You are on page 1of 1

Benha University Power) Benha Faculty of Engineering Dynamics Mechanical Engineering Department Order Number System Dynamics Project

Order Group No. ( Project title: Project classification: )

4th Year (Production & M461 System Fall 2011 Subscribing Date

Study the thermal system Thermal system

Assessment Summary First Evaluation Second Evaluation Final Evaluation Repor Projec Intervie t t w

Project description: A building consisting of two rooms as


shown. Room 1 has athermal capacitance of C1 and can be assumed to have a uniform temperature T1.Room 1 is filled with air. Room 2 has athermal capacitance of C2 and can be assumed to have a uniform temperature T2 .Room 2 is filled with water. Rooms 1 and 2 are heated electrically and the heat flow rates are q1 and q2 respectively . The dividing wall between the two rooms has athermal resistance R. The rest of the wall , floor and ceiling are insulator. The objective : Athermal system used to study the temperature variation at any times as at two rooms with two heater with air in room 1 and water in room 2 , and it's considered as adevice for estimating the thermal conductivity of the

Team Work: No 1 2 3 4 5 6 Student Name Interview Date Specialization Section 1 1 2 2 3 3 Position Member Member Member Leader Member M Member Signature

You might also like