Professional Documents
Culture Documents
BP21
: 20061023
(BP21)(A/15)
BP21
BP21
1.
: BP21, (Grid) A/15 ;
: +58.11mPD, (Grade III) ;
: +74.783 mPD. ;
: +57.08 mPD. ;
: 22.4 ;
: 14.7 ;
: 15.7 ;
: 6.755 ;
: 9/10/2006, (Founding) :
16/10/2006 ;
(23/10/2006)
, , , , ;
, , 45 ;
540, 52 , 1
35;
6, (Casing), ,
, ;
620, (13.9), 2 ;
630, , ,
, 38Y25 ,
3.5 ;
, ,
;
(Base Spacer),
;
, ;
, RCD
,() ;
() ;
ASD,
(1)
(Spacer), 46, 68
, (Spacing)2.71.5 ,
;
1, 1.5
;
, 1135 , 1
246 ;
BP32, 34,
;
2/3,
(Starter), (oscillator)(Casing),
;
, 2, 3,
;
(2)
(Tremie Pipe), 2 ;
, , (
) ;
,
(Starter), (oscillator)(Casing),
;
,, ,
2 ;
, , ,
;
(1)
a)
b)
3 90o
c)
d)
Casing
1
c.)
d)
e)
f)
g)
h)
(2)
i)
j)
200mm
k)
m)
2m
4m
n)
p)
p)
q)
:1850 mm
10
11
(4)
ASD(1)
Remove the Cement/Concrete within the steel casing with soil grab;
Set up the RCD Rig;
Further cleaning for the remained concrete with Reverse Circulation Drilling Method.
Base Cleaning
the sequence of steel cage installation shall be in accordance with our method statement;
For prevention of cage up-lifting during concreting, the following measures will be employed:
1 no of Y25 Steel Ring will be added in the cage below the top of reinforcement bar at 300mm;
2~3 nos. of Y25 steel bar will be fixed on the top of vertical bar of steel cage and extend to the top of steel cage.
The extended Y25 steel bar will be welded by tack weld on the casing before concreting.
Additional roller spacers will be added to the steel reinforcement cage in order to stabilize the cage in the pile
hole; i.e. 4 nos. spacer increase to 6 nos. spacer, or 6 nos. spacer increase to 8 nos.
12
ASD(2)
Concreting
The sequence of concreting will be in
accordance with our method statement.
After the app. 60% completion of concreting,
(1)
13
(2)
14