cooling system. To be quoted as a PO.
The proposal includes equipment to obtain 19°C +/-1.5°C, humidity 45% +/-15% for tools room.
The proposal includes exhaust in toilets and lockers. In the hall between offices and toilets include
grills to supply air conditioner to hall at toilets.
FPS
The proposal includes Sprinklers in offices and production area, we don´t have specification or
approved by corporate insurer company.- NFPA considered
ANSUL Fire suppression is not included, Fire suppression excluded only in cooking area. To be quoted
as a PO.
The proposal includes sprinklers and cabinet hose in production, and warehouse, and offices area.
The proposal doesn’t include in rack sprinklers.
The fire protection is according to national standards and NFPA 13 & NFPA 20.
The IT Room proposal includes fire suppression system with FM 200.
The proposal includes 1 hydrant to exterior areas.
.
Notes
Cost of kVAs: To be covered by Tenant
We do not include the cost of Infrastructure, nor contributions to CFE
For CCTV, BMS, Automation, Access control, IT and other Special Systems only empty conduits are
considered
We do not include production facilities nor their connections
Compressors are not included nor any compressed air equipment (only 6” loop is considered)
Reverse Osmosis Treatment System is not included
All design and specifications will comply with local regulations and norms
When brands are indicated, Landlord will comply with such or similar brands or products that comply
with ZF requirements and have the same quality as the ones requested
For Lighting purposes, Luxes requirements will be followed, if not local regulations and norms will be
followed.
Air Conditioning is only included in the Office Area and certain Utility Rooms, for the Production Area 6
ACH are complied with.