MILESTONE # 3 PROJECT DESIGN & CONSTRUCTION MT 258- 064

NAME PRATIK PUROHIT -300635722

CHARANPREET SINGH -300640402

INTRODUCTION The purpose of this milestone is giving information about the project that how we are going to make our project.

MATERIAL Mild steel, Pressure Gauge, Compressed air tank & Hose.

CONTRUCTION First, we did cutting of cylinder as per required size than we started to search for the all required materials in work shop. So we can arrange for the remaining materials. Than we made all rods and made them according to our required shapes and dimensions. After that we tried to match the parts according to the drawing dimensions. And what kind of factors that we have to keep in our mind in future to complete it on time. After configuring all keys points we are going to start for the assembly. We will use nuts and screws and weld to make our assembly and base rods, to keep them tight and strong bonding, so they cant move from their places.

After this we can say that we have completed our project more than 60 %. As we can say, we are almost done with our major parts. Now , we are working on our base and assembly.

MACHINING PROCESS We started with milling machine, we used it for cutting operations, as we used in cylinder to make lengthy according to our dimension, then we made cylinder and connecting rod to give it finishing .Also, we did some milling on base. Then we made connecting rod with the help of Drill machine by using .2inch dia. Cutter. Then, next in this way, welding machine, we did minor welding in between supporting rods.