bcement concrete
150
2.5
0.5 cft
187.5
45
8437.5
c)brick masonry
195
1.5 cft
585
50
29250
d)Block work
195
sft
780
50
39000
120
1.5
sft
180
50
9000
b)Internal plastering
120
sft
240
15
3600
c)Angle fixing
22
ls
1500
50
10
sft
1000
b)Passage
16
10
sft
160
c)Girls hostel
50
10
sft total
Grand total
101677.5
Ramakrishna civil contractor No 60, Sri Nilaya,Ramanashree nagar, Chikkakamanahalli off B.G. Road Bangalore-560076
1 Compound wall a)Earth work excavation in hard gravel soil b)Bed concrete c)Size stone masonry d)Block work 2 Compound wall rised at staff quarters a)Block work b)Internal plastering c)Angle fixing 3 Repainting oil bound distemper a)boys hostel 2 rooms b)Passage c)Girls hostel
1 1 1 1
2.5 2.5 2 4
3 45 50 50
1 1 22
120 120
1.5 2
sft sft ls
180 240
50 15
2 1 2
50 16 50
10 10 10
Grand total
101678