You are on page 1of 5

Advanced Computing Facility

Constructed 1976 for the University of Edinburgh:


1 x 600 m Computer Room 24-stage DX-based cooling (R12!) servicing the room through 4 vast walk-in air-handling units "conventional" downflow system

Refurbished 2004 as the Advanced Computing Facility:


2 x 300 m Computer Rooms (one active, one empty concrete shell) all new chilled-water based plant services, with capacity of 1.2MW

Major expansion 2007 for "hector" (UK national service):


2nd Computer Room brought into operation new-build external plant room to support massive uplift in required capacity new HV electrical provision (up to 7MW)
June 2008 1

Freecooling opportunity (at 56N)


Percentage time 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Temp (deg C)

June 2008

Snapshot: Thu 12 June (Computer Room 1)


Output from TX3/TX4 (input to UPS): Output from TX5/TX6 (mech. services): Duty chiller (no 3): Room CCU's: Cooling towers, fans and pumps: 1022 kW 199 kW 128 kW 23 kW 48 kW

Total input power: UPS losses: Mechanical services loads: Computer Room connected load: Total overhead (%ge of connected load):
June 2008

1221 kW 62 kW (5%)

199 kW (16%) 960 kW (79%) 261 kW (27%)


3

Snapshot: Thu 12 June (Computer Room 2)


Duty chiller (no 3): Room CCU's: Cooling towers, fans and pumps: 80 kW 63 kW 41 kW

Total input power: UPS losses (estimated): Mechanical services loads: Computer Room connected load: Total overhead (%ge of connected load):

601 kW 57 kW (9%)

184 kW (31%) 360 kW (60%) 241 kW (67%)

June 2008

Dec 07 input power to UPS

June 2008